{
  "edition": "HGAB 3rd reading",
  "summary": [
    {
      "category": "Roads",
      "program": "All selected programs · coverage only",
      "lineItems": 6498,
      "withLength": 3175,
      "withoutLength": 3323,
      "missingPct": 51.14,
      "withRate": 3175,
      "allocationPesos": 270361659000,
      "unusableLengthAllocationPesos": 90872281000
    },
    {
      "category": "Bridges",
      "program": "All selected programs · coverage only",
      "lineItems": 1140,
      "withLength": 60,
      "withoutLength": 1080,
      "missingPct": 94.74,
      "withRate": 60,
      "allocationPesos": 54971153000,
      "unusableLengthAllocationPesos": 49629846000
    },
    {
      "category": "FMR",
      "program": "All selected programs · coverage only",
      "lineItems": 795,
      "withLength": 2,
      "withoutLength": 793,
      "missingPct": 99.75,
      "withRate": 2,
      "allocationPesos": 14035375000,
      "unusableLengthAllocationPesos": 14010375000
    },
    {
      "category": "Mixed roads / bridges",
      "program": "All selected programs · coverage only",
      "lineItems": 117,
      "withLength": 44,
      "withoutLength": 73,
      "missingPct": 62.39,
      "withRate": 0,
      "allocationPesos": 12178486000,
      "unusableLengthAllocationPesos": 5902037000
    }
  ],
  "coverage": [
    {
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "lineItems": 127,
      "withLength": 116,
      "withoutLength": 11,
      "missingPct": 8.66,
      "withRate": 116,
      "allocationPesos": 18611152000,
      "unusableLengthAllocationPesos": 4011126000
    },
    {
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "lineItems": 29,
      "withLength": 7,
      "withoutLength": 22,
      "missingPct": 75.86,
      "withRate": 7,
      "allocationPesos": 5719293000,
      "unusableLengthAllocationPesos": 4542468000
    },
    {
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "lineItems": 336,
      "withLength": 276,
      "withoutLength": 60,
      "missingPct": 17.86,
      "withRate": 276,
      "allocationPesos": 39273427000,
      "unusableLengthAllocationPesos": 7550408000
    },
    {
      "category": "Mixed roads / bridges",
      "program": "Public-Private Partnership Strategic Support Fund (including ROW, Subsidy, and Variations)",
      "lineItems": 1,
      "withLength": 0,
      "withoutLength": 1,
      "missingPct": 100.0,
      "withRate": 0,
      "allocationPesos": 1000000000,
      "unusableLengthAllocationPesos": 1000000000
    },
    {
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "lineItems": 4091,
      "withLength": 1026,
      "withoutLength": 3065,
      "missingPct": 74.92,
      "withRate": 1026,
      "allocationPesos": 109903971000,
      "unusableLengthAllocationPesos": 68922615000
    },
    {
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "lineItems": 304,
      "withLength": 42,
      "withoutLength": 262,
      "missingPct": 86.18,
      "withRate": 42,
      "allocationPesos": 16415740000,
      "unusableLengthAllocationPesos": 13618735000
    },
    {
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "lineItems": 175,
      "withLength": 0,
      "withoutLength": 175,
      "missingPct": 100.0,
      "withRate": 0,
      "allocationPesos": 11465636000,
      "unusableLengthAllocationPesos": 11465636000
    },
    {
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "lineItems": 141,
      "withLength": 132,
      "withoutLength": 9,
      "missingPct": 6.38,
      "withRate": 132,
      "allocationPesos": 19945130000,
      "unusableLengthAllocationPesos": 789700000
    },
    {
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "lineItems": 227,
      "withLength": 1,
      "withoutLength": 226,
      "missingPct": 99.56,
      "withRate": 1,
      "allocationPesos": 13493005000,
      "unusableLengthAllocationPesos": 13473005000
    },
    {
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "lineItems": 32,
      "withLength": 26,
      "withoutLength": 6,
      "missingPct": 18.75,
      "withRate": 0,
      "allocationPesos": 4707980000,
      "unusableLengthAllocationPesos": 615000000
    },
    {
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "lineItems": 16,
      "withLength": 6,
      "withoutLength": 10,
      "missingPct": 62.5,
      "withRate": 6,
      "allocationPesos": 1670000000,
      "unusableLengthAllocationPesos": 1125000000
    },
    {
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "lineItems": 235,
      "withLength": 226,
      "withoutLength": 9,
      "missingPct": 3.83,
      "withRate": 226,
      "allocationPesos": 14395583000,
      "unusableLengthAllocationPesos": 466436000
    },
    {
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "lineItems": 122,
      "withLength": 0,
      "withoutLength": 122,
      "missingPct": 100.0,
      "withRate": 0,
      "allocationPesos": 2842245000,
      "unusableLengthAllocationPesos": 2842245000
    },
    {
      "category": "Bridges",
      "program": "Construction of Missing Links/ New Roads",
      "lineItems": 4,
      "withLength": 4,
      "withoutLength": 0,
      "missingPct": 0.0,
      "withRate": 4,
      "allocationPesos": 542500000,
      "unusableLengthAllocationPesos": 0
    },
    {
      "category": "Bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "lineItems": 6,
      "withLength": 6,
      "withoutLength": 0,
      "missingPct": 0.0,
      "withRate": 6,
      "allocationPesos": 804977000,
      "unusableLengthAllocationPesos": 0
    },
    {
      "category": "Bridges",
      "program": "Construction of Flyovers/ Interchanges/ Underpasses/ Long Span Bridges",
      "lineItems": 1,
      "withLength": 0,
      "withoutLength": 1,
      "missingPct": 100.0,
      "withRate": 0,
      "allocationPesos": 315000000,
      "unusableLengthAllocationPesos": 315000000
    },
    {
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "lineItems": 20,
      "withLength": 10,
      "withoutLength": 10,
      "missingPct": 50.0,
      "withRate": 0,
      "allocationPesos": 2173469000,
      "unusableLengthAllocationPesos": 747000000
    },
    {
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "lineItems": 321,
      "withLength": 305,
      "withoutLength": 16,
      "missingPct": 4.98,
      "withRate": 305,
      "allocationPesos": 14433303000,
      "unusableLengthAllocationPesos": 850016000
    },
    {
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "lineItems": 38,
      "withLength": 35,
      "withoutLength": 3,
      "missingPct": 7.89,
      "withRate": 35,
      "allocationPesos": 2376194000,
      "unusableLengthAllocationPesos": 391358000
    },
    {
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "lineItems": 52,
      "withLength": 8,
      "withoutLength": 44,
      "missingPct": 84.62,
      "withRate": 0,
      "allocationPesos": 3399500000,
      "unusableLengthAllocationPesos": 2642500000
    },
    {
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "lineItems": 71,
      "withLength": 71,
      "withoutLength": 0,
      "missingPct": 0.0,
      "withRate": 71,
      "allocationPesos": 4836582000,
      "unusableLengthAllocationPesos": 0
    },
    {
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "lineItems": 213,
      "withLength": 207,
      "withoutLength": 6,
      "missingPct": 2.82,
      "withRate": 207,
      "allocationPesos": 10900467000,
      "unusableLengthAllocationPesos": 456568000
    },
    {
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "lineItems": 181,
      "withLength": 164,
      "withoutLength": 17,
      "missingPct": 9.39,
      "withRate": 164,
      "allocationPesos": 6587927000,
      "unusableLengthAllocationPesos": 1239800000
    },
    {
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "lineItems": 132,
      "withLength": 127,
      "withoutLength": 5,
      "missingPct": 3.79,
      "withRate": 127,
      "allocationPesos": 5736126000,
      "unusableLengthAllocationPesos": 344000000
    },
    {
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "lineItems": 79,
      "withLength": 60,
      "withoutLength": 19,
      "missingPct": 24.05,
      "withRate": 60,
      "allocationPesos": 3030074000,
      "unusableLengthAllocationPesos": 1133870000
    },
    {
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "lineItems": 28,
      "withLength": 27,
      "withoutLength": 1,
      "missingPct": 3.57,
      "withRate": 27,
      "allocationPesos": 1604318000,
      "unusableLengthAllocationPesos": 200000000
    },
    {
      "category": "Mixed roads / bridges",
      "program": "Construction of Flyovers/ Interchanges/ Underpasses/ Long Span Bridges",
      "lineItems": 1,
      "withLength": 0,
      "withoutLength": 1,
      "missingPct": 100.0,
      "withRate": 0,
      "allocationPesos": 200000000,
      "unusableLengthAllocationPesos": 200000000
    },
    {
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "lineItems": 51,
      "withLength": 36,
      "withoutLength": 15,
      "missingPct": 29.41,
      "withRate": 36,
      "allocationPesos": 1656179000,
      "unusableLengthAllocationPesos": 722201000
    },
    {
      "category": "Mixed roads / bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "lineItems": 2,
      "withLength": 0,
      "withoutLength": 2,
      "missingPct": 100.0,
      "withRate": 0,
      "allocationPesos": 225000000,
      "unusableLengthAllocationPesos": 225000000
    },
    {
      "category": "Mixed roads / bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "lineItems": 9,
      "withLength": 0,
      "withoutLength": 9,
      "missingPct": 100.0,
      "withRate": 0,
      "allocationPesos": 472537000,
      "unusableLengthAllocationPesos": 472537000
    },
    {
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "lineItems": 181,
      "withLength": 156,
      "withoutLength": 25,
      "missingPct": 13.81,
      "withRate": 156,
      "allocationPesos": 7265937000,
      "unusableLengthAllocationPesos": 539404000
    },
    {
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "lineItems": 90,
      "withLength": 81,
      "withoutLength": 9,
      "missingPct": 10.0,
      "withRate": 81,
      "allocationPesos": 3575480000,
      "unusableLengthAllocationPesos": 496296000
    },
    {
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "lineItems": 272,
      "withLength": 0,
      "withoutLength": 272,
      "missingPct": 100.0,
      "withRate": 0,
      "allocationPesos": 3372757000,
      "unusableLengthAllocationPesos": 3372757000
    },
    {
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "lineItems": 108,
      "withLength": 87,
      "withoutLength": 21,
      "missingPct": 19.44,
      "withRate": 87,
      "allocationPesos": 2885909000,
      "unusableLengthAllocationPesos": 975734000
    },
    {
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Tertiary Roads",
      "lineItems": 13,
      "withLength": 2,
      "withoutLength": 11,
      "missingPct": 84.62,
      "withRate": 2,
      "allocationPesos": 569029000,
      "unusableLengthAllocationPesos": 553625000
    },
    {
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "lineItems": 42,
      "withLength": 34,
      "withoutLength": 8,
      "missingPct": 19.05,
      "withRate": 34,
      "allocationPesos": 1077879000,
      "unusableLengthAllocationPesos": 87050000
    },
    {
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Secondary Roads",
      "lineItems": 3,
      "withLength": 1,
      "withoutLength": 2,
      "missingPct": 66.67,
      "withRate": 1,
      "allocationPesos": 21992000,
      "unusableLengthAllocationPesos": 12074000
    },
    {
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Primary Roads",
      "lineItems": 1,
      "withLength": 0,
      "withoutLength": 1,
      "missingPct": 100.0,
      "withRate": 0,
      "allocationPesos": 5000000,
      "unusableLengthAllocationPesos": 5000000
    },
    {
      "category": "FMR",
      "program": "FMR",
      "lineItems": 795,
      "withLength": 2,
      "withoutLength": 793,
      "missingPct": 99.75,
      "withRate": 2,
      "allocationPesos": 14035375000,
      "unusableLengthAllocationPesos": 14010375000
    }
  ],
  "projects": [
    {
      "id": "HB10858-3-0150-000763",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Rolando R. Andaya Highway - K0296 + 418 - K0311 + 638",
      "office": "Central Office",
      "amountPesos": 2589421000,
      "lengthKm": 15.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 170132785.81,
      "lengthMeters": 15220.0,
      "allocationPerStatedMeter": 170132.79,
      "rangesMeters": [
        [
          296418.0,
          311638.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "Rolando R. Andaya Highway - K0296 + 418 - K0311 + 638",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 4.96,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0150-000764",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Rolando R. Andaya Highway - K281+198 - K0296+418",
      "office": "Central Office",
      "amountPesos": 2370485000,
      "lengthKm": 15.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 155748028.91,
      "lengthMeters": 15220.0,
      "allocationPerStatedMeter": 155748.03,
      "rangesMeters": [
        [
          281198.0,
          296418.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "Rolando R. Andaya Highway - K281+198 - K0296+418",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 4.54,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0294-003413",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Pancian Viaduct along Manila North Road, Ilocos Norte",
      "office": "Central Office",
      "amountPesos": 2088668000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Pancian Viaduct along Manila North Road, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0150-000761",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Daang Maharlika Road Development Project - Package B3-A, Section: Quirino-Andaya Highway",
      "office": "Central Office",
      "amountPesos": 1845741000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "Daang Maharlika Road Development Project - Package B3-A, Section: Quirino-Andaya Highway",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0150-000762",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Daang Maharlika Road Development Project - Package B3-B, Section: R. Andaya Highway",
      "office": "Central Office",
      "amountPesos": 1572830000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "Daang Maharlika Road Development Project - Package B3-B, Section: R. Andaya Highway",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0150-000759",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Quirino H-way - K0264 + 968 - K0281 +198",
      "office": "Central Office",
      "amountPesos": 1392209000,
      "lengthKm": 16.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 85779975.35,
      "lengthMeters": 16230.0,
      "allocationPerStatedMeter": 85779.98,
      "rangesMeters": [
        [
          264968.0,
          281198.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "Quirino H-way - K0264 + 968 - K0281 +198",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 2.5,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0294-003415",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Lopez Viaduct (FB50957LZ) along Maharlika Highway, Barangay Canda Ibaba - Barangay Pandanan, Calauag, Quezon",
      "office": "Central Office",
      "amountPesos": 1200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Lopez Viaduct (FB50957LZ) along Maharlika Highway, Barangay Canda Ibaba - Barangay Pandanan, Calauag, Quezon",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0151-000783",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0816 + 000 - K0831 + 000",
      "office": "Central Office",
      "amountPesos": 1000000000,
      "lengthKm": 15.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66666666.67,
      "lengthMeters": 15000.0,
      "allocationPerStatedMeter": 66666.67,
      "rangesMeters": [
        [
          816000.0,
          831000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0816 + 000 - K0831 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 1.94,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0151-000784",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0831 + 000 - K0846 + 000",
      "office": "Central Office",
      "amountPesos": 1000000000,
      "lengthKm": 15.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66666666.67,
      "lengthMeters": 15000.0,
      "allocationPerStatedMeter": 66666.67,
      "rangesMeters": [
        [
          831000.0,
          846000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0831 + 000 - K0846 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 1.94,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0151-000785",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0846 + 000 - K0861 + 000",
      "office": "Central Office",
      "amountPesos": 1000000000,
      "lengthKm": 15.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66666666.67,
      "lengthMeters": 15000.0,
      "allocationPerStatedMeter": 66666.67,
      "rangesMeters": [
        [
          846000.0,
          861000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0846 + 000 - K0861 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 1.94,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0151-000786",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0861 + 000 - K0876 + 000",
      "office": "Central Office",
      "amountPesos": 1000000000,
      "lengthKm": 15.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66666666.67,
      "lengthMeters": 15000.0,
      "allocationPerStatedMeter": 66666.67,
      "rangesMeters": [
        [
          861000.0,
          876000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0861 + 000 - K0876 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 1.94,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0228-002158",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Davao City Bypass Construction Project, Package II",
      "office": "Central Office",
      "amountPesos": 1000000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Davao City Bypass Construction Project, Package II",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0927-016037",
      "category": "Mixed roads / bridges",
      "program": "Public-Private Partnership Strategic Support Fund (including ROW, Subsidy, and Variations)",
      "projectName": "Tarlac-Pangasinan-La Union Expressway; NLEX-SLEX Connector Road Project; Cavite- Laguna Expressway Project; Muntinlupa-Cavite Expressway (Daang Hari-SLEX Link Road); NAIA Expressway; Quirino Highway Project; DPWH Central Office Building; Central Luzon Link Expressway (CLLEX), Phase II (PPP hybrid modality) (Region III); North Luzon Expressway East (NLEE) Phase I and II (Region III); Metro Cebu Expressway (Region VII); Iloilo-Capiz-Aklan Expressway (ICAX) (Region VI); Naawan- Opol-Cagayan de Oro-Villanueva Expressway Project (Region X); Dingalan-Capas- Botolan Expressway Project (Region III); Pangasinan-Nueva Ecija Expressway (PaNEX) (Region I & III); Cavite-Tagaytay-Batangas Expressway (CTBEX) (Region IV-A); Tarlac- Pangasinan-La Union Expressway (TPLEX) Extension Project (Region I); Boracay Bridge Projects (Region VI); Pacific Eastern Seaboard Expressway (Region III & IV-A); Mindoro-Batangas Super Bridge (Region IV-A & IV-B); Rehabilitation/ Reconstruction/ Improvement, Operation & Maintenance of Kennon Road Project (CAR); and such other priority Public-Private Partnership Infrastructure Projects",
      "office": "Central Office",
      "amountPesos": 1000000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "927",
      "lengthEvidence": "Tarlac-Pangasinan-La Union Expressway; NLEX-SLEX Connector Road Project; Cavite- Laguna Expressway Project; Muntinlupa-Cavite Expressway (Daang Hari-SLEX Link Road); NAIA Expressway; Quirino Highway Project; DPWH Central Office Building; Central Luzon Link Expressway (CLLEX), Phase II (PPP hybrid modality) (Region III); North Luzon Expressway East (NLEE) Phase I and II (Region III); Metro Cebu Expressway (Region VII); Iloilo-Capiz-Aklan Expressway (ICAX) (Region VI); Naawan- Opol-Cagayan de Oro-Villanueva Expressway Project (Region X); Dingalan-Capas- Botolan Expressway Project (Region III); Pangasinan-Nueva Ecija Expressway (PaNEX) (Region I & III); Cavite-Tagaytay-Batangas Expressway (CTBEX) (Region IV-A); Tarlac- Pangasinan-La Union Expressway (TPLEX) Extension Project (Region I); Boracay Bridge Projects (Region VI); Pacific Eastern Seaboard Expressway (Region III & IV-A); Mindoro-Batangas Super Bridge (Region IV-A & IV-B); Rehabilitation/ Reconstruction/ Improvement, Operation & Maintenance of Kennon Road Project (CAR); and such other priority Public-Private Partnership Infrastructure Projects",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0422-005893",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Dike along Abacan River, San Jose Malino - Tangle, Mexico, Pampanga Sta. 0 + 000 - Sta. 4 + 552",
      "office": "Central Office",
      "amountPesos": 750000000,
      "lengthKm": 4.552,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 164762741.65,
      "lengthMeters": 4552.0,
      "allocationPerStatedMeter": 164762.74,
      "rangesMeters": [
        [
          0.0,
          4552.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Construction of Road Dike along Abacan River, San Jose Malino - Tangle, Mexico, Pampanga Sta. 0 + 000 - Sta. 4 + 552",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 5.24,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0437-006196",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Tandu Bato -Tulayan Bridge, Barangay Tandu- Bato, Municipality of Luuk, Sulu",
      "office": "Central Office",
      "amountPesos": 750000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Construction of Tandu Bato -Tulayan Bridge, Barangay Tandu- Bato, Municipality of Luuk, Sulu",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0260-002689",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Tagoloan Br. (B01116MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "office": "Central Office",
      "amountPesos": 712000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Tagoloan Br. (B01116MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0237-002319",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mindoro Island Circumferential Road (Puerto Galera - Abra de Ilog), Barangay Udalo, Abra de Ilog, Occidental Mindoro, Sta. 1 + 435 - Sta. 1 + 645, Sta. 7 + 094 - Sta. 7 + 165, Sta. 9 + 560 - Sta. 9 + 916, Sta. 16 + 000 - Sta. 16 + 700",
      "office": "Central Office",
      "amountPesos": 700000000,
      "lengthKm": 1.337,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 523560209.42,
      "lengthMeters": 1337.0,
      "allocationPerStatedMeter": 523560.21,
      "rangesMeters": [
        [
          1435.0,
          1645.0
        ],
        [
          7094.0,
          7165.0
        ],
        [
          9560.0,
          9916.0
        ],
        [
          16000.0,
          16700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Mindoro Island Circumferential Road (Puerto Galera - Abra de Ilog), Barangay Udalo, Abra de Ilog, Occidental Mindoro, Sta. 1 + 435 - Sta. 1 + 645, Sta. 7 + 094 - Sta. 7 + 165, Sta. 9 + 560 - Sta. 9 + 916, Sta. 16 + 000 - Sta. 16 + 700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 8.38,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0286-003258",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Atugan Parallel Br. Along Sayre Highway",
      "office": "Central Office",
      "amountPesos": 600000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Atugan Parallel Br. Along Sayre Highway",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0444-006340",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of NRJ Tagum - Panabo Circum Road, Barangay Datu Balang - Barangay Gupitan, Sta. 1505+440.000 - Sta. 1517+440.000, Kapalong Section, to Loreto (Agusan del Sur), Davao del Norte",
      "office": "Central Office",
      "amountPesos": 600000000,
      "lengthKm": 12.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 12000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          1505440.0,
          1517440.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of NRJ Tagum - Panabo Circum Road, Barangay Datu Balang - Barangay Gupitan, Sta. 1505+440.000 - Sta. 1517+440.000, Kapalong Section, to Loreto (Agusan del Sur), Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.59,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0294-003421",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Albay West Coast Rd - K0511+000 - K0511+438",
      "office": "Central Office",
      "amountPesos": 500000000,
      "lengthKm": 0.438,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1141552511.42,
      "lengthMeters": 438.0,
      "allocationPerStatedMeter": 1141552.51,
      "rangesMeters": [
        [
          511000.0,
          511438.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Albay West Coast Rd - K0511+000 - K0511+438",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0214-001879",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
      "office": "Central Office",
      "amountPesos": 480000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0226-002122",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Eastern Interior Bypass Road (Gusa-Puerto/Jct. Sayre Highway), Barangay Cugman- Barangay Tablon (Cugman Bridge 3), Sta. 3+607-Sta. 3+897, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 450000000,
      "lengthKm": 0.29,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 290.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          3607.0,
          3897.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Eastern Interior Bypass Road (Gusa-Puerto/Jct. Sayre Highway), Barangay Cugman- Barangay Tablon (Cugman Bridge 3), Sta. 3+607-Sta. 3+897, Cagayan de Oro City",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0629-010232",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Gingoog Coastal Road, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 450000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "629",
      "lengthEvidence": "Construction of Gingoog Coastal Road, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0239-002353",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 16+103 - Sta. 16+340, Sta. 16+340 - Sta. 16+420, Sta. 16+420 - Sta. 16+425), Northern Samar",
      "office": "Central Office",
      "amountPesos": 448380000,
      "lengthKm": 0.322,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 1392484472.05,
      "lengthMeters": 322.0,
      "allocationPerStatedMeter": 1392484.47,
      "rangesMeters": [
        [
          16103.0,
          16340.0
        ],
        [
          16340.0,
          16420.0
        ],
        [
          16420.0,
          16425.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 16+103 - Sta. 16+340, Sta. 16+340 - Sta. 16+420, Sta. 16+420 - Sta. 16+425), Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 14.09,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0214-001889",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Binmaley, Pangasinan",
      "office": "Central Office",
      "amountPesos": 438930000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Binmaley, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0223-002070",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Metro Cebu Expressway, Sta. 1+387.5 - Sta. 1+700, Cebu",
      "office": "Central Office",
      "amountPesos": 420000000,
      "lengthKm": 0.3125,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1344000000.0,
      "lengthMeters": 312.5,
      "allocationPerStatedMeter": 1344000.0,
      "rangesMeters": [
        [
          1387.5,
          1700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Metro Cebu Expressway, Sta. 1+387.5 - Sta. 1+700, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 6.41,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0224-002100",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Balingasag-Claveria Alternate Road, Sta. 7+870 - Sta. 13+870, Barangay Plaridel to Barangay Hinaplanan Section, Claveria, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 400000000,
      "lengthKm": 6.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66666666.67,
      "lengthMeters": 6000.0,
      "allocationPerStatedMeter": 66666.67,
      "rangesMeters": [
        [
          7870.0,
          13870.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Balingasag-Claveria Alternate Road, Sta. 7+870 - Sta. 13+870, Barangay Plaridel to Barangay Hinaplanan Section, Claveria, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 1.71,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0235-002279",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
      "office": "Central Office",
      "amountPesos": 400000000,
      "lengthKm": 3.175,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 125984251.97,
      "lengthMeters": 3175.0,
      "allocationPerStatedMeter": 125984.25,
      "rangesMeters": [
        [
          8320.0,
          9845.0
        ],
        [
          9845.0,
          11495.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 2.9,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0237-002320",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mindoro Island Circumferential Road (Puerto Galera - Abra de Ilog), Barangay Udalo, Abra de Ilog, Occidental Mindoro, Sta. 7 + 400 - Sta. 7 + 710, Sta. 11 + 100 - Sta. 11 + 492.92",
      "office": "Central Office",
      "amountPesos": 400000000,
      "lengthKm": 0.7029200000000001,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 569054799.98,
      "lengthMeters": 702.92,
      "allocationPerStatedMeter": 569054.8,
      "rangesMeters": [
        [
          7400.0,
          7710.0
        ],
        [
          11100.0,
          11492.92
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Mindoro Island Circumferential Road (Puerto Galera - Abra de Ilog), Barangay Udalo, Abra de Ilog, Occidental Mindoro, Sta. 7 + 400 - Sta. 7 + 710, Sta. 11 + 100 - Sta. 11 + 492.92",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 5.76,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0239-002364",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Iligan City - Cagayan de Oro City Alternate Road (Digkilaan-Bulua Section), Barangay Nangcaon Section, Sta. 23+806 - Sta. 27+226, Opol, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 400000000,
      "lengthKm": 3.42,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 116959064.33,
      "lengthMeters": 3420.0,
      "allocationPerStatedMeter": 116959.06,
      "rangesMeters": [
        [
          23806.0,
          27226.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Iligan City - Cagayan de Oro City Alternate Road (Digkilaan-Bulua Section), Barangay Nangcaon Section, Sta. 23+806 - Sta. 27+226, Opol, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 2.69,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0286-003245",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Baliacao Parallel Br. along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 400000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Baliacao Parallel Br. along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0441-006269",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Kibungsod, Magsaysay to Talisayan, Gingoog City Circumferential Road, Magsaysay, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 400000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Kibungsod, Magsaysay to Talisayan, Gingoog City Circumferential Road, Magsaysay, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0446-006376",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Butuan City - Agusan del Norte Logistical Highway, Sta. 14+780 - Sta. 15+934.3, Sta. Sta. 16+144.3 - Sta. 17+000, Masao Section, Butuan City",
      "office": "Central Office",
      "amountPesos": 400000000,
      "lengthKm": 2.01,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 199004975.12,
      "lengthMeters": 2010.0,
      "allocationPerStatedMeter": 199004.98,
      "rangesMeters": [
        [
          14780.0,
          15934.3
        ],
        [
          16144.3,
          17000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Butuan City - Agusan del Norte Logistical Highway, Sta. 14+780 - Sta. 15+934.3, Sta. Sta. 16+144.3 - Sta. 17+000, Masao Section, Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 8.24,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0257-002622",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Samal Br. (B00055LZ) along Roman Expressway",
      "office": "Central Office",
      "amountPesos": 393450000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Samal Br. (B00055LZ) along Roman Expressway",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0111-000002",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0212 + 007 - K0213 + 497, K0215 + (-927) - K0215 + (-837), K0215 + (-808) - K0215 + (-077), K0217 + 1010 - K0218 + 333, K0218 + 655 - K0219 + 076, K0220 + 418 - K0220 + 571, K0220 + 618 - K0220 + 857, K0222 + 000 - K0222 + 661, K0223 + 589 - K0223 + 906, K0225 + 870 - K0226 + 144, K0227 + 994 - K0229 + 753, K0231 + 576 - K0232 + 174, K0233 + 212 - K0233 + 383",
      "office": "Central Office",
      "amountPesos": 377931000,
      "lengthKm": 7.227,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 52294312.99,
      "lengthMeters": 7227.0,
      "allocationPerStatedMeter": 52294.31,
      "rangesMeters": [
        [
          212007.0,
          213497.0
        ],
        [
          214073.0,
          214163.0
        ],
        [
          214192.0,
          214923.0
        ],
        [
          218010.0,
          218333.0
        ],
        [
          218655.0,
          219076.0
        ],
        [
          220418.0,
          220571.0
        ],
        [
          220618.0,
          220857.0
        ],
        [
          222000.0,
          222661.0
        ],
        [
          223589.0,
          223906.0
        ],
        [
          225870.0,
          226144.0
        ],
        [
          227994.0,
          229753.0
        ],
        [
          231576.0,
          232174.0
        ],
        [
          233212.0,
          233383.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Manila North Rd - K0212 + 007 - K0213 + 497, K0215 + (-927) - K0215 + (-837), K0215 + (-808) - K0215 + (-077), K0217 + 1010 - K0218 + 333, K0218 + 655 - K0219 + 076, K0220 + 418 - K0220 + 571, K0220 + 618 - K0220 + 857, K0222 + 000 - K0222 + 661, K0223 + 589 - K0223 + 906, K0225 + 870 - K0226 + 144, K0227 + 994 - K0229 + 753, K0231 + 576 - K0232 + 174, K0233 + 212 - K0233 + 383",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 1.5,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0418-005812",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge & Approaches Sta 0+(-230) to Sta0+000, Sta 0+200 to Sta 0+690, Barangay Annafunan, Echague, Isabela",
      "office": "Central Office",
      "amountPesos": 370000000,
      "lengthKm": 0.72,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 513888888.89,
      "lengthMeters": 720.0,
      "allocationPerStatedMeter": 513888.89,
      "rangesMeters": [
        [
          -230.0,
          0.0
        ],
        [
          200.0,
          690.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Bridge & Approaches Sta 0+(-230) to Sta0+000, Sta 0+200 to Sta 0+690, Barangay Annafunan, Echague, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 0.85,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0284-003194",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Don Teofilo Sison Br. (B00722LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 363400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Don Teofilo Sison Br. (B00722LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0265-002788",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Narciso Ramos Br. (B01626LZ) along Binalonan-Asingan-Santa Maria Rd",
      "office": "Central Office",
      "amountPesos": 363115000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Narciso Ramos Br. (B01626LZ) along Binalonan-Asingan-Santa Maria Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0223-002065",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 20+680 - Sta. 20+950, Sta. 23+028 - Sta. 23+375, Sta. 23+745 - Sta. 24+245.33, Talisay City, Negros Occidental",
      "office": "Central Office",
      "amountPesos": 360000000,
      "lengthKm": 1.1173300000000017,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 322196665.26,
      "lengthMeters": 1117.33,
      "allocationPerStatedMeter": 322196.67,
      "rangesMeters": [
        [
          20680.0,
          20950.0
        ],
        [
          23028.0,
          23375.0
        ],
        [
          23745.0,
          24245.33
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 20+680 - Sta. 20+950, Sta. 23+028 - Sta. 23+375, Sta. 23+745 - Sta. 24+245.33, Talisay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 3.0,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0223-002075",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Metro Cebu Expressway, Sta. 4 + 200 - Sta. 4 + 550, Cebu",
      "office": "Central Office",
      "amountPesos": 360000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1028571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 1028571.43,
      "rangesMeters": [
        [
          4200.0,
          4550.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Metro Cebu Expressway, Sta. 4 + 200 - Sta. 4 + 550, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 8.08,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0223-002068",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 5+230 - Sta. 6+113, Sta. 14+450 - Sta. 14+750, Bacolod City",
      "office": "Central Office",
      "amountPesos": 358750000,
      "lengthKm": 1.183,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 303254437.87,
      "lengthMeters": 1183.0,
      "allocationPerStatedMeter": 303254.44,
      "rangesMeters": [
        [
          5230.0,
          6113.0
        ],
        [
          14450.0,
          14750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 5+230 - Sta. 6+113, Sta. 14+450 - Sta. 14+750, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 3.68,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0257-002608",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Carlos P. Romulo Br. (B00885LZ) along Camiling-Wawa-Bayambang-Malasiqui-Sta Barbara Rd",
      "office": "Central Office",
      "amountPesos": 356047000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Carlos P. Romulo Br. (B00885LZ) along Camiling-Wawa-Bayambang-Malasiqui-Sta Barbara Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0214-001884",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Laoag-San Nicolas Bypass Road, Sta 4+237.62 - Sta 5+318.72, San Nicolas, Ilocos Norte",
      "office": "Central Office",
      "amountPesos": 350000000,
      "lengthKm": 1.0811000000000004,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 323744334.47,
      "lengthMeters": 1081.1,
      "allocationPerStatedMeter": 323744.33,
      "rangesMeters": [
        [
          4237.62,
          5318.72
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Laoag-San Nicolas Bypass Road, Sta 4+237.62 - Sta 5+318.72, San Nicolas, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 3.01,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0223-002082",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Calbayog City Coastal Road Special Bridge, Sta. 2+217.21 - Sta. 2+277.21, Barangay Aguit-itan, Calbayog City, Samar",
      "office": "Central Office",
      "amountPesos": 350000000,
      "lengthKm": 0.06,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 60.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          2217.21,
          2277.21
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Calbayog City Coastal Road Special Bridge, Sta. 2+217.21 - Sta. 2+277.21, Barangay Aguit-itan, Calbayog City, Samar",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0226-002124",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Eastern Interior Bypass Road (Gusa-Puerto/Jct. Sayre Highway), Barangay Tablon- Barangay Agusan (Agusan Bridge 3), Sta. 7+716 - Sta. 7+916, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 350000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          7716.0,
          7916.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Eastern Interior Bypass Road (Gusa-Puerto/Jct. Sayre Highway), Barangay Tablon- Barangay Agusan (Agusan Bridge 3), Sta. 7+716 - Sta. 7+916, Cagayan de Oro City",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0414-005731",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Bridge connecting Bolinao to Santiago Island, Bolinao, Pangasinan, 6.38299, 119.92525 + 16.38329, 119.92648",
      "office": "Central Office",
      "amountPesos": 350000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Construction (Completion) of Bridge connecting Bolinao to Santiago Island, Bolinao, Pangasinan, 6.38299, 119.92525 + 16.38329, 119.92648",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0447-006384",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Babag-Lumbocan road leading to proposed Butuan Logistical Seaport, Babag-Lumbocan Section, Butuan City",
      "office": "Central Office",
      "amountPesos": 350000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "447",
      "lengthEvidence": "Construction of Babag-Lumbocan road leading to proposed Butuan Logistical Seaport, Babag-Lumbocan Section, Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0214-001892",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "San Carlos City Bypass Road, Pangasinan",
      "office": "Central Office",
      "amountPesos": 346000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "San Carlos City Bypass Road, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0220-002005",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Parian - San Jose - Bucal Diversion Road Sta. 3+270 - Sta. 5+900, Calamba, Laguna",
      "office": "Central Office",
      "amountPesos": 343236000,
      "lengthKm": 2.63,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 130507984.79,
      "lengthMeters": 2630.0,
      "allocationPerStatedMeter": 130507.98,
      "rangesMeters": [
        [
          3270.0,
          5900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Parian - San Jose - Bucal Diversion Road Sta. 3+270 - Sta. 5+900, Calamba, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 2.54,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0235-002278",
      "category": "Bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Tuguegarao City Boulevard (Pinacanauan Bridge 2 and Approaches) (Sta.0+000 - Sta. 1+632.82) , Tuguegarao City, Cagayan",
      "office": "Central Office",
      "amountPesos": 337000000,
      "lengthKm": 1.6328200000000002,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 206391396.48,
      "lengthMeters": 1632.82,
      "allocationPerStatedMeter": 206391.4,
      "rangesMeters": [
        [
          0.0,
          1632.8200000000002
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Tuguegarao City Boulevard (Pinacanauan Bridge 2 and Approaches) (Sta.0+000 - Sta. 1+632.82) , Tuguegarao City, Cagayan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 4,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0425-005953",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage along Barangays Langgam, Magsaysay, Narra, San Antonio, and San Vicente, San Pedro City, Laguna",
      "office": "Central Office",
      "amountPesos": 330500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Construction of Road and Drainage along Barangays Langgam, Magsaysay, Narra, San Antonio, and San Vicente, San Pedro City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0215-001904",
      "category": "Bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Alicia-Angadanan-San Guillermo-Cauayan City-Naguilian Alternate Route (Bridge and Approaches) (Sta. 32+321 - Sta. 32+701), Isabela",
      "office": "Central Office",
      "amountPesos": 329153000,
      "lengthKm": 0.38,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 866192105.26,
      "lengthMeters": 380.0,
      "allocationPerStatedMeter": 866192.11,
      "rangesMeters": [
        [
          32321.0,
          32701.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Alicia-Angadanan-San Guillermo-Cauayan City-Naguilian Alternate Route (Bridge and Approaches) (Sta. 32+321 - Sta. 32+701), Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0236-002289",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "General Aguinaldo-Magallanes-Nasugbu Rd (East-West Rd), Sta. 71+862.7 - Sta. 72+084.84, Gen. Emilio Aguinaldo Section, Cavite",
      "office": "Central Office",
      "amountPesos": 329000000,
      "lengthKm": 0.22213999999999942,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1481047987.76,
      "lengthMeters": 222.14,
      "allocationPerStatedMeter": 1481047.99,
      "rangesMeters": [
        [
          71862.7,
          72084.84
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "General Aguinaldo-Magallanes-Nasugbu Rd (East-West Rd), Sta. 71+862.7 - Sta. 72+084.84, Gen. Emilio Aguinaldo Section, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 1.7,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0221-002043",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tagkawayan-Labo Diversion Road (Bridge) Sta. 303+076 - Sta. 303+145, Sta. 312+056.7 - Sta. 312+116.7, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 325000000,
      "lengthKm": 0.129,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": null,
      "lengthMeters": 129.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          303076.0,
          303145.0
        ],
        [
          312056.7,
          312116.7
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Tagkawayan-Labo Diversion Road (Bridge) Sta. 303+076 - Sta. 303+145, Sta. 312+056.7 - Sta. 312+116.7, Camarines Norte",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0243-002416",
      "category": "Bridges",
      "program": "Construction of Flyovers/ Interchanges/ Underpasses/ Long Span Bridges",
      "projectName": "Interchange along Cebu North Hagnaya Wharf Road (M.C. Briones Street) corner U.N. Avenue, Mandaue City",
      "office": "Central Office",
      "amountPesos": 315000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "243",
      "lengthEvidence": "Interchange along Cebu North Hagnaya Wharf Road (M.C. Briones Street) corner U.N. Avenue, Mandaue City",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0118-000145",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1239 + 382 - K1244 + 299",
      "office": "Central Office",
      "amountPesos": 310000000,
      "lengthKm": 4.917,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 63046573.11,
      "lengthMeters": 4917.0,
      "allocationPerStatedMeter": 63046.57,
      "rangesMeters": [
        [
          1239382.0,
          1244299.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1239 + 382 - K1244 + 299",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 1.81,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0118-000146",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1244 + 299 - K1246 + 655 - K1246 + 908 - K1250 + (-542)",
      "office": "Central Office",
      "amountPesos": 310000000,
      "lengthKm": 4.906,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 63187933.14,
      "lengthMeters": 4906.0,
      "allocationPerStatedMeter": 63187.93,
      "rangesMeters": [
        [
          1244299.0,
          1246655.0
        ],
        [
          1246908.0,
          1249458.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1244 + 299 - K1246 + 655 - K1246 + 908 - K1250 + (-542)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 1.81,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0221-002038",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
      "office": "Central Office",
      "amountPesos": 301120000,
      "lengthKm": 3.115849999999977,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 96641365.92,
      "lengthMeters": 3115.85,
      "allocationPerStatedMeter": 96641.37,
      "rangesMeters": [
        [
          470970.0,
          471700.0
        ],
        [
          471700.0,
          472400.0
        ],
        [
          472400.0,
          472974.63
        ],
        [
          472974.63,
          474085.85
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 2.48,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0213-001877",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bauang-San Fernando-San Juan Bypass Road, Bauang, La Union",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "213",
      "lengthEvidence": "Bauang-San Fernando-San Juan Bypass Road, Bauang, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0217-001961",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "San Ildefonso - San Miguel Bypass Road, San Ildefonso and San Miguel, (Sta.005+430 - Sta.005+535, Sta 009+000 - Sta 009+180, Sta 009 + 420 - Sta 010 + 135, Sta 012 + 355 - Sta 015 + 671, Sta 016 + 200 - Sta 017 + 730), Bulacan",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 5.846,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 51317139.92,
      "lengthMeters": 5846.0,
      "allocationPerStatedMeter": 51317.14,
      "rangesMeters": [
        [
          5430.0,
          5535.0
        ],
        [
          9000.0,
          9180.0
        ],
        [
          9420.0,
          10135.0
        ],
        [
          12355.0,
          15671.0
        ],
        [
          16200.0,
          17730.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "San Ildefonso - San Miguel Bypass Road, San Ildefonso and San Miguel, (Sta.005+430 - Sta.005+535, Sta 009+000 - Sta 009+180, Sta 009 + 420 - Sta 010 + 135, Sta 012 + 355 - Sta 015 + 671, Sta 016 + 200 - Sta 017 + 730), Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 1.31,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0218-001980",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Manila-Cavite Bypass Road, Sta. 24 + 685 - Sta. 25 + 555, Cavite",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 0.87,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 344827586.21,
      "lengthMeters": 870.0,
      "allocationPerStatedMeter": 344827.59,
      "rangesMeters": [
        [
          24685.0,
          25555.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Manila-Cavite Bypass Road, Sta. 24 + 685 - Sta. 25 + 555, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 3.21,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0218-001981",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Manila-Cavite Bypass Road, Sta. 25 + 555 - Sta. 26 + 425, Cavite",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 0.87,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 344827586.21,
      "lengthMeters": 870.0,
      "allocationPerStatedMeter": 344827.59,
      "rangesMeters": [
        [
          25555.0,
          26425.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Manila-Cavite Bypass Road, Sta. 25 + 555 - Sta. 26 + 425, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 3.21,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0219-001995",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Manila-Cavite Bypass Road, Sta. 25+509 - Sta. 26 + 286.16, Cavite",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 0.7771599999999999,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 386020896.6,
      "lengthMeters": 777.16,
      "allocationPerStatedMeter": 386020.9,
      "rangesMeters": [
        [
          25509.0,
          26286.16
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Manila-Cavite Bypass Road, Sta. 25+509 - Sta. 26 + 286.16, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 2.84,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0220-002012",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Guinayangan-Tagkawayan Diversion Road (Bridge 1), Sta. 0 + 448 - 0 +848",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          448.0,
          848.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Guinayangan-Tagkawayan Diversion Road (Bridge 1), Sta. 0 + 448 - 0 +848",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0220-002014",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 2.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 136363636.36,
      "lengthMeters": 2200.0,
      "allocationPerStatedMeter": 136363.64,
      "rangesMeters": [
        [
          5900.0,
          8100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 2.65,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0223-002073",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Asturias-Danao-Liloan Bypass Road, Danao-Liloan Section, Barangay Lawaan, Danao - Barangay Tag-Ube, Compostela (Sta. 5 + 020 - Sta. 13 + 560), Cebu",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 8.54,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35128805.62,
      "lengthMeters": 8540.0,
      "allocationPerStatedMeter": 35128.81,
      "rangesMeters": [
        [
          5020.0,
          13560.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Asturias-Danao-Liloan Bypass Road, Danao-Liloan Section, Barangay Lawaan, Danao - Barangay Tag-Ube, Compostela (Sta. 5 + 020 - Sta. 13 + 560), Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.9,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0223-002074",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Asturias-Danao-Liloan Bypass Road, Danao-Liloan Section, Barangay Tag-Ube - Barangay Mulao (Sta. 13 + 560 - Sta. 21 + 420), Compostela, Cebu",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 7.86,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38167938.93,
      "lengthMeters": 7860.0,
      "allocationPerStatedMeter": 38167.94,
      "rangesMeters": [
        [
          13560.0,
          21420.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Asturias-Danao-Liloan Bypass Road, Danao-Liloan Section, Barangay Tag-Ube - Barangay Mulao (Sta. 13 + 560 - Sta. 21 + 420), Compostela, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.98,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0223-002077",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Basey-Maydolong Road (Sta. 21+676 - Sta. 22+066, Sta. 28+276 - Sta. 30+960.13), Eastern Samar",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 3.074130000000001,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 97588586.04,
      "lengthMeters": 3074.13,
      "allocationPerStatedMeter": 97588.59,
      "rangesMeters": [
        [
          21676.0,
          22066.0
        ],
        [
          28276.0,
          30960.13
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Basey-Maydolong Road (Sta. 21+676 - Sta. 22+066, Sta. 28+276 - Sta. 30+960.13), Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 2.5,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0224-002103",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Misamis Oriental West Diversion Road, Sta. 15+900 - Sta.18+900, Barangay Betahon, Lugait to Barangay Upper Malubog, Manticao, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          15900.0,
          18900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Misamis Oriental West Diversion Road, Sta. 15+900 - Sta.18+900, Barangay Betahon, Lugait to Barangay Upper Malubog, Manticao, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 2.56,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0225-002110",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "CDOC-Iligan City Hinterland Road (Jct. CDO Camp Kibaritan Road-Dominorog Road, Dansolihon-Jct. IBR, Rogongon, Iligan City) Alternate Road, Barangay Rogongon, Sta. 2+200-Sta. 5+000, Iligan City",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 2.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 107142857.14,
      "lengthMeters": 2800.0,
      "allocationPerStatedMeter": 107142.86,
      "rangesMeters": [
        [
          2200.0,
          5000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "225",
      "lengthEvidence": "CDOC-Iligan City Hinterland Road (Jct. CDO Camp Kibaritan Road-Dominorog Road, Dansolihon-Jct. IBR, Rogongon, Iligan City) Alternate Road, Barangay Rogongon, Sta. 2+200-Sta. 5+000, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 2.09,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0228-002168",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Butuan City West Diversion Road, Butuan City",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Butuan City West Diversion Road, Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0235-002284",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Atimonan-Mauban Road, Sta. 11 + 554 - Sta. 11 + 674 , Mauban, Quezon",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 0.12,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2500000000.0,
      "lengthMeters": 120.0,
      "allocationPerStatedMeter": 2500000.0,
      "rangesMeters": [
        [
          11554.0,
          11674.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Atimonan-Mauban Road, Sta. 11 + 554 - Sta. 11 + 674 , Mauban, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 2.87,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0235-002285",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mauban-Tignoan Road, Sta. 0+265 - Sta. 1+745 , Mauban, Quezon",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 1.48,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 202702702.7,
      "lengthMeters": 1480.0,
      "allocationPerStatedMeter": 202702.7,
      "rangesMeters": [
        [
          265.0,
          1745.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Mauban-Tignoan Road, Sta. 0+265 - Sta. 1+745 , Mauban, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 3.24,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0237-002315",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Sangley Airport Access Road - Sta. 31 + 945 - Sta. 32 + 085, Cavite City",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 0.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2142857142.86,
      "lengthMeters": 140.0,
      "allocationPerStatedMeter": 2142857.14,
      "rangesMeters": [
        [
          31945.0,
          32085.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Sangley Airport Access Road - Sta. 31 + 945 - Sta. 32 + 085, Cavite City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 2.46,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0239-002355",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mahaplag Hilongos Road - Sta. 13+510 - Sta. 13+660.4",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 0.15039999999999965,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1994680851.06,
      "lengthMeters": 150.4,
      "allocationPerStatedMeter": 1994680.85,
      "rangesMeters": [
        [
          13510.0,
          13660.4
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Mahaplag Hilongos Road - Sta. 13+510 - Sta. 13+660.4",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 2.29,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0240-002373",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Sitio Magawa Sta. 57+900-Sta. 62+150, Barangay Bulonay, Impasug-ong, Bukidnon",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 4.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 70588235.29,
      "lengthMeters": 4250.0,
      "allocationPerStatedMeter": 70588.24,
      "rangesMeters": [
        [
          57900.0,
          62150.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Sitio Magawa Sta. 57+900-Sta. 62+150, Barangay Bulonay, Impasug-ong, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.63,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0240-002375",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Sitio Nanahaw, Sta. 53+650-Sta.57+900, Barangay Bulonay, Impasug-ong, Bukidnon",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 4.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 70588235.29,
      "lengthMeters": 4250.0,
      "allocationPerStatedMeter": 70588.24,
      "rangesMeters": [
        [
          53650.0,
          57900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Sitio Nanahaw, Sta. 53+650-Sta.57+900, Barangay Bulonay, Impasug-ong, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.63,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0241-002392",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "East-West Lateral Road connecting Agusan Del Sur to Bukidnon, San Miguel Proper (Surigao del Sur) - Calaitan (Bayugan), Sta.19+969.5 - Sta. 22+ 112.5, Barangay Umalag - Castillo Section, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 2.143,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 139990667.29,
      "lengthMeters": 2143.0,
      "allocationPerStatedMeter": 139990.67,
      "rangesMeters": [
        [
          19969.5,
          22112.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "East-West Lateral Road connecting Agusan Del Sur to Bukidnon, San Miguel Proper (Surigao del Sur) - Calaitan (Bayugan), Sta.19+969.5 - Sta. 22+ 112.5, Barangay Umalag - Castillo Section, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 1.77,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0294-003423",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Viaduct along Daang Maharlika K0397 + (-192.28) - K0397 + 224.37",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 0.4166500000000233,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 720028801.15,
      "lengthMeters": 416.65,
      "allocationPerStatedMeter": 720028.8,
      "rangesMeters": [
        [
          396807.72,
          397224.37
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Viaduct along Daang Maharlika K0397 + (-192.28) - K0397 + 224.37",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0415-005752",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge connecting Barangay Pangapisan North and Barangay Capandanan, Lingayen, Pangasinan",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Bridge connecting Barangay Pangapisan North and Barangay Capandanan, Lingayen, Pangasinan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0435-006159",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Estaka Road leading to Naga Valley (NAVA) Industrial Park, Cebu",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Estaka Road leading to Naga Valley (NAVA) Industrial Park, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0438-006215",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Gingoog City-Medina Alternate Road, Sta. 0+000 - Sta. 3+500, Barangay Murallon to Barangay Agay-ayan, Gingoog, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 3.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 85714285.71,
      "lengthMeters": 3500.0,
      "allocationPerStatedMeter": 85714.29,
      "rangesMeters": [
        [
          0.0,
          3500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Construction of Gingoog City-Medina Alternate Road, Sta. 0+000 - Sta. 3+500, Barangay Murallon to Barangay Agay-ayan, Gingoog, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 2.73,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0438-006222",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of San Fernando Alternate Road, Sta. 0+000 - Sta. 3+250, Barangay Little Baguio to Barangay Mabuhay, San Fernando, Bukidnon",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 3.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 92307692.31,
      "lengthMeters": 3250.0,
      "allocationPerStatedMeter": 92307.69,
      "rangesMeters": [
        [
          0.0,
          3250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Construction of San Fernando Alternate Road, Sta. 0+000 - Sta. 3+250, Barangay Little Baguio to Barangay Mabuhay, San Fernando, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 2.94,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0441-006271",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Laguindingan-Iligan City Alternate Road, Barangay Ayaˇaya Section, Sta. 44+000 - Sta. 46+000, Lugait, Misamis Orienta",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 150000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 150000.0,
      "rangesMeters": [
        [
          44000.0,
          46000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Laguindingan-Iligan City Alternate Road, Barangay Ayaˇaya Section, Sta. 44+000 - Sta. 46+000, Lugait, Misamis Orienta",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 6.21,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0442-006289",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Bukidnon-Paquibato District Alternate Road, Barangay Sinuda - Barangay Kipilas Section, Sta. 5+290 - Sta. 8+540, Kitaotao, Bukidnon",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 3.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 92307692.31,
      "lengthMeters": 3250.0,
      "allocationPerStatedMeter": 92307.69,
      "rangesMeters": [
        [
          5290.0,
          8540.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Construction of Road, Bukidnon-Paquibato District Alternate Road, Barangay Sinuda - Barangay Kipilas Section, Sta. 5+290 - Sta. 8+540, Kitaotao, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 2.94,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0442-006290",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Malaybalay Circumferential Road, Barangay Dalwangan, Sta. 42+000-Sta.46+300, City of Malaybalay, Bukidnon",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 4.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 69767441.86,
      "lengthMeters": 4300.0,
      "allocationPerStatedMeter": 69767.44,
      "rangesMeters": [
        [
          42000.0,
          46300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Construction of Road, Malaybalay Circumferential Road, Barangay Dalwangan, Sta. 42+000-Sta.46+300, City of Malaybalay, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 2.22,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0442-006291",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Malaybalay Circumferential Road, Barangay Imbayao-Barangay Capitan Angel, Sta. 36+500-Sta. 42+000 , City of Malaybalay, Bukidnon",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 5.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54545454.55,
      "lengthMeters": 5500.0,
      "allocationPerStatedMeter": 54545.45,
      "rangesMeters": [
        [
          36500.0,
          42000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Construction of Road, Malaybalay Circumferential Road, Barangay Imbayao-Barangay Capitan Angel, Sta. 36+500-Sta. 42+000 , City of Malaybalay, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.73,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0442-006302",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Manticao - Cabalantian - Mahayahay - Limunda to Misamis Oriental, West Diversion Road (Opol to Lugait), Misamis Oriental, Barangay Limunda, Sta. 24+324 - Sta. 29+724, Opol, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": 5.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55555555.56,
      "lengthMeters": 5400.0,
      "allocationPerStatedMeter": 55555.56,
      "rangesMeters": [
        [
          24324.0,
          29724.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Manticao - Cabalantian - Mahayahay - Limunda to Misamis Oriental, West Diversion Road (Opol to Lugait), Misamis Oriental, Barangay Limunda, Sta. 24+324 - Sta. 29+724, Opol, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.77,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0447-006391",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Lake Mainit Circumferential - Lipata Port By-Pass Road to Wind Power Generation, Barangay Banbanon - Barangay Oslao, San Francisco, Surigao del Norte",
      "office": "Central Office",
      "amountPesos": 300000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "447",
      "lengthEvidence": "Construction of Lake Mainit Circumferential - Lipata Port By-Pass Road to Wind Power Generation, Barangay Banbanon - Barangay Oslao, San Francisco, Surigao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0223-002067",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 6+770 - Sta. 7+410, Sta. 10+040 - Sta. 10+260, E.B. Magalona, Negros Occidental",
      "office": "Central Office",
      "amountPesos": 299282000,
      "lengthKm": 0.86,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 348002325.58,
      "lengthMeters": 860.0,
      "allocationPerStatedMeter": 348002.33,
      "rangesMeters": [
        [
          6770.0,
          7410.0
        ],
        [
          10040.0,
          10260.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 6+770 - Sta. 7+410, Sta. 10+040 - Sta. 10+260, E.B. Magalona, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 3.24,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0219-001983",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Carsadang Bago - Malagasang Diversion Road - Sta. 03 + 362 - Sta. 03 + 564, Sta. 03 + 641 - Sta. 03 + 763, Sta. 04 + 031.5 - Sta. 04 + 365, Sta. 04 + 603 - Sta. 04 + 684, Sta. 04 + 694 - Sta. 04 + 735, Sta. 09 + 813 - Sta. 09 + 969, Sta. 10 + 699 - Sta. 11 + 445, Imus City, Cavite",
      "office": "Central Office",
      "amountPesos": 298397000,
      "lengthKm": 1.6815,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 177458816.53,
      "lengthMeters": 1681.5,
      "allocationPerStatedMeter": 177458.82,
      "rangesMeters": [
        [
          3362.0,
          3564.0
        ],
        [
          3641.0,
          3763.0
        ],
        [
          4031.5,
          4365.0
        ],
        [
          4603.0,
          4684.0
        ],
        [
          4694.0,
          4735.0
        ],
        [
          9813.0,
          9969.0
        ],
        [
          10699.0,
          11445.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Carsadang Bago - Malagasang Diversion Road - Sta. 03 + 362 - Sta. 03 + 564, Sta. 03 + 641 - Sta. 03 + 763, Sta. 04 + 031.5 - Sta. 04 + 365, Sta. 04 + 603 - Sta. 04 + 684, Sta. 04 + 694 - Sta. 04 + 735, Sta. 09 + 813 - Sta. 09 + 969, Sta. 10 + 699 - Sta. 11 + 445, Imus City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 2.15,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0214-001881",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Dagupan-Mangaldan Diversion Road, Dagupan City-Mangaldan, Sta. 0+000 - Sta. 3+500, Pangasinan",
      "office": "Central Office",
      "amountPesos": 295350000,
      "lengthKm": 3.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 84385714.29,
      "lengthMeters": 3500.0,
      "allocationPerStatedMeter": 84385.71,
      "rangesMeters": [
        [
          0.0,
          3500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Dagupan-Mangaldan Diversion Road, Dagupan City-Mangaldan, Sta. 0+000 - Sta. 3+500, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 2.16,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0429-006037",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pulot Interior, Sofronio Española, Palawan",
      "office": "Central Office",
      "amountPesos": 290000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Road, Barangay Pulot Interior, Sofronio Española, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0222-002059",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Iloilo East Coast-Capiz Rd - K0129 + 434 - K0130 + 519, K0133 + 682 - K0135 + 635, K0136 + 627 - K0137 + 420, K0151 + 000 - K0152 + 858, K0156 + 652 - K0159 + 319",
      "office": "Central Office",
      "amountPesos": 288600000,
      "lengthKm": 8.356,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34538056.49,
      "lengthMeters": 8356.0,
      "allocationPerStatedMeter": 34538.06,
      "rangesMeters": [
        [
          129434.0,
          130519.0
        ],
        [
          133682.0,
          135635.0
        ],
        [
          136627.0,
          137420.0
        ],
        [
          151000.0,
          152858.0
        ],
        [
          156652.0,
          159319.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Iloilo East Coast-Capiz Rd - K0129 + 434 - K0130 + 519, K0133 + 682 - K0135 + 635, K0136 + 627 - K0137 + 420, K0151 + 000 - K0152 + 858, K0156 + 652 - K0159 + 319",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.88,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0238-002339",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Pasacao-Balatan Tourism Coastal Highway - Sta. 495+800.00 - Sta. 497+600.00, Sta. 501+680.00 - Sta. 502+770.00",
      "office": "Central Office",
      "amountPesos": 287300000,
      "lengthKm": 2.89,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 99411764.71,
      "lengthMeters": 2890.0,
      "allocationPerStatedMeter": 99411.76,
      "rangesMeters": [
        [
          495800.0,
          497600.0
        ],
        [
          501680.0,
          502770.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Pasacao-Balatan Tourism Coastal Highway - Sta. 495+800.00 - Sta. 497+600.00, Sta. 501+680.00 - Sta. 502+770.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 2.29,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0214-001894",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
      "office": "Central Office",
      "amountPesos": 280000000,
      "lengthKm": 1.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 254545454.55,
      "lengthMeters": 1100.0,
      "allocationPerStatedMeter": 254545.45,
      "rangesMeters": [
        [
          2300.0,
          3000.0
        ],
        [
          4109.0,
          4509.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 2.37,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0241-002390",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Cabadbaran - Puting Bato - Lanuza Road, (Sta. 67+223 - Sta. 72+553), Barangay Pakwan Section, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 280000000,
      "lengthKm": 5.33,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52532833.02,
      "lengthMeters": 5330.0,
      "allocationPerStatedMeter": 52532.83,
      "rangesMeters": [
        [
          67223.0,
          72553.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "Cabadbaran - Puting Bato - Lanuza Road, (Sta. 67+223 - Sta. 72+553), Barangay Pakwan Section, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.21,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0429-006032",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Magara - Barangay Little Caramay, Roxas, Palawan",
      "office": "Central Office",
      "amountPesos": 280000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Road, Barangay Magara - Barangay Little Caramay, Roxas, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006020",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Odiongan-Alcantara Access Road, leading to Tugdan Airport, Barangay Progreso Este - Barangay Tugdan, Alcantara, Romblon",
      "office": "Central Office",
      "amountPesos": 278889000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Odiongan-Alcantara Access Road, leading to Tugdan Airport, Barangay Progreso Este - Barangay Tugdan, Alcantara, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0115-000088",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1675 + (-337) - K1675 + 000, K1676 + 000 - K1676 + 669, K1676 + 721 - K1676 + 822, K1678 + 000 - K1678 + 091, K1680 + 380 - K1680 + 603, K1680 + 945 - K1681 + 000, K1684 + 018 - K1684 + 028, K1684 + 682 - K1685 + 000, K1687 + 000 - K1688 + 500, K1689 + 961 - K1690 + 508, K1690 + 526 - K1690 + 825, K1694 + 723 - K1694 + 775, K1694 + 812 - K1694 + 870, K1700 + 056 - K1700 + 106, K1714 + 2160 - K1718 + 020, K1718 + 1285 - K1718 + 1305",
      "office": "Central Office",
      "amountPesos": 272000000,
      "lengthKm": 6.19,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 43941841.68,
      "lengthMeters": 6190.0,
      "allocationPerStatedMeter": 43941.84,
      "rangesMeters": [
        [
          1674663.0,
          1675000.0
        ],
        [
          1676000.0,
          1676669.0
        ],
        [
          1676721.0,
          1676822.0
        ],
        [
          1678000.0,
          1678091.0
        ],
        [
          1680380.0,
          1680603.0
        ],
        [
          1680945.0,
          1681000.0
        ],
        [
          1684018.0,
          1684028.0
        ],
        [
          1684682.0,
          1685000.0
        ],
        [
          1687000.0,
          1688500.0
        ],
        [
          1689961.0,
          1690508.0
        ],
        [
          1690526.0,
          1690825.0
        ],
        [
          1694723.0,
          1694775.0
        ],
        [
          1694812.0,
          1694870.0
        ],
        [
          1700056.0,
          1700106.0
        ],
        [
          1716160.0,
          1718020.0
        ],
        [
          1719285.0,
          1719305.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1675 + (-337) - K1675 + 000, K1676 + 000 - K1676 + 669, K1676 + 721 - K1676 + 822, K1678 + 000 - K1678 + 091, K1680 + 380 - K1680 + 603, K1680 + 945 - K1681 + 000, K1684 + 018 - K1684 + 028, K1684 + 682 - K1685 + 000, K1687 + 000 - K1688 + 500, K1689 + 961 - K1690 + 508, K1690 + 526 - K1690 + 825, K1694 + 723 - K1694 + 775, K1694 + 812 - K1694 + 870, K1700 + 056 - K1700 + 106, K1714 + 2160 - K1718 + 020, K1718 + 1285 - K1718 + 1305",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 1.26,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0285-003231",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Cangaranan Parallel Br. along Iloilo-Antique Rd",
      "office": "Central Office",
      "amountPesos": 270500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Cangaranan Parallel Br. along Iloilo-Antique Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006012",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Sitio Igang- Barangay Pamantolon, Taytay, Palawan",
      "office": "Central Office",
      "amountPesos": 270000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Access Road, Sitio Igang- Barangay Pamantolon, Taytay, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0150-000760",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Quirino H-way - K0248 + 738 - K0251 +(-511)",
      "office": "Central Office",
      "amountPesos": 265466000,
      "lengthKm": 1.751,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 151608223.87,
      "lengthMeters": 1751.0,
      "allocationPerStatedMeter": 151608.22,
      "rangesMeters": [
        [
          248738.0,
          250489.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "Quirino H-way - K0248 + 738 - K0251 +(-511)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 6.06,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0226-002132",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Jct. Maramag-Maradugao Road-Jct. Lampanusan Road Ext. (Jct. Sayre Highway (Damulog)-Kibawe-Jct. Buda (Sinuda), Kitaotao By-Pass/Alternate Road, Barangay Sagundanon, Sta. 50+040 - Sta. 52+540, Kitaotao, Bukidnon",
      "office": "Central Office",
      "amountPesos": 265000000,
      "lengthKm": 2.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 106000000.0,
      "lengthMeters": 2500.0,
      "allocationPerStatedMeter": 106000.0,
      "rangesMeters": [
        [
          50040.0,
          52540.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Jct. Maramag-Maradugao Road-Jct. Lampanusan Road Ext. (Jct. Sayre Highway (Damulog)-Kibawe-Jct. Buda (Sinuda), Kitaotao By-Pass/Alternate Road, Barangay Sagundanon, Sta. 50+040 - Sta. 52+540, Kitaotao, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 2.06,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0227-002152",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Valencia City - Pangantucan Diversion Road, Barangay La Roxas - Barangay Bagong Silang, Sta. 16+600 - Sta. 20+600, Maramag, Bukidnon",
      "office": "Central Office",
      "amountPesos": 265000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66250000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 66250.0,
      "rangesMeters": [
        [
          16600.0,
          20600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Valencia City - Pangantucan Diversion Road, Barangay La Roxas - Barangay Bagong Silang, Sta. 16+600 - Sta. 20+600, Maramag, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 1.7,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0238-002347",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Himamaylan City - Negros Oriental Boundary - Tayasan Road, Sta. 0+000 - Sta. 5+175",
      "office": "Central Office",
      "amountPesos": 265000000,
      "lengthKm": 5.175,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51207729.47,
      "lengthMeters": 5175.0,
      "allocationPerStatedMeter": 51207.73,
      "rangesMeters": [
        [
          0.0,
          5175.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Himamaylan City - Negros Oriental Boundary - Tayasan Road, Sta. 0+000 - Sta. 5+175",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.18,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0239-002352",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22 + 783 - Sta. 24 + 733), Eastern Samar",
      "office": "Central Office",
      "amountPesos": 265000000,
      "lengthKm": 1.95,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 135897435.9,
      "lengthMeters": 1950.0,
      "allocationPerStatedMeter": 135897.44,
      "rangesMeters": [
        [
          22783.0,
          24733.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22 + 783 - Sta. 24 + 733), Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 1.72,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0214-001895",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Villasis-Sto.Tomas Bypass Road",
      "office": "Central Office",
      "amountPesos": 263387000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Villasis-Sto.Tomas Bypass Road",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0237-002312",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "MSR JCT Canda-Hondagua-Roma Point Road (Roma Point Bridge), Sta. 1 + 360 - Sta. 1 + 600",
      "office": "Central Office",
      "amountPesos": 260508000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          1360.0,
          1600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "MSR JCT Canda-Hondagua-Roma Point Road (Roma Point Bridge), Sta. 1 + 360 - Sta. 1 + 600",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0237-002311",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "MSR JCT Canda-Hondagua-Roma Point Road (Roma Point Bridge), Sta. 1 + 210 - Sta. 1 + 480",
      "office": "Central Office",
      "amountPesos": 259408000,
      "lengthKm": 0.27,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 270.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          1210.0,
          1480.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "MSR JCT Canda-Hondagua-Roma Point Road (Roma Point Bridge), Sta. 1 + 210 - Sta. 1 + 480",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0284-003215",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Gibanga Br. (B05233LZ) along Sariaya Bypass Rd",
      "office": "Central Office",
      "amountPesos": 259250000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Gibanga Br. (B05233LZ) along Sariaya Bypass Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0240-002381",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Columbio - Lutayan - Koronadal Road, Sta.13+369 - Sta.13+663, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 255780000,
      "lengthKm": 0.294,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 870000000.0,
      "lengthMeters": 294.0,
      "allocationPerStatedMeter": 870000.0,
      "rangesMeters": [
        [
          13369.0,
          13663.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Columbio - Lutayan - Koronadal Road, Sta.13+369 - Sta.13+663, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0117-000123",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1649 + 1000 - K1654 + 100",
      "office": "Central Office",
      "amountPesos": 253406000,
      "lengthKm": 4.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 61806341.46,
      "lengthMeters": 4100.0,
      "allocationPerStatedMeter": 61806.34,
      "rangesMeters": [
        [
          1650000.0,
          1654100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1649 + 1000 - K1654 + 100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 1.77,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0425-005951",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Barangays GSIS and Nueva, San Pedro City, Laguna",
      "office": "Central Office",
      "amountPesos": 253000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Barangays GSIS and Nueva, San Pedro City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0115-000087",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1665 + 000 - K1665 + 500, K1667 + 623 - K1667 + 897, K1667 + 936 - K1669 + 000, K1670 + 000 - K1674 + 000",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 5.838,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 42822884.55,
      "lengthMeters": 5838.0,
      "allocationPerStatedMeter": 42822.88,
      "rangesMeters": [
        [
          1665000.0,
          1665500.0
        ],
        [
          1667623.0,
          1667897.0
        ],
        [
          1667936.0,
          1669000.0
        ],
        [
          1670000.0,
          1674000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1665 + 000 - K1665 + 500, K1667 + 623 - K1667 + 897, K1667 + 936 - K1669 + 000, K1670 + 000 - K1674 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 1.23,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0214-001885",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Lingayen Baywalk-Bonuan Road, Pangasinan",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Lingayen Baywalk-Bonuan Road, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0214-001890",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Dagupan City, Pangasinan",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Dagupan City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0223-002072",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Asturias-Danao-Liloan Bypass Road, Danao-Liloan Section, Barangay Cabadiangan - Barangay Cotcot (Sta. 26 + 620 - Sta. 33 + 170), Liloan, Cebu",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 6.55,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38167938.93,
      "lengthMeters": 6550.0,
      "allocationPerStatedMeter": 38167.94,
      "rangesMeters": [
        [
          26620.0,
          33170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Asturias-Danao-Liloan Bypass Road, Danao-Liloan Section, Barangay Cabadiangan - Barangay Cotcot (Sta. 26 + 620 - Sta. 33 + 170), Liloan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.98,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0224-002101",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cagayan de Oro Coastal Road (Puerto-Gusa Section), Barangay Gusa, Sta. 8+137-Sta. 8+177, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 0.04,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 6250000000.0,
      "lengthMeters": 40.0,
      "allocationPerStatedMeter": 6250000.0,
      "rangesMeters": [
        [
          8137.0,
          8177.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Cagayan de Oro Coastal Road (Puerto-Gusa Section), Barangay Gusa, Sta. 8+137-Sta. 8+177, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 5.22,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0236-002291",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "General Nakar - Dingalan Road, Sta. 25 + 336.32 - Sta. 27 + 636.32, General Nakar, Quezon",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 2.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 108695652.17,
      "lengthMeters": 2300.0,
      "allocationPerStatedMeter": 108695.65,
      "rangesMeters": [
        [
          25336.32,
          27636.32
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "General Nakar - Dingalan Road, Sta. 25 + 336.32 - Sta. 27 + 636.32, General Nakar, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 1.38,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0258-002632",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Dancalan Br. (B05019LZ) along Dancalan-Sta. Cruz, Donsol-Pio Duran Roa",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Dancalan Br. (B05019LZ) along Dancalan-Sta. Cruz, Donsol-Pio Duran Roa",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0286-003250",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Pambujan Br. (B00299SM) along Catarman-Laoang Rd",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Pambujan Br. (B00299SM) along Catarman-Laoang Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0412-005707",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Cable Bridge from Punta Barangay 898 to Beata St. Barangay 839 Sta. 0 - Sta. 180",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "412",
      "lengthEvidence": "Construction of Cable Bridge from Punta Barangay 898 to Beata St. Barangay 839 Sta. 0 - Sta. 180",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0420-005867",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Dalisdis Overpass Bridge, Barangay Panipuan, Mexico, Pampanga",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Construction of Dalisdis Overpass Bridge, Barangay Panipuan, Mexico, Pampanga",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0433-006127",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay 1 and Barangay Inolingan, Moises Padilla, Negros Occidental",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Bridge, Barangay 1 and Barangay Inolingan, Moises Padilla, Negros Occidental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0435-006163",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road from Uteron-Antol in Calbiga to Canlobo-Layo-Magdawat- Pelaon of Pinabacdao to Mabini Basey Sta. 17+290 - Sta. 19+075, Sta. 29-970 - Sta. 31+750",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          17290.0,
          19075.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of Access Road from Uteron-Antol in Calbiga to Canlobo-Layo-Magdawat- Pelaon of Pinabacdao to Mabini Basey Sta. 17+290 - Sta. 19+075, Sta. 29-970 - Sta. 31+750",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0440-006258",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Gingoog City-Medina Alternate Road, Sta. 14+000 - Sta. 17+500, Barangay San Vicente to Barangay San Jose, Medina, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 3.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 71428571.43,
      "lengthMeters": 3500.0,
      "allocationPerStatedMeter": 71428.57,
      "rangesMeters": [
        [
          14000.0,
          17500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Construction of Gingoog City-Medina Alternate Road, Sta. 14+000 - Sta. 17+500, Barangay San Vicente to Barangay San Jose, Medina, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 2.27,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0440-006259",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Impasug-ong - Malaybalay City Hinterland Road, Sta. 0+000 - Sta. 4+000, Impasug-ong, Bukidnon",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 62500000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 62500.0,
      "rangesMeters": [
        [
          0.0,
          4000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Construction of Impasug-ong - Malaybalay City Hinterland Road, Sta. 0+000 - Sta. 4+000, Impasug-ong, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.99,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0440-006260",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Impasug-ong - Malaybalay City Hinterland Road, Sta. 12+000 - Sta. 16+000, Malaybalay City, Bukidnon",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 62500000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 62500.0,
      "rangesMeters": [
        [
          12000.0,
          16000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Construction of Impasug-ong - Malaybalay City Hinterland Road, Sta. 12+000 - Sta. 16+000, Malaybalay City, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.99,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0440-006261",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Impasug-ong - Malaybalay City Hinterland Road, Sta. 4+000 - Sta. 8+000, Impasug-ong, Bukidnon",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 62500000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 62500.0,
      "rangesMeters": [
        [
          4000.0,
          8000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Construction of Impasug-ong - Malaybalay City Hinterland Road, Sta. 4+000 - Sta. 8+000, Impasug-ong, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.99,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0440-006262",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Impasug-ong - Malaybalay City Hinterland Road, Sta. 8+000 - Sta. 12+000, Impasug-ong, Bukidnon",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 62500000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 62500.0,
      "rangesMeters": [
        [
          8000.0,
          12000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Construction of Impasug-ong - Malaybalay City Hinterland Road, Sta. 8+000 - Sta. 12+000, Impasug-ong, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.99,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0440-006264",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Jct. Kibawe-Arakan – Jct. Puntian-Arakan Alternate Road, Sta. 0+000 - Sta. 3+000, Barangay Migcawayan to Barangay Tumaras, Kibawe, Bukidnon",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 83333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 83333.33,
      "rangesMeters": [
        [
          0.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Construction of Jct. Kibawe-Arakan – Jct. Puntian-Arakan Alternate Road, Sta. 0+000 - Sta. 3+000, Barangay Migcawayan to Barangay Tumaras, Kibawe, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 2.65,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0440-006265",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Jct. Kibawe-Arakan – Jct. Puntian-Arakan Alternate Road, Sta. 3+700 - Sta. 6+700, Barangay Liwayway to Barangay Cagawasan, Kibawe, Bukidnon",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 83333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 83333.33,
      "rangesMeters": [
        [
          3700.0,
          6700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Construction of Jct. Kibawe-Arakan – Jct. Puntian-Arakan Alternate Road, Sta. 3+700 - Sta. 6+700, Barangay Liwayway to Barangay Cagawasan, Kibawe, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 2.65,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0440-006266",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Jct. Kibawe-Arakan – Jct. Puntian-Arakan Alternate Road, Sta. 6+700 - Sta. 9+700, Barangay Cagawasan, Kibawe, Bukidnon",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 83333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 83333.33,
      "rangesMeters": [
        [
          6700.0,
          9700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Construction of Jct. Kibawe-Arakan – Jct. Puntian-Arakan Alternate Road, Sta. 6+700 - Sta. 9+700, Barangay Cagawasan, Kibawe, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 2.65,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0441-006267",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Jct. Kibawe-Arakan – Jct. Puntian-Arakan Alternate Road, Sta. 9+700 - Sta. 12+700, Barangay Magsaysay, Kibawe, Bukidnon",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 83333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 83333.33,
      "rangesMeters": [
        [
          9700.0,
          12700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Jct. Kibawe-Arakan – Jct. Puntian-Arakan Alternate Road, Sta. 9+700 - Sta. 12+700, Barangay Magsaysay, Kibawe, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 2.65,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0441-006270",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Laguindingan-Iligan City Alternate Road, Barangay Aya-aya Section, Sta. 40+900 - Sta. 41+000, Lugait, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 0.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2500000000.0,
      "lengthMeters": 100.0,
      "allocationPerStatedMeter": 2500000.0,
      "rangesMeters": [
        [
          40900.0,
          41000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Laguindingan-Iligan City Alternate Road, Barangay Aya-aya Section, Sta. 40+900 - Sta. 41+000, Lugait, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 70.71,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0441-006272",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Laguindingan-Iligan City Alternate Road, Barangay Kamelon Section, Sta. 23+800 - Sta. 23+900, Initao, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 0.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2500000000.0,
      "lengthMeters": 100.0,
      "allocationPerStatedMeter": 2500000.0,
      "rangesMeters": [
        [
          23800.0,
          23900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Laguindingan-Iligan City Alternate Road, Barangay Kamelon Section, Sta. 23+800 - Sta. 23+900, Initao, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 70.71,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0441-006273",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Laguindingan-Iligan City Alternate Road, Barangay Tawantawan- Barangay Aluna Section, Sta. 25+000 - Sta. 28+500, Initao, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 3.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 71428571.43,
      "lengthMeters": 3500.0,
      "allocationPerStatedMeter": 71428.57,
      "rangesMeters": [
        [
          25000.0,
          28500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Laguindingan-Iligan City Alternate Road, Barangay Tawantawan- Barangay Aluna Section, Sta. 25+000 - Sta. 28+500, Initao, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 2.27,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0442-006303",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Manticao - Cabalantian - Mahayahay - Limunda to Misamis Oriental, West Diversion Road (Opol to Lugait), Misamis Oriental, Barangay Nangcaon, Sta. 29+824 - Sta. 32+404, Opol, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 2.58,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 96899224.81,
      "lengthMeters": 2580.0,
      "allocationPerStatedMeter": 96899.22,
      "rangesMeters": [
        [
          29824.0,
          32404.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Manticao - Cabalantian - Mahayahay - Limunda to Misamis Oriental, West Diversion Road (Opol to Lugait), Misamis Oriental, Barangay Nangcaon, Sta. 29+824 - Sta. 32+404, Opol, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 3.08,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0442-006304",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Manticao - Cabalantian - Mahayahay - Limunda to Misamis Oriental, West Diversion Road (Opol to Lugait), Misamis Oriental, Barangay Nangcaon, Sta. 32+440 - Sta. 34+664, Opol, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 2.224,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 112410071.94,
      "lengthMeters": 2224.0,
      "allocationPerStatedMeter": 112410.07,
      "rangesMeters": [
        [
          32440.0,
          34664.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Manticao - Cabalantian - Mahayahay - Limunda to Misamis Oriental, West Diversion Road (Opol to Lugait), Misamis Oriental, Barangay Nangcaon, Sta. 32+440 - Sta. 34+664, Opol, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 4.66,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0445-006360",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Esperanza-Lebak Bypass Road, Sta. 10 + 715 - Sta. 17 + 737, Esperanza, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": 7.022,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35602392.48,
      "lengthMeters": 7022.0,
      "allocationPerStatedMeter": 35602.39,
      "rangesMeters": [
        [
          10715.0,
          17737.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Construction of Esperanza-Lebak Bypass Road, Sta. 10 + 715 - Sta. 17 + 737, Esperanza, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.13,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0447-006392",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of NRJ Daang Maharlika, Sibagat (Sitio Eureka, Tabon-Tabon) - Bugsukan - Antongalon Road, Barangay Bugsukan - Barangay Antongalon Section, Butuan City",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "447",
      "lengthEvidence": "Construction of NRJ Daang Maharlika, Sibagat (Sitio Eureka, Tabon-Tabon) - Bugsukan - Antongalon Road, Barangay Bugsukan - Barangay Antongalon Section, Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0629-010231",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Pajo-Pusok-Ibo Coastal Road, Lapu-Lapu City, Cebu",
      "office": "Central Office",
      "amountPesos": 250000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "629",
      "lengthEvidence": "Construction of Pajo-Pusok-Ibo Coastal Road, Lapu-Lapu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0128-000339",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Banisilan-Guiling-Alamada-Libungan Rd - K1636 + 000 - K1640 + 395",
      "office": "Central Office",
      "amountPesos": 249992000,
      "lengthKm": 4.395,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 56881001.14,
      "lengthMeters": 4395.0,
      "allocationPerStatedMeter": 56881.0,
      "rangesMeters": [
        [
          1636000.0,
          1640395.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Banisilan-Guiling-Alamada-Libungan Rd - K1636 + 000 - K1640 + 395",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 3.46,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0223-002066",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 2+497 - Sta. 3+270, Sta. 5+470 - Sta. 6+330, Silay City, Negros Occidental",
      "office": "Central Office",
      "amountPesos": 246500000,
      "lengthKm": 1.633,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 150949173.3,
      "lengthMeters": 1633.0,
      "allocationPerStatedMeter": 150949.17,
      "rangesMeters": [
        [
          2497.0,
          3270.0
        ],
        [
          5470.0,
          6330.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 2+497 - Sta. 3+270, Sta. 5+470 - Sta. 6+330, Silay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.83,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0228-002167",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Butuan City By-pass Road (Lemon-NRJ-Antongalon-Pianing Section) (Arc Bridge), Butuan City, Agusan del Norte",
      "office": "Central Office",
      "amountPesos": 245000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Butuan City By-pass Road (Lemon-NRJ-Antongalon-Pianing Section) (Arc Bridge), Butuan City, Agusan del Norte",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0240-002382",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Columbio - Lutayan - Koronadal Road, Sta.20+310 - Sta.29+869, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 240000000,
      "lengthKm": 9.559,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25107228.79,
      "lengthMeters": 9559.0,
      "allocationPerStatedMeter": 25107.23,
      "rangesMeters": [
        [
          20310.0,
          29869.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Columbio - Lutayan - Koronadal Road, Sta.20+310 - Sta.29+869, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.58,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0214-001888",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Pangasinan-Nueva Vizcaya Road connecting TPLEX, Rosales, Pangasinan",
      "office": "Central Office",
      "amountPesos": 239681000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Pangasinan-Nueva Vizcaya Road connecting TPLEX, Rosales, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005753",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge connecting Lacuben-Gabut Sur, Badoc, Ilocos Norte",
      "office": "Central Office",
      "amountPesos": 237000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Bridge connecting Lacuben-Gabut Sur, Badoc, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0212-001851",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Sanga-Sanga-Bato-Bato Rd - Chainage 1445 - Chainage 1566, Chainage 1755 - Chainage 1794, Chainage 2026 - Chainage 2087, Chainage 2132 - Chainage 2185, Chainage 2365 - Chainage 2410, Chainage 2730 - Chainage 11917, Chainage 11956.65 - Chainage 12587, Chainage 12688 - Chainage 12811, Chainage 12841.3 - Chainage 21620",
      "office": "Central Office",
      "amountPesos": 236586000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Sanga-Sanga-Bato-Bato Rd - Chainage 1445 - Chainage 1566, Chainage 1755 - Chainage 1794, Chainage 2026 - Chainage 2087, Chainage 2132 - Chainage 2185, Chainage 2365 - Chainage 2410, Chainage 2730 - Chainage 11917, Chainage 11956.65 - Chainage 12587, Chainage 12688 - Chainage 12811, Chainage 12841.3 - Chainage 21620",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0111-000003",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0235 + 415 - K0236 + 005, K0236 + 238 - K0236 + 755, K0247 + 523 - K0247 + 588, K0251 + 1014 - K0252 + 147, K0252 + 219 - K0253 + 070, K0253 + 610 - K0253 + 973, K0255 + 403 - K0255 + 688, K0255 + 719 - K0255 + 924, K0256 + 252 - K0256 + 989, K0258 + 715 - K0259 + 460",
      "office": "Central Office",
      "amountPesos": 234959000,
      "lengthKm": 4.491,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 52317746.6,
      "lengthMeters": 4491.0,
      "allocationPerStatedMeter": 52317.75,
      "rangesMeters": [
        [
          235415.0,
          236005.0
        ],
        [
          236238.0,
          236755.0
        ],
        [
          247523.0,
          247588.0
        ],
        [
          252014.0,
          252147.0
        ],
        [
          252219.0,
          253070.0
        ],
        [
          253610.0,
          253973.0
        ],
        [
          255403.0,
          255688.0
        ],
        [
          255719.0,
          255924.0
        ],
        [
          256252.0,
          256989.0
        ],
        [
          258715.0,
          259460.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Manila North Rd - K0235 + 415 - K0236 + 005, K0236 + 238 - K0236 + 755, K0247 + 523 - K0247 + 588, K0251 + 1014 - K0252 + 147, K0252 + 219 - K0253 + 070, K0253 + 610 - K0253 + 973, K0255 + 403 - K0255 + 688, K0255 + 719 - K0255 + 924, K0256 + 252 - K0256 + 989, K0258 + 715 - K0259 + 460",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 1.5,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0115-000093",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1648 + (-264) - K1648 + 881, K1651 + 000 - K1651 + 263, K1651 + 566 - K1651 + 1023, K1651 + 2111 - K1651 + 2239, K1651 + 2270 - K1651 + 2370, K1659 + 071 - K1659 + 2122, K1659 + 2153 - K1659 + 2795",
      "office": "Central Office",
      "amountPesos": 230000000,
      "lengthKm": 4.786,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 48056832.43,
      "lengthMeters": 4786.0,
      "allocationPerStatedMeter": 48056.83,
      "rangesMeters": [
        [
          1647736.0,
          1648881.0
        ],
        [
          1651000.0,
          1651263.0
        ],
        [
          1651566.0,
          1652023.0
        ],
        [
          1653111.0,
          1653239.0
        ],
        [
          1653270.0,
          1653370.0
        ],
        [
          1659071.0,
          1661122.0
        ],
        [
          1661153.0,
          1661795.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1648 + (-264) - K1648 + 881, K1651 + 000 - K1651 + 263, K1651 + 566 - K1651 + 1023, K1651 + 2111 - K1651 + 2239, K1651 + 2270 - K1651 + 2370, K1659 + 071 - K1659 + 2122, K1659 + 2153 - K1659 + 2795",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 1.38,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0419-005845",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge at Barangay Florida Blanca, Llanera, Nueva Ecija",
      "office": "Central Office",
      "amountPesos": 230000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Construction of Bridge at Barangay Florida Blanca, Llanera, Nueva Ecija",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005970",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Slope Protection Structures along As-is Niyugan Road, Laurel, Batangas",
      "office": "Central Office",
      "amountPesos": 230000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Rehabilitation of Road including Slope Protection Structures along As-is Niyugan Road, Laurel, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0444-006341",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of NRJ Tagum - Panabo Circum Road, Barangay Datu Balong, Kapalong Section, to Loreto (Agusan del Sur), Davao del Norte",
      "office": "Central Office",
      "amountPesos": 230000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of NRJ Tagum - Panabo Circum Road, Barangay Datu Balong, Kapalong Section, to Loreto (Agusan del Sur), Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0257-002621",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Gen. Luna Br. (B01324LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 228399000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Gen. Luna Br. (B01324LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0234-002267",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Halsema - Madaymen - Masala - Sagpat Rd - Sta. 16 + 040 - Sta. 21 + 040",
      "office": "Central Office",
      "amountPesos": 228000000,
      "lengthKm": 5.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45600000.0,
      "lengthMeters": 5000.0,
      "allocationPerStatedMeter": 45600.0,
      "rangesMeters": [
        [
          16040.0,
          21040.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Halsema - Madaymen - Masala - Sagpat Rd - Sta. 16 + 040 - Sta. 21 + 040",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.05,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0428-006030",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Kemdeng, San Vicente Airport, Palawan",
      "office": "Central Office",
      "amountPesos": 228000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Road, Barangay Kemdeng, San Vicente Airport, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0259-002663",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Makinhas Br. (B00559LT) along Tacloban-Baybay South Rd",
      "office": "Central Office",
      "amountPesos": 225000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Makinhas Br. (B00559LT) along Tacloban-Baybay South Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0219-001996",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Manila-Cavite Bypass Road, Sta. 26 + 286.16 - Sta. 26 + 863.2, Cavite",
      "office": "Central Office",
      "amountPesos": 222751000,
      "lengthKm": 0.5770400000000009,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 386023499.24,
      "lengthMeters": 577.04,
      "allocationPerStatedMeter": 386023.5,
      "rangesMeters": [
        [
          26286.16,
          26863.2
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Manila-Cavite Bypass Road, Sta. 26 + 286.16 - Sta. 26 + 863.2, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 2.84,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0238-002346",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Candoni - Gatuslao - Basay Bdry Road, Sta. 22+550 - Sta. 27+595",
      "office": "Central Office",
      "amountPesos": 222000000,
      "lengthKm": 5.045,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44003964.32,
      "lengthMeters": 5045.0,
      "allocationPerStatedMeter": 44003.96,
      "rangesMeters": [
        [
          22550.0,
          27595.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Candoni - Gatuslao - Basay Bdry Road, Sta. 22+550 - Sta. 27+595",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.01,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0416-005776",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Burayukan Bridge and Approaches along Bulanao-Dagupan-Balong Road Sta. 0+000 - Sta. 0+120, Tabuk City, Kalinga",
      "office": "Central Office",
      "amountPesos": 222000000,
      "lengthKm": 0.12,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 120.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          120.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Construction of Burayukan Bridge and Approaches along Bulanao-Dagupan-Balong Road Sta. 0+000 - Sta. 0+120, Tabuk City, Kalinga",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0234-002252",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Cabugao-Nueva Era-Danglas Road, Sta. 4+200- Sta. 9+708 Nueva Era, Ilocos Norte",
      "office": "Central Office",
      "amountPesos": 221000000,
      "lengthKm": 5.508,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40123456.79,
      "lengthMeters": 5508.0,
      "allocationPerStatedMeter": 40123.46,
      "rangesMeters": [
        [
          4200.0,
          9708.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Cabugao-Nueva Era-Danglas Road, Sta. 4+200- Sta. 9+708 Nueva Era, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.92,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0199-001593",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1843 + 561.05 - K1846 + 830, K1846 + 858.05 - K1849 + 300, K1849 + 360 - K1849 + 796, K1850 + 565 - K1851 + 026",
      "office": "Central Office",
      "amountPesos": 220000000,
      "lengthKm": 6.607899999999907,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 33293482.04,
      "lengthMeters": 6607.9,
      "allocationPerStatedMeter": 33293.48,
      "rangesMeters": [
        [
          1843561.05,
          1846830.0
        ],
        [
          1846858.05,
          1849300.0
        ],
        [
          1849360.0,
          1849796.0
        ],
        [
          1850565.0,
          1851026.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1843 + 561.05 - K1846 + 830, K1846 + 858.05 - K1849 + 300, K1849 + 360 - K1849 + 796, K1850 + 565 - K1851 + 026",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 0.95,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0226-002129",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Jct. Buda, Quezon-Jct. Valencia-Talaingod Road-Kalagangan, San Fernando Alternate/Bypass Road, Barangay Sta. Filomena Section, Sta. 28+156 - Sta. 28+196, Sta. 28+196 - Sta. 32+048.31, Quezon, Bukidnon",
      "office": "Central Office",
      "amountPesos": 219100000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          28156.0,
          28196.0
        ],
        [
          28196.0,
          32048.31
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Jct. Buda, Quezon-Jct. Valencia-Talaingod Road-Kalagangan, San Fernando Alternate/Bypass Road, Barangay Sta. Filomena Section, Sta. 28+156 - Sta. 28+196, Sta. 28+196 - Sta. 32+048.31, Quezon, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0202-001658",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Quezon-Batangas Road - K0097 + 620 - K0099 + 095, K0099 + 150 - K0100 + 511",
      "office": "Central Office",
      "amountPesos": 216200000,
      "lengthKm": 2.836,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 76234132.58,
      "lengthMeters": 2836.0,
      "allocationPerStatedMeter": 76234.13,
      "rangesMeters": [
        [
          97620.0,
          99095.0
        ],
        [
          99150.0,
          100511.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Quezon-Batangas Road - K0097 + 620 - K0099 + 095, K0099 + 150 - K0100 + 511",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 2.85,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0234-002253",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
      "office": "Central Office",
      "amountPesos": 215000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0257-002609",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Cauplasan Br. (B02395LZ) along Ilocos Norte-Apayao Rd",
      "office": "Central Office",
      "amountPesos": 210954000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Cauplasan Br. (B02395LZ) along Ilocos Norte-Apayao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0260-002679",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Quezon Br. (B01191MN) along Dipolog-Oroquieta National Rd",
      "office": "Central Office",
      "amountPesos": 210000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Quezon Br. (B01191MN) along Dipolog-Oroquieta National Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005927",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Wawa Bridge, Pilar, Bataan, 0+000 - 0+045, (14.672155, 120.563000)",
      "office": "Central Office",
      "amountPesos": 210000000,
      "lengthKm": 0.045,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 4666666666.67,
      "lengthMeters": 45.0,
      "allocationPerStatedMeter": 4666666.67,
      "rangesMeters": [
        [
          0.0,
          45.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Wawa Bridge, Pilar, Bataan, 0+000 - 0+045, (14.672155, 120.563000)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 7.69,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0441-006268",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Kibawe - Arakan Road, Barangay Lagandang Section, Sta. 14+300 - Sta. 19+550, Damulog, Bukidnon",
      "office": "Central Office",
      "amountPesos": 210000000,
      "lengthKm": 5.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 5250.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          14300.0,
          19550.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Kibawe - Arakan Road, Barangay Lagandang Section, Sta. 14+300 - Sta. 19+550, Damulog, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.27,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0418-005819",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Buenavista Bridge and Approach, Barangay Buenavista, Santiago City, Isabela",
      "office": "Central Office",
      "amountPesos": 209000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Buenavista Bridge and Approach, Barangay Buenavista, Santiago City, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0214-001882",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Dagupan-Mangaldan-Calasiao Circumferential Road, Dagupan City-Mangaldan, Sta. 6+114.62 - Sta.6+620.48, Pangasinan",
      "office": "Central Office",
      "amountPesos": 208628000,
      "lengthKm": 0.5058599999999996,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 412422409.36,
      "lengthMeters": 505.86,
      "allocationPerStatedMeter": 412422.41,
      "rangesMeters": [
        [
          6114.62,
          6620.48
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Dagupan-Mangaldan-Calasiao Circumferential Road, Dagupan City-Mangaldan, Sta. 6+114.62 - Sta.6+620.48, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 3.24,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0238-002337",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Pasacao-Balatan Tourism Coastal Highway - Sta. 424+669.34 - Sta. 424+960, Sta. 433+842 - Sta. 435+699.02",
      "office": "Central Office",
      "amountPesos": 207096000,
      "lengthKm": 2.147679999999993,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 96427773.23,
      "lengthMeters": 2147.68,
      "allocationPerStatedMeter": 96427.77,
      "rangesMeters": [
        [
          424669.34,
          424960.0
        ],
        [
          433842.0,
          435699.02
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Pasacao-Balatan Tourism Coastal Highway - Sta. 424+669.34 - Sta. 424+960, Sta. 433+842 - Sta. 435+699.02",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 1.22,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0241-002389",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Cabadbaran - Puting Bato - Lanuza Road, (Sta. 65+797 - Sta. 67+068, Sta. 72+553 - Sta. 76+652), Barangay Pakwan Section, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 206160000,
      "lengthKm": 5.37,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 38391061.45,
      "lengthMeters": 5370.0,
      "allocationPerStatedMeter": 38391.06,
      "rangesMeters": [
        [
          65797.0,
          67068.0
        ],
        [
          72553.0,
          76652.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "Cabadbaran - Puting Bato - Lanuza Road, (Sta. 65+797 - Sta. 67+068, Sta. 72+553 - Sta. 76+652), Barangay Pakwan Section, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.88,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0148-000742",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Manila North Rd, Pampanga K0057 +747 -K0058+040, K0058+088.80 - K0058+ 155.54, K0058 + 168.34- K0058 + 291.99, K0062 + 674 - K0063 +742.53, K0063 + 800 - K0064 + 207.2",
      "office": "Central Office",
      "amountPesos": 205000000,
      "lengthKm": 1.9591199999999953,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 104638817.43,
      "lengthMeters": 1959.12,
      "allocationPerStatedMeter": 104638.82,
      "rangesMeters": [
        [
          57747.0,
          58040.0
        ],
        [
          58088.8,
          58155.54
        ],
        [
          58168.34,
          58291.99
        ],
        [
          62674.0,
          63742.53
        ],
        [
          63800.0,
          64207.2
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "148",
      "lengthEvidence": "Manila North Rd, Pampanga K0057 +747 -K0058+040, K0058+088.80 - K0058+ 155.54, K0058 + 168.34- K0058 + 291.99, K0062 + 674 - K0063 +742.53, K0063 + 800 - K0064 + 207.2",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 4.18,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0429-006039",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Cristobal, Victoria, Oriental Mindoro",
      "office": "Central Office",
      "amountPesos": 205000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Road, Barangay San Cristobal, Victoria, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0224-002089",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tacloban - Palo Diversion Road, (Sta. 3 + 072 - Sta. 3 + 160.5, Sta. 2 + 711.50 - Sta. 2 + 742, Sta. 1+303 - Sta. 1+357, Sta. 2 + 742 - Sta. 3 + 039), Palo, Leyte",
      "office": "Central Office",
      "amountPesos": 204527000,
      "lengthKm": 0.47,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 435163829.79,
      "lengthMeters": 470.0,
      "allocationPerStatedMeter": 435163.83,
      "rangesMeters": [
        [
          3072.0,
          3160.5
        ],
        [
          2711.5,
          2742.0
        ],
        [
          1303.0,
          1357.0
        ],
        [
          2742.0,
          3039.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Tacloban - Palo Diversion Road, (Sta. 3 + 072 - Sta. 3 + 160.5, Sta. 2 + 711.50 - Sta. 2 + 742, Sta. 1+303 - Sta. 1+357, Sta. 2 + 742 - Sta. 3 + 039), Palo, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 3.42,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0158-000909",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Repair/ Rehabilitation/ Improvement/ Reconstruction of Damaged Road Sections along National Roads - Secondary Roads",
      "office": "Central Office",
      "amountPesos": 204000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "Repair/ Rehabilitation/ Improvement/ Reconstruction of Damaged Road Sections along National Roads - Secondary Roads",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0177-001223",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Rehabilitation/ Reconstruction/ Construction of Road Slips/ Collapses including slope protection along National Roads - Secondary Roads",
      "office": "Central Office",
      "amountPesos": 204000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Rehabilitation/ Reconstruction/ Construction of Road Slips/ Collapses including slope protection along National Roads - Secondary Roads",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0412-005701",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road Dike leading to Navotas Pumping Station No. 1 (C0+000 - C0+385) along Navotas Coastal Dike, Navotas City",
      "office": "Central Office",
      "amountPesos": 204000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "412",
      "lengthEvidence": "Improvement of Road Dike leading to Navotas Pumping Station No. 1 (C0+000 - C0+385) along Navotas Coastal Dike, Navotas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0248-002494",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Off-Carriageway Road Safety Facilities/Devices along National Roads - Secondary Roads",
      "office": "Central Office",
      "amountPesos": 203000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "248",
      "lengthEvidence": "Off-Carriageway Road Safety Facilities/Devices along National Roads - Secondary Roads",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0424-005930",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Replacement of Marcos Bridge (Tawiran Bridge), Meycauayan, Bulacan (120.910624, 14.746335)",
      "office": "Central Office",
      "amountPesos": 203000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Replacement of Marcos Bridge (Tawiran Bridge), Meycauayan, Bulacan (120.910624, 14.746335)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0447-006398",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction/ Improvement/ Repair/ Rehabilitation of Access Roads and/or Bridges leading to Major/ Strategic Public Buildings/ Facilities for Enhanced Public Service Delivery and/ or Regional Connectivity",
      "office": "Central Office",
      "amountPesos": 203000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "447",
      "lengthEvidence": "Construction/ Improvement/ Repair/ Rehabilitation of Access Roads and/or Bridges leading to Major/ Strategic Public Buildings/ Facilities for Enhanced Public Service Delivery and/ or Regional Connectivity",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0286-003242",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "La-Libertad Br. (B00513NR) along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "office": "Central Office",
      "amountPesos": 202500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "La-Libertad Br. (B00513NR) along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0420-005858",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Replacement of Bridge, Barangay Sta. Rita, Quezon to Barangay Santa Cruz, Guimba, Nueva Ecija Sta. 0+000 - Sta. 0+112",
      "office": "Central Office",
      "amountPesos": 202400000,
      "lengthKm": 0.112,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1807142857.14,
      "lengthMeters": 112.0,
      "allocationPerStatedMeter": 1807142.86,
      "rangesMeters": [
        [
          0.0,
          112.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Replacement of Bridge, Barangay Sta. Rita, Quezon to Barangay Santa Cruz, Guimba, Nueva Ecija Sta. 0+000 - Sta. 0+112",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 2.98,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0228-002166",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Butuan City - Agusan del Norte Logistical Highway, Sta. 2+140 - Sta. 2+646.1, Cabcabon Section, Butuan City",
      "office": "Central Office",
      "amountPesos": 201129000,
      "lengthKm": 0.5060999999999999,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 397409602.85,
      "lengthMeters": 506.1,
      "allocationPerStatedMeter": 397409.6,
      "rangesMeters": [
        [
          2140.0,
          2646.1
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Butuan City - Agusan del Norte Logistical Highway, Sta. 2+140 - Sta. 2+646.1, Cabcabon Section, Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 2.92,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0234-002254",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Naguilian-Bagulin (La Union) - Kapangan (Benguet) Road, Sta 6+440 - Sta 8+454.54",
      "office": "Central Office",
      "amountPesos": 200866000,
      "lengthKm": 2.0145400000000007,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 99708121.95,
      "lengthMeters": 2014.54,
      "allocationPerStatedMeter": 99708.12,
      "rangesMeters": [
        [
          6440.0,
          8454.54
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Naguilian-Bagulin (La Union) - Kapangan (Benguet) Road, Sta 6+440 - Sta 8+454.54",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 1.26,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0260-002684",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Mambayaan Br. 2 (B01315MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "office": "Central Office",
      "amountPesos": 200500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Mambayaan Br. 2 (B01315MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0152-000800",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Repair/ Rehabilitation/ Improvement/ Reconstruction of Damaged Road Sections along National Roads - Primary Roads",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Repair/ Rehabilitation/ Improvement/ Reconstruction of Damaged Road Sections along National Roads - Primary Roads",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0152-000801",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Repair/ Rehabilitation/ Improvement/ Reconstruction of Major Roads in Metro Manila",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Repair/ Rehabilitation/ Improvement/ Reconstruction of Major Roads in Metro Manila",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0157-000894",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Cebu South Coastal Rd - (S00014CB) Chainage 512 - Chainage 1024",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "157",
      "lengthEvidence": "Cebu South Coastal Rd - (S00014CB) Chainage 512 - Chainage 1024",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0173-001169",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Rehabilitation/ Reconstruction/ Construction of Road Slips/ Collapses including slope protection along National Roads - Primary Roads",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Rehabilitation/ Reconstruction/ Construction of Road Slips/ Collapses including slope protection along National Roads - Primary Roads",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0215-001914",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tuguegarao-Solana Diversion Road (Tuguegarao-Solana Bridge) (Sta. 0+849.513 - Sta. 2+515.463), Solana, Cagayan",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 1.6659499999999998,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 1665.95,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          849.513,
          2515.4629999999997
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Tuguegarao-Solana Diversion Road (Tuguegarao-Solana Bridge) (Sta. 0+849.513 - Sta. 2+515.463), Solana, Cagayan",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0217-001951",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Guiguinto By-pass Road, Sta.000+000.00 - Sta.000+920.00, Guiguinto, Bulacan",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 0.92,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 217391304.35,
      "lengthMeters": 920.0,
      "allocationPerStatedMeter": 217391.3,
      "rangesMeters": [
        [
          0.0,
          920.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Guiguinto By-pass Road, Sta.000+000.00 - Sta.000+920.00, Guiguinto, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 2.02,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0217-001953",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Lubao -Guagaua-Minalin-Sto Tomas Road, Bridge 11, Sta 6+860 - Sta 6+980), Pampanga",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 0.12,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 120.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          6860.0,
          6980.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Lubao -Guagaua-Minalin-Sto Tomas Road, Bridge 11, Sta 6+860 - Sta 6+980), Pampanga",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0219-001990",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Lipa City-Padre Garcia Diversion Road - Sta. 88 + 400 - Sta. 99 + 923, Batangas",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 11.523,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17356591.17,
      "lengthMeters": 11523.0,
      "allocationPerStatedMeter": 17356.59,
      "rangesMeters": [
        [
          88400.0,
          99923.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Lipa City-Padre Garcia Diversion Road - Sta. 88 + 400 - Sta. 99 + 923, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.44,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0219-002002",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Padre Garcia-Rosario Diversion Road, Sta. 113+000 - Sta. 116+388.99, Padre Garcia, Batangas",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 3.388990000000005,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 59014632.68,
      "lengthMeters": 3388.99,
      "allocationPerStatedMeter": 59014.63,
      "rangesMeters": [
        [
          113000.0,
          116388.99
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Padre Garcia-Rosario Diversion Road, Sta. 113+000 - Sta. 116+388.99, Padre Garcia, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 1.51,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0219-002003",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Padre Garcia-Rosario Diversion Road - Sta. 116 + 388.99 - Sta. 118 + 434.54, Sta. 118 + 467.04 - Sta. 118 + 580.00, Batangas",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 2.158509999999995,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 92656508.42,
      "lengthMeters": 2158.51,
      "allocationPerStatedMeter": 92656.51,
      "rangesMeters": [
        [
          116388.99,
          118434.54
        ],
        [
          118467.04,
          118580.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Padre Garcia-Rosario Diversion Road - Sta. 116 + 388.99 - Sta. 118 + 434.54, Sta. 118 + 467.04 - Sta. 118 + 580.00, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 1.8,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0223-002071",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Metro Cebu Expressway, Sta. 3+560 - Sta. 3+920, Cebu",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 0.36,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 555555555.56,
      "lengthMeters": 360.0,
      "allocationPerStatedMeter": 555555.56,
      "rangesMeters": [
        [
          3560.0,
          3920.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Metro Cebu Expressway, Sta. 3+560 - Sta. 3+920, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 4.37,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0225-002104",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Barangay Taglimao - Barangay Bagocboc, Sta. 8+084 - Sta. 9+620, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 1.536,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 130208333.33,
      "lengthMeters": 1536.0,
      "allocationPerStatedMeter": 130208.33,
      "rangesMeters": [
        [
          8084.0,
          9620.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "225",
      "lengthEvidence": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Barangay Taglimao - Barangay Bagocboc, Sta. 8+084 - Sta. 9+620, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.58,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0225-002115",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "CDO-Opol-El Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Amoros Bridge 2, Sta. 16+545 - Sta. 16+605, Barangay Sambulawan, El Salvador City, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 0.06,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 60.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          16545.0,
          16605.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "225",
      "lengthEvidence": "CDO-Opol-El Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Amoros Bridge 2, Sta. 16+545 - Sta. 16+605, Barangay Sambulawan, El Salvador City, Misamis Oriental",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0225-002118",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "CDO-Opol-El Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Barangay Patag Section, Sta. 15+512 - Sta. 16+762, Opol, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 1.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 160000000.0,
      "lengthMeters": 1250.0,
      "allocationPerStatedMeter": 160000.0,
      "rangesMeters": [
        [
          15512.0,
          16762.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "225",
      "lengthEvidence": "CDO-Opol-El Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Barangay Patag Section, Sta. 15+512 - Sta. 16+762, Opol, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.94,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0226-002121",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Construction of Jct. Sayre Highway Dalirig–Kisolon Bypass Road, Barangay San Roque Section, Sta. 1+000 - Sta. 5+000, Sumilao, Bukidnon",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          1000.0,
          5000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Construction of Jct. Sayre Highway Dalirig–Kisolon Bypass Road, Barangay San Roque Section, Sta. 1+000 - Sta. 5+000, Sumilao, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 1.28,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0227-002147",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sayre Highway Parallel Road II (Impasug-ong - Malaybalay City Section), Barangay Sayawan Section, Sta. 33+020 - Sta. 37+020, Impasug-ong, Bukidnon",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          33020.0,
          37020.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Sayre Highway Parallel Road II (Impasug-ong - Malaybalay City Section), Barangay Sayawan Section, Sta. 33+020 - Sta. 37+020, Impasug-ong, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 1.28,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0235-002277",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Road (Sta. 02 + 061 - Sta. 02 + 607.32)",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 0.5463200000000001,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 366085810.51,
      "lengthMeters": 546.32,
      "allocationPerStatedMeter": 366085.81,
      "rangesMeters": [
        [
          2061.0,
          2607.32
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Road (Sta. 02 + 061 - Sta. 02 + 607.32)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 3.7,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0236-002303",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "MSR JCT Canda-Hondagua-Roma Point Road (Roma Point Bridge), Sta. 1 + 210 - Sta. 1 + 600",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 0.39,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 390.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          1210.0,
          1600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "MSR JCT Canda-Hondagua-Roma Point Road (Roma Point Bridge), Sta. 1 + 210 - Sta. 1 + 600",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0237-002316",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Sangley Airport Access Road - Sta. 32 + 085 - Sta. 32 + 178.33, Cavite City",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 0.09333000000000174,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2142933676.2,
      "lengthMeters": 93.33,
      "allocationPerStatedMeter": 2142933.68,
      "rangesMeters": [
        [
          32085.0,
          32178.33
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Sangley Airport Access Road - Sta. 32 + 085 - Sta. 32 + 178.33, Cavite City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 2.46,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0239-002349",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Himamaylan City - Negros Oriental Boundary - Tayasan Road, Sta. 9 + 415 - Sta. 9 + 485",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 0.07,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2857142857.14,
      "lengthMeters": 70.0,
      "allocationPerStatedMeter": 2857142.86,
      "rangesMeters": [
        [
          9415.0,
          9485.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Himamaylan City - Negros Oriental Boundary - Tayasan Road, Sta. 9 + 415 - Sta. 9 + 485",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 3.28,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0239-002361",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Iligan City - Cagayan de Oro City Alternate Road (Digkilaan-Bulua Section), Barangay Baikingon, Sta. 49+837 - Sta. 53+187, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 3.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 59701492.54,
      "lengthMeters": 3350.0,
      "allocationPerStatedMeter": 59701.49,
      "rangesMeters": [
        [
          49837.0,
          53187.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Iligan City - Cagayan de Oro City Alternate Road (Digkilaan-Bulua Section), Barangay Baikingon, Sta. 49+837 - Sta. 53+187, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.37,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0240-002368",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Barangay Canayan, Sta. 18+100 - Sta. 19+806, Malaybalay City, Bukidnon",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 1.706,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 117233294.26,
      "lengthMeters": 1706.0,
      "allocationPerStatedMeter": 117233.29,
      "rangesMeters": [
        [
          18100.0,
          19806.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Barangay Canayan, Sta. 18+100 - Sta. 19+806, Malaybalay City, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 1.48,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0241-002387",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Butuan City - Pianing - Tandag Road - Sta. 45+694 - Sta. 60+614, Barangay Pakwan Section, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 14.92,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13404825.74,
      "lengthMeters": 14920.0,
      "allocationPerStatedMeter": 13404.83,
      "rangesMeters": [
        [
          45694.0,
          60614.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "Butuan City - Pianing - Tandag Road - Sta. 45+694 - Sta. 60+614, Barangay Pakwan Section, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.31,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0241-002388",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Butuan City - Pianing - Tandag, Boundary Agusan del Sur - Surigao del Sur, Sta. 23+741 - Sta. 23+742.49, Pakwan Section, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 0.0014900000000016007,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 134228187919.32,
      "lengthMeters": 1.49,
      "allocationPerStatedMeter": 134228187.92,
      "rangesMeters": [
        [
          23741.0,
          23742.49
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "Butuan City - Pianing - Tandag, Boundary Agusan del Sur - Surigao del Sur, Sta. 23+741 - Sta. 23+742.49, Pakwan Section, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": true,
      "rateReview": "Very short printed range · verify length first"
    },
    {
      "id": "HB10858-3-0241-002391",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Cabadbaran - Puting Bato - Lanuza, Boundary Agusan del Norte - Lanuza Road, Sta. 47+925 - Sta. 49+120, Sta. 49+220 - Sta. 49+720, Hinapoyan Section, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 1.695,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 117994100.29,
      "lengthMeters": 1695.0,
      "allocationPerStatedMeter": 117994.1,
      "rangesMeters": [
        [
          47925.0,
          49120.0
        ],
        [
          49220.0,
          49720.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "Cabadbaran - Puting Bato - Lanuza, Boundary Agusan del Norte - Lanuza Road, Sta. 47+925 - Sta. 49+120, Sta. 49+220 - Sta. 49+720, Hinapoyan Section, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 1.49,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0243-002415",
      "category": "Mixed roads / bridges",
      "program": "Construction of Flyovers/ Interchanges/ Underpasses/ Long Span Bridges",
      "projectName": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "243",
      "lengthEvidence": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0244-002428",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Off-Carriageway Road Safety Facilities/Devices along National Roads - Primary Roads",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "244",
      "lengthEvidence": "Off-Carriageway Road Safety Facilities/Devices along National Roads - Primary Roads",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0248-002485",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Gumaca - Pitogo - Mulanay - Sn Narciso Rd - K0248 + 900 - K0251 + 200, K0268 + 600 - K0269 + 089, K0269 + 800 - K0270 + 500 - K0273+000, Quezon",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          248900.0,
          251200.0
        ],
        [
          268600.0,
          269089.0
        ],
        [
          269800.0,
          270500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "248",
      "lengthEvidence": "Gumaca - Pitogo - Mulanay - Sn Narciso Rd - K0248 + 900 - K0251 + 200, K0268 + 600 - K0269 + 089, K0269 + 800 - K0270 + 500 - K0273+000, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002633",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Dancalan Br. (B05019LZ) along Dancalan-Sta. Cruz, Donsol-Pio Duran Road, Sorsogon",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Dancalan Br. (B05019LZ) along Dancalan-Sta. Cruz, Donsol-Pio Duran Road, Sorsogon",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0261-002721",
      "category": "Mixed roads / bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Replacement of Bridges along National Road",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Replacement of Bridges along National Road",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002806",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Biliran Br. (B00057BR) along Leyte-Biliran Rd",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Biliran Br. (B00057BR) along Leyte-Biliran Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002823",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Structural Retrofitting/ Strengthening along National Bridges",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Structural Retrofitting/ Strengthening along National Bridges",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002958",
      "category": "Mixed roads / bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Rehabilitation/ Major Repair of Bridges along National Roads",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Rehabilitation/ Major Repair of Bridges along National Roads",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0284-003202",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Dalibubon Parallel Br. (B01203LZ) along Jct. Ipil-Quirino Bdry. Rd., Jones, Isabela",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Dalibubon Parallel Br. (B01203LZ) along Jct. Ipil-Quirino Bdry. Rd., Jones, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0286-003259",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Carmen Steel Parallel Br. along Carmen-Patag-Bulua Rd",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Carmen Steel Parallel Br. along Carmen-Patag-Bulua Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003289",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Bislig Parallel Br. along Surigao-Davao Coastal Rd",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Bislig Parallel Br. along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0294-003417",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Libas Br. Along Tigwi-Dampulan-Lipata-Yook Buenavista Rd. K0095 + 075",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Libas Br. Along Tigwi-Dampulan-Lipata-Yook Buenavista Rd. K0095 + 075",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0414-005730",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Calungbuyan Br. along Santa-Rancho Road, Sta. 388+733.15 - Sta. 388+790.00 Ilocos Sur",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 0.05684999999997672,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 3518029903.26,
      "lengthMeters": 56.85,
      "allocationPerStatedMeter": 3518029.9,
      "rangesMeters": [
        [
          388733.15,
          388790.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Rehabilitation of Calungbuyan Br. along Santa-Rancho Road, Sta. 388+733.15 - Sta. 388+790.00 Ilocos Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 99.5,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0415-005749",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge connecting Bolinao to Santiago Island, Bolinao, Pangasinan",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Bridge connecting Bolinao to Santiago Island, Bolinao, Pangasinan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005754",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of By-pass and Diversion Road-Laoac-Manaoag-San Jacinto-Mangaldan Road (Laoac Section), Pangasinan",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of By-pass and Diversion Road-Laoac-Manaoag-San Jacinto-Mangaldan Road (Laoac Section), Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005755",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Daquioag-Tabucbuc Bridge, Marcos, Ilocos Norte",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Daquioag-Tabucbuc Bridge, Marcos, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0419-005832",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Concrete Road, Barangay Callao, Alicia, Isabela to Barangay San Sebastian, Ramon, Isabela",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Rehabilitation of Concrete Road, Barangay Callao, Alicia, Isabela to Barangay San Sebastian, Ramon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0422-005903",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Makabaclay Road leading to Minalungao National Park, Gapan City, Nueva Ecija",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Improvement of Makabaclay Road leading to Minalungao National Park, Gapan City, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005983",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road along Panamitan River connecting to R1 - Aguinaldo Shrine and Museum - New Kawit City Hall Access Road, Kawit, Cavite",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Road along Panamitan River connecting to R1 - Aguinaldo Shrine and Museum - New Kawit City Hall Access Road, Kawit, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006011",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Magsaysay - Tigman, Aborlan, Palawan, Start 9.412702N 118.537565E End 9.366752N 118.527674E",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Road, Barangay Magsaysay - Tigman, Aborlan, Palawan, Start 9.412702N 118.537565E End 9.366752N 118.527674E",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006014",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bantay-Mainit Bridge, Boac, Marinduque",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Bantay-Mainit Bridge, Boac, Marinduque",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006023",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection, Barangay Coron Town Proper - Barangay Borac RoRo Port, Coron, Palawan",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Road Slope Protection, Barangay Coron Town Proper - Barangay Borac RoRo Port, Coron, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0434-006143",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Extension of Babag-Calawisan Diversion Road",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Extension of Babag-Calawisan Diversion Road",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0434-006153",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Slope Protection, Libo St., Barangay Tayud, Consolacion, Cebu",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Road with Slope Protection, Libo St., Barangay Tayud, Consolacion, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0435-006157",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of the Basak-Patong Road at Barangays Patong, Basak and Alawijao, Badian, Cebu",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of the Basak-Patong Road at Barangays Patong, Basak and Alawijao, Badian, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0438-006219",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nacabuklad - Barangay Namnam, San Fernando, Bukidnon, Sta. 11+000 - Sta. 15+000",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          11000.0,
          15000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Construction of Road, Barangay Nacabuklad - Barangay Namnam, San Fernando, Bukidnon, Sta. 11+000 - Sta. 15+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.59,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0438-006220",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nacabuklad - Barangay Namnam, San Fernando, Bukidnon, Sta. 15+000 - Sta. 19+000",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          15000.0,
          19000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Construction of Road, Barangay Nacabuklad - Barangay Namnam, San Fernando, Bukidnon, Sta. 15+000 - Sta. 19+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.59,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0438-006221",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nacabuklad - Barangay Namnam, San Fernando, Bukidnon, Sta. 7+000 - Sta. 11+000",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          7000.0,
          11000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Construction of Road, Barangay Nacabuklad - Barangay Namnam, San Fernando, Bukidnon, Sta. 7+000 - Sta. 11+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.59,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0440-006251",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of CDOC - Iligan Hinterland Road, Jct. CDO - Camp Kibaritan / Dansolihon - Jct. BCIR / Laguindingan Airport Road Extension, Barangay Tugasnon-Barangay Lourdes, Sta. 49+000 - Sta. 52+700, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 3.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54054054.05,
      "lengthMeters": 3700.0,
      "allocationPerStatedMeter": 54054.05,
      "rangesMeters": [
        [
          49000.0,
          52700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Construction of CDOC - Iligan Hinterland Road, Jct. CDO - Camp Kibaritan / Dansolihon - Jct. BCIR / Laguindingan Airport Road Extension, Barangay Tugasnon-Barangay Lourdes, Sta. 49+000 - Sta. 52+700, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.72,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0441-006274",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Northern Bukidnon Agri-Industrial Economic Zone Road, Barangay Kalilangan Section, Sta. 3+375 - Sta. 7+075, Baungon, Bukidnon",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 3.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54054054.05,
      "lengthMeters": 3700.0,
      "allocationPerStatedMeter": 54054.05,
      "rangesMeters": [
        [
          3375.0,
          7075.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Northern Bukidnon Agri-Industrial Economic Zone Road, Barangay Kalilangan Section, Sta. 3+375 - Sta. 7+075, Baungon, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.72,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0442-006295",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Wao Road, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Construction of Wao Road, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0445-006359",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Esperanza-Lebak Bypass Road, Sta. 5 + 550 - Sta. 7 + 259, Sta. 7 + 449 - Sta. 10 + 715, Esperanza, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": 4.975,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 40201005.03,
      "lengthMeters": 4975.0,
      "allocationPerStatedMeter": 40201.01,
      "rangesMeters": [
        [
          5550.0,
          7259.0
        ],
        [
          7449.0,
          10715.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Construction of Esperanza-Lebak Bypass Road, Sta. 5 + 550 - Sta. 7 + 259, Sta. 7 + 449 - Sta. 10 + 715, Esperanza, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.28,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0447-006397",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sta. Irene - San Miguel Road, Barangay Bolhoon, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "447",
      "lengthEvidence": "Construction of Sta. Irene - San Miguel Road, Barangay Bolhoon, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0629-010230",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Coastal Road, Barangay Culo to Barangay Ubay, Pulupandan, Negros Occidental",
      "office": "Central Office",
      "amountPesos": 200000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "629",
      "lengthEvidence": "Construction of Coastal Road, Barangay Culo to Barangay Ubay, Pulupandan, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0124-000259",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagaytay-Nasugbu Rd - K0074 + 915 - K0075 + 000, K0085 + 000 - K0087 + 000, K0088 + 000 - K0088 + 777, K0090 + 670 - K0091 + 000, K0093 + 670 - K0094 + 000, K0097 + 000 - K0098 + 434, K0100 + 000 - K0100 + 068, K0100 + 300 - K0101 + 000, K0102 + 000 - K0102 + 365",
      "office": "Central Office",
      "amountPesos": 198629000,
      "lengthKm": 6.089,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 32620955.82,
      "lengthMeters": 6089.0,
      "allocationPerStatedMeter": 32620.96,
      "rangesMeters": [
        [
          74915.0,
          75000.0
        ],
        [
          85000.0,
          87000.0
        ],
        [
          88000.0,
          88777.0
        ],
        [
          90670.0,
          91000.0
        ],
        [
          93670.0,
          94000.0
        ],
        [
          97000.0,
          98434.0
        ],
        [
          100000.0,
          100068.0
        ],
        [
          100300.0,
          101000.0
        ],
        [
          102000.0,
          102365.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Tagaytay-Nasugbu Rd - K0074 + 915 - K0075 + 000, K0085 + 000 - K0087 + 000, K0088 + 000 - K0088 + 777, K0090 + 670 - K0091 + 000, K0093 + 670 - K0094 + 000, K0097 + 000 - K0098 + 434, K0100 + 000 - K0100 + 068, K0100 + 300 - K0101 + 000, K0102 + 000 - K0102 + 365",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.98,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0118-000143",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1763 + (-720) - K1764 + 330.01",
      "office": "Central Office",
      "amountPesos": 197130000,
      "lengthKm": 2.050010000000009,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 96160506.53,
      "lengthMeters": 2050.01,
      "allocationPerStatedMeter": 96160.51,
      "rangesMeters": [
        [
          1762280.0,
          1764330.01
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1763 + (-720) - K1764 + 330.01",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 2.56,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0214-001880",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Construction of Vigan-Cabugao Coastal/Diversion Road, Ilocos Sur",
      "office": "Central Office",
      "amountPesos": 195000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Construction of Vigan-Cabugao Coastal/Diversion Road, Ilocos Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0234-002268",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
      "office": "Central Office",
      "amountPesos": 195000000,
      "lengthKm": 0.122,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1598360655.74,
      "lengthMeters": 122.0,
      "allocationPerStatedMeter": 1598360.66,
      "rangesMeters": [
        [
          7771.0,
          7893.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 1.84,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0287-003265",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Mariano Lluch Badelles Sr. Parallel Br. along Tambacan Rd-Tubod Natl H-way Jct",
      "office": "Central Office",
      "amountPesos": 195000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Mariano Lluch Badelles Sr. Parallel Br. along Tambacan Rd-Tubod Natl H-way Jct",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006027",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Barong-Barong, Brooke’s Point, Palawan",
      "office": "Central Office",
      "amountPesos": 195000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Road, Barangay Barong-Barong, Brooke’s Point, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0429-006042",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sayab II, Barangay Puring to Barangay Tabud, Bataraza, Palawan",
      "office": "Central Office",
      "amountPesos": 195000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Road, Sayab II, Barangay Puring to Barangay Tabud, Bataraza, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0234-002265",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
      "office": "Central Office",
      "amountPesos": 192237000,
      "lengthKm": 0.13275,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1448112994.35,
      "lengthMeters": 132.75,
      "allocationPerStatedMeter": 1448112.99,
      "rangesMeters": [
        [
          805.0,
          937.75
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 1.66,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0222-002053",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Passi Bypass Road, Sta. 3+676.10 - Sta. 4+573.94, Sta. 4+587.34 - Sta. 5+424.34, Iloilo",
      "office": "Central Office",
      "amountPesos": 191627000,
      "lengthKm": 1.7348400000000006,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 110458024.95,
      "lengthMeters": 1734.84,
      "allocationPerStatedMeter": 110458.02,
      "rangesMeters": [
        [
          3676.1,
          4573.9400000000005
        ],
        [
          4587.34,
          5424.34
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Passi Bypass Road, Sta. 3+676.10 - Sta. 4+573.94, Sta. 4+587.34 - Sta. 5+424.34, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 2.15,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0128-000338",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Banisilan-Guiling-Alamada-Libungan Rd - K1632 + 320 - K1636 + 000",
      "office": "Central Office",
      "amountPesos": 191370000,
      "lengthKm": 3.68,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52002717.39,
      "lengthMeters": 3680.0,
      "allocationPerStatedMeter": 52002.72,
      "rangesMeters": [
        [
          1632320.0,
          1636000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Banisilan-Guiling-Alamada-Libungan Rd - K1632 + 320 - K1636 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 3.16,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0127-000325",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siocon-Sirawai-Sibuco-Limpapa Rd - (S01151MN) Chainage 13315 - Chainage 15237, Chainage 15520 - Chainage 19774",
      "office": "Central Office",
      "amountPesos": 190461000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Siocon-Sirawai-Sibuco-Limpapa Rd - (S01151MN) Chainage 13315 - Chainage 15237, Chainage 15520 - Chainage 19774",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006701",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Alsem-Dipilat Bridge, Barangay Alsem and Barangay Dipilat, Vintar, Ilocos Norte, Start 18.30553349, 120.71033720 End 18.36261217, 120.76077792",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 190000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Alsem-Dipilat Bridge, Barangay Alsem and Barangay Dipilat, Vintar, Ilocos Norte, Start 18.30553349, 120.71033720 End 18.36261217, 120.76077792",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0220-002024",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Camarines Sur - Albay Diversion Road, 473+895 - 474+700, 474+734 - 478+915.52, Libon, Albay",
      "office": "Central Office",
      "amountPesos": 188137000,
      "lengthKm": 4.986520000000018,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 37729117.7,
      "lengthMeters": 4986.52,
      "allocationPerStatedMeter": 37729.12,
      "rangesMeters": [
        [
          473895.0,
          474700.0
        ],
        [
          474734.0,
          478915.52
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Camarines Sur - Albay Diversion Road, 473+895 - 474+700, 474+734 - 478+915.52, Libon, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.97,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0199-001587",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1805 + 000 - K1807 + 167, K1807 + 195.34 - K1811 + 000",
      "office": "Central Office",
      "amountPesos": 188000000,
      "lengthKm": 5.9716599999999165,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 31482033.47,
      "lengthMeters": 5971.66,
      "allocationPerStatedMeter": 31482.03,
      "rangesMeters": [
        [
          1805000.0,
          1807167.0
        ],
        [
          1807195.34,
          1811000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1805 + 000 - K1807 + 167, K1807 + 195.34 - K1811 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 0.89,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0222-002064",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 11+630.6 - Sta. 18+079, Victorias City, Negros Occidental",
      "office": "Central Office",
      "amountPesos": 185074000,
      "lengthKm": 6.4483999999999995,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28700762.98,
      "lengthMeters": 6448.4,
      "allocationPerStatedMeter": 28700.76,
      "rangesMeters": [
        [
          11630.6,
          18079.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 11+630.6 - Sta. 18+079, Victorias City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.74,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0227-002146",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sayre Highway Parallel Road II (Impasug-ong - Malaybalay City Section), Barangay San Jose Section, Sta. 90+900 - Sta. 94+550, Malaybalay City, Bukidnon",
      "office": "Central Office",
      "amountPesos": 185000000,
      "lengthKm": 3.65,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50684931.51,
      "lengthMeters": 3650.0,
      "allocationPerStatedMeter": 50684.93,
      "rangesMeters": [
        [
          90900.0,
          94550.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Sayre Highway Parallel Road II (Impasug-ong - Malaybalay City Section), Barangay San Jose Section, Sta. 90+900 - Sta. 94+550, Malaybalay City, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 1.3,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0238-002348",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Himamaylan City - Negros Oriental Boundary - Tayasan Road, Sta. 19+510 - Sta. 23+123",
      "office": "Central Office",
      "amountPesos": 185000000,
      "lengthKm": 3.613,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51203985.61,
      "lengthMeters": 3613.0,
      "allocationPerStatedMeter": 51203.99,
      "rangesMeters": [
        [
          19510.0,
          23123.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Himamaylan City - Negros Oriental Boundary - Tayasan Road, Sta. 19+510 - Sta. 23+123",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.18,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0284-003197",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Magallanes Parallel Br. along Pangasinan-Nueva Vizcaya Rd",
      "office": "Central Office",
      "amountPesos": 185000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Magallanes Parallel Br. along Pangasinan-Nueva Vizcaya Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0205-001713",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Banisilan-Guiling-Alamada-Libungan Rd - K1659 + 000 - K1663 + 000",
      "office": "Central Office",
      "amountPesos": 184785000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46196250.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 46196.25,
      "rangesMeters": [
        [
          1659000.0,
          1663000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Banisilan-Guiling-Alamada-Libungan Rd - K1659 + 000 - K1663 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 1.73,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0149-000752",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0192 + 000 - K0192 + 072, K0192 + 292 - K0193 + 940, K0193 + 950 - K0193 + 1028, K0194 + 201 - K0194 + 390, K0194 + 655 - K0194 + 690, K0195 + 029 - K0196 + 133, K0196 + 180 - K0201 + 712, K0202 + 075 - K0202 + 365, K0202 + 432 - K0203 + 800",
      "office": "Central Office",
      "amountPesos": 184534000,
      "lengthKm": 10.316,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 17888134.94,
      "lengthMeters": 10316.0,
      "allocationPerStatedMeter": 17888.13,
      "rangesMeters": [
        [
          192000.0,
          192072.0
        ],
        [
          192292.0,
          193940.0
        ],
        [
          193950.0,
          194028.0
        ],
        [
          194201.0,
          194390.0
        ],
        [
          194655.0,
          194690.0
        ],
        [
          195029.0,
          196133.0
        ],
        [
          196180.0,
          201712.0
        ],
        [
          202075.0,
          202365.0
        ],
        [
          202432.0,
          203800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "149",
      "lengthEvidence": "Maharlika Highway (LZ) - K0192 + 000 - K0192 + 072, K0192 + 292 - K0193 + 940, K0193 + 950 - K0193 + 1028, K0194 + 201 - K0194 + 390, K0194 + 655 - K0194 + 690, K0195 + 029 - K0196 + 133, K0196 + 180 - K0201 + 712, K0202 + 075 - K0202 + 365, K0202 + 432 - K0203 + 800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 0.52,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0142-000622",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Matalam-Mlang-Bagontapay Jct Rd - K1659 + 309 - K1661 + 185.30",
      "office": "Central Office",
      "amountPesos": 183490000,
      "lengthKm": 1.8763000000000465,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 97793529.82,
      "lengthMeters": 1876.3,
      "allocationPerStatedMeter": 97793.53,
      "rangesMeters": [
        [
          1659309.0,
          1661185.3
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "Matalam-Mlang-Bagontapay Jct Rd - K1659 + 309 - K1661 + 185.30",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 3.26,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0426-005986",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Wawa, Barangay Malaban, Biñan City, Laguna",
      "office": "Central Office",
      "amountPesos": 182000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Road and Drainage, Wawa, Barangay Malaban, Biñan City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0284-003214",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Bridge of Promise (B03026LZ) along Batangas-Lobo Rd",
      "office": "Central Office",
      "amountPesos": 180800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Bridge of Promise (B03026LZ) along Batangas-Lobo Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0228-002165",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bislig City-San Isidro-San Antonio-San Jose, Sta. 5+026.735 - Sta. 9+170.735, Barangay San Isidro Section, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 180000000,
      "lengthKm": 4.144000000000001,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 43436293.44,
      "lengthMeters": 4144.0,
      "allocationPerStatedMeter": 43436.29,
      "rangesMeters": [
        [
          5026.735,
          9170.735
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Bislig City-San Isidro-San Antonio-San Jose, Sta. 5+026.735 - Sta. 9+170.735, Barangay San Isidro Section, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 1.11,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0229-002172",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 180000000,
      "lengthKm": 0.0005869999999995343,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 306643952300.07,
      "lengthMeters": 0.587,
      "allocationPerStatedMeter": 306643952.3,
      "rangesMeters": [
        [
          17580.9,
          17581.487
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": true,
      "rateReview": "Very short printed range · verify length first"
    },
    {
      "id": "HB10858-3-0257-002619",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Agana Br. (B01376LZ) along Romulo H-way, Tarlac City, Tarlac",
      "office": "Central Office",
      "amountPesos": 180000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Agana Br. (B01376LZ) along Romulo H-way, Tarlac City, Tarlac",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0286-003256",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Polo Parallel Br. along Jct Polo-Dapitan Park Natl Rd",
      "office": "Central Office",
      "amountPesos": 180000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Polo Parallel Br. along Jct Polo-Dapitan Park Natl Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0419-005846",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Kaliwanagan to Barangay Tayabo, San Jose City, Nueva Ecija",
      "office": "Central Office",
      "amountPesos": 180000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Construction of Bridge, Barangay Kaliwanagan to Barangay Tayabo, San Jose City, Nueva Ecija",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0425-005950",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Barangays Chrysanthemum, Cuyab, and Poblacion, San Pedro City, Laguna",
      "office": "Central Office",
      "amountPesos": 180000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Barangays Chrysanthemum, Cuyab, and Poblacion, San Pedro City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0438-006217",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Leading to Science and Technology Park, Barangay Taytayan (Libertad)-Barangay Lagutay (Gitagum), Sta. 1+300-Sta. 4+800, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 180000000,
      "lengthKm": 3.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51428571.43,
      "lengthMeters": 3500.0,
      "allocationPerStatedMeter": 51428.57,
      "rangesMeters": [
        [
          1300.0,
          4800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Construction of Road Leading to Science and Technology Park, Barangay Taytayan (Libertad)-Barangay Lagutay (Gitagum), Sta. 1+300-Sta. 4+800, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.64,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0223-002081",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Burauen Bypass Road, Chainage 3+500 - Chainage 3+592.75, Poblacion District VI - San Jose East, Burauen, Leyte",
      "office": "Central Office",
      "amountPesos": 179317000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Burauen Bypass Road, Chainage 3+500 - Chainage 3+592.75, Poblacion District VI - San Jose East, Burauen, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0157-000891",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0089 + (-689) - K0089 + (-512), K0122 + 024 - K0122 + 999, K0126 + 724 - K0127 + 000, K0139 + 1100 - K0139 + 1904, K0141 + 000 - K0141 + 326, K0144 + 000 - K0145 + 000, K0186 + 332 - K0186 + 966",
      "office": "Central Office",
      "amountPesos": 176257000,
      "lengthKm": 4.192,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 42046040.08,
      "lengthMeters": 4192.0,
      "allocationPerStatedMeter": 42046.04,
      "rangesMeters": [
        [
          88311.0,
          88488.0
        ],
        [
          122024.0,
          122999.0
        ],
        [
          126724.0,
          127000.0
        ],
        [
          140100.0,
          140904.0
        ],
        [
          141000.0,
          141326.0
        ],
        [
          144000.0,
          145000.0
        ],
        [
          186332.0,
          186966.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "157",
      "lengthEvidence": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0089 + (-689) - K0089 + (-512), K0122 + 024 - K0122 + 999, K0126 + 724 - K0127 + 000, K0139 + 1100 - K0139 + 1904, K0141 + 000 - K0141 + 326, K0144 + 000 - K0145 + 000, K0186 + 332 - K0186 + 966",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 1.87,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0117-000119",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1606 + 190 - K1609 + 758",
      "office": "Central Office",
      "amountPesos": 175183000,
      "lengthKm": 3.568,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49098374.44,
      "lengthMeters": 3568.0,
      "allocationPerStatedMeter": 49098.37,
      "rangesMeters": [
        [
          1606190.0,
          1609758.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1606 + 190 - K1609 + 758",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 1.41,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0114-000071",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dipolog-Oroquieta National Rd - K1810 + 000 - K1813 + 005",
      "office": "Central Office",
      "amountPesos": 175133000,
      "lengthKm": 3.005,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 58280532.45,
      "lengthMeters": 3005.0,
      "allocationPerStatedMeter": 58280.53,
      "rangesMeters": [
        [
          1810000.0,
          1813005.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Dipolog-Oroquieta National Rd - K1810 + 000 - K1813 + 005",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 1.67,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0218-001962",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "San Jose City Bypass Road, Sta. 5+200 - Sta. 5+600, Sta. 5+651 - Sta. 6+060, Nueva Ecija",
      "office": "Central Office",
      "amountPesos": 175000000,
      "lengthKm": 0.809,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 216316440.05,
      "lengthMeters": 809.0,
      "allocationPerStatedMeter": 216316.44,
      "rangesMeters": [
        [
          5200.0,
          5600.0
        ],
        [
          5651.0,
          6060.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "San Jose City Bypass Road, Sta. 5+200 - Sta. 5+600, Sta. 5+651 - Sta. 6+060, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 2.01,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0236-002299",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mauban-Tignoan Road, Bisibis Bridge, Sta. 179+968 - Sta. 180+008, Mauban, Quezon",
      "office": "Central Office",
      "amountPesos": 175000000,
      "lengthKm": 0.04,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 40.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          179968.0,
          180008.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Mauban-Tignoan Road, Bisibis Bridge, Sta. 179+968 - Sta. 180+008, Mauban, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0422-005901",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of San Vicente - Catmon Bridge, Sta. Maria, Bulacan (121.000200, 14.818020)",
      "office": "Central Office",
      "amountPesos": 175000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Construction of San Vicente - Catmon Bridge, Sta. Maria, Bulacan (121.000200, 14.818020)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0445-006358",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Esperanza-Lebak Bypass Road (Lebak Section) - Sta. 55 + 860 - Sta. 59+930, Lebak, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 175000000,
      "lengthKm": 4.07,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42997543.0,
      "lengthMeters": 4070.0,
      "allocationPerStatedMeter": 42997.54,
      "rangesMeters": [
        [
          55860.0,
          59930.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Construction of Esperanza-Lebak Bypass Road (Lebak Section) - Sta. 55 + 860 - Sta. 59+930, Lebak, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.37,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0433-006133",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Magatas-Calabnugan Bridge, Sibulan, Negros Oriental (9.342847, 123.270291)",
      "office": "Central Office",
      "amountPesos": 174236000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Magatas-Calabnugan Bridge, Sibulan, Negros Oriental (9.342847, 123.270291)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0211-001843",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Lutucan-Guisguis Port Road, Quezon - K0116 + 418 - K0117 + 640, K0121 + 037 - K0122 + 151",
      "office": "Central Office",
      "amountPesos": 174200000,
      "lengthKm": 2.336,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 74571917.81,
      "lengthMeters": 2336.0,
      "allocationPerStatedMeter": 74571.92,
      "rangesMeters": [
        [
          116418.0,
          117640.0
        ],
        [
          121037.0,
          122151.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "211",
      "lengthEvidence": "Lutucan-Guisguis Port Road, Quezon - K0116 + 418 - K0117 + 640, K0121 + 037 - K0122 + 151",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.84,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0413-005722",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage System at Don Manuel St. (Don Jose to Banawe St.), Barangay Sto. Domingo, Quezon City",
      "office": "Central Office",
      "amountPesos": 173530000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Rehabilitation of Road and Drainage System at Don Manuel St. (Don Jose to Banawe St.), Barangay Sto. Domingo, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0216-001924",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Ilagan City Bypass Road (Sta. 3 + 840 - Sta. 4 + 032.5, Sta. 5 + 140 - Sta. 5 + 550), Isabela",
      "office": "Central Office",
      "amountPesos": 172791000,
      "lengthKm": 0.6025,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 286790041.49,
      "lengthMeters": 602.5,
      "allocationPerStatedMeter": 286790.04,
      "rangesMeters": [
        [
          3840.0,
          4032.5
        ],
        [
          5140.0,
          5550.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Ilagan City Bypass Road (Sta. 3 + 840 - Sta. 4 + 032.5, Sta. 5 + 140 - Sta. 5 + 550), Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 2.11,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0216-001926",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Ramon-Cordon-Diadi Bypass Road, Barangay Poblacion Section (Sta. 0+060 - Sta. 0+280, Sta. 0+658.17 - Sta. 0+808.17, Sta. 1+395 - Sta. 2+600, Sta. 2+660 - Sta. 2+730), Diadi, Nueva Vizcaya",
      "office": "Central Office",
      "amountPesos": 171000000,
      "lengthKm": 1.645,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 103951367.78,
      "lengthMeters": 1645.0,
      "allocationPerStatedMeter": 103951.37,
      "rangesMeters": [
        [
          60.0,
          280.0
        ],
        [
          658.17,
          808.17
        ],
        [
          1395.0,
          2600.0
        ],
        [
          2660.0,
          2730.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Ramon-Cordon-Diadi Bypass Road, Barangay Poblacion Section (Sta. 0+060 - Sta. 0+280, Sta. 0+658.17 - Sta. 0+808.17, Sta. 1+395 - Sta. 2+600, Sta. 2+660 - Sta. 2+730), Diadi, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.26,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0220-002016",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sta. Cruz - Pagsanjan Diversion Road - Sta. 0 + 000 - Sta.3+084.56, Laguna",
      "office": "Central Office",
      "amountPesos": 170000000,
      "lengthKm": 3.0845599999999997,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55113209.02,
      "lengthMeters": 3084.56,
      "allocationPerStatedMeter": 55113.21,
      "rangesMeters": [
        [
          0.0,
          3084.56
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Sta. Cruz - Pagsanjan Diversion Road - Sta. 0 + 000 - Sta.3+084.56, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 1.41,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0234-002258",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
      "office": "Central Office",
      "amountPesos": 170000000,
      "lengthKm": 3.845,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 44213263.98,
      "lengthMeters": 3845.0,
      "allocationPerStatedMeter": 44213.26,
      "rangesMeters": [
        [
          11760.0,
          13725.0
        ],
        [
          16140.0,
          18020.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.02,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0418-005825",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Naggasican Bridge and Approach, Barangay Naggasican, Santiago City, Isabela",
      "office": "Central Office",
      "amountPesos": 170000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Naggasican Bridge and Approach, Barangay Naggasican, Santiago City, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0202-001656",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Quezon Eco-Tourism Road, Quezon - K0155 + 000 - K0156 + 095, K0156 + 176 - K0157 + 120",
      "office": "Central Office",
      "amountPesos": 169300000,
      "lengthKm": 2.039,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 83030897.5,
      "lengthMeters": 2039.0,
      "allocationPerStatedMeter": 83030.9,
      "rangesMeters": [
        [
          155000.0,
          156095.0
        ],
        [
          156176.0,
          157120.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Quezon Eco-Tourism Road, Quezon - K0155 + 000 - K0156 + 095, K0156 + 176 - K0157 + 120",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 2.91,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0235-002286",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Section I: Sta. 12 + 355 - Sta. 16+ 285, Section II: Sta. 16 + 325 - Sta. 16 + 377, Quezon",
      "office": "Central Office",
      "amountPesos": 169000000,
      "lengthKm": 3.982,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 42440984.43,
      "lengthMeters": 3982.0,
      "allocationPerStatedMeter": 42440.98,
      "rangesMeters": [
        [
          12355.0,
          16285.0
        ],
        [
          16325.0,
          16377.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Section I: Sta. 12 + 355 - Sta. 16+ 285, Section II: Sta. 16 + 325 - Sta. 16 + 377, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.98,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0222-002062",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bacolod Negros Occidental Economic Highway (BANOCEH) (Victorias - Sagay), Sta. 3+000 - Sta. 3+500, Manapla, Negros Occidental",
      "office": "Central Office",
      "amountPesos": 168775000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 337550000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 337550.0,
      "rangesMeters": [
        [
          3000.0,
          3500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Bacolod Negros Occidental Economic Highway (BANOCEH) (Victorias - Sagay), Sta. 3+000 - Sta. 3+500, Manapla, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 2.65,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0151-000780",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0724 + 000 - K0724 + 095, K0724 + 280 - K0724 + 316, K0724 + 591 - K0724 + 655, K0724 + 743 - K0724 + 854, K0729 + 320 - K0729 + 437, K0729 + 776 - K0730 + 010, K0732 + 504 - K0732 + 669, K0732 + 780 - K0732 + 896, K0735 + 853 - K0737 + 080, K0738 + 194 - K0740 + 394",
      "office": "Central Office",
      "amountPesos": 168767000,
      "lengthKm": 4.365,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 38663688.43,
      "lengthMeters": 4365.0,
      "allocationPerStatedMeter": 38663.69,
      "rangesMeters": [
        [
          724000.0,
          724095.0
        ],
        [
          724280.0,
          724316.0
        ],
        [
          724591.0,
          724655.0
        ],
        [
          724743.0,
          724854.0
        ],
        [
          729320.0,
          729437.0
        ],
        [
          729776.0,
          730010.0
        ],
        [
          732504.0,
          732669.0
        ],
        [
          732780.0,
          732896.0
        ],
        [
          735853.0,
          737080.0
        ],
        [
          738194.0,
          740394.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0724 + 000 - K0724 + 095, K0724 + 280 - K0724 + 316, K0724 + 591 - K0724 + 655, K0724 + 743 - K0724 + 854, K0729 + 320 - K0729 + 437, K0729 + 776 - K0730 + 010, K0732 + 504 - K0732 + 669, K0732 + 780 - K0732 + 896, K0735 + 853 - K0737 + 080, K0738 + 194 - K0740 + 394",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 1.13,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0218-001970",
      "category": "Bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Aliaga - Guimba Diversion Rd, Replacement of Bridge, Quezon-Guimba Bridge, Nueva Ecija Sta. 14+062.70 - Sta.14+123.70",
      "office": "Central Office",
      "amountPesos": 168500000,
      "lengthKm": 0.061,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2762295081.97,
      "lengthMeters": 61.0,
      "allocationPerStatedMeter": 2762295.08,
      "rangesMeters": [
        [
          14062.7,
          14123.7
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Aliaga - Guimba Diversion Rd, Replacement of Bridge, Quezon-Guimba Bridge, Nueva Ecija Sta. 14+062.70 - Sta.14+123.70",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0222-002054",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Pontevedra Bypass Road, Sta. 000 + 382 - Sta. 000 + 502, Capiz",
      "office": "Central Office",
      "amountPesos": 166420000,
      "lengthKm": 0.12,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1386833333.33,
      "lengthMeters": 120.0,
      "allocationPerStatedMeter": 1386833.33,
      "rangesMeters": [
        [
          382.0,
          502.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Pontevedra Bypass Road, Sta. 000 + 382 - Sta. 000 + 502, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 1.16,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0176-001220",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Isulan Jct-Ninoy Aquino Rd (S00743MN) - K1826 + 000 - K1826 + 085, K1826 + 400 - K1826 + 520, K1826 + 450 - K1826 + 520, K1826 + 700 - K1826 + 880, K1826 + 700 - K1826 + 940, K1828 + 090 - K1828 + 135, K1828 + 300 - K1828 + 400, K1828 + 770 - K1828 + 920, K1830 + 360 - K1830 + 450, K1831 + 860 - K1831 + 940, K1832 + 200 - K1832 + 336, K1832 + 620 - K1832 + 670, K1834 + 096 - K1834 + 183",
      "office": "Central Office",
      "amountPesos": 165234000,
      "lengthKm": 1.183,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 139673710.9,
      "lengthMeters": 1183.0,
      "allocationPerStatedMeter": 139673.71,
      "rangesMeters": [
        [
          1826000.0,
          1826085.0
        ],
        [
          1826400.0,
          1826520.0
        ],
        [
          1826450.0,
          1826520.0
        ],
        [
          1826700.0,
          1826880.0
        ],
        [
          1826700.0,
          1826940.0
        ],
        [
          1828090.0,
          1828135.0
        ],
        [
          1828300.0,
          1828400.0
        ],
        [
          1828770.0,
          1828920.0
        ],
        [
          1830360.0,
          1830450.0
        ],
        [
          1831860.0,
          1831940.0
        ],
        [
          1832200.0,
          1832336.0
        ],
        [
          1832620.0,
          1832670.0
        ],
        [
          1834096.0,
          1834183.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Isulan Jct-Ninoy Aquino Rd (S00743MN) - K1826 + 000 - K1826 + 085, K1826 + 400 - K1826 + 520, K1826 + 450 - K1826 + 520, K1826 + 700 - K1826 + 880, K1826 + 700 - K1826 + 940, K1828 + 090 - K1828 + 135, K1828 + 300 - K1828 + 400, K1828 + 770 - K1828 + 920, K1830 + 360 - K1830 + 450, K1831 + 860 - K1831 + 940, K1832 + 200 - K1832 + 336, K1832 + 620 - K1832 + 670, K1834 + 096 - K1834 + 183",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 1.35,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0198-001582",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1686 + 078 - K1689 + 191, K1689 + 275 - K1690 + 459",
      "office": "Central Office",
      "amountPesos": 165000000,
      "lengthKm": 4.297,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 38398882.94,
      "lengthMeters": 4297.0,
      "allocationPerStatedMeter": 38398.88,
      "rangesMeters": [
        [
          1686078.0,
          1689191.0
        ],
        [
          1689275.0,
          1690459.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1686 + 078 - K1689 + 191, K1689 + 275 - K1690 + 459",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 1.09,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0198-001583",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1690 + 642.45 - K1691 + 000, K1695 + 866 - K1700 + 232",
      "office": "Central Office",
      "amountPesos": 165000000,
      "lengthKm": 4.7235500000000465,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34931354.6,
      "lengthMeters": 4723.55,
      "allocationPerStatedMeter": 34931.35,
      "rangesMeters": [
        [
          1690642.45,
          1691000.0
        ],
        [
          1695866.0,
          1700232.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1690 + 642.45 - K1691 + 000, K1695 + 866 - K1700 + 232",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 0.99,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0241-002385",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Doroluman-President Roxas-Kadingilan Road, Sta. 10+354 - Sta. 12+354, Cotabato",
      "office": "Central Office",
      "amountPesos": 165000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 82500000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 82500.0,
      "rangesMeters": [
        [
          10354.0,
          12354.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "Doroluman-President Roxas-Kadingilan Road, Sta. 10+354 - Sta. 12+354, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 1.04,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0437-006192",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Vigo - San Antonio Bridge, Laoang, Northern Samar (Sta. 6+600 - Sta. 6+710)",
      "office": "Central Office",
      "amountPesos": 165000000,
      "lengthKm": 0.11,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1500000000.0,
      "lengthMeters": 110.0,
      "allocationPerStatedMeter": 1500000.0,
      "rangesMeters": [
        [
          6600.0,
          6710.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Construction of Vigo - San Antonio Bridge, Laoang, Northern Samar (Sta. 6+600 - Sta. 6+710)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 2.47,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0215-001905",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Alicia-Angadanan-San Guillermo-Cauayan City-Naguilian Alternate Route (Sta. 35+799 - Sta. 36+361), Isabela",
      "office": "Central Office",
      "amountPesos": 164577000,
      "lengthKm": 0.562,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 292841637.01,
      "lengthMeters": 562.0,
      "allocationPerStatedMeter": 292841.64,
      "rangesMeters": [
        [
          35799.0,
          36361.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Alicia-Angadanan-San Guillermo-Cauayan City-Naguilian Alternate Route (Sta. 35+799 - Sta. 36+361), Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 2.15,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0445-006361",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Esperanza-Lebak Bypass Road, Sta. 52 + 238 - Sta. 55 + 860, Lebak, Sultan",
      "office": "Central Office",
      "amountPesos": 163000000,
      "lengthKm": 3.622,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45002760.91,
      "lengthMeters": 3622.0,
      "allocationPerStatedMeter": 45002.76,
      "rangesMeters": [
        [
          52238.0,
          55860.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Construction of Esperanza-Lebak Bypass Road, Sta. 52 + 238 - Sta. 55 + 860, Lebak, Sultan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.43,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0257-002607",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Busilac Br. (B00664LZ) along Luna-Bangar Rd",
      "office": "Central Office",
      "amountPesos": 161935000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Busilac Br. (B00664LZ) along Luna-Bangar Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0240-002380",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Columbio - Lutayan - Koronadal Road, Sta.12+501 - Sta.12+687, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 161820000,
      "lengthKm": 0.186,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 870000000.0,
      "lengthMeters": 186.0,
      "allocationPerStatedMeter": 870000.0,
      "rangesMeters": [
        [
          12501.0,
          12687.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Columbio - Lutayan - Koronadal Road, Sta.12+501 - Sta.12+687, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0220-002017",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "STAR Tollway-Pinamucan Bypass, Sta. 101 + 778 - Sta. 105 + 200, Batangas",
      "office": "Central Office",
      "amountPesos": 160000000,
      "lengthKm": 3.422,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46756282.88,
      "lengthMeters": 3422.0,
      "allocationPerStatedMeter": 46756.28,
      "rangesMeters": [
        [
          101778.0,
          105200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "STAR Tollway-Pinamucan Bypass, Sta. 101 + 778 - Sta. 105 + 200, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 1.2,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0222-002061",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bacolod Negros Occidental Economic Highway (BANOCEH) (Victorias - Sagay), Sta. 12+231 - Sta. 12+700 , Cadiz City, Negros Occidental",
      "office": "Central Office",
      "amountPesos": 160000000,
      "lengthKm": 0.469,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 341151385.93,
      "lengthMeters": 469.0,
      "allocationPerStatedMeter": 341151.39,
      "rangesMeters": [
        [
          12231.0,
          12700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Bacolod Negros Occidental Economic Highway (BANOCEH) (Victorias - Sagay), Sta. 12+231 - Sta. 12+700 , Cadiz City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 2.68,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0227-002148",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sayre Highway Parallel Road II (Impasug-ong - Malaybalay City Section), Barangay Sumpong Section, Sta. 67+500 - Sta. 71+500, Malaybalay City, Bukidnon",
      "office": "Central Office",
      "amountPesos": 160000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          67500.0,
          71500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Sayre Highway Parallel Road II (Impasug-ong - Malaybalay City Section), Barangay Sumpong Section, Sta. 67+500 - Sta. 71+500, Malaybalay City, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 1.02,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0284-003198",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Manat Parallel Br. along Pangasinan-Zambales Road",
      "office": "Central Office",
      "amountPesos": 160000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Manat Parallel Br. along Pangasinan-Zambales Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006016",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Aplaya to Barangay Labasan, Bongabong, Oriental Mindoro",
      "office": "Central Office",
      "amountPesos": 160000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Bridge, Barangay Aplaya to Barangay Labasan, Bongabong, Oriental Mindoro",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006018",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Libtuan - Buho - Upper, Sigange Road, Sigange, Bongabong, Oriental Mindoro",
      "office": "Central Office",
      "amountPesos": 160000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Libtuan - Buho - Upper, Sigange Road, Sigange, Bongabong, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0442-006288",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Bukidnon-Paquibato District Alternate Road, Barangay Kipilas Section, Sta. 9+000 - Sta. 12+450, Kitaotao, Bukidnon",
      "office": "Central Office",
      "amountPesos": 160000000,
      "lengthKm": 3.45,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46376811.59,
      "lengthMeters": 3450.0,
      "allocationPerStatedMeter": 46376.81,
      "rangesMeters": [
        [
          9000.0,
          12450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Construction of Road, Bukidnon-Paquibato District Alternate Road, Barangay Kipilas Section, Sta. 9+000 - Sta. 12+450, Kitaotao, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.47,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0114-000077",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dipolog-Sindangan-Liloy Rd - K1847 + (-003) - K1847 + 705, K1848 + 897 - K1849 + 000, K1863 + 558 - K1863 + 687, K1866 + 867.23 - K1866 + 871, K1866 + 883 - K1867 + 000, K1868 + 365 - K1869 + 000, K1869 + 139 - K1869 + 312, K1870 + 000 - K1872 + 112",
      "office": "Central Office",
      "amountPesos": 159415000,
      "lengthKm": 3.980770000000019,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 40046272.45,
      "lengthMeters": 3980.77,
      "allocationPerStatedMeter": 40046.27,
      "rangesMeters": [
        [
          1846997.0,
          1847705.0
        ],
        [
          1848897.0,
          1849000.0
        ],
        [
          1863558.0,
          1863687.0
        ],
        [
          1866867.23,
          1866871.0
        ],
        [
          1866883.0,
          1867000.0
        ],
        [
          1868365.0,
          1869000.0
        ],
        [
          1869139.0,
          1869312.0
        ],
        [
          1870000.0,
          1872112.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Dipolog-Sindangan-Liloy Rd - K1847 + (-003) - K1847 + 705, K1848 + 897 - K1849 + 000, K1863 + 558 - K1863 + 687, K1866 + 867.23 - K1866 + 871, K1866 + 883 - K1867 + 000, K1868 + 365 - K1869 + 000, K1869 + 139 - K1869 + 312, K1870 + 000 - K1872 + 112",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 1.15,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0419-005844",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Baler Bypass Road, Baler, Aurora, 0 + 000 - 13 + 250",
      "office": "Central Office",
      "amountPesos": 159000000,
      "lengthKm": 13.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12000000.0,
      "lengthMeters": 13250.0,
      "allocationPerStatedMeter": 12000.0,
      "rangesMeters": [
        [
          0.0,
          13250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Construction of Baler Bypass Road, Baler, Aurora, 0 + 000 - 13 + 250",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.38,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0220-002006",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
      "office": "Central Office",
      "amountPesos": 158845000,
      "lengthKm": 8.25887,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19233260.72,
      "lengthMeters": 8258.87,
      "allocationPerStatedMeter": 19233.26,
      "rangesMeters": [
        [
          11068.99,
          19327.86
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.49,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0215-001910",
      "category": "Bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cauayan City Alternate Route (Bridge and Approaches) (Sta. 1+400 - Sta. 1+779.49), Isabela",
      "office": "Central Office",
      "amountPesos": 157447000,
      "lengthKm": 0.37949,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 414891037.97,
      "lengthMeters": 379.49,
      "allocationPerStatedMeter": 414891.04,
      "rangesMeters": [
        [
          1400.0,
          1779.49
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Cauayan City Alternate Route (Bridge and Approaches) (Sta. 1+400 - Sta. 1+779.49), Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0240-002366",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Jct. Maramag-Maradugao Road-Jct. Lampanusan Road, Adtuyon-Barandias Section, Sta. 7+00 - Sta. 10+198.5, Pangantucan, Bukidnon",
      "office": "Central Office",
      "amountPesos": 155000000,
      "lengthKm": 3.1985,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 48460215.73,
      "lengthMeters": 3198.5,
      "allocationPerStatedMeter": 48460.22,
      "rangesMeters": [
        [
          7000.0,
          10198.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Jct. Maramag-Maradugao Road-Jct. Lampanusan Road, Adtuyon-Barandias Section, Sta. 7+00 - Sta. 10+198.5, Pangantucan, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.12,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0429-006040",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tinagong Dagat, Narra, Palawan",
      "office": "Central Office",
      "amountPesos": 155000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Road, Barangay Tinagong Dagat, Narra, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0213-001878",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bauang-San Fernando-San Juan ByPass Road, Sta. 7+797.87- Sta. 13+461.69, San Fernando, La Union",
      "office": "Central Office",
      "amountPesos": 154989000,
      "lengthKm": 5.66382,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27364746.76,
      "lengthMeters": 5663.82,
      "allocationPerStatedMeter": 27364.75,
      "rangesMeters": [
        [
          7797.87,
          13461.69
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "213",
      "lengthEvidence": "Bauang-San Fernando-San Juan ByPass Road, Sta. 7+797.87- Sta. 13+461.69, San Fernando, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.7,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0240-002369",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Barangay Lawit, Sta. 131+851 - Sta. 133+033.69, Gingoog City, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 153750000,
      "lengthKm": 1.1826900000000022,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 130000253.66,
      "lengthMeters": 1182.69,
      "allocationPerStatedMeter": 130000.25,
      "rangesMeters": [
        [
          131851.0,
          133033.69
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Barangay Lawit, Sta. 131+851 - Sta. 133+033.69, Gingoog City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 2.08,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0218-001973",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bacoor Diversion Road, Sta. 0+000 - Sta. 0+370, Acess Road, Sta. 0+370 - Sta. 0+395, Cavite",
      "office": "Central Office",
      "amountPesos": 153041000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          370.0
        ],
        [
          370.0,
          395.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Bacoor Diversion Road, Sta. 0+000 - Sta. 0+370, Acess Road, Sta. 0+370 - Sta. 0+395, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0235-002273",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road, Sta.18+783.20 - Sta. 25+350, Kabugao, Apayao",
      "office": "Central Office",
      "amountPesos": 152200000,
      "lengthKm": 6.566799999999999,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23177194.37,
      "lengthMeters": 6566.8,
      "allocationPerStatedMeter": 23177.19,
      "rangesMeters": [
        [
          18783.2,
          25350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road, Sta.18+783.20 - Sta. 25+350, Kabugao, Apayao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.53,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0237-002323",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Cabusao - Calabanga Road, Cabusao, Camarines Sur, (Bridge) Sta. 412+209 - Sta. 412+749",
      "office": "Central Office",
      "amountPesos": 151540000,
      "lengthKm": 0.54,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 540.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          412209.0,
          412749.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Cabusao - Calabanga Road, Cabusao, Camarines Sur, (Bridge) Sta. 412+209 - Sta. 412+749",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003228",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Mauca Br. (B00434LZ) along Rolando R. Andaya Highway",
      "office": "Central Office",
      "amountPesos": 151000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Mauca Br. (B00434LZ) along Rolando R. Andaya Highway",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006022",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road leading to Aglicay Beach, Barangay Madalag - Barangay Comod- om, Alcantara, Romblon",
      "office": "Central Office",
      "amountPesos": 150259000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Road leading to Aglicay Beach, Barangay Madalag - Barangay Comod- om, Alcantara, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0115-000082",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Lanao-Pagadian-Zamboanga City Rd - K1642 + 000 - K1647 + 738",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 5.738,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26141512.72,
      "lengthMeters": 5738.0,
      "allocationPerStatedMeter": 26141.51,
      "rangesMeters": [
        [
          1642000.0,
          1647738.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Lanao-Pagadian-Zamboanga City Rd - K1642 + 000 - K1647 + 738",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 0.75,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0116-000100",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Ozamis - Pagadian Rd, K1660 + (-076) -K1660 + 000, K1660 + 000 - K1660 + 070, K1660 + 812 - K1663 + 519, K1663 + 551 - K1664 + 000, K1670 + 070 - K1670 + 325, K1671 + 444 - K1672 + 000, K1672 + 640 -K1673 + 628, K1677 + 694 - K1678 + 000",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 5.407,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 27741816.16,
      "lengthMeters": 5407.0,
      "allocationPerStatedMeter": 27741.82,
      "rangesMeters": [
        [
          1659924.0,
          1660000.0
        ],
        [
          1660000.0,
          1660070.0
        ],
        [
          1660812.0,
          1663519.0
        ],
        [
          1663551.0,
          1664000.0
        ],
        [
          1670070.0,
          1670325.0
        ],
        [
          1671444.0,
          1672000.0
        ],
        [
          1672640.0,
          1673628.0
        ],
        [
          1677694.0,
          1678000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Ozamis - Pagadian Rd, K1660 + (-076) -K1660 + 000, K1660 + 000 - K1660 + 070, K1660 + 812 - K1663 + 519, K1663 + 551 - K1664 + 000, K1670 + 070 - K1670 + 325, K1671 + 444 - K1672 + 000, K1672 + 640 -K1673 + 628, K1677 + 694 - K1678 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 0.8,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0116-000101",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Ozamis - Pagadian Rd, K1680 + 128 - K1680 + 818, K1688 + 000 - K1688 + 081, K1688 + 900 - K1689 + 398, K1689 + 398 - K1689 + 448, K1689 + 459 -K1689 + 509, K1689 + 509 - K1689 + 860, K1689 + 871 - K1690 + 487, K1691 + 324 - K1692 + 129, K1692 + 141 - K1692 + 635, K1692 + 640 - K1692 + 789, K1694 + 193 - K1695 + 000, K1698 + 000 - K1698 + 372",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 4.963,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 30223655.05,
      "lengthMeters": 4963.0,
      "allocationPerStatedMeter": 30223.66,
      "rangesMeters": [
        [
          1680128.0,
          1680818.0
        ],
        [
          1688000.0,
          1688081.0
        ],
        [
          1688900.0,
          1689398.0
        ],
        [
          1689398.0,
          1689448.0
        ],
        [
          1689459.0,
          1689509.0
        ],
        [
          1689509.0,
          1689860.0
        ],
        [
          1689871.0,
          1690487.0
        ],
        [
          1691324.0,
          1692129.0
        ],
        [
          1692141.0,
          1692635.0
        ],
        [
          1692640.0,
          1692789.0
        ],
        [
          1694193.0,
          1695000.0
        ],
        [
          1698000.0,
          1698372.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Ozamis - Pagadian Rd, K1680 + 128 - K1680 + 818, K1688 + 000 - K1688 + 081, K1688 + 900 - K1689 + 398, K1689 + 398 - K1689 + 448, K1689 + 459 -K1689 + 509, K1689 + 509 - K1689 + 860, K1689 + 871 - K1690 + 487, K1691 + 324 - K1692 + 129, K1692 + 141 - K1692 + 635, K1692 + 640 - K1692 + 789, K1694 + 193 - K1695 + 000, K1698 + 000 - K1698 + 372",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 0.87,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0125-000274",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Batangas-Quezon Rd - K0108 + 000 - K0108 + 259, K0110 + 000 - K0110 + 259, K0121 + 444 - K0121 + 968, K0122 + 824 - K0122 + 920, K0122 + 931 - K0124 + 198, K0124 + 206 - K0124 + 606, K0124 + 706 - K0125 + 106, K0126 + 700 - K0126 + 885, K0127 + 004 - K0127 + 386, K0127 + 610 - K0127 + 844, K0128 + 000 - K0128 + 940, K0130 + 944 - K0130 + 958, K0131 + 016 - K0131 + 088",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 5.032,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29809220.99,
      "lengthMeters": 5032.0,
      "allocationPerStatedMeter": 29809.22,
      "rangesMeters": [
        [
          108000.0,
          108259.0
        ],
        [
          110000.0,
          110259.0
        ],
        [
          121444.0,
          121968.0
        ],
        [
          122824.0,
          122920.0
        ],
        [
          122931.0,
          124198.0
        ],
        [
          124206.0,
          124606.0
        ],
        [
          124706.0,
          125106.0
        ],
        [
          126700.0,
          126885.0
        ],
        [
          127004.0,
          127386.0
        ],
        [
          127610.0,
          127844.0
        ],
        [
          128000.0,
          128940.0
        ],
        [
          130944.0,
          130958.0
        ],
        [
          131016.0,
          131088.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Batangas-Quezon Rd - K0108 + 000 - K0108 + 259, K0110 + 000 - K0110 + 259, K0121 + 444 - K0121 + 968, K0122 + 824 - K0122 + 920, K0122 + 931 - K0124 + 198, K0124 + 206 - K0124 + 606, K0124 + 706 - K0125 + 106, K0126 + 700 - K0126 + 885, K0127 + 004 - K0127 + 386, K0127 + 610 - K0127 + 844, K0128 + 000 - K0128 + 940, K0130 + 944 - K0130 + 958, K0131 + 016 - K0131 + 088",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.81,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0127-000317",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Along Jolo-Indanan-Parang-Silangkan Roads, Sulu, Chainage 0 + 000 to Chainage 4 + 000",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Along Jolo-Indanan-Parang-Silangkan Roads, Sulu, Chainage 0 + 000 to Chainage 4 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0148-000738",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bauang-Baguio Road - K0274 + 316 - K0275 + 388, K0275 + 714 - K0278 + 760, K0279 + 070 - K0280 + 170, K0280 + 354 - K0280 + 763,",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 5.627,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 26657188.56,
      "lengthMeters": 5627.0,
      "allocationPerStatedMeter": 26657.19,
      "rangesMeters": [
        [
          274316.0,
          275388.0
        ],
        [
          275714.0,
          278760.0
        ],
        [
          279070.0,
          280170.0
        ],
        [
          280354.0,
          280763.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "148",
      "lengthEvidence": "Bauang-Baguio Road - K0274 + 316 - K0275 + 388, K0275 + 714 - K0278 + 760, K0279 + 070 - K0280 + 170, K0280 + 354 - K0280 + 763,",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 0.78,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0156-000879",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0022 + 700 - K0023 + 300",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 250000000.0,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 250000.0,
      "rangesMeters": [
        [
          22700.0,
          23300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "Puerto Princesa North Rd - K0022 + 700 - K0023 + 300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 6.28,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0173-001158",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Bacolod North Rd - K0073 + 290 - K0075 + 109, K0075 + 216 - K0075 + 693",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.296,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 65331010.45,
      "lengthMeters": 2296.0,
      "allocationPerStatedMeter": 65331.01,
      "rangesMeters": [
        [
          73290.0,
          75109.0
        ],
        [
          75216.0,
          75693.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Bacolod North Rd - K0073 + 290 - K0075 + 109, K0075 + 216 - K0075 + 693",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 0.2,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0173-001159",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Bacolod North Rd - K0076 + 388 - K0074 + 199, K0076 + (-194) - K0076 + 283",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.189,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 68524440.38,
      "lengthMeters": 2189.0,
      "allocationPerStatedMeter": 68524.44,
      "rangesMeters": [
        [
          74199.0,
          76388.0
        ],
        [
          75806.0,
          76283.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Bacolod North Rd - K0076 + 388 - K0074 + 199, K0076 + (-194) - K0076 + 283",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 0.21,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0176-001207",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Santander-Barili-Toledo Rd - K0163 + 000 - K0163 + 040, K0163 + 053 - K0163 + 080, K0163 + 085 - K0163 + 092",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.074,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 2027027027.03,
      "lengthMeters": 74.0,
      "allocationPerStatedMeter": 2027027.03,
      "rangesMeters": [
        [
          163000.0,
          163040.0
        ],
        [
          163053.0,
          163080.0
        ],
        [
          163085.0,
          163092.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Santander-Barili-Toledo Rd - K0163 + 000 - K0163 + 040, K0163 + 053 - K0163 + 080, K0163 + 085 - K0163 + 092",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 6.74,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0183-001335",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Tabango-Catmon-La Fortuna-Manlawaan-Gimarco Rd. - K1033 + 030 - K1033 + 080, K1033+126 - K1033 + 164, K1033 + 402 - K1033 + 468, K1033 + 545 - K1033 + 571, K1033 + 849 - K1034 + 000, K1034 + 411 - K1034 + 481, K1035 +317 + K1035 + 345, K1035 + 332 - K1035 + 353",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          1033030.0,
          1033080.0
        ],
        [
          1033126.0,
          1033164.0
        ],
        [
          1033402.0,
          1033468.0
        ],
        [
          1033545.0,
          1033571.0
        ],
        [
          1033849.0,
          1034000.0
        ],
        [
          1034411.0,
          1034481.0
        ],
        [
          1035332.0,
          1035353.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Tabango-Catmon-La Fortuna-Manlawaan-Gimarco Rd. - K1033 + 030 - K1033 + 080, K1033+126 - K1033 + 164, K1033 + 402 - K1033 + 468, K1033 + 545 - K1033 + 571, K1033 + 849 - K1034 + 000, K1034 + 411 - K1034 + 481, K1035 +317 + K1035 + 345, K1035 + 332 - K1035 + 353",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0199-001588",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1811 + 000 - K1811 + 748, K1811 + 782 - K1812 + 748, K1813 + 160 - K1813 + 817, K1815 + 740 - K1817 + 000, K1817 + 107.70 - K1817 + 711",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 4.234300000000046,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 35424981.7,
      "lengthMeters": 4234.3,
      "allocationPerStatedMeter": 35424.98,
      "rangesMeters": [
        [
          1811000.0,
          1811748.0
        ],
        [
          1811782.0,
          1812748.0
        ],
        [
          1813160.0,
          1813817.0
        ],
        [
          1815740.0,
          1817000.0
        ],
        [
          1817107.7,
          1817711.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1811 + 000 - K1811 + 748, K1811 + 782 - K1812 + 748, K1813 + 160 - K1813 + 817, K1815 + 740 - K1817 + 000, K1817 + 107.70 - K1817 + 711",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 1.01,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0199-001590",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1824 + 714.21 - K1829 + 330",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 4.615790000000037,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32497145.67,
      "lengthMeters": 4615.79,
      "allocationPerStatedMeter": 32497.15,
      "rangesMeters": [
        [
          1824714.21,
          1829330.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1824 + 714.21 - K1829 + 330",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 0.92,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0211-001845",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Ariman - Jct. Bulusan Lake Rd,Sorsogon - K0602+(-793) - K0602+(-633), K0602+(- 584) - K0603+822, K0603+847 - K0606+843",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          601207.0,
          601367.0
        ],
        [
          603847.0,
          606843.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "211",
      "lengthEvidence": "Ariman - Jct. Bulusan Lake Rd,Sorsogon - K0602+(-793) - K0602+(-633), K0602+(- 584) - K0603+822, K0603+847 - K0606+843",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0216-001937",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Guiguinto By-pass Road, Guiguinto, Bulacan, Sta. 0+000 - 0 + 500.00",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 300000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 300000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Guiguinto By-pass Road, Guiguinto, Bulacan, Sta. 0+000 - 0 + 500.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 2.36,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0216-001938",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Guiguinto By-pass Road, Guiguinto, Bulacan, Sta. 0+500 - 1 + 000.00",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 300000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 300000.0,
      "rangesMeters": [
        [
          500.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Guiguinto By-pass Road, Guiguinto, Bulacan, Sta. 0+500 - 1 + 000.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 2.36,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0217-001947",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bangantalinga-Amungan, Iba, Zambales Sta. 0+000 - Sta. 1+500",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          0.0,
          1500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Bangantalinga-Amungan, Iba, Zambales Sta. 0+000 - Sta. 1+500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.21,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0217-001948",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bangantalinga-Amungan, Iba, Zambales Sta. 1+500 - Sta. 3+000",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          1500.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Bangantalinga-Amungan, Iba, Zambales Sta. 1+500 - Sta. 3+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.21,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0217-001950",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Concepcion - Mabalacat Bypass Road (Sta 3+400- Sta 4+115.71), Tarlac",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.7157100000000001,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 209582093.31,
      "lengthMeters": 715.71,
      "allocationPerStatedMeter": 209582.09,
      "rangesMeters": [
        [
          3400.0,
          4115.71
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Concepcion - Mabalacat Bypass Road (Sta 3+400- Sta 4+115.71), Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 1.54,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0218-001964",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 2+580 - Sta. 3+805.61",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 1.22561,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 122388035.35,
      "lengthMeters": 1225.61,
      "allocationPerStatedMeter": 122388.04,
      "rangesMeters": [
        [
          2580.0,
          3805.61
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 2+580 - Sta. 3+805.61",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.48,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0218-001965",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 3+805.61 - Sta. 5+031.30",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 1.22569,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 122380047.16,
      "lengthMeters": 1225.69,
      "allocationPerStatedMeter": 122380.05,
      "rangesMeters": [
        [
          3805.61,
          5031.3
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 3+805.61 - Sta. 5+031.30",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.48,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0218-001966",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 1+580 - Sta. 2+580",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 150000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 150000.0,
      "rangesMeters": [
        [
          1580.0,
          2580.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 1+580 - Sta. 2+580",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 1.39,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0218-001971",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 6+395 - Sta. 8+000",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 1.605,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 93457943.93,
      "lengthMeters": 1605.0,
      "allocationPerStatedMeter": 93457.94,
      "rangesMeters": [
        [
          6395.0,
          8000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 6+395 - Sta. 8+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.13,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0219-001992",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Luisiana-Mauban Diversion Road, Luisiana Section - Sta. 0 + 625 - Sta. 3+147.5, Laguna",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.5225,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 59464816.65,
      "lengthMeters": 2522.5,
      "allocationPerStatedMeter": 59464.82,
      "rangesMeters": [
        [
          625.0,
          3147.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Luisiana-Mauban Diversion Road, Luisiana Section - Sta. 0 + 625 - Sta. 3+147.5, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 1.16,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0219-001994",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Majayjay Diversion Road - Sta. 106 + 485 - Sta. 107+381, Laguna",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.896,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 167410714.29,
      "lengthMeters": 896.0,
      "allocationPerStatedMeter": 167410.71,
      "rangesMeters": [
        [
          106485.0,
          107381.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Majayjay Diversion Road - Sta. 106 + 485 - Sta. 107+381, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 1.56,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0219-001997",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Mauban Bypass Road (Bridge 3), Mauban, Quezon",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Mauban Bypass Road (Bridge 3), Mauban, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0220-002010",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Guinayangan-Tagkawayan Diversion Road, Sta. 4+600 - Sta. 6+800, Tagkawayan, Quezon",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 68181818.18,
      "lengthMeters": 2200.0,
      "allocationPerStatedMeter": 68181.82,
      "rangesMeters": [
        [
          4600.0,
          6800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Guinayangan-Tagkawayan Diversion Road, Sta. 4+600 - Sta. 6+800, Tagkawayan, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 1.33,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0220-002020",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Camarines Sur - Albay Diversion Road - Sta. 502+815 - Sta. 502+980, Oma-oma - Tula- Tula Pequeno Section with Bridge Component, Albay",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.165,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 165.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          502815.0,
          502980.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Camarines Sur - Albay Diversion Road - Sta. 502+815 - Sta. 502+980, Oma-oma - Tula- Tula Pequeno Section with Bridge Component, Albay",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0220-002022",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sorsogon City Coastal Bypass Road, Barangay Boton, Sorsogon Sta. 4 + 052 - Sta. 4 + 295",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.243,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 617283950.62,
      "lengthMeters": 243.0,
      "allocationPerStatedMeter": 617283.95,
      "rangesMeters": [
        [
          4052.0,
          4295.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Sorsogon City Coastal Bypass Road, Barangay Boton, Sorsogon Sta. 4 + 052 - Sta. 4 + 295",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 2.94,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0220-002023",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sorsogon City Coastal Bypass Road, Barangay Boton, Sorsogon Sta. 4 + 295 - Sta. 4 + 538",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.243,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 617283950.62,
      "lengthMeters": 243.0,
      "allocationPerStatedMeter": 617283.95,
      "rangesMeters": [
        [
          4295.0,
          4538.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Sorsogon City Coastal Bypass Road, Barangay Boton, Sorsogon Sta. 4 + 295 - Sta. 4 + 538",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 2.94,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0221-002025",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Camarines Sur Expressway Project - Irayang Solong Overpass - (Sta. 431 + 950 - Sta. 432 + 100), Camarines Sur",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1000000000.0,
      "lengthMeters": 150.0,
      "allocationPerStatedMeter": 1000000.0,
      "rangesMeters": [
        [
          431950.0,
          432100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Camarines Sur Expressway Project - Irayang Solong Overpass - (Sta. 431 + 950 - Sta. 432 + 100), Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 4.77,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0221-002026",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Daang Maharlika-Daet Mercedes Road Link, Bactas Section, Chainage 2361.7 - Chainaga 3486.7, Basud, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Daang Maharlika-Daet Mercedes Road Link, Bactas Section, Chainage 2361.7 - Chainaga 3486.7, Basud, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0221-002027",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Daang Maharlika-Tagas-Daet Poblacion Road Link, Barangay Camambugan Section, Chainage 500 - Chainage 661, Daet, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Daang Maharlika-Tagas-Daet Poblacion Road Link, Barangay Camambugan Section, Chainage 500 - Chainage 661, Daet, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0221-002035",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Legazpi-Sto.Domingo-Tabaco Tramo Road, Sta. 10+166.8 - Sta. 12+481.8, Albay",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.315,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 64794816.41,
      "lengthMeters": 2315.0,
      "allocationPerStatedMeter": 64794.82,
      "rangesMeters": [
        [
          10166.8,
          12481.8
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Legazpi-Sto.Domingo-Tabaco Tramo Road, Sta. 10+166.8 - Sta. 12+481.8, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 1.26,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0221-002042",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.3149999999999995,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 64794816.41,
      "lengthMeters": 2315.0,
      "allocationPerStatedMeter": 64794.82,
      "rangesMeters": [
        [
          3883.73,
          6198.73
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 1.26,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0221-002044",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.315,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 64794816.41,
      "lengthMeters": 2315.0,
      "allocationPerStatedMeter": 64794.82,
      "rangesMeters": [
        [
          0.0,
          2315.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 1.26,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0222-002046",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Iloilo Circumferential Road 2, Sta. 0+520 - Sta. 2+929, Sta. 3+576 -Sta. 5+100, Sta. 5+627 - Sta. 6+152, Sta. 1+600 - Sta. 2+898, Iloilo",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 4.458,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 33647375.5,
      "lengthMeters": 4458.0,
      "allocationPerStatedMeter": 33647.38,
      "rangesMeters": [
        [
          520.0,
          2929.0
        ],
        [
          3576.0,
          5100.0
        ],
        [
          5627.0,
          6152.0
        ],
        [
          1600.0,
          2898.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Iloilo Circumferential Road 2, Sta. 0+520 - Sta. 2+929, Sta. 3+576 -Sta. 5+100, Sta. 5+627 - Sta. 6+152, Sta. 1+600 - Sta. 2+898, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.86,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0222-002047",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Iloilo Circumferential Road 3, Sta. 3+330.50 - Sta. 3+993.50, Iloilo",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.663,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 226244343.89,
      "lengthMeters": 663.0,
      "allocationPerStatedMeter": 226244.34,
      "rangesMeters": [
        [
          3330.5,
          3993.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Iloilo Circumferential Road 3, Sta. 3+330.50 - Sta. 3+993.50, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 1.66,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0222-002056",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Roxas City Circumferential Rd (C1), Chainage 7138 - Chainage 7789, Chainage 7996 - Chainage 9482.5, Capiz",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Roxas City Circumferential Rd (C1), Chainage 7138 - Chainage 7789, Chainage 7996 - Chainage 9482.5, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0222-002058",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Barotac Viejo Bypass Road, Sta. 0 + 480 - Sta. 0 + 568.47 & Sta. 0 + 673.47 - Sta. 1 + 455.47, Iloilo",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.8704700000000001,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 172320700.31,
      "lengthMeters": 870.47,
      "allocationPerStatedMeter": 172320.7,
      "rangesMeters": [
        [
          480.0,
          568.47
        ],
        [
          673.47,
          1455.47
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Barotac Viejo Bypass Road, Sta. 0 + 480 - Sta. 0 + 568.47 & Sta. 0 + 673.47 - Sta. 1 + 455.47, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 1.6,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0223-002083",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Catarman Diversion Road, Sta. 000+740 - Sta. 001+470, Northern Samar",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.73,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 205479452.05,
      "lengthMeters": 730.0,
      "allocationPerStatedMeter": 205479.45,
      "rangesMeters": [
        [
          740.0,
          1470.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Catarman Diversion Road, Sta. 000+740 - Sta. 001+470, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 1.51,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0224-002086",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Ormoc City Diversion Road, Naungan-Linao-Alegria-Poblacion, Sta. 4+380 - Sta. 4+610.67, Leyte",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.23067000000000007,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 650279620.24,
      "lengthMeters": 230.67,
      "allocationPerStatedMeter": 650279.62,
      "rangesMeters": [
        [
          4380.0,
          4610.67
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Ormoc City Diversion Road, Naungan-Linao-Alegria-Poblacion, Sta. 4+380 - Sta. 4+610.67, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 3.1,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0225-002106",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cagayan de Oro Coastal Road (Puerto-Gusa Section), Barangay Gusa, Sta. 8+177- Sta. 8+352.4, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.17539999999999964,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 855188141.39,
      "lengthMeters": 175.4,
      "allocationPerStatedMeter": 855188.14,
      "rangesMeters": [
        [
          8177.0,
          8352.4
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "225",
      "lengthEvidence": "Cagayan de Oro Coastal Road (Puerto-Gusa Section), Barangay Gusa, Sta. 8+177- Sta. 8+352.4, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 4.08,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0225-002116",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "CDO-Opol-El Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Barangay Bolisong Section, Sta. 23+992 - Sta. 24+992, El Salvador City, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 150000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 150000.0,
      "rangesMeters": [
        [
          23992.0,
          24992.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "225",
      "lengthEvidence": "CDO-Opol-El Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Barangay Bolisong Section, Sta. 23+992 - Sta. 24+992, El Salvador City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 1.39,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0226-002127",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Iligan City Coastal Bypass Road (Mandulog Bridge 4), Barangay Hinaplanon, Sta. 0+550 - Sta. 0+650, Iligan City",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 100.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          550.0,
          650.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Iligan City Coastal Bypass Road (Mandulog Bridge 4), Barangay Hinaplanon, Sta. 0+550 - Sta. 0+650, Iligan City",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0227-002141",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Barangay Dalwangan Section, Sta. 59+350 - Sta. 62+600, Malaybalay City, Bukidnon",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 3.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46153846.15,
      "lengthMeters": 3250.0,
      "allocationPerStatedMeter": 46153.85,
      "rangesMeters": [
        [
          59350.0,
          62600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Barangay Dalwangan Section, Sta. 59+350 - Sta. 62+600, Malaybalay City, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 1.18,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0229-002182",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Trento - Lingig Road, (Sta. 12+880 - Sta. 14+548.5), Barangay Bogac - Barangay Rajah Cabungsu-an Section, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 1.6685,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 89901108.78,
      "lengthMeters": 1668.5,
      "allocationPerStatedMeter": 89901.11,
      "rangesMeters": [
        [
          12880.0,
          14548.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Trento - Lingig Road, (Sta. 12+880 - Sta. 14+548.5), Barangay Bogac - Barangay Rajah Cabungsu-an Section, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.09,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0234-002261",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 3.325,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 45112781.95,
      "lengthMeters": 3325.0,
      "allocationPerStatedMeter": 45112.78,
      "rangesMeters": [
        [
          17951.0,
          19451.0
        ],
        [
          21775.0,
          23600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.04,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0234-002266",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Banaue-Barlig-Tanudan-Tabuk Road, Sta. 4+160 - Sta. 15+000, Barangay Viewpoint, Banaue, Ifugao",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 10.84,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13837638.38,
      "lengthMeters": 10840.0,
      "allocationPerStatedMeter": 13837.64,
      "rangesMeters": [
        [
          4160.0,
          15000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Banaue-Barlig-Tanudan-Tabuk Road, Sta. 4+160 - Sta. 15+000, Barangay Viewpoint, Banaue, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.32,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0235-002271",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road, Sta.10+783.20 - Sta. 13+783.20, Kabugao, Apayao",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          10783.2,
          13783.2
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road, Sta.10+783.20 - Sta. 13+783.20, Kabugao, Apayao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.15,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0235-002272",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road, Sta.13+783.20 - Sta. 16+783.20, Kabugao, Apayao",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          13783.2,
          16783.2
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road, Sta.13+783.20 - Sta. 16+783.20, Kabugao, Apayao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.15,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0235-002283",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Atimonan-Mauban Road, Sta. 8+354 - Sta. 9+857, Mauban, Quezon",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 1.503,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 99800399.2,
      "lengthMeters": 1503.0,
      "allocationPerStatedMeter": 99800.4,
      "rangesMeters": [
        [
          8354.0,
          9857.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Atimonan-Mauban Road, Sta. 8+354 - Sta. 9+857, Mauban, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 1.26,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0237-002310",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Lopez-Macalelon Road, Sta. 0 + 000 - Sta. 2 + 700, Lopez, Quezon",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55555555.56,
      "lengthMeters": 2700.0,
      "allocationPerStatedMeter": 55555.56,
      "rangesMeters": [
        [
          0.0,
          2700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Lopez-Macalelon Road, Sta. 0 + 000 - Sta. 2 + 700, Lopez, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.28,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0237-002327",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Lalud-Garchitorena Road, Garchitorena, (Ason Section), Garchitorena, Camarines Sur, Sta. 40+960 - Sta. 42+820, Sta. 49+900 - Sta. 50+765",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.725,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 55045871.56,
      "lengthMeters": 2725.0,
      "allocationPerStatedMeter": 55045.87,
      "rangesMeters": [
        [
          40960.0,
          42820.0
        ],
        [
          49900.0,
          50765.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Lalud-Garchitorena Road, Garchitorena, (Ason Section), Garchitorena, Camarines Sur, Sta. 40+960 - Sta. 42+820, Sta. 49+900 - Sta. 50+765",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.27,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0238-002329",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Lalud-Garchitorena Road, Garchitorena, (Sagrada Section), Garchitorena, Camarines Sur, Sta. 37+917 - Sta. 40+200",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.283,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 65703022.34,
      "lengthMeters": 2283.0,
      "allocationPerStatedMeter": 65703.02,
      "rangesMeters": [
        [
          37917.0,
          40200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Lalud-Garchitorena Road, Garchitorena, (Sagrada Section), Garchitorena, Camarines Sur, Sta. 37+917 - Sta. 40+200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 0.83,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0238-002345",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Tabaco City-Malinao-Buhi-Iriga Road - Chainage 6020 - Chainage 10220, Albay",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Tabaco City-Malinao-Buhi-Iriga Road - Chainage 6020 - Chainage 10220, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0239-002350",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Alegria-Alcoy Road - Sta. 2 + 459 - Sta. 4 + 257",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 1.798,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 83426028.92,
      "lengthMeters": 1798.0,
      "allocationPerStatedMeter": 83426.03,
      "rangesMeters": [
        [
          2459.0,
          4257.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Alegria-Alcoy Road - Sta. 2 + 459 - Sta. 4 + 257",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 1.06,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0240-002374",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Sitio Nahigit, Sta. 49+400 - Sta. 52+297.73, Barangay Bulonay, Impasug-ong, Bukidnon",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.8977300000000032,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51764657.16,
      "lengthMeters": 2897.73,
      "allocationPerStatedMeter": 51764.66,
      "rangesMeters": [
        [
          49400.0,
          52297.73
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Sitio Nahigit, Sta. 49+400 - Sta. 52+297.73, Barangay Bulonay, Impasug-ong, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.19,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0240-002376",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Muslim-Christian Unity Crossroad, Barangay Dimayon, Sta. 9+350- Sta. 12+850 , Tagoloan, Lanao del Norte",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 3.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42857142.86,
      "lengthMeters": 3500.0,
      "allocationPerStatedMeter": 42857.14,
      "rangesMeters": [
        [
          9350.0,
          12850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Muslim-Christian Unity Crossroad, Barangay Dimayon, Sta. 9+350- Sta. 12+850 , Tagoloan, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.99,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0240-002377",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Muslim-Christian Unity Crossroad,Barangay Malimbato, Sta. 5+850- Sta. 9+350, Tagoloan, Lanao del Norte",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 3.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42857142.86,
      "lengthMeters": 3500.0,
      "allocationPerStatedMeter": 42857.14,
      "rangesMeters": [
        [
          5850.0,
          9350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Muslim-Christian Unity Crossroad,Barangay Malimbato, Sta. 5+850- Sta. 9+350, Tagoloan, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.99,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0241-002383",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Datu Paglas - Columbio - Matanao Road, Sta. 0+000 - Sta. 0+165, Sta. 2+030 - Sta. 2+290, Sta. 2+370 - Sta. 4+060, Sta. 7+885 - Sta. 9+065, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 3.295,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 45523520.49,
      "lengthMeters": 3295.0,
      "allocationPerStatedMeter": 45523.52,
      "rangesMeters": [
        [
          0.0,
          165.0
        ],
        [
          2030.0,
          2290.0
        ],
        [
          2370.0,
          4060.0
        ],
        [
          7885.0,
          9065.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "Datu Paglas - Columbio - Matanao Road, Sta. 0+000 - Sta. 0+165, Sta. 2+030 - Sta. 2+290, Sta. 2+370 - Sta. 4+060, Sta. 7+885 - Sta. 9+065, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.05,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0257-002614",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Baua Br. 2 (B02053LZ) along Dugo-Sn Vicente Rd (Mission-Sta Ana Sect)",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Baua Br. 2 (B02053LZ) along Dugo-Sn Vicente Rd (Mission-Sta Ana Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0257-002624",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Bugaan Br. (B03174LZ) along Talisay-Laurel-Agoncillo Rd",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Bugaan Br. (B03174LZ) along Talisay-Laurel-Agoncillo Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0259-002655",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Gandara Br. (B00359SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Gandara Br. (B00359SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0284-003204",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Gamu Parallel Br. along Gamu-Roxas Rd",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Gamu Parallel Br. along Gamu-Roxas Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0284-003207",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Lucban Parallel Br. along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Lucban Parallel Br. along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0284-003211",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Pamplona Parallel Br. along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Pamplona Parallel Br. along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0284-003217",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Maragondon Br. (B02613LZ) along Juanito R. Remulla, Sr. Rd",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Maragondon Br. (B02613LZ) along Juanito R. Remulla, Sr. Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003266",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "New Batangan Br. (B01657MN) along Kapalong-Talaingod-Valencia (Bukidnon) Rd",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "New Batangan Br. (B01657MN) along Kapalong-Talaingod-Valencia (Bukidnon) Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003267",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Odiongan Br. (B01342MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Odiongan Br. (B01342MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0294-003414",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Construction of Dianed Bridge 3 along Baler-Casiguran Rd.",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Construction of Dianed Bridge 3 along Baler-Casiguran Rd.",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0294-003416",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Subic Ilaya Br. Along Talisay-Laurel-Agoncillo Rd",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Subic Ilaya Br. Along Talisay-Laurel-Agoncillo Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0412-005709",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Completion of Malanday Access Road, Barangay Malanday, Marikina City,Sta. 0 + 000 - Sta. 0 + 892",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.892,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 168161434.98,
      "lengthMeters": 892.0,
      "allocationPerStatedMeter": 168161.43,
      "rangesMeters": [
        [
          0.0,
          892.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "412",
      "lengthEvidence": "Completion of Malanday Access Road, Barangay Malanday, Marikina City,Sta. 0 + 000 - Sta. 0 + 892",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 8.65,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0416-005777",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Abagong Bridge along Mongol - Nalbu - Alimit - Nattum - Dulao Road, Nattum, Mayoyao, Ifugao",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Construction of Abagong Bridge along Mongol - Nalbu - Alimit - Nattum - Dulao Road, Nattum, Mayoyao, Ifugao",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0416-005780",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bucay-Peñarrubia Road, Bucay and Peñarrubia, Abra",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Construction of Bucay-Peñarrubia Road, Bucay and Peñarrubia, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0416-005781",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Dao Balbalan - Bullaguian Road, Sta. 1+650 - Sta. 4+650, Balbalan, Kalinga",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          1650.0,
          4650.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Construction of Dao Balbalan - Bullaguian Road, Sta. 1+650 - Sta. 4+650, Balbalan, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.59,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0417-005792",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Kiangan-Asipulo-Ambaguio-Bayombong Road, Sta. 32+514 - Sta. 32+899, Barangay Camandag, Asipulo, Ifugao",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.385,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 389610389.61,
      "lengthMeters": 385.0,
      "allocationPerStatedMeter": 389610.39,
      "rangesMeters": [
        [
          32514.0,
          32899.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Construction of Kiangan-Asipulo-Ambaguio-Bayombong Road, Sta. 32+514 - Sta. 32+899, Barangay Camandag, Asipulo, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 15.91,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0417-005795",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Manuel S. Agyao Boulevard-Ileb junc.-Dilag-San Julian-Balong-Tuao Circumferential Road, Tabuk City, Kalinga",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Construction of Manuel S. Agyao Boulevard-Ileb junc.-Dilag-San Julian-Balong-Tuao Circumferential Road, Tabuk City, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0417-005809",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Ilagan-Divilacan Road (Sta. 41 + 615 - Sta. 43 + 805, Sta. 43 + 835 - Sta. 44 + 913), including Bridges (Br.1: Sta. 43 + 805 - Sta. 43 + 835, Br. 2: Sta. 44 + 913 - Sta. 44 + 928), including Slope Protection and Drainage Structures, Barangay Sindon Bayabo, City of Ilagan, to Barangay Sapinit, Divilacan, Isabela",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 3.313,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": null,
      "lengthMeters": 3313.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          41615.0,
          43805.0
        ],
        [
          43835.0,
          44913.0
        ],
        [
          43805.0,
          43835.0
        ],
        [
          44913.0,
          44928.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Construction of Ilagan-Divilacan Road (Sta. 41 + 615 - Sta. 43 + 805, Sta. 43 + 835 - Sta. 44 + 913), including Bridges (Br.1: Sta. 43 + 805 - Sta. 43 + 835, Br. 2: Sta. 44 + 913 - Sta. 44 + 928), including Slope Protection and Drainage Structures, Barangay Sindon Bayabo, City of Ilagan, to Barangay Sapinit, Divilacan, Isabela",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0418-005826",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Core Urban Center), Barangay San Luis, Cauayan City, Isabela",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Road (Core Urban Center), Barangay San Luis, Cauayan City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0419-005843",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Alternate bridge Calvario - Poblacion Meycauayan Bulacan (120.957754, 14.737204)",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Construction of Alternate bridge Calvario - Poblacion Meycauayan Bulacan (120.957754, 14.737204)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0420-005849",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Continuation) along Strada-Navy-New Clark City Bypass Road, Capas, Tarlac",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Construction of Road (Continuation) along Strada-Navy-New Clark City Bypass Road, Capas, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0420-005850",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Continuation), Concepcion-Bamban going to New Clark City Bypass Road, Bamban, Tarlac",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Construction of Road (Continuation), Concepcion-Bamban going to New Clark City Bypass Road, Bamban, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0421-005878",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of MNR - Daungan - Libtong - Camalig Road (South Alignment), Meycauayan City, Bulacan Sta. 00+000 - Sta. 01+255 (120.98045000, 14.74881389)",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 1.255,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 119521912.35,
      "lengthMeters": 1255.0,
      "allocationPerStatedMeter": 119521.91,
      "rangesMeters": [
        [
          0.0,
          1255.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Construction of MNR - Daungan - Libtong - Camalig Road (South Alignment), Meycauayan City, Bulacan Sta. 00+000 - Sta. 01+255 (120.98045000, 14.74881389)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 4.78,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0421-005879",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of MNR - Lias - Camalig Road (North Alignment), Meycauayan City, Bulacan Sta. 00+000 - Sta. 01+255 (120.99013889, 14.76863056)",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 1.255,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 119521912.35,
      "lengthMeters": 1255.0,
      "allocationPerStatedMeter": 119521.91,
      "rangesMeters": [
        [
          0.0,
          1255.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Construction of MNR - Lias - Camalig Road (North Alignment), Meycauayan City, Bulacan Sta. 00+000 - Sta. 01+255 (120.99013889, 14.76863056)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 4.78,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0422-005902",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Access Road leading to Minalungao National Park, Bungo-Macabaklay Road, Gapan City, Nueva Ecija",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Improvement of Access Road leading to Minalungao National Park, Bungo-Macabaklay Road, Gapan City, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0422-005905",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road leading to Minalungao National Park, Macabaklay-Callos Road, Nueva Ecija",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Improvement of Road leading to Minalungao National Park, Macabaklay-Callos Road, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005908",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Burol Overpass, Sta. 1+120 - Sta. 1+145, Provincial Road, Borol 2nd, Balagtas, Bulacan",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.025,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 6000000000.0,
      "lengthMeters": 25.0,
      "allocationPerStatedMeter": 6000000.0,
      "rangesMeters": [
        [
          1120.0,
          1145.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Burol Overpass, Sta. 1+120 - Sta. 1+145, Provincial Road, Borol 2nd, Balagtas, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 169.7,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0423-005910",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Malolos - Paombong - Hagonoy - Calumpit Road, Sta. 0+000 - Sta. 2+800, Calumpit, Bulacan",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53571428.57,
      "lengthMeters": 2800.0,
      "allocationPerStatedMeter": 53571.43,
      "rangesMeters": [
        [
          0.0,
          2800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Malolos - Paombong - Hagonoy - Calumpit Road, Sta. 0+000 - Sta. 2+800, Calumpit, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.7,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0424-005947",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Ibaan-Taysan Road with Drainage Structures, Municipality of Ibaan, Province of Batangas, Start 13.792626, 121.145810 End 13.770645, 121172732",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Improvement of Ibaan-Taysan Road with Drainage Structures, Municipality of Ibaan, Province of Batangas, Start 13.792626, 121.145810 End 13.770645, 121172732",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0425-005955",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of CALAX Service Road, Barangay San Francisco, General Trias City Cavite, Sta. 0 + 000, Sta. 01 + 470",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Construction of CALAX Service Road, Barangay San Francisco, General Trias City Cavite, Sta. 0 + 000, Sta. 01 + 470",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005972",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Lumbang-Inosloban Bypass Road (Inosluban Section), Lipa City, Batangas",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Lumbang-Inosloban Bypass Road (Inosluban Section), Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0427-006004",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road Manila-Batangas Bypass Road, Lipa City, Batangas",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Improvement of Road Manila-Batangas Bypass Road, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006019",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Mansalay By-Pass Road, Mansalay, Oriental Mindoro",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Mansalay By-Pass Road, Mansalay, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006028",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Batino to Barangay Maidlang, Calapan City, Oriental Mindoro",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Road, Barangay Batino to Barangay Maidlang, Calapan City, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0430-006056",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of San Miguel Bridge leading to Isolated Barangays of San Miguel - Pacogon, Siay, Dayawa, Obo, Katipunan, Patagan, and Boton, Catanduanes",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Construction of San Miguel Bridge leading to Isolated Barangays of San Miguel - Pacogon, Siay, Dayawa, Obo, Katipunan, Patagan, and Boton, Catanduanes",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0430-006070",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of New Bridge 1 (Viaduct) along Pili-Tigaon-Albay Bdry Rd",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Construction of New Bridge 1 (Viaduct) along Pili-Tigaon-Albay Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0433-006129",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Buenos Aires Bridge, Bago City, Negros Occidental",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Buenos Aires Bridge, Bago City, Negros Occidental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0434-006146",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, SRP Backroad, Sta. 2+859 - Sta. 3+304, Cebu City",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.445,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 337078651.69,
      "lengthMeters": 445.0,
      "allocationPerStatedMeter": 337078.65,
      "rangesMeters": [
        [
          2859.0,
          3304.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Road, SRP Backroad, Sta. 2+859 - Sta. 3+304, Cebu City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 13.77,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0436-006175",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Maduruto - Barangay Deit, Sta. 0+445 - Sta. 738, Sta 0+382 - Sta. 4+539, Matuginao, Samar",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          382.0,
          4539.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Road, Barangay Maduruto - Barangay Deit, Sta. 0+445 - Sta. 738, Sta 0+382 - Sta. 4+539, Matuginao, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0437-006205",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Mabuhay - Talusan Coastal Road (Mabuhay Boulevard), Mabuhay, Zamboanga Sibugay",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Construction of Mabuhay - Talusan Coastal Road (Mabuhay Boulevard), Mabuhay, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0440-006263",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Jct. CDO City-Dominorog-Camp Kibaritan Road to Jct SH-Aglayan- Alanib-Ticalaan Road (Aglayan-Basak), Barangay Baylanan Section, Sta. 17+700 - Sta. 20+700, Talakag, Bukidnon",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          17700.0,
          20700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Construction of Jct. CDO City-Dominorog-Camp Kibaritan Road to Jct SH-Aglayan- Alanib-Ticalaan Road (Aglayan-Basak), Barangay Baylanan Section, Sta. 17+700 - Sta. 20+700, Talakag, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.59,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0441-006280",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of road balindong-piagapo-pantaoragat road, Barangay Pindolonan, Sta. 0+000 - Sta. 7+000, Piagapo, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 7.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21428571.43,
      "lengthMeters": 7000.0,
      "allocationPerStatedMeter": 21428.57,
      "rangesMeters": [
        [
          0.0,
          7000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of road balindong-piagapo-pantaoragat road, Barangay Pindolonan, Sta. 0+000 - Sta. 7+000, Piagapo, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.68,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0442-006296",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Sinonoc - San Vicente - Dinas - Katipunan - Namut Road on intermittent sections along Sta. 0+000 - Sta. 16+200, Sinacaban, Misamis Occidental",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 16.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9259259.26,
      "lengthMeters": 16200.0,
      "allocationPerStatedMeter": 9259.26,
      "rangesMeters": [
        [
          0.0,
          16200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Improvement of Road, Sinonoc - San Vicente - Dinas - Katipunan - Namut Road on intermittent sections along Sta. 0+000 - Sta. 16+200, Sinacaban, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.29,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0442-006297",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Don Victoriano-Concepcion Road, Sta. 0+000 - Sta. 2+500, Don Victoriano, Misamis Occidental",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 60000000.0,
      "lengthMeters": 2500.0,
      "allocationPerStatedMeter": 60000.0,
      "rangesMeters": [
        [
          0.0,
          2500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Construction of Concrete Road, Don Victoriano-Concepcion Road, Sta. 0+000 - Sta. 2+500, Don Victoriano, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.91,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0442-006298",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Mountain Bypass Road (Namut - Liboron Section), Sta. 0+000 - Sta. 2+100, Tudela - Don Victoriano, Misamis Occidental",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 71428571.43,
      "lengthMeters": 2100.0,
      "allocationPerStatedMeter": 71428.57,
      "rangesMeters": [
        [
          0.0,
          2100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Construction of Mountain Bypass Road (Namut - Liboron Section), Sta. 0+000 - Sta. 2+100, Tudela - Don Victoriano, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 2.96,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0442-006299",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of NPC-Ditucalan Parallel Bridge at Maria Cristina Falls, Barangay Ma. Cristina, Sta. 0 + 000 - Sta. 0 + 082, Iligan City",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.082,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1829268292.68,
      "lengthMeters": 82.0,
      "allocationPerStatedMeter": 1829268.29,
      "rangesMeters": [
        [
          0.0,
          82.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Construction of NPC-Ditucalan Parallel Bridge at Maria Cristina Falls, Barangay Ma. Cristina, Sta. 0 + 000 - Sta. 0 + 082, Iligan City",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 3.01,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0443-006307",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Anibongan, Carmen, Davao del Norte - Sta. 2+600 - Sta. 2+670",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 0.07,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2142857142.86,
      "lengthMeters": 70.0,
      "allocationPerStatedMeter": 2142857.14,
      "rangesMeters": [
        [
          2600.0,
          2670.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Construction of Bridge, Barangay Anibongan, Carmen, Davao del Norte - Sta. 2+600 - Sta. 2+670",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 3.53,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0444-006327",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Rizal - Barangay Baylo, Sta. 9+837.50 - Sta. 12+546.50, Monkayo, Davao de Oro",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.709,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55370985.6,
      "lengthMeters": 2709.0,
      "allocationPerStatedMeter": 55370.99,
      "rangesMeters": [
        [
          9837.5,
          12546.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of Road, Barangay Rizal - Barangay Baylo, Sta. 9+837.50 - Sta. 12+546.50, Monkayo, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.76,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0444-006328",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Rizal - Barangay Baylo, Sta. 12+546.50 - Sta. 15+246.5, Monkayo, Davao de Oro",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": 2.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55555555.56,
      "lengthMeters": 2700.0,
      "allocationPerStatedMeter": 55555.56,
      "rangesMeters": [
        [
          12546.5,
          15246.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of Road, Barangay Rizal - Barangay Baylo, Sta. 12+546.50 - Sta. 15+246.5, Monkayo, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.77,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0444-006335",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Limbo Bridge, Barangay Limbo, Maco, Davao de Oro",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of Limbo Bridge, Barangay Limbo, Maco, Davao de Oro",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0446-006363",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Paruayan Bridge I along Guiling-Bao-Malitubog-Paruayan-Nicaan Road, Alamada Cotabato",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Construction of Paruayan Bridge I along Guiling-Bao-Malitubog-Paruayan-Nicaan Road, Alamada Cotabato",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0446-006364",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Paruayan Bridge II along Guiling-Bao-Malitubog-Paruayan-Nicaan Road, Alamada Cotabato",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Construction of Paruayan Bridge II along Guiling-Bao-Malitubog-Paruayan-Nicaan Road, Alamada Cotabato",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0446-006381",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Surigao City - San Francisco, Surigao del Norte",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Construction of Road, Surigao City - San Francisco, Surigao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0447-006382",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Pacemco-Kaningag Bridge, Barangay Mabni, Surigao City, Surigao del Norte",
      "office": "Central Office",
      "amountPesos": 150000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "447",
      "lengthEvidence": "Construction of Pacemco-Kaningag Bridge, Barangay Mabni, Surigao City, Surigao del Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0612-009906",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Don Victoriano-Concepcion Road, Sta. 2+500 - Sta. 5+000, Don Victoriano, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 150000000,
      "lengthKm": 2.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 60000000.0,
      "lengthMeters": 2500.0,
      "allocationPerStatedMeter": 60000.0,
      "rangesMeters": [
        [
          2500.0,
          5000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Concrete Road, Don Victoriano-Concepcion Road, Sta. 2+500 - Sta. 5+000, Don Victoriano, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.91,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0294-003420",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Albay West Coast Rd - K0503+763 - K0503+897, K0504+033 - K0504+158",
      "office": "Central Office",
      "amountPesos": 149566000,
      "lengthKm": 0.259,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 577474903.47,
      "lengthMeters": 259.0,
      "allocationPerStatedMeter": 577474.9,
      "rangesMeters": [
        [
          503763.0,
          503897.0
        ],
        [
          504033.0,
          504158.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Albay West Coast Rd - K0503+763 - K0503+897, K0504+033 - K0504+158",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0259-002660",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Layog Br. (B00551LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 149100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Layog Br. (B00551LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0432-006096",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Hidhid-Banogao, Matnog, Sorsogon- La Esperanza- San Antonio, Santa Magdalena, Sorsogon",
      "office": "Central Office",
      "amountPesos": 149000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Construction of Road, Hidhid-Banogao, Matnog, Sorsogon- La Esperanza- San Antonio, Santa Magdalena, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0111-000016",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Cauayan - Cabatuan Rd - K0374 + 047 - K0377 + 456",
      "office": "Central Office",
      "amountPesos": 148530000,
      "lengthKm": 3.409,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 43569961.87,
      "lengthMeters": 3409.0,
      "allocationPerStatedMeter": 43569.96,
      "rangesMeters": [
        [
          374047.0,
          377456.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Cauayan - Cabatuan Rd - K0374 + 047 - K0377 + 456",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 1.25,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0259-002664",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Malaga Br. (B00331SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "office": "Central Office",
      "amountPesos": 148308000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Malaga Br. (B00331SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0215-001901",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Alcala-Santo Niño-Lasam Road, Santo Niño Section, (Sta. 4+500 - Sta. 4+590, Sta 4+670 - Sta. 4+760, Sta. 5+140 - Sta. 5+571.63, Sta 10+840 - Sta. 13+040), Cagayan",
      "office": "Central Office",
      "amountPesos": 148000000,
      "lengthKm": 2.81163,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 52638505.07,
      "lengthMeters": 2811.63,
      "allocationPerStatedMeter": 52638.51,
      "rangesMeters": [
        [
          4500.0,
          4590.0
        ],
        [
          4670.0,
          4760.0
        ],
        [
          5140.0,
          5571.63
        ],
        [
          10840.0,
          13040.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Alcala-Santo Niño-Lasam Road, Santo Niño Section, (Sta. 4+500 - Sta. 4+590, Sta 4+670 - Sta. 4+760, Sta. 5+140 - Sta. 5+571.63, Sta 10+840 - Sta. 13+040), Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 1.02,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0215-001902",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Alcala-Santo Niño-Lasam Road, Santo Niño Section, (Sta. 4+590 - Sta. 4+670), Cagayan",
      "office": "Central Office",
      "amountPesos": 148000000,
      "lengthKm": 0.08,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1850000000.0,
      "lengthMeters": 80.0,
      "allocationPerStatedMeter": 1850000.0,
      "rangesMeters": [
        [
          4590.0,
          4670.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Alcala-Santo Niño-Lasam Road, Santo Niño Section, (Sta. 4+590 - Sta. 4+670), Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 1.54,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0229-002180",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tago - La Paz Bypass Road, Sta. 3+377 - Sta.3+709, Barangay Poblacion - Barangay La Paz, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 148000000,
      "lengthKm": 0.332,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 445783132.53,
      "lengthMeters": 332.0,
      "allocationPerStatedMeter": 445783.13,
      "rangesMeters": [
        [
          3377.0,
          3709.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Tago - La Paz Bypass Road, Sta. 3+377 - Sta.3+709, Barangay Poblacion - Barangay La Paz, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 3.5,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0444-006324",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Montevista, Davao de Oro to Asuncion, Davao del Norte Bypass Road (Camansa to Cabawkawan Section), Asuncion, Davao del Norte",
      "office": "Central Office",
      "amountPesos": 148000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of Montevista, Davao de Oro to Asuncion, Davao del Norte Bypass Road (Camansa to Cabawkawan Section), Asuncion, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005746",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Bolinao-Patar Road, Bolinao Pangasinan Sta. 0+000 - Sta. 8+140",
      "office": "Central Office",
      "amountPesos": 147624000,
      "lengthKm": 8.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18135626.54,
      "lengthMeters": 8140.0,
      "allocationPerStatedMeter": 18135.63,
      "rangesMeters": [
        [
          0.0,
          8140.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Rehabilitation of Bolinao-Patar Road, Bolinao Pangasinan Sta. 0+000 - Sta. 8+140",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0111-000011",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Urdaneta Jct - Dagupan Road, K0194+674 - K0194+985, K0198+657 - K0200+853",
      "office": "Central Office",
      "amountPesos": 147344000,
      "lengthKm": 2.507,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 58773035.5,
      "lengthMeters": 2507.0,
      "allocationPerStatedMeter": 58773.04,
      "rangesMeters": [
        [
          194674.0,
          194985.0
        ],
        [
          198657.0,
          200853.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Urdaneta Jct - Dagupan Road, K0194+674 - K0194+985, K0198+657 - K0200+853",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.57,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0294-003419",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Albay West Coast Rd - K0504+158 - K0504+413",
      "office": "Central Office",
      "amountPesos": 147259000,
      "lengthKm": 0.255,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 577486274.51,
      "lengthMeters": 255.0,
      "allocationPerStatedMeter": 577486.27,
      "rangesMeters": [
        [
          504158.0,
          504413.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Albay West Coast Rd - K0504+158 - K0504+413",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0151-000781",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0754 + 500 - K0755 + 000, K0760 + 000 - K0760 + 769, K0764 + 200 - K0766 + 860",
      "office": "Central Office",
      "amountPesos": 147172000,
      "lengthKm": 3.929,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 37457877.32,
      "lengthMeters": 3929.0,
      "allocationPerStatedMeter": 37457.88,
      "rangesMeters": [
        [
          754500.0,
          755000.0
        ],
        [
          760000.0,
          760769.0
        ],
        [
          764200.0,
          766860.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0754 + 500 - K0755 + 000, K0760 + 000 - K0760 + 769, K0764 + 200 - K0766 + 860",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 1.09,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0221-002034",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Jct. Nato-Sabang Coastal Road, Manzana Section, San Jose , Camarines Sur, Sta.8+877 - Sta.9+627",
      "office": "Central Office",
      "amountPesos": 147000000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 196000000.0,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 196000.0,
      "rangesMeters": [
        [
          8877.0,
          9627.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Jct. Nato-Sabang Coastal Road, Manzana Section, San Jose , Camarines Sur, Sta.8+877 - Sta.9+627",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 1.44,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0221-002037",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Jct. Nato-Sabang Coastal Road, Telegrafo Section, San Jose, Camarines Sur, Sta.8+127 - Sta.8+877",
      "office": "Central Office",
      "amountPesos": 147000000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 196000000.0,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 196000.0,
      "rangesMeters": [
        [
          8127.0,
          8877.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Jct. Nato-Sabang Coastal Road, Telegrafo Section, San Jose, Camarines Sur, Sta.8+127 - Sta.8+877",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 1.44,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0215-001907",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bayombong-Quezon-Bagabag Road, Barangay Nalubbunan Section (Sta.10+100 - Sta. 12+365), Nueva Vizcaya",
      "office": "Central Office",
      "amountPesos": 146030000,
      "lengthKm": 2.265,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 64472406.18,
      "lengthMeters": 2265.0,
      "allocationPerStatedMeter": 64472.41,
      "rangesMeters": [
        [
          10100.0,
          12365.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Bayombong-Quezon-Bagabag Road, Barangay Nalubbunan Section (Sta.10+100 - Sta. 12+365), Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 1.25,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0432-006095",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tugas-Barangay Calpi, Matnog Sorsogon",
      "office": "Central Office",
      "amountPesos": 146000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Construction of Road, Barangay Tugas-Barangay Calpi, Matnog Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0221-002032",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Jct. Nato-Sabang Coastal Road, Dolo Section, San Jose, Camarines Sur, Sta.9+627 - Sta.10+368",
      "office": "Central Office",
      "amountPesos": 145500000,
      "lengthKm": 0.741,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 196356275.3,
      "lengthMeters": 741.0,
      "allocationPerStatedMeter": 196356.28,
      "rangesMeters": [
        [
          9627.0,
          10368.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Jct. Nato-Sabang Coastal Road, Dolo Section, San Jose, Camarines Sur, Sta.9+627 - Sta.10+368",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 1.44,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0235-002275",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Jct. Abbag-Guingin Bdry. Rd (Mactol-Bucao Section), San Pugo, Quirino - Sta. 3+380 - Sta. 6+286.96",
      "office": "Central Office",
      "amountPesos": 145348000,
      "lengthKm": 2.90696,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 2906.96,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          3380.0,
          6286.96
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Jct. Abbag-Guingin Bdry. Rd (Mactol-Bucao Section), San Pugo, Quirino - Sta. 3+380 - Sta. 6+286.96",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.15,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0173-001160",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Naga-Uling Rd - K0024 + 875 - K0024 + 915, K0032 + 260 - K0032 + 330, K0034 + 640 - K0034 + 690, K0034 + 950 - K0035 + 000, K0036 + 000 - K0036 + 150",
      "office": "Central Office",
      "amountPesos": 145000000,
      "lengthKm": 0.36,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 402777777.78,
      "lengthMeters": 360.0,
      "allocationPerStatedMeter": 402777.78,
      "rangesMeters": [
        [
          24875.0,
          24915.0
        ],
        [
          32260.0,
          32330.0
        ],
        [
          34640.0,
          34690.0
        ],
        [
          34950.0,
          35000.0
        ],
        [
          36000.0,
          36150.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Naga-Uling Rd - K0024 + 875 - K0024 + 915, K0032 + 260 - K0032 + 330, K0034 + 640 - K0034 + 690, K0034 + 950 - K0035 + 000, K0036 + 000 - K0036 + 150",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 1.21,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0176-001212",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kapalong-Talaingod-Valencia (Bukidnon) Rd K1541 + 720 - K1541 + 766, K1543 +863 - K1544 + 025, K1574 + 618 - K1574 + 652, K1574 + 700 - K1574 + 758",
      "office": "Central Office",
      "amountPesos": 145000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 483333333.33,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 483333.33,
      "rangesMeters": [
        [
          1541720.0,
          1541766.0
        ],
        [
          1543863.0,
          1544025.0
        ],
        [
          1574618.0,
          1574652.0
        ],
        [
          1574700.0,
          1574758.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Kapalong-Talaingod-Valencia (Bukidnon) Rd K1541 + 720 - K1541 + 766, K1543 +863 - K1544 + 025, K1574 + 618 - K1574 + 652, K1574 + 700 - K1574 + 758",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 2.68,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0294-003422",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Poblacion/Barrera Jr Br. along Cabutagan-Haluban-Sooc Rd",
      "office": "Central Office",
      "amountPesos": 145000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Poblacion/Barrera Jr Br. along Cabutagan-Haluban-Sooc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0427-005999",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 4+523 – Sta. 4+900",
      "office": "Central Office",
      "amountPesos": 145000000,
      "lengthKm": 0.377,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 384615384.62,
      "lengthMeters": 377.0,
      "allocationPerStatedMeter": 384615.38,
      "rangesMeters": [
        [
          4523.0,
          4900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 4+523 – Sta. 4+900",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 15.71,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0215-001915",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
      "office": "Central Office",
      "amountPesos": 144726000,
      "lengthKm": 1.4766799999999998,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 98007692.93,
      "lengthMeters": 1476.68,
      "allocationPerStatedMeter": 98007.69,
      "rangesMeters": [
        [
          2344.0,
          3820.68
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.19,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0221-002028",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Daraga Urban Tourism Eco Route Project, Sta. 525 + 850.70 - Sta. 525 + 991.30, Barangay Tagas - Barangay Kilicao Daraga, Albay",
      "office": "Central Office",
      "amountPesos": 144692000,
      "lengthKm": 0.14060000000009312,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1029103840.68,
      "lengthMeters": 140.6,
      "allocationPerStatedMeter": 1029103.84,
      "rangesMeters": [
        [
          525850.7,
          525991.3
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Daraga Urban Tourism Eco Route Project, Sta. 525 + 850.70 - Sta. 525 + 991.30, Barangay Tagas - Barangay Kilicao Daraga, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 4.91,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0221-002030",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Daraga Urban Tourism Eco Route Project, Sta. 527 + 039.70 - Sta. 527 + 130.3, Barangay Kilicao, Daraga - Barangay Pawa, Legazpi City, Albay",
      "office": "Central Office",
      "amountPesos": 144692000,
      "lengthKm": 0.09060000000009313,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1597041942.6,
      "lengthMeters": 90.6,
      "allocationPerStatedMeter": 1597041.94,
      "rangesMeters": [
        [
          527039.7,
          527130.3
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Daraga Urban Tourism Eco Route Project, Sta. 527 + 039.70 - Sta. 527 + 130.3, Barangay Kilicao, Daraga - Barangay Pawa, Legazpi City, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 1.33,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0114-000073",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dipolog-Oroquieta National Rd - K1839 + 690 - K1841 + 710, K1841 + 742 - K1843 + 260, K1844 + 330 - K1845 + 000",
      "office": "Central Office",
      "amountPesos": 144622000,
      "lengthKm": 4.208,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34368346.01,
      "lengthMeters": 4208.0,
      "allocationPerStatedMeter": 34368.35,
      "rangesMeters": [
        [
          1839690.0,
          1841710.0
        ],
        [
          1841742.0,
          1843260.0
        ],
        [
          1844330.0,
          1845000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Dipolog-Oroquieta National Rd - K1839 + 690 - K1841 + 710, K1841 + 742 - K1843 + 260, K1844 + 330 - K1845 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 0.99,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0416-005778",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Apao, Tineg - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub, Abra",
      "office": "Central Office",
      "amountPesos": 144039000,
      "lengthKm": 5.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28807800.0,
      "lengthMeters": 5000.0,
      "allocationPerStatedMeter": 28807.8,
      "rangesMeters": [
        [
          0.0,
          5000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Construction of Apao, Tineg - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.92,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0438-006210",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Lapid-Lapid to Masantong, Bongao, Tawi-Tawi",
      "office": "Central Office",
      "amountPesos": 144000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Construction of Road, Lapid-Lapid to Masantong, Bongao, Tawi-Tawi",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0215-001912",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cauayan City Bypass Road (Bridge and Approaches) (Sta. 2+413 - Sta. 2+443), Cauayan City, Isabela",
      "office": "Central Office",
      "amountPesos": 143906000,
      "lengthKm": 0.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 30.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          2413.0,
          2443.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Cauayan City Bypass Road (Bridge and Approaches) (Sta. 2+413 - Sta. 2+443), Cauayan City, Isabela",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0215-001916",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
      "office": "Central Office",
      "amountPesos": 143906000,
      "lengthKm": 0.531,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 271009416.2,
      "lengthMeters": 531.0,
      "allocationPerStatedMeter": 271009.42,
      "rangesMeters": [
        [
          4069.0,
          4600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 1.99,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0218-001969",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Talavera-Licab Road, Replacement of Bridge, Ikatlo Bridge, Barangay Malasin, Sto. Domingo, Nueva Ecija STA. 3+349.041- STA. 3+390.51",
      "office": "Central Office",
      "amountPesos": 143500000,
      "lengthKm": 0.04146900000000005,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 41.469,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          3349.041,
          3390.51
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Talavera-Licab Road, Replacement of Bridge, Ikatlo Bridge, Barangay Malasin, Sto. Domingo, Nueva Ecija STA. 3+349.041- STA. 3+390.51",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0416-005779",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bacag - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub Abra",
      "office": "Central Office",
      "amountPesos": 142837000,
      "lengthKm": 5.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28567400.0,
      "lengthMeters": 5000.0,
      "allocationPerStatedMeter": 28567.4,
      "rangesMeters": [
        [
          0.0,
          5000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Construction of Bacag - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.91,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0417-005800",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Tamac, Villaviciosa - Dalit, Pilar Road, Sta. 0+000 - Sta. 4+000, Villaviciosa and Pilar, Abra",
      "office": "Central Office",
      "amountPesos": 142256000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35564000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 35564.0,
      "rangesMeters": [
        [
          0.0,
          4000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Construction of Tamac, Villaviciosa - Dalit, Pilar Road, Sta. 0+000 - Sta. 4+000, Villaviciosa and Pilar, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.13,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0445-006347",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge along Alah River connecting Barangay Dajay and Barangay Moloy, Surallah, South Cotabato",
      "office": "Central Office",
      "amountPesos": 142230000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Construction of Bridge along Alah River connecting Barangay Dajay and Barangay Moloy, Surallah, South Cotabato",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0198-001581",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1679 + 000 - K1680 + 000, K1680 + 623 - K1683 + 500",
      "office": "Central Office",
      "amountPesos": 142000000,
      "lengthKm": 3.877,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 36626257.42,
      "lengthMeters": 3877.0,
      "allocationPerStatedMeter": 36626.26,
      "rangesMeters": [
        [
          1679000.0,
          1680000.0
        ],
        [
          1680623.0,
          1683500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1679 + 000 - K1680 + 000, K1680 + 623 - K1683 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 1.04,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0199-001591",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1829 + 364 - K1833 + 756",
      "office": "Central Office",
      "amountPesos": 142000000,
      "lengthKm": 4.392,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32331511.84,
      "lengthMeters": 4392.0,
      "allocationPerStatedMeter": 32331.51,
      "rangesMeters": [
        [
          1829364.0,
          1833756.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1829 + 364 - K1833 + 756",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 0.92,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0117-000134",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Marbel-Makar Rd) - K1703 + 000 - K1704 + 456.21",
      "office": "Central Office",
      "amountPesos": 141995000,
      "lengthKm": 1.4562099999999627,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 97509974.52,
      "lengthMeters": 1456.21,
      "allocationPerStatedMeter": 97509.97,
      "rangesMeters": [
        [
          1703000.0,
          1704456.21
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Maharlika Highway (Marbel-Makar Rd) - K1703 + 000 - K1704 + 456.21",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 2.48,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0150-000758",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0233 + 296 - K0234 + 717, K0234 + 800 - K0235 + 984, K0236 + 127 - K0236 + 276, K0236 + 816 - K0236 + 969, K0237 + 217 - K0237 + 528, K0237 + 643 - K0237 + 963, K0239 + 000 - K0239 + 114, K0239 + 347 - K0239 + 611, K0239 + 682 - K0239 + 973, K0240 + 212 - K0240 + 622, K0240 + 778 - K0240 + 978, K0241 + 688 - K0242 + 367, K0242 + 415 - K0242 + 482, K0242 + 895 - K0243 + 028, K0243 + 073 - K0243 + 114, K0243 + 840 - K0244 + 191, K0244 + 451 - K0244 + 489, K0244 + 609 - K0245 + 066, K0245 + 103 - K0245 + 176, K0245 + 820 - K0245 + 916, K0245 + 994 - K0246 + 319, K0246 + 452 - K0246 + 732",
      "office": "Central Office",
      "amountPesos": 141823000,
      "lengthKm": 7.357,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 19277286.94,
      "lengthMeters": 7357.0,
      "allocationPerStatedMeter": 19277.29,
      "rangesMeters": [
        [
          233296.0,
          234717.0
        ],
        [
          234800.0,
          235984.0
        ],
        [
          236127.0,
          236276.0
        ],
        [
          236816.0,
          236969.0
        ],
        [
          237217.0,
          237528.0
        ],
        [
          237643.0,
          237963.0
        ],
        [
          239000.0,
          239114.0
        ],
        [
          239347.0,
          239611.0
        ],
        [
          239682.0,
          239973.0
        ],
        [
          240212.0,
          240622.0
        ],
        [
          240778.0,
          240978.0
        ],
        [
          241688.0,
          242367.0
        ],
        [
          242415.0,
          242482.0
        ],
        [
          242895.0,
          243028.0
        ],
        [
          243073.0,
          243114.0
        ],
        [
          243840.0,
          244191.0
        ],
        [
          244451.0,
          244489.0
        ],
        [
          244609.0,
          245066.0
        ],
        [
          245103.0,
          245176.0
        ],
        [
          245820.0,
          245916.0
        ],
        [
          245994.0,
          246319.0
        ],
        [
          246452.0,
          246732.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "Maharlika Highway (LZ) - K0233 + 296 - K0234 + 717, K0234 + 800 - K0235 + 984, K0236 + 127 - K0236 + 276, K0236 + 816 - K0236 + 969, K0237 + 217 - K0237 + 528, K0237 + 643 - K0237 + 963, K0239 + 000 - K0239 + 114, K0239 + 347 - K0239 + 611, K0239 + 682 - K0239 + 973, K0240 + 212 - K0240 + 622, K0240 + 778 - K0240 + 978, K0241 + 688 - K0242 + 367, K0242 + 415 - K0242 + 482, K0242 + 895 - K0243 + 028, K0243 + 073 - K0243 + 114, K0243 + 840 - K0244 + 191, K0244 + 451 - K0244 + 489, K0244 + 609 - K0245 + 066, K0245 + 103 - K0245 + 176, K0245 + 820 - K0245 + 916, K0245 + 994 - K0246 + 319, K0246 + 452 - K0246 + 732",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 0.56,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0238-002334",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Managnag(Tigaon-Goa-Sn Jose-Lagonoy via Sn Vicente Rd)-Himanag Road, Lagonoy, Camarines Sur, Sta.13+484 - Sta.15+360.7",
      "office": "Central Office",
      "amountPesos": 141801000,
      "lengthKm": 1.8767000000000007,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 75558693.45,
      "lengthMeters": 1876.7,
      "allocationPerStatedMeter": 75558.69,
      "rangesMeters": [
        [
          13484.0,
          15360.7
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Managnag(Tigaon-Goa-Sn Jose-Lagonoy via Sn Vicente Rd)-Himanag Road, Lagonoy, Camarines Sur, Sta.13+484 - Sta.15+360.7",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 0.96,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0197-001556",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Santiago-Tuguegarao Rd - K0412 + 422 - K0415 + 461",
      "office": "Central Office",
      "amountPesos": 141550000,
      "lengthKm": 3.039,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46577821.65,
      "lengthMeters": 3039.0,
      "allocationPerStatedMeter": 46577.82,
      "rangesMeters": [
        [
          412422.0,
          415461.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "197",
      "lengthEvidence": "Santiago-Tuguegarao Rd - K0412 + 422 - K0415 + 461",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 1.32,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0285-003219",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Morong Br. (B05232LZ) along Sariaya Bypass Rd",
      "office": "Central Office",
      "amountPesos": 141500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Morong Br. (B05232LZ) along Sariaya Bypass Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0124-000257",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Gumaca Bypass Rd - K0191 + 060 - K0193 + 157",
      "office": "Central Office",
      "amountPesos": 140000000,
      "lengthKm": 2.097,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66762041.01,
      "lengthMeters": 2097.0,
      "allocationPerStatedMeter": 66762.04,
      "rangesMeters": [
        [
          191060.0,
          193157.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Gumaca Bypass Rd - K0191 + 060 - K0193 + 157",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 3.32,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0142-000617",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Montevista-Dnas Rd - K1413+(-602) - K1413+000, K1414+535 - K1415+539, K1416+000 - K1422+002, K1431+541 - K1432+966",
      "office": "Central Office",
      "amountPesos": 140000000,
      "lengthKm": 9.033,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 15498726.89,
      "lengthMeters": 9033.0,
      "allocationPerStatedMeter": 15498.73,
      "rangesMeters": [
        [
          1412398.0,
          1413000.0
        ],
        [
          1414535.0,
          1415539.0
        ],
        [
          1416000.0,
          1422002.0
        ],
        [
          1431541.0,
          1432966.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "Montevista-Dnas Rd - K1413+(-602) - K1413+000, K1414+535 - K1415+539, K1416+000 - K1422+002, K1431+541 - K1432+966",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 1.06,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0175-001193",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Marikina-Infanta Rd - K0114 + 936 - K0114 + 976, K0118 + 242 - K0118 + 288, K0119 + 815 - K0119 + 858, K0121 + 355 - K0121 + 404",
      "office": "Central Office",
      "amountPesos": 140000000,
      "lengthKm": 0.178,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 786516853.93,
      "lengthMeters": 178.0,
      "allocationPerStatedMeter": 786516.85,
      "rangesMeters": [
        [
          114936.0,
          114976.0
        ],
        [
          118242.0,
          118288.0
        ],
        [
          119815.0,
          119858.0
        ],
        [
          121355.0,
          121404.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "Marikina-Infanta Rd - K0114 + 936 - K0114 + 976, K0118 + 242 - K0118 + 288, K0119 + 815 - K0119 + 858, K0121 + 355 - K0121 + 404",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 4.14,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0216-001936",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Construction of Pandi By-pass Road, Pandi, Bulacan, Sta. 5+000.00 - Sta. 6+040.00",
      "office": "Central Office",
      "amountPesos": 140000000,
      "lengthKm": 1.04,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 134615384.62,
      "lengthMeters": 1040.0,
      "allocationPerStatedMeter": 134615.38,
      "rangesMeters": [
        [
          5000.0,
          6040.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Construction of Pandi By-pass Road, Pandi, Bulacan, Sta. 5+000.00 - Sta. 6+040.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 1.25,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0234-002255",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Piddig-Carasi (Ilocos Norte) - Calanasan (Apayao) Connecting Cabugao-Conner (Apayao)-Tuao (Cagayan) Road, Sta. 36+236 - Sta. 38+588, Ilocos Norte",
      "office": "Central Office",
      "amountPesos": 140000000,
      "lengthKm": 2.352,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 59523809.52,
      "lengthMeters": 2352.0,
      "allocationPerStatedMeter": 59523.81,
      "rangesMeters": [
        [
          36236.0,
          38588.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Piddig-Carasi (Ilocos Norte) - Calanasan (Apayao) Connecting Cabugao-Conner (Apayao)-Tuao (Cagayan) Road, Sta. 36+236 - Sta. 38+588, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 0.75,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0234-002263",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Aguinaldo-Toboy-Natonin Road, Sta. 11+286 - Sta. 11+512",
      "office": "Central Office",
      "amountPesos": 140000000,
      "lengthKm": 0.226,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 619469026.55,
      "lengthMeters": 226.0,
      "allocationPerStatedMeter": 619469.03,
      "rangesMeters": [
        [
          11286.0,
          11512.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Aguinaldo-Toboy-Natonin Road, Sta. 11+286 - Sta. 11+512",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 0.71,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0240-002370",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Barangay Silae, Sta. 20+00 - Sta. 22+863.64, Malaybalay City, Bukidnon",
      "office": "Central Office",
      "amountPesos": 140000000,
      "lengthKm": 2.8636399999999993,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 48888826.81,
      "lengthMeters": 2863.64,
      "allocationPerStatedMeter": 48888.83,
      "rangesMeters": [
        [
          20000.0,
          22863.64
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Barangay Silae, Sta. 20+00 - Sta. 22+863.64, Malaybalay City, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 1.13,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0413-005718",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Drainage System along Roxas Blvd Service Road S02896LZ K0001 + (- 214) - K0001 + (212)",
      "office": "Central Office",
      "amountPesos": 140000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Improvement of Drainage System along Roxas Blvd Service Road S02896LZ K0001 + (- 214) - K0001 + (212)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0430-006066",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Comagaycay-Alibuag Coastal Road, Barangay Comagaycay and Barangay Alibuag, San Andres, Catanduanes",
      "office": "Central Office",
      "amountPesos": 140000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Construction of Comagaycay-Alibuag Coastal Road, Barangay Comagaycay and Barangay Alibuag, San Andres, Catanduanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0126-000307",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siquijor Circumferential Rd - K0004 + 100 - K0004 + 786, K0009 + 720 - K0012 + 000, K0051 + 330 - K0051 + 731, K0074 + 520 - K0075 + 339",
      "office": "Central Office",
      "amountPesos": 138900000,
      "lengthKm": 4.186,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 33182035.36,
      "lengthMeters": 4186.0,
      "allocationPerStatedMeter": 33182.04,
      "rangesMeters": [
        [
          4100.0,
          4786.0
        ],
        [
          9720.0,
          12000.0
        ],
        [
          51330.0,
          51731.0
        ],
        [
          74520.0,
          75339.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Siquijor Circumferential Rd - K0004 + 100 - K0004 + 786, K0009 + 720 - K0012 + 000, K0051 + 330 - K0051 + 731, K0074 + 520 - K0075 + 339",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 2.02,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0215-001908",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
      "office": "Central Office",
      "amountPesos": 138682000,
      "lengthKm": 1.489,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 93137676.29,
      "lengthMeters": 1489.0,
      "allocationPerStatedMeter": 93137.68,
      "rangesMeters": [
        [
          0.0,
          27.0
        ],
        [
          5800.0,
          7262.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.13,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0212-001855",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Magpet-Nowa-Doroluman-Greenfield Rd - K1660 + 352 - K1664 + 703",
      "office": "Central Office",
      "amountPesos": 138647000,
      "lengthKm": 4.351,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31865548.15,
      "lengthMeters": 4351.0,
      "allocationPerStatedMeter": 31865.55,
      "rangesMeters": [
        [
          1660352.0,
          1664703.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Magpet-Nowa-Doroluman-Greenfield Rd - K1660 + 352 - K1664 + 703",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.78,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0416-005785",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Palao-Calaba Bypass Road - Sta. 3+000-Sta. 3+273, Bangued, Abra",
      "office": "Central Office",
      "amountPesos": 137970000,
      "lengthKm": 0.273,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 505384615.38,
      "lengthMeters": 273.0,
      "allocationPerStatedMeter": 505384.62,
      "rangesMeters": [
        [
          3000.0,
          3273.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Palao-Calaba Bypass Road - Sta. 3+000-Sta. 3+273, Bangued, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 17.69,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0283-003190",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Bued Parallel Br. along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 137047000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Bued Parallel Br. along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0204-001708",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Babak-Samal-Kaputian Rd - K1507 + 550 - K1509 + 072, K1516 + 460 - K1519 + 343",
      "office": "Central Office",
      "amountPesos": 137001000,
      "lengthKm": 4.405,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 31101248.58,
      "lengthMeters": 4405.0,
      "allocationPerStatedMeter": 31101.25,
      "rangesMeters": [
        [
          1507550.0,
          1509072.0
        ],
        [
          1516460.0,
          1519343.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Babak-Samal-Kaputian Rd - K1507 + 550 - K1509 + 072, K1516 + 460 - K1519 + 343",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 1.16,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0228-002156",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Construction of Davao de Oro Bypass Road, (Kahayag – Pagsabangan – Panansalan Section), Davao de Oro",
      "office": "Central Office",
      "amountPesos": 137000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Construction of Davao de Oro Bypass Road, (Kahayag – Pagsabangan – Panansalan Section), Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0199-001601",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1710 + 046 - K1710 + 780, K1710 + 792.25 - K1711 + 031, K1711 + 049 - K1712 + 493, K1712 + 517 - K1713 + 037",
      "office": "Central Office",
      "amountPesos": 136115000,
      "lengthKm": 2.93675,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 46348855.03,
      "lengthMeters": 2936.75,
      "allocationPerStatedMeter": 46348.86,
      "rangesMeters": [
        [
          1710046.0,
          1710780.0
        ],
        [
          1710792.25,
          1711031.0
        ],
        [
          1711049.0,
          1712493.0
        ],
        [
          1712517.0,
          1713037.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1710 + 046 - K1710 + 780, K1710 + 792.25 - K1711 + 031, K1711 + 049 - K1712 + 493, K1712 + 517 - K1713 + 037",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 1.32,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0221-002041",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sorsogon City Coastal Bypass Road, Barangay Abuyog, Sta. 4 + 211 - Sta. 4 + 265.44, Sorsogon",
      "office": "Central Office",
      "amountPesos": 136092000,
      "lengthKm": 0.0544399999999996,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2499853049.23,
      "lengthMeters": 54.44,
      "allocationPerStatedMeter": 2499853.05,
      "rangesMeters": [
        [
          4211.0,
          4265.44
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Sorsogon City Coastal Bypass Road, Barangay Abuyog, Sta. 4 + 211 - Sta. 4 + 265.44, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 2.09,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0444-006338",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Monkayo, Compostela Valley - Veruela Road, Barangay Awao, Monkayo - Barangay Kidawa, Laak Section, Davao de Oro",
      "office": "Central Office",
      "amountPesos": 136000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of Monkayo, Compostela Valley - Veruela Road, Barangay Awao, Monkayo - Barangay Kidawa, Laak Section, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0202-001659",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Sn Juan-Candelaria Jct-Candelaria-Bolboc Road, Quezon - K0147 + 903 - K0149 + 164",
      "office": "Central Office",
      "amountPesos": 135800000,
      "lengthKm": 1.261,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 107692307.69,
      "lengthMeters": 1261.0,
      "allocationPerStatedMeter": 107692.31,
      "rangesMeters": [
        [
          147903.0,
          149164.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Sn Juan-Candelaria Jct-Candelaria-Bolboc Road, Quezon - K0147 + 903 - K0149 + 164",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 3.21,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0142-000616",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Montevista-Compostela-Mati Bdry Rd - K1438+627 - K1439+584, K1439+600 - K1441+000, K1475+485 - K1476+548, K1476+564 - K1476+948, K1476+978 - K1477+000, K1483+188 - K1483+605, K1484+044 - K1484+940, K1490+208 - K1490+902",
      "office": "Central Office",
      "amountPesos": 135000000,
      "lengthKm": 5.833,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23144179.67,
      "lengthMeters": 5833.0,
      "allocationPerStatedMeter": 23144.18,
      "rangesMeters": [
        [
          1438627.0,
          1439584.0
        ],
        [
          1439600.0,
          1441000.0
        ],
        [
          1475485.0,
          1476548.0
        ],
        [
          1476564.0,
          1476948.0
        ],
        [
          1476978.0,
          1477000.0
        ],
        [
          1483188.0,
          1483605.0
        ],
        [
          1484044.0,
          1484940.0
        ],
        [
          1490208.0,
          1490902.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "Montevista-Compostela-Mati Bdry Rd - K1438+627 - K1439+584, K1439+600 - K1441+000, K1475+485 - K1476+548, K1476+564 - K1476+948, K1476+978 - K1477+000, K1483+188 - K1483+605, K1484+044 - K1484+940, K1490+208 - K1490+902",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 1.58,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0238-002332",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Managnag(Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)-Himanag Road, Lagonoy, Camarines Sur, Sta.15+360.70 - Sta.16+980",
      "office": "Central Office",
      "amountPesos": 135000000,
      "lengthKm": 1.6192999999999993,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 83369357.13,
      "lengthMeters": 1619.3,
      "allocationPerStatedMeter": 83369.36,
      "rangesMeters": [
        [
          15360.7,
          16980.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Managnag(Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)-Himanag Road, Lagonoy, Camarines Sur, Sta.15+360.70 - Sta.16+980",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 1.05,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0413-005726",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Network Improvement with Drainage System and Solar Lights, ESSU Guiuan Campus, Eastern Samar",
      "office": "Central Office",
      "amountPesos": 135000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Road Network Improvement with Drainage System and Solar Lights, ESSU Guiuan Campus, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0418-005828",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mabini, Gamu, Isabela",
      "office": "Central Office",
      "amountPesos": 135000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Road, Barangay Mabini, Gamu, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0422-005900",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of San Fernando Road, San Fernando, Sta Cruz, Zambales Sta. 0+000.00 - Sta. 1+500.00",
      "office": "Central Office",
      "amountPesos": 135000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 90000000.0,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 90000.0,
      "rangesMeters": [
        [
          0.0,
          1500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Construction of San Fernando Road, San Fernando, Sta Cruz, Zambales Sta. 0+000.00 - Sta. 1+500.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 3.73,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0444-006331",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Montevista, Davao de Oro to Asuncion, Davao del Norte Bypass Road (Montevista Section), Montevista, Davao de Oro",
      "office": "Central Office",
      "amountPesos": 135000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of Montevista, Davao de Oro to Asuncion, Davao del Norte Bypass Road (Montevista Section), Montevista, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0205-001715",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "General Santos City-T'Boli-Surallah Rd - (S01487MN) Chainage 31284 - Chainage 37800",
      "office": "Central Office",
      "amountPesos": 134857000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "General Santos City-T'Boli-Surallah Rd - (S01487MN) Chainage 31284 - Chainage 37800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0202-001657",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Quezon Eco-Tourism Road, Quezon - K0165 + 127 - K0166 + 258",
      "office": "Central Office",
      "amountPesos": 134300000,
      "lengthKm": 1.131,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 118744473.92,
      "lengthMeters": 1131.0,
      "allocationPerStatedMeter": 118744.47,
      "rangesMeters": [
        [
          165127.0,
          166258.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Quezon Eco-Tourism Road, Quezon - K0165 + 127 - K0166 + 258",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 2.34,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0124-000253",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Nueva Ecija - Pangasinan Rd, K0171 + 267 - K0175 + 300",
      "office": "Central Office",
      "amountPesos": 134000000,
      "lengthKm": 4.033,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33225886.44,
      "lengthMeters": 4033.0,
      "allocationPerStatedMeter": 33225.89,
      "rangesMeters": [
        [
          171267.0,
          175300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Nueva Ecija - Pangasinan Rd, K0171 + 267 - K0175 + 300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 2.02,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0436-006183",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of San Mateo Bridge including approaches, Barangay San Mateo, Borongan City, Eastern Samar",
      "office": "Central Office",
      "amountPesos": 134000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of San Mateo Bridge including approaches, Barangay San Mateo, Borongan City, Eastern Samar",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0211-001844",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Coron-Busuanga Rd - K0063 + 000 - K0065 + 000",
      "office": "Central Office",
      "amountPesos": 133801000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66900500.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 66900.5,
      "rangesMeters": [
        [
          63000.0,
          65000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "211",
      "lengthEvidence": "Coron-Busuanga Rd - K0063 + 000 - K0065 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.65,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0148-000744",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Manila North Road K0039 + 442 - K0039 + 982, K0040 + 990 - K0041+ 340, K0041 + 780 - K0042 + 000, K0043 + 127 - K0043 + 497, K0050 +260 - K0050 + 300, Bulacan",
      "office": "Central Office",
      "amountPesos": 133601000,
      "lengthKm": 1.52,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 87895394.74,
      "lengthMeters": 1520.0,
      "allocationPerStatedMeter": 87895.39,
      "rangesMeters": [
        [
          39442.0,
          39982.0
        ],
        [
          40990.0,
          41340.0
        ],
        [
          41780.0,
          42000.0
        ],
        [
          43127.0,
          43497.0
        ],
        [
          50260.0,
          50300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "148",
      "lengthEvidence": "Manila North Road K0039 + 442 - K0039 + 982, K0040 + 990 - K0041+ 340, K0041 + 780 - K0042 + 000, K0043 + 127 - K0043 + 497, K0050 +260 - K0050 + 300, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 3.51,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0117-000116",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (MN) -(S01364MN) K1470 + 1044 - K1471 + 441, K1472 + 936 - K1475 + 006 (S01390MN) K1472 + 553 - K1471 + 008, K1476 + 999 - K1473 + 105",
      "office": "Central Office",
      "amountPesos": 132384000,
      "lengthKm": 5.608,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23606276.75,
      "lengthMeters": 5608.0,
      "allocationPerStatedMeter": 23606.28,
      "rangesMeters": [
        [
          1471044.0,
          1471441.0
        ],
        [
          1472936.0,
          1475006.0
        ],
        [
          1471008.0,
          1472553.0
        ],
        [
          1473105.0,
          1476999.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Maharlika Highway (MN) -(S01364MN) K1470 + 1044 - K1471 + 441, K1472 + 936 - K1475 + 006 (S01390MN) K1472 + 553 - K1471 + 008, K1476 + 999 - K1473 + 105",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 0.68,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0224-002094",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Construction of Diversion Road, Barangay Alvenda, Mutia - Pob. Sergio Osmeña Sr. Road, Zamboanga del Norte - Sta. 7+872 - Sta. 8+308, Sta. 9+540 - Sta. 9+660.84",
      "office": "Central Office",
      "amountPesos": 131900000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          7872.0,
          8308.0
        ],
        [
          9540.0,
          9660.84
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Construction of Diversion Road, Barangay Alvenda, Mutia - Pob. Sergio Osmeña Sr. Road, Zamboanga del Norte - Sta. 7+872 - Sta. 8+308, Sta. 9+540 - Sta. 9+660.84",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0198-001570",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0078 + 434 - K0078 + 499, K0125 + 719 - K0125 + 815, K0125 + 838 - K0125 + 933, K0129 + 284 - K0131 + 484",
      "office": "Central Office",
      "amountPesos": 131845000,
      "lengthKm": 2.456,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 53682817.59,
      "lengthMeters": 2456.0,
      "allocationPerStatedMeter": 53682.82,
      "rangesMeters": [
        [
          78434.0,
          78499.0
        ],
        [
          125719.0,
          125815.0
        ],
        [
          125838.0,
          125933.0
        ],
        [
          129284.0,
          131484.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0078 + 434 - K0078 + 499, K0125 + 719 - K0125 + 815, K0125 + 838 - K0125 + 933, K0129 + 284 - K0131 + 484",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 1.53,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0287-003274",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Dapnan Br. (B00098MN) along Surigao del Sur Bdry-Davao Or Coastal Rd",
      "office": "Central Office",
      "amountPesos": 131780000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Dapnan Br. (B00098MN) along Surigao del Sur Bdry-Davao Or Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0236-002307",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Section I: Sta. 6 + 992 - Sta. 7 + 156.2, Section II: Sta. 7 + 201.8 - Sta. 9 + 700, San Antonio, Quezon",
      "office": "Central Office",
      "amountPesos": 131500000,
      "lengthKm": 2.6623999999999994,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 49391526.44,
      "lengthMeters": 2662.4,
      "allocationPerStatedMeter": 49391.53,
      "rangesMeters": [
        [
          6992.0,
          7156.2
        ],
        [
          7201.8,
          9700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Section I: Sta. 6 + 992 - Sta. 7 + 156.2, Section II: Sta. 7 + 201.8 - Sta. 9 + 700, San Antonio, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 0.62,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0259-002659",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Jibatang Br. (B00342SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "office": "Central Office",
      "amountPesos": 131500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Jibatang Br. (B00342SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003239",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Bateria Br. (B00515NR) along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "office": "Central Office",
      "amountPesos": 131400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Bateria Br. (B00515NR) along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0445-006351",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Esperanza - Lebak Bypass Road, Sta. 17 + 737 - Sta. 18 + 446, Sta. 18 + 606 - Sta. 20 + 467, Sta. 20 + 597 - Sta. 21 + 677, Esperanza, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 131400000,
      "lengthKm": 3.65,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 36000000.0,
      "lengthMeters": 3650.0,
      "allocationPerStatedMeter": 36000.0,
      "rangesMeters": [
        [
          17737.0,
          18446.0
        ],
        [
          18606.0,
          20467.0
        ],
        [
          20597.0,
          21677.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Construction of Esperanza - Lebak Bypass Road, Sta. 17 + 737 - Sta. 18 + 446, Sta. 18 + 606 - Sta. 20 + 467, Sta. 20 + 597 - Sta. 21 + 677, Esperanza, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.14,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0215-001909",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
      "office": "Central Office",
      "amountPesos": 131318000,
      "lengthKm": 2.166,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 60626962.14,
      "lengthMeters": 2166.0,
      "allocationPerStatedMeter": 60626.96,
      "rangesMeters": [
        [
          3634.0,
          5800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 1.18,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0140-000586",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Dr Damian Reyes Rd (Torrijos Side) - K0042 + 210 - K0049 + 273",
      "office": "Central Office",
      "amountPesos": 131113000,
      "lengthKm": 7.063,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18563358.35,
      "lengthMeters": 7063.0,
      "allocationPerStatedMeter": 18563.36,
      "rangesMeters": [
        [
          42210.0,
          49273.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Dr Damian Reyes Rd (Torrijos Side) - K0042 + 210 - K0049 + 273",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 1.27,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0224-002098",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "NRJ Dipolo - NRJ San Isidro Bypass Road (NRJ Dipolo - Rizal - Miligan - NRJ San Isidro Bypass Road) By-Pass Road, Zamboanga del Sur",
      "office": "Central Office",
      "amountPesos": 130792000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "NRJ Dipolo - NRJ San Isidro Bypass Road (NRJ Dipolo - Rizal - Miligan - NRJ San Isidro Bypass Road) By-Pass Road, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0114-000068",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Palo-Carigara-Ormoc Rd - K0996 + 000 - K0998 + 000, K0998 + 507 - K0999 + 000",
      "office": "Central Office",
      "amountPesos": 130558000,
      "lengthKm": 2.493,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 52369835.54,
      "lengthMeters": 2493.0,
      "allocationPerStatedMeter": 52369.84,
      "rangesMeters": [
        [
          996000.0,
          998000.0
        ],
        [
          998507.0,
          999000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Palo-Carigara-Ormoc Rd - K0996 + 000 - K0998 + 000, K0998 + 507 - K0999 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.4,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0113-000057",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0052 + 650 - K0055 + 000, K0055 + 400 - K0056 + 303",
      "office": "Central Office",
      "amountPesos": 130067000,
      "lengthKm": 3.253,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 39983707.35,
      "lengthMeters": 3253.0,
      "allocationPerStatedMeter": 39983.71,
      "rangesMeters": [
        [
          52650.0,
          55000.0
        ],
        [
          55400.0,
          56303.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0052 + 650 - K0055 + 000, K0055 + 400 - K0056 + 303",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 1.15,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0127-000323",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) - K1933 + 000 - K1936 + 518, K1937 + 000 - K1938 + 000, K1941 + 000 - K1942 + 000, K1943 + 000 - K1944 + 000",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": 6.518,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 19944768.33,
      "lengthMeters": 6518.0,
      "allocationPerStatedMeter": 19944.77,
      "rangesMeters": [
        [
          1933000.0,
          1936518.0
        ],
        [
          1937000.0,
          1938000.0
        ],
        [
          1941000.0,
          1942000.0
        ],
        [
          1943000.0,
          1944000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) - K1933 + 000 - K1936 + 518, K1937 + 000 - K1938 + 000, K1941 + 000 - K1942 + 000, K1943 + 000 - K1944 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.21,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0127-000324",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) - K1945 + 000 - K1949 + 774, K1949 + 803 - K1951 + 572",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": 6.543,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 19868561.82,
      "lengthMeters": 6543.0,
      "allocationPerStatedMeter": 19868.56,
      "rangesMeters": [
        [
          1945000.0,
          1949774.0
        ],
        [
          1949803.0,
          1951572.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) - K1945 + 000 - K1949 + 774, K1949 + 803 - K1951 + 572",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.21,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0128-000328",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Benigno S. Aquino Jr. National Highway - K1414+(-1205) - K1414+256, K1414+408 - K1414+800, K1415+311 - K1417+000, K1425+291 - K1425+867, K1426+574 - K1427+067, K1427+189 - K1427+389",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": 4.811,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 27021409.27,
      "lengthMeters": 4811.0,
      "allocationPerStatedMeter": 27021.41,
      "rangesMeters": [
        [
          1412795.0,
          1414256.0
        ],
        [
          1414408.0,
          1414800.0
        ],
        [
          1415311.0,
          1417000.0
        ],
        [
          1425291.0,
          1425867.0
        ],
        [
          1426574.0,
          1427067.0
        ],
        [
          1427189.0,
          1427389.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Benigno S. Aquino Jr. National Highway - K1414+(-1205) - K1414+256, K1414+408 - K1414+800, K1415+311 - K1417+000, K1425+291 - K1425+867, K1426+574 - K1427+067, K1427+189 - K1427+389",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.64,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0128-000332",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Nabunturan-Maragusan Rd - K1445+013 - K1445+135, K1447+038 - K1448+000, K1455+563 - K1456+582, K1456+671 - K1457+150, K1457+270 - K1457+886, K1471+265 - K1473+093, K1473+118 - K1474+162",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": 6.07,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21416803.95,
      "lengthMeters": 6070.0,
      "allocationPerStatedMeter": 21416.8,
      "rangesMeters": [
        [
          1445013.0,
          1445135.0
        ],
        [
          1447038.0,
          1448000.0
        ],
        [
          1455563.0,
          1456582.0
        ],
        [
          1456671.0,
          1457150.0
        ],
        [
          1457270.0,
          1457886.0
        ],
        [
          1471265.0,
          1473093.0
        ],
        [
          1473118.0,
          1474162.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Nabunturan-Maragusan Rd - K1445+013 - K1445+135, K1447+038 - K1448+000, K1455+563 - K1456+582, K1456+671 - K1457+150, K1457+270 - K1457+886, K1471+265 - K1473+093, K1473+118 - K1474+162",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.3,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0199-001589",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1820 + 755 - K1824 + 670",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": 3.915,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33205619.41,
      "lengthMeters": 3915.0,
      "allocationPerStatedMeter": 33205.62,
      "rangesMeters": [
        [
          1820755.0,
          1824670.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1820 + 755 - K1824 + 670",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 0.94,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0199-001592",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1833 + 784 - K1834 + 140, K1834 + 531 - K1838 + 000",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": 3.825,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 33986928.1,
      "lengthMeters": 3825.0,
      "allocationPerStatedMeter": 33986.93,
      "rangesMeters": [
        [
          1833784.0,
          1834140.0
        ],
        [
          1834531.0,
          1838000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1833 + 784 - K1834 + 140, K1834 + 531 - K1838 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 0.97,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0223-002084",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Javier By-Pass Road, Sta. 1+188 - 2+374, Barangay Pinocawan, Javier, Leyte",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": 1.186,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 109612141.65,
      "lengthMeters": 1186.0,
      "allocationPerStatedMeter": 109612.14,
      "rangesMeters": [
        [
          1188.0,
          2374.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Javier By-Pass Road, Sta. 1+188 - 2+374, Barangay Pinocawan, Javier, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.33,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0228-002160",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Mapawa-Bahi-Langgawisan, (4+872.500 - 6+605.83), Maragusan, Davao de Oro Bypass Road",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": 1.73333,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 75000144.23,
      "lengthMeters": 1733.33,
      "allocationPerStatedMeter": 75000.14,
      "rangesMeters": [
        [
          4872.5,
          6605.83
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Mapawa-Bahi-Langgawisan, (4+872.500 - 6+605.83), Maragusan, Davao de Oro Bypass Road",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 1.46,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0236-002290",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          56753.0,
          56863.0
        ],
        [
          60555.0,
          60595.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0236-002294",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mauban-Tignoan Road (Dakil Bridge), Mauban, Quezon",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Mauban-Tignoan Road (Dakil Bridge), Mauban, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0236-002298",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mauban-Tignoan Road (Munting Ilog Bridge), Mauban, Quezon",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Mauban-Tignoan Road (Munting Ilog Bridge), Mauban, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0236-002302",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mauban-Tignoan, Mauban Section, Sta. 16+500 - Sta. 19+750",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": 3.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 3250.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          16500.0,
          19750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Mauban-Tignoan, Mauban Section, Sta. 16+500 - Sta. 19+750",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.92,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0271-002913",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Iyam Br. (B02935LZ) along Maharlika Highway (MSR Diversion Rd)",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Iyam Br. (B02935LZ) along Maharlika Highway (MSR Diversion Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0294-003418",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Pangpang Br. along Salvador H. Escudero III Diversion Road",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Pangpang Br. along Salvador H. Escudero III Diversion Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0417-005805",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Ambalatungan Bridge and Approach, Barangay Ambalatungan, Santiago City",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Construction of Ambalatungan Bridge and Approach, Barangay Ambalatungan, Santiago City",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0427-005995",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Fatima, San Pedro City, Laguna",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Construction of Road, Barangay Fatima, San Pedro City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0443-006323",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Poblacion Nabunturan to San Isidro, Nabunturan, Davao de oro, 7.60472, 125.96167",
      "office": "Central Office",
      "amountPesos": 130000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Construction of Road, Poblacion Nabunturan to San Isidro, Nabunturan, Davao de oro, 7.60472, 125.96167",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0125-000276",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Rosario-Sn Juan Rd - K0127 + 000 - K0127 + 402, K0127 + 800 - K0128 + 684, K0131 + 324 - K0132 + 000, K0134 + 000 - K0134 + 004, K0136 + 000 - K0136 + 103, K0136 + 394 - K0137 + 000, K0141 + 393 - K0141 + 772, K0141 + 781 - K0142 + 000, K0130 + 000 - K0130 + 439, K0133 + 679 - K0134 + 000, K0134 + 004 - K0134+ 151, K0134 + 237 - K0134 + 591, K0139 + 185 - K0140 + 327, K0140 + 752 - K0140 + 842",
      "office": "Central Office",
      "amountPesos": 128833000,
      "lengthKm": 5.766,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22343565.73,
      "lengthMeters": 5766.0,
      "allocationPerStatedMeter": 22343.57,
      "rangesMeters": [
        [
          127000.0,
          127402.0
        ],
        [
          127800.0,
          128684.0
        ],
        [
          131324.0,
          132000.0
        ],
        [
          134000.0,
          134004.0
        ],
        [
          136000.0,
          136103.0
        ],
        [
          136394.0,
          137000.0
        ],
        [
          141393.0,
          141772.0
        ],
        [
          141781.0,
          142000.0
        ],
        [
          130000.0,
          130439.0
        ],
        [
          133679.0,
          134000.0
        ],
        [
          134004.0,
          134151.0
        ],
        [
          134237.0,
          134591.0
        ],
        [
          139185.0,
          140327.0
        ],
        [
          140752.0,
          140842.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Rosario-Sn Juan Rd - K0127 + 000 - K0127 + 402, K0127 + 800 - K0128 + 684, K0131 + 324 - K0132 + 000, K0134 + 000 - K0134 + 004, K0136 + 000 - K0136 + 103, K0136 + 394 - K0137 + 000, K0141 + 393 - K0141 + 772, K0141 + 781 - K0142 + 000, K0130 + 000 - K0130 + 439, K0133 + 679 - K0134 + 000, K0134 + 004 - K0134+ 151, K0134 + 237 - K0134 + 591, K0139 + 185 - K0140 + 327, K0140 + 752 - K0140 + 842",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.36,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0214-001886",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Lingayen Bypass Road, Pangasinan",
      "office": "Central Office",
      "amountPesos": 128155000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Lingayen Bypass Road, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0444-006332",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Montevista, Davao de Oro to New Corella, Davao del Norte Bypass Road (Montevista Section), Montevista, Davao de Oro",
      "office": "Central Office",
      "amountPesos": 128000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of Montevista, Davao de Oro to New Corella, Davao del Norte Bypass Road (Montevista Section), Montevista, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0167-001054",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - Chainage 15210 - Chainage 16869, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 127835000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - Chainage 15210 - Chainage 16869, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0256-002594",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Tertiary Roads",
      "projectName": "Zamboanga del Sur Coastal Rd - (S01187MN) Chainage 19002 - Chainage 19008, Chainage 19154 - Chainage 19950, Chainage 21732 - Chainage 22229, Chainage 22344 - Chainage 25118, Chainage 25147 - Chainage 25271, Chainage 29623 - Chainage 29969",
      "office": "Central Office",
      "amountPesos": 127207000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "256",
      "lengthEvidence": "Zamboanga del Sur Coastal Rd - (S01187MN) Chainage 19002 - Chainage 19008, Chainage 19154 - Chainage 19950, Chainage 21732 - Chainage 22229, Chainage 22344 - Chainage 25118, Chainage 25147 - Chainage 25271, Chainage 29623 - Chainage 29969",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0211-001840",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Jct Ipil - Quirino Bdry Rd - K0359+333 - K0359+423, K0359+468 - K0360+000, K0360+765 - K0361+322, K0372+000 - K0373+000, K0373+053 - K0374+000",
      "office": "Central Office",
      "amountPesos": 127000000,
      "lengthKm": 3.126,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 40626999.36,
      "lengthMeters": 3126.0,
      "allocationPerStatedMeter": 40627.0,
      "rangesMeters": [
        [
          359333.0,
          359423.0
        ],
        [
          359468.0,
          360000.0
        ],
        [
          360765.0,
          361322.0
        ],
        [
          372000.0,
          373000.0
        ],
        [
          373053.0,
          374000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "211",
      "lengthEvidence": "Jct Ipil - Quirino Bdry Rd - K0359+333 - K0359+423, K0359+468 - K0360+000, K0360+765 - K0361+322, K0372+000 - K0373+000, K0373+053 - K0374+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0219-001991",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Luisiana Diversion Road - Sta. 0 + 000 - Sta. 0+939.07, Laguna",
      "office": "Central Office",
      "amountPesos": 126902000,
      "lengthKm": 0.9390700000000001,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 135135825.87,
      "lengthMeters": 939.07,
      "allocationPerStatedMeter": 135135.83,
      "rangesMeters": [
        [
          0.0,
          939.07
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Luisiana Diversion Road - Sta. 0 + 000 - Sta. 0+939.07, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 1.26,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0167-001053",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - Chainage 13560 - Chainage 15210, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 126750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - Chainage 13560 - Chainage 15210, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0432-006099",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Naburacan - Santa Isabel Road, Matnog, Sorsogon",
      "office": "Central Office",
      "amountPesos": 126000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Construction of Road, Naburacan - Santa Isabel Road, Matnog, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0260-002687",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Pantar Br. 1 (B00936MN) along Iligan City-Marawi City Rd",
      "office": "Central Office",
      "amountPesos": 125860000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Pantar Br. 1 (B00936MN) along Iligan City-Marawi City Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0117-000133",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Marbel-Makar Rd) - K1700 + 212 - K1701 + 504",
      "office": "Central Office",
      "amountPesos": 125516000,
      "lengthKm": 1.292,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 97148606.81,
      "lengthMeters": 1292.0,
      "allocationPerStatedMeter": 97148.61,
      "rangesMeters": [
        [
          1700212.0,
          1701504.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Maharlika Highway (Marbel-Makar Rd) - K1700 + 212 - K1701 + 504",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 2.48,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0128-000335",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "General Santos City - T'Boli - Surallah Road (Surallah Section) K1722 + 668 - K1725 + 868",
      "office": "Central Office",
      "amountPesos": 125500000,
      "lengthKm": 3.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39218750.0,
      "lengthMeters": 3200.0,
      "allocationPerStatedMeter": 39218.75,
      "rangesMeters": [
        [
          1722668.0,
          1725868.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "General Santos City - T'Boli - Surallah Road (Surallah Section) K1722 + 668 - K1725 + 868",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.95,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0285-003220",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "San Roque Br. (B04943LZ) along Quezon Eco-Tourism Rd",
      "office": "Central Office",
      "amountPesos": 125300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "San Roque Br. (B04943LZ) along Quezon Eco-Tourism Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003223",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "San Isidro Br. (B00014MR) along Calapan South Rd",
      "office": "Central Office",
      "amountPesos": 125000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "San Isidro Br. (B00014MR) along Calapan South Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0420-005868",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Dike including groundsill, along Abacan River, San Jose Malino - Tangle, Mexico, Pampanga Sta. 0+000 - Sta. 4 + 552",
      "office": "Central Office",
      "amountPesos": 125000000,
      "lengthKm": 4.552,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27460456.94,
      "lengthMeters": 4552.0,
      "allocationPerStatedMeter": 27460.46,
      "rangesMeters": [
        [
          0.0,
          4552.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Construction of Road Dike including groundsill, along Abacan River, San Jose Malino - Tangle, Mexico, Pampanga Sta. 0+000 - Sta. 4 + 552",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.87,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0422-005894",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Suclaban Bridge tranversing NLEX, Mexico, Pampanga, Sta. 0+000 - Sta. 0+62.60",
      "office": "Central Office",
      "amountPesos": 125000000,
      "lengthKm": 0.0626,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1996805111.82,
      "lengthMeters": 62.6,
      "allocationPerStatedMeter": 1996805.11,
      "rangesMeters": [
        [
          0.0,
          62.6
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Construction of Suclaban Bridge tranversing NLEX, Mexico, Pampanga, Sta. 0+000 - Sta. 0+62.60",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 3.29,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0427-006000",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road Lipa City-Padre Garcia Diversion Road (Malitlit-San Celestino Section), Lipa City, Batangas",
      "office": "Central Office",
      "amountPesos": 125000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Improvement of Road Lipa City-Padre Garcia Diversion Road (Malitlit-San Celestino Section), Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0427-006001",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road Lipa City-Padre Garcia Diversion Road (San Celestino-San Francisco-Pansol Section), Batangas",
      "office": "Central Office",
      "amountPesos": 125000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Improvement of Road Lipa City-Padre Garcia Diversion Road (San Celestino-San Francisco-Pansol Section), Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0427-006002",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road Lipa City-Padre Garcia Diversion Road (Sto. Niño-Malitlit Section), Lipa City, Batangas",
      "office": "Central Office",
      "amountPesos": 125000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Improvement of Road Lipa City-Padre Garcia Diversion Road (Sto. Niño-Malitlit Section), Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0427-006003",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road Lipa City-Padre Garcia Diversion Road (Talisay-Sto. Niño Section), Lipa City, Batangas",
      "office": "Central Office",
      "amountPesos": 125000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Improvement of Road Lipa City-Padre Garcia Diversion Road (Talisay-Sto. Niño Section), Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0432-006109",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of La Purisima - San Isidro Road, Barangay La Purisima and Barangay San Isidro, Calabanga, Camarines Sur",
      "office": "Central Office",
      "amountPesos": 125000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Construction of La Purisima - San Isidro Road, Barangay La Purisima and Barangay San Isidro, Calabanga, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0435-006156",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Manipis - Junction Linao - Cantabaco, Talisay City, Cebu",
      "office": "Central Office",
      "amountPesos": 125000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of Road, Barangay Manipis - Junction Linao - Cantabaco, Talisay City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0271-002917",
      "category": "Mixed roads / bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Alayao Bridge (B00433LZ) along Andaya Highway (Package B3-B)",
      "office": "Central Office",
      "amountPesos": 124970000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Alayao Bridge (B00433LZ) along Andaya Highway (Package B3-B)",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0239-002354",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Burauen-Albuera Road (Burauen Side), Chainage 5+418 - Chainage 5+443, Chainage 5+574 - Chainage 5+604, Chainage 7+312 - Chainage 7+430, Chainage 8+869 - Chainage 8+908, Barangay Abuyogon & Barangay Catagbacan, Burauen, Leyte",
      "office": "Central Office",
      "amountPesos": 124700000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Burauen-Albuera Road (Burauen Side), Chainage 5+418 - Chainage 5+443, Chainage 5+574 - Chainage 5+604, Chainage 7+312 - Chainage 7+430, Chainage 8+869 - Chainage 8+908, Barangay Abuyogon & Barangay Catagbacan, Burauen, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0112-000023",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0040 + 191 - K0040 + 565, K0040 + 660 - K0041 + 827",
      "office": "Central Office",
      "amountPesos": 124545000,
      "lengthKm": 1.541,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 80820895.52,
      "lengthMeters": 1541.0,
      "allocationPerStatedMeter": 80820.9,
      "rangesMeters": [
        [
          40191.0,
          40565.0
        ],
        [
          40660.0,
          41827.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0040 + 191 - K0040 + 565, K0040 + 660 - K0041 + 827",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 2.16,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0432-006100",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Fernando- San Jacinto- Monreal Road (Piña Section), San Jacinto Masbate Sta. 18 +818 - Sta.20 + 018",
      "office": "Central Office",
      "amountPesos": 124000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 103333333.33,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 103333.33,
      "rangesMeters": [
        [
          18818.0,
          20018.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Construction of Road, San Fernando- San Jacinto- Monreal Road (Piña Section), San Jacinto Masbate Sta. 18 +818 - Sta.20 + 018",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 4.13,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0149-000756",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0213 + 659 - K0213 + 750, K0214 + 000 - K0214 + 679, K0214 + 707 - K0214 + 880, K0215 + 020 - K0215 + 385, K0215 + 536 - K0215 + 954, K0216 + 060 - K0216 + 227, K0216 + 241 - K0216 + 376, K0216 + 450 - K0219 + 306, K0219 + 348 - K0220 + 455, K0221 + 559 - K0221 + 878",
      "office": "Central Office",
      "amountPesos": 123731000,
      "lengthKm": 6.31,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 19608716.32,
      "lengthMeters": 6310.0,
      "allocationPerStatedMeter": 19608.72,
      "rangesMeters": [
        [
          213659.0,
          213750.0
        ],
        [
          214000.0,
          214679.0
        ],
        [
          214707.0,
          214880.0
        ],
        [
          215020.0,
          215385.0
        ],
        [
          215536.0,
          215954.0
        ],
        [
          216060.0,
          216227.0
        ],
        [
          216241.0,
          216376.0
        ],
        [
          216450.0,
          219306.0
        ],
        [
          219348.0,
          220455.0
        ],
        [
          221559.0,
          221878.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "149",
      "lengthEvidence": "Maharlika Highway (LZ) - K0213 + 659 - K0213 + 750, K0214 + 000 - K0214 + 679, K0214 + 707 - K0214 + 880, K0215 + 020 - K0215 + 385, K0215 + 536 - K0215 + 954, K0216 + 060 - K0216 + 227, K0216 + 241 - K0216 + 376, K0216 + 450 - K0219 + 306, K0219 + 348 - K0220 + 455, K0221 + 559 - K0221 + 878",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 0.57,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0183-001334",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose Rd - K0779 + 000 - K0779 + 221, K0780 + 446 - K0780 + 500, K0780 + 861 - K0780 + 930, K0781 + 256 - K0781 + 268",
      "office": "Central Office",
      "amountPesos": 123602000,
      "lengthKm": 0.356,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 347196629.21,
      "lengthMeters": 356.0,
      "allocationPerStatedMeter": 347196.63,
      "rangesMeters": [
        [
          779000.0,
          779221.0
        ],
        [
          780446.0,
          780500.0
        ],
        [
          780861.0,
          780930.0
        ],
        [
          781256.0,
          781268.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose Rd - K0779 + 000 - K0779 + 221, K0780 + 446 - K0780 + 500, K0780 + 861 - K0780 + 930, K0781 + 256 - K0781 + 268",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 3.75,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0417-005801",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Calabigan-Cagandungan Road, Barangay Calabigan and Cagandungan, Luna, Apayao",
      "office": "Central Office",
      "amountPesos": 123000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Improvement of Calabigan-Cagandungan Road, Barangay Calabigan and Cagandungan, Luna, Apayao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0212-001852",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Kidapawan-Calunasan-Mlang Rd - K1625 + 000 - K1628 + 906",
      "office": "Central Office",
      "amountPesos": 122492000,
      "lengthKm": 3.906,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31359959.04,
      "lengthMeters": 3906.0,
      "allocationPerStatedMeter": 31359.96,
      "rangesMeters": [
        [
          1625000.0,
          1628906.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Kidapawan-Calunasan-Mlang Rd - K1625 + 000 - K1628 + 906",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.77,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0167-001056",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - Chainage 833 - Chainage 2483, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 122250000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - Chainage 833 - Chainage 2483, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0113-000058",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0066 + 000 - K0067 + 605, K0067 + 670 - K0069 + 529",
      "office": "Central Office",
      "amountPesos": 122231000,
      "lengthKm": 3.464,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 35286085.45,
      "lengthMeters": 3464.0,
      "allocationPerStatedMeter": 35286.09,
      "rangesMeters": [
        [
          66000.0,
          67605.0
        ],
        [
          67670.0,
          69529.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0066 + 000 - K0067 + 605, K0067 + 670 - K0069 + 529",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 1.01,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0416-005784",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Palao-Calaba Bypass Road - Sta. 2+000- Sta. 2+480, Bangued, Abra",
      "office": "Central Office",
      "amountPesos": 122190000,
      "lengthKm": 0.48,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 254562500.0,
      "lengthMeters": 480.0,
      "allocationPerStatedMeter": 254562.5,
      "rangesMeters": [
        [
          2000.0,
          2480.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Palao-Calaba Bypass Road - Sta. 2+000- Sta. 2+480, Bangued, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 10.4,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0235-002288",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Quezon Industrial Highway, Sta. 1 + 195 - Sta. 2 + 060, Lucena City, Quezon",
      "office": "Central Office",
      "amountPesos": 122070000,
      "lengthKm": 0.865,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 141121387.28,
      "lengthMeters": 865.0,
      "allocationPerStatedMeter": 141121.39,
      "rangesMeters": [
        [
          1195.0,
          2060.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Quezon Industrial Highway, Sta. 1 + 195 - Sta. 2 + 060, Lucena City, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 1.43,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0175-001190",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Marikina-Infanta Rd - K0104 + 650 - K0104 + 715, K0105 + 635 - K0105 + 700",
      "office": "Central Office",
      "amountPesos": 122000000,
      "lengthKm": 0.13,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 938461538.46,
      "lengthMeters": 130.0,
      "allocationPerStatedMeter": 938461.54,
      "rangesMeters": [
        [
          104650.0,
          104715.0
        ],
        [
          105635.0,
          105700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "Marikina-Infanta Rd - K0104 + 650 - K0104 + 715, K0105 + 635 - K0105 + 700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 4.94,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0228-002161",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+569 - Sta. 25+942, Sta. 25+987 - Sta. 27+317, South Cotabato",
      "office": "Central Office",
      "amountPesos": 122000000,
      "lengthKm": 1.703,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 71638285.38,
      "lengthMeters": 1703.0,
      "allocationPerStatedMeter": 71638.29,
      "rangesMeters": [
        [
          25569.0,
          25942.0
        ],
        [
          25987.0,
          27317.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+569 - Sta. 25+942, Sta. 25+987 - Sta. 27+317, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 1.39,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0204-001702",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Rizal-Dakak-Dapitan Coastal Loop Rd - K1810 + 000 - K1815 + 000",
      "office": "Central Office",
      "amountPesos": 121865000,
      "lengthKm": 5.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24373000.0,
      "lengthMeters": 5000.0,
      "allocationPerStatedMeter": 24373.0,
      "rangesMeters": [
        [
          1810000.0,
          1815000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Rizal-Dakak-Dapitan Coastal Loop Rd - K1810 + 000 - K1815 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 0.91,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0149-000750",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0138 + 919 - K0139 + 331, K0139 + 366 - K0139 + 400, K0140 + 140 - K0141 + 694, K0141 + 914 - K0142 + 039, K0142 + 495 - K0142 + 945, K0144 + 031 - K0145 + 004",
      "office": "Central Office",
      "amountPesos": 121787000,
      "lengthKm": 3.548,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34325535.51,
      "lengthMeters": 3548.0,
      "allocationPerStatedMeter": 34325.54,
      "rangesMeters": [
        [
          138919.0,
          139331.0
        ],
        [
          139366.0,
          139400.0
        ],
        [
          140140.0,
          141694.0
        ],
        [
          141914.0,
          142039.0
        ],
        [
          142495.0,
          142945.0
        ],
        [
          144031.0,
          145004.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "149",
      "lengthEvidence": "Maharlika Highway (LZ) - K0138 + 919 - K0139 + 331, K0139 + 366 - K0139 + 400, K0140 + 140 - K0141 + 694, K0141 + 914 - K0142 + 039, K0142 + 495 - K0142 + 945, K0144 + 031 - K0145 + 004",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 1.0,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0167-001055",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - Chainage 2483 - Chainage 4048, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 121725000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - Chainage 2483 - Chainage 4048, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0127-000322",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Rizal-Dakak-Dapitan Coastal Loop Rd - K1840 + 000 - K1844 + 000",
      "office": "Central Office",
      "amountPesos": 121629000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30407250.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 30407.25,
      "rangesMeters": [
        [
          1840000.0,
          1844000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Rizal-Dakak-Dapitan Coastal Loop Rd - K1840 + 000 - K1844 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.85,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0115-000081",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Lanao-Pagadian-Zamboanga City Rd - K1637 + 000 - K1642 + 000",
      "office": "Central Office",
      "amountPesos": 121000000,
      "lengthKm": 5.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24200000.0,
      "lengthMeters": 5000.0,
      "allocationPerStatedMeter": 24200.0,
      "rangesMeters": [
        [
          1637000.0,
          1642000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Lanao-Pagadian-Zamboanga City Rd - K1637 + 000 - K1642 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 0.69,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0173-001154",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Kennon Rd - K0237 + 715 - K0237 + 840",
      "office": "Central Office",
      "amountPesos": 121000000,
      "lengthKm": 0.125,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 968000000.0,
      "lengthMeters": 125.0,
      "allocationPerStatedMeter": 968000.0,
      "rangesMeters": [
        [
          237715.0,
          237840.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Kennon Rd - K0237 + 715 - K0237 + 840",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 2.9,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0431-006085",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Carriedo - Barangay San Ignacio, Gubat, Sorsogon",
      "office": "Central Office",
      "amountPesos": 121000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road, Barangay Carriedo - Barangay San Ignacio, Gubat, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0203-001679",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Capiz-Aklan Rd - K0339 + 580 - K0340 + 103, K0343 + 650 - K0345 + 346",
      "office": "Central Office",
      "amountPesos": 120565000,
      "lengthKm": 2.219,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 54333032.9,
      "lengthMeters": 2219.0,
      "allocationPerStatedMeter": 54333.03,
      "rangesMeters": [
        [
          339580.0,
          340103.0
        ],
        [
          343650.0,
          345346.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Capiz-Aklan Rd - K0339 + 580 - K0340 + 103, K0343 + 650 - K0345 + 346",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 1.91,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0260-002682",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Kolambugan Br. (B00954MN) along Linamon-Zamboanga Rd",
      "office": "Central Office",
      "amountPesos": 120340000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Kolambugan Br. (B00954MN) along Linamon-Zamboanga Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0176-001213",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kapalong-Talaingod-Valencia (Bukidnon) Rd K1561 + 849 - K1561 + 968, K1566 + 031 - K1566 + 189, K1570 + 921 - K1570 + 984",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": 0.34,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 352941176.47,
      "lengthMeters": 340.0,
      "allocationPerStatedMeter": 352941.18,
      "rangesMeters": [
        [
          1561849.0,
          1561968.0
        ],
        [
          1566031.0,
          1566189.0
        ],
        [
          1570921.0,
          1570984.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Kapalong-Talaingod-Valencia (Bukidnon) Rd K1561 + 849 - K1561 + 968, K1566 + 031 - K1566 + 189, K1570 + 921 - K1570 + 984",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 1.95,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0214-001899",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Alcala Bypass Road, Sta. 5+460 - Sta. 5+510, Cagayan",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2400000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 2400000.0,
      "rangesMeters": [
        [
          5460.0,
          5510.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Alcala Bypass Road, Sta. 5+460 - Sta. 5+510, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 2.0,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0218-001976",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Dasmarinas-General Trias-Tanza Diversion Road, General Trias Section, Sta. 1 + 948 - Sta. 2 + 415, Cavite",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": 0.467,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 256959314.78,
      "lengthMeters": 467.0,
      "allocationPerStatedMeter": 256959.31,
      "rangesMeters": [
        [
          1948.0,
          2415.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Dasmarinas-General Trias-Tanza Diversion Road, General Trias Section, Sta. 1 + 948 - Sta. 2 + 415, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 2.02,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0221-002031",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": 0.781,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 153649167.73,
      "lengthMeters": 781.0,
      "allocationPerStatedMeter": 153649.17,
      "rangesMeters": [
        [
          1660.0,
          2441.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 1.43,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0222-002050",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Kalibo Circumferential Road, K0273+307 - K0274 + 756, Aklan",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": 1.449,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 82815734.99,
      "lengthMeters": 1449.0,
      "allocationPerStatedMeter": 82815.73,
      "rangesMeters": [
        [
          273307.0,
          274756.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Kalibo Circumferential Road, K0273+307 - K0274 + 756, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.0,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0223-002069",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Metro Dumaguete Diversion Road, Sta. 0+000 - Sta. 4+286, Barangay Magatas, Sibulan, Negros Oriental",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": 4.286,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27998133.46,
      "lengthMeters": 4286.0,
      "allocationPerStatedMeter": 27998.13,
      "rangesMeters": [
        [
          0.0,
          4286.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Metro Dumaguete Diversion Road, Sta. 0+000 - Sta. 4+286, Barangay Magatas, Sibulan, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.72,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0224-002096",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Ipil Circumferential Road, Veterans-Tiayon-Don Andres Section",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Ipil Circumferential Road, Veterans-Tiayon-Don Andres Section",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0225-002113",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "CDO-New Western Diversion Road (Macabalan-Bonbon Bridge and Access Road), Barangay Macabalan, Sta. 0+738- Sta. 0+778, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": 0.04,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 40.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          738.0,
          778.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "225",
      "lengthEvidence": "CDO-New Western Diversion Road (Macabalan-Bonbon Bridge and Access Road), Barangay Macabalan, Sta. 0+738- Sta. 0+778, Cagayan de Oro City",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0229-002174",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": 1.071101,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 112034252.61,
      "lengthMeters": 1071.101,
      "allocationPerStatedMeter": 112034.25,
      "rangesMeters": [
        [
          3143.239,
          4214.34
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 1.04,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0236-002300",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mauban-Tignoan Road, Inaduang Bridge, Sta. 0+234 - Sta. 0+394, Real, Quezon",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": 0.16,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 160.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          234.0,
          394.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Mauban-Tignoan Road, Inaduang Bridge, Sta. 0+234 - Sta. 0+394, Real, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0237-002328",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Lalud-Garchitorena Road, Garchitorena, Camarines Sur, Sta. 34+420 - Sta. 34+576, Sta. 35+560 - Sta. 37+200",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": 1.796,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 66815144.77,
      "lengthMeters": 1796.0,
      "allocationPerStatedMeter": 66815.14,
      "rangesMeters": [
        [
          34420.0,
          34576.0
        ],
        [
          35560.0,
          37200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Lalud-Garchitorena Road, Garchitorena, Camarines Sur, Sta. 34+420 - Sta. 34+576, Sta. 35+560 - Sta. 37+200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 0.85,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0257-002616",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Piggatan Br. (B01086LZ) along Maharlika Highway ( Cagayan Valley Rd)",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Piggatan Br. (B01086LZ) along Maharlika Highway ( Cagayan Valley Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0257-002625",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Quipot Br. (B02945LZ) along Quezon-Batangas Rd",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Quipot Br. (B02945LZ) along Quezon-Batangas Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002643",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Lagnason Br. (B00442CB) along N Bacalso Ave (Cebu South Rd)",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Lagnason Br. (B00442CB) along N Bacalso Ave (Cebu South Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0260-002691",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Dakung Banwa Br. (B00086MN) along Surigao del Sur Bdry-Davao Or Coastal Rd",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Dakung Banwa Br. (B00086MN) along Surigao del Sur Bdry-Davao Or Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003232",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Jalaur Br. (B00067PN) along Iloilo-Capiz Rd (Old Route)",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Jalaur Br. (B00067PN) along Iloilo-Capiz Rd (Old Route)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0417-005791",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Liwan West-Anonang Road, Rizal, Kalinga, Sta. 0+000 - Sta. 4+088",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": 4.088,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29354207.44,
      "lengthMeters": 4088.0,
      "allocationPerStatedMeter": 29354.21,
      "rangesMeters": [
        [
          0.0,
          4088.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Construction of Liwan West-Anonang Road, Rizal, Kalinga, Sta. 0+000 - Sta. 4+088",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.93,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0419-005833",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Concrete Road, Barangay Minanga-Barangay Magsaysay (Ferry), Naguilian, Isabela",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Rehabilitation of Concrete Road, Barangay Minanga-Barangay Magsaysay (Ferry), Naguilian, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0419-005839",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads, Barangay Abulalas-Iba-Palapat, Sta 0 to Sta 3+351.86, Hagonoy, Bulacan",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Rehabilitation of Roads, Barangay Abulalas-Iba-Palapat, Sta 0 to Sta 3+351.86, Hagonoy, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0422-005891",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Almacen-Saba, Hermosa, Bataan",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Construction of Road Barangay Almacen-Saba, Hermosa, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005978",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Punta - Open Canal Diversion Road, Bridge 2, Gen. Trias, Cavite",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Punta - Open Canal Diversion Road, Bridge 2, Gen. Trias, Cavite",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005979",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Punta - Open Canal Diversion Road, Pasong Kawayan I, Gen. Trias, Cavite",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Punta - Open Canal Diversion Road, Pasong Kawayan I, Gen. Trias, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005980",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Punta - Open Canal Diversion Road, Tapia Section, General Trias City, Cavite",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Punta - Open Canal Diversion Road, Tapia Section, General Trias City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006013",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bacawan-Buhay na Tubig-Calima Road, Pola, Oriental Mindoro",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Bacawan-Buhay na Tubig-Calima Road, Pola, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0433-006132",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Ilog Bridge, Barangay Arebasore, Mabinay, Negros Oriental (9.72945833, 122.87403611)",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Ilog Bridge, Barangay Arebasore, Mabinay, Negros Oriental (9.72945833, 122.87403611)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0434-006140",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Tabuay Bridge, Barangay Banban, Mabinay, Negros Oriental (9.732931, 122.888303)",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Tabuay Bridge, Barangay Banban, Mabinay, Negros Oriental (9.732931, 122.888303)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0435-006166",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Camayse to Barangay Mualbual, Zumarraga, Samar (Sta. 0+700.00 - Sta. 1+716.00)",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": 1.016,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 118110236.22,
      "lengthMeters": 1016.0,
      "allocationPerStatedMeter": 118110.24,
      "rangesMeters": [
        [
          700.0,
          1716.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of Road, Barangay Camayse to Barangay Mualbual, Zumarraga, Samar (Sta. 0+700.00 - Sta. 1+716.00)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 4.72,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0437-006204",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Desin Bridge, Barangay Desin, Piñan, Zamboanga del Norte",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Construction of Desin Bridge, Barangay Desin, Piñan, Zamboanga del Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0629-010228",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Coastal Road from Roman Blvd. (Fishport Area) to Lighthouse Bonifacio, Barangay Poblacion, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 112",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": 0.112,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1071428571.43,
      "lengthMeters": 112.0,
      "allocationPerStatedMeter": 1071428.57,
      "rangesMeters": [
        [
          0.0,
          112.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "629",
      "lengthEvidence": "Construction of Coastal Road from Roman Blvd. (Fishport Area) to Lighthouse Bonifacio, Barangay Poblacion, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 112",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0629-010229",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Coastal Road, Malaban, Biñan",
      "office": "Central Office",
      "amountPesos": 120000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "629",
      "lengthEvidence": "Construction of Coastal Road, Malaban, Biñan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0213-001876",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
      "office": "Central Office",
      "amountPesos": 119874000,
      "lengthKm": 3.003,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39918081.92,
      "lengthMeters": 3003.0,
      "allocationPerStatedMeter": 39918.08,
      "rangesMeters": [
        [
          0.0,
          3003.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "213",
      "lengthEvidence": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 1.02,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0156-000884",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Catanduanes Cir Rd - K0012 + 000 - K0014 + 000, K0015 + 000 - K0016 + 000",
      "office": "Central Office",
      "amountPesos": 119600000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 39866666.67,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 39866.67,
      "rangesMeters": [
        [
          12000.0,
          14000.0
        ],
        [
          15000.0,
          16000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "Catanduanes Cir Rd - K0012 + 000 - K0014 + 000, K0015 + 000 - K0016 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 1.77,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0214-001896",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Alfonso Lista-San Manuel Diversion Road, Sta. 8+622.5 - Sta. 11+600, Barangay Little Tadian, Ifugao",
      "office": "Central Office",
      "amountPesos": 119100000,
      "lengthKm": 2.9775,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 2977.5,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          8622.5,
          11600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Alfonso Lista-San Manuel Diversion Road, Sta. 8+622.5 - Sta. 11+600, Barangay Little Tadian, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.78,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0431-006094",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Santa Lourdes-Tigkiw-Bagacay-Bugtong Section, Gubat and Barcelona, Sorsogon",
      "office": "Central Office",
      "amountPesos": 119000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road, Santa Lourdes-Tigkiw-Bagacay-Bugtong Section, Gubat and Barcelona, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0175-001187",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Gov JJ Linao Rd - K0166 + 000 - K0167 + 000",
      "office": "Central Office",
      "amountPesos": 118998000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 118998000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 118998.0,
      "rangesMeters": [
        [
          166000.0,
          167000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "Gov JJ Linao Rd - K0166 + 000 - K0167 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 1.15,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0183-001326",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Bagac-Mariveles Rd - K0161 + 500 - K0162 + 500",
      "office": "Central Office",
      "amountPesos": 118998000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 118998000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 118998.0,
      "rangesMeters": [
        [
          161500.0,
          162500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Bagac-Mariveles Rd - K0161 + 500 - K0162 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 1.28,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0183-001329",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Bagac-Mariveles Rd - K0178 + 000 - K0179 + 000",
      "office": "Central Office",
      "amountPesos": 118998000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 118998000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 118998.0,
      "rangesMeters": [
        [
          178000.0,
          179000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Bagac-Mariveles Rd - K0178 + 000 - K0179 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 1.28,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0149-000751",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0145 + 564 - K0145 + 800, K0149 + 314 - K0149 + 607, K0149 + 1034 - K0150 + 478, K0151 + 000 - K0152 + 000, K0153 + 003 - K0153 + 100, K0153 + 155 - K0154 + 010, K0155 + 300 - K0155 + 600",
      "office": "Central Office",
      "amountPesos": 118917000,
      "lengthKm": 3.225,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 36873488.37,
      "lengthMeters": 3225.0,
      "allocationPerStatedMeter": 36873.49,
      "rangesMeters": [
        [
          145564.0,
          145800.0
        ],
        [
          149314.0,
          149607.0
        ],
        [
          150034.0,
          150478.0
        ],
        [
          151000.0,
          152000.0
        ],
        [
          153003.0,
          153100.0
        ],
        [
          153155.0,
          154010.0
        ],
        [
          155300.0,
          155600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "149",
      "lengthEvidence": "Maharlika Highway (LZ) - K0145 + 564 - K0145 + 800, K0149 + 314 - K0149 + 607, K0149 + 1034 - K0150 + 478, K0151 + 000 - K0152 + 000, K0153 + 003 - K0153 + 100, K0153 + 155 - K0154 + 010, K0155 + 300 - K0155 + 600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 1.07,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0175-001203",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "PPSR Jct-Napsan-Apurawan Rd K0035+650 - K0035+750",
      "office": "Central Office",
      "amountPesos": 118000000,
      "lengthKm": 0.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1180000000.0,
      "lengthMeters": 100.0,
      "allocationPerStatedMeter": 1180000.0,
      "rangesMeters": [
        [
          35650.0,
          35750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "PPSR Jct-Napsan-Apurawan Rd K0035+650 - K0035+750",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 3.92,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0431-006087",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Guruyan, Juban, Sorsogon - Barangay Dolos, Bulan, Sorsogon",
      "office": "Central Office",
      "amountPesos": 118000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road, Barangay Guruyan, Juban, Sorsogon - Barangay Dolos, Bulan, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0118-000140",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway( Cotabato-Marbel Rd) - K1736 + 136 - K1738 + 462",
      "office": "Central Office",
      "amountPesos": 117873000,
      "lengthKm": 2.326,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50676268.27,
      "lengthMeters": 2326.0,
      "allocationPerStatedMeter": 50676.27,
      "rangesMeters": [
        [
          1736136.0,
          1738462.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Maharlika Highway( Cotabato-Marbel Rd) - K1736 + 136 - K1738 + 462",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.35,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0202-001655",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Quezon Eco-Tourism Road, Quezon - K0148 + 426 - K0149 + 851",
      "office": "Central Office",
      "amountPesos": 117800000,
      "lengthKm": 1.425,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 82666666.67,
      "lengthMeters": 1425.0,
      "allocationPerStatedMeter": 82666.67,
      "rangesMeters": [
        [
          148426.0,
          149851.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Quezon Eco-Tourism Road, Quezon - K0148 + 426 - K0149 + 851",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 2.46,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0205-001709",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Babak-Samal-Kaputian Rd - K1503 + 015 - K1503 + 143, K1520 + 485 - K1520 + 1391, K1522 + 374 - K1524 + 294, K1524 + 1096 - K1525 + 116",
      "office": "Central Office",
      "amountPesos": 117500000,
      "lengthKm": 2.974,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 39509078.68,
      "lengthMeters": 2974.0,
      "allocationPerStatedMeter": 39509.08,
      "rangesMeters": [
        [
          1503015.0,
          1503143.0
        ],
        [
          1520485.0,
          1521391.0
        ],
        [
          1522374.0,
          1524294.0
        ],
        [
          1525096.0,
          1525116.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Babak-Samal-Kaputian Rd - K1503 + 015 - K1503 + 143, K1520 + 485 - K1520 + 1391, K1522 + 374 - K1524 + 294, K1524 + 1096 - K1525 + 116",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 1.48,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0435-006161",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Segment A - Sta. 0+000 - Sta. 0+275, Segment B - Sta. 0+000 - Sta. 0+405, Barangay Trinidad, Calbayog City Samar",
      "office": "Central Office",
      "amountPesos": 117000000,
      "lengthKm": 0.405,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 288888888.89,
      "lengthMeters": 405.0,
      "allocationPerStatedMeter": 288888.89,
      "rangesMeters": [
        [
          0.0,
          275.0
        ],
        [
          0.0,
          405.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of Road, Segment A - Sta. 0+000 - Sta. 0+275, Segment B - Sta. 0+000 - Sta. 0+405, Barangay Trinidad, Calbayog City Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 11.8,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0115-000084",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - K1648 + 246 - K1650 + 380",
      "office": "Central Office",
      "amountPesos": 116695000,
      "lengthKm": 2.134,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54683692.6,
      "lengthMeters": 2134.0,
      "allocationPerStatedMeter": 54683.69,
      "rangesMeters": [
        [
          1648246.0,
          1650380.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - K1648 + 246 - K1650 + 380",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.46,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0183-001328",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Bagac-Mariveles Rd - K0176 + 020 - K0176 + 800",
      "office": "Central Office",
      "amountPesos": 116619000,
      "lengthKm": 0.78,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 149511538.46,
      "lengthMeters": 780.0,
      "allocationPerStatedMeter": 149511.54,
      "rangesMeters": [
        [
          176020.0,
          176800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Bagac-Mariveles Rd - K0176 + 020 - K0176 + 800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 1.61,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0157-000887",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Catanduanes Cir Rd - K0045 + 336 - K0046 + 304, K0046 + 376 - K0047 + 000, K0048 + 000 - K0049 + 000, K0050 + 300 - K0050 + 327, K0050 + 760 - K0050 + 765, K0051 + 000 - K0051 + 280",
      "office": "Central Office",
      "amountPesos": 116320000,
      "lengthKm": 2.904,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 40055096.42,
      "lengthMeters": 2904.0,
      "allocationPerStatedMeter": 40055.1,
      "rangesMeters": [
        [
          45336.0,
          46304.0
        ],
        [
          46376.0,
          47000.0
        ],
        [
          48000.0,
          49000.0
        ],
        [
          50300.0,
          50327.0
        ],
        [
          50760.0,
          50765.0
        ],
        [
          51000.0,
          51280.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "157",
      "lengthEvidence": "Catanduanes Cir Rd - K0045 + 336 - K0046 + 304, K0046 + 376 - K0047 + 000, K0048 + 000 - K0049 + 000, K0050 + 300 - K0050 + 327, K0050 + 760 - K0050 + 765, K0051 + 000 - K0051 + 280",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 1.78,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0431-006081",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bulawan, Irosin, Sorsogon - Barangay Bical, Bulan Sorsogon",
      "office": "Central Office",
      "amountPesos": 116000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road, Barangay Bulawan, Irosin, Sorsogon - Barangay Bical, Bulan Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0413-005725",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads within Zone 41 to 57 (P. Campa St., Fajardo Ext., Sobriedad St., Dimasalang St., Fajardo St., Maceda St., Dapitan St., Ma. Clara St., Conception St., Asturias St. and Navarra St.) Manila City",
      "office": "Central Office",
      "amountPesos": 115000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Rehabilitation of Roads within Zone 41 to 57 (P. Campa St., Fajardo Ext., Sobriedad St., Dimasalang St., Fajardo St., Maceda St., Dapitan St., Ma. Clara St., Conception St., Asturias St. and Navarra St.) Manila City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005969",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Malitam, Batangas City",
      "office": "Central Office",
      "amountPesos": 115000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Bridge, Barangay Malitam, Batangas City",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0429-006043",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Upper Lapu-Lapu Road, Barangay Poblacion, Narra, Palawan",
      "office": "Central Office",
      "amountPesos": 115000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Upper Lapu-Lapu Road, Barangay Poblacion, Narra, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0446-006379",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Lahi, Gigaquit, Surigao del Norte",
      "office": "Central Office",
      "amountPesos": 115000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Concreting of Road, Barangay Lahi, Gigaquit, Surigao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0430-006065",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "San Isidro-Bahao Road to Bahao Port - Sta. 424+808 to Sta. 426+080, Barangay Villadima, Libmanan, Camarines Sur",
      "office": "Central Office",
      "amountPesos": 114209000,
      "lengthKm": 1.272,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 89786949.69,
      "lengthMeters": 1272.0,
      "allocationPerStatedMeter": 89786.95,
      "rangesMeters": [
        [
          424808.0,
          426080.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "San Isidro-Bahao Road to Bahao Port - Sta. 424+808 to Sta. 426+080, Barangay Villadima, Libmanan, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 3.59,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0123-000248",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Olongapo-Bugallon Rd - K0140+000 - K0141+970",
      "office": "Central Office",
      "amountPesos": 114000000,
      "lengthKm": 1.97,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 57868020.3,
      "lengthMeters": 1970.0,
      "allocationPerStatedMeter": 57868.02,
      "rangesMeters": [
        [
          140000.0,
          141970.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Olongapo-Bugallon Rd - K0140+000 - K0141+970",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.9,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0123-000250",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Olongapo - Bugallon Road - K0162 + 527 - K0164 + 109",
      "office": "Central Office",
      "amountPesos": 114000000,
      "lengthKm": 1.582,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 72060682.68,
      "lengthMeters": 1582.0,
      "allocationPerStatedMeter": 72060.68,
      "rangesMeters": [
        [
          162527.0,
          164109.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Olongapo - Bugallon Road - K0162 + 527 - K0164 + 109",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 2.36,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0126-000306",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siquijor - Bolos San Juan Rd - K0064 + 000 - K0065 + 000, K0067 + 000 - K0069 + 518",
      "office": "Central Office",
      "amountPesos": 114000000,
      "lengthKm": 3.518,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 32404775.44,
      "lengthMeters": 3518.0,
      "allocationPerStatedMeter": 32404.78,
      "rangesMeters": [
        [
          64000.0,
          65000.0
        ],
        [
          67000.0,
          69518.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Siquijor - Bolos San Juan Rd - K0064 + 000 - K0065 + 000, K0067 + 000 - K0069 + 518",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.97,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0430-006072",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "San Isidro-Bahao Road to Bahao Port - Sta. 423+538 to Sta. 424+808, Barangay Cawayan to Barangay Villadima, Libmanan, Camarines Sur",
      "office": "Central Office",
      "amountPesos": 114000000,
      "lengthKm": 1.27,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 89763779.53,
      "lengthMeters": 1270.0,
      "allocationPerStatedMeter": 89763.78,
      "rangesMeters": [
        [
          423538.0,
          424808.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "San Isidro-Bahao Road to Bahao Port - Sta. 423+538 to Sta. 424+808, Barangay Cawayan to Barangay Villadima, Libmanan, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 3.59,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0445-006362",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Highway Jct. Titulok-Sto. Niño-Monteverde-Daluga Highway Jct. Ned Lake Sebu - Sta 6+530 - Sta 9+850, Bagumbayan, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 113760000,
      "lengthKm": 3.32,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34265060.24,
      "lengthMeters": 3320.0,
      "allocationPerStatedMeter": 34265.06,
      "rangesMeters": [
        [
          6530.0,
          9850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Construction of Highway Jct. Titulok-Sto. Niño-Monteverde-Daluga Highway Jct. Ned Lake Sebu - Sta 6+530 - Sta 9+850, Bagumbayan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.09,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0260-002690",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Callawa Br. 1 along Agusan-Davao Corridor Highway (Davao-Bukidnon Section)",
      "office": "Central Office",
      "amountPesos": 113000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Callawa Br. 1 along Agusan-Davao Corridor Highway (Davao-Bukidnon Section)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0425-005952",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road along Barangays Poblacion, Sampaguita, United Bayanihan, and United Better Living, San Pedro City, Laguna",
      "office": "Central Office",
      "amountPesos": 113000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Construction of Road along Barangays Poblacion, Sampaguita, United Bayanihan, and United Better Living, San Pedro City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0141-000613",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Ayala-La Paz Rd - (S01495MN) Chainage 006 - Chainage 4023, Chainage 4032 - Chainage 7000",
      "office": "Central Office",
      "amountPesos": 112786000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Ayala-La Paz Rd - (S01495MN) Chainage 006 - Chainage 4023, Chainage 4032 - Chainage 7000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0157-000899",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Lemon-Leyte-Biliran Rd - K0979 + 457 - K0979 + 796, K0979 + 850 - K0981 + 056, K0982 + 931 - K0983 + 102, K0983 + 134 - K0983 + 488, K0983 + 517 - K0983 + 657",
      "office": "Central Office",
      "amountPesos": 112000000,
      "lengthKm": 2.21,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 50678733.03,
      "lengthMeters": 2210.0,
      "allocationPerStatedMeter": 50678.73,
      "rangesMeters": [
        [
          979457.0,
          979796.0
        ],
        [
          979850.0,
          981056.0
        ],
        [
          982931.0,
          983102.0
        ],
        [
          983134.0,
          983488.0
        ],
        [
          983517.0,
          983657.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "157",
      "lengthEvidence": "Lemon-Leyte-Biliran Rd - K0979 + 457 - K0979 + 796, K0979 + 850 - K0981 + 056, K0982 + 931 - K0983 + 102, K0983 + 134 - K0983 + 488, K0983 + 517 - K0983 + 657",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 2.26,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0197-001555",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Santiago-Tuguegarao Rd - K0402 + 623 - K0405 + 000",
      "office": "Central Office",
      "amountPesos": 111199000,
      "lengthKm": 2.377,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46781236.85,
      "lengthMeters": 2377.0,
      "allocationPerStatedMeter": 46781.24,
      "rangesMeters": [
        [
          402623.0,
          405000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "197",
      "lengthEvidence": "Santiago-Tuguegarao Rd - K0402 + 623 - K0405 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 1.33,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0123-000236",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Zapote-Alabang Rd - K0015 + 274 - K0016 + 233, K0019 + 804 - K0020 + 364",
      "office": "Central Office",
      "amountPesos": 111140000,
      "lengthKm": 1.519,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 73166556.95,
      "lengthMeters": 1519.0,
      "allocationPerStatedMeter": 73166.56,
      "rangesMeters": [
        [
          15274.0,
          16233.0
        ],
        [
          19804.0,
          20364.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Zapote-Alabang Rd - K0015 + 274 - K0016 + 233, K0019 + 804 - K0020 + 364",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 2.4,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0202-001653",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Candelaria Bypass Road, Quezon - K0110 + 236 - K0110 + 592, K0110 + 622 - K0111 + 504",
      "office": "Central Office",
      "amountPesos": 111000000,
      "lengthKm": 1.238,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 89660743.13,
      "lengthMeters": 1238.0,
      "allocationPerStatedMeter": 89660.74,
      "rangesMeters": [
        [
          110236.0,
          110592.0
        ],
        [
          110622.0,
          111504.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Candelaria Bypass Road, Quezon - K0110 + 236 - K0110 + 592, K0110 + 622 - K0111 + 504",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.77,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0287-003275",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Hulid Parallel Br. along Benigno S. Aquino Jr. National Highway",
      "office": "Central Office",
      "amountPesos": 110591000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Hulid Parallel Br. along Benigno S. Aquino Jr. National Highway",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0243-002418",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0332 + 700 - K0335 + 514, K0335 + 638 - K0342 + 764, K0342 + 794 - K0343 + 961 (Road Safety: Roadway Lighting)",
      "office": "Central Office",
      "amountPesos": 110500000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          332700.0,
          335514.0
        ],
        [
          335638.0,
          342764.0
        ],
        [
          342794.0,
          343961.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "243",
      "lengthEvidence": "Maharlika Highway (LZ) - K0332 + 700 - K0335 + 514, K0335 + 638 - K0342 + 764, K0342 + 794 - K0343 + 961 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002646",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Bito Br. (B00536LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 110030000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Bito Br. (B00536LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0216-001920",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Gattaran Diversion Road, Sta. 6+000 - Sta. 7+250, Sta. 7+757 - Sta. 8+530, Cagayan",
      "office": "Central Office",
      "amountPesos": 110002000,
      "lengthKm": 2.023,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 54375679.68,
      "lengthMeters": 2023.0,
      "allocationPerStatedMeter": 54375.68,
      "rangesMeters": [
        [
          6000.0,
          7250.0
        ],
        [
          7757.0,
          8530.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Gattaran Diversion Road, Sta. 6+000 - Sta. 7+250, Sta. 7+757 - Sta. 8+530, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 1.06,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0126-000300",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Ligao-Pio Duran Rd - K0514 + 000 - K0515 + 250",
      "office": "Central Office",
      "amountPesos": 110000000,
      "lengthKm": 1.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 88000000.0,
      "lengthMeters": 1250.0,
      "allocationPerStatedMeter": 88000.0,
      "rangesMeters": [
        [
          514000.0,
          515250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Ligao-Pio Duran Rd - K0514 + 000 - K0515 + 250",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 2.83,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0126-000301",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Ligao-Pio Duran Rd - K0534 + 900 - K0536 + 200",
      "office": "Central Office",
      "amountPesos": 110000000,
      "lengthKm": 1.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 84615384.62,
      "lengthMeters": 1300.0,
      "allocationPerStatedMeter": 84615.38,
      "rangesMeters": [
        [
          534900.0,
          536200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Ligao-Pio Duran Rd - K0534 + 900 - K0536 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 2.72,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0128-000344",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd - K1162 + 000 - K1166 + 200",
      "office": "Central Office",
      "amountPesos": 110000000,
      "lengthKm": 4.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26190476.19,
      "lengthMeters": 4200.0,
      "allocationPerStatedMeter": 26190.48,
      "rangesMeters": [
        [
          1162000.0,
          1166200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Surigao-Davao Coastal Rd - K1162 + 000 - K1166 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.59,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0215-001913",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cauayan City Bypass Road (Bridge and Approaches) (Sta. 5+580 - Sta. 5+671.73), Isabela",
      "office": "Central Office",
      "amountPesos": 110000000,
      "lengthKm": 0.09172999999999956,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 91.73,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          5580.0,
          5671.73
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Cauayan City Bypass Road (Bridge and Approaches) (Sta. 5+580 - Sta. 5+671.73), Isabela",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0216-001939",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Guiguinto By-pass Road, Guiguinto, Bulacan, Sta. 2+501.00 - Sta. 3+065.00",
      "office": "Central Office",
      "amountPesos": 110000000,
      "lengthKm": 0.564,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 195035460.99,
      "lengthMeters": 564.0,
      "allocationPerStatedMeter": 195035.46,
      "rangesMeters": [
        [
          2501.0,
          3065.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Guiguinto By-pass Road, Guiguinto, Bulacan, Sta. 2+501.00 - Sta. 3+065.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 1.43,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0228-002153",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Alternate Road, Tagum City to Asuncion, Barangay Magatos, Asuncion, Davao del Norte",
      "office": "Central Office",
      "amountPesos": 110000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Alternate Road, Tagum City to Asuncion, Barangay Magatos, Asuncion, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0238-002330",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Lalud-Garchitorena Road, Garchitorena, (Olas Section), Lagonoy, Camarines Sur, Sta. 16+721.16 - Sta. 17+086, Sta. 18+445 - Sta. 19+000",
      "office": "Central Office",
      "amountPesos": 110000000,
      "lengthKm": 0.9198400000000001,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 119586014.96,
      "lengthMeters": 919.84,
      "allocationPerStatedMeter": 119586.01,
      "rangesMeters": [
        [
          16721.16,
          17086.0
        ],
        [
          18445.0,
          19000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Lalud-Garchitorena Road, Garchitorena, (Olas Section), Lagonoy, Camarines Sur, Sta. 16+721.16 - Sta. 17+086, Sta. 18+445 - Sta. 19+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 1.21,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0284-003205",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Ganano Parallel Br. along Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato)",
      "office": "Central Office",
      "amountPesos": 110000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Ganano Parallel Br. along Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0417-005808",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Imbiao, Roxas, Isabela",
      "office": "Central Office",
      "amountPesos": 110000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Construction of Bridge, Barangay Imbiao, Roxas, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0115-000086",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - (S01639MN) Chainage 000 - Chainage 324, Chainage 1048 - Chainage 2603",
      "office": "Central Office",
      "amountPesos": 109729000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - (S01639MN) Chainage 000 - Chainage 324, Chainage 1048 - Chainage 2603",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0112-000035",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0345 + 222 - K0345 + 486, K0346 + 031.15 - K0347 + 220, K0348 + 339 - K0348 + 568",
      "office": "Central Office",
      "amountPesos": 109203000,
      "lengthKm": 1.6818499999999768,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 64930285.1,
      "lengthMeters": 1681.85,
      "allocationPerStatedMeter": 64930.29,
      "rangesMeters": [
        [
          345222.0,
          345486.0
        ],
        [
          346031.15,
          347220.0
        ],
        [
          348339.0,
          348568.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Maharlika Highway (LZ) - K0345 + 222 - K0345 + 486, K0346 + 031.15 - K0347 + 220, K0348 + 339 - K0348 + 568",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.73,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0126-000302",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Capiz-Aklan Rd - K0324 + (-740) - K0325 + 000, K0327 + 594 - K0329 + 000",
      "office": "Central Office",
      "amountPesos": 109073000,
      "lengthKm": 3.146,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34670375.08,
      "lengthMeters": 3146.0,
      "allocationPerStatedMeter": 34670.38,
      "rangesMeters": [
        [
          323260.0,
          325000.0
        ],
        [
          327594.0,
          329000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Capiz-Aklan Rd - K0324 + (-740) - K0325 + 000, K0327 + 594 - K0329 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.73,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0220-002021",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Calauag - San Felipe By-pass Road, km 0+000 - 1+200, Naga City, Camarines Sur",
      "office": "Central Office",
      "amountPesos": 109000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 90833333.33,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 90833.33,
      "rangesMeters": [
        [
          0.0,
          1200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Calauag - San Felipe By-pass Road, km 0+000 - 1+200, Naga City, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.1,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0112-000027",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (MSR Diversion Rd) - K0125 + (-350) - K0126 + 000",
      "office": "Central Office",
      "amountPesos": 108542000,
      "lengthKm": 1.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 80401481.48,
      "lengthMeters": 1350.0,
      "allocationPerStatedMeter": 80401.48,
      "rangesMeters": [
        [
          124650.0,
          126000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Maharlika Highway (MSR Diversion Rd) - K0125 + (-350) - K0126 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 2.05,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0239-002362",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Iligan City - Cagayan de Oro City Alternate Road (Digkilaan-Bulua Section), Barangay Barangay Canitoan, Sta. 53+257 - Sta. 56+349, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 108333000,
      "lengthKm": 3.092,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35036545.92,
      "lengthMeters": 3092.0,
      "allocationPerStatedMeter": 35036.55,
      "rangesMeters": [
        [
          53257.0,
          56349.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Iligan City - Cagayan de Oro City Alternate Road (Digkilaan-Bulua Section), Barangay Barangay Canitoan, Sta. 53+257 - Sta. 56+349, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.81,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0199-001596",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1606 + 117 - K1607 + 710, K1607 + 929 - K1609 + 758",
      "office": "Central Office",
      "amountPesos": 108150000,
      "lengthKm": 3.422,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 31604324.96,
      "lengthMeters": 3422.0,
      "allocationPerStatedMeter": 31604.32,
      "rangesMeters": [
        [
          1606117.0,
          1607710.0
        ],
        [
          1607929.0,
          1609758.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1606 + 117 - K1607 + 710, K1607 + 929 - K1609 + 758",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 0.9,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0286-003253",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Kipit Br. 2 (B01183MN) along Liloy-Siocon Rd",
      "office": "Central Office",
      "amountPesos": 108000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Kipit Br. 2 (B01183MN) along Liloy-Siocon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0233-002251",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
      "office": "Central Office",
      "amountPesos": 107687000,
      "lengthKm": 7.282,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14788107.66,
      "lengthMeters": 7282.0,
      "allocationPerStatedMeter": 14788.11,
      "rangesMeters": [
        [
          53200.0,
          60482.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "233",
      "lengthEvidence": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.34,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0205-001717",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1666 + 000 - K1667 + 561, K1667 + 839 - K1670 + 171, K1670 + 431 - K1671 + 000",
      "office": "Central Office",
      "amountPesos": 107400000,
      "lengthKm": 4.462,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 24069923.8,
      "lengthMeters": 4462.0,
      "allocationPerStatedMeter": 24069.92,
      "rangesMeters": [
        [
          1666000.0,
          1667561.0
        ],
        [
          1667839.0,
          1670171.0
        ],
        [
          1670431.0,
          1671000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1666 + 000 - K1667 + 561, K1667 + 839 - K1670 + 171, K1670 + 431 - K1671 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 0.9,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0216-001933",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tuguegarao-Solana Diversion Road (Tuguegarao-Solana Bridge and Approaches) (Section 1: Sta. 0+680 - Sta. 1+630.48), Cagayan",
      "office": "Central Office",
      "amountPesos": 107400000,
      "lengthKm": 0.95048,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 950.48,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          680.0,
          1630.48
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Tuguegarao-Solana Diversion Road (Tuguegarao-Solana Bridge and Approaches) (Section 1: Sta. 0+680 - Sta. 1+630.48), Cagayan",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0156-000866",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Kalinga-Abra Rd - K0496 + 850 - K0497 + 859, K0497 + 879 - K0499+015",
      "office": "Central Office",
      "amountPesos": 107160000,
      "lengthKm": 2.145,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 49958041.96,
      "lengthMeters": 2145.0,
      "allocationPerStatedMeter": 49958.04,
      "rangesMeters": [
        [
          496850.0,
          497859.0
        ],
        [
          497879.0,
          499015.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "Kalinga-Abra Rd - K0496 + 850 - K0497 + 859, K0497 + 879 - K0499+015",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 2.22,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0183-001327",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Bagac-Mariveles Rd - K0171 + 600 - K0172 + 500",
      "office": "Central Office",
      "amountPesos": 107099000,
      "lengthKm": 0.9,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 118998888.89,
      "lengthMeters": 900.0,
      "allocationPerStatedMeter": 118998.89,
      "rangesMeters": [
        [
          171600.0,
          172500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Bagac-Mariveles Rd - K0171 + 600 - K0172 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 1.28,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0198-001577",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Dumaguete South Rd - K0075 + 978 - K0077 + 972",
      "office": "Central Office",
      "amountPesos": 107044000,
      "lengthKm": 1.994,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53683049.15,
      "lengthMeters": 1994.0,
      "allocationPerStatedMeter": 53683.05,
      "rangesMeters": [
        [
          75978.0,
          77972.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Dumaguete South Rd - K0075 + 978 - K0077 + 972",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 1.53,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0202-001654",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "MSR Jct Tiaong-Dolores Road, Quezon - K0096 + 524 - K0097 + 771",
      "office": "Central Office",
      "amountPesos": 107000000,
      "lengthKm": 1.247,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 85805934.24,
      "lengthMeters": 1247.0,
      "allocationPerStatedMeter": 85805.93,
      "rangesMeters": [
        [
          96524.0,
          97771.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "MSR Jct Tiaong-Dolores Road, Quezon - K0096 + 524 - K0097 + 771",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.69,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0259-002674",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Sapiniton Br. (B00056LT) along Mainit-Sn Miguel-Santol Rd",
      "office": "Central Office",
      "amountPesos": 106839000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Sapiniton Br. (B00056LT) along Mainit-Sn Miguel-Santol Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0199-001599",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1679 + (-305) - K1681 + 000",
      "office": "Central Office",
      "amountPesos": 106693000,
      "lengthKm": 2.305,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46287635.57,
      "lengthMeters": 2305.0,
      "allocationPerStatedMeter": 46287.64,
      "rangesMeters": [
        [
          1678695.0,
          1681000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1679 + (-305) - K1681 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 1.32,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0257-002617",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Calaguiman Br. (B01701LZ) along Roman Expressway",
      "office": "Central Office",
      "amountPesos": 106500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Calaguiman Br. (B01701LZ) along Roman Expressway",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0155-000865",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "España Blvd. (S02295LZ) K0004 + 006.40 - K0004 + 509.70, K0004 + 709.70 - K0004 + 866.10; (S02296LZ) K0005 + 077.50 - K0005 + 232.70, K0005 + 433.60 to K0005 + 936.50",
      "office": "Central Office",
      "amountPesos": 106233000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          4006.4,
          4509.7
        ],
        [
          4709.7,
          4866.1
        ],
        [
          5077.5,
          5232.7
        ],
        [
          5433.6,
          5936.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "España Blvd. (S02295LZ) K0004 + 006.40 - K0004 + 509.70, K0004 + 709.70 - K0004 + 866.10; (S02296LZ) K0005 + 077.50 - K0005 + 232.70, K0005 + 433.60 to K0005 + 936.50",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0260-002680",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Bulod Br. (B00960MN) along Linamon-Zamboanga Rd",
      "office": "Central Office",
      "amountPesos": 106110000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Bulod Br. (B00960MN) along Linamon-Zamboanga Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0173-001168",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Jct Lingig-Trento Rd - K1482 + 532 - K1482 + 611",
      "office": "Central Office",
      "amountPesos": 106000000,
      "lengthKm": 0.079,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1341772151.9,
      "lengthMeters": 79.0,
      "allocationPerStatedMeter": 1341772.15,
      "rangesMeters": [
        [
          1482532.0,
          1482611.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Jct Lingig-Trento Rd - K1482 + 532 - K1482 + 611",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 4.03,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0428-006029",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Budiong to Barangay Canduyong, Sta. 0+000 - Sta. 2+400, Odiongan, Romblon",
      "office": "Central Office",
      "amountPesos": 105600000,
      "lengthKm": 2.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44000000.0,
      "lengthMeters": 2400.0,
      "allocationPerStatedMeter": 44000.0,
      "rangesMeters": [
        [
          0.0,
          2400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Road, Barangay Budiong to Barangay Canduyong, Sta. 0+000 - Sta. 2+400, Odiongan, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.4,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0174-001183",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0422 + 360 - K0422 + 415, K0424 + 403 - K0424 + 421, K0424 + 836 - K0424 + 947, K0428 + 450 - K0428 + 500, K0431 + 375 - K0431 + 417, K0432 + 950 - K0432 + 971, K0437 + 098 - K0437 + 140, K0438 + 780 - K0438 + 834, K0439 + 965 - K0439 + 1002, K0441 + 794 - K0441 + 831, K0442 + 362 - K0442 + 412, K0442 + 488 - K0442 + 526, K0444 + 960 - K0445 + 000, K0446 + 919 - K0447 + 115, K0447 + 195 - K0447 + 234, K0448 + 443 - K0448 + 643, K0448 + 909 - K0448 + 945, K0448 + 974 - K0449 + 015, K0449 + 513 - K0449 + 587",
      "office": "Central Office",
      "amountPesos": 105456000,
      "lengthKm": 1.181,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 89293818.8,
      "lengthMeters": 1181.0,
      "allocationPerStatedMeter": 89293.82,
      "rangesMeters": [
        [
          422360.0,
          422415.0
        ],
        [
          424403.0,
          424421.0
        ],
        [
          424836.0,
          424947.0
        ],
        [
          428450.0,
          428500.0
        ],
        [
          431375.0,
          431417.0
        ],
        [
          432950.0,
          432971.0
        ],
        [
          437098.0,
          437140.0
        ],
        [
          438780.0,
          438834.0
        ],
        [
          439965.0,
          440002.0
        ],
        [
          441794.0,
          441831.0
        ],
        [
          442362.0,
          442412.0
        ],
        [
          442488.0,
          442526.0
        ],
        [
          444960.0,
          445000.0
        ],
        [
          446919.0,
          447115.0
        ],
        [
          447195.0,
          447234.0
        ],
        [
          448443.0,
          448643.0
        ],
        [
          448909.0,
          448945.0
        ],
        [
          448974.0,
          449015.0
        ],
        [
          449513.0,
          449587.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "174",
      "lengthEvidence": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0422 + 360 - K0422 + 415, K0424 + 403 - K0424 + 421, K0424 + 836 - K0424 + 947, K0428 + 450 - K0428 + 500, K0431 + 375 - K0431 + 417, K0432 + 950 - K0432 + 971, K0437 + 098 - K0437 + 140, K0438 + 780 - K0438 + 834, K0439 + 965 - K0439 + 1002, K0441 + 794 - K0441 + 831, K0442 + 362 - K0442 + 412, K0442 + 488 - K0442 + 526, K0444 + 960 - K0445 + 000, K0446 + 919 - K0447 + 115, K0447 + 195 - K0447 + 234, K0448 + 443 - K0448 + 643, K0448 + 909 - K0448 + 945, K0448 + 974 - K0449 + 015, K0449 + 513 - K0449 + 587",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 0.86,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0111-000010",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Pangasinan-La Union Inter-Provl Rd - K0386 + 737 - K0389 + 142",
      "office": "Central Office",
      "amountPesos": 105000000,
      "lengthKm": 2.405,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 43659043.66,
      "lengthMeters": 2405.0,
      "allocationPerStatedMeter": 43659.04,
      "rangesMeters": [
        [
          386737.0,
          389142.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Pangasinan-La Union Inter-Provl Rd - K0386 + 737 - K0389 + 142",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.16,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0166-001049",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Cagayan-Apayao Rd (Tuao-Rizal Sect) - K0530 + (-1771) - K0530 + 480",
      "office": "Central Office",
      "amountPesos": 105000000,
      "lengthKm": 2.251,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46645935.14,
      "lengthMeters": 2251.0,
      "allocationPerStatedMeter": 46645.94,
      "rangesMeters": [
        [
          528229.0,
          530480.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "166",
      "lengthEvidence": "Cagayan-Apayao Rd (Tuao-Rizal Sect) - K0530 + (-1771) - K0530 + 480",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 2.06,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0204-001698",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Romandier-Camp Andres-Tanduh Bato Rd (S00007SL), Chainage 600 to Chainage 4 + 539",
      "office": "Central Office",
      "amountPesos": 105000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Romandier-Camp Andres-Tanduh Bato Rd (S00007SL), Chainage 600 to Chainage 4 + 539",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0239-002356",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
      "office": "Central Office",
      "amountPesos": 105000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35000000.0,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 35000.0,
      "rangesMeters": [
        [
          25610.0,
          28610.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.81,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0239-002359",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
      "office": "Central Office",
      "amountPesos": 105000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35000000.0,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 35000.0,
      "rangesMeters": [
        [
          15715.0,
          18715.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.81,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0418-005820",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Cabulay Bridge and Approach, Barangay Cabulay, Santiago City, Isabela",
      "office": "Central Office",
      "amountPesos": 105000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Cabulay Bridge and Approach, Barangay Cabulay, Santiago City, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0419-005829",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Claveria (Cagayan) - Union - Bacsay Cataraoan Sur Nagsabaran - Sta. Filomena (Apayao) Road, Claveria, Cagayan",
      "office": "Central Office",
      "amountPesos": 105000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Construction of Road, Claveria (Cagayan) - Union - Bacsay Cataraoan Sur Nagsabaran - Sta. Filomena (Apayao) Road, Claveria, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0431-006083",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cagang-Biyong-San Vicente-San Antonio Section, Barcelona, Sorsogon",
      "office": "Central Office",
      "amountPesos": 105000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road, Barangay Cagang-Biyong-San Vicente-San Antonio Section, Barcelona, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0439-006246",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Baylanan - San Miguel Bridge along Jct. Cagayan de Oro City - Dominorog • Camp Kibaritan Road to Jct SH-Aglayan-Alanib-Ticlaan Road (Aglayan - Basak), Bgy. Cosina, Sta, 21+750 - Sta. 21+800, Talakag, Bukldnon",
      "office": "Central Office",
      "amountPesos": 105000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          21750.0,
          21800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Construction of Baylanan - San Miguel Bridge along Jct. Cagayan de Oro City - Dominorog • Camp Kibaritan Road to Jct SH-Aglayan-Alanib-Ticlaan Road (Aglayan - Basak), Bgy. Cosina, Sta, 21+750 - Sta. 21+800, Talakag, Bukldnon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0416-005786",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Damulog Bridge, Sta. 0+000 - Sta. 0+090,Danglas, Abra",
      "office": "Central Office",
      "amountPesos": 104891000,
      "lengthKm": 0.09,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1165455555.56,
      "lengthMeters": 90.0,
      "allocationPerStatedMeter": 1165455.56,
      "rangesMeters": [
        [
          0.0,
          90.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Construction of Damulog Bridge, Sta. 0+000 - Sta. 0+090,Danglas, Abra",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 1.92,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0212-001848",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Mambusao-Imbug Rd - K0099 + 073 - K0101 + 000",
      "office": "Central Office",
      "amountPesos": 104743000,
      "lengthKm": 1.927,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54355474.83,
      "lengthMeters": 1927.0,
      "allocationPerStatedMeter": 54355.47,
      "rangesMeters": [
        [
          99073.0,
          101000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Mambusao-Imbug Rd - K0099 + 073 - K0101 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.34,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0446-006372",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sitio Deseket - Sitio Demamis Road, Barangay Laconon, T'boli, South Cotabato",
      "office": "Central Office",
      "amountPesos": 104387000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Construction of Sitio Deseket - Sitio Demamis Road, Barangay Laconon, T'boli, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0117-000131",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Marbel-Makar Rd) - (S00253MN) Chainage 33078 - Chainage 33564, Chainage 34565 - Chainage 35161",
      "office": "Central Office",
      "amountPesos": 104147000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Maharlika Highway (Marbel-Makar Rd) - (S00253MN) Chainage 33078 - Chainage 33564, Chainage 34565 - Chainage 35161",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0140-000581",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Coron - Busuanga Rd K0002 + 900 - K0005 + 510, K0005+575 - K0006+522",
      "office": "Central Office",
      "amountPesos": 104000000,
      "lengthKm": 3.557,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29238122.01,
      "lengthMeters": 3557.0,
      "allocationPerStatedMeter": 29238.12,
      "rangesMeters": [
        [
          2900.0,
          5510.0
        ],
        [
          5575.0,
          6522.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Coron - Busuanga Rd K0002 + 900 - K0005 + 510, K0005+575 - K0006+522",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 1.76,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0224-002093",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Airport - Turno - Sinaman Bypass Road incluing ROW",
      "office": "Central Office",
      "amountPesos": 103740000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Airport - Turno - Sinaman Bypass Road incluing ROW",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0215-001911",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cauayan City Alternate Route (Sta. 0+000 - Sta. 1+400), Isabela",
      "office": "Central Office",
      "amountPesos": 103724000,
      "lengthKm": 1.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 74088571.43,
      "lengthMeters": 1400.0,
      "allocationPerStatedMeter": 74088.57,
      "rangesMeters": [
        [
          0.0,
          1400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Cauayan City Alternate Route (Sta. 0+000 - Sta. 1+400), Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.9,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0445-006357",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Bai Saripinang - Upper Sepaka Road, Surallah, South Cotabato",
      "office": "Central Office",
      "amountPesos": 103500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Concreting of Bai Saripinang - Upper Sepaka Road, Surallah, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0124-000266",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Lopez Bypass Rd - K0219 + 149 - K0219 + 959",
      "office": "Central Office",
      "amountPesos": 103000000,
      "lengthKm": 0.81,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 127160493.83,
      "lengthMeters": 810.0,
      "allocationPerStatedMeter": 127160.49,
      "rangesMeters": [
        [
          219149.0,
          219959.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Lopez Bypass Rd - K0219 + 149 - K0219 + 959",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 4.18,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0446-006378",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Barangay Dugmanon to Barangay Pocto, Hinatuan, Surigao del Sur, Start 8.406936, 126.327582 End 8.422778, 126.308273",
      "office": "Central Office",
      "amountPesos": 103000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Construction of Road from Barangay Dugmanon to Barangay Pocto, Hinatuan, Surigao del Sur, Start 8.406936, 126.327582 End 8.422778, 126.308273",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0212-001846",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Jct Natl Rd-Dumarao-Sn Rafael (Iloilo) Rd - K0094 + 000 - K0096 + 000",
      "office": "Central Office",
      "amountPesos": 102847000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51423500.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 51423.5,
      "rangesMeters": [
        [
          94000.0,
          96000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Jct Natl Rd-Dumarao-Sn Rafael (Iloilo) Rd - K0094 + 000 - K0096 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.27,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0198-001574",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Dumaguete South Rd - K0070 + 000 - K0071 + 986",
      "office": "Central Office",
      "amountPesos": 102000000,
      "lengthKm": 1.986,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51359516.62,
      "lengthMeters": 1986.0,
      "allocationPerStatedMeter": 51359.52,
      "rangesMeters": [
        [
          70000.0,
          71986.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Dumaguete South Rd - K0070 + 000 - K0071 + 986",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 1.46,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0214-001883",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
      "office": "Central Office",
      "amountPesos": 101240000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0260-002699",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Kinabutan Br. 2 (B01211MN) along Maharlika Highway (Lipata-Surigao Sect)",
      "office": "Central Office",
      "amountPesos": 101183000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Kinabutan Br. 2 (B01211MN) along Maharlika Highway (Lipata-Surigao Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0212-001847",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Mambusao-Imbug Rd - K0097 + 162 - K0099 + 055",
      "office": "Central Office",
      "amountPesos": 101166000,
      "lengthKm": 1.893,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53442155.31,
      "lengthMeters": 1893.0,
      "allocationPerStatedMeter": 53442.16,
      "rangesMeters": [
        [
          97162.0,
          99055.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Mambusao-Imbug Rd - K0097 + 162 - K0099 + 055",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.32,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0284-003196",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Lagasit Br. (B00738LZ) along Pangasinan-Nueva Vizcaya Rd",
      "office": "Central Office",
      "amountPesos": 101000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Lagasit Br. (B00738LZ) along Pangasinan-Nueva Vizcaya Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003283",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Kabacan Br. (B00283MN) along Magpet-Nowa-Doroluman-Greenfield Rd",
      "office": "Central Office",
      "amountPesos": 100560000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Kabacan Br. (B00283MN) along Magpet-Nowa-Doroluman-Greenfield Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0149-000745",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0100 + 224 - K0100 + 236, K0101 + 985 - K0102 + 408, K0102 + 454 - K0104 + 000",
      "office": "Central Office",
      "amountPesos": 100359000,
      "lengthKm": 1.981,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 50660777.39,
      "lengthMeters": 1981.0,
      "allocationPerStatedMeter": 50660.78,
      "rangesMeters": [
        [
          100224.0,
          100236.0
        ],
        [
          101985.0,
          102408.0
        ],
        [
          102454.0,
          104000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "149",
      "lengthEvidence": "Maharlika Highway (LZ) - K0100 + 224 - K0100 + 236, K0101 + 985 - K0102 + 408, K0102 + 454 - K0104 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 2.02,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0234-002256",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Road Connecting Santa-Rancho Road (S00089LZ) and Santa-Caoayan Road, Sta. 1+045.80 - Sta. 1+501.70, Ilocos Sur",
      "office": "Central Office",
      "amountPesos": 100162000,
      "lengthKm": 0.4559000000000001,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 219701688.97,
      "lengthMeters": 455.9,
      "allocationPerStatedMeter": 219701.69,
      "rangesMeters": [
        [
          1045.8,
          1501.7
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Road Connecting Santa-Rancho Road (S00089LZ) and Santa-Caoayan Road, Sta. 1+045.80 - Sta. 1+501.70, Ilocos Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 2.22,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0111-000004",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0275 + 000 - K0277 + 508",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.508,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39872408.29,
      "lengthMeters": 2508.0,
      "allocationPerStatedMeter": 39872.41,
      "rangesMeters": [
        [
          275000.0,
          277508.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Manila North Rd - K0275 + 000 - K0277 + 508",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.06,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0111-000006",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0283 + 408 - K0283 + 569, K0283 + 708 - K0284 + 000, K0284 + 916 - K0286 + 100, K0286 + 100 - K0286 + 136, K0286 + 247 - K0287 + 425, K0287 + 500 - K0288 + 000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.351,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29841838.26,
      "lengthMeters": 3351.0,
      "allocationPerStatedMeter": 29841.84,
      "rangesMeters": [
        [
          283408.0,
          283569.0
        ],
        [
          283708.0,
          284000.0
        ],
        [
          284916.0,
          286100.0
        ],
        [
          286100.0,
          286136.0
        ],
        [
          286247.0,
          287425.0
        ],
        [
          287500.0,
          288000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Manila North Rd - K0283 + 408 - K0283 + 569, K0283 + 708 - K0284 + 000, K0284 + 916 - K0286 + 100, K0286 + 100 - K0286 + 136, K0286 + 247 - K0287 + 425, K0287 + 500 - K0288 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 0.86,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0111-000014",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Jct Ipil-Quirino Bdry Rd-K0350+157-K0352+902",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.745,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36429872.5,
      "lengthMeters": 2745.0,
      "allocationPerStatedMeter": 36429.87,
      "rangesMeters": [
        [
          350157.0,
          352902.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Jct Ipil-Quirino Bdry Rd-K0350+157-K0352+902",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.97,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0112-000030",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Calapan North Road - K0015+964 - K0016+181,K0018+452 - K0019+511, K0026+962 - K0027+311, K0029+000 - K0029+720,K0031+519 - K0032+000, K0037+913 - K0039+181",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 4.094,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 24425989.25,
      "lengthMeters": 4094.0,
      "allocationPerStatedMeter": 24425.99,
      "rangesMeters": [
        [
          15964.0,
          16181.0
        ],
        [
          18452.0,
          19511.0
        ],
        [
          26962.0,
          27311.0
        ],
        [
          29000.0,
          29720.0
        ],
        [
          31519.0,
          32000.0
        ],
        [
          37913.0,
          39181.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Calapan North Road - K0015+964 - K0016+181,K0018+452 - K0019+511, K0026+962 - K0027+311, K0029+000 - K0029+720,K0031+519 - K0032+000, K0037+913 - K0039+181",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 0.7,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0116-000102",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Ozamis - Pagadian Rd, K1692 + 789 - K1693 + 903, K1693 + 909 - K1694 + 193",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.398,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 71530758.23,
      "lengthMeters": 1398.0,
      "allocationPerStatedMeter": 71530.76,
      "rangesMeters": [
        [
          1692789.0,
          1693903.0
        ],
        [
          1693909.0,
          1694193.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Ozamis - Pagadian Rd, K1692 + 789 - K1693 + 903, K1693 + 909 - K1694 + 193",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 1.82,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0116-000103",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Ozamis - Oroquieta Rd, K1706 + 720 - K1707 + 000, K1707 + 205 - K1707 + 895, K1711 + 500 - K1712 + 885, K1712 + 915 - K1713 + 320, K1707 + 000 - K1707 + 205, K1718 + 254 - K1718 + 398, K1719 + 585 - K1720 + 000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.524,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 28376844.49,
      "lengthMeters": 3524.0,
      "allocationPerStatedMeter": 28376.84,
      "rangesMeters": [
        [
          1706720.0,
          1707000.0
        ],
        [
          1707205.0,
          1707895.0
        ],
        [
          1711500.0,
          1712885.0
        ],
        [
          1712915.0,
          1713320.0
        ],
        [
          1707000.0,
          1707205.0
        ],
        [
          1718254.0,
          1718398.0
        ],
        [
          1719585.0,
          1720000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Ozamis - Oroquieta Rd, K1706 + 720 - K1707 + 000, K1707 + 205 - K1707 + 895, K1711 + 500 - K1712 + 885, K1712 + 915 - K1713 + 320, K1707 + 000 - K1707 + 205, K1718 + 254 - K1718 + 398, K1719 + 585 - K1720 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 0.81,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0116-000104",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Ozamis - Oroquieta Rd, K1714 + 000 - K1715 + 388, K1715, + 963 - K1717 + 407, K1717 + 421 - K1717 + 616, K1720 + 182 - K1720 + 665, K1720 + 692 - K1721 + 183",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          1714000.0,
          1715388.0
        ],
        [
          1717421.0,
          1717616.0
        ],
        [
          1720182.0,
          1720665.0
        ],
        [
          1720692.0,
          1721183.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Ozamis - Oroquieta Rd, K1714 + 000 - K1715 + 388, K1715, + 963 - K1717 + 407, K1717 + 421 - K1717 + 616, K1720 + 182 - K1720 + 665, K1720 + 692 - K1721 + 183",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0123-000237",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Alaminos - Bolinao Rd - K0345+000 - K0352+507",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 7.507,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13320900.49,
      "lengthMeters": 7507.0,
      "allocationPerStatedMeter": 13320.9,
      "rangesMeters": [
        [
          345000.0,
          352507.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Alaminos - Bolinao Rd - K0345+000 - K0352+507",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.81,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0123-000238",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Alaminos - Bolinao Rd - K0349+577 - K0353+003, K0356+000 - K0358+650",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 6.076,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 16458196.18,
      "lengthMeters": 6076.0,
      "allocationPerStatedMeter": 16458.2,
      "rangesMeters": [
        [
          349577.0,
          353003.0
        ],
        [
          356000.0,
          358650.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Alaminos - Bolinao Rd - K0349+577 - K0353+003, K0356+000 - K0358+650",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.0,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0123-000239",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Pangasinan - Zambales Rd - K0292+542 - K0297+627, K0300+000 - K0300+480",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 5.565,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 17969451.93,
      "lengthMeters": 5565.0,
      "allocationPerStatedMeter": 17969.45,
      "rangesMeters": [
        [
          292542.0,
          297627.0
        ],
        [
          300000.0,
          300480.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Pangasinan - Zambales Rd - K0292+542 - K0297+627, K0300+000 - K0300+480",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.09,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0123-000240",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Pangasinan - Zambales Rd - K0311+463 - K0317+982",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 6.519,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15339776.04,
      "lengthMeters": 6519.0,
      "allocationPerStatedMeter": 15339.78,
      "rangesMeters": [
        [
          311463.0,
          317982.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Pangasinan - Zambales Rd - K0311+463 - K0317+982",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.93,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0123-000243",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Pangasinan - Zambales Rd - K0317+982 - K0324+493",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 6.511,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15358623.87,
      "lengthMeters": 6511.0,
      "allocationPerStatedMeter": 15358.62,
      "rangesMeters": [
        [
          317982.0,
          324493.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Pangasinan - Zambales Rd - K0317+982 - K0324+493",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.93,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0123-000245",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0449 + 064 - K0449 + 973, K0450 + 180 - K0451 + 046, K0454 + 665 - K0455 + 678, K0459 + 968 - K0463 + 834",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 6.654,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 15028554.25,
      "lengthMeters": 6654.0,
      "allocationPerStatedMeter": 15028.55,
      "rangesMeters": [
        [
          449064.0,
          449973.0
        ],
        [
          450180.0,
          451046.0
        ],
        [
          454665.0,
          455678.0
        ],
        [
          459968.0,
          463834.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0449 + 064 - K0449 + 973, K0450 + 180 - K0451 + 046, K0454 + 665 - K0455 + 678, K0459 + 968 - K0463 + 834",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.91,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0124-000258",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Gumaca - Pitogo - Mulanay - Sn Narciso Rd - K0302 + (-445) - K0304 + 012",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.457,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40700040.7,
      "lengthMeters": 2457.0,
      "allocationPerStatedMeter": 40700.04,
      "rangesMeters": [
        [
          301555.0,
          304012.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Gumaca - Pitogo - Mulanay - Sn Narciso Rd - K0302 + (-445) - K0304 + 012",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 2.03,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0124-000270",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "P Burgos-Pototanin Jct - K0159 + 987 - K0160 + 160, K0188 + 094 - K0189 + 000, K0192 + 437 - K0193 + 045",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.687,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 59276822.76,
      "lengthMeters": 1687.0,
      "allocationPerStatedMeter": 59276.82,
      "rangesMeters": [
        [
          159987.0,
          160160.0
        ],
        [
          188094.0,
          189000.0
        ],
        [
          192437.0,
          193045.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "P Burgos-Pototanin Jct - K0159 + 987 - K0160 + 160, K0188 + 094 - K0189 + 000, K0192 + 437 - K0193 + 045",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.94,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0124-000271",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "P Burgos-Pototanin Jct - K0168 + 516 - K0170 + 000, K0192 + 111 - K0192 + 421",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.794,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 55741360.09,
      "lengthMeters": 1794.0,
      "allocationPerStatedMeter": 55741.36,
      "rangesMeters": [
        [
          168516.0,
          170000.0
        ],
        [
          192111.0,
          192421.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "P Burgos-Pototanin Jct - K0168 + 516 - K0170 + 000, K0192 + 111 - K0192 + 421",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.83,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0124-000272",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "P Burgos-Pototanin Jct - K0172 + 000 - K0173 + 043, K0175 + 000 - K0175 + 622, K0181 + 220 - K0181 + 330",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.775,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 56338028.17,
      "lengthMeters": 1775.0,
      "allocationPerStatedMeter": 56338.03,
      "rangesMeters": [
        [
          172000.0,
          173043.0
        ],
        [
          175000.0,
          175622.0
        ],
        [
          181220.0,
          181330.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "P Burgos-Pototanin Jct - K0172 + 000 - K0173 + 043, K0175 + 000 - K0175 + 622, K0181 + 220 - K0181 + 330",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.85,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0124-000273",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "P Burgos-Pototanin Jct - K0196 + 875 - K0198 + 174",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.299,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 76982294.07,
      "lengthMeters": 1299.0,
      "allocationPerStatedMeter": 76982.29,
      "rangesMeters": [
        [
          196875.0,
          198174.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "P Burgos-Pototanin Jct - K0196 + 875 - K0198 + 174",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 2.48,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0125-000277",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "P Burgos-Pototanin Jct - K0198 + 190 - K0199 + 100",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.91,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 109890109.89,
      "lengthMeters": 910.0,
      "allocationPerStatedMeter": 109890.11,
      "rangesMeters": [
        [
          198190.0,
          199100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "P Burgos-Pototanin Jct - K0198 + 190 - K0199 + 100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 3.61,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0125-000281",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sn Francisco-Sn Andres-Sn Narciso Rd - K0394 + 000 - K0396 + 000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          394000.0,
          396000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Sn Francisco-Sn Andres-Sn Narciso Rd - K0394 + 000 - K0396 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.64,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0127-000326",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Cagayan de Oro City Coastal Bypass Rd - K1444 + (-655) - K1446 + 356",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.011,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33211557.62,
      "lengthMeters": 3011.0,
      "allocationPerStatedMeter": 33211.56,
      "rangesMeters": [
        [
          1443345.0,
          1446356.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Cagayan de Oro City Coastal Bypass Rd - K1444 + (-655) - K1446 + 356",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.65,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0139-000561",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Balbalan Pinukpuk Rd - K0480 + (-369) - K0483 + 000, K0485 + 000 - K0489 + 000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 7.369,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 13570362.33,
      "lengthMeters": 7369.0,
      "allocationPerStatedMeter": 13570.36,
      "rangesMeters": [
        [
          479631.0,
          483000.0
        ],
        [
          485000.0,
          489000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Balbalan Pinukpuk Rd - K0480 + (-369) - K0483 + 000, K0485 + 000 - K0489 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 0.93,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0139-000562",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Jct. Talubin-Barlig-Natonin-Paracelis-Calaccad Rd (S00593LZ) - K0476 + 000 - K0464 + 000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 12.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8333333.33,
      "lengthMeters": 12000.0,
      "allocationPerStatedMeter": 8333.33,
      "rangesMeters": [
        [
          464000.0,
          476000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Jct. Talubin-Barlig-Natonin-Paracelis-Calaccad Rd (S00593LZ) - K0476 + 000 - K0464 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 0.57,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0139-000563",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Mountain Province - Isabela Road - K0468 + 125 - KO472 + 552",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Mountain Province - Isabela Road - K0468 + 125 - KO472 + 552",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0139-000565",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Jct Ipil - Quirino Bdry Rd - K0353 + 300 - K0354 + 763, K0357 + 095 - K0355 + 500",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.058,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 32701111.84,
      "lengthMeters": 3058.0,
      "allocationPerStatedMeter": 32701.11,
      "rangesMeters": [
        [
          353300.0,
          354763.0
        ],
        [
          355500.0,
          357095.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Jct Ipil - Quirino Bdry Rd - K0353 + 300 - K0354 + 763, K0357 + 095 - K0355 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 1.97,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0139-000568",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Victoria -Pura Rd - K0148 + (-758) - K0148 + 870",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.628,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 61425061.43,
      "lengthMeters": 1628.0,
      "allocationPerStatedMeter": 61425.06,
      "rangesMeters": [
        [
          147242.0,
          148870.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Victoria -Pura Rd - K0148 + (-758) - K0148 + 870",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 2.85,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0139-000569",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Victoria-Pura Rd - K0148 + 870 - K0150 + 300, K0151 + 562 - K0151 + 757",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.625,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 61538461.54,
      "lengthMeters": 1625.0,
      "allocationPerStatedMeter": 61538.46,
      "rangesMeters": [
        [
          148870.0,
          150300.0
        ],
        [
          151562.0,
          151757.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Victoria-Pura Rd - K0148 + 870 - K0150 + 300, K0151 + 562 - K0151 + 757",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 2.85,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0156-000877",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Quezon-Batangas Road, Quezon - K0096 + 634 - K0097 + 079",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.445,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 224719101.12,
      "lengthMeters": 445.0,
      "allocationPerStatedMeter": 224719.1,
      "rangesMeters": [
        [
          96634.0,
          97079.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "Quezon-Batangas Road, Quezon - K0096 + 634 - K0097 + 079",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 5.65,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0158-000905",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 3 + 500 to Chainage 7 + 000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 3 + 500 to Chainage 7 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0173-001161",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Maharlika Highway (LT) - K0936 + 130 - K0936 + 233",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.103,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 970873786.41,
      "lengthMeters": 103.0,
      "allocationPerStatedMeter": 970873.79,
      "rangesMeters": [
        [
          936130.0,
          936233.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Maharlika Highway (LT) - K0936 + 130 - K0936 + 233",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 2.91,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0174-001182",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Pangasinan - Zambales Rd - K0336+650 - K0337+000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 285714285.71,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 285714.29,
      "rangesMeters": [
        [
          336650.0,
          337000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "174",
      "lengthEvidence": "Pangasinan - Zambales Rd - K0336+650 - K0337+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 1.58,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0175-001192",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "MSR Jct - Lopez - Catanauan Rd - K0240 + 000 - K0240 + 150, K0243 + 100 - K0243 + 300, K0243 + 700 - K0244 + 170, Quezon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.82,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 121951219.51,
      "lengthMeters": 820.0,
      "allocationPerStatedMeter": 121951.22,
      "rangesMeters": [
        [
          240000.0,
          240150.0
        ],
        [
          243100.0,
          243300.0
        ],
        [
          243700.0,
          244170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "MSR Jct - Lopez - Catanauan Rd - K0240 + 000 - K0240 + 150, K0243 + 100 - K0243 + 300, K0243 + 700 - K0244 + 170, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 1.18,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0175-001199",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Gumaca Bypass Road - K0193 + 375 - K0193 + 405, K0194 + 027 - K0194 + 094, K0194 + 247 - K0194 + 292, K0194 + 292 - K0194 + 334, K0194 +395 - K0194 + 455, K0195 + 620 - K0195 + 730, Quezon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.354,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 282485875.71,
      "lengthMeters": 354.0,
      "allocationPerStatedMeter": 282485.88,
      "rangesMeters": [
        [
          193375.0,
          193405.0
        ],
        [
          194027.0,
          194094.0
        ],
        [
          194247.0,
          194292.0
        ],
        [
          194292.0,
          194334.0
        ],
        [
          194395.0,
          194455.0
        ],
        [
          195620.0,
          195730.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "Gumaca Bypass Road - K0193 + 375 - K0193 + 405, K0194 + 027 - K0194 + 094, K0194 + 247 - K0194 + 292, K0194 + 292 - K0194 + 334, K0194 +395 - K0194 + 455, K0195 + 620 - K0195 + 730, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 1.56,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0182-001315",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Bani - Agno Rd - K0348+089 - K0348+439",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 285714285.71,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 285714.29,
      "rangesMeters": [
        [
          348089.0,
          348439.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "182",
      "lengthEvidence": "Bani - Agno Rd - K0348+089 - K0348+439",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 3.08,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0182-001322",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 18900 - Chainage 19007",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "182",
      "lengthEvidence": "Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 18900 - Chainage 19007",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0199-001594",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1484 + 650 - K1487 + 172.19",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.522189999999944,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39648083.61,
      "lengthMeters": 2522.19,
      "allocationPerStatedMeter": 39648.08,
      "rangesMeters": [
        [
          1484650.0,
          1487172.19
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1484 + 650 - K1487 + 172.19",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 1.13,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0201-001625",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Alaminos-Bolinao Rd - K0336 + 110 - K0339 + 510",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 3400.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          336110.0,
          339510.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Alaminos-Bolinao Rd - K0336 + 110 - K0339 + 510",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 1.1,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0201-001626",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Alaminos-Bolinao Rd - K0347 + 000 - K0349 + 046",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.046,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 48875855.33,
      "lengthMeters": 2046.0,
      "allocationPerStatedMeter": 48875.86,
      "rangesMeters": [
        [
          347000.0,
          349046.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Alaminos-Bolinao Rd - K0347 + 000 - K0349 + 046",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 1.71,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0201-001627",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Alaminos-Bolinao Rd - K0355 + 340 - K0357 + 300",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.96,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51020408.16,
      "lengthMeters": 1960.0,
      "allocationPerStatedMeter": 51020.41,
      "rangesMeters": [
        [
          355340.0,
          357300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Alaminos-Bolinao Rd - K0355 + 340 - K0357 + 300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 1.79,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0201-001628",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Pangasinan - Zambales Rd - K0283 + 994 - K0286 + 438",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.444,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40916530.28,
      "lengthMeters": 2444.0,
      "allocationPerStatedMeter": 40916.53,
      "rangesMeters": [
        [
          283994.0,
          286438.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Pangasinan - Zambales Rd - K0283 + 994 - K0286 + 438",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 1.53,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0201-001629",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Pangasinan - Zambales Rd - K0289 + 974 - K0292 + 469",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.495,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40080160.32,
      "lengthMeters": 2495.0,
      "allocationPerStatedMeter": 40080.16,
      "rangesMeters": [
        [
          289974.0,
          292469.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Pangasinan - Zambales Rd - K0289 + 974 - K0292 + 469",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 1.5,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0201-001630",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Pangasinan-Zambales Rd - K0276 + 554 - K0278 + 821",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.267,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44111160.12,
      "lengthMeters": 2267.0,
      "allocationPerStatedMeter": 44111.16,
      "rangesMeters": [
        [
          276554.0,
          278821.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Pangasinan-Zambales Rd - K0276 + 554 - K0278 + 821",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 1.65,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0203-001666",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Sagnay - Nato Rd, K0486 + 073 - K0486 + 193",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.12,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 833333333.33,
      "lengthMeters": 120.0,
      "allocationPerStatedMeter": 833333.33,
      "rangesMeters": [
        [
          486073.0,
          486193.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Sagnay - Nato Rd, K0486 + 073 - K0486 + 193",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 16.67,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0215-001906",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Aurora Bypass Road (Bridge and Approaches), Sta. 0+000 - Sta. 0+729.82, Isabela",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.72982,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 729.82,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          729.82
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Aurora Bypass Road (Bridge and Approaches), Sta. 0+000 - Sta. 0+729.82, Isabela",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0216-001925",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Mallig Bypass Road (Sta. 0 + 000 - Sta. 1 + 238, Sta. 2 + 738 - Sta. 2+837.39), Isabela",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.3373899999999999,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 74772504.65,
      "lengthMeters": 1337.39,
      "allocationPerStatedMeter": 74772.5,
      "rangesMeters": [
        [
          0.0,
          1238.0
        ],
        [
          2738.0,
          2837.39
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Mallig Bypass Road (Sta. 0 + 000 - Sta. 1 + 238, Sta. 2 + 738 - Sta. 2+837.39), Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.91,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0216-001932",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tuguegarao-Enrile Diversion Road (Tuguegarao-Enrile Bridge) (Sta. 0+172.60 - Sta. 0+781.9), Cagayan",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.6093,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 609.3,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          172.6,
          781.9
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Tuguegarao-Enrile Diversion Road (Tuguegarao-Enrile Bridge) (Sta. 0+172.60 - Sta. 0+781.9), Cagayan",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0216-001934",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Anao To Ramos Road, Barangay Pance, Sta. 0+329.05 - Sta. 0+340.61, Ramos, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.011560000000000003,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8650519031.14,
      "lengthMeters": 11.56,
      "allocationPerStatedMeter": 8650519.03,
      "rangesMeters": [
        [
          329.05,
          340.61
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Anao To Ramos Road, Barangay Pance, Sta. 0+329.05 - Sta. 0+340.61, Ramos, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 7.22,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0216-001935",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Balagtas Diversion Road, Sta.0+335.80 - Sta.0+383.80, Balagtas, Bulacan",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.048,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2083333333.33,
      "lengthMeters": 48.0,
      "allocationPerStatedMeter": 2083333.33,
      "rangesMeters": [
        [
          335.8,
          383.8
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Balagtas Diversion Road, Sta.0+335.80 - Sta.0+383.80, Balagtas, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 1.74,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0216-001941",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Barretto Bypass Road, Sta. 5+600 - Sta. 6+320, Zambales",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.72,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 138888888.89,
      "lengthMeters": 720.0,
      "allocationPerStatedMeter": 138888.89,
      "rangesMeters": [
        [
          5600.0,
          6320.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Barretto Bypass Road, Sta. 5+600 - Sta. 6+320, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 1.02,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0217-001942",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Barretto Bypass Road, Sta.0+580 - Sta. 1+620, Sta. 2+440 - Sta. 2+800, Zambales",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 71428571.43,
      "lengthMeters": 1400.0,
      "allocationPerStatedMeter": 71428.57,
      "rangesMeters": [
        [
          580.0,
          1620.0
        ],
        [
          2440.0,
          2800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Barretto Bypass Road, Sta.0+580 - Sta. 1+620, Sta. 2+440 - Sta. 2+800, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.87,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0217-001944",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Botolan Bypass Road, Botolan, Zambales Sta. 0+000 - Sta. 1+000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Botolan Bypass Road, Botolan, Zambales Sta. 0+000 - Sta. 1+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.93,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0217-001946",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Botolan Bypass Road, Botolan, Zambales Sta. 1+000 - Sta. 2+000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          1000.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Botolan Bypass Road, Botolan, Zambales Sta. 1+000 - Sta. 2+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.93,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0218-001967",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Guimba - Pura Road, Nueva Ecija STA.4+200- STA. 6+146",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.946,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51387461.46,
      "lengthMeters": 1946.0,
      "allocationPerStatedMeter": 51387.46,
      "rangesMeters": [
        [
          4200.0,
          6146.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Guimba - Pura Road, Nueva Ecija STA.4+200- STA. 6+146",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 1.0,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0218-001972",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tarlac City Northwestern Alternate Route (San Isidro-Aguso) (Sta 000+000- Sta 000+070.23), Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.07023,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1423892923.25,
      "lengthMeters": 70.23,
      "allocationPerStatedMeter": 1423892.92,
      "rangesMeters": [
        [
          0.0,
          70.23
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Tarlac City Northwestern Alternate Route (San Isidro-Aguso) (Sta 000+000- Sta 000+070.23), Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 1.19,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0218-001977",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Macalelon - Lopez Road, Quezon, Sta. 2+100 - Sta. 4+900",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35714285.71,
      "lengthMeters": 2800.0,
      "allocationPerStatedMeter": 35714.29,
      "rangesMeters": [
        [
          2100.0,
          4900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Macalelon - Lopez Road, Quezon, Sta. 2+100 - Sta. 4+900",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.7,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0218-001978",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Macalelon - Lopez Road, Quezon, Sta. 4 +900 - Sta. 7+700",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35714285.71,
      "lengthMeters": 2800.0,
      "allocationPerStatedMeter": 35714.29,
      "rangesMeters": [
        [
          4900.0,
          7700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Macalelon - Lopez Road, Quezon, Sta. 4 +900 - Sta. 7+700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.7,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0218-001979",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Macalelon - Lopez Road, Quezon, Sta. 7+700 - Sta. 10+500",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35714285.71,
      "lengthMeters": 2800.0,
      "allocationPerStatedMeter": 35714.29,
      "rangesMeters": [
        [
          7700.0,
          10500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Macalelon - Lopez Road, Quezon, Sta. 7+700 - Sta. 10+500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.7,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0219-001988",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Infanta Bypass Road, Sta. 0+000 - Sta. 1+380, Infanta, Quezon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.38,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 72463768.12,
      "lengthMeters": 1380.0,
      "allocationPerStatedMeter": 72463.77,
      "rangesMeters": [
        [
          0.0,
          1380.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Infanta Bypass Road, Sta. 0+000 - Sta. 1+380, Infanta, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.88,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0219-001989",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.97,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 103092783.51,
      "lengthMeters": 970.0,
      "allocationPerStatedMeter": 103092.78,
      "rangesMeters": [
        [
          27700.0,
          28500.0
        ],
        [
          30450.0,
          30620.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.96,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0219-001999",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Mauban Bypass Road, Sta. 1+829 - Sta. 3+829, Mauban, Quezon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          1829.0,
          3829.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Mauban Bypass Road, Sta. 1+829 - Sta. 3+829, Mauban, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.97,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0219-002000",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Padre Garcia-Ibaan Diversion Road - Sta. 0 + 000 - Sta. 0 + 840, Sta. 1 + 555 - Sta. 1 + 733, Sta. 1 + 768 - Sta. 2 + 040, Sta. 2 + 180 - Sta. 2 + 220, Sta. 2 + 720 - Sta. 2 + 825, Sta. 3 + 332 - Sta. 4 + 432, Padre Garcia, Batangas",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.535,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 39447731.76,
      "lengthMeters": 2535.0,
      "allocationPerStatedMeter": 39447.73,
      "rangesMeters": [
        [
          0.0,
          840.0
        ],
        [
          1555.0,
          1733.0
        ],
        [
          1768.0,
          2040.0
        ],
        [
          2180.0,
          2220.0
        ],
        [
          2720.0,
          2825.0
        ],
        [
          3332.0,
          4432.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Padre Garcia-Ibaan Diversion Road - Sta. 0 + 000 - Sta. 0 + 840, Sta. 1 + 555 - Sta. 1 + 733, Sta. 1 + 768 - Sta. 2 + 040, Sta. 2 + 180 - Sta. 2 + 220, Sta. 2 + 720 - Sta. 2 + 825, Sta. 3 + 332 - Sta. 4 + 432, Padre Garcia, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.77,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0219-002001",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Padre Garcia-Ibaan Diversion Road - Sta. 121 + 659.34 - Sta. 121 + 781.5, Sta. 122 + 354.5 - Sta. 123 + 038.50, Sta. 123 + 078.5 - Sta. 123 + 177, Sta. 124 + 199.5 – Sta. 124 + 420, Sta. 124 + 719 - Sta. 125 + 000, Ibaan, Batangas",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.4061600000000034,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 71115662.51,
      "lengthMeters": 1406.16,
      "allocationPerStatedMeter": 71115.66,
      "rangesMeters": [
        [
          121659.34,
          121781.5
        ],
        [
          122354.5,
          123038.5
        ],
        [
          123078.5,
          123177.0
        ],
        [
          124199.5,
          124420.0
        ],
        [
          124719.0,
          125000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Padre Garcia-Ibaan Diversion Road - Sta. 121 + 659.34 - Sta. 121 + 781.5, Sta. 122 + 354.5 - Sta. 123 + 038.50, Sta. 123 + 078.5 - Sta. 123 + 177, Sta. 124 + 199.5 – Sta. 124 + 420, Sta. 124 + 719 - Sta. 125 + 000, Ibaan, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.86,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0220-002009",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Plaridel By-pass Road - Sta 1+197 - Sta 1+747, Sta 3+509 - Sta 4+389, Quezon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.43,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 69930069.93,
      "lengthMeters": 1430.0,
      "allocationPerStatedMeter": 69930.07,
      "rangesMeters": [
        [
          1197.0,
          1747.0
        ],
        [
          3509.0,
          4389.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Plaridel By-pass Road - Sta 1+197 - Sta 1+747, Sta 3+509 - Sta 4+389, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.85,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0220-002015",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Sta. 141+530 - Sta. 143+770, Sta. 143+830 – Sta. 145+240, Batangas",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.65,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 27397260.27,
      "lengthMeters": 3650.0,
      "allocationPerStatedMeter": 27397.26,
      "rangesMeters": [
        [
          141530.0,
          143770.0
        ],
        [
          143830.0,
          145240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Sta. 141+530 - Sta. 143+770, Sta. 143+830 – Sta. 145+240, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.7,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0221-002039",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sorsogon City Coastal Bypass Road, Barangay Abuyog, Sta. 3 + 681 - Sta. 3 + 946, Sorsogon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.265,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 377358490.57,
      "lengthMeters": 265.0,
      "allocationPerStatedMeter": 377358.49,
      "rangesMeters": [
        [
          3681.0,
          3946.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Sorsogon City Coastal Bypass Road, Barangay Abuyog, Sta. 3 + 681 - Sta. 3 + 946, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 1.8,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0221-002040",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sorsogon City Coastal Bypass Road, Barangay Abuyog, Sta. 3 + 946 - Sta. 4 + 211, Sorsogon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.265,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 377358490.57,
      "lengthMeters": 265.0,
      "allocationPerStatedMeter": 377358.49,
      "rangesMeters": [
        [
          3946.0,
          4211.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Sorsogon City Coastal Bypass Road, Barangay Abuyog, Sta. 3 + 946 - Sta. 4 + 211, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 1.8,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0222-002045",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Balete Bypass Road, Sta. 1+080.00 - Sta. 1+140.00, Aklan",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.06,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1666666666.67,
      "lengthMeters": 60.0,
      "allocationPerStatedMeter": 1666666.67,
      "rangesMeters": [
        [
          1080.0,
          1140.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Balete Bypass Road, Sta. 1+080.00 - Sta. 1+140.00, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 1.39,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0223-002076",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Abuyog By-Pass Road, Sta. 0+820 - 1+520, Sta. 3+299 - 3+440, Barangay Barayong and Barangay Balocawe, Abuyog, Leyte",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.841,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 118906064.21,
      "lengthMeters": 841.0,
      "allocationPerStatedMeter": 118906.06,
      "rangesMeters": [
        [
          820.0,
          1520.0
        ],
        [
          3299.0,
          3440.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Abuyog By-Pass Road, Sta. 0+820 - 1+520, Sta. 3+299 - 3+440, Barangay Barayong and Barangay Balocawe, Abuyog, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 1.11,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0223-002078",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Basey-Maydolong Road, Barangay Del Pilar, Maydolong, Eastern Samar",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Basey-Maydolong Road, Barangay Del Pilar, Maydolong, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0224-002085",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Naval Diversion Road (Riverside to Provincial Hospital), Biliran (Sta. 1 + 088 - Sta. 1 + 291)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.203,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 492610837.44,
      "lengthMeters": 203.0,
      "allocationPerStatedMeter": 492610.84,
      "rangesMeters": [
        [
          1088.0,
          1291.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Naval Diversion Road (Riverside to Provincial Hospital), Biliran (Sta. 1 + 088 - Sta. 1 + 291)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 2.35,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0224-002087",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Ormoc City Diversion Road,Barangay San Juan-Lao-Naungan Section, Sta. 0+000 - Sta. 4+380, Leyte",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 4.38,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22831050.23,
      "lengthMeters": 4380.0,
      "allocationPerStatedMeter": 22831.05,
      "rangesMeters": [
        [
          0.0,
          4380.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Ormoc City Diversion Road,Barangay San Juan-Lao-Naungan Section, Sta. 0+000 - Sta. 4+380, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.58,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0224-002090",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tacloban City Bypass Road Extension (Sta. 0+910 - Sta. 1+00, Sta. 1+040 - Sta. 1+169.35), Tacloban City",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.2193499999999999,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 455892409.39,
      "lengthMeters": 219.35,
      "allocationPerStatedMeter": 455892.41,
      "rangesMeters": [
        [
          910.0,
          1000.0
        ],
        [
          1040.0,
          1169.35
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Tacloban City Bypass Road Extension (Sta. 0+910 - Sta. 1+00, Sta. 1+040 - Sta. 1+169.35), Tacloban City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 2.17,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0224-002091",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tacloban-Palo Diversion Road, (Sta. 1+920 - Sta. 2+035.91), Barangay 82 Marasbaras, Tacloban City",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.11591000000000008,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 862738331.46,
      "lengthMeters": 115.91,
      "allocationPerStatedMeter": 862738.33,
      "rangesMeters": [
        [
          1920.0,
          2035.91
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Tacloban-Palo Diversion Road, (Sta. 1+920 - Sta. 2+035.91), Barangay 82 Marasbaras, Tacloban City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.72,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0225-002108",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cagayan de Oro Diversion Road (Jct. Balubal-Sayre Highway-Pueblo de Oro), CDO Old Airport Diversion Road, Barangay Cugman, Sta. 19+700-Sta. 20+768.83, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.0688300000000017,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 93560248.12,
      "lengthMeters": 1068.83,
      "allocationPerStatedMeter": 93560.25,
      "rangesMeters": [
        [
          19700.0,
          20768.83
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "225",
      "lengthEvidence": "Cagayan de Oro Diversion Road (Jct. Balubal-Sayre Highway-Pueblo de Oro), CDO Old Airport Diversion Road, Barangay Cugman, Sta. 19+700-Sta. 20+768.83, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.87,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0225-002117",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "CDO-Opol-El Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Barangay Pagatpat Section, Sta. 2+680 - Sta. 3+330, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.65,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 153846153.85,
      "lengthMeters": 650.0,
      "allocationPerStatedMeter": 153846.15,
      "rangesMeters": [
        [
          2680.0,
          3330.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "225",
      "lengthEvidence": "CDO-Opol-El Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Barangay Pagatpat Section, Sta. 2+680 - Sta. 3+330, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 1.13,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0226-002120",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Construction of By-Pass and Diversion Roads, Panguil Bay Access Road (Ozamiz City- Tangub City Section), Misamis Occidental",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Construction of By-Pass and Diversion Roads, Panguil Bay Access Road (Ozamiz City- Tangub City Section), Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0227-002136",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Panguil Bay Access Road (Ozamiz City - Tangub City Section), Sta. 0+000 - Sta. 0+500, Misamis Occidental",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 200000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 200000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Panguil Bay Access Road (Ozamiz City - Tangub City Section), Sta. 0+000 - Sta. 0+500, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 1.57,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0227-002138",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Puerto - Claveria Bypass Road, Bugo Bridge, Sta. 4+400 - Sta. 4+500, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 100.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          4400.0,
          4500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Puerto - Claveria Bypass Road, Bugo Bridge, Sta. 4+400 - Sta. 4+500, Cagayan de Oro City",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0228-002163",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Koronadal City Bypass Road (Segment 2) Sta. 3 + 763 - Sta. 6 + 763, South Cotabato",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          3763.0,
          6763.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Koronadal City Bypass Road (Segment 2) Sta. 3 + 763 - Sta. 6 + 763, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.85,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0228-002164",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Midsayap Diversion Road (Sadaan-Central Glad), Sta. 0+000 - Sta. 2+600, Cotabato",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38461538.46,
      "lengthMeters": 2600.0,
      "allocationPerStatedMeter": 38461.54,
      "rangesMeters": [
        [
          0.0,
          2600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Midsayap Diversion Road (Sadaan-Central Glad), Sta. 0+000 - Sta. 2+600, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.75,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0229-002178",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Surigao - Agusan West Coastal Road Sta. 2+660 - Sta. 2+768, Barangay Karihatag, Malimono, Surigao del Norte",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.108,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 925925925.93,
      "lengthMeters": 108.0,
      "allocationPerStatedMeter": 925925.93,
      "rangesMeters": [
        [
          2660.0,
          2768.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Surigao - Agusan West Coastal Road Sta. 2+660 - Sta. 2+768, Barangay Karihatag, Malimono, Surigao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.77,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0229-002181",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          1866.5,
          2800.0
        ],
        [
          4554.5,
          6621.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.85,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0233-002250",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 7.535,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 13271400.13,
      "lengthMeters": 7535.0,
      "allocationPerStatedMeter": 13271.4,
      "rangesMeters": [
        [
          42760.0,
          44620.0
        ],
        [
          60482.0,
          66157.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "233",
      "lengthEvidence": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.31,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0234-002269",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 6.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 16666666.67,
      "lengthMeters": 6000.0,
      "allocationPerStatedMeter": 16666.67,
      "rangesMeters": [
        [
          4995.0,
          6795.0
        ],
        [
          7893.0,
          12093.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.38,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0235-002270",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road, Sta. 4+345 - Sta. 5+467.23, Kabugao, Apayao",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.1222299999999996,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 89108293.31,
      "lengthMeters": 1122.23,
      "allocationPerStatedMeter": 89108.29,
      "rangesMeters": [
        [
          4345.0,
          5467.23
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road, Sta. 4+345 - Sta. 5+467.23, Kabugao, Apayao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 1.43,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0235-002274",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Piddig-Carasi-Calanasan Road (Calanasan Side), Sta. 17+596 - Sta.19+196, Calanasan, Apayao",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 62500000.0,
      "lengthMeters": 1600.0,
      "allocationPerStatedMeter": 62500.0,
      "rangesMeters": [
        [
          17596.0,
          19196.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Piddig-Carasi-Calanasan Road (Calanasan Side), Sta. 17+596 - Sta.19+196, Calanasan, Apayao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 0.79,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0235-002280",
      "category": "Bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Capas-Botolan Rd (Zambales Section), Zambales, Baquillan Bridge 1, Sta. 000+045.68 - Sta. 000+562.48",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.5168,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 193498452.01,
      "lengthMeters": 516.8,
      "allocationPerStatedMeter": 193498.45,
      "rangesMeters": [
        [
          45.68,
          562.48
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Capas-Botolan Rd (Zambales Section), Zambales, Baquillan Bridge 1, Sta. 000+045.68 - Sta. 000+562.48",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 4,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0235-002282",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Atimonan-Mauban Road - STA 002+440 - STA 002 + 615, STA 002 + 815 - STA 003+660",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.02,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 98039215.69,
      "lengthMeters": 1020.0,
      "allocationPerStatedMeter": 98039.22,
      "rangesMeters": [
        [
          2440.0,
          2615.0
        ],
        [
          2815.0,
          3660.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Atimonan-Mauban Road - STA 002+440 - STA 002 + 615, STA 002 + 815 - STA 003+660",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 1.57,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0236-002292",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Lobo-Malabrigo-Laiya-San Juan Road, Lumbangan Bridge,STA. 149 + 635 - STA. 149 + 830, Lobo, Batangas",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.195,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 195.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          149635.0,
          149830.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Lobo-Malabrigo-Laiya-San Juan Road, Lumbangan Bridge,STA. 149 + 635 - STA. 149 + 830, Lobo, Batangas",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0236-002295",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mauban-Tignoan Road (Kabanabanaan Bridge), Mauban, Quezon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Mauban-Tignoan Road (Kabanabanaan Bridge), Mauban, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0236-002297",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mauban-Tignoan Road (Malaking Ilog Bridge), Mauban, Quezon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Mauban-Tignoan Road (Malaking Ilog Bridge), Mauban, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0236-002301",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mauban-Tignoan Road, Lagyo Bridge, Sta. 0+115 - Sta. 0+265, Mauban, Quezon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 150.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          115.0,
          265.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Mauban-Tignoan Road, Lagyo Bridge, Sta. 0+115 - Sta. 0+265, Mauban, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0236-002309",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Quezon - Alabat - Perez Circumferential Road - Sta. 20+110 - Sta. 21+910",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55555555.56,
      "lengthMeters": 1800.0,
      "allocationPerStatedMeter": 55555.56,
      "rangesMeters": [
        [
          20110.0,
          21910.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Quezon - Alabat - Perez Circumferential Road - Sta. 20+110 - Sta. 21+910",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 0.7,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0237-002313",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "MSR JCT Canda-Hondagua-Roma Point Road, Sta. 228 + 562 - Sta. 229 + 686",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.124,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 88967971.53,
      "lengthMeters": 1124.0,
      "allocationPerStatedMeter": 88967.97,
      "rangesMeters": [
        [
          228562.0,
          229686.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "MSR JCT Canda-Hondagua-Roma Point Road, Sta. 228 + 562 - Sta. 229 + 686",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 1.42,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0237-002317",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Dr. Damian Reyes Memorial Road, Sta. 29+695.00 - Sta. 30+095.00, Sta. 32+026.00 - Sta. 32+826.00, Sta. 38+880.00 - Sta. 39+380.00, Boac, Marinduque,",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 58823529.41,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 58823.53,
      "rangesMeters": [
        [
          29695.0,
          30095.0
        ],
        [
          32026.0,
          32826.0
        ],
        [
          38880.0,
          39380.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Dr. Damian Reyes Memorial Road, Sta. 29+695.00 - Sta. 30+095.00, Sta. 32+026.00 - Sta. 32+826.00, Sta. 38+880.00 - Sta. 39+380.00, Boac, Marinduque,",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 0.74,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0238-002331",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.736,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 135869565.22,
      "lengthMeters": 736.0,
      "allocationPerStatedMeter": 135869.57,
      "rangesMeters": [
        [
          7700.0,
          8322.0
        ],
        [
          9400.0,
          9514.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 1.37,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0239-002357",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Zamboanga del Sur Coastal Road (Liasan - Sagucan Road), Zamboanga del Sur Coastal Rd, Station 1+ 000 - Station 3 + 850, Zamboanga del Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.85,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35087719.3,
      "lengthMeters": 2850.0,
      "allocationPerStatedMeter": 35087.72,
      "rangesMeters": [
        [
          1000.0,
          3850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Zamboanga del Sur Coastal Road (Liasan - Sagucan Road), Zamboanga del Sur Coastal Rd, Station 1+ 000 - Station 3 + 850, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.81,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0239-002358",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Zamboanga del Sur Coastal Road (Margosatubig-Lapuyan Road), Station 0 + 000 - Station 2 + 850, Margosatubig, Zamboanga del Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.85,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35087719.3,
      "lengthMeters": 2850.0,
      "allocationPerStatedMeter": 35087.72,
      "rangesMeters": [
        [
          0.0,
          2850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Zamboanga del Sur Coastal Road (Margosatubig-Lapuyan Road), Station 0 + 000 - Station 2 + 850, Margosatubig, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.81,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0240-002367",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Barangay Bal-ason - Barangay Hindangon, Sta. 125+958 - Sta. 127+158, Gingoog City, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 83333333.33,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 83333.33,
      "rangesMeters": [
        [
          125958.0,
          127158.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Barangay Bal-ason - Barangay Hindangon, Sta. 125+958 - Sta. 127+158, Gingoog City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 1.33,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0240-002378",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Puntian-Arakan Road, Barangay Magsaysay - Barangay Sampaguita Section, Sta. 14+500 - Sta. 19+500, Kibawe, Bukidnon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 5.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 5000.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          14500.0,
          19500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Puntian-Arakan Road, Barangay Magsaysay - Barangay Sampaguita Section, Sta. 14+500 - Sta. 19+500, Kibawe, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.46,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0241-002384",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Datu Paglas - Columbio - Matanao Road, Sta. 0+165 - Sta. 2+030, Sta. 2+290 - Sta. 2+370, Sta. 4+150 - Sta. 7+885, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 5.68,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 17605633.8,
      "lengthMeters": 5680.0,
      "allocationPerStatedMeter": 17605.63,
      "rangesMeters": [
        [
          165.0,
          2030.0
        ],
        [
          2290.0,
          2370.0
        ],
        [
          4150.0,
          7885.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "Datu Paglas - Columbio - Matanao Road, Sta. 0+165 - Sta. 2+030, Sta. 2+290 - Sta. 2+370, Sta. 4+150 - Sta. 7+885, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.41,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0241-002386",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Koronadal - Lutayan - Columbio - Matanao Road, Sta. 9+00 - Sta. 9+114.94",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.11494000000000051,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 870019140.42,
      "lengthMeters": 114.94,
      "allocationPerStatedMeter": 870019.14,
      "rangesMeters": [
        [
          9000.0,
          9114.94
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "Koronadal - Lutayan - Columbio - Matanao Road, Sta. 9+00 - Sta. 9+114.94",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0243-002422",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Ormoc-Baybay-Southern Leyte Bdry Rd - K1122 + 526 - K1123 + 000, K1025 + 87 - K1037 + 246",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 12.633,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 7915776.14,
      "lengthMeters": 12633.0,
      "allocationPerStatedMeter": 7915.78,
      "rangesMeters": [
        [
          1122526.0,
          1123000.0
        ],
        [
          1025087.0,
          1037246.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "243",
      "lengthEvidence": "Ormoc-Baybay-Southern Leyte Bdry Rd - K1122 + 526 - K1123 + 000, K1025 + 87 - K1037 + 246",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.66,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0247-002471",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Pangasinan - Zambales Rd - K0295 + 158 - K0297 + 879; K0304 + 991 - K0306 + 470 (Road Safety: Roadway Lighting)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          295158.0,
          297879.0
        ],
        [
          304991.0,
          306470.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "Pangasinan - Zambales Rd - K0295 + 158 - K0297 + 879; K0304 + 991 - K0306 + 470 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0247-002473",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Pangasinan - Zambales Rd - K0306+490 - K0307+794; K0331+048 - K0334+244 (Road Safety: Roadway Lighting)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          306490.0,
          307794.0
        ],
        [
          331048.0,
          334244.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "Pangasinan - Zambales Rd - K0306+490 - K0307+794; K0331+048 - K0334+244 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0247-002474",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Pangasinan - Zambales Rd - K0336+104 - K0340+154 (Road Safety: Roadway Lighting)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 4.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24691358.02,
      "lengthMeters": 4050.0,
      "allocationPerStatedMeter": 24691.36,
      "rangesMeters": [
        [
          336104.0,
          340154.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "Pangasinan - Zambales Rd - K0336+104 - K0340+154 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 2.39,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0248-002489",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation / Application of Road Safety Facilities (Roadway Lighting) along Gingoog - Claveria - Villanueva Rd - K1325 + 000 K1329 + 000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "248",
      "lengthEvidence": "Installation / Application of Road Safety Facilities (Roadway Lighting) along Gingoog - Claveria - Villanueva Rd - K1325 + 000 K1329 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0248-002490",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Roadway Lighting) Along Kapalong - Talaingod - Valencia Rd - K1573 + 500 - K1580 + 500, Barangay Magkalungay - Barangay Halapitan, San Fernando, Bukidnon 2nd LD",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 7.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14285714.29,
      "lengthMeters": 7000.0,
      "allocationPerStatedMeter": 14285.71,
      "rangesMeters": [
        [
          1573500.0,
          1580500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "248",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Roadway Lighting) Along Kapalong - Talaingod - Valencia Rd - K1573 + 500 - K1580 + 500, Barangay Magkalungay - Barangay Halapitan, San Fernando, Bukidnon 2nd LD",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.38,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0248-002493",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Dapa-General Luna Road (S00001SG), K0001+250-K0015+00 (Road Safety : Roadway Lighting)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 13.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 7272727.27,
      "lengthMeters": 13750.0,
      "allocationPerStatedMeter": 7272.73,
      "rangesMeters": [
        [
          1250.0,
          15000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "248",
      "lengthEvidence": "Dapa-General Luna Road (S00001SG), K0001+250-K0015+00 (Road Safety : Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.7,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0252-002554",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "MT Villanueva Ave-Magsaysay Rd - K0439+(-869)-K0439+640",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.509,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66269052.35,
      "lengthMeters": 1509.0,
      "allocationPerStatedMeter": 66269.05,
      "rangesMeters": [
        [
          438131.0,
          439640.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "252",
      "lengthEvidence": "MT Villanueva Ave-Magsaysay Rd - K0439+(-869)-K0439+640",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 6.69,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0258-002631",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Aslong Br. (B00383LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Aslong Br. (B00383LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002642",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Namangyan Br. (B00055NR) along Bais-Kabankalan Rd",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Namangyan Br. (B00055NR) along Bais-Kabankalan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0260-002692",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Gov. Miranda Br. (B00016MN) along Maharlika Highway (MN)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Gov. Miranda Br. (B00016MN) along Maharlika Highway (MN)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0261-002709",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Magtiaco Br. (B00868MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Magtiaco Br. (B00868MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002954",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Carmen Br. (B00322MN) along Bukidnon-Cotabato Rd",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Carmen Br. (B00322MN) along Bukidnon-Cotabato Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003186",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Amburayan Parallel Br. along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Amburayan Parallel Br. along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0284-003208",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Malalam Parallel Br. along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Malalam Parallel Br. along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003233",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Jalaur Parallel Br. along Iloilo City-Leganes-Dumangas Coastal Rd",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Jalaur Parallel Br. along Iloilo City-Leganes-Dumangas Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003236",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Peñaflorida-Deza Parallel Br. along Iloilo East Coast-Capiz Rd",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Peñaflorida-Deza Parallel Br. along Iloilo East Coast-Capiz Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003286",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Nicaan Br. (B01244MN) along Banisilan-Guiling-Alamada-Libungan Rd",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Nicaan Br. (B01244MN) along Banisilan-Guiling-Alamada-Libungan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003292",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Magsaysay Viaduct Br. 1 (B00998MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Magsaysay Viaduct Br. 1 (B00998MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0413-005716",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at MWSS Compound, Barangay Matandang Balara, Quezon City",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Construction of Road at MWSS Compound, Barangay Matandang Balara, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0413-005719",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road including Drainage Structure along Paz Mendoza Guazon St. Manila City",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Improvement of Road including Drainage Structure along Paz Mendoza Guazon St. Manila City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0414-005728",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangays Mal-Ong, Poblacion, Roxas, Awile, Sablig, Macaleeng, and Toritori, Anda, Pangasinan",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Construction of Road, Barangays Mal-Ong, Poblacion, Roxas, Awile, Sablig, Macaleeng, and Toritori, Anda, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0414-005735",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road - Upper Tumapoc Road, Burgos, La Union",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Rehabilitation of Road - Upper Tumapoc Road, Burgos, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005756",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Datag-Dampig Bridge, Barangay San Isidro, Dumalneg, Ilocos Norte",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Datag-Dampig Bridge, Barangay San Isidro, Dumalneg, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005757",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of New Bridge - Barangay San Juan, Agno, Pangasinan (16.100800, 119.838638)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of New Bridge - Barangay San Juan, Agno, Pangasinan (16.100800, 119.838638)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0416-005775",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Taga-Dugpa-Nambucayan Access Road, Pinukpuk, Kalinga",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Construction of Taga-Dugpa-Nambucayan Access Road, Pinukpuk, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0417-005793",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of La Paz-Danglas-Dolores Road, La Paz, Danglas, and Dolores Abra",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Rehabilitation of La Paz-Danglas-Dolores Road, La Paz, Danglas, and Dolores Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0417-005796",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Mudeng-Liguis Road, Barangay Mudeng, La Paz, Abra",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Rehabilitation of Mudeng-Liguis Road, Barangay Mudeng, La Paz, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0417-005799",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Poblacion, Pidigan Road, Barangay Poblacion, Pidigan, Abra",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Rehabilitation of Poblacion, Pidigan Road, Barangay Poblacion, Pidigan, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0417-005802",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Poblacion - Langnao (Calanasan) - Baliwanan (Kabugao) Road, Barangay Ferdinand-Langnao(Calanasan)-Kabugao, Apayao",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Improvement of Poblacion - Langnao (Calanasan) - Baliwanan (Kabugao) Road, Barangay Ferdinand-Langnao(Calanasan)-Kabugao, Apayao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0418-005810",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure (Sta.)+125 - Sta.0+180, Sta.0+215-Sta 0+250, Sta 0+352-Sta.1+000) Including Construction of Concrete Road (Sta.0+000 - Sta 1+400) and Construction of Drainage Structure along Road (Sta. 0+260 - Sta. 0+400, Sta. 0+820-Sta. 1+000, Barangay Namnama, City of Ilagan, Isabela",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          215.0,
          250.0
        ],
        [
          352.0,
          1000.0
        ],
        [
          0.0,
          1400.0
        ],
        [
          260.0,
          400.0
        ],
        [
          820.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Road Slope Protection Structure (Sta.)+125 - Sta.0+180, Sta.0+215-Sta 0+250, Sta 0+352-Sta.1+000) Including Construction of Concrete Road (Sta.0+000 - Sta 1+400) and Construction of Drainage Structure along Road (Sta. 0+260 - Sta. 0+400, Sta. 0+820-Sta. 1+000, Barangay Namnama, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0418-005814",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Sitio Ordonez to Sitio Canaan (Sta. 0+000-Sta.2+000), Barangay Sto. Domingo Proper, Bambang, Nueva Vizcaya",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          0.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Access Road, Sitio Ordonez to Sitio Canaan (Sta. 0+000-Sta.2+000), Barangay Sto. Domingo Proper, Bambang, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 2.07,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0418-005815",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Purok 6A to Purok 7, Sitio Faralan-Upper Batu (Sta. 0+000-Sta. 3+000), Barangay Sto Domingo Proper, Bambang, Nueva Vizcaya",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          0.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Access Road, Purok 6A to Purok 7, Sitio Faralan-Upper Batu (Sta. 0+000-Sta. 3+000), Barangay Sto Domingo Proper, Bambang, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.06,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0418-005816",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Nagasabaran-Balete-Namamparan-Pinya Road (Sta. 0+000-Sta. 2+000), Diadi, Nueva Vizcaya",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          0.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Access Road, Nagasabaran-Balete-Namamparan-Pinya Road (Sta. 0+000-Sta. 2+000), Diadi, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 2.07,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0418-005817",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Duruarog-Villa Aurora Road (Sta 0+000-Sta 2+000), Diadi, Nueva Vizcaya",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          0.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Access Road, Duruarog-Villa Aurora Road (Sta 0+000-Sta 2+000), Diadi, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 2.07,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0418-005818",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Bugnay-San Pablo-Butao Road (Sta. 0+000-Sta. 2+000), Diadi, Nueva Vizcaya",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          0.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Access Road, Bugnay-San Pablo-Butao Road (Sta. 0+000-Sta. 2+000), Diadi, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 2.07,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0418-005821",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Canadam-Reina Mercedes Bridge (Blos River), Maconacon, Isabela",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Canadam-Reina Mercedes Bridge (Blos River), Maconacon, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0419-005837",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road along Estrada-Navy-New Clark City Bypass Road, Sta. 1+490 to Sta. 2+090, Capas, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 166666666.67,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 166666.67,
      "rangesMeters": [
        [
          1490.0,
          2090.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Construction of Road along Estrada-Navy-New Clark City Bypass Road, Sta. 1+490 to Sta. 2+090, Capas, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 6.81,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0419-005838",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Concepcion-Bamban going to New Clark City Bypass Road, Sta. 0 + 842.50 - Sta. 6 + 700 & Sta. 8 + 464 - Sta. 8+ 770, Concepcion & Bamban, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          842.5,
          6700.0
        ],
        [
          8464.0,
          8770.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Construction of Road, Concepcion-Bamban going to New Clark City Bypass Road, Sta. 0 + 842.50 - Sta. 6 + 700 & Sta. 8 + 464 - Sta. 8+ 770, Concepcion & Bamban, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0419-005847",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of By- Pass Road, Barangay Bangantalinga, Iba, Zambales Sta.9+159.00- Sta.9+999.00",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.84,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 119047619.05,
      "lengthMeters": 840.0,
      "allocationPerStatedMeter": 119047.62,
      "rangesMeters": [
        [
          9159.0,
          9999.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Construction of By- Pass Road, Barangay Bangantalinga, Iba, Zambales Sta.9+159.00- Sta.9+999.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 6.13,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0420-005855",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Macabaklay Road at Barangay Macabaklay, Gapan City, Nueva Ecija, 15.288881, 121.056177",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Improvement of Macabaklay Road at Barangay Macabaklay, Gapan City, Nueva Ecija, 15.288881, 121.056177",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0420-005859",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Dueg - Labney Diversion Road (Dueg), Barangay Maasin, San Clemente, Tarlac, Sta. 0 + 000.00 - Sta. 1 + 200.00",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 83333333.33,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 83333.33,
      "rangesMeters": [
        [
          0.0,
          1200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Construction of Dueg - Labney Diversion Road (Dueg), Barangay Maasin, San Clemente, Tarlac, Sta. 0 + 000.00 - Sta. 1 + 200.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 3.33,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0420-005860",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of By-Pass Road and Diversion Road, Botolan, Zambales (Sta. 0+854 - Sta. 0+939, Sta. 1+257 - Sta. 1+384, Sta. 1+854 -Sta. 2+091, Sta. 3+702 - Sta. 3+958)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          854.0,
          939.0
        ],
        [
          1257.0,
          1384.0
        ],
        [
          1854.0,
          2091.0
        ],
        [
          3702.0,
          3958.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Construction of By-Pass Road and Diversion Road, Botolan, Zambales (Sta. 0+854 - Sta. 0+939, Sta. 1+257 - Sta. 1+384, Sta. 1+854 -Sta. 2+091, Sta. 3+702 - Sta. 3+958)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0420-005861",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of By-Pass Road, Bangatalinga, Iba, Zambales Sta. 8+319.00-Sta. 9+159.00",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.84,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 119047619.05,
      "lengthMeters": 840.0,
      "allocationPerStatedMeter": 119047.62,
      "rangesMeters": [
        [
          8319.0,
          9159.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Construction of By-Pass Road, Bangatalinga, Iba, Zambales Sta. 8+319.00-Sta. 9+159.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 6.13,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0420-005862",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Clark - Mabalacat Access Road, Mabalacat City, Pampanga (Sta. 0+000 to Sta. 1+100)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 90909090.91,
      "lengthMeters": 1100.0,
      "allocationPerStatedMeter": 90909.09,
      "rangesMeters": [
        [
          0.0,
          1100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Construction of Clark - Mabalacat Access Road, Mabalacat City, Pampanga (Sta. 0+000 to Sta. 1+100)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 3.64,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0420-005863",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Dingalan-San Luis-Baler Road, Dingalan/San Luis, Aurora",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Construction of Dingalan-San Luis-Baler Road, Dingalan/San Luis, Aurora",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0420-005864",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Constructuon of Baler-San Luis-Dingalan Road, Baler/San Luis, Aurora",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Constructuon of Baler-San Luis-Dingalan Road, Baler/San Luis, Aurora",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0421-005874",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Manila North Road to SCTEX Luisita (SCTEX Luisita Access Road ), Balete/Central Sta. 2 + 992.00 - Sta. 3 + 452.00",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.46,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 217391304.35,
      "lengthMeters": 460.0,
      "allocationPerStatedMeter": 217391.3,
      "rangesMeters": [
        [
          2992.0,
          3452.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Construction of Manila North Road to SCTEX Luisita (SCTEX Luisita Access Road ), Balete/Central Sta. 2 + 992.00 - Sta. 3 + 452.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 8.88,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0421-005875",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Manila North Road to SCTEX Luisita (SCTEX Luisita Access Road ), Lourdes - Balete/Central - Capehan/Maligaya Sta. 3 + 452.00 - Sta. 3 + 912.00",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.46,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 217391304.35,
      "lengthMeters": 460.0,
      "allocationPerStatedMeter": 217391.3,
      "rangesMeters": [
        [
          3452.0,
          3912.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Construction of Manila North Road to SCTEX Luisita (SCTEX Luisita Access Road ), Lourdes - Balete/Central - Capehan/Maligaya Sta. 3 + 452.00 - Sta. 3 + 912.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 8.88,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0421-005876",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Manila North Road to SCTEX Luisita (SCTEX Luisita Access Road ), Lourdes - Balete/Central Sta. 2 + 531.60 - Sta. 2 + 992.00",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.4604000000000001,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 217202432.67,
      "lengthMeters": 460.4,
      "allocationPerStatedMeter": 217202.43,
      "rangesMeters": [
        [
          2531.6,
          2992.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Construction of Manila North Road to SCTEX Luisita (SCTEX Luisita Access Road ), Lourdes - Balete/Central Sta. 2 + 531.60 - Sta. 2 + 992.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 8.87,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0421-005877",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Manila North Road to SCTEX Luisita (SCTEX Luisita Access Road ), Maligaya/Capehan Sta. 3 + 912.00 - Sta. 4 + 372.00",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.46,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 217391304.35,
      "lengthMeters": 460.0,
      "allocationPerStatedMeter": 217391.3,
      "rangesMeters": [
        [
          3912.0,
          4372.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Construction of Manila North Road to SCTEX Luisita (SCTEX Luisita Access Road ), Maligaya/Capehan Sta. 3 + 912.00 - Sta. 4 + 372.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 8.88,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0421-005881",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of New Bridge at Barangay Bucanan, Magalang, Pampanga",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Construction of New Bridge at Barangay Bucanan, Magalang, Pampanga",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0421-005883",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road along Candaba - San Luis - San Simon - Apalit - Macabebe- Masantol Setback Levee (Candaba - San Luis Section), San Luis to Candaba, Pampanga",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Rehabilitation of Road along Candaba - San Luis - San Simon - Apalit - Macabebe- Masantol Setback Levee (Candaba - San Luis Section), San Luis to Candaba, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0421-005884",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road along Candaba-San Luis- San Simon- Apalit- Macabebe- Masantol Setback Levee (San Luis - Apalit Section) San Luis to Apalit, Pampanga",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Rehabilitation of Road along Candaba-San Luis- San Simon- Apalit- Macabebe- Masantol Setback Levee (San Luis - Apalit Section) San Luis to Apalit, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0421-005887",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road along Candaba-San Luis-San Simon- Apalit- Macabebe- Masantol Setback Levee (Apalit - Masantol Section), Apalit to Masantol, Pampanga",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Rehabilitation of Road along Candaba-San Luis-San Simon- Apalit- Macabebe- Masantol Setback Levee (Apalit - Masantol Section), Apalit to Masantol, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0422-005890",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage along Barangays San Nicolas 2-Bucanan- San Agustin, Magalang, Pampanga",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Construction of Road and Drainage along Barangays San Nicolas 2-Bucanan- San Agustin, Magalang, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0422-005892",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Dike (Baywalk) along Angat River, Barangay Lico - Poblacion - Libis - Talacsan, San Rafael, Bulacan, Sta. 00+000 - Sta. 02+000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          0.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Construction of Road Dike (Baywalk) along Angat River, Barangay Lico - Poblacion - Libis - Talacsan, San Rafael, Bulacan, Sta. 00+000 - Sta. 02+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 2.07,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0422-005895",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Roman Expressway (Mabatang) leading to Colegio de San Juan de Letran, Abucay, Bataan",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Construction of Road from Roman Expressway (Mabatang) leading to Colegio de San Juan de Letran, Abucay, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0422-005896",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, CSJDM Hall of Justice Compound, Barangay Poblacion, City of San Jose del Monte, Bulacan (121.043850, 14.812862)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Construction of Road with Drainage, CSJDM Hall of Justice Compound, Barangay Poblacion, City of San Jose del Monte, Bulacan (121.043850, 14.812862)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0422-005897",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Productivity Area, Barangay Sapang Palay Proper, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 02+400 (121.045715, 14.839749)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 2400.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          2400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Construction of Road with Drainage, Productivity Area, Barangay Sapang Palay Proper, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 02+400 (121.045715, 14.839749)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.32,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0422-005899",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangays Tungkong Mangga and Sto. Cristo, City of San Jose del Monte, Bulacan (121.08040, 14.809015)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Construction of Road, Barangays Tungkong Mangga and Sto. Cristo, City of San Jose del Monte, Bulacan (121.08040, 14.809015)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0422-005904",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Malolos Paombong Hagonoy Calumpit Road, Municipality of Calumpit, Bulacan",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Improvement of Malolos Paombong Hagonoy Calumpit Road, Municipality of Calumpit, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0422-005906",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "New Clark City-Tarlac City Diversion Road Barangay San Pablo, Sta. 8 + 508.00 - Sta. 8 + 967.90",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.45989999999999964,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 217438573.6,
      "lengthMeters": 459.9,
      "allocationPerStatedMeter": 217438.57,
      "rangesMeters": [
        [
          8508.0,
          8967.9
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "New Clark City-Tarlac City Diversion Road Barangay San Pablo, Sta. 8 + 508.00 - Sta. 8 + 967.90",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 8.88,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0422-005907",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Abacan Road Dike along Barangays Anunas-Malabanias-Sapalibutad, Angeles City, Pampanga",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Rehabilitation of Abacan Road Dike along Barangays Anunas-Malabanias-Sapalibutad, Angeles City, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005909",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Gerona Road Network (Apsayan - Tagumbao Section), Gerona, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Gerona Road Network (Apsayan - Tagumbao Section), Gerona, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005911",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Caluluan, Concepcion, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Road at Barangay Caluluan, Concepcion, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005913",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Lilibangan, Concepcion, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Road at Barangay Lilibangan, Concepcion, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005915",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Parulung, Concepcion, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Road at Barangay Parulung, Concepcion, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005916",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay San Agustin, Concepcion, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Road at Barangay San Agustin, Concepcion, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005917",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay San Nicolas Balas, Concepcion, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Road at Barangay San Nicolas Balas, Concepcion, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005920",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Sta. Rosa, Concepcion, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Road at Barangay Sta. Rosa, Concepcion, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005922",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Tinang, Concepcion, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Road at Barangay Tinang, Concepcion, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005924",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Tarlac City Road Network (Tibag - Sapang Maragul Section), Tarlac City, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Tarlac City Road Network (Tibag - Sapang Maragul Section), Tarlac City, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005925",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Victoria Road Network (Balbaloto - Bantog Section), Victoria, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Victoria Road Network (Balbaloto - Bantog Section), Victoria, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005926",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Victoria Road Network (Lalapac - Balayang Section), Victoria, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Victoria Road Network (Lalapac - Balayang Section), Victoria, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005928",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Tarlac City Road Network (Baras-Baras Mapalad Section)Tarlac City, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation/Improvement of Tarlac City Road Network (Baras-Baras Mapalad Section)Tarlac City, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005929",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Victoria Road Network (Section 3), Victoria, Tarlac",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation/Improvement of Victoria Road Network (Section 3), Victoria, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0424-005933",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Anabu Bypass Road, Sta. 00 + 000 - Sta. 00 + 854, Imus, Cavite",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.854,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 117096018.74,
      "lengthMeters": 854.0,
      "allocationPerStatedMeter": 117096.02,
      "rangesMeters": [
        [
          0.0,
          854.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Construction of Anabu Bypass Road, Sta. 00 + 000 - Sta. 00 + 854, Imus, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 6.02,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0424-005934",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road to Trading Post (Quezon Coffee Belt), Sta. 11 + 934 - Sta. 12 + 644, Quezon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.71,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 140845070.42,
      "lengthMeters": 710.0,
      "allocationPerStatedMeter": 140845.07,
      "rangesMeters": [
        [
          11934.0,
          12644.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Construction of Access Road to Trading Post (Quezon Coffee Belt), Sta. 11 + 934 - Sta. 12 + 644, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 5.75,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0424-005935",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Tagabas Ibaba - Barangay Doongan Ilaya, Catanauan, Quezon, Sta. 2+000 - Sta. 5+000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          2000.0,
          5000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Construction of Access Road, Barangay Tagabas Ibaba - Barangay Doongan Ilaya, Catanauan, Quezon, Sta. 2+000 - Sta. 5+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.06,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0424-005936",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Caigdal - Barangay San Roque, Unisan, Quezon, Sta. 0+000 - Sta. 3+000 Construction of Bridge along Barangay San Benito-San Isidro Road including Road",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Construction of Road, Barangay Caigdal - Barangay San Roque, Unisan, Quezon, Sta. 0+000 - Sta. 3+000 Construction of Bridge along Barangay San Benito-San Isidro Road including Road",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0424-005938",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ibabang Pacatin - Barangay Ibabang Soliyao, Pitogo, Quezon, Sta. 0 + 000 - Sta. 3 + 000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          0.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Construction of Road, Barangay Ibabang Pacatin - Barangay Ibabang Soliyao, Pitogo, Quezon, Sta. 0 + 000 - Sta. 3 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.06,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0424-005939",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mabini - Barangay Bonifacio, Unisan, Quezon, Sta. 0 + 000 - Sta. 3 + 000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          0.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Construction of Road, Barangay Mabini - Barangay Bonifacio, Unisan, Quezon, Sta. 0 + 000 - Sta. 3 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.06,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0424-005940",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mairok Ibaba - Barangay Mairok Ilaya, Unisan, Quezon, Sta. 0 + 000 - Sta. 3 + 000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          0.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Construction of Road, Barangay Mairok Ibaba - Barangay Mairok Ilaya, Unisan, Quezon, Sta. 0 + 000 - Sta. 3 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.06,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0424-005941",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Rizal Ilaya - Barangay Rizal Ibaba, Unisan, Quezon, Sta. 3+700 - Sta. 6+700",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          3700.0,
          6700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Construction of Road, Barangay Rizal Ilaya - Barangay Rizal Ibaba, Unisan, Quezon, Sta. 3+700 - Sta. 6+700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.06,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0424-005942",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Silangang Maligaya-Dayap-Kanlurang Maligaya, Agdangan, Quezon, Sta. 3+000 - Sta. 6+000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          3000.0,
          6000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Construction of Road, Barangay Silangang Maligaya-Dayap-Kanlurang Maligaya, Agdangan, Quezon, Sta. 3+000 - Sta. 6+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.06,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0424-005943",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sildora - Barangay Salvacion, Agdangan, Quezon, Sta. 3 + 900 - Sta. 6 + 900",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          3900.0,
          6900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Construction of Road, Barangay Sildora - Barangay Salvacion, Agdangan, Quezon, Sta. 3 + 900 - Sta. 6 + 900",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.06,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0424-005944",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of San Francisco - San Andres Road, Barangay Pansoy, San Andres, Quezon, Sta. 8+900 - Sta. 10+300, Sta. 11+200 - Sta. 11+980, Sta. 14+550 - Sta. 15+170",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 35714285.71,
      "lengthMeters": 2800.0,
      "allocationPerStatedMeter": 35714.29,
      "rangesMeters": [
        [
          8900.0,
          10300.0
        ],
        [
          11200.0,
          11980.0
        ],
        [
          14550.0,
          15170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Construction of San Francisco - San Andres Road, Barangay Pansoy, San Andres, Quezon, Sta. 8+900 - Sta. 10+300, Sta. 11+200 - Sta. 11+980, Sta. 14+550 - Sta. 15+170",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.14,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0424-005945",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of San Francisco - San Andres Road, Barangay Sto. Niño - Barangay Mabunga, San Francisco, Quezon, Sta. 4+400 - Sta. 6+100, Sta. 7+800 - Sta. 8+900",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 35714285.71,
      "lengthMeters": 2800.0,
      "allocationPerStatedMeter": 35714.29,
      "rangesMeters": [
        [
          4400.0,
          6100.0
        ],
        [
          7800.0,
          8900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Construction of San Francisco - San Andres Road, Barangay Sto. Niño - Barangay Mabunga, San Francisco, Quezon, Sta. 4+400 - Sta. 6+100, Sta. 7+800 - Sta. 8+900",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.14,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0425-005954",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Contruction and Improvement of Road and Drainage System, Kingsville Subdivision, Barangay Mayamot, Antipolo City",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Contruction and Improvement of Road and Drainage System, Kingsville Subdivision, Barangay Mayamot, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0425-005956",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Malitlit-Asia Brewery Road (Cabstar), Phase 1, Barangay Malitlit, City of Santa Rosa, Laguna Sta. 0+000 - 1+800",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55555555.56,
      "lengthMeters": 1800.0,
      "allocationPerStatedMeter": 55555.56,
      "rangesMeters": [
        [
          0.0,
          1800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Improvement of Malitlit-Asia Brewery Road (Cabstar), Phase 1, Barangay Malitlit, City of Santa Rosa, Laguna Sta. 0+000 - 1+800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 2.3,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0425-005957",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge along Cabuco - Indang Diversion Road, Trece Martires City Section, Trece Martires City, Cavite",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Construction of Bridge along Cabuco - Indang Diversion Road, Trece Martires City Section, Trece Martires City, Cavite",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0425-005961",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge connecting Barangay Del Remedio and Barangay San Lucas I, San Pablo City, Laguna",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Construction of Bridge connecting Barangay Del Remedio and Barangay San Lucas I, San Pablo City, Laguna",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0425-005962",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Mabini Coastal Road, (Talaga Proper - Saguing - Gasang - Malimatoc II - Mainit), Section 2, Mabini, Batangas",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Construction of Mabini Coastal Road, (Talaga Proper - Saguing - Gasang - Malimatoc II - Mainit), Section 2, Mabini, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0425-005964",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Buenavista Bypass Road, General Trias City, Cavite",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Construction of Buenavista Bypass Road, General Trias City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005968",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Pedro - Mahacot, Batangas City",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Road, San Pedro - Mahacot, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005973",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Mabini Coastal Road, (Talaga Proper - Saguing - Gasang - Malimatoc II - Mainit), Section 1, Mabini, Batangas",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Mabini Coastal Road, (Talaga Proper - Saguing - Gasang - Malimatoc II - Mainit), Section 1, Mabini, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005974",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Mabini-Bauan-San Luis-Lemery Road, Batangas",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Mabini-Bauan-San Luis-Lemery Road, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005976",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Pag-asa - Alapan - Tinabunan Road, Sta. 00 + 805 - Sta. 01 + 610, Barangay Pag-asa - Barangay Alapan, Imus, Cavite",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.805,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 124223602.48,
      "lengthMeters": 805.0,
      "allocationPerStatedMeter": 124223.6,
      "rangesMeters": [
        [
          805.0,
          1610.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Pag-asa - Alapan - Tinabunan Road, Sta. 00 + 805 - Sta. 01 + 610, Barangay Pag-asa - Barangay Alapan, Imus, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 6.39,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0426-005977",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Poblacion Bypass Road, General Trias City, Cavite",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Poblacion Bypass Road, General Trias City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005987",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Lumbang, Lipa City, Batangas",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Road at Barangay Lumbang, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005988",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Approach of Kaibayo Bridge, Barangay 1 - Barangay 5, Catanauan, Quezon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Road with Approach of Kaibayo Bridge, Barangay 1 - Barangay 5, Catanauan, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005989",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Bridge leading to Baybay Beach, Macalelon, Quezon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Road with Bridge leading to Baybay Beach, Macalelon, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0427-005990",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Bridge, Barangay San Ignacio Ilaya - Barangay Sumilang, General Luna, Quezon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Construction of Road with Bridge, Barangay San Ignacio Ilaya - Barangay Sumilang, General Luna, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0427-005991",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Bridge, Barangay Sumag Weste - Sumag Este, Pitogo, Quezon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Construction of Road with Bridge, Barangay Sumag Weste - Sumag Este, Pitogo, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0427-005993",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bolo - Barangay Cutcutan - Barangay Gatasan - Barangay Macpac - Barangay Tuhian, Catanauan, Quezon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Construction of Road, Barangay Bolo - Barangay Cutcutan - Barangay Gatasan - Barangay Macpac - Barangay Tuhian, Catanauan, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0427-005994",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Casasahan Ibaba - Barangay Ilayang Piña - Ibabang Piña, Pitogo, Quezon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Construction of Road, Barangay Casasahan Ibaba - Barangay Ilayang Piña - Ibabang Piña, Pitogo, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0427-005996",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Carsadang Bago R1 By-Pass, Sta. 0 + 259 - Sta. 0 + 871, Kawit, Cavite",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.612,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 163398692.81,
      "lengthMeters": 612.0,
      "allocationPerStatedMeter": 163398.69,
      "rangesMeters": [
        [
          259.0,
          871.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Construction of Road, Carsadang Bago R1 By-Pass, Sta. 0 + 259 - Sta. 0 + 871, Kawit, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 6.67,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0427-006006",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Municipal Road, Poblacion, Mabini, Batangas",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Rehabilitation of Municipal Road, Poblacion, Mabini, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006015",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Marigondon Sur to Barangay Marigondon Norte Access Road, Sta. 1+700 - Sta. 3+000, Barangay Marigondon Sur, San Andres, Romblon",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 76923076.92,
      "lengthMeters": 1300.0,
      "allocationPerStatedMeter": 76923.08,
      "rangesMeters": [
        [
          1700.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Barangay Marigondon Sur to Barangay Marigondon Norte Access Road, Sta. 1+700 - Sta. 3+000, Barangay Marigondon Sur, San Andres, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 3.08,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0428-006017",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Imulnod, Brooke’s Point, Palawan",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Bridge, Barangay Imulnod, Brooke’s Point, Palawan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006021",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Salogon, Barangay Danleg, Dumaran, Palawan",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Road, Sitio Salogon, Barangay Danleg, Dumaran, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0429-006036",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Montemayor, Naujan, Oriental Mindoro",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Road, Barangay Montemayor, Naujan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0429-006046",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Canapawan, Labo, Camarines Norte Sta. 0 + 000 - Sta. 2 + 200",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45454545.45,
      "lengthMeters": 2200.0,
      "allocationPerStatedMeter": 45454.55,
      "rangesMeters": [
        [
          0.0,
          2200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Road, Barangay Canapawan, Labo, Camarines Norte Sta. 0 + 000 - Sta. 2 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.88,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0429-006047",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Guinacutan, Labo, Camarines Norte Sta. 0 + 000 - Sta. 2 + 200",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45454545.45,
      "lengthMeters": 2200.0,
      "allocationPerStatedMeter": 45454.55,
      "rangesMeters": [
        [
          0.0,
          2200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Road, Barangay Guinacutan, Labo, Camarines Norte Sta. 0 + 000 - Sta. 2 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.88,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0429-006048",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Maot, Labo, Camarines Norte Sta. 0 + 000 - Sta. 2 + 200",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45454545.45,
      "lengthMeters": 2200.0,
      "allocationPerStatedMeter": 45454.55,
      "rangesMeters": [
        [
          0.0,
          2200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Road, Barangay Maot, Labo, Camarines Norte Sta. 0 + 000 - Sta. 2 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.88,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0429-006049",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Benguet, Barangay Magsaysay, Capalonga, Camarines Norte Sta. 0 + 000 - Sta. 2 + 200",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45454545.45,
      "lengthMeters": 2200.0,
      "allocationPerStatedMeter": 45454.55,
      "rangesMeters": [
        [
          0.0,
          2200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Road, Sitio Benguet, Barangay Magsaysay, Capalonga, Camarines Norte Sta. 0 + 000 - Sta. 2 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.88,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0431-006077",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Network at Bicol Medical Center Compound, Barangay Cadlan, Pili, Camarines Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road Network at Bicol Medical Center Compound, Barangay Cadlan, Pili, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0432-006105",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sibujo-Tampuhan Road, Sta 0+000 - Sta. 0+470; Sta. 0+570 - Sta. 2+400, Baragay Sibujo to Barangay Tampuhan, Libmanan, Camarines Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          470.0
        ],
        [
          570.0,
          2400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Construction of Sibujo-Tampuhan Road, Sta 0+000 - Sta. 0+470; Sta. 0+570 - Sta. 2+400, Baragay Sibujo to Barangay Tampuhan, Libmanan, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0432-006112",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Caroyroyan, Pili, Camarines Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Construction of Road, Barangay Caroyroyan, Pili, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0433-006117",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Maabay to Dasal Road, Sta. 4 + 367.50 - Sta. 6 + 564.5, Sta. 6 + 828.5 - Sta. 7 + 156, Barangay Maabay and Barangay Dasal, Sibunag, Guimaras",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.5245,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 39611804.32,
      "lengthMeters": 2524.5,
      "allocationPerStatedMeter": 39611.8,
      "rangesMeters": [
        [
          4367.5,
          6564.5
        ],
        [
          6828.5,
          7156.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Maabay to Dasal Road, Sta. 4 + 367.50 - Sta. 6 + 564.5, Sta. 6 + 828.5 - Sta. 7 + 156, Barangay Maabay and Barangay Dasal, Sibunag, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.26,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0433-006128",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Biao, Binalbagan, Negros Occidental",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Bridge, Barangay Biao, Binalbagan, Negros Occidental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0434-006135",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 1 + 229- Sta. 7+ 759) at Monarch and PLDT Tower, Barangay Canlandog, Murcia, Negros Occidental (10.6092520, 10.6092520)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 6.53,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15313935.68,
      "lengthMeters": 6530.0,
      "allocationPerStatedMeter": 15313.94,
      "rangesMeters": [
        [
          1229.0,
          7759.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Road (Sta. 1 + 229- Sta. 7+ 759) at Monarch and PLDT Tower, Barangay Canlandog, Murcia, Negros Occidental (10.6092520, 10.6092520)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.49,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0434-006145",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 2+360-Sta. 3+200, Sitio Antuanga, Barangay Quiot to Sitio Badiang, Barangay Toong Cebu City, Cebu",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.84,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 119047619.05,
      "lengthMeters": 840.0,
      "allocationPerStatedMeter": 119047.62,
      "rangesMeters": [
        [
          2360.0,
          3200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Road, Sta. 2+360-Sta. 3+200, Sitio Antuanga, Barangay Quiot to Sitio Badiang, Barangay Toong Cebu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 6.13,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0435-006155",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Package 3, Sta. 1+520.00 - 2+720.00 Sta. Barangay Pardo - Toong, Cebu City",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 83333333.33,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 83333.33,
      "rangesMeters": [
        [
          1520.0,
          2720.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of Road, Package 3, Sta. 1+520.00 - 2+720.00 Sta. Barangay Pardo - Toong, Cebu City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 3.33,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0435-006158",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of the Kanghalo-Kabatbatan Road at Barangays Kanghalo and Kabatbatan, Dumanjug, Cebu",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of the Kanghalo-Kabatbatan Road at Barangays Kanghalo and Kabatbatan, Dumanjug, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0435-006172",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Bridge, Barangay Del Pilar, Maydolong Eastern Samar, Start 125.31027778 , End 11.38722222",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of Road including Bridge, Barangay Del Pilar, Maydolong Eastern Samar, Start 125.31027778 , End 11.38722222",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0436-006176",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Campacion, Arteche - Barangay Cagpile, Oras, Eastern Samar (Sta. 0+000 - Sta. 1+300)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 76923076.92,
      "lengthMeters": 1300.0,
      "allocationPerStatedMeter": 76923.08,
      "rangesMeters": [
        [
          0.0,
          1300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Road, Barangay Campacion, Arteche - Barangay Cagpile, Oras, Eastern Samar (Sta. 0+000 - Sta. 1+300)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 3.08,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0436-006177",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Dapdap to Barangay Malaintos, Dolores, Eastern Samar (Sta. 3+550 - Sta. 5+050)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66666666.67,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 66666.67,
      "rangesMeters": [
        [
          3550.0,
          5050.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Road, Barangay Dapdap to Barangay Malaintos, Dolores, Eastern Samar (Sta. 3+550 - Sta. 5+050)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 2.76,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0436-006178",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Guibuangan - Barangay Camantang, Can-avid, Eastern Samar",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Road, Barangay Guibuangan - Barangay Camantang, Can-avid, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0436-006179",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tamoso - Barangay Bayobay, Borongan City, Eastern Samar",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Road, Barangay Tamoso - Barangay Bayobay, Borongan City, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0436-006182",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Jipapad Bridge II, Jipapad, Eastern Samar",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Jipapad Bridge II, Jipapad, Eastern Samar",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0436-006186",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Quezon to Magsaysay Road (Sta. 2+250 - Sta. 4+500), Mapanas, Northern Samar",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44444444.44,
      "lengthMeters": 2250.0,
      "allocationPerStatedMeter": 44444.44,
      "rangesMeters": [
        [
          2250.0,
          4500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Quezon to Magsaysay Road (Sta. 2+250 - Sta. 4+500), Mapanas, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.84,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0436-006187",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cagpili, Oras - Barangay Campacion, Arteche, Eastern Samar (Sta. 3+483 - Sta. 4+350)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.867,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 115340253.75,
      "lengthMeters": 867.0,
      "allocationPerStatedMeter": 115340.25,
      "rangesMeters": [
        [
          3483.0,
          4350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Road, Barangay Cagpili, Oras - Barangay Campacion, Arteche, Eastern Samar (Sta. 3+483 - Sta. 4+350)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 5.93,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0436-006188",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Danao - Barangay Beto, Taft, Eastern Samar (Sta. 0+000 - Sta. 0+800)",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 125000000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 125000.0,
      "rangesMeters": [
        [
          0.0,
          800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Road, Barangay Danao - Barangay Beto, Taft, Eastern Samar (Sta. 0+000 - Sta. 0+800)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 6.43,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0436-006190",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Tangbo, Catubig - Abaton - Bawang - San Antonio, Laoang (Sta. 0+000 - Sta. 2+338.75), Catubig and Laoang, Northern Samar",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.33875,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42757883.48,
      "lengthMeters": 2338.75,
      "allocationPerStatedMeter": 42757.88,
      "rangesMeters": [
        [
          0.0,
          2338.75
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Road, Tangbo, Catubig - Abaton - Bawang - San Antonio, Laoang (Sta. 0+000 - Sta. 2+338.75), Catubig and Laoang, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.36,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0437-006193",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Simora – Palapag Road (Sta. 11+015 - Sta. 11+568, Sta. 11+703 - Sta. 11+743.50, Sta. 11+829 - Sta. 11+950.50, Sta. 13+642.50 - Sta. 14+034, Sta. 14+362.50 - Sta. 14+502, Sta. 14+533.50 - Sta. 14+574, Sta. 14+592 - Sta. 14+650.50, Sta. 14+691 - Sta. 14+731.50, Sta. 14+767.50 - Sta. 14+821.50, Sta. 14+862 - Sta. 14+952, Sta. 15+258 - Sta. 15+280.50, Sta. 15+384 - Sta.15+402, Sta. 15+453 - Sta. 15+507, Sta. 16+006.50 - Sta. 16+020, Sta. 16+033.50 - Sta. 16+065, Sta. 16+105.50 - Sta. 16+119, Sta. 16+191 - Sta. 16+236, Sta. 16+254 - Sta. 16+281, Sta. 16+326 - Sta. 16+348.50, Sta. 16+398 - Sta. 16+443, Sta. 16+515 - Sta. 16+632, Sta. 16+641 - Sta. 16+654.50, Sta. 16+681.50 - Sta. 16+713, Sta. 16+785 - Sta. 16+812, Sta. 17+578 - Sta. 17+794), Laoang and Palapag, Northern Samar",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.227,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 44903457.57,
      "lengthMeters": 2227.0,
      "allocationPerStatedMeter": 44903.46,
      "rangesMeters": [
        [
          11015.0,
          11568.0
        ],
        [
          11703.0,
          11743.5
        ],
        [
          11829.0,
          11950.5
        ],
        [
          13642.5,
          14034.0
        ],
        [
          14362.5,
          14502.0
        ],
        [
          14533.5,
          14574.0
        ],
        [
          14592.0,
          14650.5
        ],
        [
          14691.0,
          14731.5
        ],
        [
          14767.5,
          14821.5
        ],
        [
          14862.0,
          14952.0
        ],
        [
          15258.0,
          15280.5
        ],
        [
          15384.0,
          15402.0
        ],
        [
          15453.0,
          15507.0
        ],
        [
          16006.5,
          16020.0
        ],
        [
          16033.5,
          16065.0
        ],
        [
          16105.5,
          16119.0
        ],
        [
          16191.0,
          16236.0
        ],
        [
          16254.0,
          16281.0
        ],
        [
          16326.0,
          16348.5
        ],
        [
          16398.0,
          16443.0
        ],
        [
          16515.0,
          16632.0
        ],
        [
          16641.0,
          16654.5
        ],
        [
          16681.5,
          16713.0
        ],
        [
          16785.0,
          16812.0
        ],
        [
          17578.0,
          17794.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Rehabilitation of Simora – Palapag Road (Sta. 11+015 - Sta. 11+568, Sta. 11+703 - Sta. 11+743.50, Sta. 11+829 - Sta. 11+950.50, Sta. 13+642.50 - Sta. 14+034, Sta. 14+362.50 - Sta. 14+502, Sta. 14+533.50 - Sta. 14+574, Sta. 14+592 - Sta. 14+650.50, Sta. 14+691 - Sta. 14+731.50, Sta. 14+767.50 - Sta. 14+821.50, Sta. 14+862 - Sta. 14+952, Sta. 15+258 - Sta. 15+280.50, Sta. 15+384 - Sta.15+402, Sta. 15+453 - Sta. 15+507, Sta. 16+006.50 - Sta. 16+020, Sta. 16+033.50 - Sta. 16+065, Sta. 16+105.50 - Sta. 16+119, Sta. 16+191 - Sta. 16+236, Sta. 16+254 - Sta. 16+281, Sta. 16+326 - Sta. 16+348.50, Sta. 16+398 - Sta. 16+443, Sta. 16+515 - Sta. 16+632, Sta. 16+641 - Sta. 16+654.50, Sta. 16+681.50 - Sta. 16+713, Sta. 16+785 - Sta. 16+812, Sta. 17+578 - Sta. 17+794), Laoang and Palapag, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.86,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0437-006195",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Don Perfecto, R.T. Lim- Barangay Kipit, Titay, Zamboanga Sibugay",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Construction of Access Road, Barangay Don Perfecto, R.T. Lim- Barangay Kipit, Titay, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0437-006198",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay La Union, Zamboanga del Norte",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Construction of Bridge, Barangay La Union, Zamboanga del Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0437-006199",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Niangkaan- Mantas Road, Omar, Sulu",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Construction of Niangkaan- Mantas Road, Omar, Sulu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0437-006202",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay La Union, La Libertad, Zamboanga del Norte",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Construction of Bridge, Barangay La Union, La Libertad, Zamboanga del Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0437-006203",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road in Purok 6 Barangay Milagrosa, Alicia, Zamboanga Sibugay",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Construction of Concrete Road in Purok 6 Barangay Milagrosa, Alicia, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0438-006212",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Macayas, Barangay Mandhi, Sindangan to Sitio Suminugod, Barangay Guibo, Siayan, Zamboanga del Norte",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Construction of Road, Sitio Macayas, Barangay Mandhi, Sindangan to Sitio Suminugod, Barangay Guibo, Siayan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0438-006223",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Replacement of Calaanan Steel Bridge (Sta. 0+000 - Sta. 0+040), Baranagay Canitoan, Cagayan De Oro City, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.04,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2500000000.0,
      "lengthMeters": 40.0,
      "allocationPerStatedMeter": 2500000.0,
      "rangesMeters": [
        [
          0.0,
          40.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Replacement of Calaanan Steel Bridge (Sta. 0+000 - Sta. 0+040), Baranagay Canitoan, Cagayan De Oro City, Misamis Oriental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 1.77,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0438-006224",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Bridge component, Mala-Iawasaig, Ditsaan-Ramain, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Construction of Road with Bridge component, Mala-Iawasaig, Ditsaan-Ramain, Lanao del Sur",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0439-006230",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Poblacion - Barangay Banawag, President Quirino, Sultan Kudarat, Sta. 0 + 000 - Sta. 4+ 737",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 4.737,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21110407.43,
      "lengthMeters": 4737.0,
      "allocationPerStatedMeter": 21110.41,
      "rangesMeters": [
        [
          0.0,
          4737.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Construction of Concrete Road, Poblacion - Barangay Banawag, President Quirino, Sultan Kudarat, Sta. 0 + 000 - Sta. 4+ 737",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.67,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0439-006231",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bitibut-Sapang Ama-Caluya,Sapang Dalaga, Misamis Occidental, Sta. 0 + 000 - Sta. 3 + 200",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31250000.0,
      "lengthMeters": 3200.0,
      "allocationPerStatedMeter": 31250.0,
      "rangesMeters": [
        [
          0.0,
          3200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Construction of Road, Barangay Bitibut-Sapang Ama-Caluya,Sapang Dalaga, Misamis Occidental, Sta. 0 + 000 - Sta. 3 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.99,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0439-006232",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, DiversionRoad, Oroquieta City, Misamis Occidental",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Construction of Road, DiversionRoad, Oroquieta City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0439-006233",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, BarangayUpper Potongan-Capuli-Maligubaan, Concepcion, Misamis Occidental",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Construction of Road, BarangayUpper Potongan-Capuli-Maligubaan, Concepcion, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0439-006234",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay SanIsidro-Matugas Alto- Malibacsan, Jimenez, Misamis Occidental",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Construction of Road, Barangay SanIsidro-Matugas Alto- Malibacsan, Jimenez, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0439-006240",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Molicay - Barangay Labo, Ozamiz City, Misamis Occidental",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Construction of Road, Barangay Molicay - Barangay Labo, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0439-006244",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road of Barangay Guimba, Marawi City to Pantar, Lanao del Norte",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Construction of Road of Barangay Guimba, Marawi City to Pantar, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0440-006252",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concepcion-Don Victoriano Road, Concepcion, Misamis Occidental",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Construction of Concepcion-Don Victoriano Road, Concepcion, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0440-006257",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Naga-Taraka-Corrales Road, Jimenez, Misamis Occidental",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Construction of Naga-Taraka-Corrales Road, Jimenez, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0442-006293",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Volcan, Barangay Naasag, Mambajao to Sitio Bolangon, Barangay Bonbon, Catarman, Camiguin",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Construction of Road, Sitio Volcan, Barangay Naasag, Mambajao to Sitio Bolangon, Barangay Bonbon, Catarman, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0442-006305",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Provincial Road, Ditsaan Ramain, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Rehabilitation of Provincial Road, Ditsaan Ramain, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0443-006310",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road Barangay New Cebu to Barangay Solongvale to Barangay Tanwalang, Sta. 0+000.00 - Sta. 0+248.40 & Sta. 0+760.40 - Sta. 4+312.00, Sulop, Davao del Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 26315789.47,
      "lengthMeters": 3800.0,
      "allocationPerStatedMeter": 26315.79,
      "rangesMeters": [
        [
          0.0,
          248.4
        ],
        [
          760.4,
          4312.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Concreting of Road Barangay New Cebu to Barangay Solongvale to Barangay Tanwalang, Sta. 0+000.00 - Sta. 0+248.40 & Sta. 0+760.40 - Sta. 4+312.00, Sulop, Davao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.84,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0443-006311",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road from Bonifacio to Sitio Lamblong to Lamsaging to Centro Barangay Bagong Negros, Sta. 0+000 - Sta. 3+000.00, Kiblawan, Davao del Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          0.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Concreting of Road from Bonifacio to Sitio Lamblong to Lamsaging to Centro Barangay Bagong Negros, Sta. 0+000 - Sta. 3+000.00, Kiblawan, Davao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.06,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0443-006312",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road from Purok 6 Balnate to Relocation Site, Barangay Maibo, Sta. 0+000.00 - Sta. 3+500.00, Magsaysay, Davao del Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 3500.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          3500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Concreting of Road from Purok 6 Balnate to Relocation Site, Barangay Maibo, Sta. 0+000.00 - Sta. 3+500.00, Magsaysay, Davao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.91,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0443-006313",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Purok Waling Waling, Barangay Sibayan to Sitio Balagonon, Barangay Managa, Sta. 0+000.00 - Sta. 1+622.60 & Sta. 2+011.70-Sta. 3+889.10, Bansalan, Davao del Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 3500.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          1622.6
        ],
        [
          2011.7,
          3889.1
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Concreting of Road, Purok Waling Waling, Barangay Sibayan to Sitio Balagonon, Barangay Managa, Sta. 0+000.00 - Sta. 1+622.60 & Sta. 2+011.70-Sta. 3+889.10, Bansalan, Davao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.91,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0443-006314",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road- NRJ Sibugay Circumferential Road (S01220MN), Connecting Barangay Logpond - Barangay San Vicenta - Barangay Buntong, Malangas Zamboanga Sibugay",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Construction of Concrete Road- NRJ Sibugay Circumferential Road (S01220MN), Connecting Barangay Logpond - Barangay San Vicenta - Barangay Buntong, Malangas Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0443-006316",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Purok 5 to Purok 1, Barangay Haguimitan, Monkayo, Davao de Oro Sta. 0+000 - Sta. 3+610",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.61,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27700831.02,
      "lengthMeters": 3610.0,
      "allocationPerStatedMeter": 27700.83,
      "rangesMeters": [
        [
          0.0,
          3610.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Construction of Roads, Purok 5 to Purok 1, Barangay Haguimitan, Monkayo, Davao de Oro Sta. 0+000 - Sta. 3+610",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.88,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0443-006317",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Poblacion - Barangay Pamintaran, Maragusan, Davao de Oro Section 1: Sta. 0+000 - Sta. 0+151 Section 2: Sta. 0+294 - Sta. 2+408 Section 3: Sta. 0+000 - Sta. 0+400",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 2.408,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 41528239.2,
      "lengthMeters": 2408.0,
      "allocationPerStatedMeter": 41528.24,
      "rangesMeters": [
        [
          0.0,
          151.0
        ],
        [
          294.0,
          2408.0
        ],
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Construction of Road Barangay Poblacion - Barangay Pamintaran, Maragusan, Davao de Oro Section 1: Sta. 0+000 - Sta. 0+151 Section 2: Sta. 0+294 - Sta. 2+408 Section 3: Sta. 0+000 - Sta. 0+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.32,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0443-006318",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Prosperidad - Barangay Casoon, Montevista, Davao de Oro, Sta. 0+000 - Sta. 3+550 , Sta. 0+140 - St.a 0+697, Sta. 0+000 - Sta. 1+037",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          3550.0
        ],
        [
          0.0,
          1037.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Construction of Road, Barangay Prosperidad - Barangay Casoon, Montevista, Davao de Oro, Sta. 0+000 - Sta. 3+550 , Sta. 0+140 - St.a 0+697, Sta. 0+000 - Sta. 1+037",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0443-006322",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Mapaang to Concepcion, Maco, Davao de Oro",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Construction of Road, Mapaang to Concepcion, Maco, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0445-006343",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cebulida to Barangay Bagong Silang, Laak, Davao de Oro",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Construction of Road, Barangay Cebulida to Barangay Bagong Silang, Laak, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0445-006344",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cebulida to Poblacion, Laak, Davao de Oro",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Construction of Road, Barangay Cebulida to Poblacion, Laak, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0445-006349",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Jct. National Highway (Marbel-Makar Rd) Bo.2 to San Jose - Columbio Road, Sta. 1+548 - Sta. 6+048, South Cotabato",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 4.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22222222.22,
      "lengthMeters": 4500.0,
      "allocationPerStatedMeter": 22222.22,
      "rangesMeters": [
        [
          1548.0,
          6048.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Construction of Road, Jct. National Highway (Marbel-Makar Rd) Bo.2 to San Jose - Columbio Road, Sta. 1+548 - Sta. 6+048, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.71,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0445-006354",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Datu Paglas-Columbio-Matanao Road, Sta. 11+200-Sta. 15+200, Columbio, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          11200.0,
          15200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Improvement of Datu Paglas-Columbio-Matanao Road, Sta. 11+200-Sta. 15+200, Columbio, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.79,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0445-006355",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Datu Paglas-Columbio-Matanao Road, Sta. 16+637-Sta. 20+637, Columbio, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          16637.0,
          20637.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Improvement of Datu Paglas-Columbio-Matanao Road, Sta. 16+637-Sta. 20+637, Columbio, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.79,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0445-006356",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Koronadal-Lutayan-Columbio-Matanao Road, Sta. 0+000 - Sta. 4+000, Columbio, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          4000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Improvement of Koronadal-Lutayan-Columbio-Matanao Road, Sta. 0+000 - Sta. 4+000, Columbio, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.79,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0446-006377",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge (One Lane Bridge), Barangay Bagyang, San Miguel, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Construction of Bridge (One Lane Bridge), Barangay Bagyang, San Miguel, Surigao del Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0447-006386",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Gamut - Unidad - Sua, Unidad Road Section, Sta. 2+980 - Sta. 6+140, Barobo, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.16,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31645569.62,
      "lengthMeters": 3160.0,
      "allocationPerStatedMeter": 31645.57,
      "rangesMeters": [
        [
          2980.0,
          6140.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "447",
      "lengthEvidence": "Construction of Gamut - Unidad - Sua, Unidad Road Section, Sta. 2+980 - Sta. 6+140, Barobo, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.01,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0447-006389",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Jct Sering-Calangugan Road, Socorro, Surigao del Norte 0+000 - 3+000",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          0.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "447",
      "lengthEvidence": "Construction of Jct Sering-Calangugan Road, Socorro, Surigao del Norte 0+000 - 3+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.06,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0447-006390",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Jct. Cabadbaran - Puting Bato - Lanuza Road to Barangay Pakwan (Sta. 2+046.5 -Sta. 6+146.5), Lanuza, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 4.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24390243.9,
      "lengthMeters": 4100.0,
      "allocationPerStatedMeter": 24390.24,
      "rangesMeters": [
        [
          2046.5,
          6146.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "447",
      "lengthEvidence": "Construction of Jct. Cabadbaran - Puting Bato - Lanuza Road to Barangay Pakwan (Sta. 2+046.5 -Sta. 6+146.5), Lanuza, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.78,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0447-006393",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Barangay Carpenito to Barangay Lago, Tagbina, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "447",
      "lengthEvidence": "Construction of Road from Barangay Carpenito to Barangay Lago, Tagbina, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0447-006394",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Barangay Mahayahay to Barangay Handamayan, Sta. 4+900 - Sta 6+288, Sta. 6+528.7 - Sta 6+958.2, Sta. 7+078.4 - Sta 8+760.9, Lingig, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 3.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 3500.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          4900.0,
          6288.0
        ],
        [
          6528.7,
          6958.2
        ],
        [
          7078.4,
          8760.9
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "447",
      "lengthEvidence": "Construction of Road from Barangay Mahayahay to Barangay Handamayan, Sta. 4+900 - Sta 6+288, Sta. 6+528.7 - Sta 6+958.2, Sta. 7+078.4 - Sta 8+760.9, Lingig, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.91,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0447-006395",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Barangay Maligaya to Barangay Tagbobonga, Hinatuan, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "447",
      "lengthEvidence": "Construction of Road from Barangay Maligaya to Barangay Tagbobonga, Hinatuan, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0613-009918",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, (Barangay Mitugas - Gala Road), Sta. 0+000 - Sta. 1+500, Tudela, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 100000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66666666.67,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 66666.67,
      "rangesMeters": [
        [
          0.0,
          1500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Construction of Road, (Barangay Mitugas - Gala Road), Sta. 0+000 - Sta. 1+500, Tudela, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 2.76,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0629-010227",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Mahatao Coastal Road (Sta. 0 + 292 - Sta. 0 + 362), Mahatao, Batanes",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 0.07,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1428571428.57,
      "lengthMeters": 70.0,
      "allocationPerStatedMeter": 1428571.43,
      "rangesMeters": [
        [
          292.0,
          362.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "629",
      "lengthEvidence": "Construction of Mahatao Coastal Road (Sta. 0 + 292 - Sta. 0 + 362), Mahatao, Batanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0629-010233",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Coastal Bypass Road Barangay Bug-ong - Poblacion Mambajao, Camiguin, (Bug-ong to Kuguita Section), Sta. 0+000 - Sta. 1+200",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 83333333.33,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 83333.33,
      "rangesMeters": [
        [
          0.0,
          1200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "629",
      "lengthEvidence": "Construction of Coastal Bypass Road Barangay Bug-ong - Poblacion Mambajao, Camiguin, (Bug-ong to Kuguita Section), Sta. 0+000 - Sta. 1+200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0629-010234",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Coastal Bypass Road Barangay Bug-ong - Poblacion, Mambajao, Camiguin, (Kuguita to Baylao Section), Sta. 1+200 - Sta. 2+400",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 83333333.33,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 83333.33,
      "rangesMeters": [
        [
          1200.0,
          2400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "629",
      "lengthEvidence": "Construction of Coastal Bypass Road Barangay Bug-ong - Poblacion, Mambajao, Camiguin, (Kuguita to Baylao Section), Sta. 1+200 - Sta. 2+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0629-010235",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Coastal Bypass Road, Barangay Bug-ong to Poblacion Mambajao, Camiguin (Baylao-Poblacion Section) Sta. 2 + 400 - Sta. 3 + 600",
      "office": "Central Office",
      "amountPesos": 100000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 83333333.33,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 83333.33,
      "rangesMeters": [
        [
          2400.0,
          3600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "629",
      "lengthEvidence": "Construction of Coastal Bypass Road, Barangay Bug-ong to Poblacion Mambajao, Camiguin (Baylao-Poblacion Section) Sta. 2 + 400 - Sta. 3 + 600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0416-005783",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Palao-Calaba Bypass Road - Sta. 0+000-Sta. 1+780, Bangued, Abra",
      "office": "Central Office",
      "amountPesos": 99945000,
      "lengthKm": 1.78,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 56148876.4,
      "lengthMeters": 1780.0,
      "allocationPerStatedMeter": 56148.88,
      "rangesMeters": [
        [
          0.0,
          1780.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Palao-Calaba Bypass Road - Sta. 0+000-Sta. 1+780, Bangued, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 2.33,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0141-000596",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Bagong Silang-Capalonga Rd - K0324 + 573 - K0327 + 986",
      "office": "Central Office",
      "amountPesos": 99600000,
      "lengthKm": 3.413,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29182537.36,
      "lengthMeters": 3413.0,
      "allocationPerStatedMeter": 29182.54,
      "rangesMeters": [
        [
          324573.0,
          327986.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Bagong Silang-Capalonga Rd - K0324 + 573 - K0327 + 986",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 1.76,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0141-000597",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Bagong Silang-Capalonga Rd - K0327 + 986 - K0331 + 181",
      "office": "Central Office",
      "amountPesos": 99600000,
      "lengthKm": 3.195,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31173708.92,
      "lengthMeters": 3195.0,
      "allocationPerStatedMeter": 31173.71,
      "rangesMeters": [
        [
          327986.0,
          331181.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Bagong Silang-Capalonga Rd - K0327 + 986 - K0331 + 181",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 1.88,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0412-005702",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Atis St. (Chainage 0+000 - Chainage 0+144), Dalanghita St. (Chainage 0+000 - Chainage 156.50), Dayap St. (Chainage 0+000 - Chainage 0+179), Durian St. (Chainage 0+000 - Chainage 0+212) at Barangay Sta. Monica, Quezon City",
      "office": "Central Office",
      "amountPesos": 99576000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "412",
      "lengthEvidence": "Construction of Road and Drainage at Atis St. (Chainage 0+000 - Chainage 0+144), Dalanghita St. (Chainage 0+000 - Chainage 156.50), Dayap St. (Chainage 0+000 - Chainage 0+179), Durian St. (Chainage 0+000 - Chainage 0+212) at Barangay Sta. Monica, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0446-006365",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Esperanza - Lebak Bypass Road (Lebak Section) - Sta. 47 + 331 - Sta. 50 + 353, Lebak, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 99237000,
      "lengthKm": 3.022,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32838186.63,
      "lengthMeters": 3022.0,
      "allocationPerStatedMeter": 32838.19,
      "rangesMeters": [
        [
          47331.0,
          50353.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Construction of Esperanza - Lebak Bypass Road (Lebak Section) - Sta. 47 + 331 - Sta. 50 + 353, Lebak, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.04,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0216-001930",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tuguegarao West Diversion Road (Sta. 1+800 - Sta. 1+989.19), Cagayan",
      "office": "Central Office",
      "amountPesos": 99150000,
      "lengthKm": 0.18919000000000005,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 524076325.39,
      "lengthMeters": 189.19,
      "allocationPerStatedMeter": 524076.33,
      "rangesMeters": [
        [
          1800.0,
          1989.19
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Tuguegarao West Diversion Road (Sta. 1+800 - Sta. 1+989.19), Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 2.5,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0216-001931",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tuguegarao West Diversion Road (Sta. 5+520 - Sta. 5+744.04), Tuguegarao City, Cagayan",
      "office": "Central Office",
      "amountPesos": 99150000,
      "lengthKm": 0.22403999999999996,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 442554900.91,
      "lengthMeters": 224.04,
      "allocationPerStatedMeter": 442554.9,
      "rangesMeters": [
        [
          5520.0,
          5744.04
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Tuguegarao West Diversion Road (Sta. 5+520 - Sta. 5+744.04), Tuguegarao City, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 2.11,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0124-000261",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0230 + 000 - K0232 + 000",
      "office": "Central Office",
      "amountPesos": 99100000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49550000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 49550.0,
      "rangesMeters": [
        [
          230000.0,
          232000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0230 + 000 - K0232 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.62,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0127-000310",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0171 + 000 - K0175 + 194, K0188 + 842 - K0190 + 208",
      "office": "Central Office",
      "amountPesos": 99034000,
      "lengthKm": 5.56,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 17811870.5,
      "lengthMeters": 5560.0,
      "allocationPerStatedMeter": 17811.87,
      "rangesMeters": [
        [
          171000.0,
          175194.0
        ],
        [
          188842.0,
          190208.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0171 + 000 - K0175 + 194, K0188 + 842 - K0190 + 208",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.08,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0116-000109",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Linamon-Zamboanga Rd - K1618 + 000 - K1618 + 665, K1618 + 709 - K1620 + 000",
      "office": "Central Office",
      "amountPesos": 98594000,
      "lengthKm": 1.956,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 50405930.47,
      "lengthMeters": 1956.0,
      "allocationPerStatedMeter": 50405.93,
      "rangesMeters": [
        [
          1618000.0,
          1618665.0
        ],
        [
          1618709.0,
          1620000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Linamon-Zamboanga Rd - K1618 + 000 - K1618 + 665, K1618 + 709 - K1620 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.34,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0117-000124",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1656 + 000 - K1658 + 000",
      "office": "Central Office",
      "amountPesos": 98500000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49250000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 49250.0,
      "rangesMeters": [
        [
          1656000.0,
          1658000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1656 + 000 - K1658 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.31,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0260-002695",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Buluan Br. (B02157MN) along Kidapawan-Allah Junction Rd",
      "office": "Central Office",
      "amountPesos": 98050000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Buluan Br. (B02157MN) along Kidapawan-Allah Junction Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0125-000278",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sn Francisco-Sn Andres-Sn Narciso Rd - K0382 + 000 - K0384 + 000",
      "office": "Central Office",
      "amountPesos": 98000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 49000.0,
      "rangesMeters": [
        [
          382000.0,
          384000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Sn Francisco-Sn Andres-Sn Narciso Rd - K0382 + 000 - K0384 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.6,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0421-005888",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage along Barangay San Nicolas II to Barangay San Agustin, Magalang, Pampanga, Sta. 0+000 - Sta. 3+000 & Sta. 0+000 - Sta. 2+800",
      "office": "Central Office",
      "amountPesos": 98000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 32666666.67,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 32666.67,
      "rangesMeters": [
        [
          0.0,
          3000.0
        ],
        [
          0.0,
          2800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Construction of Road and Drainage along Barangay San Nicolas II to Barangay San Agustin, Magalang, Pampanga, Sta. 0+000 - Sta. 3+000 & Sta. 0+000 - Sta. 2+800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.04,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0422-005889",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage along Barangay San Roque to Barangay Sto. Rosario, Magalang, Pampanga, Sta. 0+000 - Sta. 1+530, Sta. 0+000 - Sta. 1+340 & Sta. 0+000 - Sta. 1+800",
      "office": "Central Office",
      "amountPesos": 98000000,
      "lengthKm": 1.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 54444444.44,
      "lengthMeters": 1800.0,
      "allocationPerStatedMeter": 54444.44,
      "rangesMeters": [
        [
          0.0,
          1530.0
        ],
        [
          0.0,
          1340.0
        ],
        [
          0.0,
          1800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Construction of Road and Drainage along Barangay San Roque to Barangay Sto. Rosario, Magalang, Pampanga, Sta. 0+000 - Sta. 1+530, Sta. 0+000 - Sta. 1+340 & Sta. 0+000 - Sta. 1+800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 2.26,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0431-006076",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road leading to Pantao-Sitio Pentason-Cadawag, Libon and Oas, Albay. Sta 0+000.00 - Sta. 2+300.00",
      "office": "Central Office",
      "amountPesos": 98000000,
      "lengthKm": 2.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42608695.65,
      "lengthMeters": 2300.0,
      "allocationPerStatedMeter": 42608.7,
      "rangesMeters": [
        [
          0.0,
          2300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road leading to Pantao-Sitio Pentason-Cadawag, Libon and Oas, Albay. Sta 0+000.00 - Sta. 2+300.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.77,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0436-006174",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure, Barangay Mabuhay - Barangay Bana- ao, Sta. 1+260 - Sta. 1+705, Sta. 5+000 - Sta. 5+081, Sta. 5+860 - Sta. 5+977, Sta. 6+071 - Sta. 6+107, Sta. 7+162 - Sta. 7 + 233, Sta. Margarita, Samar",
      "office": "Central Office",
      "amountPesos": 98000000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 130666666.67,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 130666.67,
      "rangesMeters": [
        [
          1260.0,
          1705.0
        ],
        [
          5000.0,
          5081.0
        ],
        [
          5860.0,
          5977.0
        ],
        [
          6071.0,
          6107.0
        ],
        [
          7162.0,
          7233.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Road Slope Protection Structure, Barangay Mabuhay - Barangay Bana- ao, Sta. 1+260 - Sta. 1+705, Sta. 5+000 - Sta. 5+081, Sta. 5+860 - Sta. 5+977, Sta. 6+071 - Sta. 6+107, Sta. 7+162 - Sta. 7 + 233, Sta. Margarita, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 6.72,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0447-006387",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Jct Sta Cruz to Sitio Buajahan Road, Sta Cruz, Socorro, Surigao del Norte (0+000-3+260)",
      "office": "Central Office",
      "amountPesos": 98000000,
      "lengthKm": 3.26,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30061349.69,
      "lengthMeters": 3260.0,
      "allocationPerStatedMeter": 30061.35,
      "rangesMeters": [
        [
          0.0,
          3260.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "447",
      "lengthEvidence": "Construction of Jct Sta Cruz to Sitio Buajahan Road, Sta Cruz, Socorro, Surigao del Norte (0+000-3+260)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.96,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0447-006388",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Jct Dagatan to Sitio Inayaran Road, Sudlon, Socorro, Surigao del Norte (0+000-3+260)",
      "office": "Central Office",
      "amountPesos": 98000000,
      "lengthKm": 3.26,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30061349.69,
      "lengthMeters": 3260.0,
      "allocationPerStatedMeter": 30061.35,
      "rangesMeters": [
        [
          0.0,
          3260.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "447",
      "lengthEvidence": "Construction of Jct Dagatan to Sitio Inayaran Road, Sudlon, Socorro, Surigao del Norte (0+000-3+260)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.96,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0447-006396",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Roque-Tugbungan, Socorro, Surigao del Norte (0+000 - 2+800)",
      "office": "Central Office",
      "amountPesos": 98000000,
      "lengthKm": 2.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35000000.0,
      "lengthMeters": 2800.0,
      "allocationPerStatedMeter": 35000.0,
      "rangesMeters": [
        [
          0.0,
          2800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "447",
      "lengthEvidence": "Construction of Road, Barangay San Roque-Tugbungan, Socorro, Surigao del Norte (0+000 - 2+800)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.11,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0261-002706",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Mabuhay Br. (B00852MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "office": "Central Office",
      "amountPesos": 97680000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Mabuhay Br. (B00852MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0446-006375",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Replacement of Bridge, Barangay Rang-Ay, Banga, South Cotabato",
      "office": "Central Office",
      "amountPesos": 97500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Replacement of Bridge, Barangay Rang-Ay, Banga, South Cotabato",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0224-002092",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tacloban-Sta Fe-San Miguel Road (Sta. 3 + 350 - Sta. 3+600, Sta. 9+292 - Sta. 9+712), San Miguel, Leyte",
      "office": "Central Office",
      "amountPesos": 97355000,
      "lengthKm": 0.67,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 145305970.15,
      "lengthMeters": 670.0,
      "allocationPerStatedMeter": 145305.97,
      "rangesMeters": [
        [
          3350.0,
          3600.0
        ],
        [
          9292.0,
          9712.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Tacloban-Sta Fe-San Miguel Road (Sta. 3 + 350 - Sta. 3+600, Sta. 9+292 - Sta. 9+712), San Miguel, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 1.07,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0124-000267",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Lopez Bypass Rd - K0219 + 959 - K0220 + 719",
      "office": "Central Office",
      "amountPesos": 97000000,
      "lengthKm": 0.76,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 127631578.95,
      "lengthMeters": 760.0,
      "allocationPerStatedMeter": 127631.58,
      "rangesMeters": [
        [
          219959.0,
          220719.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Lopez Bypass Rd - K0219 + 959 - K0220 + 719",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 3.96,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0432-006098",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Macabugos-Tambo Road, Libon, Albay, Sta 0+000.00 - Sta. 2+160.000",
      "office": "Central Office",
      "amountPesos": 97000000,
      "lengthKm": 2.16,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44907407.41,
      "lengthMeters": 2160.0,
      "allocationPerStatedMeter": 44907.41,
      "rangesMeters": [
        [
          0.0,
          2160.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Construction of Road, Macabugos-Tambo Road, Libon, Albay, Sta 0+000.00 - Sta. 2+160.000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.86,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0114-000069",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Palo-Carigara-Ormoc Rd - K1004 + 000 - K1006 + 000",
      "office": "Central Office",
      "amountPesos": 96900000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 48450000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 48450.0,
      "rangesMeters": [
        [
          1004000.0,
          1006000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Palo-Carigara-Ormoc Rd - K1004 + 000 - K1006 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.29,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0252-002552",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Jct Logac-Lasam-Gagabutan Rd - K0716 + 265 - K0717 + 027, K0720 + 028 - K0720 + 682, K0724 + 810 - K0725 + 456, K0729 + 210 - K0733 + 631, K0734 + 000 - K0734 + 700, K0735 + 008 - K0735 + 600 (Off-Carriageway Improvement: Paving of Shoulders)",
      "office": "Central Office",
      "amountPesos": 96718000,
      "lengthKm": 7.775,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 12439614.15,
      "lengthMeters": 7775.0,
      "allocationPerStatedMeter": 12439.61,
      "rangesMeters": [
        [
          716265.0,
          717027.0
        ],
        [
          720028.0,
          720682.0
        ],
        [
          724810.0,
          725456.0
        ],
        [
          729210.0,
          733631.0
        ],
        [
          734000.0,
          734700.0
        ],
        [
          735008.0,
          735600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "252",
      "lengthEvidence": "Jct Logac-Lasam-Gagabutan Rd - K0716 + 265 - K0717 + 027, K0720 + 028 - K0720 + 682, K0724 + 810 - K0725 + 456, K0729 + 210 - K0733 + 631, K0734 + 000 - K0734 + 700, K0735 + 008 - K0735 + 600 (Off-Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 1.26,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0156-000886",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Catanduanes Cir Rd - K0039 + 565 - K0042 + 000",
      "office": "Central Office",
      "amountPesos": 96680000,
      "lengthKm": 2.435,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39704312.11,
      "lengthMeters": 2435.0,
      "allocationPerStatedMeter": 39704.31,
      "rangesMeters": [
        [
          39565.0,
          42000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "Catanduanes Cir Rd - K0039 + 565 - K0042 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 1.77,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0183-001330",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Dr Damian Reyes Rd (Boac Side) - K0010 + 225 - K0010 + 276, K0010 + 520 - K0010 + 580",
      "office": "Central Office",
      "amountPesos": 96600000,
      "lengthKm": 0.111,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 870270270.27,
      "lengthMeters": 111.0,
      "allocationPerStatedMeter": 870270.27,
      "rangesMeters": [
        [
          10225.0,
          10276.0
        ],
        [
          10520.0,
          10580.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Dr Damian Reyes Rd (Boac Side) - K0010 + 225 - K0010 + 276, K0010 + 520 - K0010 + 580",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 2.33,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0234-002259",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
      "office": "Central Office",
      "amountPesos": 96579000,
      "lengthKm": 13.105,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 7369629.91,
      "lengthMeters": 13105.0,
      "allocationPerStatedMeter": 7369.63,
      "rangesMeters": [
        [
          5182.0,
          17780.0
        ],
        [
          24980.0,
          25487.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.17,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0111-000018",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Santiago-Tuguegarao Rd - K0328+ (-687) - K0328+000, K0328+956 - K0329+923, K0331+684 - K0331+757",
      "office": "Central Office",
      "amountPesos": 96208000,
      "lengthKm": 1.727,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 55708164.45,
      "lengthMeters": 1727.0,
      "allocationPerStatedMeter": 55708.16,
      "rangesMeters": [
        [
          327313.0,
          328000.0
        ],
        [
          328956.0,
          329923.0
        ],
        [
          331684.0,
          331757.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Santiago-Tuguegarao Rd - K0328+ (-687) - K0328+000, K0328+956 - K0329+923, K0331+684 - K0331+757",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.49,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0175-001200",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "P Burgos-Pototanin Jct - K0153 + (-700) - K0153 + 228",
      "office": "Central Office",
      "amountPesos": 96000000,
      "lengthKm": 0.928,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 103448275.86,
      "lengthMeters": 928.0,
      "allocationPerStatedMeter": 103448.28,
      "rangesMeters": [
        [
          152300.0,
          153228.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "P Burgos-Pototanin Jct - K0153 + (-700) - K0153 + 228",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 1.0,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0434-006142",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Sabang, Olango Island to Pangan-an Island, Lapu- Lapu City, Cebu",
      "office": "Central Office",
      "amountPesos": 96000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Bridge, Barangay Sabang, Olango Island to Pangan-an Island, Lapu- Lapu City, Cebu",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0175-001189",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0271 + 250 - K0271 + 386, K0271 + 831 - K0271 + 931",
      "office": "Central Office",
      "amountPesos": 95900000,
      "lengthKm": 0.236,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 406355932.2,
      "lengthMeters": 236.0,
      "allocationPerStatedMeter": 406355.93,
      "rangesMeters": [
        [
          271250.0,
          271386.0
        ],
        [
          271831.0,
          271931.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0271 + 250 - K0271 + 386, K0271 + 831 - K0271 + 931",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 2.25,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0175-001191",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Gumaca - Pitogo - Mulanay - San Narciso Road, Quezon - K0271 + 250 - K0271 + 386, K0271 + 831 - K0271 + 931",
      "office": "Central Office",
      "amountPesos": 95900000,
      "lengthKm": 0.236,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 406355932.2,
      "lengthMeters": 236.0,
      "allocationPerStatedMeter": 406355.93,
      "rangesMeters": [
        [
          271250.0,
          271386.0
        ],
        [
          271831.0,
          271931.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "Gumaca - Pitogo - Mulanay - San Narciso Road, Quezon - K0271 + 250 - K0271 + 386, K0271 + 831 - K0271 + 931",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 2.25,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0176-001205",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Sibuyan Circumferential Rd - K0050 + 300 - K0050 + 400",
      "office": "Central Office",
      "amountPesos": 95780000,
      "lengthKm": 0.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 957800000.0,
      "lengthMeters": 100.0,
      "allocationPerStatedMeter": 957800.0,
      "rangesMeters": [
        [
          50300.0,
          50400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Sibuyan Circumferential Rd - K0050 + 300 - K0050 + 400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 3.18,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0116-000107",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Linamon-Zamboanga Rd - K1600 + 161 - K1602 + 000",
      "office": "Central Office",
      "amountPesos": 95608000,
      "lengthKm": 1.839,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51989124.52,
      "lengthMeters": 1839.0,
      "allocationPerStatedMeter": 51989.12,
      "rangesMeters": [
        [
          1600161.0,
          1602000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Linamon-Zamboanga Rd - K1600 + 161 - K1602 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.39,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0176-001208",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Catarman-Calbayog Rd - K0752 + 510 - K0752 + 540, K0753 + 200 - K0753 + 366, K0753 + 773 - K0753 + 848, K0762 + 672 - K0762 + 689",
      "office": "Central Office",
      "amountPesos": 95501000,
      "lengthKm": 0.288,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 331600694.44,
      "lengthMeters": 288.0,
      "allocationPerStatedMeter": 331600.69,
      "rangesMeters": [
        [
          752510.0,
          752540.0
        ],
        [
          753200.0,
          753366.0
        ],
        [
          753773.0,
          753848.0
        ],
        [
          762672.0,
          762689.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Catarman-Calbayog Rd - K0752 + 510 - K0752 + 540, K0753 + 200 - K0753 + 366, K0753 + 773 - K0753 + 848, K0762 + 672 - K0762 + 689",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 1.84,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0205-001714",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Banisilan-Guiling-Alamada-Libungan Rd - K1663 + 000 - K1665 + 000",
      "office": "Central Office",
      "amountPesos": 95471000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 47735500.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 47735.5,
      "rangesMeters": [
        [
          1663000.0,
          1665000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Banisilan-Guiling-Alamada-Libungan Rd - K1663 + 000 - K1665 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 1.67,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0149-000746",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0124 + (-655) - K0124 + 000, K0125 + 413 - K0126 + 000, K0126 + 360 - K0127 + 000",
      "office": "Central Office",
      "amountPesos": 95349000,
      "lengthKm": 1.882,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 50663655.69,
      "lengthMeters": 1882.0,
      "allocationPerStatedMeter": 50663.66,
      "rangesMeters": [
        [
          123345.0,
          124000.0
        ],
        [
          125413.0,
          126000.0
        ],
        [
          126360.0,
          127000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "149",
      "lengthEvidence": "Maharlika Highway (LZ) - K0124 + (-655) - K0124 + 000, K0125 + 413 - K0126 + 000, K0126 + 360 - K0127 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 2.02,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0412-005705",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Lanzones St. (Chainage 0+000 - Chainage 0+314.50), Macopa St. (Chainage 0+000 - Chainage 0+121), Mabolo St. (Chainage 0+000 - Chainage 0+108) and Langka St. (Chainage 0+000 - Chainage 0+118) at Barangay Sta. Monica, Quezon City",
      "office": "Central Office",
      "amountPesos": 95256000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "412",
      "lengthEvidence": "Construction of Road and Drainage at Lanzones St. (Chainage 0+000 - Chainage 0+314.50), Macopa St. (Chainage 0+000 - Chainage 0+121), Mabolo St. (Chainage 0+000 - Chainage 0+108) and Langka St. (Chainage 0+000 - Chainage 0+118) at Barangay Sta. Monica, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0156-000883",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Catanduanes Cir Rd - K0008 + 000 - K0008 + 780, K0010 + 000 - K0011 + 702, K0011 + 763 - K0012 + 000",
      "office": "Central Office",
      "amountPesos": 95235000,
      "lengthKm": 2.719,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 35025744.76,
      "lengthMeters": 2719.0,
      "allocationPerStatedMeter": 35025.74,
      "rangesMeters": [
        [
          8000.0,
          8780.0
        ],
        [
          10000.0,
          11702.0
        ],
        [
          11763.0,
          12000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "Catanduanes Cir Rd - K0008 + 000 - K0008 + 780, K0010 + 000 - K0011 + 702, K0011 + 763 - K0012 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 1.56,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0111-000012",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Pangasinan-La Union Inter-Provl Rd - K0390 + 000 - K0391 + 137, K0391 + 420 - K0392 + 000",
      "office": "Central Office",
      "amountPesos": 95000000,
      "lengthKm": 1.717,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 55329062.32,
      "lengthMeters": 1717.0,
      "allocationPerStatedMeter": 55329.06,
      "rangesMeters": [
        [
          390000.0,
          391137.0
        ],
        [
          391420.0,
          392000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Pangasinan-La Union Inter-Provl Rd - K0390 + 000 - K0391 + 137, K0391 + 420 - K0392 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.48,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0124-000262",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0248 + 790 - K0250 + 600",
      "office": "Central Office",
      "amountPesos": 95000000,
      "lengthKm": 1.81,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52486187.85,
      "lengthMeters": 1810.0,
      "allocationPerStatedMeter": 52486.19,
      "rangesMeters": [
        [
          248790.0,
          250600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0248 + 790 - K0250 + 600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.72,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0157-000898",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Biliran Circumferential Rd - K1029 + 300 - K1030 + 000",
      "office": "Central Office",
      "amountPesos": 95000000,
      "lengthKm": 0.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 135714285.71,
      "lengthMeters": 700.0,
      "allocationPerStatedMeter": 135714.29,
      "rangesMeters": [
        [
          1029300.0,
          1030000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "157",
      "lengthEvidence": "Biliran Circumferential Rd - K1029 + 300 - K1030 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 4.09,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0257-002618",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Mapangpang Br. (Muñoz) (B01271LZ) along Muñoz-Lupao Rd",
      "office": "Central Office",
      "amountPesos": 95000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Mapangpang Br. (Muñoz) (B01271LZ) along Muñoz-Lupao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0265-002783",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Aurora/Katipunan Flyover (B03211LZ) along C-5 (Katipunan/Aurora Flyover)",
      "office": "Central Office",
      "amountPesos": 95000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Aurora/Katipunan Flyover (B03211LZ) along C-5 (Katipunan/Aurora Flyover)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0414-005734",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay San Juan to Barangay Magsaysay, Agno, Pangasinan (Sta. 4+400 - Sta. 7+994.10)",
      "office": "Central Office",
      "amountPesos": 95000000,
      "lengthKm": 3.5941000000000005,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26432208.34,
      "lengthMeters": 3594.1,
      "allocationPerStatedMeter": 26432.21,
      "rangesMeters": [
        [
          4400.0,
          7994.1
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Construction of Road Barangay San Juan to Barangay Magsaysay, Agno, Pangasinan (Sta. 4+400 - Sta. 7+994.10)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.84,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0420-005853",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road/Diversion Road, Daang Kalikasan to Candelaria, Yamot, Candelaria, Zambales Sta. 0+000.00-Sta. 1+800.00",
      "office": "Central Office",
      "amountPesos": 95000000,
      "lengthKm": 1.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52777777.78,
      "lengthMeters": 1800.0,
      "allocationPerStatedMeter": 52777.78,
      "rangesMeters": [
        [
          0.0,
          1800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Construction of Access Road/Diversion Road, Daang Kalikasan to Candelaria, Yamot, Candelaria, Zambales Sta. 0+000.00-Sta. 1+800.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 2.19,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0431-006093",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nogpo-Barangay Bariw-Barangay Libtong, Libon, Albay, Sta 0+000.00 - Sta. 2+240.00",
      "office": "Central Office",
      "amountPesos": 95000000,
      "lengthKm": 2.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42410714.29,
      "lengthMeters": 2240.0,
      "allocationPerStatedMeter": 42410.71,
      "rangesMeters": [
        [
          0.0,
          2240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road, Barangay Nogpo-Barangay Bariw-Barangay Libtong, Libon, Albay, Sta 0+000.00 - Sta. 2+240.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.76,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0434-006144",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Zone 7 - Namo Coastal Road, Ta. 0 +345 - Sta. 0 + 528, Bulan, Sorsogon",
      "office": "Central Office",
      "amountPesos": 95000000,
      "lengthKm": 0.183,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 519125683.06,
      "lengthMeters": 183.0,
      "allocationPerStatedMeter": 519125.68,
      "rangesMeters": [
        [
          345.0,
          528.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Zone 7 - Namo Coastal Road, Ta. 0 +345 - Sta. 0 + 528, Bulan, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 14.68,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0434-006149",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Mainit to Ug-ug to Barangay Jaguimit, Naga City, Cebu",
      "office": "Central Office",
      "amountPesos": 95000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Concrete Road, Barangay Mainit to Ug-ug to Barangay Jaguimit, Naga City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0216-001927",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Ramon-Cordon-Diadi Bypass Road, Cordon Section, Sta. Sta. 16+543 - Sta. 18+916.85, Isabela",
      "office": "Central Office",
      "amountPesos": 94954000,
      "lengthKm": 2.3738499999999987,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 2373.85,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          16543.0,
          18916.85
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Ramon-Cordon-Diadi Bypass Road, Cordon Section, Sta. Sta. 16+543 - Sta. 18+916.85, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.78,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0220-002004",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Pagbilao-Tayabas-Lucban Diversion Road (Tayabas Section), Sta. 14+032 - Sta. 15+174, Tayabas City, Quezon",
      "office": "Central Office",
      "amountPesos": 94160000,
      "lengthKm": 1.142,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 82451838.88,
      "lengthMeters": 1142.0,
      "allocationPerStatedMeter": 82451.84,
      "rangesMeters": [
        [
          14032.0,
          15174.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Pagbilao-Tayabas-Lucban Diversion Road (Tayabas Section), Sta. 14+032 - Sta. 15+174, Tayabas City, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 1.0,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0211-001842",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Naguilian-Sn Mariano Rd - K0392 + 000 - K0394 + 000",
      "office": "Central Office",
      "amountPesos": 94087000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 47043500.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 47043.5,
      "rangesMeters": [
        [
          392000.0,
          394000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "211",
      "lengthEvidence": "Naguilian-Sn Mariano Rd - K0392 + 000 - K0394 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.16,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0414-005740",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction/Improvement of Roads, s. Poblacion Central - Cauringan, Poblacion Sur, Poblacion Central and Asan Norte, Sison, Pangasinan, Sta. 0+000 - Sta. 3+657",
      "office": "Central Office",
      "amountPesos": 94030000,
      "lengthKm": 3.657,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25712332.51,
      "lengthMeters": 3657.0,
      "allocationPerStatedMeter": 25712.33,
      "rangesMeters": [
        [
          0.0,
          3657.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Reconstruction/Improvement of Roads, s. Poblacion Central - Cauringan, Poblacion Sur, Poblacion Central and Asan Norte, Sison, Pangasinan, Sta. 0+000 - Sta. 3+657",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.82,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0156-000875",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "P Burgos - Pototanin Jct, Quezon- K0153 + 246 - K0155 + 000",
      "office": "Central Office",
      "amountPesos": 94000000,
      "lengthKm": 1.754,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53591790.19,
      "lengthMeters": 1754.0,
      "allocationPerStatedMeter": 53591.79,
      "rangesMeters": [
        [
          153246.0,
          155000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "P Burgos - Pototanin Jct, Quezon- K0153 + 246 - K0155 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 1.65,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0260-002693",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Haguibawa Br. 1 (B01419MN) along Benigno S. Aquino Jr. National Highway",
      "office": "Central Office",
      "amountPesos": 93400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Haguibawa Br. 1 (B01419MN) along Benigno S. Aquino Jr. National Highway",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0141-000605",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sta. Elena-Capalonga By Pass Coastal Rd - K0282 + 698 – K0285 + 712",
      "office": "Central Office",
      "amountPesos": 93001000,
      "lengthKm": 3.014,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30856337.09,
      "lengthMeters": 3014.0,
      "allocationPerStatedMeter": 30856.34,
      "rangesMeters": [
        [
          282698.0,
          285712.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Sta. Elena-Capalonga By Pass Coastal Rd - K0282 + 698 – K0285 + 712",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 1.86,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0440-006253",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road from Barangay Darumawang Ilaya - Barangay Matampay Ilaya, Sta. 0+000 - Sta. 3+800, Lala, Lanao del Norte",
      "office": "Central Office",
      "amountPesos": 93000000,
      "lengthKm": 3.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24473684.21,
      "lengthMeters": 3800.0,
      "allocationPerStatedMeter": 24473.68,
      "rangesMeters": [
        [
          0.0,
          3800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Construction of Concrete Road from Barangay Darumawang Ilaya - Barangay Matampay Ilaya, Sta. 0+000 - Sta. 3+800, Lala, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.78,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0117-000128",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1675 + 000 - K1676 + 516",
      "office": "Central Office",
      "amountPesos": 92981000,
      "lengthKm": 1.516,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 61333113.46,
      "lengthMeters": 1516.0,
      "allocationPerStatedMeter": 61333.11,
      "rangesMeters": [
        [
          1675000.0,
          1676516.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1675 + 000 - K1676 + 516",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.64,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0117-000126",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1660 + 644 - K1661 + 409, K1662 + 000 - K1663 + 235",
      "office": "Central Office",
      "amountPesos": 92650000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 46325000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 46325.0,
      "rangesMeters": [
        [
          1660644.0,
          1661409.0
        ],
        [
          1662000.0,
          1663235.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1660 + 644 - K1661 + 409, K1662 + 000 - K1663 + 235",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.24,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0140-000576",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Calauan-Nagcarlan Bdry Rd - K0083 + 000 - K0084 + 196, K0087 + 000 - K0087 + 918",
      "office": "Central Office",
      "amountPesos": 92600000,
      "lengthKm": 2.114,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 43803216.65,
      "lengthMeters": 2114.0,
      "allocationPerStatedMeter": 43803.22,
      "rangesMeters": [
        [
          83000.0,
          84196.0
        ],
        [
          87000.0,
          87918.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Calauan-Nagcarlan Bdry Rd - K0083 + 000 - K0084 + 196, K0087 + 000 - K0087 + 918",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 1.46,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0423-005923",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Linawan Rd., Barangay Muzon East, City of San Jose Del Monte, Bulacan (121.025335, 14.820824)",
      "office": "Central Office",
      "amountPesos": 92500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Road, Linawan Rd., Barangay Muzon East, City of San Jose Del Monte, Bulacan (121.025335, 14.820824)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0222-002057",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Guimbal-Tigbauan Bypass Road - R1 Bypass Road, Iloilo Sta.01 + 480 - Sta. 03 + 780",
      "office": "Central Office",
      "amountPesos": 92330000,
      "lengthKm": 2.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40143478.26,
      "lengthMeters": 2300.0,
      "allocationPerStatedMeter": 40143.48,
      "rangesMeters": [
        [
          1480.0,
          3780.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Guimbal-Tigbauan Bypass Road - R1 Bypass Road, Iloilo Sta.01 + 480 - Sta. 03 + 780",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.78,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0433-006119",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Durog - Barangay Tigmarabo Road, Miagao, Iloilo",
      "office": "Central Office",
      "amountPesos": 92330000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Barangay Durog - Barangay Tigmarabo Road, Miagao, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0433-006120",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Cabunotan - Barangay Olango - Barangay Alimodias Road, Miagao, Iloilo",
      "office": "Central Office",
      "amountPesos": 92330000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Barangay Cabunotan - Barangay Olango - Barangay Alimodias Road, Miagao, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0149-000747",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0128 + 000 - K0128 + 450, K0132 + 245 - K0132 + 506, K0132 + 782 - K0133 + 000, K0133 + 976 - K0135 + 193, K0136 + 559 - K0136 + 657, K0145 + 550 - K0145 + 855",
      "office": "Central Office",
      "amountPesos": 92293000,
      "lengthKm": 2.549,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 36207532.37,
      "lengthMeters": 2549.0,
      "allocationPerStatedMeter": 36207.53,
      "rangesMeters": [
        [
          128000.0,
          128450.0
        ],
        [
          132245.0,
          132506.0
        ],
        [
          132782.0,
          133000.0
        ],
        [
          133976.0,
          135193.0
        ],
        [
          136559.0,
          136657.0
        ],
        [
          145550.0,
          145855.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "149",
      "lengthEvidence": "Maharlika Highway (LZ) - K0128 + 000 - K0128 + 450, K0132 + 245 - K0132 + 506, K0132 + 782 - K0133 + 000, K0133 + 976 - K0135 + 193, K0136 + 559 - K0136 + 657, K0145 + 550 - K0145 + 855",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 1.05,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0445-006350",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Datal Dianag - Tudok Road, Barangay Datal Dlanag, T'boli, South Cotabato",
      "office": "Central Office",
      "amountPesos": 92254000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Construction of Datal Dianag - Tudok Road, Barangay Datal Dlanag, T'boli, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0113-000050",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod North Rd - K0149 + 549 - K0150 + 348, K0150 + 441 - K0151 + 649, K0151 + 675 - K0152 + 000, K0152 + 335 - K0152 + 672",
      "office": "Central Office",
      "amountPesos": 92136000,
      "lengthKm": 2.669,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34520794.3,
      "lengthMeters": 2669.0,
      "allocationPerStatedMeter": 34520.79,
      "rangesMeters": [
        [
          149549.0,
          150348.0
        ],
        [
          150441.0,
          151649.0
        ],
        [
          151675.0,
          152000.0
        ],
        [
          152335.0,
          152672.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Bacolod North Rd - K0149 + 549 - K0150 + 348, K0150 + 441 - K0151 + 649, K0151 + 675 - K0152 + 000, K0152 + 335 - K0152 + 672",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.92,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0111-000017",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Santiago - Tuguegarao Rd - K0376 + 204 - K0378 + 315",
      "office": "Central Office",
      "amountPesos": 92060000,
      "lengthKm": 2.111,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 43609663.67,
      "lengthMeters": 2111.0,
      "allocationPerStatedMeter": 43609.66,
      "rangesMeters": [
        [
          376204.0,
          378315.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Santiago - Tuguegarao Rd - K0376 + 204 - K0378 + 315",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.16,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0114-000072",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dipolog-Oroquieta National Rd - K1820 + 234 - K1820 + 343, K1820 + 363 - K1823 + 000",
      "office": "Central Office",
      "amountPesos": 92000000,
      "lengthKm": 2.746,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 33503277.49,
      "lengthMeters": 2746.0,
      "allocationPerStatedMeter": 33503.28,
      "rangesMeters": [
        [
          1820234.0,
          1820343.0
        ],
        [
          1820363.0,
          1823000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Dipolog-Oroquieta National Rd - K1820 + 234 - K1820 + 343, K1820 + 363 - K1823 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.89,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0203-001678",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Capiz-Aklan Rd - K0335 + 580 - K0335 + 760, K0336 + 200 - K0336 + 880, K0337 + 340 - K0337 + 800, K0338 + 050 - K0338 + 420",
      "office": "Central Office",
      "amountPesos": 91576000,
      "lengthKm": 1.69,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 54186982.25,
      "lengthMeters": 1690.0,
      "allocationPerStatedMeter": 54186.98,
      "rangesMeters": [
        [
          335580.0,
          335760.0
        ],
        [
          336200.0,
          336880.0
        ],
        [
          337340.0,
          337800.0
        ],
        [
          338050.0,
          338420.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Capiz-Aklan Rd - K0335 + 580 - K0335 + 760, K0336 + 200 - K0336 + 880, K0337 + 340 - K0337 + 800, K0338 + 050 - K0338 + 420",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 1.9,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0237-002325",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Lagonoy-Caramoan Road, (Salvacion Section) Garchitorena, Camarines Sur, Sta.16+500 - Sta. 19+650",
      "office": "Central Office",
      "amountPesos": 91500000,
      "lengthKm": 3.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29047619.05,
      "lengthMeters": 3150.0,
      "allocationPerStatedMeter": 29047.62,
      "rangesMeters": [
        [
          16500.0,
          19650.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Lagonoy-Caramoan Road, (Salvacion Section) Garchitorena, Camarines Sur, Sta.16+500 - Sta. 19+650",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 43430.55,
      "peerRateMultiple": 0.67,
      "peerRecords": 44,
      "peerBand": "≥2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77744.45500000002,
      "graphUpperFence": 104283.98500000002
    },
    {
      "id": "HB10858-3-0235-002287",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Quezon Industrial Highway, Sta. 0 + 484 - Sta. 0 + 825, Sta. 0 + 995 - Sta. 1 + 136, Sta. 2 + 092 - Sta. 2 + 289, Sta. 3 + 882 - Sta. 4 + 138, Lucena City, Quezon",
      "office": "Central Office",
      "amountPesos": 91300000,
      "lengthKm": 0.935,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 97647058.82,
      "lengthMeters": 935.0,
      "allocationPerStatedMeter": 97647.06,
      "rangesMeters": [
        [
          484.0,
          825.0
        ],
        [
          995.0,
          1136.0
        ],
        [
          2092.0,
          2289.0
        ],
        [
          3882.0,
          4138.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Quezon Industrial Highway, Sta. 0 + 484 - Sta. 0 + 825, Sta. 0 + 995 - Sta. 1 + 136, Sta. 2 + 092 - Sta. 2 + 289, Sta. 3 + 882 - Sta. 4 + 138, Lucena City, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 0.99,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0443-006315",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Purok 7 to Purok 15, to Purok 14, Barangay. Pasian, Monkayo, Davao de Oro Sta. 0+000 - Sta. 2+000",
      "office": "Central Office",
      "amountPesos": 90500000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45250000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 45250.0,
      "rangesMeters": [
        [
          0.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Construction of Roads, Purok 7 to Purok 15, to Purok 14, Barangay. Pasian, Monkayo, Davao de Oro Sta. 0+000 - Sta. 2+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.87,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0273-002955",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Colongolo Br. (B01040MN) along Surallah-Lake Sebu-Maitum Rd",
      "office": "Central Office",
      "amountPesos": 90240000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Colongolo Br. (B01040MN) along Surallah-Lake Sebu-Maitum Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0112-000031",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Calapan North Road - K0046+570 - K0048+063,K0048+407 - K0049+208, K0053+420 - K0054+066, K0058+534 - K0059+102,K0059+132 - K0060+000",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": 4.376,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20566727.61,
      "lengthMeters": 4376.0,
      "allocationPerStatedMeter": 20566.73,
      "rangesMeters": [
        [
          46570.0,
          48063.0
        ],
        [
          48407.0,
          49208.0
        ],
        [
          53420.0,
          54066.0
        ],
        [
          58534.0,
          59102.0
        ],
        [
          59132.0,
          60000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Calapan North Road - K0046+570 - K0048+063,K0048+407 - K0049+208, K0053+420 - K0054+066, K0058+534 - K0059+102,K0059+132 - K0060+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 0.59,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0125-000280",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sn Francisco-Sn Andres-Sn Narciso Rd - K0392 + 184 - K0394 + 000",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": 1.816,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49559471.37,
      "lengthMeters": 1816.0,
      "allocationPerStatedMeter": 49559.47,
      "rangesMeters": [
        [
          392184.0,
          394000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Sn Francisco-Sn Andres-Sn Narciso Rd - K0392 + 184 - K0394 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.62,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0158-000904",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 200 to Chainage 3 + 500",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 200 to Chainage 3 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0175-001202",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0083 + 215 - K0083 + 261",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": 0.046,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1956521739.13,
      "lengthMeters": 46.0,
      "allocationPerStatedMeter": 1956521.74,
      "rangesMeters": [
        [
          83215.0,
          83261.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "Puerto Princesa North Rd - K0083 + 215 - K0083 + 261",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 3.13,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0217-001960",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Pandi By-pass Road, Sta.6+040 - Sta.6+640, Pandi, Bulacan",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 150000000.0,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 150000.0,
      "rangesMeters": [
        [
          6040.0,
          6640.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Pandi By-pass Road, Sta.6+040 - Sta.6+640, Pandi, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 1.1,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0226-002134",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Opol Diversion Road (Opol-Canito-an), Barangay Baikingon-Barangay Canito-an, Sta. 0+000 - Sta. 2+250, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": 2.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 2250.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          0.0,
          2250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Opol Diversion Road (Opol-Canito-an), Barangay Baikingon-Barangay Canito-an, Sta. 0+000 - Sta. 2+250, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.78,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0257-002612",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Tulnagan Br. (B00533LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Tulnagan Br. (B00533LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0257-002620",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Poblacion West Br. 2 (B03405LZ) along San Jose City-Rizal Rd via Pinili-Porais-Villa Joson (Palarilla) Rd",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Poblacion West Br. 2 (B03405LZ) along San Jose City-Rizal Rd via Pinili-Porais-Villa Joson (Palarilla) Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0259-002653",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Danao Br. (B00456SM) along Wright-Taft-Borongan Rd",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Danao Br. (B00456SM) along Wright-Taft-Borongan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0418-005824",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Mungia-Parai Bridge, Barangay Parai, Dupax del Norte, Nueva Vizcaya",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Mungia-Parai Bridge, Barangay Parai, Dupax del Norte, Nueva Vizcaya",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0421-005882",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of New Road Barangay Almacen, Hermosa, Bataan",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Construction of New Road Barangay Almacen, Hermosa, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0421-005886",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Sta. Lucia Matua, Masantol, Pampanga",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Construction of Bridge, Sta. Lucia Matua, Masantol, Pampanga",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0424-005946",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge with Approach, Boso-Boso to Pulang Panyo, Barangay San Jose, Antipolo City, Rizal, 14.640425, 121.246825",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Construction of Bridge with Approach, Boso-Boso to Pulang Panyo, Barangay San Jose, Antipolo City, Rizal, 14.640425, 121.246825",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0433-006130",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bungahin Bridge, Barangay Robles, La Castellana, Negros Occidental",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Bungahin Bridge, Barangay Robles, La Castellana, Negros Occidental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0434-006152",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Sytem at Looc and Islas de Palma, Mandaue City",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Road with Drainage Sytem at Looc and Islas de Palma, Mandaue City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0436-006189",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Las Navas - Catubig - Laoang Road (Sta. 1+750 - Sta. 3+250), Northern Samar",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 60000000.0,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 60000.0,
      "rangesMeters": [
        [
          1750.0,
          3250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Road, Las Navas - Catubig - Laoang Road (Sta. 1+750 - Sta. 3+250), Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 2.49,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0438-006218",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Leading to Science and Technology Park, Barangay Taytayan (Libertad)-Barangay Lagutay (Gitagum), Sta. 7+300-Sta. 9+000, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52941176.47,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 52941.18,
      "rangesMeters": [
        [
          7300.0,
          9000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Construction of Road Leading to Science and Technology Park, Barangay Taytayan (Libertad)-Barangay Lagutay (Gitagum), Sta. 7+300-Sta. 9+000, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 2.19,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0444-006329",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of New Corella Bypass Road (Suwaon - Sto. Niño - Macgum), New Corella, Davao del Norte",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of New Corella Bypass Road (Suwaon - Sto. Niño - Macgum), New Corella, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0445-006345",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Singanan, Barangay Libay-Libay, Maco, Davao de Oro",
      "office": "Central Office",
      "amountPesos": 90000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Construction of Road, Sitio Singanan, Barangay Libay-Libay, Maco, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009392",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Cansaga-Lamac, Consolacion, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 90000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Bridge, Barangay Cansaga-Lamac, Consolacion, Cebu",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0205-001722",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Dinagat-Loreto Rd - K0061 + 000 - K0064 + 000",
      "office": "Central Office",
      "amountPesos": 89974000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29991333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 29991.33,
      "rangesMeters": [
        [
          61000.0,
          64000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Dinagat-Loreto Rd - K0061 + 000 - K0064 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 1.12,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0204-001707",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Gingoog-Claveria-Villanueva Rd - K1372 + 000 - K1374 + 529",
      "office": "Central Office",
      "amountPesos": 89907000,
      "lengthKm": 2.529,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35550415.18,
      "lengthMeters": 2529.0,
      "allocationPerStatedMeter": 35550.42,
      "rangesMeters": [
        [
          1372000.0,
          1374529.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Gingoog-Claveria-Villanueva Rd - K1372 + 000 - K1374 + 529",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 1.33,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0114-000075",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1848 + 093 - K1850 + 572",
      "office": "Central Office",
      "amountPesos": 89658000,
      "lengthKm": 2.479,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36167002.82,
      "lengthMeters": 2479.0,
      "allocationPerStatedMeter": 36167.0,
      "rangesMeters": [
        [
          1848093.0,
          1850572.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1848 + 093 - K1850 + 572",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.96,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0111-000001",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0026 + (-1036) - K0026 + (-120), K0028 + 240 - K0028 + 590, K0029 + 350 - K0030 + 000",
      "office": "Central Office",
      "amountPesos": 89314000,
      "lengthKm": 1.916,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 46614822.55,
      "lengthMeters": 1916.0,
      "allocationPerStatedMeter": 46614.82,
      "rangesMeters": [
        [
          24964.0,
          25880.0
        ],
        [
          28240.0,
          28590.0
        ],
        [
          29350.0,
          30000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Maharlika Highway (LZ) - K0026 + (-1036) - K0026 + (-120), K0028 + 240 - K0028 + 590, K0029 + 350 - K0030 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.24,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0261-002713",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "San Pedro Br. (B00869MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "office": "Central Office",
      "amountPesos": 89200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "San Pedro Br. (B00869MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0446-006373",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sitio Kao - Lamakati Road, Sitio Kao, Barangay Laconon, T'boli, South Cotabato",
      "office": "Central Office",
      "amountPesos": 89166000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Construction of Sitio Kao - Lamakati Road, Sitio Kao, Barangay Laconon, T'boli, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0197-001557",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Santiago-Tuguegarao Rd - K0354 + 991 - K0356 + 026, K0356 + 129 - K0357 + 000",
      "office": "Central Office",
      "amountPesos": 89052000,
      "lengthKm": 1.906,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 46721930.75,
      "lengthMeters": 1906.0,
      "allocationPerStatedMeter": 46721.93,
      "rangesMeters": [
        [
          354991.0,
          356026.0
        ],
        [
          356129.0,
          357000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "197",
      "lengthEvidence": "Santiago-Tuguegarao Rd - K0354 + 991 - K0356 + 026, K0356 + 129 - K0357 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 1.33,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0124-000263",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0250 + 600 - K0252 + 200",
      "office": "Central Office",
      "amountPesos": 89000000,
      "lengthKm": 1.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55625000.0,
      "lengthMeters": 1600.0,
      "allocationPerStatedMeter": 55625.0,
      "rangesMeters": [
        [
          250600.0,
          252200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0250 + 600 - K0252 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.82,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0142-000620",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Magpet-Nowa-Doroluman-Greenfield Rd - K1635 + 000 - K1638 + 1000",
      "office": "Central Office",
      "amountPesos": 88910000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22227500.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 22227.5,
      "rangesMeters": [
        [
          1635000.0,
          1639000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "Magpet-Nowa-Doroluman-Greenfield Rd - K1635 + 000 - K1638 + 1000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 1.52,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0118-000141",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway( Cotabato-Marbel Rd) - K1743 + 233 - K1745 + 000",
      "office": "Central Office",
      "amountPesos": 88809000,
      "lengthKm": 1.767,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50259762.31,
      "lengthMeters": 1767.0,
      "allocationPerStatedMeter": 50259.76,
      "rangesMeters": [
        [
          1743233.0,
          1745000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Maharlika Highway( Cotabato-Marbel Rd) - K1743 + 233 - K1745 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.34,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0257-002615",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Lanog Br. (B01262LZ) along Nueva Vizcaya-Ifugao Rd",
      "office": "Central Office",
      "amountPesos": 88200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Lanog Br. (B01262LZ) along Nueva Vizcaya-Ifugao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0223-002080",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
      "office": "Central Office",
      "amountPesos": 88100000,
      "lengthKm": 1.0005600000000003,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 88050691.61,
      "lengthMeters": 1000.56,
      "allocationPerStatedMeter": 88050.69,
      "rangesMeters": [
        [
          5820.0,
          5910.0
        ],
        [
          7178.0,
          8088.56
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.82,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0256-002595",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Tertiary Roads",
      "projectName": "Zamboanga del Sur Coastal Rd - (S01510MN) Chainage 8396 - Chainage 10886",
      "office": "Central Office",
      "amountPesos": 87838000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "256",
      "lengthEvidence": "Zamboanga del Sur Coastal Rd - (S01510MN) Chainage 8396 - Chainage 10886",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0218-001963",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "San Jose City Bypass Road, Sta. 7+003 - Sta. 7+094, Nueva Ecija",
      "office": "Central Office",
      "amountPesos": 87500000,
      "lengthKm": 0.091,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 961538461.54,
      "lengthMeters": 91.0,
      "allocationPerStatedMeter": 961538.46,
      "rangesMeters": [
        [
          7003.0,
          7094.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "San Jose City Bypass Road, Sta. 7+003 - Sta. 7+094, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.8,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0117-000125",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1658 + 000 - K1660 + 000",
      "office": "Central Office",
      "amountPesos": 86800000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 43400000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 43400.0,
      "rangesMeters": [
        [
          1658000.0,
          1660000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1658 + 000 - K1660 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.16,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0127-000314",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Allen-Catarman Rd - K0707 + 813 - K0709 + 250, K0722 + 756 - K0723 + 502",
      "office": "Central Office",
      "amountPesos": 86660000,
      "lengthKm": 2.183,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 39697663.77,
      "lengthMeters": 2183.0,
      "allocationPerStatedMeter": 39697.66,
      "rangesMeters": [
        [
          707813.0,
          709250.0
        ],
        [
          722756.0,
          723502.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Allen-Catarman Rd - K0707 + 813 - K0709 + 250, K0722 + 756 - K0723 + 502",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.98,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0150-000770",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0137 + 634 - K0141 + 405",
      "office": "Central Office",
      "amountPesos": 86291000,
      "lengthKm": 3.771,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22882789.71,
      "lengthMeters": 3771.0,
      "allocationPerStatedMeter": 22882.79,
      "rangesMeters": [
        [
          137634.0,
          141405.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0137 + 634 - K0141 + 405",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 0.67,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0173-001155",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Kennon Rd - K0222+920 - K0223+210",
      "office": "Central Office",
      "amountPesos": 86050000,
      "lengthKm": 0.29,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 296724137.93,
      "lengthMeters": 290.0,
      "allocationPerStatedMeter": 296724.14,
      "rangesMeters": [
        [
          222920.0,
          223210.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Kennon Rd - K0222+920 - K0223+210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 0.89,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0222-002055",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Pototan Bypass Road, Sta. 2+415.17 - Sta. 3+115.17, Sta. 4+915 - Sta. 6+105, Iloilo",
      "office": "Central Office",
      "amountPesos": 86000000,
      "lengthKm": 1.89,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 45502645.5,
      "lengthMeters": 1890.0,
      "allocationPerStatedMeter": 45502.65,
      "rangesMeters": [
        [
          2415.17,
          3115.17
        ],
        [
          4915.0,
          6105.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Pototan Bypass Road, Sta. 2+415.17 - Sta. 3+115.17, Sta. 4+915 - Sta. 6+105, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.89,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0204-001701",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Camp Andres - Tandu Bato Road, Sulu K030 + 207 - K033 + 000",
      "office": "Central Office",
      "amountPesos": 85200000,
      "lengthKm": 2.793,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30504833.51,
      "lengthMeters": 2793.0,
      "allocationPerStatedMeter": 30504.83,
      "rangesMeters": [
        [
          30207.0,
          33000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Camp Andres - Tandu Bato Road, Sulu K030 + 207 - K033 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 1.14,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0124-000260",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Nasugbu-Lian-Calatagan Rd - K0103 + 200 - K0104 + 140, K0108 + 000 - K0108 + 500, K0118 + 167 - K0119 + 000, K0123 + 500 - K0124 + 000",
      "office": "Central Office",
      "amountPesos": 85044000,
      "lengthKm": 2.773,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 30668589.97,
      "lengthMeters": 2773.0,
      "allocationPerStatedMeter": 30668.59,
      "rangesMeters": [
        [
          103200.0,
          104140.0
        ],
        [
          108000.0,
          108500.0
        ],
        [
          118167.0,
          119000.0
        ],
        [
          123500.0,
          124000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Nasugbu-Lian-Calatagan Rd - K0103 + 200 - K0104 + 140, K0108 + 000 - K0108 + 500, K0118 + 167 - K0119 + 000, K0123 + 500 - K0124 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.53,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0126-000295",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sibuyan Circumferential Rd - K0087 + 018 - K0089 + 113, K0089 + 211 - K0093 + 000",
      "office": "Central Office",
      "amountPesos": 85015000,
      "lengthKm": 5.884,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14448504.42,
      "lengthMeters": 5884.0,
      "allocationPerStatedMeter": 14448.5,
      "rangesMeters": [
        [
          87018.0,
          89113.0
        ],
        [
          89211.0,
          93000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Sibuyan Circumferential Rd - K0087 + 018 - K0089 + 113, K0089 + 211 - K0093 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.88,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0116-000112",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Digos-Makar Rd) - K1579+831 - K1580+714",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 0.883,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 96262740.66,
      "lengthMeters": 883.0,
      "allocationPerStatedMeter": 96262.74,
      "rangesMeters": [
        [
          1579831.0,
          1580714.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Maharlika Highway (Digos-Makar Rd) - K1579+831 - K1580+714",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 2.27,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0116-000113",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Digos-Makar Rd) - K1586+000 - K1587+040",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 1.04,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 81730769.23,
      "lengthMeters": 1040.0,
      "allocationPerStatedMeter": 81730.77,
      "rangesMeters": [
        [
          1586000.0,
          1587040.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Maharlika Highway (Digos-Makar Rd) - K1586+000 - K1587+040",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 1.77,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0125-000283",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Aramaywan-Berong-Pto Princesa Rd - K0089 + 006 - K0089 + 909, K0092 + 000 - K0093 + 809, K0095 + 000 - K0096 + 000, K0096 + 437 - K0098 + 509",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 5.784,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14695712.31,
      "lengthMeters": 5784.0,
      "allocationPerStatedMeter": 14695.71,
      "rangesMeters": [
        [
          89006.0,
          89909.0
        ],
        [
          92000.0,
          93809.0
        ],
        [
          95000.0,
          96000.0
        ],
        [
          96437.0,
          98509.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Aramaywan-Berong-Pto Princesa Rd - K0089 + 006 - K0089 + 909, K0092 + 000 - K0093 + 809, K0095 + 000 - K0096 + 000, K0096 + 437 - K0098 + 509",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.89,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0125-000288",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Culandanum-Panalingaan Cross Country Rd - K0248 + 000 - K0253 + 548",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 5.548,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15320836.34,
      "lengthMeters": 5548.0,
      "allocationPerStatedMeter": 15320.84,
      "rangesMeters": [
        [
          248000.0,
          253548.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Culandanum-Panalingaan Cross Country Rd - K0248 + 000 - K0253 + 548",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.93,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0128-000330",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagum City Diversion Road K1462 + 694 - K1464 + 197",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 1.503,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 56553559.55,
      "lengthMeters": 1503.0,
      "allocationPerStatedMeter": 56553.56,
      "rangesMeters": [
        [
          1462694.0,
          1464197.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Tagum City Diversion Road K1462 + 694 - K1464 + 197",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.85,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0128-000331",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagum City Diversion Road K1461 + 115 - K1462 + 694",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 1.579,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53831538.95,
      "lengthMeters": 1579.0,
      "allocationPerStatedMeter": 53831.54,
      "rangesMeters": [
        [
          1461115.0,
          1462694.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Tagum City Diversion Road K1461 + 115 - K1462 + 694",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.76,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0176-001211",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Sambulawan Jct-Calaguise-Calubian Rd - K1000 + 170 - K1000 + 370, K1003 + 903 - K1004 + 000",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 0.297,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 286195286.2,
      "lengthMeters": 297.0,
      "allocationPerStatedMeter": 286195.29,
      "rangesMeters": [
        [
          1000170.0,
          1000370.0
        ],
        [
          1003903.0,
          1004000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Sambulawan Jct-Calaguise-Calubian Rd - K1000 + 170 - K1000 + 370, K1003 + 903 - K1004 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 1.58,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0237-002314",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Sta. 11 + 640 - Sta. 12 + 159, Tiaong, Quezon",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 0.519,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 163776493.26,
      "lengthMeters": 519.0,
      "allocationPerStatedMeter": 163776.49,
      "rangesMeters": [
        [
          11640.0,
          12159.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Sta. 11 + 640 - Sta. 12 + 159, Tiaong, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 1.66,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0238-002344",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Tabaco City-Malinao-Buhi-Iriga City Road, Camarines Sur, Sta. 40+300.00 - Sta. 41+100.00",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 106250000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 106250.0,
      "rangesMeters": [
        [
          40300.0,
          41100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Tabaco City-Malinao-Buhi-Iriga City Road, Camarines Sur, Sta. 40+300.00 - Sta. 41+100.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 1.08,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0257-002623",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "San Agustin Br. (B01482LZ) along Jose Abad Santos Ave (JASA)",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "San Agustin Br. (B01482LZ) along Jose Abad Santos Ave (JASA)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002630",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Tandayag Br. (B00091PW) along Puerto Princesa North Rd",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Tandayag Br. (B00091PW) along Puerto Princesa North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002804",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Mananga Br. 1 (B00073CB) along N Bacalso Ave (Cebu South Rd)",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Mananga Br. 1 (B00073CB) along N Bacalso Ave (Cebu South Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0272-002940",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Calbiga Br. (B00387SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Calbiga Br. (B00387SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003234",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Janipa-an Br. 3 (B00585PN) along Metro Iloilo Radial Rd (R4 Bypass Rd)",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Janipa-an Br. 3 (B00585PN) along Metro Iloilo Radial Rd (R4 Bypass Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0413-005717",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads and Drainage along Interconnecting Streets of Miramonte (C 0+000 - C 1+380), Barangay 180, Caloocan City",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Construction of Roads and Drainage along Interconnecting Streets of Miramonte (C 0+000 - C 1+380), Barangay 180, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0414-005744",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads, s. Flores, Sinabaan, Cabalitian, Tanggal Sawang, San Vicente, Cadiz, Poblacion West, Nancalabasaan, Barat and Esperanza, Umingan, Pangasinan, Sta. 0+000 - Sta. 5+229",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 5.229,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16255498.18,
      "lengthMeters": 5229.0,
      "allocationPerStatedMeter": 16255.5,
      "rangesMeters": [
        [
          0.0,
          5229.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Rehabilitation of Roads, s. Flores, Sinabaan, Cabalitian, Tanggal Sawang, San Vicente, Cadiz, Poblacion West, Nancalabasaan, Barat and Esperanza, Umingan, Pangasinan, Sta. 0+000 - Sta. 5+229",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.52,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0415-005745",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads, s. Zone I, Zone II, Zone III, Zone IV, Zone V and Casanicolasan, Rosales, Pangasinan, Sta. 0+000 - Sta. 5+229",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 5.229,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16255498.18,
      "lengthMeters": 5229.0,
      "allocationPerStatedMeter": 16255.5,
      "rangesMeters": [
        [
          0.0,
          5229.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Rehabilitation of Roads, s. Zone I, Zone II, Zone III, Zone IV, Zone V and Casanicolasan, Rosales, Pangasinan, Sta. 0+000 - Sta. 5+229",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.52,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0427-006007",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage, Aratan Blvd. Pulo Santa Cruz, City of Santa Rosa, Laguna",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Rehabilitation of Road and Drainage, Aratan Blvd. Pulo Santa Cruz, City of Santa Rosa, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0429-006044",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabiltiation of Odiongan- Kabaliwan Access Road (including Slope Protection, Sta 2+770-3+560, Sta 4+300-4+600, Sta 6+120-6+150, Sta 6+410-6+450, Sta 9+230- 9+270, Sta 11+120-11+320, Barangay Panique, Odiongan & Barangay Bachawan, San Agustin, Romblon",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 1.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 60714285.71,
      "lengthMeters": 1400.0,
      "allocationPerStatedMeter": 60714.29,
      "rangesMeters": [
        [
          2770.0,
          3560.0
        ],
        [
          4300.0,
          4600.0
        ],
        [
          6120.0,
          6150.0
        ],
        [
          6410.0,
          6450.0
        ],
        [
          9230.0,
          9270.0
        ],
        [
          11120.0,
          11320.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Rehabiltiation of Odiongan- Kabaliwan Access Road (including Slope Protection, Sta 2+770-3+560, Sta 4+300-4+600, Sta 6+120-6+150, Sta 6+410-6+450, Sta 9+230- 9+270, Sta 11+120-11+320, Barangay Panique, Odiongan & Barangay Bachawan, San Agustin, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 2.43,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0430-006055",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Legazpi City Coastal Road, Sta. 0+000.00 – Sta. 0+150.00, Barangay Puro, Legazpi City, Albay",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 0.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 566666666.67,
      "lengthMeters": 150.0,
      "allocationPerStatedMeter": 566666.67,
      "rangesMeters": [
        [
          0.0,
          150.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Construction of Legazpi City Coastal Road, Sta. 0+000.00 – Sta. 0+150.00, Barangay Puro, Legazpi City, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 16.03,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0430-006057",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Pinagbobong, Tabaco City, Albay",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Rehabilitation of Road at Barangay Pinagbobong, Tabaco City, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0434-006137",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Nagerong, Lazi, Siquijor (Segment 1: 1 + 420 - 3 + 148 Segment 2: 1 + 937 - 2 + 947)",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 1.728,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 49189814.81,
      "lengthMeters": 1728.0,
      "allocationPerStatedMeter": 49189.81,
      "rangesMeters": [
        [
          1420.0,
          3148.0
        ],
        [
          1937.0,
          2947.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Road Barangay Nagerong, Lazi, Siquijor (Segment 1: 1 + 420 - 3 + 148 Segment 2: 1 + 937 - 2 + 947)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 2.04,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0435-006170",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Catoto-ogan - Barangay San Antonio, Las Navas, Northern Samar",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of Road, Barangay Catoto-ogan - Barangay San Antonio, Las Navas, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0438-006216",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Malindawag Bridge, Barangay Abuno, Sta. 0+000 - Sta. 0+140, Iligan City",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 0.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 607142857.14,
      "lengthMeters": 140.0,
      "allocationPerStatedMeter": 607142.86,
      "rangesMeters": [
        [
          0.0,
          140.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Construction of Malindawag Bridge, Barangay Abuno, Sta. 0+000 - Sta. 0+140, Iligan City",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 1.0,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0440-006254",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of the Access Road, Barangay Poblacion - Pigkalawag Beach & Dive Site, Sta. 0+000 - Sta. 2+340, Sultan Naga Dimaporo, Lanao del Norte",
      "office": "Central Office",
      "amountPesos": 85000000,
      "lengthKm": 2.34,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36324786.32,
      "lengthMeters": 2340.0,
      "allocationPerStatedMeter": 36324.79,
      "rangesMeters": [
        [
          0.0,
          2340.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Improvement of the Access Road, Barangay Poblacion - Pigkalawag Beach & Dive Site, Sta. 0+000 - Sta. 2+340, Sultan Naga Dimaporo, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.16,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0198-001569",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Iloilo-Capiz Rd (New Route) - K0098 + 1004 - K0100 + 100",
      "office": "Central Office",
      "amountPesos": 84747000,
      "lengthKm": 1.096,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 77323905.11,
      "lengthMeters": 1096.0,
      "allocationPerStatedMeter": 77323.91,
      "rangesMeters": [
        [
          99004.0,
          100100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Iloilo-Capiz Rd (New Route) - K0098 + 1004 - K0100 + 100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 1.73,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0236-002304",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Sta. 0 + 000 - Sta. 0 + 520, San Antonio, Quezon",
      "office": "Central Office",
      "amountPesos": 84700000,
      "lengthKm": 0.52,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 162884615.38,
      "lengthMeters": 520.0,
      "allocationPerStatedMeter": 162884.62,
      "rangesMeters": [
        [
          0.0,
          520.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Sta. 0 + 000 - Sta. 0 + 520, San Antonio, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 1.65,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0139-000557",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "International Receiver Rd - K0019 + (-330) - K0019 + 741",
      "office": "Central Office",
      "amountPesos": 84690000,
      "lengthKm": 1.071,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 79075630.25,
      "lengthMeters": 1071.0,
      "allocationPerStatedMeter": 79075.63,
      "rangesMeters": [
        [
          18670.0,
          19741.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "International Receiver Rd - K0019 + (-330) - K0019 + 741",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 3.31,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0205-001719",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "SNA-Lebak-Kalamansig Rd (S00739MN) - K1848 + 857 - K1848 + 917, K1848 + 933.50 - K1849 + 671, K1849 + 921 - K1850 + 040, K1852 + 996 - K1853 + 287",
      "office": "Central Office",
      "amountPesos": 84525000,
      "lengthKm": 1.2075,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 70000000.0,
      "lengthMeters": 1207.5,
      "allocationPerStatedMeter": 70000.0,
      "rangesMeters": [
        [
          1848857.0,
          1848917.0
        ],
        [
          1848933.5,
          1849671.0
        ],
        [
          1849921.0,
          1850040.0
        ],
        [
          1852996.0,
          1853287.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "SNA-Lebak-Kalamansig Rd (S00739MN) - K1848 + 857 - K1848 + 917, K1848 + 933.50 - K1849 + 671, K1849 + 921 - K1850 + 040, K1852 + 996 - K1853 + 287",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.38,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0294-003424",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Esperanza Br. (B01779MN) along Bayugan-Esperanza Rd",
      "office": "Central Office",
      "amountPesos": 84440000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Esperanza Br. (B01779MN) along Bayugan-Esperanza Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0203-001680",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Dumaguete South Rd - K0112 + 423 - K0114 + 000",
      "office": "Central Office",
      "amountPesos": 84390000,
      "lengthKm": 1.577,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53512999.37,
      "lengthMeters": 1577.0,
      "allocationPerStatedMeter": 53513.0,
      "rangesMeters": [
        [
          112423.0,
          114000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Dumaguete South Rd - K0112 + 423 - K0114 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 1.59,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0113-000052",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod South Rd - K0005 + (-138) - K0005 + 000, K0005 + 298 - K0005 + 305, K0006 + 000 - K0006 + 162, K0006 + 433 - K0007 + 000, K0009 + 154 - K0010 + 000",
      "office": "Central Office",
      "amountPesos": 83961000,
      "lengthKm": 1.72,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 48814534.88,
      "lengthMeters": 1720.0,
      "allocationPerStatedMeter": 48814.53,
      "rangesMeters": [
        [
          4862.0,
          5000.0
        ],
        [
          5298.0,
          5305.0
        ],
        [
          6000.0,
          6162.0
        ],
        [
          6433.0,
          7000.0
        ],
        [
          9154.0,
          10000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Bacolod South Rd - K0005 + (-138) - K0005 + 000, K0005 + 298 - K0005 + 305, K0006 + 000 - K0006 + 162, K0006 + 433 - K0007 + 000, K0009 + 154 - K0010 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.3,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0177-001221",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "SNA-Lebak-Kalamansig Rd - K1851 + 170 - K1851 + 210, K1851 + 240 - K1851 + 324, K1851 + 440 - K1851 + 490, K1852 + 110 - K1852 + 200, K1852 + 310 - K1852 + 360, K1852 + 500 - K1852 + 550, K1853 + 000 - K1853 + 210",
      "office": "Central Office",
      "amountPesos": 83920000,
      "lengthKm": 0.574,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 146202090.59,
      "lengthMeters": 574.0,
      "allocationPerStatedMeter": 146202.09,
      "rangesMeters": [
        [
          1851170.0,
          1851210.0
        ],
        [
          1851240.0,
          1851324.0
        ],
        [
          1851440.0,
          1851490.0
        ],
        [
          1852110.0,
          1852200.0
        ],
        [
          1852310.0,
          1852360.0
        ],
        [
          1852500.0,
          1852550.0
        ],
        [
          1853000.0,
          1853210.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "SNA-Lebak-Kalamansig Rd - K1851 + 170 - K1851 + 210, K1851 + 240 - K1851 + 324, K1851 + 440 - K1851 + 490, K1852 + 110 - K1852 + 200, K1852 + 310 - K1852 + 360, K1852 + 500 - K1852 + 550, K1853 + 000 - K1853 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 1.41,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0112-000036",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0356 + 076.95 - K0357 + 377",
      "office": "Central Office",
      "amountPesos": 83919000,
      "lengthKm": 1.3000499999999884,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 64550594.21,
      "lengthMeters": 1300.05,
      "allocationPerStatedMeter": 64550.59,
      "rangesMeters": [
        [
          356076.95,
          357377.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Maharlika Highway (LZ) - K0356 + 076.95 - K0357 + 377",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 1.64,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0128-000334",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Banisilan-Guiling-Alamada-Libungan Rd - (S00825MN) Chainage 14268 - Chainage 15575",
      "office": "Central Office",
      "amountPesos": 83870000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Banisilan-Guiling-Alamada-Libungan Rd - (S00825MN) Chainage 14268 - Chainage 15575",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0202-001652",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0178 + 740 - K0178 + 836, K0178 + 915 - K0179 + 000, K0184 + 509 - K0185 + 560, K0185 + 820 - K0186 + 160, K0186 + 536 - K0187 + 560, K0189 + 1272 - K0191 + 017",
      "office": "Central Office",
      "amountPesos": 83709000,
      "lengthKm": 3.341,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 25055073.33,
      "lengthMeters": 3341.0,
      "allocationPerStatedMeter": 25055.07,
      "rangesMeters": [
        [
          178740.0,
          178836.0
        ],
        [
          178915.0,
          179000.0
        ],
        [
          184509.0,
          185560.0
        ],
        [
          185820.0,
          186160.0
        ],
        [
          186536.0,
          187560.0
        ],
        [
          190272.0,
          191017.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Puerto Princesa South Rd - K0178 + 740 - K0178 + 836, K0178 + 915 - K0179 + 000, K0184 + 509 - K0185 + 560, K0185 + 820 - K0186 + 160, K0186 + 536 - K0187 + 560, K0189 + 1272 - K0191 + 017",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 0.94,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0212-001849",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Mambusao-Imbug Rd - K0101 + 000 - K0102 + 539",
      "office": "Central Office",
      "amountPesos": 83394000,
      "lengthKm": 1.539,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54187134.5,
      "lengthMeters": 1539.0,
      "allocationPerStatedMeter": 54187.13,
      "rangesMeters": [
        [
          101000.0,
          102539.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Mambusao-Imbug Rd - K0101 + 000 - K0102 + 539",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.33,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0413-005710",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Pallmall St. (Chainage 0+000 - Chainage 0+442) and Newport St. (Chainage 0+000 - Chainage 0+136) at Barangay Fairview, Quezon City",
      "office": "Central Office",
      "amountPesos": 83232000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Construction of Road and Drainage at Pallmall St. (Chainage 0+000 - Chainage 0+442) and Newport St. (Chainage 0+000 - Chainage 0+136) at Barangay Fairview, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0205-001718",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1671 + 000 - K1673 + 755",
      "office": "Central Office",
      "amountPesos": 83055000,
      "lengthKm": 2.755,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30147005.44,
      "lengthMeters": 2755.0,
      "allocationPerStatedMeter": 30147.01,
      "rangesMeters": [
        [
          1671000.0,
          1673755.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1671 + 000 - K1673 + 755",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 1.13,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0199-001595",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1596 + 759 - K1596 + 958, K1597 + 186 - K1598 + 009, K1598 + 240 - K1598 + 450, K1598 + 470 - K1598 + 550, K1598 + 570 - K1599 + 200, K1599 + 220 - K1599 + 875",
      "office": "Central Office",
      "amountPesos": 83008000,
      "lengthKm": 2.597,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 31963034.27,
      "lengthMeters": 2597.0,
      "allocationPerStatedMeter": 31963.03,
      "rangesMeters": [
        [
          1596759.0,
          1596958.0
        ],
        [
          1597186.0,
          1598009.0
        ],
        [
          1598240.0,
          1598450.0
        ],
        [
          1598470.0,
          1598550.0
        ],
        [
          1598570.0,
          1599200.0
        ],
        [
          1599220.0,
          1599875.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1596 + 759 - K1596 + 958, K1597 + 186 - K1598 + 009, K1598 + 240 - K1598 + 450, K1598 + 470 - K1598 + 550, K1598 + 570 - K1599 + 200, K1599 + 220 - K1599 + 875",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 0.91,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0114-000074",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd",
      "office": "Central Office",
      "amountPesos": 83000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0226-002125",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Eastern Interior Bypass Road (Gusa-Puerto/Jct. Sayre Highway), Barangay Tablon- Barangay Agusan, Sta. 7+360-Sta. 7+560, Sta. 10+200- Sta. 10+325, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 83000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          7360.0,
          7560.0
        ],
        [
          10200.0,
          10325.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Eastern Interior Bypass Road (Gusa-Puerto/Jct. Sayre Highway), Barangay Tablon- Barangay Agusan, Sta. 7+360-Sta. 7+560, Sta. 10+200- Sta. 10+325, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0236-002306",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Section I: Sta. 12 + 159 - Sta. 12 + 355, Section II: Sta. 16 + 377 - Sta. 17 + 962, Tiaong, Quezon",
      "office": "Central Office",
      "amountPesos": 83000000,
      "lengthKm": 1.781,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 46603032.0,
      "lengthMeters": 1781.0,
      "allocationPerStatedMeter": 46603.03,
      "rangesMeters": [
        [
          12159.0,
          12355.0
        ],
        [
          16377.0,
          17962.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Section I: Sta. 12 + 159 - Sta. 12 + 355, Section II: Sta. 16 + 377 - Sta. 17 + 962, Tiaong, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 0.59,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0414-005733",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road connecting Barangay Siapar, Anda, Pangasinan and Barangay Pilar, Bolinao, Pangasinan (Sta. 0+000 - Sta. 2+480.80)",
      "office": "Central Office",
      "amountPesos": 83000000,
      "lengthKm": 2.4808000000000003,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33456949.37,
      "lengthMeters": 2480.8,
      "allocationPerStatedMeter": 33456.95,
      "rangesMeters": [
        [
          0.0,
          2480.8
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Construction of Road connecting Barangay Siapar, Anda, Pangasinan and Barangay Pilar, Bolinao, Pangasinan (Sta. 0+000 - Sta. 2+480.80)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 1.06,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0173-001162",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Davao-Bukidnon Rd - K1643 + 154 - K1643 + 193",
      "office": "Central Office",
      "amountPesos": 82730000,
      "lengthKm": 0.039,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2121282051.28,
      "lengthMeters": 39.0,
      "allocationPerStatedMeter": 2121282.05,
      "rangesMeters": [
        [
          1643154.0,
          1643193.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Davao-Bukidnon Rd - K1643 + 154 - K1643 + 193",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 6.36,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0139-000571",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Guimba - Talugtug - Umingan Rd K0153+112 - K0156+000, K0159+000 - K0160+080",
      "office": "Central Office",
      "amountPesos": 82500000,
      "lengthKm": 3.968,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20791330.65,
      "lengthMeters": 3968.0,
      "allocationPerStatedMeter": 20791.33,
      "rangesMeters": [
        [
          153112.0,
          156000.0
        ],
        [
          159000.0,
          160080.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Guimba - Talugtug - Umingan Rd K0153+112 - K0156+000, K0159+000 - K0160+080",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 1.42,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0142-000618",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Dualing-New Panay-Midsayap Rd - K1688 + 231 - K1689 + 428",
      "office": "Central Office",
      "amountPesos": 82458000,
      "lengthKm": 1.197,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 68887218.05,
      "lengthMeters": 1197.0,
      "allocationPerStatedMeter": 68887.22,
      "rangesMeters": [
        [
          1688231.0,
          1689428.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "Dualing-New Panay-Midsayap Rd - K1688 + 231 - K1689 + 428",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 2.88,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0156-000885",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Catanduanes Cir Rd - K0034 + 637 - K0034 + 700, K0036 + 386 - K0036 + 395, K0037 + 000 - K0039 + 000",
      "office": "Central Office",
      "amountPesos": 82320000,
      "lengthKm": 2.072,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 39729729.73,
      "lengthMeters": 2072.0,
      "allocationPerStatedMeter": 39729.73,
      "rangesMeters": [
        [
          34637.0,
          34700.0
        ],
        [
          36386.0,
          36395.0
        ],
        [
          37000.0,
          39000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "Catanduanes Cir Rd - K0034 + 637 - K0034 + 700, K0036 + 386 - K0036 + 395, K0037 + 000 - K0039 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 1.77,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0202-001647",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0068 + 591 - K0071 + 674",
      "office": "Central Office",
      "amountPesos": 82245000,
      "lengthKm": 3.083,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26676938.05,
      "lengthMeters": 3083.0,
      "allocationPerStatedMeter": 26676.94,
      "rangesMeters": [
        [
          68591.0,
          71674.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Puerto Princesa South Rd - K0068 + 591 - K0071 + 674",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 1.0,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0125-000285",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Capitol - Canigaran Rd - K0001+(-1006) - K0001+190",
      "office": "Central Office",
      "amountPesos": 82000000,
      "lengthKm": 1.196,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 68561872.91,
      "lengthMeters": 1196.0,
      "allocationPerStatedMeter": 68561.87,
      "rangesMeters": [
        [
          -6.0,
          1190.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Capitol - Canigaran Rd - K0001+(-1006) - K0001+190",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 2.21,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0218-001982",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Batangas City-San Pascual-Bauan Diversion Road, Bridge 2, Sta. 104+228 - Sta. 104+307, San Mateo to Palsahingin, San Pascual, Batangas",
      "office": "Central Office",
      "amountPesos": 82000000,
      "lengthKm": 0.079,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 79.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          104228.0,
          104307.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Batangas City-San Pascual-Bauan Diversion Road, Bridge 2, Sta. 104+228 - Sta. 104+307, San Mateo to Palsahingin, San Pascual, Batangas",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0444-006325",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Asuncion Bypass Road (Cambanogoy - New Bantayan - Tagum), Asuncion, Davao del Norte",
      "office": "Central Office",
      "amountPesos": 82000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of Asuncion Bypass Road (Cambanogoy - New Bantayan - Tagum), Asuncion, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0126-000303",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Iloilo East Coast-Capiz Rd - K0267 + 542 - K0268 + 500, K0269 + 400 - K0271 + 000",
      "office": "Central Office",
      "amountPesos": 81984000,
      "lengthKm": 2.558,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 32050039.09,
      "lengthMeters": 2558.0,
      "allocationPerStatedMeter": 32050.04,
      "rangesMeters": [
        [
          267542.0,
          268500.0
        ],
        [
          269400.0,
          271000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Iloilo East Coast-Capiz Rd - K0267 + 542 - K0268 + 500, K0269 + 400 - K0271 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.6,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0412-005704",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Consul Street (Chainage 0+000 to Chainage 0+565) at Barangay Fairview, Quezon City",
      "office": "Central Office",
      "amountPesos": 81925000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "412",
      "lengthEvidence": "Construction of Road and Drainage at Consul Street (Chainage 0+000 to Chainage 0+565) at Barangay Fairview, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0127-000321",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Rizal-Dakak-Dapitan Coastal Loop Rd - K1804+000 - K1804+500, K1817+000 - K1820+000",
      "office": "Central Office",
      "amountPesos": 81800000,
      "lengthKm": 3.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23371428.57,
      "lengthMeters": 3500.0,
      "allocationPerStatedMeter": 23371.43,
      "rangesMeters": [
        [
          1804000.0,
          1804500.0
        ],
        [
          1817000.0,
          1820000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Rizal-Dakak-Dapitan Coastal Loop Rd - K1804+000 - K1804+500, K1817+000 - K1820+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.16,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0157-000893",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Cebu North Hagnaya Wharf Rd - K0074 + 050 -K0074 + 490",
      "office": "Central Office",
      "amountPesos": 81800000,
      "lengthKm": 0.44,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 185909090.91,
      "lengthMeters": 440.0,
      "allocationPerStatedMeter": 185909.09,
      "rangesMeters": [
        [
          74050.0,
          74490.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "157",
      "lengthEvidence": "Cebu North Hagnaya Wharf Rd - K0074 + 050 -K0074 + 490",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 4.67,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0113-000055",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0049+300 - K0052 + 182",
      "office": "Central Office",
      "amountPesos": 81697000,
      "lengthKm": 2.882,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28347328.24,
      "lengthMeters": 2882.0,
      "allocationPerStatedMeter": 28347.33,
      "rangesMeters": [
        [
          49300.0,
          52182.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0049+300 - K0052 + 182",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 0.81,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0284-003193",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Calvo Br. (B02765LZ) along Carmen Jct - Bayambang - Manat Rd",
      "office": "Central Office",
      "amountPesos": 81500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Calvo Br. (B02765LZ) along Carmen Jct - Bayambang - Manat Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0149-000753",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0203 + 918 - K0203 + 956, K0204 + 254 - K0205 + 379, K0205 + 627 - K0206 + 062, K0206 + 072 - K0207 + 892, K0207 + 968 - K0208 + 405, K0208 + 795 - K0209 + 093",
      "office": "Central Office",
      "amountPesos": 81457000,
      "lengthKm": 4.153,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 19614013.97,
      "lengthMeters": 4153.0,
      "allocationPerStatedMeter": 19614.01,
      "rangesMeters": [
        [
          203918.0,
          203956.0
        ],
        [
          204254.0,
          205379.0
        ],
        [
          205627.0,
          206062.0
        ],
        [
          206072.0,
          207892.0
        ],
        [
          207968.0,
          208405.0
        ],
        [
          208795.0,
          209093.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "149",
      "lengthEvidence": "Maharlika Highway (LZ) - K0203 + 918 - K0203 + 956, K0204 + 254 - K0205 + 379, K0205 + 627 - K0206 + 062, K0206 + 072 - K0207 + 892, K0207 + 968 - K0208 + 405, K0208 + 795 - K0209 + 093",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 0.57,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0113-000049",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod North Rd - K0107 + 658 - K0109 + 999",
      "office": "Central Office",
      "amountPesos": 81286000,
      "lengthKm": 2.341,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34722768.05,
      "lengthMeters": 2341.0,
      "allocationPerStatedMeter": 34722.77,
      "rangesMeters": [
        [
          107658.0,
          109999.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Bacolod North Rd - K0107 + 658 - K0109 + 999",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.93,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0434-006138",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cangomantong, Lazi, Siquijor to Barangay Cangclaran, Lazi, Siquijor",
      "office": "Central Office",
      "amountPesos": 81000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Road, Barangay Cangomantong, Lazi, Siquijor to Barangay Cangclaran, Lazi, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0113-000051",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod North Rd - K0153 + 483 - K0155 + 000, K0155 + 117 - K0156 + 000",
      "office": "Central Office",
      "amountPesos": 80854000,
      "lengthKm": 2.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 33689166.67,
      "lengthMeters": 2400.0,
      "allocationPerStatedMeter": 33689.17,
      "rangesMeters": [
        [
          153483.0,
          155000.0
        ],
        [
          155117.0,
          156000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Bacolod North Rd - K0153 + 483 - K0155 + 000, K0155 + 117 - K0156 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.9,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0198-001576",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Dumaguete South Rd - K0073 + 428 - K0074 + 933",
      "office": "Central Office",
      "amountPesos": 80834000,
      "lengthKm": 1.505,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53710299.0,
      "lengthMeters": 1505.0,
      "allocationPerStatedMeter": 53710.3,
      "rangesMeters": [
        [
          73428.0,
          74933.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Dumaguete South Rd - K0073 + 428 - K0074 + 933",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 1.2,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0149-000757",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0222 + 099 - K0223 + 440, K0224 + 914 - K0225 + 020, K0225 + 212 - K0225 + 420, K0225 + 480 - K0225 + 555, K0225 + 585 - K0225 + 617, K0225 + 636 - K0225 + 659, K0225 + 682 - K0225 + 840, K0226 + 920 - K0226 + 988, K0227 + 052 - K0227 + 362, K0227 + 572 - K0227 + 926, K0228 + 499 - K0228 + 752, K0229 + 002 - K0229 + 183, K0229 + 970 - K0230 + 248, K0230 + 741 - K0230 + 846, K0231 + 205 - K0231 + 479, K0231 + 529 - K0231 + 542, K0231 + 592 - K0231 + 767, K0231 + 987 - K0231 + 1051, K0233 + 112 - K0233 + 167",
      "office": "Central Office",
      "amountPesos": 80339000,
      "lengthKm": 4.073,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 19724772.89,
      "lengthMeters": 4073.0,
      "allocationPerStatedMeter": 19724.77,
      "rangesMeters": [
        [
          222099.0,
          223440.0
        ],
        [
          224914.0,
          225020.0
        ],
        [
          225212.0,
          225420.0
        ],
        [
          225480.0,
          225555.0
        ],
        [
          225585.0,
          225617.0
        ],
        [
          225636.0,
          225659.0
        ],
        [
          225682.0,
          225840.0
        ],
        [
          226920.0,
          226988.0
        ],
        [
          227052.0,
          227362.0
        ],
        [
          227572.0,
          227926.0
        ],
        [
          228499.0,
          228752.0
        ],
        [
          229002.0,
          229183.0
        ],
        [
          229970.0,
          230248.0
        ],
        [
          230741.0,
          230846.0
        ],
        [
          231205.0,
          231479.0
        ],
        [
          231529.0,
          231542.0
        ],
        [
          231592.0,
          231767.0
        ],
        [
          231987.0,
          232051.0
        ],
        [
          233112.0,
          233167.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "149",
      "lengthEvidence": "Maharlika Highway (LZ) - K0222 + 099 - K0223 + 440, K0224 + 914 - K0225 + 020, K0225 + 212 - K0225 + 420, K0225 + 480 - K0225 + 555, K0225 + 585 - K0225 + 617, K0225 + 636 - K0225 + 659, K0225 + 682 - K0225 + 840, K0226 + 920 - K0226 + 988, K0227 + 052 - K0227 + 362, K0227 + 572 - K0227 + 926, K0228 + 499 - K0228 + 752, K0229 + 002 - K0229 + 183, K0229 + 970 - K0230 + 248, K0230 + 741 - K0230 + 846, K0231 + 205 - K0231 + 479, K0231 + 529 - K0231 + 542, K0231 + 592 - K0231 + 767, K0231 + 987 - K0231 + 1051, K0233 + 112 - K0233 + 167",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 0.57,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0141-000612",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Mabinay - Ayungon Rd - K0096 + 000 - K0099 + 778",
      "office": "Central Office",
      "amountPesos": 80300000,
      "lengthKm": 3.778,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21254632.08,
      "lengthMeters": 3778.0,
      "allocationPerStatedMeter": 21254.63,
      "rangesMeters": [
        [
          96000.0,
          99778.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Mabinay - Ayungon Rd - K0096 + 000 - K0099 + 778",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 1.45,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0261-002711",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Pongtud Br. (B00862MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "office": "Central Office",
      "amountPesos": 80040000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Pongtud Br. (B00862MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0127-000315",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Biliran Circumferential Rd - K1025 + 448 - K1027 + 544",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": 2.096,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38167938.93,
      "lengthMeters": 2096.0,
      "allocationPerStatedMeter": 38167.94,
      "rangesMeters": [
        [
          1025448.0,
          1027544.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Biliran Circumferential Rd - K1025 + 448 - K1027 + 544",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.9,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0128-000343",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd - K1148+403 - K1149 + 000, K1154 + 000 - K1155 + 262, K1156+664 - K1157+814, K1158 + 030 - K1161 + 000",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": 5.979,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 13380163.91,
      "lengthMeters": 5979.0,
      "allocationPerStatedMeter": 13380.16,
      "rangesMeters": [
        [
          1148403.0,
          1149000.0
        ],
        [
          1154000.0,
          1155262.0
        ],
        [
          1156664.0,
          1157814.0
        ],
        [
          1158030.0,
          1161000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Surigao-Davao Coastal Rd - K1148+403 - K1149 + 000, K1154 + 000 - K1155 + 262, K1156+664 - K1157+814, K1158 + 030 - K1161 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.81,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0158-000903",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Jolo-Indanan-Parang-Silangkan Road (S00005SL), Chainage 22 + 000 to Chainage 25 + 000",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "Jolo-Indanan-Parang-Silangkan Road (S00005SL), Chainage 22 + 000 to Chainage 25 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0204-001699",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Nabunturan-Mainit Park Road (S00137MN) K1428+000 -K1430+240, Davao De Oro",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": 2.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35714285.71,
      "lengthMeters": 2240.0,
      "allocationPerStatedMeter": 35714.29,
      "rangesMeters": [
        [
          1428000.0,
          1430240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Nabunturan-Mainit Park Road (S00137MN) K1428+000 -K1430+240, Davao De Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 1.25,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0217-001943",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cawag-Philseco Bypass Road, Sta. 1+925 - Sta. 3+600, Zambales",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": 1.675,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 47761194.03,
      "lengthMeters": 1675.0,
      "allocationPerStatedMeter": 47761.19,
      "rangesMeters": [
        [
          1925.0,
          3600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Cawag-Philseco Bypass Road, Sta. 1+925 - Sta. 3+600, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.58,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0218-001974",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sampaloc Bypass Road (Bridge 1), Barangay Ilayang Owain, Sampaloc, Quezon",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Sampaloc Bypass Road (Bridge 1), Barangay Ilayang Owain, Sampaloc, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0224-002099",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Barangay Lumbia Section, Sta. 2+110 - Sta. 2+572.98 (Sec. A), Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": 0.46298,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 172793641.19,
      "lengthMeters": 462.98,
      "allocationPerStatedMeter": 172793.64,
      "rangesMeters": [
        [
          2110.0,
          2572.98
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Barangay Lumbia Section, Sta. 2+110 - Sta. 2+572.98 (Sec. A), Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 1.36,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0224-002102",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "CDO-New Western Diversion Road (Canito-an-CDO Coastal Road Section), Barangay Canito-an, Sta. 0+000-0+045, Sta. 0+620-0+660, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          45.0
        ],
        [
          620.0,
          660.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "CDO-New Western Diversion Road (Canito-an-CDO Coastal Road Section), Barangay Canito-an, Sta. 0+000-0+045, Sta. 0+620-0+660, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0225-002107",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cagayan de Oro Coastal Road (Punta-Macabalan Section), Barangay Macabalan, Sta. 0+000- Sta. 0+072.71, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": 0.07271,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1100261312.06,
      "lengthMeters": 72.71,
      "allocationPerStatedMeter": 1100261.31,
      "rangesMeters": [
        [
          0.0,
          72.71
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "225",
      "lengthEvidence": "Cagayan de Oro Coastal Road (Punta-Macabalan Section), Barangay Macabalan, Sta. 0+000- Sta. 0+072.71, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.92,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0226-002123",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Eastern Interior Bypass Road (Gusa-Puerto/Jct. Sayre Highway), Barangay Gusa- Barangay Cugman, Sta. 0+000-Sta. 0+365.33, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": 0.36533,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 218980100.18,
      "lengthMeters": 365.33,
      "allocationPerStatedMeter": 218980.1,
      "rangesMeters": [
        [
          0.0,
          365.33
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Eastern Interior Bypass Road (Gusa-Puerto/Jct. Sayre Highway), Barangay Gusa- Barangay Cugman, Sta. 0+000-Sta. 0+365.33, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 1.72,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0227-002140",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sayre Highway Bypass Road-Carmen Puerto Section (Climbing Lanes), Barangay Puerto, Sta. 1+680-Sta. 2+805.71, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": 1.12571,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 71066260.4,
      "lengthMeters": 1125.71,
      "allocationPerStatedMeter": 71066.26,
      "rangesMeters": [
        [
          1680.0,
          2805.71
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Sayre Highway Bypass Road-Carmen Puerto Section (Climbing Lanes), Barangay Puerto, Sta. 1+680-Sta. 2+805.71, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.66,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0244-002424",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Ozamiz - Oroquieta Road, K1701 + (-381) + K1701 + (-272), K1701 + 690 - K1707 + 895",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          1701690.0,
          1707895.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "244",
      "lengthEvidence": "Ozamiz - Oroquieta Road, K1701 + (-381) + K1701 + (-272), K1701 + 690 - K1707 + 895",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0244-002425",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Ozamiz - Oroquieta Road, K1714 + 211 - K1715 + 963, K1716 + 286 - K1717 + 510, K1717 + 736 - K1718 + 540, K1718 + 740 - K1720 + 184, K1720 + 587 - K1721 + 183",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": 5.82,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 13745704.47,
      "lengthMeters": 5820.0,
      "allocationPerStatedMeter": 13745.7,
      "rangesMeters": [
        [
          1714211.0,
          1715963.0
        ],
        [
          1716286.0,
          1717510.0
        ],
        [
          1717736.0,
          1718540.0
        ],
        [
          1718740.0,
          1720184.0
        ],
        [
          1720587.0,
          1721183.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "244",
      "lengthEvidence": "Ozamiz - Oroquieta Road, K1714 + 211 - K1715 + 963, K1716 + 286 - K1717 + 510, K1717 + 736 - K1718 + 540, K1718 + 740 - K1720 + 184, K1720 + 587 - K1721 + 183",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 1.14,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0284-003192",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Cagubay Br. (B00679LZ) along Pangasinan-Tarlac Rd",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Cagubay Br. (B00679LZ) along Pangasinan-Tarlac Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0286-003264",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Maganding Br. 2 (B02109MN) along Maharlika Highway( Cotabato-Malabang-Lanao del Norte Rd)",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Maganding Br. 2 (B02109MN) along Maharlika Highway( Cotabato-Malabang-Lanao del Norte Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0413-005724",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Senatorial St., Barangay Batasan Hills, Quezon City, Metro Manila",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Rehabilitation of Road, Senatorial St., Barangay Batasan Hills, Quezon City, Metro Manila",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0414-005732",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Purok Sinamar Barangay Taguiporo, Bangui, Ilocos Norte, Start 18.51889, 120.71444 End 18.51944, 120.71389",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Construction of Bridge, Purok Sinamar Barangay Taguiporo, Bangui, Ilocos Norte, Start 18.51889, 120.71444 End 18.51944, 120.71389",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0414-005739",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction/Improvement of Roads, s. Poblacion District 1, Poblacion District 2, Talogtog, Amagbagan and Malasin, Pozorrubio, Pangasinan, Sta. 0+000 - Sta. 3+080",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": 3.08,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25974025.97,
      "lengthMeters": 3080.0,
      "allocationPerStatedMeter": 25974.03,
      "rangesMeters": [
        [
          0.0,
          3080.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Reconstruction/Improvement of Roads, s. Poblacion District 1, Poblacion District 2, Talogtog, Amagbagan and Malasin, Pozorrubio, Pangasinan, Sta. 0+000 - Sta. 3+080",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.83,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0414-005743",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction/Improvement of Roads, Barangay Cabalaoangan Sur to Barangay Guiling, Rosales, Pangasinan, Sta. 0+000 - Sta. 3+080",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": 3.08,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25974025.97,
      "lengthMeters": 3080.0,
      "allocationPerStatedMeter": 25974.03,
      "rangesMeters": [
        [
          0.0,
          3080.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Reconstruction/Improvement of Roads, Barangay Cabalaoangan Sur to Barangay Guiling, Rosales, Pangasinan, Sta. 0+000 - Sta. 3+080",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.83,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0418-005813",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Pag-asa, Echague, Isabela",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Bridge, Barangay Pag-asa, Echague, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0419-005840",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads, Barangay San Agustin-San Miguel-San Pedro, Sta 0 to Sta 3+145.92, Hagonoy, Bulacan",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Rehabilitation of Roads, Barangay San Agustin-San Miguel-San Pedro, Sta 0 to Sta 3+145.92, Hagonoy, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0421-005885",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Slope Protection along Sto. Tomas - Minalin Tail Dike, (Sto. Tomas - Minalin Portion), Sto. Tomas - Minalin, Pampanga",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Rehabilitation of Road with Slope Protection along Sto. Tomas - Minalin Tail Dike, (Sto. Tomas - Minalin Portion), Sto. Tomas - Minalin, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0424-005931",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Bridge along Indang - Amadeo Diversion Road, Amadeo, Cavite",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Construction (Completion) of Bridge along Indang - Amadeo Diversion Road, Amadeo, Cavite",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0424-005932",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Nagtaluntong to Bignay, Lobo, Batangas",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "424",
      "lengthEvidence": "Construction of Bridge, Barangay Nagtaluntong to Bignay, Lobo, Batangas",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0425-005958",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Santo Niño, Batangas City, Batangas",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Construction of Bridge, Barangay Santo Niño, Batangas City, Batangas",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005984",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Bridge crossing Julian River going to Toclong Road, Barangay Toclong 1C - Barangay Toclong 2B, Imus City, Cavite",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Road and Bridge crossing Julian River going to Toclong Road, Barangay Toclong 1C - Barangay Toclong 2B, Imus City, Cavite",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0430-006063",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay San Francisco - Barangay Sta. Eulalia, Baao, Camarines Sur",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Concreting of Road, Barangay San Francisco - Barangay Sta. Eulalia, Baao, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0436-006173",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction of Roads with Slips, Slope collapse and Landslides to Danao Lake and Inayupan Peak Road, Barangay Rizal-Barangay Inayupan, Javier, Leyte",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Reconstruction of Roads with Slips, Slope collapse and Landslides to Danao Lake and Inayupan Peak Road, Barangay Rizal-Barangay Inayupan, Javier, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0439-006238",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Roads, Macapagal Dr. Road, Cagayan de Oro City, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Improvement of Roads, Macapagal Dr. Road, Cagayan de Oro City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0440-006255",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road from Barangay Simpak - Barangay Darumawang Ilaya, Sta. 0+000 - Sta. 2+800, Lala, Lanao del Norte",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": 2.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 2800.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          2800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Construction of Concrete Road from Barangay Simpak - Barangay Darumawang Ilaya, Sta. 0+000 - Sta. 2+800, Lala, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.91,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0444-006326",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at NRJ Kapalong - Talaingod - Valencia - Bukidnon Road to Sitio Kilomayon, Talaingod, Davao del Norte",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of Road at NRJ Kapalong - Talaingod - Valencia - Bukidnon Road to Sitio Kilomayon, Talaingod, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0445-006346",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Bridge along T'boli - Laconon Road, South Cotabato",
      "office": "Central Office",
      "amountPesos": 80000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Construction (Completion) of Bridge along T'boli - Laconon Road, South Cotabato",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0413-005721",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation Of Road And Drainage At Samonte, Barangay Holy Spirit, Quezon City",
      "office": "Central Office",
      "amountPesos": 79870000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Rehabilitation Of Road And Drainage At Samonte, Barangay Holy Spirit, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0203-001685",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1038 + 833 - K1040 + 031, K1040 + 069 - K1040 + 400",
      "office": "Central Office",
      "amountPesos": 79700000,
      "lengthKm": 1.529,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 52125572.27,
      "lengthMeters": 1529.0,
      "allocationPerStatedMeter": 52125.57,
      "rangesMeters": [
        [
          1038833.0,
          1040031.0
        ],
        [
          1040069.0,
          1040400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1038 + 833 - K1040 + 031, K1040 + 069 - K1040 + 400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 1.55,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0176-001209",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Catarman-Calbayog Rd - K0762 + 802 - K0762 + 886, K0765 + 176 - K0765 + 432, K0771 + 000 - K0771 + 078, K0771 + 751 - K0771 + 837",
      "office": "Central Office",
      "amountPesos": 79366000,
      "lengthKm": 0.504,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 157472222.22,
      "lengthMeters": 504.0,
      "allocationPerStatedMeter": 157472.22,
      "rangesMeters": [
        [
          762802.0,
          762886.0
        ],
        [
          765176.0,
          765432.0
        ],
        [
          771000.0,
          771078.0
        ],
        [
          771751.0,
          771837.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Catarman-Calbayog Rd - K0762 + 802 - K0762 + 886, K0765 + 176 - K0765 + 432, K0771 + 000 - K0771 + 078, K0771 + 751 - K0771 + 837",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 1.52,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0412-005706",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Orange St. (Chainage 0+000 - Chainage 0+104), Manga St. (Chainage 0+000 - Chainage 0+330), Rambutan St. (Chainage 0+000 - Chainage 0+036), Kamatsile St. (Chainage 0+074 - Chainage 0+149) at Barangay Sta. Monica, Quezon City",
      "office": "Central Office",
      "amountPesos": 79025000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "412",
      "lengthEvidence": "Construction of Road and Drainage at Orange St. (Chainage 0+000 - Chainage 0+104), Manga St. (Chainage 0+000 - Chainage 0+330), Rambutan St. (Chainage 0+000 - Chainage 0+036), Kamatsile St. (Chainage 0+074 - Chainage 0+149) at Barangay Sta. Monica, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0157-000890",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Iloilo-Antique Rd - K0018 + 677 - K0018 + 768, K0018 + 768 - K0018 + 802, K0018 + 802 - K0018 + 876, K0018 +921 - K0018 + 951, K0018 + 951 - K0019 + 072, K0019 + 072 - K0019 + 333, K0019 + 333 - K0020 + 000, K0020 + 000 - K0020 + 188",
      "office": "Central Office",
      "amountPesos": 79000000,
      "lengthKm": 1.466,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 53888130.97,
      "lengthMeters": 1466.0,
      "allocationPerStatedMeter": 53888.13,
      "rangesMeters": [
        [
          18677.0,
          18768.0
        ],
        [
          18768.0,
          18802.0
        ],
        [
          18802.0,
          18876.0
        ],
        [
          18921.0,
          18951.0
        ],
        [
          18951.0,
          19072.0
        ],
        [
          19072.0,
          19333.0
        ],
        [
          19333.0,
          20000.0
        ],
        [
          20000.0,
          20188.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "157",
      "lengthEvidence": "Iloilo-Antique Rd - K0018 + 677 - K0018 + 768, K0018 + 768 - K0018 + 802, K0018 + 802 - K0018 + 876, K0018 +921 - K0018 + 951, K0018 + 951 - K0019 + 072, K0019 + 072 - K0019 + 333, K0019 + 333 - K0020 + 000, K0020 + 000 - K0020 + 188",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 1.66,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0175-001188",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Abuyon-Buenavista Rd - K0258 + 300 - K0258 + 600",
      "office": "Central Office",
      "amountPesos": 79000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 263333333.33,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 263333.33,
      "rangesMeters": [
        [
          258300.0,
          258600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "Abuyon-Buenavista Rd - K0258 + 300 - K0258 + 600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 1.46,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0260-002685",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Napisik Br. (B00392MN) along Oroquieta City-Calamba Mt Rd",
      "office": "Central Office",
      "amountPesos": 79000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Napisik Br. (B00392MN) along Oroquieta City-Calamba Mt Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0151-000776",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0679 + (-056) - K0679 + 100, K0679 + 450 - K0680 + 133, K0680 + 914 - K0681 + 300, K0689 + 330 - K0689 + 933, K0694 + 700 - K0695 + 279, K0695 + 325 - K0696 + 010",
      "office": "Central Office",
      "amountPesos": 78885000,
      "lengthKm": 3.092,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 25512613.2,
      "lengthMeters": 3092.0,
      "allocationPerStatedMeter": 25512.61,
      "rangesMeters": [
        [
          678944.0,
          679100.0
        ],
        [
          679450.0,
          680133.0
        ],
        [
          680914.0,
          681300.0
        ],
        [
          689330.0,
          689933.0
        ],
        [
          694700.0,
          695279.0
        ],
        [
          695325.0,
          696010.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0679 + (-056) - K0679 + 100, K0679 + 450 - K0680 + 133, K0680 + 914 - K0681 + 300, K0689 + 330 - K0689 + 933, K0694 + 700 - K0695 + 279, K0695 + 325 - K0696 + 010",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 0.74,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0199-001598",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1644 + 549 - K1647 + 000",
      "office": "Central Office",
      "amountPesos": 78484000,
      "lengthKm": 2.451,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32021215.83,
      "lengthMeters": 2451.0,
      "allocationPerStatedMeter": 32021.22,
      "rangesMeters": [
        [
          1644549.0,
          1647000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1644 + 549 - K1647 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 0.91,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0417-005797",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Mongol-Nalbu-Alimit-Nattum-Dulao Road, Sta. 15+900 - Sta. 17+600, Mayoyao, Ifugao",
      "office": "Central Office",
      "amountPesos": 78050000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45911764.71,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 45911.76,
      "rangesMeters": [
        [
          15900.0,
          17600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Construction of Mongol-Nalbu-Alimit-Nattum-Dulao Road, Sta. 15+900 - Sta. 17+600, Mayoyao, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.9,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0125-000282",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sta Rosa-Ulat-Tagaytay Rd - K0040 + (-950) - K0040 + (-705), K0040 + (-578) - K0041 + 000, K0041 + 361 - K0043 + 000",
      "office": "Central Office",
      "amountPesos": 78028000,
      "lengthKm": 3.462,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22538417.1,
      "lengthMeters": 3462.0,
      "allocationPerStatedMeter": 22538.42,
      "rangesMeters": [
        [
          39050.0,
          39295.0
        ],
        [
          39422.0,
          41000.0
        ],
        [
          41361.0,
          43000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Sta Rosa-Ulat-Tagaytay Rd - K0040 + (-950) - K0040 + (-705), K0040 + (-578) - K0041 + 000, K0041 + 361 - K0043 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.12,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0141-000594",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Malvar Rd - K0002 + (-665) - K0002+913",
      "office": "Central Office",
      "amountPesos": 78000000,
      "lengthKm": 1.578,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49429657.79,
      "lengthMeters": 1578.0,
      "allocationPerStatedMeter": 49429.66,
      "rangesMeters": [
        [
          1335.0,
          2913.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Malvar Rd - K0002 + (-665) - K0002+913",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 2.29,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0141-000606",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sta. Elena-Capalonga By Pass Coastal Rd - K0285 + 712 – K0288 + 245",
      "office": "Central Office",
      "amountPesos": 78000000,
      "lengthKm": 2.533,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30793525.46,
      "lengthMeters": 2533.0,
      "allocationPerStatedMeter": 30793.53,
      "rangesMeters": [
        [
          285712.0,
          288245.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Sta. Elena-Capalonga By Pass Coastal Rd - K0285 + 712 – K0288 + 245",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 1.86,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0126-000296",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tablas Circumferential Rd - K0005 + 854 - K0006 + 000, K0007 + 000 - K0007 + 083, K0010 + 000 - K0010 + 307.30",
      "office": "Central Office",
      "amountPesos": 77926000,
      "lengthKm": 0.5362999999999992,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 145303002.05,
      "lengthMeters": 536.3,
      "allocationPerStatedMeter": 145303.0,
      "rangesMeters": [
        [
          5854.0,
          6000.0
        ],
        [
          7000.0,
          7083.0
        ],
        [
          10000.0,
          10307.3
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Tablas Circumferential Rd - K0005 + 854 - K0006 + 000, K0007 + 000 - K0007 + 083, K0010 + 000 - K0010 + 307.30",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 4.5,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0125-000284",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Bongabong-Sagana-Roxas-Sn Aquilino Rd - K0122 + 000 - K0122 + 421, K0124 + 000 - K0125 + 721",
      "office": "Central Office",
      "amountPesos": 77864000,
      "lengthKm": 2.142,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 36351073.76,
      "lengthMeters": 2142.0,
      "allocationPerStatedMeter": 36351.07,
      "rangesMeters": [
        [
          122000.0,
          122421.0
        ],
        [
          124000.0,
          125721.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Bongabong-Sagana-Roxas-Sn Aquilino Rd - K0122 + 000 - K0122 + 421, K0124 + 000 - K0125 + 721",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.81,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0175-001186",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0451 + 572 - K0451 + 644, K0452 + 086 - K0452 + 106, K0454 + 669 - K0454 + 710, K0455 + 065 - K0455 + 150, K0455 + 252 - K0455 + 287, K0455 + 945 - K0455 + 970, K0456 + 099 - K0456 + 144, K0456 + 175 - K0456 + 195, K0456 + 610 - K0456 + 630, K0459 + 037 - K0459 + 066, K0459 + 1008 - K0459 + 1045, K0459 + 1300 - K0459 + 1363, K0459 + 1851 - K0459 + 1876, K0461 + 390 - K0461 + 432, K0462 + 440 - K0462 + 522, K0462 + 551 - K0462 + 585, K0463 + 510 - K0463 + 571",
      "office": "Central Office",
      "amountPesos": 77605000,
      "lengthKm": 0.736,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 105441576.09,
      "lengthMeters": 736.0,
      "allocationPerStatedMeter": 105441.58,
      "rangesMeters": [
        [
          451572.0,
          451644.0
        ],
        [
          452086.0,
          452106.0
        ],
        [
          454669.0,
          454710.0
        ],
        [
          455065.0,
          455150.0
        ],
        [
          455252.0,
          455287.0
        ],
        [
          455945.0,
          455970.0
        ],
        [
          456099.0,
          456144.0
        ],
        [
          456175.0,
          456195.0
        ],
        [
          456610.0,
          456630.0
        ],
        [
          459037.0,
          459066.0
        ],
        [
          460008.0,
          460045.0
        ],
        [
          460300.0,
          460363.0
        ],
        [
          460851.0,
          460876.0
        ],
        [
          461390.0,
          461432.0
        ],
        [
          462440.0,
          462522.0
        ],
        [
          462551.0,
          462585.0
        ],
        [
          463510.0,
          463571.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0451 + 572 - K0451 + 644, K0452 + 086 - K0452 + 106, K0454 + 669 - K0454 + 710, K0455 + 065 - K0455 + 150, K0455 + 252 - K0455 + 287, K0455 + 945 - K0455 + 970, K0456 + 099 - K0456 + 144, K0456 + 175 - K0456 + 195, K0456 + 610 - K0456 + 630, K0459 + 037 - K0459 + 066, K0459 + 1008 - K0459 + 1045, K0459 + 1300 - K0459 + 1363, K0459 + 1851 - K0459 + 1876, K0461 + 390 - K0461 + 432, K0462 + 440 - K0462 + 522, K0462 + 551 - K0462 + 585, K0463 + 510 - K0463 + 571",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 1.02,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0234-002257",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Cervantes (Ilocos Sur) - Besao-Sagada (Mt. Province) Road via Laylaya, Sta. 12+980 - Sta 14+760",
      "office": "Central Office",
      "amountPesos": 77495000,
      "lengthKm": 1.78,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 43536516.85,
      "lengthMeters": 1780.0,
      "allocationPerStatedMeter": 43536.52,
      "rangesMeters": [
        [
          12980.0,
          14760.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Cervantes (Ilocos Sur) - Besao-Sagada (Mt. Province) Road via Laylaya, Sta. 12+980 - Sta 14+760",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 0.55,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0205-001720",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Dapa-Jct Cancohoy Rd - K0002 + 000 - K0005 + 000",
      "office": "Central Office",
      "amountPesos": 77472000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25824000.0,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 25824.0,
      "rangesMeters": [
        [
          2000.0,
          5000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Dapa-Jct Cancohoy Rd - K0002 + 000 - K0005 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 0.97,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0117-000127",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1667 + 207 - K1668 + 000",
      "office": "Central Office",
      "amountPesos": 77389000,
      "lengthKm": 0.793,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 97590163.93,
      "lengthMeters": 793.0,
      "allocationPerStatedMeter": 97590.16,
      "rangesMeters": [
        [
          1667207.0,
          1668000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1667 + 207 - K1668 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 2.3,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0417-005798",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Abinuan - Nattum - Alimit, Sta. 2+450 - Sta. 4+160, Mayoyao, Ifugao",
      "office": "Central Office",
      "amountPesos": 77000000,
      "lengthKm": 1.71,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45029239.77,
      "lengthMeters": 1710.0,
      "allocationPerStatedMeter": 45029.24,
      "rangesMeters": [
        [
          2450.0,
          4160.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Construction of Road, Abinuan - Nattum - Alimit, Sta. 2+450 - Sta. 4+160, Mayoyao, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.87,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0425-005959",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge along Dasmariñas - General Trias - Tanza Diversion Road, Tanza Section, Tanza, Cavite",
      "office": "Central Office",
      "amountPesos": 77000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Construction of Bridge along Dasmariñas - General Trias - Tanza Diversion Road, Tanza Section, Tanza, Cavite",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0435-006165",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Poblacion 1 to Barangay Camayse, Zumarraga, (Sta. 0+500 - Sta.1+738) Samar",
      "office": "Central Office",
      "amountPesos": 77000000,
      "lengthKm": 1.238,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 62197092.08,
      "lengthMeters": 1238.0,
      "allocationPerStatedMeter": 62197.09,
      "rangesMeters": [
        [
          500.0,
          1738.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of Road, Poblacion 1 to Barangay Camayse, Zumarraga, (Sta. 0+500 - Sta.1+738) Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 2.49,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0427-005997",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Carsadang Bago R1 By-Pass, Sta. 0 + 871- Sta. 1 + 340, Kawit, Cavite",
      "office": "Central Office",
      "amountPesos": 76900000,
      "lengthKm": 0.469,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 163965884.86,
      "lengthMeters": 469.0,
      "allocationPerStatedMeter": 163965.88,
      "rangesMeters": [
        [
          871.0,
          1340.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Construction of Road, Carsadang Bago R1 By-Pass, Sta. 0 + 871- Sta. 1 + 340, Kawit, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 6.7,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0118-000144",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Makilala-Allah Valley Rd - K1633 + 000 - K1633 + 448, K1638 + 000 - K1638 + 526",
      "office": "Central Office",
      "amountPesos": 76875000,
      "lengthKm": 0.974,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 78927104.72,
      "lengthMeters": 974.0,
      "allocationPerStatedMeter": 78927.1,
      "rangesMeters": [
        [
          1633000.0,
          1633448.0
        ],
        [
          1638000.0,
          1638526.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Makilala-Allah Valley Rd - K1633 + 000 - K1633 + 448, K1638 + 000 - K1638 + 526",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 1.71,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0203-001677",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Aklan West Rd (Kalibo-Nabas) – K0251 + 122 – K0252 + 020",
      "office": "Central Office",
      "amountPesos": 76777000,
      "lengthKm": 0.898,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 85497772.83,
      "lengthMeters": 898.0,
      "allocationPerStatedMeter": 85497.77,
      "rangesMeters": [
        [
          251122.0,
          252020.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Aklan West Rd (Kalibo-Nabas) – K0251 + 122 – K0252 + 020",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.68,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0198-001573",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Dumaguete South Rd - K0066+867 - K0067+468, K0069+160 - K0070+000",
      "office": "Central Office",
      "amountPesos": 76730000,
      "lengthKm": 1.441,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 53247744.62,
      "lengthMeters": 1441.0,
      "allocationPerStatedMeter": 53247.74,
      "rangesMeters": [
        [
          66867.0,
          67468.0
        ],
        [
          69160.0,
          70000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Dumaguete South Rd - K0066+867 - K0067+468, K0069+160 - K0070+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 1.19,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0205-001723",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Dapa-Jct Cancohoy Rd - K0005 + 000 - K0008 + 000",
      "office": "Central Office",
      "amountPesos": 76683000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25561000.0,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 25561.0,
      "rangesMeters": [
        [
          5000.0,
          8000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Dapa-Jct Cancohoy Rd - K0005 + 000 - K0008 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 0.96,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0225-002114",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "CDO-Opol-EI Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Baikingon Bridge, Sta. 8+862 - Sta. 8+922.75, Barangay Baikingon, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 76667000,
      "lengthKm": 0.06075,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 60.75,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          8862.0,
          8922.75
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "225",
      "lengthEvidence": "CDO-Opol-EI Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Baikingon Bridge, Sta. 8+862 - Sta. 8+922.75, Barangay Baikingon, Cagayan de Oro City",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0198-001578",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Dumaguete South Rd - K0077 + 972 - K0079 + 401",
      "office": "Central Office",
      "amountPesos": 76659000,
      "lengthKm": 1.429,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53645206.44,
      "lengthMeters": 1429.0,
      "allocationPerStatedMeter": 53645.21,
      "rangesMeters": [
        [
          77972.0,
          79401.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Dumaguete South Rd - K0077 + 972 - K0079 + 401",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 1.2,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0139-000570",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Guimba - Talugtug - Umingan Rd, K0153 + 112 - K156 + 000",
      "office": "Central Office",
      "amountPesos": 76600000,
      "lengthKm": 2.888,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26523545.71,
      "lengthMeters": 2888.0,
      "allocationPerStatedMeter": 26523.55,
      "rangesMeters": [
        [
          153112.0,
          156000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Guimba - Talugtug - Umingan Rd, K0153 + 112 - K156 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 1.6,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0425-005949",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage Canal in Barangay Pacita 1, San Pedro City, Laguna",
      "office": "Central Office",
      "amountPesos": 76500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Construction of Road and Drainage Canal in Barangay Pacita 1, San Pedro City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0117-000130",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1711 + 301 - K1712 + 712.01",
      "office": "Central Office",
      "amountPesos": 76380000,
      "lengthKm": 1.4110100000000094,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54131437.76,
      "lengthMeters": 1411.01,
      "allocationPerStatedMeter": 54131.44,
      "rangesMeters": [
        [
          1711301.0,
          1712712.01
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1711 + 301 - K1712 + 712.01",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 1.38,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0156-000872",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "P Burgos - Pototanin Jct, Quezon - K0157 + 298 - K0158 + 700",
      "office": "Central Office",
      "amountPesos": 76000000,
      "lengthKm": 1.402,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54208273.89,
      "lengthMeters": 1402.0,
      "allocationPerStatedMeter": 54208.27,
      "rangesMeters": [
        [
          157298.0,
          158700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "P Burgos - Pototanin Jct, Quezon - K0157 + 298 - K0158 + 700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 1.67,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0236-002305",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Section I: Sta. 2 + 880 - 3 + 760, Secton II: Sta. 10 + 982 - Sta. 11 + 381, Section III: Sta. 11 + 475 - Sta. 11 + 640, Quezon",
      "office": "Central Office",
      "amountPesos": 76000000,
      "lengthKm": 1.444,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 52631578.95,
      "lengthMeters": 1444.0,
      "allocationPerStatedMeter": 52631.58,
      "rangesMeters": [
        [
          2880.0,
          3760.0
        ],
        [
          10982.0,
          11381.0
        ],
        [
          11475.0,
          11640.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Section I: Sta. 2 + 880 - 3 + 760, Secton II: Sta. 10 + 982 - Sta. 11 + 381, Section III: Sta. 11 + 475 - Sta. 11 + 640, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 0.84,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0437-006207",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road leading to Municipal Complex, Pahut, Bongao, Tawi-Tawi",
      "office": "Central Office",
      "amountPesos": 76000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Construction of Road leading to Municipal Complex, Pahut, Bongao, Tawi-Tawi",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0489-007258",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Morado to Barangay Pasa, City of Ilagan, Isabela (Sta. 0+000 - Sta. 7+100)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 76000000,
      "lengthKm": 7.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10704225.35,
      "lengthMeters": 7100.0,
      "allocationPerStatedMeter": 10704.23,
      "rangesMeters": [
        [
          0.0,
          7100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of Concrete Road, Barangay Morado to Barangay Pasa, City of Ilagan, Isabela (Sta. 0+000 - Sta. 7+100)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.34,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0128-000342",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Dinagat-Loreto Rd - K0003 + 000 - K0004 + 769, K0004 + 795 - K0007 + 100, K0007 + 200 - K0007 + 582",
      "office": "Central Office",
      "amountPesos": 75860000,
      "lengthKm": 4.456,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 17024236.98,
      "lengthMeters": 4456.0,
      "allocationPerStatedMeter": 17024.24,
      "rangesMeters": [
        [
          3000.0,
          4769.0
        ],
        [
          4795.0,
          7100.0
        ],
        [
          7200.0,
          7582.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Dinagat-Loreto Rd - K0003 + 000 - K0004 + 769, K0004 + 795 - K0007 + 100, K0007 + 200 - K0007 + 582",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.03,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0417-005803",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Pilar South Road, Sta. 0+000-Sta. 1+100, Pilar, Abra",
      "office": "Central Office",
      "amountPesos": 75800000,
      "lengthKm": 1.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 68909090.91,
      "lengthMeters": 1100.0,
      "allocationPerStatedMeter": 68909.09,
      "rangesMeters": [
        [
          0.0,
          1100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Rehabilitation of Pilar South Road, Sta. 0+000-Sta. 1+100, Pilar, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 2.76,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0114-000067",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Palo-Carigara-Ormoc Rd - K0993 + 000 - K0995 + 000",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37500000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 37500.0,
      "rangesMeters": [
        [
          993000.0,
          995000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Palo-Carigara-Ormoc Rd - K0993 + 000 - K0995 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0125-000292",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "PPSR Jct (Abo-abo)-Quezon Rd - K0133 + 390 - K0134 + 500, K0134 + 833 - K0136 + 228, K0136 + 253 - K0138 + 550",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 4.802,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 15618492.29,
      "lengthMeters": 4802.0,
      "allocationPerStatedMeter": 15618.49,
      "rangesMeters": [
        [
          133390.0,
          134500.0
        ],
        [
          134833.0,
          136228.0
        ],
        [
          136253.0,
          138550.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "PPSR Jct (Abo-abo)-Quezon Rd - K0133 + 390 - K0134 + 500, K0134 + 833 - K0136 + 228, K0136 + 253 - K0138 + 550",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.95,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0139-000558",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sn Juan-Sn Gabriel Rd - K0281 + 890 - K0284 + 386",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 2.496,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30048076.92,
      "lengthMeters": 2496.0,
      "allocationPerStatedMeter": 30048.08,
      "rangesMeters": [
        [
          281890.0,
          284386.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Sn Juan-Sn Gabriel Rd - K0281 + 890 - K0284 + 386",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 1.81,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0156-000873",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "P Burgos - Pototanin Jct, Quezon - K0184 + 110 - K0185 + 500",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 1.39,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53956834.53,
      "lengthMeters": 1390.0,
      "allocationPerStatedMeter": 53956.83,
      "rangesMeters": [
        [
          184110.0,
          185500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "P Burgos - Pototanin Jct, Quezon - K0184 + 110 - K0185 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 1.66,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0173-001156",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0159 + 397 - K0159 + 454 (R/S)",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.057,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1315789473.68,
      "lengthMeters": 57.0,
      "allocationPerStatedMeter": 1315789.47,
      "rangesMeters": [
        [
          159397.0,
          159454.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Maharlika Highway (LZ) - K0159 + 397 - K0159 + 454 (R/S)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 3.95,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0173-001157",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0159 + 454 - K0159 + 511 (R/S)",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.057,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1315789473.68,
      "lengthMeters": 57.0,
      "allocationPerStatedMeter": 1315789.47,
      "rangesMeters": [
        [
          159454.0,
          159511.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Maharlika Highway (LZ) - K0159 + 454 - K0159 + 511 (R/S)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 3.95,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0176-001215",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1598 + 150 - K1598 + 300",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 500000000.0,
      "lengthMeters": 150.0,
      "allocationPerStatedMeter": 500000.0,
      "rangesMeters": [
        [
          1598150.0,
          1598300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1598 + 150 - K1598 + 300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 2.63,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0182-001321",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 18000 - Chainage 18070",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "182",
      "lengthEvidence": "Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 18000 - Chainage 18070",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0202-001660",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Jct Milagros-Baleno-Lagta Rd - K0080 + 663 - K0081 + 730",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 1.067,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 70290534.21,
      "lengthMeters": 1067.0,
      "allocationPerStatedMeter": 70290.53,
      "rangesMeters": [
        [
          80663.0,
          81730.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Jct Milagros-Baleno-Lagta Rd - K0080 + 663 - K0081 + 730",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.38,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0202-001661",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Jct Milagros-Baleno-Lagta Rd - K0081 + 730 - K0082 + 786",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 1.056,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 71022727.27,
      "lengthMeters": 1056.0,
      "allocationPerStatedMeter": 71022.73,
      "rangesMeters": [
        [
          81730.0,
          82786.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Jct Milagros-Baleno-Lagta Rd - K0081 + 730 - K0082 + 786",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.4,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0203-001686",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Lemon-Leyte-Biliran Rd - K0984 + 645 - K0986 + 137",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 1.492,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50268096.51,
      "lengthMeters": 1492.0,
      "allocationPerStatedMeter": 50268.1,
      "rangesMeters": [
        [
          984645.0,
          986137.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Lemon-Leyte-Biliran Rd - K0984 + 645 - K0986 + 137",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 1.5,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0203-001687",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Lemon-Leyte-Biliran Rd - K1003 + 280 - K1004 + 778",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 1.498,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50066755.67,
      "lengthMeters": 1498.0,
      "allocationPerStatedMeter": 50066.76,
      "rangesMeters": [
        [
          1003280.0,
          1004778.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Lemon-Leyte-Biliran Rd - K1003 + 280 - K1004 + 778",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 1.49,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0214-001898",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Chico Karayan Bridge-Lanao-Tikitik Bypass Road, Sta. 1+600 - Sta. 1+760, Bontoc, Mountain Province",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.16,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 160.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          1600.0,
          1760.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Chico Karayan Bridge-Lanao-Tikitik Bypass Road, Sta. 1+600 - Sta. 1+760, Bontoc, Mountain Province",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0215-001900",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Alcala-Santo Niño-Lasam Road, Alcala Section, (Sta. 0+167.08 - Sta. 0+453.80), Cagayan",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.28672000000000003,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 261579241.07,
      "lengthMeters": 286.72,
      "allocationPerStatedMeter": 261579.24,
      "rangesMeters": [
        [
          167.08,
          453.8
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Alcala-Santo Niño-Lasam Road, Alcala Section, (Sta. 0+167.08 - Sta. 0+453.80), Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 1.25,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0219-001993",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Luisiana-Mauban Diversion Road, Sta. 31+351 - Sta. 31+913.5, Mauban Section, Quezon",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.5625,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 133333333.33,
      "lengthMeters": 562.5,
      "allocationPerStatedMeter": 133333.33,
      "rangesMeters": [
        [
          31351.0,
          31913.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Luisiana-Mauban Diversion Road, Sta. 31+351 - Sta. 31+913.5, Mauban Section, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.98,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0225-002111",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "CDO-New Eastern Diversion Road (Jct. South Diversion Road/Mandumol-Nazareth- Camamaman-an-Justo Ramonal-Jct. J.R Borja-LKKS-BCIR/Lapasan), Barangay Indahag- Barangay Lapasan, Sta. 0+000- Sta. 0+672.75, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.67275,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 111482720.18,
      "lengthMeters": 672.75,
      "allocationPerStatedMeter": 111482.72,
      "rangesMeters": [
        [
          0.0,
          672.75
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "225",
      "lengthEvidence": "CDO-New Eastern Diversion Road (Jct. South Diversion Road/Mandumol-Nazareth- Camamaman-an-Justo Ramonal-Jct. J.R Borja-LKKS-BCIR/Lapasan), Barangay Indahag- Barangay Lapasan, Sta. 0+000- Sta. 0+672.75, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.82,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0226-002131",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Jct. Maramag-Maradugao Road-Jct. Lampanusan Road Ext. (Jct. Sayre Highway (Damulog)-Kibawe-Jct. Buda (Sinuda), Kitaotao By-Pass/Alternate Road), Barangay Tangkulan (Jose Rizal), Sta. 21+700 - Sta. 22+575, Damulog, Bukidnon",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.875,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 85714285.71,
      "lengthMeters": 875.0,
      "allocationPerStatedMeter": 85714.29,
      "rangesMeters": [
        [
          21700.0,
          22575.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Jct. Maramag-Maradugao Road-Jct. Lampanusan Road Ext. (Jct. Sayre Highway (Damulog)-Kibawe-Jct. Buda (Sinuda), Kitaotao By-Pass/Alternate Road), Barangay Tangkulan (Jose Rizal), Sta. 21+700 - Sta. 22+575, Damulog, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.8,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0227-002150",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sayre Highway Parallel Road II (Quezon Section), Barangay Paitan Section, Sta. 140+830 - Sta. 140+855.71, Quezon, Bukidnon",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.02570999999999185,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2917152858.81,
      "lengthMeters": 25.71,
      "allocationPerStatedMeter": 2917152.86,
      "rangesMeters": [
        [
          140830.0,
          140855.71
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Sayre Highway Parallel Road II (Quezon Section), Barangay Paitan Section, Sta. 140+830 - Sta. 140+855.71, Quezon, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 2.44,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0228-002162",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Construction of Koronadal City By-pass Road (Paraiso-Mambucal Section), Sta. 0+000 - Sta. 0+500, South Cotabato",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 150000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 150000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Construction of Koronadal City By-pass Road (Paraiso-Mambucal Section), Sta. 0+000 - Sta. 0+500, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 1.18,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0234-002262",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Aguinaldo-Toboy-Natonin Road - Sta. 14+220 - Sta. 15+380",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 1.16,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 64655172.41,
      "lengthMeters": 1160.0,
      "allocationPerStatedMeter": 64655.17,
      "rangesMeters": [
        [
          14220.0,
          15380.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Aguinaldo-Toboy-Natonin Road - Sta. 14+220 - Sta. 15+380",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 1.03,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0237-002321",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Asid-Tigbao-Bara-Malbug Road (Atipulo Bridge), Masbate, Sta. 32+480",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Asid-Tigbao-Bara-Malbug Road (Atipulo Bridge), Masbate, Sta. 32+480",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0237-002324",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Claveria - San Isidro - Peñafrancia Road, Masbate - Sta. 5 + 695 - Sta. 6 + 995",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 1.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 57692307.69,
      "lengthMeters": 1300.0,
      "allocationPerStatedMeter": 57692.31,
      "rangesMeters": [
        [
          5695.0,
          6995.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Claveria - San Isidro - Peñafrancia Road, Masbate - Sta. 5 + 695 - Sta. 6 + 995",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 0.92,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0237-002326",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Claveria - San Isidro - Peñafrancia Road, Masbate - Sta. 6 + 995 - Sta. 7 + 425, Sta. 9 + 150 - Sta. 10 + 020",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 1.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 57692307.69,
      "lengthMeters": 1300.0,
      "allocationPerStatedMeter": 57692.31,
      "rangesMeters": [
        [
          6995.0,
          7425.0
        ],
        [
          9150.0,
          10020.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Claveria - San Isidro - Peñafrancia Road, Masbate - Sta. 6 + 995 - Sta. 7 + 425, Sta. 9 + 150 - Sta. 10 + 020",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 0.92,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0238-002333",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.978,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 76687116.56,
      "lengthMeters": 978.0,
      "allocationPerStatedMeter": 76687.12,
      "rangesMeters": [
        [
          8322.0,
          9300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 0.78,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0238-002335",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.891,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 84175084.18,
      "lengthMeters": 891.0,
      "allocationPerStatedMeter": 84175.08,
      "rangesMeters": [
        [
          7380.0,
          8271.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 0.85,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0238-002336",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 1.197,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 62656641.6,
      "lengthMeters": 1197.0,
      "allocationPerStatedMeter": 62656.64,
      "rangesMeters": [
        [
          8271.0,
          9468.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0238-002340",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Poblacion-Morocborocan-Guinhadap-Maglambong-Sto. Niño Road, Masbate - Sta. 5+875 - Sta. 6+625",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          5875.0,
          6625.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Poblacion-Morocborocan-Guinhadap-Maglambong-Sto. Niño Road, Masbate - Sta. 5+875 - Sta. 6+625",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 1.01,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0238-002341",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Poblacion-Quintina Road, Masbate - Sta. 5 + 680 - Sta. 6 + 880",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 62500000.0,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 62500.0,
      "rangesMeters": [
        [
          5680.0,
          6880.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Poblacion-Quintina Road, Masbate - Sta. 5 + 680 - Sta. 6 + 880",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0238-002342",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "San Fernando - San Jacinto - Monreal Road, Masbate - Sta. 20 + 018 - Sta. 21 + 218",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 62500000.0,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 62500.0,
      "rangesMeters": [
        [
          20018.0,
          21218.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "San Fernando - San Jacinto - Monreal Road, Masbate - Sta. 20 + 018 - Sta. 21 + 218",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0238-002343",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "San Fernando - San Jacinto - Monreal Road, Masbate - Sta. 21 + 218 - Sta. 22 + 040",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.822,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 91240875.91,
      "lengthMeters": 822.0,
      "allocationPerStatedMeter": 91240.88,
      "rangesMeters": [
        [
          21218.0,
          22040.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "San Fernando - San Jacinto - Monreal Road, Masbate - Sta. 21 + 218 - Sta. 22 + 040",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 0.92,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0239-002351",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Albuera – Burauen Rd (Albuera Section) - Sta. 7+463.50 - Sta. 7+584.73, Barangay San Pedro, Albuera, Leyte",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.12122999999999956,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 618658747.83,
      "lengthMeters": 121.23,
      "allocationPerStatedMeter": 618658.75,
      "rangesMeters": [
        [
          7463.5,
          7584.73
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Albuera – Burauen Rd (Albuera Section) - Sta. 7+463.50 - Sta. 7+584.73, Barangay San Pedro, Albuera, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 0.71,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0255-002593",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Tertiary Roads",
      "projectName": "Paracelis-Mallig-Roxas Rd - Chainage 9006 - Chainage 10506",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "255",
      "lengthEvidence": "Paracelis-Mallig-Roxas Rd - Chainage 9006 - Chainage 10506",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002629",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "San Rafael Br. (B00184MR) along Calapan North Rd",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "San Rafael Br. (B00184MR) along Calapan North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002635",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Guinobatan Br. (B00292LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Guinobatan Br. (B00292LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002641",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Señora Br. (B00008SJ) along Siquijor Circumferential Rd",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Señora Br. (B00008SJ) along Siquijor Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002798",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Mompong Br. (B00092MR) along Mindoro West Coastal Rd",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Mompong Br. (B00092MR) along Mindoro West Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0286-003246",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Cabayongan Br. (B00074LT) along Jaro-Dagami-Burauen-Lapaz Rd",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Cabayongan Br. (B00074LT) along Jaro-Dagami-Burauen-Lapaz Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0286-003249",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Pag-sangaan Parallel Br. along Palompon-Isabel-Merida-Ormoc Rd",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Pag-sangaan Parallel Br. along Palompon-Isabel-Merida-Ormoc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0412-005708",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Capitol Hills (Sta.0+000 - 0+779.48), Barangay Old Balara,Quezon City, 14.66325, 121.07438",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.7794800000000001,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 96217991.48,
      "lengthMeters": 779.48,
      "allocationPerStatedMeter": 96217.99,
      "rangesMeters": [
        [
          0.0,
          779.48
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "412",
      "lengthEvidence": "Rehabilitation of Road at Capitol Hills (Sta.0+000 - 0+779.48), Barangay Old Balara,Quezon City, 14.66325, 121.07438",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 4.95,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0414-005727",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road leading to Sitio of Pines, Tubaday, Santol, La Union",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Construction of Access Road leading to Sitio of Pines, Tubaday, Santol, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0414-005742",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction/Improvement of Roads, s. Poblacion, Nancalabasaan, Lauren and San Andres, Umingan, Pangasinan, Sta. 0+000 - Sta. 2+888",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 2.888,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25969529.09,
      "lengthMeters": 2888.0,
      "allocationPerStatedMeter": 25969.53,
      "rangesMeters": [
        [
          0.0,
          2888.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Reconstruction/Improvement of Roads, s. Poblacion, Nancalabasaan, Lauren and San Andres, Umingan, Pangasinan, Sta. 0+000 - Sta. 2+888",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.83,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0416-005770",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Rissing to Paratong No.4 Road leading to Paratong District Beach, Bangar, La Union",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Improvement of Rissing to Paratong No.4 Road leading to Paratong District Beach, Bangar, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0416-005774",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Replacement) of Kayapa Bridge, Sta. 1+220 - Sta. 1+260, Hingyon, Ifugao",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.04,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1875000000.0,
      "lengthMeters": 40.0,
      "allocationPerStatedMeter": 1875000.0,
      "rangesMeters": [
        [
          1220.0,
          1260.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Construction (Replacement) of Kayapa Bridge, Sta. 1+220 - Sta. 1+260, Hingyon, Ifugao",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 1.33,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0419-005842",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road going to Anao TPLEX (Section 4), Tarlac",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Construction of Access Road going to Anao TPLEX (Section 4), Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0419-005848",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of By-pass and Diversion Roads along Sto. Domingo Aranguren Bypass Road, Sta. 0+670.00 to Sta. 1+170.00, Capas, Tarlac",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 150000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 150000.0,
      "rangesMeters": [
        [
          670.0,
          1170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Construction of By-pass and Diversion Roads along Sto. Domingo Aranguren Bypass Road, Sta. 0+670.00 to Sta. 1+170.00, Capas, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 6.13,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0420-005866",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Lual Bridge, Casiguran, Aurora",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Construction of Lual Bridge, Casiguran, Aurora",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0421-005873",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Guiguinto By-pass Road- Construction of Bridge Sta. 1+608.61 - Sta. 1+628.61, Guiguinto, Bulacan",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.02,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 20.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          1608.6100000000001,
          1628.6100000000001
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Construction of Guiguinto By-pass Road- Construction of Bridge Sta. 1+608.61 - Sta. 1+628.61, Guiguinto, Bulacan",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0421-005880",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Moncada-San Manuel Bypass Road (Section 5), Tarlac",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Construction of Moncada-San Manuel Bypass Road (Section 5), Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005912",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Jefmin, Concepcion, Tarlac",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Road at Barangay Jefmin, Concepcion, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005914",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Minane, Concepcion, Tarlac",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Road at Barangay Minane, Concepcion, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005918",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay San Vicente to Barangay Sta. Rita Road, Concepcion, Tarlac",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Road at Barangay San Vicente to Barangay Sta. Rita Road, Concepcion, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005919",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Sta. Rita, Concepcion, Tarlac",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Road at Barangay Sta. Rita, Concepcion, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0423-005921",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Sto. Nino, Bamban, Tarlac",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "423",
      "lengthEvidence": "Rehabilitation of Road at Barangay Sto. Nino, Bamban, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0427-006009",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage at Mamplasan-Ganado Road, Biñan City, Laguna",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Rehabilitation of Road with Drainage at Mamplasan-Ganado Road, Biñan City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006010",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road Leading to Barangay Jose Rizal, Municipality of Aborlan, Province of Palawan, Start 9.36514, 118.49194 End 9.39486, 118.45788",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Access Road Leading to Barangay Jose Rizal, Municipality of Aborlan, Province of Palawan, Start 9.36514, 118.49194 End 9.39486, 118.45788",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0430-006071",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Sapngan - San Francisco Road, Bulusan, Sorsogon Sta. 0+000 - Sta. 3+000",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Rehabilitation/Improvement of Sapngan - San Francisco Road, Bulusan, Sorsogon Sta. 0+000 - Sta. 3+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.79,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0432-006103",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sagrada Diversion Road (Daang Maharlika Rd to Baao-Iriga City-Nabua Rd.), Baao, Camarines Sur, Sta. 0 + 000.00 - Sta. 0 + 300.00",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 250000000.0,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 250000.0,
      "rangesMeters": [
        [
          0.0,
          300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Construction of Sagrada Diversion Road (Daang Maharlika Rd to Baao-Iriga City-Nabua Rd.), Baao, Camarines Sur, Sta. 0 + 000.00 - Sta. 0 + 300.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 8.75,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0432-006106",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Salvacion - Patubayan - Palanas - Lalud - Tinampo - San Bernardo Road, Bulusan, Sorsogon, Sta. 0+000 - Sta. 3+000",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Concreting of Salvacion - Patubayan - Palanas - Lalud - Tinampo - San Bernardo Road, Bulusan, Sorsogon, Sta. 0+000 - Sta. 3+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.79,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0432-006108",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Mapapac-Buhang Diversion Road, (Layog-Macabari-Bangate-Buhang Section), Barcelona and Bulusan, Sorsogon",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Rehabilitation of Mapapac-Buhang Diversion Road, (Layog-Macabari-Bangate-Buhang Section), Barcelona and Bulusan, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0434-006147",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, SRP Backroad Extension, Sta. 0+880 - Sta. 1+105, Cebu City",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.225,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 333333333.33,
      "lengthMeters": 225.0,
      "allocationPerStatedMeter": 333333.33,
      "rangesMeters": [
        [
          880.0,
          1105.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Road, SRP Backroad Extension, Sta. 0+880 - Sta. 1+105, Cebu City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 9.43,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0434-006148",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Manipis - Sinsin Road, Sta. 0+000 - Sta. 0+750, Cebu City",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          0.0,
          750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Manipis - Sinsin Road, Sta. 0+000 - Sta. 0+750, Cebu City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 5.15,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0436-006191",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Polangi-Paticua-San Pascual, Sta. 002+607 - Sta. 004+607, Catarman, Northern Samar",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37500000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 37500.0,
      "rangesMeters": [
        [
          2607.0,
          4607.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Roads, Barangay Polangi-Paticua-San Pascual, Sta. 002+607 - Sta. 004+607, Catarman, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.55,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0442-006292",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of road, Sitio Mabago to Sitio Minloon, Barangay Hubangon, Mahinog, Camiguin",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Construction of road, Sitio Mabago to Sitio Minloon, Barangay Hubangon, Mahinog, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0444-006330",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sawata Bypass Road (Igangon - Linao), Sawata, Davao del Norte",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of Sawata Bypass Road (Igangon - Linao), Sawata, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0444-006334",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Panaglib, Kiblawan, Davao del Sur",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of Road, Barangay Panaglib, Kiblawan, Davao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0444-006339",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of NRJ Daang Maharlika Bunawan Proper–San Isidro–Kiotoy–Mabunao–Kauswagan–Jct. Panabo City Fatima–Malabog Road, Panabo City, Davao del Norte",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of NRJ Daang Maharlika Bunawan Proper–San Isidro–Kiotoy–Mabunao–Kauswagan–Jct. Panabo City Fatima–Malabog Road, Panabo City, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0444-006342",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Rizal Bridge to Haguimitan (Haguimitan Creek) Monkayo, Davao de Oro",
      "office": "Central Office",
      "amountPesos": 75000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of Rizal Bridge to Haguimitan (Haguimitan Creek) Monkayo, Davao de Oro",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0113-000046",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Iloilo-Capiz (New Route) - K0057 + 211 - K0057 + 869, K0058 + 239 - K0059+900",
      "office": "Central Office",
      "amountPesos": 74999000,
      "lengthKm": 2.319,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 32341095.3,
      "lengthMeters": 2319.0,
      "allocationPerStatedMeter": 32341.1,
      "rangesMeters": [
        [
          57211.0,
          57869.0
        ],
        [
          58239.0,
          59900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Iloilo-Capiz (New Route) - K0057 + 211 - K0057 + 869, K0058 + 239 - K0059+900",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.86,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0127-000311",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0092 + (-719) - K0093 + 531",
      "office": "Central Office",
      "amountPesos": 74646000,
      "lengthKm": 2.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33176000.0,
      "lengthMeters": 2250.0,
      "allocationPerStatedMeter": 33176.0,
      "rangesMeters": [
        [
          91281.0,
          93531.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0092 + (-719) - K0093 + 531",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.65,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0234-002264",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong- Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
      "office": "Central Office",
      "amountPesos": 74500000,
      "lengthKm": 1.53,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 48692810.46,
      "lengthMeters": 1530.0,
      "allocationPerStatedMeter": 48692.81,
      "rangesMeters": [
        [
          6913.0,
          8200.0
        ],
        [
          10560.0,
          10650.0
        ],
        [
          19320.0,
          19400.0
        ],
        [
          20500.0,
          20573.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong- Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 79029.35,
      "peerRateMultiple": 0.62,
      "peerRecords": 22,
      "peerBand": "1491.5–<2681.2 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 160945.425,
      "graphUpperFence": 222113.51999999996
    },
    {
      "id": "HB10858-3-0287-003273",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Bitaogan Br. (B01127MN) along Jct Manikling-Gov Generoso Rd",
      "office": "Central Office",
      "amountPesos": 74500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Bitaogan Br. (B01127MN) along Jct Manikling-Gov Generoso Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0123-000251",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Nueva Ecija - Pangasinan Rd, K0146 + 000 - K0146 + 411, K0146 + 805 - K0147 + 000, K0148 + 012 - K0148 + 950, K0156 + 000 - K0157 + 064",
      "office": "Central Office",
      "amountPesos": 74300000,
      "lengthKm": 2.608,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 28489263.8,
      "lengthMeters": 2608.0,
      "allocationPerStatedMeter": 28489.26,
      "rangesMeters": [
        [
          146000.0,
          146411.0
        ],
        [
          146805.0,
          147000.0
        ],
        [
          148012.0,
          148950.0
        ],
        [
          156000.0,
          157064.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Nueva Ecija - Pangasinan Rd, K0146 + 000 - K0146 + 411, K0146 + 805 - K0147 + 000, K0148 + 012 - K0148 + 950, K0156 + 000 - K0157 + 064",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.42,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0112-000022",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Calamba-Sta Cruz-Famy Jct Rd - K0074 + 145 - K0075 + 427, K0076 + 114 - K0076 + 558",
      "office": "Central Office",
      "amountPesos": 74229000,
      "lengthKm": 1.726,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 43006373.12,
      "lengthMeters": 1726.0,
      "allocationPerStatedMeter": 43006.37,
      "rangesMeters": [
        [
          74145.0,
          75427.0
        ],
        [
          76114.0,
          76558.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Calamba-Sta Cruz-Famy Jct Rd - K0074 + 145 - K0075 + 427, K0076 + 114 - K0076 + 558",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.15,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0202-001645",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0029 + 1025 - K0030 + 500, K0039 + 000 - K0039 + 478",
      "office": "Central Office",
      "amountPesos": 74127000,
      "lengthKm": 0.953,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 77782791.19,
      "lengthMeters": 953.0,
      "allocationPerStatedMeter": 77782.79,
      "rangesMeters": [
        [
          30025.0,
          30500.0
        ],
        [
          39000.0,
          39478.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Puerto Princesa South Rd - K0029 + 1025 - K0030 + 500, K0039 + 000 - K0039 + 478",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.53,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0199-001603",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Makilala-Allah Valley Rd - K1622 + 265 - K1623 + 874",
      "office": "Central Office",
      "amountPesos": 74117000,
      "lengthKm": 1.609,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46064014.92,
      "lengthMeters": 1609.0,
      "allocationPerStatedMeter": 46064.01,
      "rangesMeters": [
        [
          1622265.0,
          1623874.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Makilala-Allah Valley Rd - K1622 + 265 - K1623 + 874",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 1.03,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0166-001046",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Ayaga-Sta. Marcela-Flora-Lasam Rd - K0672 + (-945) - K0673 + 000",
      "office": "Central Office",
      "amountPesos": 74084000,
      "lengthKm": 1.945,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38089460.15,
      "lengthMeters": 1945.0,
      "allocationPerStatedMeter": 38089.46,
      "rangesMeters": [
        [
          671055.0,
          673000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "166",
      "lengthEvidence": "Ayaga-Sta. Marcela-Flora-Lasam Rd - K0672 + (-945) - K0673 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 1.68,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0139-000564",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Bambang-Kasibu-Solano Rd - K0250 + (-119) - K0251 + 000, K0254 + 000 - K0259 + 613",
      "office": "Central Office",
      "amountPesos": 74070000,
      "lengthKm": 6.732,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 11002673.8,
      "lengthMeters": 6732.0,
      "allocationPerStatedMeter": 11002.67,
      "rangesMeters": [
        [
          249881.0,
          251000.0
        ],
        [
          254000.0,
          259613.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Bambang-Kasibu-Solano Rd - K0250 + (-119) - K0251 + 000, K0254 + 000 - K0259 + 613",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 0.75,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0126-000304",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Passi-Sn Rafael-Lemery-Sara Rd - K0051+700 - K0053 + 000, K0053 + 257 - K0053 + 343, K0053 + 1047 - K0054 + 000, K0059 + 000 - K0060 + 000",
      "office": "Central Office",
      "amountPesos": 74000000,
      "lengthKm": 2.433,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 30415125.36,
      "lengthMeters": 2433.0,
      "allocationPerStatedMeter": 30415.13,
      "rangesMeters": [
        [
          51700.0,
          53000.0
        ],
        [
          53257.0,
          53343.0
        ],
        [
          54000.0,
          54047.0
        ],
        [
          59000.0,
          60000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Passi-Sn Rafael-Lemery-Sara Rd - K0051+700 - K0053 + 000, K0053 + 257 - K0053 + 343, K0053 + 1047 - K0054 + 000, K0059 + 000 - K0060 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.51,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0127-000312",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Cebu South Coastal Rd (S00018CB) Chainage 000 - Chainage 515, (S00019CB) Chainage 000 - Chainage 324, (S00399CB) Chainage 000 - Chainage 275, (S00398CB) Chainage 0 - Chainage 187, (S00134CB) K0010 + 000 - K0010 + 257, K0010 + 376 - K0010 + 416, Cebu City",
      "office": "Central Office",
      "amountPesos": 74000000,
      "lengthKm": 0.297,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 249158249.16,
      "lengthMeters": 297.0,
      "allocationPerStatedMeter": 249158.25,
      "rangesMeters": [
        [
          10000.0,
          10257.0
        ],
        [
          10376.0,
          10416.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Cebu South Coastal Rd (S00018CB) Chainage 000 - Chainage 515, (S00019CB) Chainage 000 - Chainage 324, (S00399CB) Chainage 000 - Chainage 275, (S00398CB) Chainage 0 - Chainage 187, (S00134CB) K0010 + 000 - K0010 + 257, K0010 + 376 - K0010 + 416, Cebu City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 4.93,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0287-003281",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Pangyan Br. (B00057MN) along Mati-Maragusan Rd",
      "office": "Central Office",
      "amountPesos": 74000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Pangyan Br. (B00057MN) along Mati-Maragusan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0427-006005",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road with Drainage Systems, Palmera 5, Barangay Dela Paz, Antipolo City, Sta.(0+000 - Sta.0+526)",
      "office": "Central Office",
      "amountPesos": 74000000,
      "lengthKm": 0.526,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 140684410.65,
      "lengthMeters": 526.0,
      "allocationPerStatedMeter": 140684.41,
      "rangesMeters": [
        [
          0.0,
          526.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Improvement of Road with Drainage Systems, Palmera 5, Barangay Dela Paz, Antipolo City, Sta.(0+000 - Sta.0+526)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 5.75,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0244-002426",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Pres. Diosdado P.Macapagal Natl Hi-way - K1712 + (-680) - K1712 + 025, K1713 + (- 969) - K1716 + 252, K1716 + 267 - K1718 + 1429, K1718 + 1445 - K1721 + 000 (Road Safety: Roadway Lighting)",
      "office": "Central Office",
      "amountPesos": 73973000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          1711320.0,
          1712025.0
        ],
        [
          1716267.0,
          1719429.0
        ],
        [
          1719445.0,
          1721000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "244",
      "lengthEvidence": "Pres. Diosdado P.Macapagal Natl Hi-way - K1712 + (-680) - K1712 + 025, K1713 + (- 969) - K1716 + 252, K1716 + 267 - K1718 + 1429, K1718 + 1445 - K1721 + 000 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0117-000122",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1646 + 850 - K1648 + 000",
      "office": "Central Office",
      "amountPesos": 73860000,
      "lengthKm": 1.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 64226086.96,
      "lengthMeters": 1150.0,
      "allocationPerStatedMeter": 64226.09,
      "rangesMeters": [
        [
          1646850.0,
          1648000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1646 + 850 - K1648 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 1.39,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0417-005790",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Karkariskis Bridge, Sta. 0+000 - Sta. 0+060, La Paz, Abra",
      "office": "Central Office",
      "amountPesos": 73730000,
      "lengthKm": 0.06,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1228833333.33,
      "lengthMeters": 60.0,
      "allocationPerStatedMeter": 1228833.33,
      "rangesMeters": [
        [
          0.0,
          60.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Construction of Karkariskis Bridge, Sta. 0+000 - Sta. 0+060, La Paz, Abra",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 2.02,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0114-000062",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Cebu North Hagnaya Wharf Rd - K0025 + 413 - K0025 +928, K0019+000 - K0019+292, K0021+000 - K0021+653, K0021+653 - K0021+819",
      "office": "Central Office",
      "amountPesos": 73710000,
      "lengthKm": 1.626,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 45332103.32,
      "lengthMeters": 1626.0,
      "allocationPerStatedMeter": 45332.1,
      "rangesMeters": [
        [
          25413.0,
          25928.0
        ],
        [
          19000.0,
          19292.0
        ],
        [
          21000.0,
          21653.0
        ],
        [
          21653.0,
          21819.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Cebu North Hagnaya Wharf Rd - K0025 + 413 - K0025 +928, K0019+000 - K0019+292, K0021+000 - K0021+653, K0021+653 - K0021+819",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.21,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0201-001636",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0187 + 000 - K0188 + 360",
      "office": "Central Office",
      "amountPesos": 73476000,
      "lengthKm": 1.36,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54026470.59,
      "lengthMeters": 1360.0,
      "allocationPerStatedMeter": 54026.47,
      "rangesMeters": [
        [
          187000.0,
          188360.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Puerto Princesa North Rd - K0187 + 000 - K0188 + 360",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 1.61,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0203-001673",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Pili-Tigaon Albay Rd- K0461 +287 - K0463 + 051.50;K0464 + 514 -K0464 + 695",
      "office": "Central Office",
      "amountPesos": 73406000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          461287.0,
          463051.5
        ],
        [
          464514.0,
          464695.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Pili-Tigaon Albay Rd- K0461 +287 - K0463 + 051.50;K0464 + 514 -K0464 + 695",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0140-000584",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Crossing MWCR (Pola)-Casague-Jct Alacaak Rd - K0389 + 000 - K0391 + 570, K0392 + 393 - K0394 + 547",
      "office": "Central Office",
      "amountPesos": 73079000,
      "lengthKm": 4.724,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 15469729.04,
      "lengthMeters": 4724.0,
      "allocationPerStatedMeter": 15469.73,
      "rangesMeters": [
        [
          389000.0,
          391570.0
        ],
        [
          392393.0,
          394547.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Crossing MWCR (Pola)-Casague-Jct Alacaak Rd - K0389 + 000 - K0391 + 570, K0392 + 393 - K0394 + 547",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 1.06,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0118-000139",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway( Cotabato-Marbel Rd) - K1723 + 243 - K1724 + 000",
      "office": "Central Office",
      "amountPesos": 73057000,
      "lengthKm": 0.757,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 96508586.53,
      "lengthMeters": 757.0,
      "allocationPerStatedMeter": 96508.59,
      "rangesMeters": [
        [
          1723243.0,
          1724000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Maharlika Highway( Cotabato-Marbel Rd) - K1723 + 243 - K1724 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 2.27,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0458-006572",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road along Phase 3 Lupang Pangako (Chainage 0+000 to Chainage 0+420), Barangay Payatas, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 73020000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Rehabilitation of Road along Phase 3 Lupang Pangako (Chainage 0+000 to Chainage 0+420), Barangay Payatas, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002640",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Amlan Br. (B00082NR) along Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan)",
      "office": "Central Office",
      "amountPesos": 73000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Amlan Br. (B00082NR) along Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0286-003244",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Tanjay Br. (B00086NR) along Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan)",
      "office": "Central Office",
      "amountPesos": 72684000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Tanjay Br. (B00086NR) along Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0128-000336",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Banisilan-Guiling-Alamada-Libungan Rd - (S00833MN) Chainage 938 - Chainage 3445",
      "office": "Central Office",
      "amountPesos": 72383000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Banisilan-Guiling-Alamada-Libungan Rd - (S00833MN) Chainage 938 - Chainage 3445",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0125-000289",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Mindoro West Coastal Rd - K0284 + 000 - K0284 + 218, K0284 + 237 - K0285 + 754, K0285 + 775 - K0286 + 000, K0287 + 783 - K0290 + 212",
      "office": "Central Office",
      "amountPesos": 72276000,
      "lengthKm": 4.389,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 16467532.47,
      "lengthMeters": 4389.0,
      "allocationPerStatedMeter": 16467.53,
      "rangesMeters": [
        [
          284000.0,
          284218.0
        ],
        [
          284237.0,
          285754.0
        ],
        [
          285775.0,
          286000.0
        ],
        [
          287783.0,
          290212.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Mindoro West Coastal Rd - K0284 + 000 - K0284 + 218, K0284 + 237 - K0285 + 754, K0285 + 775 - K0286 + 000, K0287 + 783 - K0290 + 212",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.0,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0285-003222",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Popunton Br. (B00085PW) along Puerto Princesa North Rd",
      "office": "Central Office",
      "amountPesos": 72250000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Popunton Br. (B00085PW) along Puerto Princesa North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0113-000054",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0042 + 834 - K0045 + 000",
      "office": "Central Office",
      "amountPesos": 72234000,
      "lengthKm": 2.166,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33349030.47,
      "lengthMeters": 2166.0,
      "allocationPerStatedMeter": 33349.03,
      "rangesMeters": [
        [
          42834.0,
          45000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0042 + 834 - K0045 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.89,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0114-000061",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dumaguete South Rd - K0036 + 068 - K 0036 + 148, K0051 + 000 - K0052 + 000, K0052 + 251 - K0052 + 539",
      "office": "Central Office",
      "amountPesos": 72041000,
      "lengthKm": 1.368,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 52661549.71,
      "lengthMeters": 1368.0,
      "allocationPerStatedMeter": 52661.55,
      "rangesMeters": [
        [
          36068.0,
          36148.0
        ],
        [
          51000.0,
          52000.0
        ],
        [
          52251.0,
          52539.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Dumaguete South Rd - K0036 + 068 - K 0036 + 148, K0051 + 000 - K0052 + 000, K0052 + 251 - K0052 + 539",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 1.34,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0114-000076",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1874 + 687 - K1883 + 420",
      "office": "Central Office",
      "amountPesos": 72000000,
      "lengthKm": 8.733,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8244589.49,
      "lengthMeters": 8733.0,
      "allocationPerStatedMeter": 8244.59,
      "rangesMeters": [
        [
          1874687.0,
          1883420.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1874 + 687 - K1883 + 420",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 0.24,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0156-000871",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "P Burgos - Pototanin Jct - K0185 + 500 - K0186 + 830",
      "office": "Central Office",
      "amountPesos": 72000000,
      "lengthKm": 1.33,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54135338.35,
      "lengthMeters": 1330.0,
      "allocationPerStatedMeter": 54135.34,
      "rangesMeters": [
        [
          185500.0,
          186830.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "P Burgos - Pototanin Jct - K0185 + 500 - K0186 + 830",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 1.67,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0182-001317",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Banaue-Hungduan-Benguet Bdry Rd - K0400 + 273 - K0400 + 309, K0400 + 476 - K0400 + 544, K0401 + 124 - K0401 + 178, K0401 + 330 - K0401 + 400",
      "office": "Central Office",
      "amountPesos": 72000000,
      "lengthKm": 0.228,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 315789473.68,
      "lengthMeters": 228.0,
      "allocationPerStatedMeter": 315789.47,
      "rangesMeters": [
        [
          400273.0,
          400309.0
        ],
        [
          400476.0,
          400544.0
        ],
        [
          401124.0,
          401178.0
        ],
        [
          401330.0,
          401400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "182",
      "lengthEvidence": "Banaue-Hungduan-Benguet Bdry Rd - K0400 + 273 - K0400 + 309, K0400 + 476 - K0400 + 544, K0401 + 124 - K0401 + 178, K0401 + 330 - K0401 + 400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 1.81,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0199-001600",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1706 + 000 - K1707 + 711",
      "office": "Central Office",
      "amountPesos": 71986000,
      "lengthKm": 1.711,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42072472.24,
      "lengthMeters": 1711.0,
      "allocationPerStatedMeter": 42072.47,
      "rangesMeters": [
        [
          1706000.0,
          1707711.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1706 + 000 - K1707 + 711",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 0.94,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0166-001048",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Rizal Natl Rd (Babalag-Kinama-Sn Francisco Sect) - K0527 + (-231) - K0527 + 220, K0528 + 780 - K0528 + 817, K0529 + 152 - K0529 + 209, K0529 + 293 - K0529 + 394, K0529 + 752 - K0529 + 806, K0531 + 300 - K0531 + 344, K0531 + 835 - K0532 + 000, K0532 + 600 - K0532 + 620, K0532 + 700 - K0532 + 732, K0532 + 973 - K0533 + 080, K0533 + 466 - K0533 + 536, K0533 + 597 - K0533 + 897, K0534 + 000 - K0534 + 070, K0535 + 710 - K0536 + 017, K0536 + 259 - K0536 + 345, K0536 + 920 - K0537 + 121, K0539 + 322 - K0539 + 422",
      "office": "Central Office",
      "amountPesos": 71834000,
      "lengthKm": 2.202,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 32622161.67,
      "lengthMeters": 2202.0,
      "allocationPerStatedMeter": 32622.16,
      "rangesMeters": [
        [
          526769.0,
          527220.0
        ],
        [
          528780.0,
          528817.0
        ],
        [
          529152.0,
          529209.0
        ],
        [
          529293.0,
          529394.0
        ],
        [
          529752.0,
          529806.0
        ],
        [
          531300.0,
          531344.0
        ],
        [
          531835.0,
          532000.0
        ],
        [
          532600.0,
          532620.0
        ],
        [
          532700.0,
          532732.0
        ],
        [
          532973.0,
          533080.0
        ],
        [
          533466.0,
          533536.0
        ],
        [
          533597.0,
          533897.0
        ],
        [
          534000.0,
          534070.0
        ],
        [
          535710.0,
          536017.0
        ],
        [
          536259.0,
          536345.0
        ],
        [
          536920.0,
          537121.0
        ],
        [
          539322.0,
          539422.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "166",
      "lengthEvidence": "Rizal Natl Rd (Babalag-Kinama-Sn Francisco Sect) - K0527 + (-231) - K0527 + 220, K0528 + 780 - K0528 + 817, K0529 + 152 - K0529 + 209, K0529 + 293 - K0529 + 394, K0529 + 752 - K0529 + 806, K0531 + 300 - K0531 + 344, K0531 + 835 - K0532 + 000, K0532 + 600 - K0532 + 620, K0532 + 700 - K0532 + 732, K0532 + 973 - K0533 + 080, K0533 + 466 - K0533 + 536, K0533 + 597 - K0533 + 897, K0534 + 000 - K0534 + 070, K0535 + 710 - K0536 + 017, K0536 + 259 - K0536 + 345, K0536 + 920 - K0537 + 121, K0539 + 322 - K0539 + 422",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 1.44,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0139-000567",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Gapan-Fort Magsaysay Rd - K0099 + 237 - K0099 + 517, K0109 + 216 - K0109 + 846, K0109 + 943 - K0112 + 918, K0114 + 000 - K0115 + 000",
      "office": "Central Office",
      "amountPesos": 71784000,
      "lengthKm": 4.885,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14694779.94,
      "lengthMeters": 4885.0,
      "allocationPerStatedMeter": 14694.78,
      "rangesMeters": [
        [
          99237.0,
          99517.0
        ],
        [
          109216.0,
          109846.0
        ],
        [
          109943.0,
          112918.0
        ],
        [
          114000.0,
          115000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Gapan-Fort Magsaysay Rd - K0099 + 237 - K0099 + 517, K0109 + 216 - K0109 + 846, K0109 + 943 - K0112 + 918, K0114 + 000 - K0115 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 1.0,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0268-002849",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Sumulong Br. (B05219LZ) along Maharlika Highway (LZ)",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 71736000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Sumulong Br. (B05219LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0157-000889",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Sn Pascual-Claveria Rd - K0005 + 101 - K0005 + 351, K0005 + 525 - K0005 + 588, K0005 + 624 - K0006 + 105, K0006 + 210 - K0006 + 648",
      "office": "Central Office",
      "amountPesos": 71677000,
      "lengthKm": 1.232,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 58179383.12,
      "lengthMeters": 1232.0,
      "allocationPerStatedMeter": 58179.38,
      "rangesMeters": [
        [
          5101.0,
          5351.0
        ],
        [
          5525.0,
          5588.0
        ],
        [
          5624.0,
          6105.0
        ],
        [
          6210.0,
          6648.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "157",
      "lengthEvidence": "Sn Pascual-Claveria Rd - K0005 + 101 - K0005 + 351, K0005 + 525 - K0005 + 588, K0005 + 624 - K0006 + 105, K0006 + 210 - K0006 + 648",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 1.79,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0446-006371",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sitio Dangkong - Sitio Mangga Road, Barangay Laconon, T'boli, South Cotabato",
      "office": "Central Office",
      "amountPesos": 71500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Construction of Sitio Dangkong - Sitio Mangga Road, Barangay Laconon, T'boli, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0228-002169",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
      "office": "Central Office",
      "amountPesos": 71400000,
      "lengthKm": 1.2813500000000004,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55722480.2,
      "lengthMeters": 1281.35,
      "allocationPerStatedMeter": 55722.48,
      "rangesMeters": [
        [
          3390.5,
          4671.85
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.68,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0176-001219",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Isulan Jct-Ninoy Aquino Rd - K1845 + 263 - K1845 + 363, K1845 + 365 - K1845 + 507, K1845 + 627 - K1845 + 695",
      "office": "Central Office",
      "amountPesos": 71392000,
      "lengthKm": 0.31,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 230296774.19,
      "lengthMeters": 310.0,
      "allocationPerStatedMeter": 230296.77,
      "rangesMeters": [
        [
          1845263.0,
          1845363.0
        ],
        [
          1845365.0,
          1845507.0
        ],
        [
          1845627.0,
          1845695.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Isulan Jct-Ninoy Aquino Rd - K1845 + 263 - K1845 + 363, K1845 + 365 - K1845 + 507, K1845 + 627 - K1845 + 695",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 1.28,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0113-000048",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod North Rd - K0092+118 - K0094 + 000",
      "office": "Central Office",
      "amountPesos": 71248000,
      "lengthKm": 1.882,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37857598.3,
      "lengthMeters": 1882.0,
      "allocationPerStatedMeter": 37857.6,
      "rangesMeters": [
        [
          92118.0,
          94000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Bacolod North Rd - K0092+118 - K0094 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.01,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0125-000286",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Calapan South Rd - K0079 + 598 - K0079 + 739, K0079 + 867 - K0081 + 702",
      "office": "Central Office",
      "amountPesos": 71157000,
      "lengthKm": 1.976,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 36010627.53,
      "lengthMeters": 1976.0,
      "allocationPerStatedMeter": 36010.63,
      "rangesMeters": [
        [
          79598.0,
          79739.0
        ],
        [
          79867.0,
          81702.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Calapan South Rd - K0079 + 598 - K0079 + 739, K0079 + 867 - K0081 + 702",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.18,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0141-000608",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Iloilo East Coast-Capiz Rd - K0172 + (-260) - K0173 + 730",
      "office": "Central Office",
      "amountPesos": 71074000,
      "lengthKm": 1.99,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35715577.89,
      "lengthMeters": 1990.0,
      "allocationPerStatedMeter": 35715.58,
      "rangesMeters": [
        [
          171740.0,
          173730.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Iloilo East Coast-Capiz Rd - K0172 + (-260) - K0173 + 730",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 1.19,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0259-002669",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Natubgan Br. (B00177LT) along Palo-Carigara-Ormoc Rd",
      "office": "Central Office",
      "amountPesos": 71000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Natubgan Br. (B00177LT) along Palo-Carigara-Ormoc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0222-002051",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Maasin Bypass Road, Sta. 0+00 - Sta. 3+316, Iloilo",
      "office": "Central Office",
      "amountPesos": 70484000,
      "lengthKm": 3.316,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21255729.79,
      "lengthMeters": 3316.0,
      "allocationPerStatedMeter": 21255.73,
      "rangesMeters": [
        [
          0.0,
          3316.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Maasin Bypass Road, Sta. 0+00 - Sta. 3+316, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.54,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0257-002613",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Barucboc Br. (B01160LZ) along Santiago-Tuguegarao Rd",
      "office": "Central Office",
      "amountPesos": 70460000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Barucboc Br. (B01160LZ) along Santiago-Tuguegarao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0204-001690",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Sambulawan Jct-Calaguise-Calubian Rd - K0997 + 160 - K0998 + 545",
      "office": "Central Office",
      "amountPesos": 70350000,
      "lengthKm": 1.385,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50794223.83,
      "lengthMeters": 1385.0,
      "allocationPerStatedMeter": 50794.22,
      "rangesMeters": [
        [
          997160.0,
          998545.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Sambulawan Jct-Calaguise-Calubian Rd - K0997 + 160 - K0998 + 545",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 1.51,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0112-000032",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Preventive Maintenance along Calapan South Road - K0029+690 - K0031+087, K0053+378 - K0053+511, K0054+257 - K0054+582, K0054+589 - K0054+705, K0059+554 - K0059+859",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": 2.276,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 30755711.78,
      "lengthMeters": 2276.0,
      "allocationPerStatedMeter": 30755.71,
      "rangesMeters": [
        [
          29690.0,
          31087.0
        ],
        [
          53378.0,
          53511.0
        ],
        [
          54257.0,
          54582.0
        ],
        [
          54589.0,
          54705.0
        ],
        [
          59554.0,
          59859.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Preventive Maintenance along Calapan South Road - K0029+690 - K0031+087, K0053+378 - K0053+511, K0054+257 - K0054+582, K0054+589 - K0054+705, K0059+554 - K0059+859",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.82,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0114-000070",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Palo-Carigara-Ormoc Rd - K1008 + 555 - K1010 + 000",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": 1.445,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 48442906.57,
      "lengthMeters": 1445.0,
      "allocationPerStatedMeter": 48442.91,
      "rangesMeters": [
        [
          1008555.0,
          1010000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Palo-Carigara-Ormoc Rd - K1008 + 555 - K1010 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 1.23,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0115-000095",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1758 + 626 - K1758 + 650, K1759 + 231 - K1759 + 261, K1766 + 096 - K1767 + 000, K1767 + 176 - K1767 + 608, K1767 + 911 - K1768 + 000, K1781 + 849 - K1781 + 850",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": 1.48,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 47297297.3,
      "lengthMeters": 1480.0,
      "allocationPerStatedMeter": 47297.3,
      "rangesMeters": [
        [
          1758626.0,
          1758650.0
        ],
        [
          1759231.0,
          1759261.0
        ],
        [
          1766096.0,
          1767000.0
        ],
        [
          1767176.0,
          1767608.0
        ],
        [
          1767911.0,
          1768000.0
        ],
        [
          1781849.0,
          1781850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1758 + 626 - K1758 + 650, K1759 + 231 - K1759 + 261, K1766 + 096 - K1767 + 000, K1767 + 176 - K1767 + 608, K1767 + 911 - K1768 + 000, K1781 + 849 - K1781 + 850",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 1.21,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0150-000767",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Cebu North Hagnaya Wharf Rd - K0015 + 165 - K0015 + 853, K0016 + 019 - K0016 + 836",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": 1.505,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 46511627.91,
      "lengthMeters": 1505.0,
      "allocationPerStatedMeter": 46511.63,
      "rangesMeters": [
        [
          15165.0,
          15853.0
        ],
        [
          16019.0,
          16836.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "Cebu North Hagnaya Wharf Rd - K0015 + 165 - K0015 + 853, K0016 + 019 - K0016 + 836",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 1.86,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0157-000901",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Jolo-Taglibi-Tiptipon Road, Sulu 1st District (S00006SL), Chainage 14 + 352 to Chainage 17 + 000",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "157",
      "lengthEvidence": "Jolo-Taglibi-Tiptipon Road, Sulu 1st District (S00006SL), Chainage 14 + 352 to Chainage 17 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0158-000902",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Jolo-Indanan-Parang-Silangkan Road (S00005SL), Chainage 19 + 350 to Chainage 22 + 000",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "Jolo-Indanan-Parang-Silangkan Road (S00005SL), Chainage 19 + 350 to Chainage 22 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0158-000907",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 9 + 600 to Chainage 12 + 085",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 9 + 600 to Chainage 12 + 085",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0183-001333",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Manguiring -Cagsao - Cabanbanan Rd- K0461 + 000 - K0461 + 240",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 291666666.67,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 291666.67,
      "rangesMeters": [
        [
          461000.0,
          461240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Manguiring -Cagsao - Cabanbanan Rd- K0461 + 000 - K0461 + 240",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 1.67,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0214-001891",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis- Urdaneta City, Pangasinan",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis- Urdaneta City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0218-001975",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Jct. Daang Maharlika - Tayabas By-Pass Road and Quezon Eco-Tourism Road Extension, Sta. 1+580 - Sta. 2+464, Sta. 3+478 - Sta. 3+643, Tayabas City, Quezon",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          1580.0,
          2464.0
        ],
        [
          3478.0,
          3643.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Jct. Daang Maharlika - Tayabas By-Pass Road and Quezon Eco-Tourism Road Extension, Sta. 1+580 - Sta. 2+464, Sta. 3+478 - Sta. 3+643, Tayabas City, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0225-002109",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "CDOC-Iligan City Hinterland Road (Jct. CDO Camp Kibaritan Road-Dominorog Road, Dansolihon-Jct. IBR, Rogongon, Iligan City) Alternate Road, Balongkot Bridge, Barangay Dansolihon, Sta. 23+200-Sta. 23+386.67, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": 0.18666999999999825,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 186.67,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          23200.0,
          23386.67
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "225",
      "lengthEvidence": "CDOC-Iligan City Hinterland Road (Jct. CDO Camp Kibaritan Road-Dominorog Road, Dansolihon-Jct. IBR, Rogongon, Iligan City) Alternate Road, Balongkot Bridge, Barangay Dansolihon, Sta. 23+200-Sta. 23+386.67, Cagayan de Oro City",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0227-002137",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Puerto - Claveria Bypass Road, Barangay Bugo Section, Sta. 0+000 - Sta. 0+780, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": 0.78,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 89743589.74,
      "lengthMeters": 780.0,
      "allocationPerStatedMeter": 89743.59,
      "rangesMeters": [
        [
          0.0,
          780.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Puerto - Claveria Bypass Road, Barangay Bugo Section, Sta. 0+000 - Sta. 0+780, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.83,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0234-002260",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Abra-Kalinga-Apayao Road (Buluan-Banban-Daga-Puguin-Sacpil-Pinukpuk) - Sta. 3+390 - Sta. 3+790, Sta. 3+810 - Sta.4+410, Apayao",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 70000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 70000.0,
      "rangesMeters": [
        [
          3390.0,
          3790.0
        ],
        [
          3810.0,
          4410.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "234",
      "lengthEvidence": "Abra-Kalinga-Apayao Road (Buluan-Banban-Daga-Puguin-Sacpil-Pinukpuk) - Sta. 3+390 - Sta. 3+790, Sta. 3+810 - Sta.4+410, Apayao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 1.12,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0248-002484",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Batangas City-San Pascual-Bauan Diversion Rd - (S06170LZ) Chainage 0 - 2495 (Road Safety: Roadway Lighting)",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "248",
      "lengthEvidence": "Batangas City-San Pascual-Bauan Diversion Rd - (S06170LZ) Chainage 0 - 2495 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002627",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Cavillan Br. (B00072MR) along Calapan South Rd",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Cavillan Br. (B00072MR) along Calapan South Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0261-002702",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Laminga Br. (B00410MN) along Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Laminga Br. (B00410MN) along Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0286-003260",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Danori Br. (B02107MN) along Maharlika Highway( Cotabato-Malabang-Lanao del Norte Rd)",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Danori Br. (B02107MN) along Maharlika Highway( Cotabato-Malabang-Lanao del Norte Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005747",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Minor Basilica of St. Dominic De Guzman, San Carlos City, Pangasinan",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Access Road, Minor Basilica of St. Dominic De Guzman, San Carlos City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005748",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, St. Vincent Ferrer Statue, Bayambang, Pangasinan",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Access Road, St. Vincent Ferrer Statue, Bayambang, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0419-005834",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Concreting of Road from Barangay Arcon to Barangay Namnama, Tumauini, Isabela",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Rehabilitation/Concreting of Road from Barangay Arcon to Barangay Namnama, Tumauini, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0419-005836",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Apalit Bridge, Apalit, Pampanga",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Construction of Apalit Bridge, Apalit, Pampanga",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0419-005841",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Laog Bridge, Barangay Laog, Angat, Bulacan (121.031563, 14.924604)",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Construction (Completion) of Laog Bridge, Barangay Laog, Angat, Bulacan (121.031563, 14.924604)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0421-005871",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction/Rehabilitation of Road, Mexico, Pampanga",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Construction/Rehabilitation of Road, Mexico, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005985",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Barangay Bagong Kalsada to Barangay Masili, Calamba City, Laguna",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Road and Drainage at Barangay Bagong Kalsada to Barangay Masili, Calamba City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0427-005998",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 15+940 – Sta. 16+200",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": 0.26,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 269230769.23,
      "lengthMeters": 260.0,
      "allocationPerStatedMeter": 269230.77,
      "rangesMeters": [
        [
          15940.0,
          16200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 15+940 – Sta. 16+200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 9.42,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0431-006073",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Pantao - Moroponros Road, Oas, Albay",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Pantao - Moroponros Road, Oas, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0432-006097",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Ilaor Norte - Busac Road, Oas, Albay Sta 0+000.00 - Sta. 1+270.00",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": 1.27,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55118110.24,
      "lengthMeters": 1270.0,
      "allocationPerStatedMeter": 55118.11,
      "rangesMeters": [
        [
          0.0,
          1270.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Construction of Road, Ilaor Norte - Busac Road, Oas, Albay Sta 0+000.00 - Sta. 1+270.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 2.2,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0432-006114",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Bonga, Bulan, Sorsogon, Sta. 0+000 - Sta. 2+800",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": 2.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 2800.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          2800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Construction of Road at Barangay Bonga, Bulan, Sorsogon, Sta. 0+000 - Sta. 2+800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.79,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0433-006122",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Jalandoni Br along Nabitasan Road, Iloilo City, Iloilo",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Rehabilitation of Jalandoni Br along Nabitasan Road, Iloilo City, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0433-006123",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bantayan Park - Bago Bridge Road in Barangay Poblacion and Barangay Lag-asan, Bago City, Negros Occidental",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Bantayan Park - Bago Bridge Road in Barangay Poblacion and Barangay Lag-asan, Bago City, Negros Occidental",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0433-006124",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Crossing Magallon, Moises Padilla, Negros Occidental, 10.2524, 123.0312",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Bridge, Barangay Crossing Magallon, Moises Padilla, Negros Occidental, 10.2524, 123.0312",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0433-006125",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Binubuhan Bridge at Barangay Binubuhan, Bago City, Negros Occidental",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Binubuhan Bridge at Barangay Binubuhan, Bago City, Negros Occidental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0435-006167",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Guinsorongan leading to Reclamation Area, Catbalogan City, Samar, Sta. 0+320.00 - Sta. 0+540.00",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 318181818.18,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 318181.82,
      "rangesMeters": [
        [
          320.0,
          540.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of Concrete Road, Barangay Guinsorongan leading to Reclamation Area, Catbalogan City, Samar, Sta. 0+320.00 - Sta. 0+540.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 9.0,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0446-006367",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ranzo to Sitio Sambag, Barangay Ranzo, Carmen, Cotabato",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Construction of Road, Barangay Ranzo to Sitio Sambag, Barangay Ranzo, Carmen, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0446-006370",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Kibarawon, Barangay Liliongan, Carmen, Cotabato",
      "office": "Central Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Construction of Road, Sitio Kibarawon, Barangay Liliongan, Carmen, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007056",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Makilo-Malalao Access Road, Barangays Cudal and Malalao, Tabuk City, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Makilo-Malalao Access Road, Barangays Cudal and Malalao, Tabuk City, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0201-001633",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Marinduque Circumferential Rd - K0053 + 000 - K0054 + 000",
      "office": "Central Office",
      "amountPesos": 69999000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 69999000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 69999.0,
      "rangesMeters": [
        [
          53000.0,
          54000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Marinduque Circumferential Rd - K0053 + 000 - K0054 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.38,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0125-000291",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Mindoro West Coastal Rd - K0319 + 712 - K0323 + 1023",
      "office": "Central Office",
      "amountPesos": 69852000,
      "lengthKm": 4.311,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16203201.11,
      "lengthMeters": 4311.0,
      "allocationPerStatedMeter": 16203.2,
      "rangesMeters": [
        [
          319712.0,
          324023.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Mindoro West Coastal Rd - K0319 + 712 - K0323 + 1023",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.98,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0198-001575",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Dumaguete South Rd - K0072 + 000 - K0073 + 308",
      "office": "Central Office",
      "amountPesos": 69841000,
      "lengthKm": 1.308,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53395259.94,
      "lengthMeters": 1308.0,
      "allocationPerStatedMeter": 53395.26,
      "rangesMeters": [
        [
          72000.0,
          73308.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Dumaguete South Rd - K0072 + 000 - K0073 + 308",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 1.2,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0202-001643",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0240 + 262 - K0241 + 600",
      "office": "Central Office",
      "amountPesos": 69836000,
      "lengthKm": 1.338,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52194319.88,
      "lengthMeters": 1338.0,
      "allocationPerStatedMeter": 52194.32,
      "rangesMeters": [
        [
          240262.0,
          241600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Puerto Princesa North Rd - K0240 + 262 - K0241 + 600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 1.55,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0203-001668",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0014 + 000 - K0014 + 800",
      "office": "Central Office",
      "amountPesos": 69728000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 87160000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 87160.0,
      "rangesMeters": [
        [
          14000.0,
          14800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0014 + 000 - K0014 + 800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 1.45,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0197-001560",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Santiago-Tuguegarao Rd - K0359 + 000 - K0360 + 706",
      "office": "Central Office",
      "amountPesos": 69655000,
      "lengthKm": 1.706,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40829425.56,
      "lengthMeters": 1706.0,
      "allocationPerStatedMeter": 40829.43,
      "rangesMeters": [
        [
          359000.0,
          360706.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "197",
      "lengthEvidence": "Santiago-Tuguegarao Rd - K0359 + 000 - K0360 + 706",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 0.91,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0205-001716",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1650 + 785 - K1651 + 000, K1654 + 000 - K1656 + 987",
      "office": "Central Office",
      "amountPesos": 69539000,
      "lengthKm": 3.202,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21717364.15,
      "lengthMeters": 3202.0,
      "allocationPerStatedMeter": 21717.36,
      "rangesMeters": [
        [
          1650785.0,
          1651000.0
        ],
        [
          1654000.0,
          1656987.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1650 + 785 - K1651 + 000, K1654 + 000 - K1656 + 987",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 0.81,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0142-000621",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Matalam-Lampayan-Antipas Rd - K1653 + 498 - K1653 + 700, K1659 + 000 - K1661 + 000",
      "office": "Central Office",
      "amountPesos": 69530000,
      "lengthKm": 2.202,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 31575840.15,
      "lengthMeters": 2202.0,
      "allocationPerStatedMeter": 31575.84,
      "rangesMeters": [
        [
          1653498.0,
          1653700.0
        ],
        [
          1659000.0,
          1661000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "Matalam-Lampayan-Antipas Rd - K1653 + 498 - K1653 + 700, K1659 + 000 - K1661 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 1.05,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0425-005966",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Balungay-Calasumanga Road, Barangay Balungay to Barangay Calasumanga, Panukulan, Quezon",
      "office": "Central Office",
      "amountPesos": 69500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Construction of Balungay-Calasumanga Road, Barangay Balungay to Barangay Calasumanga, Panukulan, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0123-000242",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Carmen Jct - Bayambang - Manat Road, K0194+000 - K0196+328",
      "office": "Central Office",
      "amountPesos": 69061000,
      "lengthKm": 2.328,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29665378.01,
      "lengthMeters": 2328.0,
      "allocationPerStatedMeter": 29665.38,
      "rangesMeters": [
        [
          194000.0,
          196328.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Carmen Jct - Bayambang - Manat Road, K0194+000 - K0196+328",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.48,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0156-000870",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Gumaca - Pitogo - Mulanay - San Narciso Road. Quezon - K0218 + 000 - K0219 + 000, K0223 + 000 - K0223 + 280",
      "office": "Central Office",
      "amountPesos": 69000000,
      "lengthKm": 1.28,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 53906250.0,
      "lengthMeters": 1280.0,
      "allocationPerStatedMeter": 53906.25,
      "rangesMeters": [
        [
          218000.0,
          219000.0
        ],
        [
          223000.0,
          223280.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "Gumaca - Pitogo - Mulanay - San Narciso Road. Quezon - K0218 + 000 - K0219 + 000, K0223 + 000 - K0223 + 280",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 1.66,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0286-003257",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Sibalic Br. (B01187MN) along Liloy-Siocon Rd",
      "office": "Central Office",
      "amountPesos": 69000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Sibalic Br. (B01187MN) along Liloy-Siocon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003277",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Luzon Br. (B01898MN) along Tibanban-Lavigan Rd",
      "office": "Central Office",
      "amountPesos": 69000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Luzon Br. (B01898MN) along Tibanban-Lavigan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0429-006038",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Rosacara, Bansud, Oriental Mindoro",
      "office": "Central Office",
      "amountPesos": 69000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Road, Barangay Rosacara, Bansud, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0443-006321",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Milyong to SitioBantal, Barangay Sto. Niño, Talaingod, Davao del Norte",
      "office": "Central Office",
      "amountPesos": 69000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Construction of Road Milyong to SitioBantal, Barangay Sto. Niño, Talaingod, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0202-001646",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0062 + 1324 - K0065 + 898",
      "office": "Central Office",
      "amountPesos": 68865000,
      "lengthKm": 2.574,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26754079.25,
      "lengthMeters": 2574.0,
      "allocationPerStatedMeter": 26754.08,
      "rangesMeters": [
        [
          63324.0,
          65898.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Puerto Princesa South Rd - K0062 + 1324 - K0065 + 898",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 1.0,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0140-000588",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Dr Damian Reyes Rd (Torrijos Side) - K0053 + 192 - K0057 + 000",
      "office": "Central Office",
      "amountPesos": 68765000,
      "lengthKm": 3.808,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18058035.71,
      "lengthMeters": 3808.0,
      "allocationPerStatedMeter": 18058.04,
      "rangesMeters": [
        [
          53192.0,
          57000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Dr Damian Reyes Rd (Torrijos Side) - K0053 + 192 - K0057 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 1.23,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0151-000779",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0712 + 000 - K0712 + 030, K0713 + 000 - K0713 + 200, K0716 + 446 - K0716 + 985, K0717 + 150 - K0717 + 326, K0718 + 000 - K0718 + 535, K0719 + 970 - K0720 + 230, K0721 + 158 - K0721 + 181",
      "office": "Central Office",
      "amountPesos": 68469000,
      "lengthKm": 1.763,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 38836642.09,
      "lengthMeters": 1763.0,
      "allocationPerStatedMeter": 38836.64,
      "rangesMeters": [
        [
          712000.0,
          712030.0
        ],
        [
          713000.0,
          713200.0
        ],
        [
          716446.0,
          716985.0
        ],
        [
          717150.0,
          717326.0
        ],
        [
          718000.0,
          718535.0
        ],
        [
          719970.0,
          720230.0
        ],
        [
          721158.0,
          721181.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0712 + 000 - K0712 + 030, K0713 + 000 - K0713 + 200, K0716 + 446 - K0716 + 985, K0717 + 150 - K0717 + 326, K0718 + 000 - K0718 + 535, K0719 + 970 - K0720 + 230, K0721 + 158 - K0721 + 181",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 1.55,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0220-002011",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Guinayangan-Tagkawayan Diversion Road, Sta. 11+000 -Sta. 12+000, Tagkawayan, Quezon",
      "office": "Central Office",
      "amountPesos": 68104000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 68104000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 68104.0,
      "rangesMeters": [
        [
          11000.0,
          12000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Guinayangan-Tagkawayan Diversion Road, Sta. 11+000 -Sta. 12+000, Tagkawayan, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.63,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0125-000279",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sn Francisco-Sn Andres-Sn Narciso Rd - K0384 + 641 - K0386 + 000",
      "office": "Central Office",
      "amountPesos": 68000000,
      "lengthKm": 1.359,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50036791.76,
      "lengthMeters": 1359.0,
      "allocationPerStatedMeter": 50036.79,
      "rangesMeters": [
        [
          384641.0,
          386000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Sn Francisco-Sn Andres-Sn Narciso Rd - K0384 + 641 - K0386 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.61,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0150-000766",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Carcar-Barili-Mantayupan Rd - K0040 + (-197) - K0042 + 000",
      "office": "Central Office",
      "amountPesos": 68000000,
      "lengthKm": 2.197,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30951297.22,
      "lengthMeters": 2197.0,
      "allocationPerStatedMeter": 30951.3,
      "rangesMeters": [
        [
          39803.0,
          42000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "Carcar-Barili-Mantayupan Rd - K0040 + (-197) - K0042 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 1.24,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0201-001632",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0488 + 090 - K0488 + 983, K0488 + 996 - K0490 + 000",
      "office": "Central Office",
      "amountPesos": 68000000,
      "lengthKm": 1.897,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 35846072.75,
      "lengthMeters": 1897.0,
      "allocationPerStatedMeter": 35846.07,
      "rangesMeters": [
        [
          488090.0,
          488983.0
        ],
        [
          488996.0,
          490000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0488 + 090 - K0488 + 983, K0488 + 996 - K0490 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 1.26,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0217-001945",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Aliaga-Guimba Diversion Road, Nueva Ecija, Sta. 1+153 - Sta. 1+270, Sta. 1+329 - Sta. 1+334, Sta. 5+167 - Sta. 5+260, Sta. 5+081 - Sta. 5+104, Sta. 6+049 - Sta. 6+210, Sta. 7+988 - Sta. 8+021, Sta. 8+139 - Sta. 9+047, Sta. 9+047 - Sta. 9+169, Sta. 9+200 - Sta. 9+964, Sta. 14+418.70 - Sta. 14+587.70, Sta. 15+150 - Sta. 15+287.60, Sta. 16+258 - Sta. 16+400, Sta. 16+473 - Sta. 16+513, Sta. 16+972 - Sta. 17+300, Sta. 17+330 - Sta. 17+550, Sta. 17+600 - Sta. 17+800",
      "office": "Central Office",
      "amountPesos": 68000000,
      "lengthKm": 3.4626000000000006,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 19638422.0,
      "lengthMeters": 3462.6,
      "allocationPerStatedMeter": 19638.42,
      "rangesMeters": [
        [
          1153.0,
          1270.0
        ],
        [
          1329.0,
          1334.0
        ],
        [
          5167.0,
          5260.0
        ],
        [
          5081.0,
          5104.0
        ],
        [
          6049.0,
          6210.0
        ],
        [
          7988.0,
          8021.0
        ],
        [
          8139.0,
          9047.0
        ],
        [
          9047.0,
          9169.0
        ],
        [
          9200.0,
          9964.0
        ],
        [
          14418.7,
          14587.7
        ],
        [
          15150.0,
          15287.6
        ],
        [
          16258.0,
          16400.0
        ],
        [
          16473.0,
          16513.0
        ],
        [
          16972.0,
          17300.0
        ],
        [
          17330.0,
          17550.0
        ],
        [
          17600.0,
          17800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Aliaga-Guimba Diversion Road, Nueva Ecija, Sta. 1+153 - Sta. 1+270, Sta. 1+329 - Sta. 1+334, Sta. 5+167 - Sta. 5+260, Sta. 5+081 - Sta. 5+104, Sta. 6+049 - Sta. 6+210, Sta. 7+988 - Sta. 8+021, Sta. 8+139 - Sta. 9+047, Sta. 9+047 - Sta. 9+169, Sta. 9+200 - Sta. 9+964, Sta. 14+418.70 - Sta. 14+587.70, Sta. 15+150 - Sta. 15+287.60, Sta. 16+258 - Sta. 16+400, Sta. 16+473 - Sta. 16+513, Sta. 16+972 - Sta. 17+300, Sta. 17+330 - Sta. 17+550, Sta. 17+600 - Sta. 17+800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39043.01,
      "peerRateMultiple": 0.5,
      "peerRecords": 34,
      "peerBand": "≥2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83109.36499999999,
      "graphUpperFence": 115059.64249999997
    },
    {
      "id": "HB10858-3-0247-002472",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Sta. Maria-Sn Quintin Rd, K0212 + 737 - K0221 + 237 (Road Safety: Roadway Lighting)",
      "office": "Central Office",
      "amountPesos": 68000000,
      "lengthKm": 8.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8000000.0,
      "lengthMeters": 8500.0,
      "allocationPerStatedMeter": 8000.0,
      "rangesMeters": [
        [
          212737.0,
          221237.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "Sta. Maria-Sn Quintin Rd, K0212 + 737 - K0221 + 237 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.77,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0286-003254",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Labason Br. (B01180MN) along Liloy-Siocon Rd",
      "office": "Central Office",
      "amountPesos": 68000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Labason Br. (B01180MN) along Liloy-Siocon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0444-006337",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Sto. Niño to Central Baugan, Barangay Sto. Niño (Sta. 2+000 + Sta. 4+000), Talaingod, Davao Del Norte",
      "office": "Central Office",
      "amountPesos": 68000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of Road Barangay Sto. Niño to Central Baugan, Barangay Sto. Niño (Sta. 2+000 + Sta. 4+000), Talaingod, Davao Del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0113-000059",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0077 + 799 - K0078 + 000, K0079 + 140 - K0080 + 430",
      "office": "Central Office",
      "amountPesos": 67942000,
      "lengthKm": 1.491,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 45568075.12,
      "lengthMeters": 1491.0,
      "allocationPerStatedMeter": 45568.08,
      "rangesMeters": [
        [
          77799.0,
          78000.0
        ],
        [
          79140.0,
          80430.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0077 + 799 - K0078 + 000, K0079 + 140 - K0080 + 430",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.22,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0430-006068",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Cagbatang, Cataingan, Masbate",
      "office": "Central Office",
      "amountPesos": 67875000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Construction of Bridge, Barangay Cagbatang, Cataingan, Masbate",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0126-000297",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tablas Circumferential Rd - K0078 + 126 - K0078 + 323, K0078 + 374 - K0079 + 340, K0080 + 300 - K0081 + 360, K0082 + 000 - K0082 + 862, K0084 + 000 - K0084 + 562, K0087 + 490 - K0087 + 869, K0087 + 895 - K0087 + 995, K0096 + 600 - K0097 + 000, K0099 + 000 - K0099 + 214",
      "office": "Central Office",
      "amountPesos": 67746000,
      "lengthKm": 4.74,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14292405.06,
      "lengthMeters": 4740.0,
      "allocationPerStatedMeter": 14292.41,
      "rangesMeters": [
        [
          78126.0,
          78323.0
        ],
        [
          78374.0,
          79340.0
        ],
        [
          80300.0,
          81360.0
        ],
        [
          82000.0,
          82862.0
        ],
        [
          84000.0,
          84562.0
        ],
        [
          87490.0,
          87869.0
        ],
        [
          87895.0,
          87995.0
        ],
        [
          96600.0,
          97000.0
        ],
        [
          99000.0,
          99214.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Tablas Circumferential Rd - K0078 + 126 - K0078 + 323, K0078 + 374 - K0079 + 340, K0080 + 300 - K0081 + 360, K0082 + 000 - K0082 + 862, K0084 + 000 - K0084 + 562, K0087 + 490 - K0087 + 869, K0087 + 895 - K0087 + 995, K0096 + 600 - K0097 + 000, K0099 + 000 - K0099 + 214",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.87,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0204-001705",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Camiguin Circumferential Rd - K0032 + 182 - K0033 + 059, K0033 + 095.40 - K0034 + 180",
      "office": "Central Office",
      "amountPesos": 67729000,
      "lengthKm": 1.9615999999999985,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34527426.59,
      "lengthMeters": 1961.6,
      "allocationPerStatedMeter": 34527.43,
      "rangesMeters": [
        [
          32182.0,
          33059.0
        ],
        [
          33095.4,
          34180.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Camiguin Circumferential Rd - K0032 + 182 - K0033 + 059, K0033 + 095.40 - K0034 + 180",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 1.21,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0203-001676",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Aklan West Rd (Kalibo-Nabas) (S00324PN) – K0240 + 739 – K0241 + 248",
      "office": "Central Office",
      "amountPesos": 67723000,
      "lengthKm": 0.509,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 133051080.55,
      "lengthMeters": 509.0,
      "allocationPerStatedMeter": 133051.08,
      "rangesMeters": [
        [
          240739.0,
          241248.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Aklan West Rd (Kalibo-Nabas) (S00324PN) – K0240 + 739 – K0241 + 248",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 2.56,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0140-000587",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Dr Damian Reyes Rd (Torrijos Side) - K0049 + 423 - K0053 + 163",
      "office": "Central Office",
      "amountPesos": 67694000,
      "lengthKm": 3.74,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18100000.0,
      "lengthMeters": 3740.0,
      "allocationPerStatedMeter": 18100.0,
      "rangesMeters": [
        [
          49423.0,
          53163.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Dr Damian Reyes Rd (Torrijos Side) - K0049 + 423 - K0053 + 163",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 1.23,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0247-002470",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Carmen Jct-Bayambang-Manat Rd - K0203 + (-645) - K0204 + 011, K0204 + 018.60 - K0206 + 315, K0206 + 345.90 - K0206 + 518, K0195 + 610 - K0196 + 328 (Road Safety: Roadway Lighting)",
      "office": "Central Office",
      "amountPesos": 67422000,
      "lengthKm": 4.8425,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 13922973.67,
      "lengthMeters": 4842.5,
      "allocationPerStatedMeter": 13922.97,
      "rangesMeters": [
        [
          202355.0,
          204011.0
        ],
        [
          204018.6,
          206315.0
        ],
        [
          206345.9,
          206518.0
        ],
        [
          195610.0,
          196328.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "Carmen Jct-Bayambang-Manat Rd - K0203 + (-645) - K0204 + 011, K0204 + 018.60 - K0206 + 315, K0206 + 345.90 - K0206 + 518, K0195 + 610 - K0196 + 328 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.35,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0201-001639",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0221 + 000 - K0222 + 300",
      "office": "Central Office",
      "amountPesos": 67392000,
      "lengthKm": 1.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51840000.0,
      "lengthMeters": 1300.0,
      "allocationPerStatedMeter": 51840.0,
      "rangesMeters": [
        [
          221000.0,
          222300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Puerto Princesa North Rd - K0221 + 000 - K0222 + 300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 1.54,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0436-006181",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Sitio Pagsimangan, Barangay Can-ato, Llorente, Eastern Samar",
      "office": "Central Office",
      "amountPesos": 67000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Bridge, Sitio Pagsimangan, Barangay Can-ato, Llorente, Eastern Samar",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0112-000029",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maspang H-way - K0070 + (-895) - K0071 + 280, K0071 + 613 - K0072 + 045",
      "office": "Central Office",
      "amountPesos": 66998000,
      "lengthKm": 2.607,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 25699271.19,
      "lengthMeters": 2607.0,
      "allocationPerStatedMeter": 25699.27,
      "rangesMeters": [
        [
          69105.0,
          71280.0
        ],
        [
          71613.0,
          72045.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Maspang H-way - K0070 + (-895) - K0071 + 280, K0071 + 613 - K0072 + 045",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.69,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0197-001561",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Sagbat-Pililla Div Rd - K0047 + 650 - K0048 + 000, K0048 + 312 - K0048 + 574, K0049 + 459 - K0050 + 000",
      "office": "Central Office",
      "amountPesos": 66660000,
      "lengthKm": 1.153,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 57814397.22,
      "lengthMeters": 1153.0,
      "allocationPerStatedMeter": 57814.4,
      "rangesMeters": [
        [
          47650.0,
          48000.0
        ],
        [
          48312.0,
          48574.0
        ],
        [
          49459.0,
          50000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "197",
      "lengthEvidence": "Sagbat-Pililla Div Rd - K0047 + 650 - K0048 + 000, K0048 + 312 - K0048 + 574, K0049 + 459 - K0050 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 1.29,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0126-000309",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0167 + 000 - K0171 + 000",
      "office": "Central Office",
      "amountPesos": 66381000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16595250.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 16595.25,
      "rangesMeters": [
        [
          167000.0,
          171000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0167 + 000 - K0171 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 1.01,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0443-006320",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Jct. Nabunturan -Laak Road to Barangay Cabadianan, New Corella, Davao del Norte",
      "office": "Central Office",
      "amountPesos": 66000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Construction of Road Jct. Nabunturan -Laak Road to Barangay Cabadianan, New Corella, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0203-001674",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Aklan West Rd (Kalibo-Nabas) - K0266 + 528 - K0267 + 249, K0267 + 282 - K0267 + 580, K0271 + 268 - K0271 + 484",
      "office": "Central Office",
      "amountPesos": 65675000,
      "lengthKm": 1.235,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 53178137.65,
      "lengthMeters": 1235.0,
      "allocationPerStatedMeter": 53178.14,
      "rangesMeters": [
        [
          266528.0,
          267249.0
        ],
        [
          267282.0,
          267580.0
        ],
        [
          271268.0,
          271484.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Aklan West Rd (Kalibo-Nabas) - K0266 + 528 - K0267 + 249, K0267 + 282 - K0267 + 580, K0271 + 268 - K0271 + 484",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.05,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0141-000607",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Iloilo East Coast-Capiz Rd - K0248 + 574 - K0250 + 268",
      "office": "Central Office",
      "amountPesos": 65528000,
      "lengthKm": 1.694,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38682408.5,
      "lengthMeters": 1694.0,
      "allocationPerStatedMeter": 38682.41,
      "rangesMeters": [
        [
          248574.0,
          250268.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Iloilo East Coast-Capiz Rd - K0248 + 574 - K0250 + 268",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 1.79,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0205-001721",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Dinagat-Loreto Rd - K0058 + 240 - K0061 + 000",
      "office": "Central Office",
      "amountPesos": 65527000,
      "lengthKm": 2.76,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23741666.67,
      "lengthMeters": 2760.0,
      "allocationPerStatedMeter": 23741.67,
      "rangesMeters": [
        [
          58240.0,
          61000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Dinagat-Loreto Rd - K0058 + 240 - K0061 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 0.89,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0235-002276",
      "category": "Bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Jct. Cagayan Valley Rd - Sampaguita-Warat-La Suerte-Catarauan-Afusing Rd (Bridge and Approaches) (Sta. 1+116.90 - Sta. 1+152.90)",
      "office": "Central Office",
      "amountPesos": 65500000,
      "lengthKm": 0.036,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1819444444.44,
      "lengthMeters": 36.0,
      "allocationPerStatedMeter": 1819444.44,
      "rangesMeters": [
        [
          1116.9,
          1152.9
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Jct. Cagayan Valley Rd - Sampaguita-Warat-La Suerte-Catarauan-Afusing Rd (Bridge and Approaches) (Sta. 1+116.90 - Sta. 1+152.90)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 4,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0117-000118",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway(Davao City-Jct Digos Sect) - K1519 + (-760) - K1519 + (-597), K1520 + 701 - K1520 + 904, K1521 + 042 - K1522 + 000",
      "office": "Central Office",
      "amountPesos": 65395000,
      "lengthKm": 1.324,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 49391993.96,
      "lengthMeters": 1324.0,
      "allocationPerStatedMeter": 49391.99,
      "rangesMeters": [
        [
          1518240.0,
          1518403.0
        ],
        [
          1520701.0,
          1520904.0
        ],
        [
          1521042.0,
          1522000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Maharlika Highway(Davao City-Jct Digos Sect) - K1519 + (-760) - K1519 + (-597), K1520 + 701 - K1520 + 904, K1521 + 042 - K1522 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 1.26,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0197-001554",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Santiago-Tuguegarao Rd - K0350 + 000 - K0351 + 400",
      "office": "Central Office",
      "amountPesos": 65273000,
      "lengthKm": 1.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46623571.43,
      "lengthMeters": 1400.0,
      "allocationPerStatedMeter": 46623.57,
      "rangesMeters": [
        [
          350000.0,
          351400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "197",
      "lengthEvidence": "Santiago-Tuguegarao Rd - K0350 + 000 - K0351 + 400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 1.04,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0114-000066",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Ormoc-Baybay-Southern Leyte Bdry Rd - K1034 + 806 - K1035 + 045, K1035 + 806 - K1037 + 124",
      "office": "Central Office",
      "amountPesos": 65200000,
      "lengthKm": 1.557,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 41875401.41,
      "lengthMeters": 1557.0,
      "allocationPerStatedMeter": 41875.4,
      "rangesMeters": [
        [
          1034806.0,
          1035045.0
        ],
        [
          1035806.0,
          1037124.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Ormoc-Baybay-Southern Leyte Bdry Rd - K1034 + 806 - K1035 + 045, K1035 + 806 - K1037 + 124",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.12,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0429-006033",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Caramay, Roxas, Palawan",
      "office": "Central Office",
      "amountPesos": 65100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Bridge, Barangay Caramay, Roxas, Palawan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0156-000881",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 1287 - Chainage 2288",
      "office": "Central Office",
      "amountPesos": 65065000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 1287 - Chainage 2288",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0141-000603",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sta. Elena-Capalonga By Pass Coastal Rd - K0277 + 358 - K0279 + 491",
      "office": "Central Office",
      "amountPesos": 65050000,
      "lengthKm": 2.133,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30496952.65,
      "lengthMeters": 2133.0,
      "allocationPerStatedMeter": 30496.95,
      "rangesMeters": [
        [
          277358.0,
          279491.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Sta. Elena-Capalonga By Pass Coastal Rd - K0277 + 358 - K0279 + 491",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 1.02,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0116-000110",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Digos-Makar Rd) - K1576+900 - K1577+800",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": 0.9,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 72222222.22,
      "lengthMeters": 900.0,
      "allocationPerStatedMeter": 72222.22,
      "rangesMeters": [
        [
          1576900.0,
          1577800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Maharlika Highway (Digos-Makar Rd) - K1576+900 - K1577+800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 1.7,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0116-000111",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Digos-Makar Rd) - K1577+ 800 - K1578+329",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": 0.529,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 122873345.94,
      "lengthMeters": 529.0,
      "allocationPerStatedMeter": 122873.35,
      "rangesMeters": [
        [
          1577800.0,
          1578329.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Maharlika Highway (Digos-Makar Rd) - K1577+ 800 - K1578+329",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 2.56,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0156-000882",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 287 - Chainage 1287",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 287 - Chainage 1287",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0176-001206",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Cebu-Balamban Transcentral Highway - K0015 + 050 - K0015 + 100; K0027 + (-320) - K0027 + (-240), Cebu City",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          15050.0,
          15100.0
        ],
        [
          26680.0,
          26760.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Cebu-Balamban Transcentral Highway - K0015 + 050 - K0015 + 100; K0027 + (-320) - K0027 + (-240), Cebu City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0197-001558",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Santiago-Tuguegarao Road - K0384 + 007 - K0385 + 462",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": 1.455,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44673539.52,
      "lengthMeters": 1455.0,
      "allocationPerStatedMeter": 44673.54,
      "rangesMeters": [
        [
          384007.0,
          385462.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "197",
      "lengthEvidence": "Santiago-Tuguegarao Road - K0384 + 007 - K0385 + 462",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 1.0,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0214-001897",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Chico Karayan Bridge-Lanao-Tikitik Bypass Road, Chainage 1760 - Chainage 1898, Bontoc, Mountain Province",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Chico Karayan Bridge-Lanao-Tikitik Bypass Road, Chainage 1760 - Chainage 1898, Bontoc, Mountain Province",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0221-002033",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Jct. Nato-Sabang Coastal Road, Huyon-Huyon Section, Tigaon, Camarines Sur - Sta.0+(- 135) - Sta. 0+685",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Jct. Nato-Sabang Coastal Road, Huyon-Huyon Section, Tigaon, Camarines Sur - Sta.0+(- 135) - Sta. 0+685",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0237-002322",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Asid-Tigbao-Bara-Malbug Road (Tigbao Bridge), Masbate, Sta. 35+110",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Asid-Tigbao-Bara-Malbug Road (Tigbao Bridge), Masbate, Sta. 35+110",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002644",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Riverside Br. (Songculan Br.) (B00073BH) along Anos Fonacier Circumferential Rd (Dauis-Panglao)",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Riverside Br. (Songculan Br.) (B00073BH) along Anos Fonacier Circumferential Rd (Dauis-Panglao)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0413-005714",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage System at Daisy Street, Chainage 000 - Chainage 221, Daffodils Street Chainage 000 - Chainage 255, Carnation Street Chainage 000 - Chainage 254 and Aster Street Chainage 000 - Chainage 349 in Barangay Fairview, Quezon City",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Construction of Road and Drainage System at Daisy Street, Chainage 000 - Chainage 221, Daffodils Street Chainage 000 - Chainage 255, Carnation Street Chainage 000 - Chainage 254 and Aster Street Chainage 000 - Chainage 349 in Barangay Fairview, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0413-005723",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Drainage, Holy Spirit Dr., Barangay Holy Spirit, Quezon City",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Rehabilitation of Road Drainage, Holy Spirit Dr., Barangay Holy Spirit, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0425-005948",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Balubal-Poblacion 3, Sariaya, Quezon, Start 13.95859, 121.532690 End 13.95169, 121.538830",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Construction of Bridge, Barangay Balubal-Poblacion 3, Sariaya, Quezon, Start 13.95859, 121.532690 End 13.95169, 121.538830",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0425-005963",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Lalig, Tiaong, Quezon",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Construction of Bridge, Barangay Lalig, Tiaong, Quezon",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0427-006008",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage, Dila, City of Santa Rosa, Laguna",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Rehabilitation of Road and Drainage, Dila, City of Santa Rosa, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0429-006045",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road at Mabilo II, Labo, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Concreting of Barangay Road at Mabilo II, Labo, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0429-006050",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road at Tulay na Lupa- Barangay Napaod, Labo, Camarines Norte.",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Concreting of Barangay Road at Tulay na Lupa- Barangay Napaod, Labo, Camarines Norte.",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0434-006150",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Facilities, Naga Road, Barangay Babag, Lapu-Lapu City, Cebu",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Road with Drainage Facilities, Naga Road, Barangay Babag, Lapu-Lapu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0437-006200",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Nuboran Bridge along Labangan-Midsalip Road, Labangan, Zamboanga del Sur",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Construction of Barangay Nuboran Bridge along Labangan-Midsalip Road, Labangan, Zamboanga del Sur",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0443-006308",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Malinawon to Tabontabon to Bawani, Mawab, Davao de Oro",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Construction of Road Malinawon to Tabontabon to Bawani, Mawab, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0443-006319",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Poblacion toBarangay San Roque, New Corella, Davao delNorte",
      "office": "Central Office",
      "amountPesos": 65000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Construction of Road Barangay Poblacion toBarangay San Roque, New Corella, Davao delNorte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0203-001684",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1019 + 300 - K1020 + 358",
      "office": "Central Office",
      "amountPesos": 64998000,
      "lengthKm": 1.058,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 61434782.61,
      "lengthMeters": 1058.0,
      "allocationPerStatedMeter": 61434.78,
      "rangesMeters": [
        [
          1019300.0,
          1020358.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1019 + 300 - K1020 + 358",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.21,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0203-001667",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0013 + 253 - K0014 + 000",
      "office": "Central Office",
      "amountPesos": 64935000,
      "lengthKm": 0.747,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 86927710.84,
      "lengthMeters": 747.0,
      "allocationPerStatedMeter": 86927.71,
      "rangesMeters": [
        [
          13253.0,
          14000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0013 + 253 - K0014 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 1.44,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0148-000743",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Manila North Road -K0027+530 - K0027+652, K0030+400 -K0031+700, K0033+(-123) - K0033+232.8, Bulacan",
      "office": "Central Office",
      "amountPesos": 64913000,
      "lengthKm": 1.777800000000003,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 36513106.09,
      "lengthMeters": 1777.8,
      "allocationPerStatedMeter": 36513.11,
      "rangesMeters": [
        [
          27530.0,
          27652.0
        ],
        [
          30400.0,
          31700.0
        ],
        [
          32877.0,
          33232.8
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "148",
      "lengthEvidence": "Manila North Road -K0027+530 - K0027+652, K0030+400 -K0031+700, K0033+(-123) - K0033+232.8, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 1.46,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0198-001572",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Dumaguete South Rd - K0067 + 468 - K0068 + 674",
      "office": "Central Office",
      "amountPesos": 64850000,
      "lengthKm": 1.206,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53772802.65,
      "lengthMeters": 1206.0,
      "allocationPerStatedMeter": 53772.8,
      "rangesMeters": [
        [
          67468.0,
          68674.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Dumaguete South Rd - K0067 + 468 - K0068 + 674",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 1.2,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0286-003251",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Bypass Br. 1 (B02409MN) along Zamboanga City Bypass Rd",
      "office": "Central Office",
      "amountPesos": 64826000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Bypass Br. 1 (B02409MN) along Zamboanga City Bypass Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0140-000591",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Looc (Cogon Tulay)-Odiongan Rd - K0103 + 000 - K0103 + 180, K0105 + 000 - K0105 + 400, K0109 + 000 - K0109 + 300, K0109 + 400 - K0110 + 000, K0112 + 600 - K0114 + 000, K0114 + 063 - K0114 + 650, K0118 + 091 - K0118 + 700, K0124 + 600 - K0125 + 000",
      "office": "Central Office",
      "amountPesos": 64815000,
      "lengthKm": 4.476,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14480563.0,
      "lengthMeters": 4476.0,
      "allocationPerStatedMeter": 14480.56,
      "rangesMeters": [
        [
          103000.0,
          103180.0
        ],
        [
          105000.0,
          105400.0
        ],
        [
          109000.0,
          109300.0
        ],
        [
          109400.0,
          110000.0
        ],
        [
          112600.0,
          114000.0
        ],
        [
          114063.0,
          114650.0
        ],
        [
          118091.0,
          118700.0
        ],
        [
          124600.0,
          125000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Looc (Cogon Tulay)-Odiongan Rd - K0103 + 000 - K0103 + 180, K0105 + 000 - K0105 + 400, K0109 + 000 - K0109 + 300, K0109 + 400 - K0110 + 000, K0112 + 600 - K0114 + 000, K0114 + 063 - K0114 + 650, K0118 + 091 - K0118 + 700, K0124 + 600 - K0125 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 0.99,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0286-003262",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Guinbaluran Br. (B01223MN) along Gingoog-Claveria-Villanueva Rd",
      "office": "Central Office",
      "amountPesos": 64796000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Guinbaluran Br. (B01223MN) along Gingoog-Claveria-Villanueva Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0115-000094",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) – K1724+152.50 - K1724+180,K1725+000 - K1725+500, K1738+943 - K1740+145, K1749+700 - K1750+000,K1750+268 - K1751+000, K1755+972 - K1756+236",
      "office": "Central Office",
      "amountPesos": 64603000,
      "lengthKm": 3.0255,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21352834.24,
      "lengthMeters": 3025.5,
      "allocationPerStatedMeter": 21352.83,
      "rangesMeters": [
        [
          1724152.5,
          1724180.0
        ],
        [
          1725000.0,
          1725500.0
        ],
        [
          1738943.0,
          1740145.0
        ],
        [
          1749700.0,
          1750000.0
        ],
        [
          1750268.0,
          1751000.0
        ],
        [
          1755972.0,
          1756236.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) – K1724+152.50 - K1724+180,K1725+000 - K1725+500, K1738+943 - K1740+145, K1749+700 - K1750+000,K1750+268 - K1751+000, K1755+972 - K1756+236",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 0.61,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0112-000021",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Jose Abad Santos Ave (JASA) - K0120 + 000 - K0122+059",
      "office": "Central Office",
      "amountPesos": 64500000,
      "lengthKm": 2.059,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31325886.35,
      "lengthMeters": 2059.0,
      "allocationPerStatedMeter": 31325.89,
      "rangesMeters": [
        [
          120000.0,
          122059.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Jose Abad Santos Ave (JASA) - K0120 + 000 - K0122+059",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.84,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0429-006034",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Bucana, El Nido, Palawan",
      "office": "Central Office",
      "amountPesos": 64465000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Bridge, Barangay Bucana, El Nido, Palawan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0117-000129",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1681 + 000 - K1681 + 1000",
      "office": "Central Office",
      "amountPesos": 64170000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 64170000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 64170.0,
      "rangesMeters": [
        [
          1681000.0,
          1682000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1681 + 000 - K1681 + 1000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 1.39,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0141-000611",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Prosperidad-Quezon-Cabaron Rd - K0065 + (-125) - K0065 + 225, K0066 + 000 - K0067 + 364, K0067 + 719 - K0067 + 819, K0068 + 000 - K0069 + 1143",
      "office": "Central Office",
      "amountPesos": 64100000,
      "lengthKm": 3.957,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 16199140.76,
      "lengthMeters": 3957.0,
      "allocationPerStatedMeter": 16199.14,
      "rangesMeters": [
        [
          64875.0,
          65225.0
        ],
        [
          66000.0,
          67364.0
        ],
        [
          67719.0,
          67819.0
        ],
        [
          68000.0,
          70143.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Prosperidad-Quezon-Cabaron Rd - K0065 + (-125) - K0065 + 225, K0066 + 000 - K0067 + 364, K0067 + 719 - K0067 + 819, K0068 + 000 - K0069 + 1143",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 1.1,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0123-000241",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Calasiao Old Road, K0204+965 - K0207+186",
      "office": "Central Office",
      "amountPesos": 64048000,
      "lengthKm": 2.221,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28837460.6,
      "lengthMeters": 2221.0,
      "allocationPerStatedMeter": 28837.46,
      "rangesMeters": [
        [
          204965.0,
          207186.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Calasiao Old Road, K0204+965 - K0207+186",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.44,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0128-000345",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd - K1192 + 592 - K1197 + 000",
      "office": "Central Office",
      "amountPesos": 64000000,
      "lengthKm": 4.408,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14519056.26,
      "lengthMeters": 4408.0,
      "allocationPerStatedMeter": 14519.06,
      "rangesMeters": [
        [
          1192592.0,
          1197000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Surigao-Davao Coastal Rd - K1192 + 592 - K1197 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.88,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0141-000602",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sta. Elena-Capalonga By Pass Coastal Rd - K0274 + 657 – K0276 + 744",
      "office": "Central Office",
      "amountPesos": 64000000,
      "lengthKm": 2.087,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30666027.79,
      "lengthMeters": 2087.0,
      "allocationPerStatedMeter": 30666.03,
      "rangesMeters": [
        [
          274657.0,
          276744.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Sta. Elena-Capalonga By Pass Coastal Rd - K0274 + 657 – K0276 + 744",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 1.02,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0438-006211",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Luuk Pangdan to Sitimpah, Bongao, Tawi-Tawi",
      "office": "Central Office",
      "amountPesos": 64000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Construction of Road, Luuk Pangdan to Sitimpah, Bongao, Tawi-Tawi",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0205-001710",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1611 + 850 - K1615 + 000",
      "office": "Central Office",
      "amountPesos": 63984000,
      "lengthKm": 3.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20312380.95,
      "lengthMeters": 3150.0,
      "allocationPerStatedMeter": 20312.38,
      "rangesMeters": [
        [
          1611850.0,
          1615000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1611 + 850 - K1615 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 0.76,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0126-000294",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sibuyan Circumferential Rd - K0031 + 349 - K0031 + 421, K0031 + 632 - K0031 + 728, K0032 + 000 - K0032 + 479, K0033 + 612 - K0033 + 744, K0034 + 000 - K0034 + 091, K0041 + 151 - K0042 + 000, K0042 + 439 - K0042 + 605, K0043 + 111 - K0043 + 417, K0043 + 436 - K0044 + 623, K0049 + 552 - K0049 + 730, K0052 + 066 - K0052 + 188, K0052 + 269 - K0053 + 000",
      "office": "Central Office",
      "amountPesos": 63925000,
      "lengthKm": 4.409,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14498752.55,
      "lengthMeters": 4409.0,
      "allocationPerStatedMeter": 14498.75,
      "rangesMeters": [
        [
          31349.0,
          31421.0
        ],
        [
          31632.0,
          31728.0
        ],
        [
          32000.0,
          32479.0
        ],
        [
          33612.0,
          33744.0
        ],
        [
          34000.0,
          34091.0
        ],
        [
          41151.0,
          42000.0
        ],
        [
          42439.0,
          42605.0
        ],
        [
          43111.0,
          43417.0
        ],
        [
          43436.0,
          44623.0
        ],
        [
          49552.0,
          49730.0
        ],
        [
          52066.0,
          52188.0
        ],
        [
          52269.0,
          53000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Sibuyan Circumferential Rd - K0031 + 349 - K0031 + 421, K0031 + 632 - K0031 + 728, K0032 + 000 - K0032 + 479, K0033 + 612 - K0033 + 744, K0034 + 000 - K0034 + 091, K0041 + 151 - K0042 + 000, K0042 + 439 - K0042 + 605, K0043 + 111 - K0043 + 417, K0043 + 436 - K0044 + 623, K0049 + 552 - K0049 + 730, K0052 + 066 - K0052 + 188, K0052 + 269 - K0053 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.88,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0117-000120",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1610 + 000 - K1611 + 000",
      "office": "Central Office",
      "amountPesos": 63592000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 63592000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 63592.0,
      "rangesMeters": [
        [
          1610000.0,
          1611000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1610 + 000 - K1611 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 1.38,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0183-001323",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Manila North Rd - K0590+(-620) - K0590+(-560)",
      "office": "Central Office",
      "amountPesos": 63499000,
      "lengthKm": 0.06,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1058316666.67,
      "lengthMeters": 60.0,
      "allocationPerStatedMeter": 1058316.67,
      "rangesMeters": [
        [
          589380.0,
          589440.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Manila North Rd - K0590+(-620) - K0590+(-560)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 2.83,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0284-003216",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Isabang Br. (B04948LZ) along Quezon Eco-Tourism Rd",
      "office": "Central Office",
      "amountPesos": 63450000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Isabang Br. (B04948LZ) along Quezon Eco-Tourism Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0123-000252",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Nueva Ecija - Pangasinan Rd, K0166 + 000 - K167 + 1001",
      "office": "Central Office",
      "amountPesos": 63300000,
      "lengthKm": 2.001,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31634182.91,
      "lengthMeters": 2001.0,
      "allocationPerStatedMeter": 31634.18,
      "rangesMeters": [
        [
          166000.0,
          168001.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Nueva Ecija - Pangasinan Rd, K0166 + 000 - K167 + 1001",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.04,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0201-001637",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0194 + 569 - K0195 + 500",
      "office": "Central Office",
      "amountPesos": 63284000,
      "lengthKm": 0.931,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 67974221.27,
      "lengthMeters": 931.0,
      "allocationPerStatedMeter": 67974.22,
      "rangesMeters": [
        [
          194569.0,
          195500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Puerto Princesa North Rd - K0194 + 569 - K0195 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.34,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0140-000579",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Bulalacao-Sn Jose-Jct Mapaya Rd - K0219 + 052 - K0220 + 488, K0220 + 495 - K0220 + 695, K0220 + 704 - K0223 + 375",
      "office": "Central Office",
      "amountPesos": 63000000,
      "lengthKm": 4.307,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14627350.82,
      "lengthMeters": 4307.0,
      "allocationPerStatedMeter": 14627.35,
      "rangesMeters": [
        [
          219052.0,
          220488.0
        ],
        [
          220495.0,
          220695.0
        ],
        [
          220704.0,
          223375.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Bulalacao-Sn Jose-Jct Mapaya Rd - K0219 + 052 - K0220 + 488, K0220 + 495 - K0220 + 695, K0220 + 704 - K0223 + 375",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 1.0,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0156-000874",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "P Burgos - Pototanin Jct, Quezon - K0200 + 719 - K0201 + 892",
      "office": "Central Office",
      "amountPesos": 63000000,
      "lengthKm": 1.173,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53708439.9,
      "lengthMeters": 1173.0,
      "allocationPerStatedMeter": 53708.44,
      "rangesMeters": [
        [
          200719.0,
          201892.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "P Burgos - Pototanin Jct, Quezon - K0200 + 719 - K0201 + 892",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 2.03,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0156-000876",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "P Burgos - Pototanin Jct, Quezon- K0162 + 698 - K0163 + 000, K0178 + 898 - K0179 + 769",
      "office": "Central Office",
      "amountPesos": 63000000,
      "lengthKm": 1.173,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 53708439.9,
      "lengthMeters": 1173.0,
      "allocationPerStatedMeter": 53708.44,
      "rangesMeters": [
        [
          162698.0,
          163000.0
        ],
        [
          178898.0,
          179769.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "P Burgos - Pototanin Jct, Quezon- K0162 + 698 - K0163 + 000, K0178 + 898 - K0179 + 769",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 2.03,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0434-006139",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Catulayan, San Juan, Siquijor to Barangay Cang-asa, Siquijor, Siquijor",
      "office": "Central Office",
      "amountPesos": 63000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Road, Barangay Catulayan, San Juan, Siquijor to Barangay Cang-asa, Siquijor, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0436-006180",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Polangi, Barangay Can-ato - Barangay Burak - Barangay Magtino, Llorente, Eastern Samar",
      "office": "Central Office",
      "amountPesos": 63000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Road, Sitio Polangi, Barangay Can-ato - Barangay Burak - Barangay Magtino, Llorente, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0141-000604",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sta. Elena-Capalonga By Pass Coastal Rd - K0279 + 868 – K0281 + 893",
      "office": "Central Office",
      "amountPesos": 62820000,
      "lengthKm": 2.025,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31022222.22,
      "lengthMeters": 2025.0,
      "allocationPerStatedMeter": 31022.22,
      "rangesMeters": [
        [
          279868.0,
          281893.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Sta. Elena-Capalonga By Pass Coastal Rd - K0279 + 868 – K0281 + 893",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 1.03,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0203-001671",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Milagros Rd - K0011 + 800 - K0012 + 600",
      "office": "Central Office",
      "amountPesos": 62706000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 78382500.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 78382.5,
      "rangesMeters": [
        [
          11800.0,
          12600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Masbate-Milagros Rd - K0011 + 800 - K0012 + 600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 1.3,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0113-000056",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0062 + 100 - K0062 + 473, K0063 + 000 - K0064 + 289, K0085 + 842 - K0086 + 083",
      "office": "Central Office",
      "amountPesos": 62701000,
      "lengthKm": 1.903,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 32948502.36,
      "lengthMeters": 1903.0,
      "allocationPerStatedMeter": 32948.5,
      "rangesMeters": [
        [
          62100.0,
          62473.0
        ],
        [
          63000.0,
          64289.0
        ],
        [
          85842.0,
          86083.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0062 + 100 - K0062 + 473, K0063 + 000 - K0064 + 289, K0085 + 842 - K0086 + 083",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.88,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0128-000333",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Albert Morrow Blvd - K1663 + 000 - K1663 + 684.17",
      "office": "Central Office",
      "amountPesos": 62642000,
      "lengthKm": 0.6841699999999254,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 91559115.42,
      "lengthMeters": 684.17,
      "allocationPerStatedMeter": 91559.12,
      "rangesMeters": [
        [
          1663000.0,
          1663684.17
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Albert Morrow Blvd - K1663 + 000 - K1663 + 684.17",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 2.84,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0202-001642",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0236 + 800 - K0238 + 000",
      "office": "Central Office",
      "amountPesos": 62348000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51956666.67,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 51956.67,
      "rangesMeters": [
        [
          236800.0,
          238000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Puerto Princesa North Rd - K0236 + 800 - K0238 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.02,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0212-001854",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Magpet-Nowa-Doroluman-Greenfield Rd - K1658 + 144 - K1660 + 100",
      "office": "Central Office",
      "amountPesos": 62329000,
      "lengthKm": 1.956,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31865541.92,
      "lengthMeters": 1956.0,
      "allocationPerStatedMeter": 31865.54,
      "rangesMeters": [
        [
          1658144.0,
          1660100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Magpet-Nowa-Doroluman-Greenfield Rd - K1658 + 144 - K1660 + 100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.78,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0202-001662",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Lagta-Crossing Malinta Rd - K0102 + 750 - K0103 + 500",
      "office": "Central Office",
      "amountPesos": 62192000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 82922666.67,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 82922.67,
      "rangesMeters": [
        [
          102750.0,
          103500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Lagta-Crossing Malinta Rd - K0102 + 750 - K0103 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 1.38,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0223-002079",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bato By-Pass Road, Sta. 2+501 - 3+059.01, Barangay Tabunok, Bato, Leyte",
      "office": "Central Office",
      "amountPesos": 62070000,
      "lengthKm": 0.5580100000000002,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 111234565.69,
      "lengthMeters": 558.01,
      "allocationPerStatedMeter": 111234.57,
      "rangesMeters": [
        [
          2501.0,
          3059.01
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "223",
      "lengthEvidence": "Bato By-Pass Road, Sta. 2+501 - 3+059.01, Barangay Tabunok, Bato, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.82,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0140-000573",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Calamba-Tagaytay Rd - K0051 + (-740) - K0051 + (-564), K0051 + 100 - K0051 + 571, K0051 + 669 - K0051 + 850, K0053 + 000 - K0053 + 150, K0054 + 000 - K0055 + 000, K0055 + 215 - K0056 + 635, K0058 + 840 - K0058 + 870, K0059 + 000 - K0060 + 000, K0062 + 000 - K0063 + 670",
      "office": "Central Office",
      "amountPesos": 62017000,
      "lengthKm": 6.098,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 10170055.76,
      "lengthMeters": 6098.0,
      "allocationPerStatedMeter": 10170.06,
      "rangesMeters": [
        [
          50260.0,
          50436.0
        ],
        [
          51100.0,
          51571.0
        ],
        [
          51669.0,
          51850.0
        ],
        [
          53000.0,
          53150.0
        ],
        [
          54000.0,
          55000.0
        ],
        [
          55215.0,
          56635.0
        ],
        [
          58840.0,
          58870.0
        ],
        [
          59000.0,
          60000.0
        ],
        [
          62000.0,
          63670.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Calamba-Tagaytay Rd - K0051 + (-740) - K0051 + (-564), K0051 + 100 - K0051 + 571, K0051 + 669 - K0051 + 850, K0053 + 000 - K0053 + 150, K0054 + 000 - K0055 + 000, K0055 + 215 - K0056 + 635, K0058 + 840 - K0058 + 870, K0059 + 000 - K0060 + 000, K0062 + 000 - K0063 + 670",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 0.69,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0128-000341",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Bukidnon-Cotabato Rd - K1620 + 000 - K1621 + 000, K1642 + (-635) - K1642 + 677",
      "office": "Central Office",
      "amountPesos": 62015000,
      "lengthKm": 2.312,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 26823096.89,
      "lengthMeters": 2312.0,
      "allocationPerStatedMeter": 26823.1,
      "rangesMeters": [
        [
          1620000.0,
          1621000.0
        ],
        [
          1641365.0,
          1642677.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Bukidnon-Cotabato Rd - K1620 + 000 - K1621 + 000, K1642 + (-635) - K1642 + 677",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.33,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0124-000254",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Olongapo-Bugallon Rd - K0147+696 - K0148+764",
      "office": "Central Office",
      "amountPesos": 62000000,
      "lengthKm": 1.068,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 58052434.46,
      "lengthMeters": 1068.0,
      "allocationPerStatedMeter": 58052.43,
      "rangesMeters": [
        [
          147696.0,
          148764.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Olongapo-Bugallon Rd - K0147+696 - K0148+764",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.87,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0141-000600",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sta. Elena-Capalonga By Pass Coastal Rd – K0270 + 640 - K0272 + 643",
      "office": "Central Office",
      "amountPesos": 62000000,
      "lengthKm": 2.003,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30953569.65,
      "lengthMeters": 2003.0,
      "allocationPerStatedMeter": 30953.57,
      "rangesMeters": [
        [
          270640.0,
          272643.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Sta. Elena-Capalonga By Pass Coastal Rd – K0270 + 640 - K0272 + 643",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 1.03,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0141-000601",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sta. Elena-Capalonga By Pass Coastal Rd - K0272 + 643 – K0274 + 657",
      "office": "Central Office",
      "amountPesos": 62000000,
      "lengthKm": 2.014,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30784508.44,
      "lengthMeters": 2014.0,
      "allocationPerStatedMeter": 30784.51,
      "rangesMeters": [
        [
          272643.0,
          274657.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Sta. Elena-Capalonga By Pass Coastal Rd - K0272 + 643 – K0274 + 657",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 1.02,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0271-002907",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "EDSA/Ortigas Interchange (B03316LZ) along EDSA/Ortigas Interchange",
      "office": "Central Office",
      "amountPesos": 62000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "EDSA/Ortigas Interchange (B03316LZ) along EDSA/Ortigas Interchange",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0418-005811",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bannawag - Bautista Bridge, Sta. 0+000 - Sta. 0+300, Jones and San Agustin, Isabela",
      "office": "Central Office",
      "amountPesos": 62000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 206666666.67,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 206666.67,
      "rangesMeters": [
        [
          0.0,
          300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Bannawag - Bautista Bridge, Sta. 0+000 - Sta. 0+300, Jones and San Agustin, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 0.34,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0427-005992",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Andres Bonifacio, San Narciso, Quezon",
      "office": "Central Office",
      "amountPesos": 62000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "427",
      "lengthEvidence": "Construction of Road, Barangay Andres Bonifacio, San Narciso, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0445-006348",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, GPS (Bo.1) to Barangay San Jose (Bo.5), Sta. 0+000 - Sta. 2+400, Koronadal City, South Cotabato",
      "office": "Central Office",
      "amountPesos": 62000000,
      "lengthKm": 2.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25833333.33,
      "lengthMeters": 2400.0,
      "allocationPerStatedMeter": 25833.33,
      "rangesMeters": [
        [
          0.0,
          2400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Construction of Road, GPS (Bo.1) to Barangay San Jose (Bo.5), Sta. 0+000 - Sta. 2+400, Koronadal City, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.82,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0111-000013",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Cauayan-Cabatuan Rd - K0378 + 137 - K0380 + 268",
      "office": "Central Office",
      "amountPesos": 61977000,
      "lengthKm": 2.131,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29083528.86,
      "lengthMeters": 2131.0,
      "allocationPerStatedMeter": 29083.53,
      "rangesMeters": [
        [
          378137.0,
          380268.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Cauayan-Cabatuan Rd - K0378 + 137 - K0380 + 268",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.78,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0260-002688",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Segapod Br. (B00950MN) along Linamon-Zamboanga Rd",
      "office": "Central Office",
      "amountPesos": 61920000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Segapod Br. (B00950MN) along Linamon-Zamboanga Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0412-005703",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Barangay Greater Lagro (Chainage 0+000 - Chainage 0+238), Quezon City",
      "office": "Central Office",
      "amountPesos": 61880000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "412",
      "lengthEvidence": "Construction of Road and Drainage at Barangay Greater Lagro (Chainage 0+000 - Chainage 0+238), Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0142-000619",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Kidapawan-Calunasan-Mlang Rd - K1638 + 008 - K1639 + 080, K1639 + 175 - K1640 + 000",
      "office": "Central Office",
      "amountPesos": 61732000,
      "lengthKm": 1.897,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 32541908.28,
      "lengthMeters": 1897.0,
      "allocationPerStatedMeter": 32541.91,
      "rangesMeters": [
        [
          1638008.0,
          1639080.0
        ],
        [
          1639175.0,
          1640000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "Kidapawan-Calunasan-Mlang Rd - K1638 + 008 - K1639 + 080, K1639 + 175 - K1640 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 1.08,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0174-001184",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0424 + 340 - K0424 + 358, K0426 + 290 - K0426 + 308, K0427 + 680 - K0427 + 699, K0428 + 750 - K0428 + 768, K0430 + 850 - K0430 + 867, K0431 + 700 - K0431 + 728, K0432 + 150 - K0432 + 185, K0438 + 550 - K0438 + 570, K0439 + 910 - K0439 + 950, K0440 + 250 - K0440 + 270, K0441 + 550 - K0441 + 650, K0445+312 - K0445+333, K0449+713 - K0449+740",
      "office": "Central Office",
      "amountPesos": 61649000,
      "lengthKm": 0.381,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 161808398.95,
      "lengthMeters": 381.0,
      "allocationPerStatedMeter": 161808.4,
      "rangesMeters": [
        [
          424340.0,
          424358.0
        ],
        [
          426290.0,
          426308.0
        ],
        [
          427680.0,
          427699.0
        ],
        [
          428750.0,
          428768.0
        ],
        [
          430850.0,
          430867.0
        ],
        [
          431700.0,
          431728.0
        ],
        [
          432150.0,
          432185.0
        ],
        [
          438550.0,
          438570.0
        ],
        [
          439910.0,
          439950.0
        ],
        [
          440250.0,
          440270.0
        ],
        [
          441550.0,
          441650.0
        ],
        [
          445312.0,
          445333.0
        ],
        [
          449713.0,
          449740.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "174",
      "lengthEvidence": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0424 + 340 - K0424 + 358, K0426 + 290 - K0426 + 308, K0427 + 680 - K0427 + 699, K0428 + 750 - K0428 + 768, K0430 + 850 - K0430 + 867, K0431 + 700 - K0431 + 728, K0432 + 150 - K0432 + 185, K0438 + 550 - K0438 + 570, K0439 + 910 - K0439 + 950, K0440 + 250 - K0440 + 270, K0441 + 550 - K0441 + 650, K0445+312 - K0445+333, K0449+713 - K0449+740",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 1.56,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0114-000078",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Ipil-Liloy-Sindangan Rd - K1997 + 000 - K1998 + 266",
      "office": "Central Office",
      "amountPesos": 61617000,
      "lengthKm": 1.266,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 48670616.11,
      "lengthMeters": 1266.0,
      "allocationPerStatedMeter": 48670.62,
      "rangesMeters": [
        [
          1997000.0,
          1998266.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Ipil-Liloy-Sindangan Rd - K1997 + 000 - K1998 + 266",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 1.24,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0257-002611",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Tobuan Br. (B02135LZ) along Pangasinan-Zambales Rd",
      "office": "Central Office",
      "amountPesos": 61600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Tobuan Br. (B02135LZ) along Pangasinan-Zambales Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0114-000079",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Ipil-Liloy-Sindangan Rd - K2000 + 000 - K2001 + 144.50",
      "office": "Central Office",
      "amountPesos": 61492000,
      "lengthKm": 1.1445,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53728265.62,
      "lengthMeters": 1144.5,
      "allocationPerStatedMeter": 53728.27,
      "rangesMeters": [
        [
          2000000.0,
          2001144.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Ipil-Liloy-Sindangan Rd - K2000 + 000 - K2001 + 144.50",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 1.16,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0112-000034",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0344 + 000 - K0345 + 000",
      "office": "Central Office",
      "amountPesos": 61465000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 61465000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 61465.0,
      "rangesMeters": [
        [
          344000.0,
          345000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Maharlika Highway (LZ) - K0344 + 000 - K0345 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 1.33,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0222-002060",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Lanot-Loctugan-Panitan Bdry Rd - K0109 + (-241) - K0110 + 709",
      "office": "Central Office",
      "amountPesos": 61400000,
      "lengthKm": 1.95,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31487179.49,
      "lengthMeters": 1950.0,
      "allocationPerStatedMeter": 31487.18,
      "rangesMeters": [
        [
          108759.0,
          110709.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Lanot-Loctugan-Panitan Bdry Rd - K0109 + (-241) - K0110 + 709",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.61,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0433-006134",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 0+194 - Sta. 4+569) at Sitio Binintigan, Barangay XI, Victorias City, Negros Occidental (10.7951780, 123.1821790)",
      "office": "Central Office",
      "amountPesos": 61250000,
      "lengthKm": 4.375,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14000000.0,
      "lengthMeters": 4375.0,
      "allocationPerStatedMeter": 14000.0,
      "rangesMeters": [
        [
          194.0,
          4569.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Road (Sta. 0+194 - Sta. 4+569) at Sitio Binintigan, Barangay XI, Victorias City, Negros Occidental (10.7951780, 123.1821790)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.45,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0151-000788",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - K1651 + (-212) - K1652 + 000",
      "office": "Central Office",
      "amountPesos": 61149000,
      "lengthKm": 1.212,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50452970.3,
      "lengthMeters": 1212.0,
      "allocationPerStatedMeter": 50452.97,
      "rangesMeters": [
        [
          1650788.0,
          1652000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - K1651 + (-212) - K1652 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 2.13,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0202-001663",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Lagta-Crossing Malinta Rd - K0103 + 500 - K0104 + 250",
      "office": "Central Office",
      "amountPesos": 61038000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 81384000.0,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 81384.0,
      "rangesMeters": [
        [
          103500.0,
          104250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Lagta-Crossing Malinta Rd - K0103 + 500 - K0104 + 250",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 1.35,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0204-001696",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Wright-Taft-Borongan Rd - K0855 + 000 - K0855 + 498, K0855 + 521.50 - K0855 + 762, K0855 + 797.75 - K0856 + 166",
      "office": "Central Office",
      "amountPesos": 61000000,
      "lengthKm": 1.10675,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 55116331.6,
      "lengthMeters": 1106.75,
      "allocationPerStatedMeter": 55116.33,
      "rangesMeters": [
        [
          855000.0,
          855498.0
        ],
        [
          855521.5,
          855762.0
        ],
        [
          855797.75,
          856166.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Wright-Taft-Borongan Rd - K0855 + 000 - K0855 + 498, K0855 + 521.50 - K0855 + 762, K0855 + 797.75 - K0856 + 166",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.09,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0201-001641",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0234 + 000 - K0235 + 200",
      "office": "Central Office",
      "amountPesos": 60996000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50830000.0,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 50830.0,
      "rangesMeters": [
        [
          234000.0,
          235200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Puerto Princesa North Rd - K0234 + 000 - K0235 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.0,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0167-001051",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Basud-Lanot Rd - (S06300LZ) Chainage 12604 - Chainage 15433",
      "office": "Central Office",
      "amountPesos": 60855000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Basud-Lanot Rd - (S06300LZ) Chainage 12604 - Chainage 15433",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0167-001058",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Basud-Lanot Rd - (S06300LZ) Chainage 21131 - Chainage 23960",
      "office": "Central Office",
      "amountPesos": 60855000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Basud-Lanot Rd - (S06300LZ) Chainage 21131 - Chainage 23960",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0167-001052",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Basud-Lanot Rd - (S06300LZ) Chainage 15433 - Chainage 15448, Chainage 15488 - Chainage 18302",
      "office": "Central Office",
      "amountPesos": 60854000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Basud-Lanot Rd - (S06300LZ) Chainage 15433 - Chainage 15448, Chainage 15488 - Chainage 18302",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0116-000108",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Linamon-Zamboanga Rd - K1608 + 549 - K1609 + 788",
      "office": "Central Office",
      "amountPesos": 60792000,
      "lengthKm": 1.239,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49065375.3,
      "lengthMeters": 1239.0,
      "allocationPerStatedMeter": 49065.38,
      "rangesMeters": [
        [
          1608549.0,
          1609788.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Linamon-Zamboanga Rd - K1608 + 549 - K1609 + 788",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 1.25,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0113-000053",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod South Rd - K0067+200 - K0068 + 760",
      "office": "Central Office",
      "amountPesos": 60762000,
      "lengthKm": 1.56,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38950000.0,
      "lengthMeters": 1560.0,
      "allocationPerStatedMeter": 38950.0,
      "rangesMeters": [
        [
          67200.0,
          68760.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Bacolod South Rd - K0067+200 - K0068 + 760",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 1.04,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0182-001314",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Alilem-Sugpon-Sudipen Rd - K0317 + 647 - K0317 + 677",
      "office": "Central Office",
      "amountPesos": 60750000,
      "lengthKm": 0.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2025000000.0,
      "lengthMeters": 30.0,
      "allocationPerStatedMeter": 2025000.0,
      "rangesMeters": [
        [
          317647.0,
          317677.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "182",
      "lengthEvidence": "Alilem-Sugpon-Sudipen Rd - K0317 + 647 - K0317 + 677",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 5.42,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0141-000610",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Concepcion-Sn Dionisio Rd - K0224 + 000 - K0226 + 201",
      "office": "Central Office",
      "amountPesos": 60512000,
      "lengthKm": 2.201,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27492957.75,
      "lengthMeters": 2201.0,
      "allocationPerStatedMeter": 27492.96,
      "rangesMeters": [
        [
          224000.0,
          226201.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Concepcion-Sn Dionisio Rd - K0224 + 000 - K0226 + 201",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 0.92,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0176-001216",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1504 + 790 - K1504 + 910, K1505 + 240 - K1505 + 280, K1505 + 340 - K1505 + 360, K1505 + 540 - K1505 + 600, K1509 + 500 - K1509 + 630, K1512 + 530 - K1512 + 600",
      "office": "Central Office",
      "amountPesos": 60480000,
      "lengthKm": 0.44,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 137454545.45,
      "lengthMeters": 440.0,
      "allocationPerStatedMeter": 137454.55,
      "rangesMeters": [
        [
          1504790.0,
          1504910.0
        ],
        [
          1505240.0,
          1505280.0
        ],
        [
          1505340.0,
          1505360.0
        ],
        [
          1505540.0,
          1505600.0
        ],
        [
          1509500.0,
          1509630.0
        ],
        [
          1512530.0,
          1512600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1504 + 790 - K1504 + 910, K1505 + 240 - K1505 + 280, K1505 + 340 - K1505 + 360, K1505 + 540 - K1505 + 600, K1509 + 500 - K1509 + 630, K1512 + 530 - K1512 + 600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 1.33,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0127-000313",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Terminal Bldg Access Rd - K0013 + (-080) - K0013 + 885",
      "office": "Central Office",
      "amountPesos": 60459000,
      "lengthKm": 0.965,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 62651813.47,
      "lengthMeters": 965.0,
      "allocationPerStatedMeter": 62651.81,
      "rangesMeters": [
        [
          12920.0,
          13885.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Terminal Bldg Access Rd - K0013 + (-080) - K0013 + 885",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 2.06,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0128-000340",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Bukidnon-Cotabato Rd - K1607 + 480 - K1608 + 000, K1611 + 620 - K1612 + 258",
      "office": "Central Office",
      "amountPesos": 60397000,
      "lengthKm": 1.158,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 52156303.97,
      "lengthMeters": 1158.0,
      "allocationPerStatedMeter": 52156.3,
      "rangesMeters": [
        [
          1607480.0,
          1608000.0
        ],
        [
          1611620.0,
          1612258.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Bukidnon-Cotabato Rd - K1607 + 480 - K1608 + 000, K1611 + 620 - K1612 + 258",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.68,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0205-001712",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Saturnino R. Silva Rd - K1478 + 560 - K1478 + 656, K1480 + 326 - K1480 + 431, K1481 + 235 - K1482 + 292, K1482 + 479 - K1482 + 940",
      "office": "Central Office",
      "amountPesos": 60345000,
      "lengthKm": 1.719,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 35104712.04,
      "lengthMeters": 1719.0,
      "allocationPerStatedMeter": 35104.71,
      "rangesMeters": [
        [
          1478560.0,
          1478656.0
        ],
        [
          1480326.0,
          1480431.0
        ],
        [
          1481235.0,
          1482292.0
        ],
        [
          1482479.0,
          1482940.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Saturnino R. Silva Rd - K1478 + 560 - K1478 + 656, K1480 + 326 - K1480 + 431, K1481 + 235 - K1482 + 292, K1482 + 479 - K1482 + 940",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 1.23,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0203-001670",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Milagros Rd - K0010 + 1000 - K0011 + 800",
      "office": "Central Office",
      "amountPesos": 60300000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 75375000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 75375.0,
      "rangesMeters": [
        [
          11000.0,
          11800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Masbate-Milagros Rd - K0010 + 1000 - K0011 + 800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 1.25,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0214-001887",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
      "office": "Central Office",
      "amountPesos": 60257000,
      "lengthKm": 0.5182399999999998,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 116272383.45,
      "lengthMeters": 518.24,
      "allocationPerStatedMeter": 116272.38,
      "rangesMeters": [
        [
          7680.5,
          8198.74
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.85,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0284-003203",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Dumabato Parallel Br. 2 along Jct Victoria-Maddela-Alicia-Kasibu Bdry Rd (Jct Victoria- Kasibu Bdry)",
      "office": "Central Office",
      "amountPesos": 60200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Dumabato Parallel Br. 2 along Jct Victoria-Maddela-Alicia-Kasibu Bdry Rd (Jct Victoria- Kasibu Bdry)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0141-000599",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "MT Villanueva Ave-Magsaysay Rd - K0439 + (-869) - K0439 + 638",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 1.507,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39814200.4,
      "lengthMeters": 1507.0,
      "allocationPerStatedMeter": 39814.2,
      "rangesMeters": [
        [
          438131.0,
          439638.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "MT Villanueva Ave-Magsaysay Rd - K0439 + (-869) - K0439 + 638",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 1.85,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0149-000754",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Calamba-Sta. Cruz, Famy Jct Rd, KO103+100 - KO103+500",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "149",
      "lengthEvidence": "Calamba-Sta. Cruz, Famy Jct Rd, KO103+100 - KO103+500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0157-000896",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Toledo-Tabuelan-Sn Remigio Rd - K0080 + 844 - K0081 + 412, K0090 + 202 - K0090 + 309, K0090 + 373 - K0090 + 777, K0092 + 000 - K0093 + 738",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 2.817,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21299254.53,
      "lengthMeters": 2817.0,
      "allocationPerStatedMeter": 21299.25,
      "rangesMeters": [
        [
          80844.0,
          81412.0
        ],
        [
          90202.0,
          90309.0
        ],
        [
          90373.0,
          90777.0
        ],
        [
          92000.0,
          93738.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "157",
      "lengthEvidence": "Toledo-Tabuelan-Sn Remigio Rd - K0080 + 844 - K0081 + 412, K0090 + 202 - K0090 + 309, K0090 + 373 - K0090 + 777, K0092 + 000 - K0093 + 738",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 0.95,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0174-001185",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Mt Province-N Vizcaya Rd - K0369 + 870 - K0370 + 100",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 0.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 260869565.22,
      "lengthMeters": 230.0,
      "allocationPerStatedMeter": 260869.57,
      "rangesMeters": [
        [
          369870.0,
          370100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "174",
      "lengthEvidence": "Mt Province-N Vizcaya Rd - K0369 + 870 - K0370 + 100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 1.37,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0176-001204",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0035 + 334 - K0035 + 397",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 0.063,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 952380952.38,
      "lengthMeters": 63.0,
      "allocationPerStatedMeter": 952380.95,
      "rangesMeters": [
        [
          35334.0,
          35397.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Puerto Princesa South Rd - K0035 + 334 - K0035 + 397",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 3.16,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0183-001324",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Logac-Lasam-Gagabutan Rd - K0742 + 470 - K0742 + 660",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 0.19,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 315789473.68,
      "lengthMeters": 190.0,
      "allocationPerStatedMeter": 315789.47,
      "rangesMeters": [
        [
          742470.0,
          742660.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Jct Logac-Lasam-Gagabutan Rd - K0742 + 470 - K0742 + 660",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 1.81,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0216-001922",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Iguig Bypass Road, Sta. 0+100 - Sta. 0+274, Sta. 3+500 - Sta. 3+680, Cagayan",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 0.354,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 169491525.42,
      "lengthMeters": 354.0,
      "allocationPerStatedMeter": 169491.53,
      "rangesMeters": [
        [
          100.0,
          274.0
        ],
        [
          3500.0,
          3680.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Iguig Bypass Road, Sta. 0+100 - Sta. 0+274, Sta. 3+500 - Sta. 3+680, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 1.33,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0216-001923",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Iguig Bypasss Road (Manaoag Bridge), Sta. 2+750 - Sta. 2+875, Cagayan",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 0.125,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 125.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          2750.0,
          2875.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Iguig Bypasss Road (Manaoag Bridge), Sta. 2+750 - Sta. 2+875, Cagayan",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0218-001968",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Talavera-Licab Road, Nueva Ecija, Sta. 0+000 - Sta. 2+739",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 2.739,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21905805.04,
      "lengthMeters": 2739.0,
      "allocationPerStatedMeter": 21905.81,
      "rangesMeters": [
        [
          0.0,
          2739.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "218",
      "lengthEvidence": "Talavera-Licab Road, Nueva Ecija, Sta. 0+000 - Sta. 2+739",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.43,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0219-001998",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Mauban Bypass Road (Bridge 4), Mauban, Quezon",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Mauban Bypass Road (Bridge 4), Mauban, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0220-002008",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sampaloc By-Pass Rd, Sta. 0+000 - 0+600, Sampaloc, Quezon",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          0.0,
          600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Sampaloc By-Pass Rd, Sta. 0+000 - 0+600, Sampaloc, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.73,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0220-002013",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Batangas City-San Pascual-Bauan Diversion Road - Chainage 5813 - Chainage 6246, Batangas",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Batangas City-San Pascual-Bauan Diversion Road - Chainage 5813 - Chainage 6246, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0224-002095",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Guinoman-Godod Road, Zamboanga Sibuga",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Guinoman-Godod Road, Zamboanga Sibuga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0225-002112",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "CDO-New Western Diversion Road (Kauswagan-Bonbon Section), Barangay Bonbon- Barangay Bayabas, Sta. 0+000 - Sta. 0+160, Sta. 0+224 - Sta. 0+271, Sta. 0+400 - Sta. 1+110, Sta. 1+540 - Sta. 1+970, Cagayan de Oro City",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 1.347,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 44543429.84,
      "lengthMeters": 1347.0,
      "allocationPerStatedMeter": 44543.43,
      "rangesMeters": [
        [
          0.0,
          160.0
        ],
        [
          224.0,
          271.0
        ],
        [
          400.0,
          1110.0
        ],
        [
          1540.0,
          1970.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "225",
      "lengthEvidence": "CDO-New Western Diversion Road (Kauswagan-Bonbon Section), Barangay Bonbon- Barangay Bayabas, Sta. 0+000 - Sta. 0+160, Sta. 0+224 - Sta. 0+271, Sta. 0+400 - Sta. 1+110, Sta. 1+540 - Sta. 1+970, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.54,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0228-002154",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Nabunturan-New Corella-Tagum Road (Tagum-New Corella Section), Barangay Patrocenio, New Corella, , Davao del Norte",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Nabunturan-New Corella-Tagum Road (Tagum-New Corella Section), Barangay Patrocenio, New Corella, , Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0228-002155",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Nabunturan - Laak Road, Barangay Suawon, New Corella - Barangay Binancian, Asuncion Section, Davao del Norte",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Nabunturan - Laak Road, Barangay Suawon, New Corella - Barangay Binancian, Asuncion Section, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0235-002281",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Sta. Cruz - Mangatarem Road, Santa Cruz, Zambales",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "235",
      "lengthEvidence": "Sta. Cruz - Mangatarem Road, Santa Cruz, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0237-002318",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mindoro Island Circumferential Road (Paluan - Abra de Ilog), Apyas to Mananao, Occidental Mindoro, Sta 000+000 - Sta 001+000",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 60000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 60000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "237",
      "lengthEvidence": "Mindoro Island Circumferential Road (Paluan - Abra de Ilog), Apyas to Mananao, Occidental Mindoro, Sta 000+000 - Sta 001+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 0.96,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0243-002420",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0039 + 000 - K0047 + 000 (Road Safety: Roadway Lighting)",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 8.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 7500000.0,
      "lengthMeters": 8000.0,
      "allocationPerStatedMeter": 7500.0,
      "rangesMeters": [
        [
          39000.0,
          47000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "243",
      "lengthEvidence": "Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0039 + 000 - K0047 + 000 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.62,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0285-003235",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Mait Br. (B00262PN) along Iloilo-Capiz Rd (Old Route)",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Mait Br. (B00262PN) along Iloilo-Capiz Rd (Old Route)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003237",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Tangalan Br. (B00297PN) along Aklan West Rd (Kalibo-Nabas)",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Tangalan Br. (B00297PN) along Aklan West Rd (Kalibo-Nabas)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003241",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Jimalalod Br. (B00119NR) along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Jimalalod Br. (B00119NR) along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003268",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Ramitan Br. (B02102MN) along Maharlika Highway( Cotabato-Malabang-Lanao del Norte Rd)",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Ramitan Br. (B02102MN) along Maharlika Highway( Cotabato-Malabang-Lanao del Norte Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003271",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Agusan Br. (B01427MN) along Montevista-Compostela-Mati Bdry Rd",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Agusan Br. (B01427MN) along Montevista-Compostela-Mati Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003278",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Malabog Br. (B01690MN) along Agusan-Davao Corridor Highway (Davao-Bukidnon Section)",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Malabog Br. (B01690MN) along Agusan-Davao Corridor Highway (Davao-Bukidnon Section)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003295",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Tag-iho Br. 2 (B00086DG) along Dinagat-Loreto Rd",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Tag-iho Br. 2 (B00086DG) along Dinagat-Loreto Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0413-005720",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Sidewalk and Driveway along Sen. Gil Puyat Avenue (From EDSA towards Osmeña Highway), District 1, Makati City, Metro Manila",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Improvement of Road, Sidewalk and Driveway along Sen. Gil Puyat Avenue (From EDSA towards Osmeña Highway), District 1, Makati City, Metro Manila",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0414-005738",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction/Improvement of Roads, Barangay Poblacion, Binalonan, Pangasinan, Sta 0+000 - Sta. 2+310",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 2.31,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25974025.97,
      "lengthMeters": 2310.0,
      "allocationPerStatedMeter": 25974.03,
      "rangesMeters": [
        [
          0.0,
          2310.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Reconstruction/Improvement of Roads, Barangay Poblacion, Binalonan, Pangasinan, Sta 0+000 - Sta. 2+310",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.08,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0417-005807",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Dicamay - Barangay Tappa, (Sta.0+000.00 - Sta. 0+121.00), San Mariano, Isabela",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 0.121,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 495867768.6,
      "lengthMeters": 121.0,
      "allocationPerStatedMeter": 495867.77,
      "rangesMeters": [
        [
          0.0,
          121.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Construction of Bridge, Barangay Dicamay - Barangay Tappa, (Sta.0+000.00 - Sta. 0+121.00), San Mariano, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 0.82,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0418-005822",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Dingading-Rizal Road, Sta. 0 + 000 - Sta. 4 + 000, Barangay Dingading, San Guillermo, Isabela",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15000000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 15000.0,
      "rangesMeters": [
        [
          0.0,
          4000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Dingading-Rizal Road, Sta. 0 + 000 - Sta. 4 + 000, Barangay Dingading, San Guillermo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.48,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0418-005823",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Kastila Road Gomez, Sta. 0 + 000 - Sta. 0 + 930, Sta. 0 + 000 - Sta. 3 + 070, Rizal East, Doña Paulina, Rizal West, San Isidro, Isabela",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 3.07,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 19543973.94,
      "lengthMeters": 3070.0,
      "allocationPerStatedMeter": 19543.97,
      "rangesMeters": [
        [
          0.0,
          930.0
        ],
        [
          0.0,
          3070.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Kastila Road Gomez, Sta. 0 + 000 - Sta. 0 + 930, Sta. 0 + 000 - Sta. 3 + 070, Rizal East, Doña Paulina, Rizal West, San Isidro, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.62,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0419-005831",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sitio Villa Miranda Bridge, Barangay Dibuluan, (Sta. 0+000.00 to Sta. 0+101.00) San Mariano, Isabela",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 0.101,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 594059405.94,
      "lengthMeters": 101.0,
      "allocationPerStatedMeter": 594059.41,
      "rangesMeters": [
        [
          0.0,
          101.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Construction of Sitio Villa Miranda Bridge, Barangay Dibuluan, (Sta. 0+000.00 to Sta. 0+101.00) San Mariano, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 0.98,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0420-005851",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Mallorca, San Leonardo, Nueva Ecija",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Concreting of Road, Barangay Mallorca, San Leonardo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0425-005960",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge and Approaches Sitio Bangkatan - Sitio Cadangdang, Barangay San Isidro, San Narciso, Quezon",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Construction of Bridge and Approaches Sitio Bangkatan - Sitio Cadangdang, Barangay San Isidro, San Narciso, Quezon",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0425-005965",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Bridges along Congressional Road, Carmona City, Cavite",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Improvement of Bridges along Congressional Road, Carmona City, Cavite",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0429-006041",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, F-Rafols Road, Sta. 00+504 - Sta. 00+979, Barangay Sta. Monica, Puerto Princesa City, Palawan",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 0.475,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 126315789.47,
      "lengthMeters": 475.0,
      "allocationPerStatedMeter": 126315.79,
      "rangesMeters": [
        [
          504.0,
          979.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Road, F-Rafols Road, Sta. 00+504 - Sta. 00+979, Barangay Sta. Monica, Puerto Princesa City, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 5.16,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0430-006064",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Duran - Coguit Suburban Road, Balatan, Camarines Sur, Sta. 0 + 560.00 - Sta. 1 + 460.00",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 0.9,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66666666.67,
      "lengthMeters": 900.0,
      "allocationPerStatedMeter": 66666.67,
      "rangesMeters": [
        [
          560.0,
          1460.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Concreting of Road, Duran - Coguit Suburban Road, Balatan, Camarines Sur, Sta. 0 + 560.00 - Sta. 1 + 460.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 3.43,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0432-006104",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio San Jose, Calomagon to E. Quirino, Bulan, Sorsogon, Sta. 0+000 - Sta. 2+400",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 2.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 2400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          2400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Construction of Road at Sitio San Jose, Calomagon to E. Quirino, Bulan, Sorsogon, Sta. 0+000 - Sta. 2+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.79,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0433-006116",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Sta. 0 + 843 - Sta. 0 + 868, Barangay Aguilar, San Lorenzo, Guimaras",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 0.025,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2400000000.0,
      "lengthMeters": 25.0,
      "allocationPerStatedMeter": 2400000.0,
      "rangesMeters": [
        [
          843.0,
          868.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Bridge, Sta. 0 + 843 - Sta. 0 + 868, Barangay Aguilar, San Lorenzo, Guimaras",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 1.7,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0435-006154",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Yati, Liloan, Cebu",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of Road, Barangay Yati, Liloan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0435-006162",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Cag-abaca - Cularima - General Malvar Road, Sta. 002+584.50 - Sta. 002+972, Catarman, Northern Samar",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 0.3875,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 154838709.68,
      "lengthMeters": 387.5,
      "allocationPerStatedMeter": 154838.71,
      "rangesMeters": [
        [
          2584.5,
          2972.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of Cag-abaca - Cularima - General Malvar Road, Sta. 002+584.50 - Sta. 002+972, Catarman, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 6.32,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0435-006168",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Yabon to Barangay Cabalagnan, Hinabangan, Samar (Sta. 0+000 - Sta. 0+760)",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": 0.76,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 78947368.42,
      "lengthMeters": 760.0,
      "allocationPerStatedMeter": 78947.37,
      "rangesMeters": [
        [
          0.0,
          760.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of Concrete Road, Barangay Yabon to Barangay Cabalagnan, Hinabangan, Samar (Sta. 0+000 - Sta. 0+760)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 4.06,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0435-006169",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Vicente - Barangay Santa Fe, Catubig, Northern Samar",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of Road, Barangay San Vicente - Barangay Santa Fe, Catubig, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0435-006171",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Silvino Lubos - Las Navas Road, Las Navas, Northern Samar",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of Road, Silvino Lubos - Las Navas Road, Las Navas, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0436-006184",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of San Luis Bridge including approaches, Taft, Eastern Samar",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of San Luis Bridge including approaches, Taft, Eastern Samar",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0437-006208",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Kan Marcial-Garid Road - Barangay Kan Mindus, Luuk, Sulu",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Construction of Road, Kan Marcial-Garid Road - Barangay Kan Mindus, Luuk, Sulu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0438-006209",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Kan Putlih -Neog Road, Luuk, Sulu",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Construction of Road, Kan Putlih -Neog Road, Luuk, Sulu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0446-006368",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Taguranao to Barangay Arakan, Matalam, Cotabato",
      "office": "Central Office",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Construction of Road, Barangay Taguranao to Barangay Arakan, Matalam, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0508-007665",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Santol - Bunsuran II Bridge, Sta. 3+580 - Sta. 3+596, Bunsuran II, Pandi, Bulacan (120.923015, 14.856319)",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 60000000,
      "lengthKm": 0.016,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 3750000000.0,
      "lengthMeters": 16.0,
      "allocationPerStatedMeter": 3750000.0,
      "rangesMeters": [
        [
          3580.0,
          3596.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Rehabilitation of Santol - Bunsuran II Bridge, Sta. 3+580 - Sta. 3+596, Bunsuran II, Pandi, Bulacan (120.923015, 14.856319)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 2.66,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0117-000115",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (MN) -(S01364MN) K1470 + 457 - K1470 + 1044, (S01390MN) K1471 + 008 - K1471 + 595",
      "office": "Central Office",
      "amountPesos": 59926000,
      "lengthKm": 1.138,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 52659050.97,
      "lengthMeters": 1138.0,
      "allocationPerStatedMeter": 52659.05,
      "rangesMeters": [
        [
          1470457.0,
          1471044.0
        ],
        [
          1471008.0,
          1471595.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Maharlika Highway (MN) -(S01364MN) K1470 + 457 - K1470 + 1044, (S01390MN) K1471 + 008 - K1471 + 595",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 1.14,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0201-001640",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0224 + 000 - K0225 + 150",
      "office": "Central Office",
      "amountPesos": 59904000,
      "lengthKm": 1.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52090434.78,
      "lengthMeters": 1150.0,
      "allocationPerStatedMeter": 52090.43,
      "rangesMeters": [
        [
          224000.0,
          225150.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Puerto Princesa North Rd - K0224 + 000 - K0225 + 150",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.03,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0211-001839",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Alicia-San Mateo Rd - K0354 + 711 - K0356 + 000",
      "office": "Central Office",
      "amountPesos": 59865000,
      "lengthKm": 1.289,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46442979.05,
      "lengthMeters": 1289.0,
      "allocationPerStatedMeter": 46442.98,
      "rangesMeters": [
        [
          354711.0,
          356000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "211",
      "lengthEvidence": "Alicia-San Mateo Rd - K0354 + 711 - K0356 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.14,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0203-001672",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Milagros Rd - K0012 + 600 - K0013 + 385",
      "office": "Central Office",
      "amountPesos": 59775000,
      "lengthKm": 0.785,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 76146496.82,
      "lengthMeters": 785.0,
      "allocationPerStatedMeter": 76146.5,
      "rangesMeters": [
        [
          12600.0,
          13385.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Masbate-Milagros Rd - K0012 + 600 - K0013 + 385",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 1.26,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0422-005898",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Santiago, Botolan, Zambales",
      "office": "Central Office",
      "amountPesos": 59750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "422",
      "lengthEvidence": "Construction of Road, Barangay Santiago, Botolan, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003221",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Talao-Talao Br. (B05236LZ) along Pagbilao-Dalahican Port Rd (Old MSR-Mayao-Talao- talao-Dalahican Port)",
      "office": "Central Office",
      "amountPesos": 59700000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Talao-Talao Br. (B05236LZ) along Pagbilao-Dalahican Port Rd (Old MSR-Mayao-Talao- talao-Dalahican Port)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0418-005827",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay District 2, San Manuel, Isabela",
      "office": "Central Office",
      "amountPesos": 59680000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "418",
      "lengthEvidence": "Construction of Road, Barangay District 2, San Manuel, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0124-000265",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Lipa City - Alaminos Rd - K0083 + (-044) - K0084 + 059",
      "office": "Central Office",
      "amountPesos": 59653000,
      "lengthKm": 1.103,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54082502.27,
      "lengthMeters": 1103.0,
      "allocationPerStatedMeter": 54082.5,
      "rangesMeters": [
        [
          82956.0,
          84059.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Lipa City - Alaminos Rd - K0083 + (-044) - K0084 + 059",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.74,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0227-002151",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sayre Highway Parallel Road II (Valencia City Section), Bantal Bridge, Barangay Sinayawan, Sta. 134+800 - Sta. 134+960, Valencia City, Bukidnon",
      "office": "Central Office",
      "amountPesos": 59507000,
      "lengthKm": 0.16,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 160.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          134800.0,
          134960.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Sayre Highway Parallel Road II (Valencia City Section), Bantal Bridge, Barangay Sinayawan, Sta. 134+800 - Sta. 134+960, Valencia City, Bukidnon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003279",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Marangig Br. (B01426MN) along Montevista-Compostela-Mati Bdry Rd",
      "office": "Central Office",
      "amountPesos": 59500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Marangig Br. (B01426MN) along Montevista-Compostela-Mati Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003218",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Masay Br. (B04946LZ) along Quezon Eco-Tourism Rd",
      "office": "Central Office",
      "amountPesos": 59400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Masay Br. (B04946LZ) along Quezon Eco-Tourism Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0157-000895",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Santander-Barili-Toledo Rd - K0162 + 537 - K0163 + 882, K0163 + 973 - K0165 + 411",
      "office": "Central Office",
      "amountPesos": 59322000,
      "lengthKm": 2.783,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21315846.21,
      "lengthMeters": 2783.0,
      "allocationPerStatedMeter": 21315.85,
      "rangesMeters": [
        [
          162537.0,
          163882.0
        ],
        [
          163973.0,
          165411.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "157",
      "lengthEvidence": "Santander-Barili-Toledo Rd - K0162 + 537 - K0163 + 882, K0163 + 973 - K0165 + 411",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 0.95,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0421-005869",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction/Rehabilitation of Del Carmen-Bulaon-Calulut Road, City of San Fernando, Pampanga Sta. 0+000 - Sta. 2+054",
      "office": "Central Office",
      "amountPesos": 59246000,
      "lengthKm": 2.054,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28844206.43,
      "lengthMeters": 2054.0,
      "allocationPerStatedMeter": 28844.21,
      "rangesMeters": [
        [
          0.0,
          2054.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Construction/Rehabilitation of Del Carmen-Bulaon-Calulut Road, City of San Fernando, Pampanga Sta. 0+000 - Sta. 2+054",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.19,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0125-000290",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Mindoro West Coastal Rd - K0307 + 000 - K0311 + 000",
      "office": "Central Office",
      "amountPesos": 59231000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14807750.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 14807.75,
      "rangesMeters": [
        [
          307000.0,
          311000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Mindoro West Coastal Rd - K0307 + 000 - K0311 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.9,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0150-000765",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bais-Kabankalan Rd - K0094 + 000 - K0096 + 000",
      "office": "Central Office",
      "amountPesos": 59200000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29600000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 29600.0,
      "rangesMeters": [
        [
          94000.0,
          96000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "Bais-Kabankalan Rd - K0094 + 000 - K0096 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 1.18,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0123-000249",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Olongapo - Bugallon Road - K0235 + 005 - K0236 + 000, K0239 + 000 - K0239 + 939",
      "office": "Central Office",
      "amountPesos": 59000000,
      "lengthKm": 1.934,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 30506721.82,
      "lengthMeters": 1934.0,
      "allocationPerStatedMeter": 30506.72,
      "rangesMeters": [
        [
          235005.0,
          236000.0
        ],
        [
          239000.0,
          239939.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Olongapo - Bugallon Road - K0235 + 005 - K0236 + 000, K0239 + 000 - K0239 + 939",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.0,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0205-001711",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd, K1812 + 762 - K1814 + 716",
      "office": "Central Office",
      "amountPesos": 59000000,
      "lengthKm": 1.954,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30194472.88,
      "lengthMeters": 1954.0,
      "allocationPerStatedMeter": 30194.47,
      "rangesMeters": [
        [
          1812762.0,
          1814716.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Surigao-Davao Coastal Rd, K1812 + 762 - K1814 + 716",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 1.06,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0432-006102",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Almiñe to Barangay Piña - Sta. 1+800 - Sta. 2+900, San Jacinto, Masbate",
      "office": "Central Office",
      "amountPesos": 59000000,
      "lengthKm": 1.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53636363.64,
      "lengthMeters": 1100.0,
      "allocationPerStatedMeter": 53636.36,
      "rangesMeters": [
        [
          1800.0,
          2900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Construction of Road, Barangay Almiñe to Barangay Piña - Sta. 1+800 - Sta. 2+900, San Jacinto, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 2.15,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0564-008883",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Fernando- San Jacinto- Monreal Road (Bartolabac Section), - Sta. 24 + 040 - Sta. 24 + 600, San Jacinto, Masbate",
      "office": "Masbate 1st District Engineering Office",
      "amountPesos": 59000000,
      "lengthKm": 0.56,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 105357142.86,
      "lengthMeters": 560.0,
      "allocationPerStatedMeter": 105357.14,
      "rangesMeters": [
        [
          24040.0,
          24600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Road, San Fernando- San Jacinto- Monreal Road (Bartolabac Section), - Sta. 24 + 040 - Sta. 24 + 600, San Jacinto, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 4.3,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0151-000782",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0770 + 325 - K0770 + 745, K0775 + 872 - K0776 + 090, K0779 + 000 - K0779 + 300, K0779 + 700 - K0781 + 000, K0785 + 000 - K0785 + 329",
      "office": "Central Office",
      "amountPesos": 58977000,
      "lengthKm": 2.567,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22975068.17,
      "lengthMeters": 2567.0,
      "allocationPerStatedMeter": 22975.07,
      "rangesMeters": [
        [
          770325.0,
          770745.0
        ],
        [
          775872.0,
          776090.0
        ],
        [
          779000.0,
          779300.0
        ],
        [
          779700.0,
          781000.0
        ],
        [
          785000.0,
          785329.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0770 + 325 - K0770 + 745, K0775 + 872 - K0776 + 090, K0779 + 000 - K0779 + 300, K0779 + 700 - K0781 + 000, K0785 + 000 - K0785 + 329",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 0.67,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0182-001320",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Banaue-Hungduan-Benguet Bdry Rd - K0406 + 104 - K0406 + 204, K0407 + (-327) - K0407 + (-298), K0408 + 373 - K0408 + 422, K0409 + 730 - K0409 + 778, K0411 + 000 - K0411 + 045, K0414 + 166 - K0414 + 196",
      "office": "Central Office",
      "amountPesos": 58900000,
      "lengthKm": 0.301,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 195681063.12,
      "lengthMeters": 301.0,
      "allocationPerStatedMeter": 195681.06,
      "rangesMeters": [
        [
          406104.0,
          406204.0
        ],
        [
          406673.0,
          406702.0
        ],
        [
          408373.0,
          408422.0
        ],
        [
          409730.0,
          409778.0
        ],
        [
          411000.0,
          411045.0
        ],
        [
          414166.0,
          414196.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "182",
      "lengthEvidence": "Banaue-Hungduan-Benguet Bdry Rd - K0406 + 104 - K0406 + 204, K0407 + (-327) - K0407 + (-298), K0408 + 373 - K0408 + 422, K0409 + 730 - K0409 + 778, K0411 + 000 - K0411 + 045, K0414 + 166 - K0414 + 196",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 1.12,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0134-000464",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Cavite-Batangas Rd - K0040 + 000 - K0040 + 059, K0041 + 061 - K0041 + 122, K0041 + 866 - K0041 + 953, K0044 + 799 - K0044 + 864, K0044 + 896 - K0045 + 375",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 58825000,
      "lengthKm": 0.751,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 78328894.81,
      "lengthMeters": 751.0,
      "allocationPerStatedMeter": 78328.89,
      "rangesMeters": [
        [
          40000.0,
          40059.0
        ],
        [
          41061.0,
          41122.0
        ],
        [
          41866.0,
          41953.0
        ],
        [
          44799.0,
          44864.0
        ],
        [
          44896.0,
          45375.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Cavite-Batangas Rd - K0040 + 000 - K0040 + 059, K0041 + 061 - K0041 + 122, K0041 + 866 - K0041 + 953, K0044 + 799 - K0044 + 864, K0044 + 896 - K0045 + 375",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 2.43,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0125-000275",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Batangas-Quezon Rd - K0111 + 000 - K0111 + 965, K0125 + 717 - K0125 + 831, K0129 + 420 - K0129 + 705, K0129 + 855 - K0129 + 958, K0130 + 464 - K0130 + 944",
      "office": "Central Office",
      "amountPesos": 58819000,
      "lengthKm": 1.947,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 30210066.77,
      "lengthMeters": 1947.0,
      "allocationPerStatedMeter": 30210.07,
      "rangesMeters": [
        [
          111000.0,
          111965.0
        ],
        [
          125717.0,
          125831.0
        ],
        [
          129420.0,
          129705.0
        ],
        [
          129855.0,
          129958.0
        ],
        [
          130464.0,
          130944.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Batangas-Quezon Rd - K0111 + 000 - K0111 + 965, K0125 + 717 - K0125 + 831, K0129 + 420 - K0129 + 705, K0129 + 855 - K0129 + 958, K0130 + 464 - K0130 + 944",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.99,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0141-000614",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd - K1721 + 000 - K1721 + 900, K1721 + 955 - K1723 + 000",
      "office": "Central Office",
      "amountPesos": 58700000,
      "lengthKm": 1.945,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 30179948.59,
      "lengthMeters": 1945.0,
      "allocationPerStatedMeter": 30179.95,
      "rangesMeters": [
        [
          1721000.0,
          1721900.0
        ],
        [
          1721955.0,
          1723000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd - K1721 + 000 - K1721 + 900, K1721 + 955 - K1723 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0125-000287",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Calapan South Rd - K0090 + 000 - K0090 + 710, K0094 + 424 - K0095 + 300, K0096 + 000 - K0096 + 380",
      "office": "Central Office",
      "amountPesos": 58579000,
      "lengthKm": 1.966,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29796032.55,
      "lengthMeters": 1966.0,
      "allocationPerStatedMeter": 29796.03,
      "rangesMeters": [
        [
          90000.0,
          90710.0
        ],
        [
          94424.0,
          95300.0
        ],
        [
          96000.0,
          96380.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "125",
      "lengthEvidence": "Calapan South Rd - K0090 + 000 - K0090 + 710, K0094 + 424 - K0095 + 300, K0096 + 000 - K0096 + 380",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.98,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0182-001319",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0424 + 811 - K0424 + 903, K0425 + 520 - K0425 + 649, K0426 + 242 - K0426 + 400, K0427 + 542 - K0427 + 579, K0427+674 - K0427+721",
      "office": "Central Office",
      "amountPesos": 58506000,
      "lengthKm": 0.463,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 126362850.97,
      "lengthMeters": 463.0,
      "allocationPerStatedMeter": 126362.85,
      "rangesMeters": [
        [
          424811.0,
          424903.0
        ],
        [
          425520.0,
          425649.0
        ],
        [
          426242.0,
          426400.0
        ],
        [
          427542.0,
          427579.0
        ],
        [
          427674.0,
          427721.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "182",
      "lengthEvidence": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0424 + 811 - K0424 + 903, K0425 + 520 - K0425 + 649, K0426 + 242 - K0426 + 400, K0427 + 542 - K0427 + 579, K0427+674 - K0427+721",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 1.36,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0199-001604",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Makilala-Allah Valley Rd - K1639 + 000 - K1639 + 495, K1639 + 515 - K1640 + 853",
      "office": "Central Office",
      "amountPesos": 58409000,
      "lengthKm": 1.833,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 31865248.23,
      "lengthMeters": 1833.0,
      "allocationPerStatedMeter": 31865.25,
      "rangesMeters": [
        [
          1639000.0,
          1639495.0
        ],
        [
          1639515.0,
          1640853.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Makilala-Allah Valley Rd - K1639 + 000 - K1639 + 495, K1639 + 515 - K1640 + 853",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 0.71,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0199-001602",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Makilala-Allah Valley Rd - K1621 + 000 - K1622 + 265",
      "office": "Central Office",
      "amountPesos": 58404000,
      "lengthKm": 1.265,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46169169.96,
      "lengthMeters": 1265.0,
      "allocationPerStatedMeter": 46169.17,
      "rangesMeters": [
        [
          1621000.0,
          1622265.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Makilala-Allah Valley Rd - K1621 + 000 - K1622 + 265",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 1.03,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0203-001681",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Jct (TER)-Jagna-Sierra Bullones Rd - K0068 + 000 - K0070 + 439",
      "office": "Central Office",
      "amountPesos": 58387000,
      "lengthKm": 2.439,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23938909.39,
      "lengthMeters": 2439.0,
      "allocationPerStatedMeter": 23938.91,
      "rangesMeters": [
        [
          68000.0,
          70439.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Jct (TER)-Jagna-Sierra Bullones Rd - K0068 + 000 - K0070 + 439",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 0.9,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0286-003243",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Polo Br. (B00085NR) along Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan)",
      "office": "Central Office",
      "amountPesos": 58356000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Polo Br. (B00085NR) along Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0123-000247",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Santiago Bypass Rd - K0325+561 - K0327+081",
      "office": "Central Office",
      "amountPesos": 58225000,
      "lengthKm": 1.52,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38305921.05,
      "lengthMeters": 1520.0,
      "allocationPerStatedMeter": 38305.92,
      "rangesMeters": [
        [
          325561.0,
          327081.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Santiago Bypass Rd - K0325+561 - K0327+081",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.25,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0157-000892",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Bayawan-Kabankalan Rd - K0141+121 - K0141+743, K0141+749 - K0142+171",
      "office": "Central Office",
      "amountPesos": 58099000,
      "lengthKm": 1.044,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 55650383.14,
      "lengthMeters": 1044.0,
      "allocationPerStatedMeter": 55650.38,
      "rangesMeters": [
        [
          141121.0,
          141743.0
        ],
        [
          141749.0,
          142171.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "157",
      "lengthEvidence": "Bayawan-Kabankalan Rd - K0141+121 - K0141+743, K0141+749 - K0142+171",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 2.11,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0123-000246",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Jct. Ayaga (Abulug)-Ballesteros-Aparri Rd - K0691 + 825 - K0695 + 000",
      "office": "Central Office",
      "amountPesos": 58000000,
      "lengthKm": 3.175,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18267716.54,
      "lengthMeters": 3175.0,
      "allocationPerStatedMeter": 18267.72,
      "rangesMeters": [
        [
          691825.0,
          695000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Jct. Ayaga (Abulug)-Ballesteros-Aparri Rd - K0691 + 825 - K0695 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.91,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0139-000559",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Bacnotan-Luna-Balaoan Rd - K0289 + 060 - K0291 + 000",
      "office": "Central Office",
      "amountPesos": 58000000,
      "lengthKm": 1.94,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29896907.22,
      "lengthMeters": 1940.0,
      "allocationPerStatedMeter": 29896.91,
      "rangesMeters": [
        [
          289060.0,
          291000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Bacnotan-Luna-Balaoan Rd - K0289 + 060 - K0291 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0175-001194",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Marikina-Infanta Rd - Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Rd - K0146 + 895 - K0146 + 945",
      "office": "Central Office",
      "amountPesos": 58000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1160000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 1160000.0,
      "rangesMeters": [
        [
          146895.0,
          146945.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "Marikina-Infanta Rd - Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Rd - K0146 + 895 - K0146 + 945",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 1.86,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0198-001585",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1764 + 330 - K1766 + 000",
      "office": "Central Office",
      "amountPesos": 58000000,
      "lengthKm": 1.67,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34730538.92,
      "lengthMeters": 1670.0,
      "allocationPerStatedMeter": 34730.54,
      "rangesMeters": [
        [
          1764330.0,
          1766000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1764 + 330 - K1766 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 0.78,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0236-002293",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Marilag Agoho Road - K0224 + 630 - K0224 + 731, Quezon",
      "office": "Central Office",
      "amountPesos": 58000000,
      "lengthKm": 0.101,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 574257425.74,
      "lengthMeters": 101.0,
      "allocationPerStatedMeter": 574257.43,
      "rangesMeters": [
        [
          224630.0,
          224731.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Marilag Agoho Road - K0224 + 630 - K0224 + 731, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 0.66,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0416-005773",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Poblacion, Barangay Pugaro, Barangay San Aurelio 1st, Barangay Aurelio 2nd, Barangay Aurelio 3rd, Barangay Angayan Norte, Barangay Kita Kita, Barangay Angayan Sur, Barangay Rajal, Barangay San Miguel, Balungao, Pangasinan",
      "office": "Central Office",
      "amountPesos": 58000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Rehabilitation of Road, Barangay Poblacion, Barangay Pugaro, Barangay San Aurelio 1st, Barangay Aurelio 2nd, Barangay Aurelio 3rd, Barangay Angayan Norte, Barangay Kita Kita, Barangay Angayan Sur, Barangay Rajal, Barangay San Miguel, Balungao, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0430-006067",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Junction National Road to Flor Mores Road, Monreal Masbate- Sta. 0 + 000- Sta. 1 + 200",
      "office": "Central Office",
      "amountPesos": 58000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 48333333.33,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 48333.33,
      "rangesMeters": [
        [
          0.0,
          1200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Construction of Junction National Road to Flor Mores Road, Monreal Masbate- Sta. 0 + 000- Sta. 1 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.93,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0433-006121",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sto. Rosario, Jamindan, Capiz",
      "office": "Central Office",
      "amountPesos": 58000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Road, Barangay Sto. Rosario, Jamindan, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0142-000615",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Ipil-Magdaup Wharf Rd - K2015 + 647.50 - K2016 + 671",
      "office": "Central Office",
      "amountPesos": 57761000,
      "lengthKm": 1.0235,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 56434782.61,
      "lengthMeters": 1023.5,
      "allocationPerStatedMeter": 56434.78,
      "rangesMeters": [
        [
          2015647.5,
          2016671.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "Ipil-Magdaup Wharf Rd - K2015 + 647.50 - K2016 + 671",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 2.36,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0413-005713",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage System at Bel Air, Chainage 000 - 274, Biscayne Street Chainage 000 - 249 and Colt Street Chainage 000 - 301 in Barangay Fairview, Quezon City",
      "office": "Central Office",
      "amountPesos": 57750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Construction of Road and Drainage System at Bel Air, Chainage 000 - 274, Biscayne Street Chainage 000 - 249 and Colt Street Chainage 000 - 301 in Barangay Fairview, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0211-001841",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Alicia-San Mateo Rd - K0359 + 000 - K0360 + 256",
      "office": "Central Office",
      "amountPesos": 57673000,
      "lengthKm": 1.256,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45917993.63,
      "lengthMeters": 1256.0,
      "allocationPerStatedMeter": 45917.99,
      "rangesMeters": [
        [
          359000.0,
          360256.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "211",
      "lengthEvidence": "Alicia-San Mateo Rd - K0359 + 000 - K0360 + 256",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.13,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0212-001853",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Kidapawan-Magpet-Pangaoan Rd - K1627 + 666 - K1627 + 716, K1627 + 744 - K1627 + 844, K1628 + 375 - K1629 + 264, K1629 + 305.40 - K1629 + 745",
      "office": "Central Office",
      "amountPesos": 57664000,
      "lengthKm": 1.4786000000000932,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 38999053.16,
      "lengthMeters": 1478.6,
      "allocationPerStatedMeter": 38999.05,
      "rangesMeters": [
        [
          1627666.0,
          1627716.0
        ],
        [
          1627744.0,
          1627844.0
        ],
        [
          1628375.0,
          1629264.0
        ],
        [
          1629305.4,
          1629745.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Kidapawan-Magpet-Pangaoan Rd - K1627 + 666 - K1627 + 716, K1627 + 744 - K1627 + 844, K1628 + 375 - K1629 + 264, K1629 + 305.40 - K1629 + 745",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.96,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0117-000121",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1636 + 019 - K1636 + 840, K1637 + 706 - K1637 + 858",
      "office": "Central Office",
      "amountPesos": 57559000,
      "lengthKm": 0.973,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 59156217.88,
      "lengthMeters": 973.0,
      "allocationPerStatedMeter": 59156.22,
      "rangesMeters": [
        [
          1636019.0,
          1636840.0
        ],
        [
          1637706.0,
          1637858.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1636 + 019 - K1636 + 840, K1637 + 706 - K1637 + 858",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 1.28,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0157-000897",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Calbayog-Catarman Rd - K0802 + 000 - K0802 + 984, K0803 + 160 - K0803 + 950",
      "office": "Central Office",
      "amountPesos": 57536000,
      "lengthKm": 1.774,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 32432919.95,
      "lengthMeters": 1774.0,
      "allocationPerStatedMeter": 32432.92,
      "rangesMeters": [
        [
          802000.0,
          802984.0
        ],
        [
          803160.0,
          803950.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "157",
      "lengthEvidence": "Calbayog-Catarman Rd - K0802 + 000 - K0802 + 984, K0803 + 160 - K0803 + 950",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 1.44,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0243-002423",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1352 + 189 - K1353 + 494, K1353 + 714 - K1353 + 902, K1355 + (-1103) - K1355 + (-903) (Road Safety: Roadway Lighting)",
      "office": "Central Office",
      "amountPesos": 57528000,
      "lengthKm": 1.688,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34080568.72,
      "lengthMeters": 1688.0,
      "allocationPerStatedMeter": 34080.57,
      "rangesMeters": [
        [
          1352189.0,
          1353494.0
        ],
        [
          1353714.0,
          1353902.0
        ],
        [
          1353897.0,
          1354097.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "243",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1352 + 189 - K1353 + 494, K1353 + 714 - K1353 + 902, K1355 + (-1103) - K1355 + (-903) (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 2.83,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0176-001210",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Catarman-Calbayog Rd - K0772 + 413 - K0772 + 463, K0783 + 430 - K0783 + 540",
      "office": "Central Office",
      "amountPesos": 57500000,
      "lengthKm": 0.16,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 359375000.0,
      "lengthMeters": 160.0,
      "allocationPerStatedMeter": 359375.0,
      "rangesMeters": [
        [
          772413.0,
          772463.0
        ],
        [
          783430.0,
          783540.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Catarman-Calbayog Rd - K0772 + 413 - K0772 + 463, K0783 + 430 - K0783 + 540",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 1.89,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0203-001682",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Jct Dat-an-Carmen-Sierra Bullones-Pilar-Alicia Rd - K0066 + 500 - K0068 + 800",
      "office": "Central Office",
      "amountPesos": 57430000,
      "lengthKm": 2.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24969565.22,
      "lengthMeters": 2300.0,
      "allocationPerStatedMeter": 24969.57,
      "rangesMeters": [
        [
          66500.0,
          68800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Jct Dat-an-Carmen-Sierra Bullones-Pilar-Alicia Rd - K0066 + 500 - K0068 + 800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 0.93,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0217-001955",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Moncada-San Manuel Bypass Road, Barangay Legaspi, San Manuel, Sta. 6+088.20 - Sta. 6+131.00, Tarlac",
      "office": "Central Office",
      "amountPesos": 57143000,
      "lengthKm": 0.042800000000000185,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1335116822.43,
      "lengthMeters": 42.8,
      "allocationPerStatedMeter": 1335116.82,
      "rangesMeters": [
        [
          6088.2,
          6131.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Moncada-San Manuel Bypass Road, Barangay Legaspi, San Manuel, Sta. 6+088.20 - Sta. 6+131.00, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 1.11,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0217-001956",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Moncada-San Manuel Bypass Road, Barangay Matarannoc - Pacpaco, Sta. 6 + 222.9 - Sta. 6 + 681.60, Tarlac",
      "office": "Central Office",
      "amountPesos": 57143000,
      "lengthKm": 0.4587000000000007,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 124575975.58,
      "lengthMeters": 458.7,
      "allocationPerStatedMeter": 124575.98,
      "rangesMeters": [
        [
          6222.9,
          6681.6
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Moncada-San Manuel Bypass Road, Barangay Matarannoc - Pacpaco, Sta. 6 + 222.9 - Sta. 6 + 681.60, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.98,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0217-001957",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Moncada-San Manuel Bypass Road, Barangay Pacpaco (San Manuel) to Bantog - Sinense (Anao), Sta. 6 + 681.60 - Sta. 7 + 140.30, Tarlac",
      "office": "Central Office",
      "amountPesos": 57143000,
      "lengthKm": 0.45869999999999983,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 124575975.58,
      "lengthMeters": 458.7,
      "allocationPerStatedMeter": 124575.98,
      "rangesMeters": [
        [
          6681.6,
          7140.3
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Moncada-San Manuel Bypass Road, Barangay Pacpaco (San Manuel) to Bantog - Sinense (Anao), Sta. 6 + 681.60 - Sta. 7 + 140.30, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.98,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0217-001958",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Moncada-San Manuel Bypass Road, Barangay Sinense, Sta. 7 + 140.30 - Sta. 7 + 599.00, Tarlac",
      "office": "Central Office",
      "amountPesos": 57143000,
      "lengthKm": 0.45869999999999983,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 124575975.58,
      "lengthMeters": 458.7,
      "allocationPerStatedMeter": 124575.98,
      "rangesMeters": [
        [
          7140.3,
          7599.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Moncada-San Manuel Bypass Road, Barangay Sinense, Sta. 7 + 140.30 - Sta. 7 + 599.00, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.98,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0217-001959",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Moncada-San Manuel Bypass Road, Barangay Sinense, Sta. 7 + 599.00 - Sta. 8 + 057.70, Tarlac",
      "office": "Central Office",
      "amountPesos": 57143000,
      "lengthKm": 0.45869999999999983,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 124575975.58,
      "lengthMeters": 458.7,
      "allocationPerStatedMeter": 124575.98,
      "rangesMeters": [
        [
          7599.0,
          8057.7
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Moncada-San Manuel Bypass Road, Barangay Sinense, Sta. 7 + 599.00 - Sta. 8 + 057.70, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.98,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0268-002848",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Pandanan Br. (B02591LZ) along Maharlika Highway (LZ)",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 57108000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Pandanan Br. (B02591LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0126-000299",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tablas Circumferential Rd - K0104 + 000 - K0106 + 392, K0106 + 616 - K0107 + 952, K0107 + 966 - K0108 + 144",
      "office": "Central Office",
      "amountPesos": 57041000,
      "lengthKm": 3.906,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14603430.62,
      "lengthMeters": 3906.0,
      "allocationPerStatedMeter": 14603.43,
      "rangesMeters": [
        [
          104000.0,
          106392.0
        ],
        [
          106616.0,
          107952.0
        ],
        [
          107966.0,
          108144.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Tablas Circumferential Rd - K0104 + 000 - K0106 + 392, K0106 + 616 - K0107 + 952, K0107 + 966 - K0108 + 144",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.89,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0202-001650",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0157 + 870 - K0159 + 999",
      "office": "Central Office",
      "amountPesos": 57032000,
      "lengthKm": 2.129,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26788163.46,
      "lengthMeters": 2129.0,
      "allocationPerStatedMeter": 26788.16,
      "rangesMeters": [
        [
          157870.0,
          159999.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Puerto Princesa South Rd - K0157 + 870 - K0159 + 999",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 0.94,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0261-002712",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Reyes Br. (B01856MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "office": "Central Office",
      "amountPesos": 57000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Reyes Br. (B01856MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0417-005804",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road going to Sanitary Landfill, San Agustin, Isabela",
      "office": "Central Office",
      "amountPesos": 57000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "417",
      "lengthEvidence": "Concreting of Road going to Sanitary Landfill, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0420-005865",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Sta. 0+000-16+667, Barangay Umiray, Dingalan, Aurora",
      "office": "Central Office",
      "amountPesos": 57000000,
      "lengthKm": 16.667,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 3419931.6,
      "lengthMeters": 16667.0,
      "allocationPerStatedMeter": 3419.93,
      "rangesMeters": [
        [
          0.0,
          16667.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Construction of Concrete Road, Sta. 0+000-16+667, Barangay Umiray, Dingalan, Aurora",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.11,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0429-006035",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Marfrancisco to Barangay Santa Rita, Pinamalayan, Oriental Mindoro",
      "office": "Central Office",
      "amountPesos": 57000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Road, Barangay Marfrancisco to Barangay Santa Rita, Pinamalayan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0433-006131",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sta. 0+000 - Sta. 1+075) at Barangay Concepcion, Talisay City, Negros Occidental",
      "office": "Central Office",
      "amountPesos": 57000000,
      "lengthKm": 1.075,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53023255.81,
      "lengthMeters": 1075.0,
      "allocationPerStatedMeter": 53023.26,
      "rangesMeters": [
        [
          0.0,
          1075.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Concrete Road (Sta. 0+000 - Sta. 1+075) at Barangay Concepcion, Talisay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 2.12,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0167-001063",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Surallah-Lake Sebu-Maitum Rd - K1803 + 000 - K1805 + 775",
      "office": "Central Office",
      "amountPesos": 56645000,
      "lengthKm": 2.775,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20412612.61,
      "lengthMeters": 2775.0,
      "allocationPerStatedMeter": 20412.61,
      "rangesMeters": [
        [
          1803000.0,
          1805775.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Surallah-Lake Sebu-Maitum Rd - K1803 + 000 - K1805 + 775",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 0.9,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0175-001197",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "MSR Jct-Lopez-Catanauan Rd - K0224+945 - K0225+014, K0225+568 - K0225+626, K0226+835 - K0226+900, K0227+342 - K0227+392, K0227+420 - K0227+491, K0232+840 - K0232+870, K0233+106 - K0233+133, K0234+966 - K0235+069",
      "office": "Central Office",
      "amountPesos": 56500000,
      "lengthKm": 0.473,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 119450317.12,
      "lengthMeters": 473.0,
      "allocationPerStatedMeter": 119450.32,
      "rangesMeters": [
        [
          224945.0,
          225014.0
        ],
        [
          225568.0,
          225626.0
        ],
        [
          226835.0,
          226900.0
        ],
        [
          227342.0,
          227392.0
        ],
        [
          227420.0,
          227491.0
        ],
        [
          232840.0,
          232870.0
        ],
        [
          233106.0,
          233133.0
        ],
        [
          234966.0,
          235069.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "MSR Jct-Lopez-Catanauan Rd - K0224+945 - K0225+014, K0225+568 - K0225+626, K0226+835 - K0226+900, K0227+342 - K0227+392, K0227+420 - K0227+491, K0232+840 - K0232+870, K0233+106 - K0233+133, K0234+966 - K0235+069",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 1.15,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0204-001691",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Sn Policarpo-Arteche-Lapinig Rd - K0853 + 944.60 - K0854 + 560",
      "office": "Central Office",
      "amountPesos": 56472000,
      "lengthKm": 0.6154000000000233,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 91764705.88,
      "lengthMeters": 615.4,
      "allocationPerStatedMeter": 91764.71,
      "rangesMeters": [
        [
          853944.6,
          854560.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Sn Policarpo-Arteche-Lapinig Rd - K0853 + 944.60 - K0854 + 560",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 1.52,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0416-005787",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Carsoan Bridge, Sta. 0+000 - Sta. 0+030, San Quintin, Abra",
      "office": "Central Office",
      "amountPesos": 56405000,
      "lengthKm": 0.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1880166666.67,
      "lengthMeters": 30.0,
      "allocationPerStatedMeter": 1880166.67,
      "rangesMeters": [
        [
          0.0,
          30.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Construction of Carsoan Bridge, Sta. 0+000 - Sta. 0+030, San Quintin, Abra",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 1.33,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0252-002553",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Mayan-Mauyen Port Rd - K0001 + 620 - K0001 + 626, K0002 + 026 - K0003 + 000, K0003 + 051 - K0005 + 053, K0005 + 305 - K0008 + 605 (Off-Carriageway Improvement: Paving of Shoulders)",
      "office": "Central Office",
      "amountPesos": 56403000,
      "lengthKm": 6.282,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 8978510.03,
      "lengthMeters": 6282.0,
      "allocationPerStatedMeter": 8978.51,
      "rangesMeters": [
        [
          1620.0,
          1626.0
        ],
        [
          2026.0,
          3000.0
        ],
        [
          3051.0,
          5053.0
        ],
        [
          5305.0,
          8605.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "252",
      "lengthEvidence": "Mayan-Mauyen Port Rd - K0001 + 620 - K0001 + 626, K0002 + 026 - K0003 + 000, K0003 + 051 - K0005 + 053, K0005 + 305 - K0008 + 605 (Off-Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.91,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0260-002686",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Omonay Br. (B01378MN) along Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry)",
      "office": "Central Office",
      "amountPesos": 56400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Omonay Br. (B01378MN) along Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0203-001675",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Capiz-Aklan Rd - K0334 + 252 - K0335 + 240",
      "office": "Central Office",
      "amountPesos": 56300000,
      "lengthKm": 0.988,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 56983805.67,
      "lengthMeters": 988.0,
      "allocationPerStatedMeter": 56983.81,
      "rangesMeters": [
        [
          334252.0,
          335240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Capiz-Aklan Rd - K0334 + 252 - K0335 + 240",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.12,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0416-005789",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction Manawis Bridge, Sta. 0+000 - Sta. 0+030, Lagayan, Abra",
      "office": "Central Office",
      "amountPesos": 56264000,
      "lengthKm": 0.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1875466666.67,
      "lengthMeters": 30.0,
      "allocationPerStatedMeter": 1875466.67,
      "rangesMeters": [
        [
          0.0,
          30.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Construction Manawis Bridge, Sta. 0+000 - Sta. 0+030, Lagayan, Abra",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 1.33,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0202-001649",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0154 + 506 - K0156 + 600",
      "office": "Central Office",
      "amountPesos": 56182000,
      "lengthKm": 2.094,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26829990.45,
      "lengthMeters": 2094.0,
      "allocationPerStatedMeter": 26829.99,
      "rangesMeters": [
        [
          154506.0,
          156600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Puerto Princesa South Rd - K0154 + 506 - K0156 + 600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 0.94,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0116-000097",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Sindangan-Liloy Rd - K1936 + 000 - K1937 + 071",
      "office": "Central Office",
      "amountPesos": 56135000,
      "lengthKm": 1.071,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52413632.12,
      "lengthMeters": 1071.0,
      "allocationPerStatedMeter": 52413.63,
      "rangesMeters": [
        [
          1936000.0,
          1937071.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Sindangan-Liloy Rd - K1936 + 000 - K1937 + 071",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 1.14,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0113-000043",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0613 + 883 - K0615 + 000",
      "office": "Central Office",
      "amountPesos": 56067000,
      "lengthKm": 1.117,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50194270.37,
      "lengthMeters": 1117.0,
      "allocationPerStatedMeter": 50194.27,
      "rangesMeters": [
        [
          613883.0,
          615000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Maharlika Highway (LZ) - K0613 + 883 - K0615 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 1.09,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0256-002597",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Tertiary Roads",
      "projectName": "Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 13131 - Chainage 14883",
      "office": "Central Office",
      "amountPesos": 56064000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "256",
      "lengthEvidence": "Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 13131 - Chainage 14883",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0140-000575",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Calauan-Nagcarlan Bdry Rd - K0081 + 760 - K0082 + 358, K0082 + 494 - K0083 + 000",
      "office": "Central Office",
      "amountPesos": 56000000,
      "lengthKm": 1.104,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 50724637.68,
      "lengthMeters": 1104.0,
      "allocationPerStatedMeter": 50724.64,
      "rangesMeters": [
        [
          81760.0,
          82358.0
        ],
        [
          82494.0,
          83000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Calauan-Nagcarlan Bdry Rd - K0081 + 760 - K0082 + 358, K0082 + 494 - K0083 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 2.12,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0140-000590",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Jct MWCR (Labangan)-Murtha-Jct Iriron Rd - K0248 + 000 - K0248 + 422, K0248 + 978 - K0251 + 000, K0261 + 000 - K0262 + 404",
      "office": "Central Office",
      "amountPesos": 56000000,
      "lengthKm": 3.848,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14553014.55,
      "lengthMeters": 3848.0,
      "allocationPerStatedMeter": 14553.01,
      "rangesMeters": [
        [
          248000.0,
          248422.0
        ],
        [
          248978.0,
          251000.0
        ],
        [
          261000.0,
          262404.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Jct MWCR (Labangan)-Murtha-Jct Iriron Rd - K0248 + 000 - K0248 + 422, K0248 + 978 - K0251 + 000, K0261 + 000 - K0262 + 404",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 0.99,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0204-001692",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Wright-Taft-Borongan Rd - K0851 + 000 - K0852 + 000",
      "office": "Central Office",
      "amountPesos": 56000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 56000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 56000.0,
      "rangesMeters": [
        [
          851000.0,
          852000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Wright-Taft-Borongan Rd - K0851 + 000 - K0852 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.1,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0204-001694",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Wright-Taft-Borongan Rd - K0853 + 000 - K0854 + 000",
      "office": "Central Office",
      "amountPesos": 56000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 56000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 56000.0,
      "rangesMeters": [
        [
          853000.0,
          854000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Wright-Taft-Borongan Rd - K0853 + 000 - K0854 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.1,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0426-005981",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road along Lobo-Malabrigo-Laiya-San Juan Rd, Lobo, Batangas",
      "office": "Central Office",
      "amountPesos": 56000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Road along Lobo-Malabrigo-Laiya-San Juan Rd, Lobo, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0437-006194",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road Leading Barangay Baga-Barangay Bangkaw Bangkaw- Barangay Mamagon, Naga, Zamboanga Sibugay",
      "office": "Central Office",
      "amountPesos": 56000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Construction of Access Road Leading Barangay Baga-Barangay Bangkaw Bangkaw- Barangay Mamagon, Naga, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0203-001683",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Biliran Circumferential Rd - K1040 + 744 - K1040 + 900, K1040 + 950 - K1041 + 281, K1042 + 904 - K1043 + 150, K1044 + 810 - K1044 + 935",
      "office": "Central Office",
      "amountPesos": 55999000,
      "lengthKm": 0.858,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 65266899.77,
      "lengthMeters": 858.0,
      "allocationPerStatedMeter": 65266.9,
      "rangesMeters": [
        [
          1040744.0,
          1040900.0
        ],
        [
          1040950.0,
          1041281.0
        ],
        [
          1042904.0,
          1043150.0
        ],
        [
          1044810.0,
          1044935.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Biliran Circumferential Rd - K1040 + 744 - K1040 + 900, K1040 + 950 - K1041 + 281, K1042 + 904 - K1043 + 150, K1044 + 810 - K1044 + 935",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.29,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0167-001057",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Basud-Lanot Rd - (S06300LZ) Chainage 18302 - Chainage 19255, Chainage 19270 - Chainage 19291, Chainage 19307 - Chainage 20032, Chainage 20114 - Chainage 20179, Chainage 20231 - Chainage 20428, Chainage 20446 - Chainage 21131",
      "office": "Central Office",
      "amountPesos": 55854000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Basud-Lanot Rd - (S06300LZ) Chainage 18302 - Chainage 19255, Chainage 19270 - Chainage 19291, Chainage 19307 - Chainage 20032, Chainage 20114 - Chainage 20179, Chainage 20231 - Chainage 20428, Chainage 20446 - Chainage 21131",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0113-000060",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod South Rd - K0007 + 000 - K0007 + 604, K0007 + 627 - K0008 + 000, K0008 + 000 - K0008 + 144, K0008 + 819 - K0008 + 980",
      "office": "Central Office",
      "amountPesos": 55843000,
      "lengthKm": 1.282,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 43559282.37,
      "lengthMeters": 1282.0,
      "allocationPerStatedMeter": 43559.28,
      "rangesMeters": [
        [
          7000.0,
          7604.0
        ],
        [
          7627.0,
          8000.0
        ],
        [
          8000.0,
          8144.0
        ],
        [
          8819.0,
          8980.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Bacolod South Rd - K0007 + 000 - K0007 + 604, K0007 + 627 - K0008 + 000, K0008 + 000 - K0008 + 144, K0008 + 819 - K0008 + 980",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 1.11,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0288-003294",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Rosita Br. 3 (B00034DG) along Dinagat-Loreto Rd",
      "office": "Central Office",
      "amountPesos": 55800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Rosita Br. 3 (B00034DG) along Dinagat-Loreto Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0413-005711",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Sampaguita St. (Chainage 0+000 - Chainage 0+274) and Dahlia St. (Chainage 0+000 - Chainage 0+110), at Barangay Sta. Monica, Quezon City",
      "office": "Central Office",
      "amountPesos": 55680000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Construction of Road and Drainage at Sampaguita St. (Chainage 0+000 - Chainage 0+274) and Dahlia St. (Chainage 0+000 - Chainage 0+110), at Barangay Sta. Monica, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0166-001050",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Jct Ipil-Quirino Bdry Rd - K0357 + 095 - K0359 + 000",
      "office": "Central Office",
      "amountPesos": 55500000,
      "lengthKm": 1.905,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29133858.27,
      "lengthMeters": 1905.0,
      "allocationPerStatedMeter": 29133.86,
      "rangesMeters": [
        [
          357095.0,
          359000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "166",
      "lengthEvidence": "Jct Ipil-Quirino Bdry Rd - K0357 + 095 - K0359 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 1.29,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0139-000572",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Ramos-Pura Rd - K0155 + 257 - K0156 + 608",
      "office": "Central Office",
      "amountPesos": 55447000,
      "lengthKm": 1.351,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41041450.78,
      "lengthMeters": 1351.0,
      "allocationPerStatedMeter": 41041.45,
      "rangesMeters": [
        [
          155257.0,
          156608.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Ramos-Pura Rd - K0155 + 257 - K0156 + 608",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 1.9,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0141-000609",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Passi-Sn Rafael-Lemery-Sara Rd - K0078 + 614 - K0080 + 000",
      "office": "Central Office",
      "amountPesos": 55445000,
      "lengthKm": 1.386,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40003607.5,
      "lengthMeters": 1386.0,
      "allocationPerStatedMeter": 40003.61,
      "rangesMeters": [
        [
          78614.0,
          80000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Passi-Sn Rafael-Lemery-Sara Rd - K0078 + 614 - K0080 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 1.85,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0182-001316",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Banaue-Hungduan-Benguet Bdry Rd - K0393 + 631 - K0393 + 686, K0393 + 746 - K0393 + 800, K0397 + 197 - K0397 + 244",
      "office": "Central Office",
      "amountPesos": 55100000,
      "lengthKm": 0.156,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 353205128.21,
      "lengthMeters": 156.0,
      "allocationPerStatedMeter": 353205.13,
      "rangesMeters": [
        [
          393631.0,
          393686.0
        ],
        [
          393746.0,
          393800.0
        ],
        [
          397197.0,
          397244.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "182",
      "lengthEvidence": "Banaue-Hungduan-Benguet Bdry Rd - K0393 + 631 - K0393 + 686, K0393 + 746 - K0393 + 800, K0397 + 197 - K0397 + 244",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 2.02,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0124-000256",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Batangas-Tabangao-Lobo Rd - K0147 + 012 - K0149 + 000",
      "office": "Central Office",
      "amountPesos": 55030000,
      "lengthKm": 1.988,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27681086.52,
      "lengthMeters": 1988.0,
      "allocationPerStatedMeter": 27681.09,
      "rangesMeters": [
        [
          147012.0,
          149000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Batangas-Tabangao-Lobo Rd - K0147 + 012 - K0149 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.91,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0127-000327",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Kapalong-Talaingod-Valencia, Bukidnon Road K1482 + (-672) - K1483 + 128",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 1.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30555555.56,
      "lengthMeters": 1800.0,
      "allocationPerStatedMeter": 30555.56,
      "rangesMeters": [
        [
          1481328.0,
          1483128.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Kapalong-Talaingod-Valencia, Bukidnon Road K1482 + (-672) - K1483 + 128",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.0,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0140-000574",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Calauan-Nagcarlan Bdry Rd - K0077 + (-932) - K0077 + 175",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 1.107,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49683830.17,
      "lengthMeters": 1107.0,
      "allocationPerStatedMeter": 49683.83,
      "rangesMeters": [
        [
          76068.0,
          77175.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Calauan-Nagcarlan Bdry Rd - K0077 + (-932) - K0077 + 175",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 2.08,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0156-000867",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Famy-Real-Infanta-Dinahican Port Rd - K0099 + 004 - K0100 + 004, K0100 + 488 - K0100 + 894",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 1.406,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 39118065.43,
      "lengthMeters": 1406.0,
      "allocationPerStatedMeter": 39118.07,
      "rangesMeters": [
        [
          99004.0,
          100004.0
        ],
        [
          100488.0,
          100894.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "Famy-Real-Infanta-Dinahican Port Rd - K0099 + 004 - K0100 + 004, K0100 + 488 - K0100 + 894",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 1.2,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0156-000868",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Gumaca - Pitogo - Mulanay - San Narciso Road, Quezon - K0273 + 000 - K0274 + 000",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 55000.0,
      "rangesMeters": [
        [
          273000.0,
          274000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "Gumaca - Pitogo - Mulanay - San Narciso Road, Quezon - K0273 + 000 - K0274 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 2.08,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0166-001047",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0464 + 800 - K0465 + 000, K0465 + 400 - K0466 + 450",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 1.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 44000000.0,
      "lengthMeters": 1250.0,
      "allocationPerStatedMeter": 44000.0,
      "rangesMeters": [
        [
          464800.0,
          465000.0
        ],
        [
          465400.0,
          466450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "166",
      "lengthEvidence": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0464 + 800 - K0465 + 000, K0465 + 400 - K0466 + 450",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 1.94,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0176-001214",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kapalong-Talaingod-Valencia (Bukidnon) Rd K1528+120 -K1528+500",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 0.38,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 144736842.11,
      "lengthMeters": 380.0,
      "allocationPerStatedMeter": 144736.84,
      "rangesMeters": [
        [
          1528120.0,
          1528500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Kapalong-Talaingod-Valencia (Bukidnon) Rd K1528+120 -K1528+500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 1.4,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0176-001217",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1519 + 750 - K1519 + 860",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 0.11,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 500000000.0,
      "lengthMeters": 110.0,
      "allocationPerStatedMeter": 500000.0,
      "rangesMeters": [
        [
          1519750.0,
          1519860.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1519 + 750 - K1519 + 860",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 2.63,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0183-001325",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Logac-Lasam-Gagabutan Rd - K0743 + 805 - K0743 + 975",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 0.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 323529411.76,
      "lengthMeters": 170.0,
      "allocationPerStatedMeter": 323529.41,
      "rangesMeters": [
        [
          743805.0,
          743975.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Jct Logac-Lasam-Gagabutan Rd - K0743 + 805 - K0743 + 975",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 1.85,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0216-001940",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Baliuag Diversion Road - 01+080 - 1+480, Baliuag, Bulacan",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 137500000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 137500.0,
      "rangesMeters": [
        [
          1080.0,
          1480.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Baliuag Diversion Road - 01+080 - 1+480, Baliuag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 1.08,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0217-001954",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 0.175,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 314285714.29,
      "lengthMeters": 175.0,
      "allocationPerStatedMeter": 314285.71,
      "rangesMeters": [
        [
          879.0,
          1054.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 1.5,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0224-002088",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Pawikan - Esperanza Diversion Road, Barangay Esperanza, (Sta. 4+381 - Sta. 4+678), Cabucgayan, Biliran",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 0.297,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 185185185.19,
      "lengthMeters": 297.0,
      "allocationPerStatedMeter": 185185.19,
      "rangesMeters": [
        [
          4381.0,
          4678.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "Pawikan - Esperanza Diversion Road, Barangay Esperanza, (Sta. 4+381 - Sta. 4+678), Cabucgayan, Biliran",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.88,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0227-002145",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sayre Highway Parallel Road II (Impasug-ong - Malaybalay City Section), Barangay Implautao Section, Sta. 49+020 - Sta. 50+084.52, Impasug-ong, Bukidnon",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 1.0645199999999968,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51666478.79,
      "lengthMeters": 1064.52,
      "allocationPerStatedMeter": 51666.48,
      "rangesMeters": [
        [
          49020.0,
          50084.52
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Sayre Highway Parallel Road II (Impasug-ong - Malaybalay City Section), Barangay Implautao Section, Sta. 49+020 - Sta. 50+084.52, Impasug-ong, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.48,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0236-002296",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Mauban-Tignoan Road (Kalabintian Bridge), Mauban, Quezon",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Mauban-Tignoan Road (Kalabintian Bridge), Mauban, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002628",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Lugay Br. (B00117MR) along Mindoro West Coastal Rd",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Lugay Br. (B00117MR) along Mindoro West Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002637",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Palsong Br. (B05267LZ) along Albay Diversion Rd",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Palsong Br. (B05267LZ) along Albay Diversion Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003269",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Sagay Br. (B02387MN) along Malaybalay City Bypass Road",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Sagay Br. (B02387MN) along Malaybalay City Bypass Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003270",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Timago Br. (B01237MN) along Jct SH-Aglayan-Alanib-Ticalaan Rd (Aglayan-Basak)",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Timago Br. (B01237MN) along Jct SH-Aglayan-Alanib-Ticalaan Rd (Aglayan-Basak)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003280",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Munuan Br. (B00158MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Munuan Br. (B00158MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0413-005715",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainages along Assumption Ville (C0+000 to C0+661) Barangay Lingunan, Valenzuela City",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Construction of Road and Drainages along Assumption Ville (C0+000 to C0+661) Barangay Lingunan, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0414-005736",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction/Improvement of Roads, s. Pindangan - Poblacion - San Juan, San Vicente, Laoac and Anulid, Alcala, Pangasinan, K0176+200 - K0186+000",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 9.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 5612244.9,
      "lengthMeters": 9800.0,
      "allocationPerStatedMeter": 5612.24,
      "rangesMeters": [
        [
          176200.0,
          186000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Reconstruction/Improvement of Roads, s. Pindangan - Poblacion - San Juan, San Vicente, Laoac and Anulid, Alcala, Pangasinan, K0176+200 - K0186+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.18,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0414-005737",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction/Improvement of Roads, s. Poblacion Zone V, Poblacion Zone II and Poblacion Zone I, Villasis, Pangasinan, Sta. 0+000 - Sta. 2+118",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 2.118,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25967894.24,
      "lengthMeters": 2118.0,
      "allocationPerStatedMeter": 25967.89,
      "rangesMeters": [
        [
          0.0,
          2118.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Reconstruction/Improvement of Roads, s. Poblacion Zone V, Poblacion Zone II and Poblacion Zone I, Villasis, Pangasinan, Sta. 0+000 - Sta. 2+118",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.08,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0414-005741",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction/Improvement of Roads, s. Poblacion, Balligi and Banuar, Laoac, Pangasinan, Sta. 0+000 - Sta. 2+118",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 2.118,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25967894.24,
      "lengthMeters": 2118.0,
      "allocationPerStatedMeter": 25967.89,
      "rangesMeters": [
        [
          0.0,
          2118.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "414",
      "lengthEvidence": "Reconstruction/Improvement of Roads, s. Poblacion, Balligi and Banuar, Laoac, Pangasinan, Sta. 0+000 - Sta. 2+118",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.08,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0416-005771",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Camanggaan- Barangay Malilion- Barangay Siblot- Barangay San Jose , Barangay Casaratan- Barangay Poblacion Barangay Sta Maria- Barangay Cacabugaoan, San Nicolas, Pangasinan",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Rehabilitation of Road, Barangay Camanggaan- Barangay Malilion- Barangay Siblot- Barangay San Jose , Barangay Casaratan- Barangay Poblacion Barangay Sta Maria- Barangay Cacabugaoan, San Nicolas, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006024",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage System in Barangay Poypoy, Calintaan, Occidental Mindoro",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Road with Drainage System in Barangay Poypoy, Calintaan, Occidental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0428-006025",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage System in Barangay Tanyag, Calintaan, Occidental Mindoro",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Road with Drainage System in Barangay Tanyag, Calintaan, Occidental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0432-006111",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge atSitio Caboclodan (Zone11 & 12), Barangay SanJose, Pili, Camarines Sur",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Construction of Bridge atSitio Caboclodan (Zone11 & 12), Barangay SanJose, Pili, Camarines Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0434-006151",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Facilities,Basak-Cagodoy-Bankal-Buaya Road, Barangay Bankal, Lapu-Lapu City, Cebu",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Road with Drainage Facilities,Basak-Cagodoy-Bankal-Buaya Road, Barangay Bankal, Lapu-Lapu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0435-006164",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Circumferential Road, Sta. 1+000 - Sta. 2+900, Barangay Ilijan - Barangay Baras, Santo Niño, Samar",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 1.9,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28947368.42,
      "lengthMeters": 1900.0,
      "allocationPerStatedMeter": 28947.37,
      "rangesMeters": [
        [
          1000.0,
          2900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Construction of Circumferential Road, Sta. 1+000 - Sta. 2+900, Barangay Ilijan - Barangay Baras, Santo Niño, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.2,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0436-006185",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Lavezares By-Pass Road, Sta. 000+250 - Sta. 000+641",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 0.391,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 140664961.64,
      "lengthMeters": 391.0,
      "allocationPerStatedMeter": 140664.96,
      "rangesMeters": [
        [
          250.0,
          641.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "436",
      "lengthEvidence": "Construction of Lavezares By-Pass Road, Sta. 000+250 - Sta. 000+641",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 5.75,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0440-006256",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road from Barangay Pacita - Barangay Matampay Bucana, Sta. 0+000 - Sta. 2+250, Lala, Lanao del Norte",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 2.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24444444.44,
      "lengthMeters": 2250.0,
      "allocationPerStatedMeter": 24444.44,
      "rangesMeters": [
        [
          0.0,
          2250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "440",
      "lengthEvidence": "Construction of Concrete Road from Barangay Pacita - Barangay Matampay Bucana, Sta. 0+000 - Sta. 2+250, Lala, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.01,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0443-006309",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road Salvacion road, Mawab,Davao de Oro",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "443",
      "lengthEvidence": "Construction of Concrete Road Salvacion road, Mawab,Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0444-006336",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Barangay Licanan to Barangay Kauswagan Panabo City, Davao Del Norte - Sta. 0+792 - Sta.0+992, Sta.1+250 - Sta.1+361, Sta.1+512 - Sta.1+576, Sta.1+858 - Sta.2+058, Sta.2+965 - Sta.3+246",
      "office": "Central Office",
      "amountPesos": 55000000,
      "lengthKm": 0.856,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 64252336.45,
      "lengthMeters": 856.0,
      "allocationPerStatedMeter": 64252.34,
      "rangesMeters": [
        [
          792.0,
          992.0
        ],
        [
          1250.0,
          1361.0
        ],
        [
          1512.0,
          1576.0
        ],
        [
          1858.0,
          2058.0
        ],
        [
          2965.0,
          3246.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of Road from Barangay Licanan to Barangay Kauswagan Panabo City, Davao Del Norte - Sta. 0+792 - Sta.0+992, Sta.1+250 - Sta.1+361, Sta.1+512 - Sta.1+576, Sta.1+858 - Sta.2+058, Sta.2+965 - Sta.3+246",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 3.31,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0198-001579",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Dumaguete South Rd - K0079 + 417 - K0080 + 440",
      "office": "Central Office",
      "amountPesos": 54811000,
      "lengthKm": 1.023,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53578690.13,
      "lengthMeters": 1023.0,
      "allocationPerStatedMeter": 53578.69,
      "rangesMeters": [
        [
          79417.0,
          80440.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Dumaguete South Rd - K0079 + 417 - K0080 + 440",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 1.2,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0259-002672",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Sabang Br. (B00228LT) along Villaba-Palompon Rd",
      "office": "Central Office",
      "amountPesos": 54792000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Sabang Br. (B00228LT) along Villaba-Palompon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0115-000080",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Ipil-Liloy-Sindangan Rd - K2008 + 000 - K2008 + 467, K2008 + 514 - K2009 + 000",
      "office": "Central Office",
      "amountPesos": 54570000,
      "lengthKm": 0.953,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 57261280.17,
      "lengthMeters": 953.0,
      "allocationPerStatedMeter": 57261.28,
      "rangesMeters": [
        [
          2008000.0,
          2008467.0
        ],
        [
          2008514.0,
          2009000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Ipil-Liloy-Sindangan Rd - K2008 + 000 - K2008 + 467, K2008 + 514 - K2009 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 1.24,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0140-000589",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Dr Damian Reyes Rd (Torrijos Side) - K0060 + 000 - K0063 + 000",
      "office": "Central Office",
      "amountPesos": 54538000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18179333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 18179.33,
      "rangesMeters": [
        [
          60000.0,
          63000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Dr Damian Reyes Rd (Torrijos Side) - K0060 + 000 - K0063 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 1.1,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0236-002308",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Sta. 9 + 700 - Sta. 10 + 982, San Antonio, Quezon",
      "office": "Central Office",
      "amountPesos": 54500000,
      "lengthKm": 1.282,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42511700.47,
      "lengthMeters": 1282.0,
      "allocationPerStatedMeter": 42511.7,
      "rangesMeters": [
        [
          9700.0,
          10982.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "236",
      "lengthEvidence": "Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Sta. 9 + 700 - Sta. 10 + 982, San Antonio, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 0.68,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0204-001706",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Camiguin Circumferential Rd - K0053 + 644 - K0055 + 162",
      "office": "Central Office",
      "amountPesos": 54429000,
      "lengthKm": 1.518,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35855731.23,
      "lengthMeters": 1518.0,
      "allocationPerStatedMeter": 35855.73,
      "rangesMeters": [
        [
          53644.0,
          55162.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Camiguin Circumferential Rd - K0053 + 644 - K0055 + 162",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 1.07,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0157-000900",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Sambulawan Jct-Calaguise-Calubian Rd - K0989 + 243 - K0989 + 889, K0990 + 000 - K0990 + 550, K0991 + 340 - K0991 + 410, K0991 + 490 - K0991 + 560, K0993 + 100 - K0993 + 500, K0994 + 100 - K0994 + 200, K0994 + 300 - K0994 + 500, K0995 + 000 - K0995 + 150, K0995 + 600 - K0995 + 700, K0998 + 563 - K0998 + 663",
      "office": "Central Office",
      "amountPesos": 54387000,
      "lengthKm": 2.386,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22794216.26,
      "lengthMeters": 2386.0,
      "allocationPerStatedMeter": 22794.22,
      "rangesMeters": [
        [
          989243.0,
          989889.0
        ],
        [
          990000.0,
          990550.0
        ],
        [
          991340.0,
          991410.0
        ],
        [
          991490.0,
          991560.0
        ],
        [
          993100.0,
          993500.0
        ],
        [
          994100.0,
          994200.0
        ],
        [
          994300.0,
          994500.0
        ],
        [
          995000.0,
          995150.0
        ],
        [
          995600.0,
          995700.0
        ],
        [
          998563.0,
          998663.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "157",
      "lengthEvidence": "Sambulawan Jct-Calaguise-Calubian Rd - K0989 + 243 - K0989 + 889, K0990 + 000 - K0990 + 550, K0991 + 340 - K0991 + 410, K0991 + 490 - K0991 + 560, K0993 + 100 - K0993 + 500, K0994 + 100 - K0994 + 200, K0994 + 300 - K0994 + 500, K0995 + 000 - K0995 + 150, K0995 + 600 - K0995 + 700, K0998 + 563 - K0998 + 663",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 1.01,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0202-001664",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Lagta-Crossing Malinta Rd - K0104 + 250 - K0104 + 907",
      "office": "Central Office",
      "amountPesos": 54191000,
      "lengthKm": 0.657,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 82482496.19,
      "lengthMeters": 657.0,
      "allocationPerStatedMeter": 82482.5,
      "rangesMeters": [
        [
          104250.0,
          104907.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Lagta-Crossing Malinta Rd - K0104 + 250 - K0104 + 907",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 1.37,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0150-000768",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0078 + 603 - K0081 + 000",
      "office": "Central Office",
      "amountPesos": 54181000,
      "lengthKm": 2.397,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22603671.26,
      "lengthMeters": 2397.0,
      "allocationPerStatedMeter": 22603.67,
      "rangesMeters": [
        [
          78603.0,
          81000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0078 + 603 - K0081 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 0.66,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0202-001648",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0143 + 680 - K0145 + 700",
      "office": "Central Office",
      "amountPesos": 54156000,
      "lengthKm": 2.02,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26809900.99,
      "lengthMeters": 2020.0,
      "allocationPerStatedMeter": 26809.9,
      "rangesMeters": [
        [
          143680.0,
          145700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Puerto Princesa South Rd - K0143 + 680 - K0145 + 700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 0.94,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0124-000264",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0063 + 164 - K0066 + 000",
      "office": "Central Office",
      "amountPesos": 54036000,
      "lengthKm": 2.836,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19053596.61,
      "lengthMeters": 2836.0,
      "allocationPerStatedMeter": 19053.6,
      "rangesMeters": [
        [
          63164.0,
          66000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0063 + 164 - K0066 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.95,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0140-000577",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Crisanto M de los Reyes Ave - K0054 + (-410) - K0054 + 267, K0057 + 506 - K0058 + 353, K0063 + 389 - K0064 + 000, K0065 + 000 - K0065 + 491",
      "office": "Central Office",
      "amountPesos": 54034000,
      "lengthKm": 2.626,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20576542.27,
      "lengthMeters": 2626.0,
      "allocationPerStatedMeter": 20576.54,
      "rangesMeters": [
        [
          53590.0,
          54267.0
        ],
        [
          57506.0,
          58353.0
        ],
        [
          63389.0,
          64000.0
        ],
        [
          65000.0,
          65491.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Crisanto M de los Reyes Ave - K0054 + (-410) - K0054 + 267, K0057 + 506 - K0058 + 353, K0063 + 389 - K0064 + 000, K0065 + 000 - K0065 + 491",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 1.24,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0124-000255",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Olongapo-Bugallon Rd - K0127 + 224 - K0128 + 158",
      "office": "Central Office",
      "amountPesos": 54000000,
      "lengthKm": 0.934,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 57815845.82,
      "lengthMeters": 934.0,
      "allocationPerStatedMeter": 57815.85,
      "rangesMeters": [
        [
          127224.0,
          128158.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Olongapo-Bugallon Rd - K0127 + 224 - K0128 + 158",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.9,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0201-001631",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0677 + 853 - K0678 + 552",
      "office": "Central Office",
      "amountPesos": 54000000,
      "lengthKm": 0.699,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 77253218.88,
      "lengthMeters": 699.0,
      "allocationPerStatedMeter": 77253.22,
      "rangesMeters": [
        [
          677853.0,
          678552.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0677 + 853 - K0678 + 552",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 1.28,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0204-001693",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Wright-Taft-Borongan Rd - K0852 + 000 - K0852 + 851, K0852 + 880 - K0853 + 000",
      "office": "Central Office",
      "amountPesos": 54000000,
      "lengthKm": 0.971,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 55612770.34,
      "lengthMeters": 971.0,
      "allocationPerStatedMeter": 55612.77,
      "rangesMeters": [
        [
          852000.0,
          852851.0
        ],
        [
          852880.0,
          853000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Wright-Taft-Borongan Rd - K0852 + 000 - K0852 + 851, K0852 + 880 - K0853 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.1,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0204-001695",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Wright-Taft-Borongan Rd - K0854 + 000 - K0854 + 257, K0854 + 291 - K0855 + 000",
      "office": "Central Office",
      "amountPesos": 54000000,
      "lengthKm": 0.966,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 55900621.12,
      "lengthMeters": 966.0,
      "allocationPerStatedMeter": 55900.62,
      "rangesMeters": [
        [
          854000.0,
          854257.0
        ],
        [
          854291.0,
          855000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Wright-Taft-Borongan Rd - K0854 + 000 - K0854 + 257, K0854 + 291 - K0855 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.1,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0261-002718",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Tagbatican Br. (B00038DG) along Dinagat-Loreto Rd",
      "office": "Central Office",
      "amountPesos": 54000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Tagbatican Br. (B00038DG) along Dinagat-Loreto Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003282",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Butilen Br. (B02165MN) along Midsayap-Dulawan-Makar Rd",
      "office": "Central Office",
      "amountPesos": 54000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Butilen Br. (B02165MN) along Midsayap-Dulawan-Makar Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0183-001336",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Tabango-Catmon-La Fortuna-Manlawaan-Gimarco Rd - K1032 + 230 - K1032 + 283, K1033 + 225 - K1033 + 271, K1035 + 060 - K1035 + 130, K1037 + 709 - K1037 + 748",
      "office": "Central Office",
      "amountPesos": 53999000,
      "lengthKm": 0.208,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 259610576.92,
      "lengthMeters": 208.0,
      "allocationPerStatedMeter": 259610.58,
      "rangesMeters": [
        [
          1032230.0,
          1032283.0
        ],
        [
          1033225.0,
          1033271.0
        ],
        [
          1035060.0,
          1035130.0
        ],
        [
          1037709.0,
          1037748.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Tabango-Catmon-La Fortuna-Manlawaan-Gimarco Rd - K1032 + 230 - K1032 + 283, K1033 + 225 - K1033 + 271, K1035 + 060 - K1035 + 130, K1037 + 709 - K1037 + 748",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 1.48,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0167-001059",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Candoni-Sipalay Rd - K0132 + 000 - K0132 + 774, K0132 + 823 - K0133 + 000, K0134 + 182 - K0134 + 789, K0135 + 000 - K0135 + 845",
      "office": "Central Office",
      "amountPesos": 53923000,
      "lengthKm": 2.403,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22439866.83,
      "lengthMeters": 2403.0,
      "allocationPerStatedMeter": 22439.87,
      "rangesMeters": [
        [
          132000.0,
          132774.0
        ],
        [
          132823.0,
          133000.0
        ],
        [
          134182.0,
          134789.0
        ],
        [
          135000.0,
          135845.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Candoni-Sipalay Rd - K0132 + 000 - K0132 + 774, K0132 + 823 - K0133 + 000, K0134 + 182 - K0134 + 789, K0135 + 000 - K0135 + 845",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 0.99,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0111-000020",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Santiago-Tuguegarao Rd - K0431 + 070 - K0433 + 241",
      "office": "Central Office",
      "amountPesos": 53906000,
      "lengthKm": 2.171,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24830032.24,
      "lengthMeters": 2171.0,
      "allocationPerStatedMeter": 24830.03,
      "rangesMeters": [
        [
          431070.0,
          433241.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Santiago-Tuguegarao Rd - K0431 + 070 - K0433 + 241",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.66,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0157-000888",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Sn Fernando North Rd - K0023 + 435 - K0024 + 000, K0028 + 750 - K0029 +116",
      "office": "Central Office",
      "amountPesos": 53835000,
      "lengthKm": 0.931,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 57824919.44,
      "lengthMeters": 931.0,
      "allocationPerStatedMeter": 57824.92,
      "rangesMeters": [
        [
          23435.0,
          24000.0
        ],
        [
          28750.0,
          29116.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "157",
      "lengthEvidence": "Sn Fernando North Rd - K0023 + 435 - K0024 + 000, K0028 + 750 - K0029 +116",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 2.19,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0183-001331",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Dr Damian Reyes Rd (Boac Side) - K0015 + 110 - K0015 + 170",
      "office": "Central Office",
      "amountPesos": 53800000,
      "lengthKm": 0.06,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 896666666.67,
      "lengthMeters": 60.0,
      "allocationPerStatedMeter": 896666.67,
      "rangesMeters": [
        [
          15110.0,
          15170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Dr Damian Reyes Rd (Boac Side) - K0015 + 110 - K0015 + 170",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 2.4,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0183-001332",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Dr Damian Reyes Rd (Boac Side) - K0015 + 740 - K0015 + 800",
      "office": "Central Office",
      "amountPesos": 53800000,
      "lengthKm": 0.06,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 896666666.67,
      "lengthMeters": 60.0,
      "allocationPerStatedMeter": 896666.67,
      "rangesMeters": [
        [
          15740.0,
          15800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Dr Damian Reyes Rd (Boac Side) - K0015 + 740 - K0015 + 800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 2.4,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0198-001571",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0140 + 000 - K0141 + 000",
      "office": "Central Office",
      "amountPesos": 53790000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53790000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 53790.0,
      "rangesMeters": [
        [
          140000.0,
          141000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0140 + 000 - K0141 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 1.1,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0219-001984",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Catanauan Diversion Road, Chainage 2030 - Chainage 2559, Chainage 3707 - Chainage 4490, Quezon",
      "office": "Central Office",
      "amountPesos": 53750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Catanauan Diversion Road, Chainage 2030 - Chainage 2559, Chainage 3707 - Chainage 4490, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0219-001985",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Catanauan Diversion Road, Chainage 3087 - Chainage 3707, Quezon",
      "office": "Central Office",
      "amountPesos": 53750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Catanauan Diversion Road, Chainage 3087 - Chainage 3707, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0219-001986",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Catanauan Diversion Road, Chainage 5179 - Chainage 6679, Quezon",
      "office": "Central Office",
      "amountPesos": 53750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Catanauan Diversion Road, Chainage 5179 - Chainage 6679, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0219-001987",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Catanauan Diversion Road, Chainage 6679 - Chainage 8237, Quezon",
      "office": "Central Office",
      "amountPesos": 53750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "219",
      "lengthEvidence": "Catanauan Diversion Road, Chainage 6679 - Chainage 8237, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0198-001580",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1891 + 454 - K1893 + 696",
      "office": "Central Office",
      "amountPesos": 53661000,
      "lengthKm": 2.242,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23934433.54,
      "lengthMeters": 2242.0,
      "allocationPerStatedMeter": 23934.43,
      "rangesMeters": [
        [
          1891454.0,
          1893696.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1891 + 454 - K1893 + 696",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 0.68,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0204-001704",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 13226 - Chainage 15375",
      "office": "Central Office",
      "amountPesos": 53413000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 13226 - Chainage 15375",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0148-000740",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Santiago - Tuguegarao Rd - K0369 - 000 - K0370 + 385",
      "office": "Central Office",
      "amountPesos": 53390000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "148",
      "lengthEvidence": "Santiago - Tuguegarao Rd - K0369 - 000 - K0370 + 385",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0140-000578",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sn Pablo-Rizal-Nagcarlan-Liliw Rd - K0100 + 397 - K0102 + 000",
      "office": "Central Office",
      "amountPesos": 53314000,
      "lengthKm": 1.603,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33258889.58,
      "lengthMeters": 1603.0,
      "allocationPerStatedMeter": 33258.89,
      "rangesMeters": [
        [
          100397.0,
          102000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Sn Pablo-Rizal-Nagcarlan-Liliw Rd - K0100 + 397 - K0102 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 1.54,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0201-001638",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0202 + 000 - K0203 + 000",
      "office": "Central Office",
      "amountPesos": 53196000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53196000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 53196.0,
      "rangesMeters": [
        [
          202000.0,
          203000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Puerto Princesa North Rd - K0202 + 000 - K0203 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.05,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0201-001634",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Mindoro Oriental/Occidental East Coastal Rd - K0215 +000 - K0216 + 662",
      "office": "Central Office",
      "amountPesos": 53100000,
      "lengthKm": 1.662,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31949458.48,
      "lengthMeters": 1662.0,
      "allocationPerStatedMeter": 31949.46,
      "rangesMeters": [
        [
          215000.0,
          216662.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Mindoro Oriental/Occidental East Coastal Rd - K0215 +000 - K0216 + 662",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 1.12,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0156-000878",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "San Francisco-San Andres-San Narciso Road, Quezon - K0372 + 564 - K0373 + 559",
      "office": "Central Office",
      "amountPesos": 53000000,
      "lengthKm": 0.995,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53266331.66,
      "lengthMeters": 995.0,
      "allocationPerStatedMeter": 53266.33,
      "rangesMeters": [
        [
          372564.0,
          373559.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "San Francisco-San Andres-San Narciso Road, Quezon - K0372 + 564 - K0373 + 559",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 2.02,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0204-001689",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0798 + (-200) - K0798 + 400",
      "office": "Central Office",
      "amountPesos": 53000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 88333333.33,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 88333.33,
      "rangesMeters": [
        [
          797800.0,
          798400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0798 + (-200) - K0798 + 400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 1.47,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0271-002906",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "EDSA/Ortigas Flyover (B03315LZ) along EDSA/Ortigas Flyover",
      "office": "Central Office",
      "amountPesos": 53000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "EDSA/Ortigas Flyover (B03315LZ) along EDSA/Ortigas Flyover",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0416-005772",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Lawak, Barangay Saleng, Barangay Sto. Domingo,Barangay Evangelista- Barangay Toketec , Barangay Trenchera- Poblacion A, Barangay Poblacion C- Barangay Amistad, Tayug, Pangasinan",
      "office": "Central Office",
      "amountPesos": 53000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Rehabilitation of Road, Barangay Lawak, Barangay Saleng, Barangay Sto. Domingo,Barangay Evangelista- Barangay Toketec , Barangay Trenchera- Poblacion A, Barangay Poblacion C- Barangay Amistad, Tayug, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0123-000244",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0479 + 799 - K0482 + 000, K0483 + 180 - K0485 + 000",
      "office": "Central Office",
      "amountPesos": 52999000,
      "lengthKm": 4.021,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 13180552.1,
      "lengthMeters": 4021.0,
      "allocationPerStatedMeter": 13180.55,
      "rangesMeters": [
        [
          479799.0,
          482000.0
        ],
        [
          483180.0,
          485000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0479 + 799 - K0482 + 000, K0483 + 180 - K0485 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.8,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0419-005830",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sinsayon Bridge and Approaches, Santiago City, Isabela",
      "office": "Central Office",
      "amountPesos": 52900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "419",
      "lengthEvidence": "Construction of Sinsayon Bridge and Approaches, Santiago City, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0413-005712",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage Papaya St. (Chainage 0+000 - Chainage 0+114), Magnolia St. (Chainage 0+000 - Chainage 0+155), Rosal St. (Chainage 0+000 - Chainage 0+098) at Barangay Sta. Monica, Quezon City",
      "office": "Central Office",
      "amountPesos": 52848000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "413",
      "lengthEvidence": "Construction of Road and Drainage Papaya St. (Chainage 0+000 - Chainage 0+114), Magnolia St. (Chainage 0+000 - Chainage 0+155), Rosal St. (Chainage 0+000 - Chainage 0+098) at Barangay Sta. Monica, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0429-006031",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Linao leading to Barangay Talisay Road, Sta. 1+800 - Sta. 3+000, Calatrava, Romblon",
      "office": "Central Office",
      "amountPesos": 52800000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44000000.0,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 44000.0,
      "rangesMeters": [
        [
          1800.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Construction of Road, Barangay Linao leading to Barangay Talisay Road, Sta. 1+800 - Sta. 3+000, Calatrava, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.76,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0204-001688",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Palompon-Isabel-Merida-Ormoc Rd - K1103 + 504 - K1104 + 908, K1105 + 000 - K1105 + 146",
      "office": "Central Office",
      "amountPesos": 52754000,
      "lengthKm": 1.55,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34034838.71,
      "lengthMeters": 1550.0,
      "allocationPerStatedMeter": 34034.84,
      "rangesMeters": [
        [
          1103504.0,
          1104908.0
        ],
        [
          1105000.0,
          1105146.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Palompon-Isabel-Merida-Ormoc Rd - K1103 + 504 - K1104 + 908, K1105 + 000 - K1105 + 146",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 1.01,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0116-000105",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Linamon-Zamboanga Rd - K1595 + 000 - K1596 + 000",
      "office": "Central Office",
      "amountPesos": 52716000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52716000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 52716.0,
      "rangesMeters": [
        [
          1595000.0,
          1596000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Linamon-Zamboanga Rd - K1595 + 000 - K1596 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 1.14,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0111-000019",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Santiago-Tuguegarao Rd - K0362 + 050 - K0363 + 753",
      "office": "Central Office",
      "amountPesos": 52687000,
      "lengthKm": 1.703,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30937756.9,
      "lengthMeters": 1703.0,
      "allocationPerStatedMeter": 30937.76,
      "rangesMeters": [
        [
          362050.0,
          363753.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Santiago-Tuguegarao Rd - K0362 + 050 - K0363 + 753",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.83,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0126-000305",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0130 + 337 - K0133+510",
      "office": "Central Office",
      "amountPesos": 52686000,
      "lengthKm": 3.173,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16604475.26,
      "lengthMeters": 3173.0,
      "allocationPerStatedMeter": 16604.48,
      "rangesMeters": [
        [
          130337.0,
          133510.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0130 + 337 - K0133+510",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.83,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0202-001651",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0166 + 532 - K0168 + 495",
      "office": "Central Office",
      "amountPesos": 52665000,
      "lengthKm": 1.963,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26828833.42,
      "lengthMeters": 1963.0,
      "allocationPerStatedMeter": 26828.83,
      "rangesMeters": [
        [
          166532.0,
          168495.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Puerto Princesa South Rd - K0166 + 532 - K0168 + 495",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 0.94,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0127-000320",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Liloy-Siocon Rd - K2030 + 000 - K2032 + 090, K2034 + 800 - K2035 + 691, K2035 + 711 - K2036 + 200",
      "office": "Central Office",
      "amountPesos": 52515000,
      "lengthKm": 3.47,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 15134005.76,
      "lengthMeters": 3470.0,
      "allocationPerStatedMeter": 15134.01,
      "rangesMeters": [
        [
          2030000.0,
          2032090.0
        ],
        [
          2034800.0,
          2035691.0
        ],
        [
          2035711.0,
          2036200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Liloy-Siocon Rd - K2030 + 000 - K2032 + 090, K2034 + 800 - K2035 + 691, K2035 + 711 - K2036 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.75,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0216-001921",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Gattaran Diversion Road, Sta. 7+250 - Sta. 7+757, Cagayan",
      "office": "Central Office",
      "amountPesos": 52500000,
      "lengthKm": 0.507,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 103550295.86,
      "lengthMeters": 507.0,
      "allocationPerStatedMeter": 103550.3,
      "rangesMeters": [
        [
          7250.0,
          7757.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Gattaran Diversion Road, Sta. 7+250 - Sta. 7+757, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.76,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0260-002696",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Tapian Br. (B02215MN) along Hi-Way Tamontaka Jct. Tapian Wharf Rd",
      "office": "Central Office",
      "amountPesos": 52500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Tapian Br. (B02215MN) along Hi-Way Tamontaka Jct. Tapian Wharf Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0421-005870",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Main Road (Concepcion - San Juan Road including Drainage system), Mexico, Pampanga Sta. 0+000 - Sta. 1+665",
      "office": "Central Office",
      "amountPesos": 52500000,
      "lengthKm": 1.665,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31531531.53,
      "lengthMeters": 1665.0,
      "allocationPerStatedMeter": 31531.53,
      "rangesMeters": [
        [
          0.0,
          1665.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "421",
      "lengthEvidence": "Rehabilitation of Main Road (Concepcion - San Juan Road including Drainage system), Mexico, Pampanga Sta. 0+000 - Sta. 1+665",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.31,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0446-006369",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 2 to Purok 8, Barangay Raja Muda, Tacurong City to connect Sampao Road, Isulan, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 52500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Construction of Road, Purok 2 to Purok 8, Barangay Raja Muda, Tacurong City to connect Sampao Road, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003272",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Biason Br. (B00102MN) along Surigao del Sur Bdry-Davao Or Coastal Rd",
      "office": "Central Office",
      "amountPesos": 52475000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Biason Br. (B00102MN) along Surigao del Sur Bdry-Davao Or Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0433-006118",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Antalon to Santiago Road, San Joaquin, Iloilo - Sta. 03+021 - Sta. 04+520",
      "office": "Central Office",
      "amountPesos": 52457000,
      "lengthKm": 1.499,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34994663.11,
      "lengthMeters": 1499.0,
      "allocationPerStatedMeter": 34994.66,
      "rangesMeters": [
        [
          3021.0,
          4520.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Concreting of Antalon to Santiago Road, San Joaquin, Iloilo - Sta. 03+021 - Sta. 04+520",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.45,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0202-001665",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0010 + 289 - K0010 + 888",
      "office": "Central Office",
      "amountPesos": 52209000,
      "lengthKm": 0.599,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 87160267.11,
      "lengthMeters": 599.0,
      "allocationPerStatedMeter": 87160.27,
      "rangesMeters": [
        [
          10289.0,
          10888.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0010 + 289 - K0010 + 888",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 1.45,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0204-001700",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Jolo -Taglibi -Tiptipon Rd, K021 + 350 - K023 + 000",
      "office": "Central Office",
      "amountPesos": 52200000,
      "lengthKm": 1.65,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31636363.64,
      "lengthMeters": 1650.0,
      "allocationPerStatedMeter": 31636.36,
      "rangesMeters": [
        [
          21350.0,
          23000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Jolo -Taglibi -Tiptipon Rd, K021 + 350 - K023 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 1.11,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0286-003261",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Diarong Br. (B02095MN) along Maharlika Highway( Cotabato-Malabang-Lanao del Norte Rd)",
      "office": "Central Office",
      "amountPesos": 52000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Diarong Br. (B02095MN) along Maharlika Highway( Cotabato-Malabang-Lanao del Norte Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0139-000560",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Balbalan-Pinukpuk Rd - K0515 + 347 - K0516 + 000, K0518 + 958 - K0519 + 052, K0520 + 258 - K0523 + 410",
      "office": "Central Office",
      "amountPesos": 51997000,
      "lengthKm": 3.899,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 13335983.59,
      "lengthMeters": 3899.0,
      "allocationPerStatedMeter": 13335.98,
      "rangesMeters": [
        [
          515347.0,
          516000.0
        ],
        [
          518958.0,
          519052.0
        ],
        [
          520258.0,
          523410.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Balbalan-Pinukpuk Rd - K0515 + 347 - K0516 + 000, K0518 + 958 - K0519 + 052, K0520 + 258 - K0523 + 410",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 0.91,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0167-001060",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Calbayog Diversion Rd - K0727 + 716 - K0728 + 145, K0728 + 593 - K0728 + 725, K0729 + 403 - K0730 + 000",
      "office": "Central Office",
      "amountPesos": 51971000,
      "lengthKm": 1.158,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 44879965.46,
      "lengthMeters": 1158.0,
      "allocationPerStatedMeter": 44879.97,
      "rangesMeters": [
        [
          727716.0,
          728145.0
        ],
        [
          728593.0,
          728725.0
        ],
        [
          729403.0,
          730000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Calbayog Diversion Rd - K0727 + 716 - K0728 + 145, K0728 + 593 - K0728 + 725, K0729 + 403 - K0730 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 1.98,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0261-002707",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Magpayang Br. 1 (B00860MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "office": "Central Office",
      "amountPesos": 51900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Magpayang Br. 1 (B00860MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0201-001635",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0184 + 522 - K0185 + 431",
      "office": "Central Office",
      "amountPesos": 51844000,
      "lengthKm": 0.909,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 57034103.41,
      "lengthMeters": 909.0,
      "allocationPerStatedMeter": 57034.1,
      "rangesMeters": [
        [
          184522.0,
          185431.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Puerto Princesa North Rd - K0184 + 522 - K0185 + 431",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.12,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0128-000337",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Banisilan-Guiling-Alamada-Libungan Rd - K1632 + (-601) - K1632 + (-002), K1640 + 395 - K1640 + 523, K1641 + 013 - K1641 + 278",
      "office": "Central Office",
      "amountPesos": 51784000,
      "lengthKm": 0.992,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 52201612.9,
      "lengthMeters": 992.0,
      "allocationPerStatedMeter": 52201.61,
      "rangesMeters": [
        [
          1631399.0,
          1631998.0
        ],
        [
          1640395.0,
          1640523.0
        ],
        [
          1641013.0,
          1641278.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Banisilan-Guiling-Alamada-Libungan Rd - K1632 + (-601) - K1632 + (-002), K1640 + 395 - K1640 + 523, K1641 + 013 - K1641 + 278",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.72,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0203-001669",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0061 + 500 - K0062 + 520",
      "office": "Central Office",
      "amountPesos": 51650000,
      "lengthKm": 1.02,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50637254.9,
      "lengthMeters": 1020.0,
      "allocationPerStatedMeter": 50637.25,
      "rangesMeters": [
        [
          61500.0,
          62520.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "203",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0061 + 500 - K0062 + 520",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.0,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0182-001318",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0403 + 690 - K0403 + 709, K0404 + 470 - K0404 + 530, K0404 + 590 - K0404 + 620, K0404+625 - K0404+655, K0404 + 685 - K0404 + 720, K0404 + 870 - K0404 + 915, K0405 + 760 - K0405 + 800, K0406 + 090 - K0406 + 150, K0406 + 200 - K0406 + 240, K0406 + 630 - K0406 + 770",
      "office": "Central Office",
      "amountPesos": 51630000,
      "lengthKm": 0.499,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 103466933.87,
      "lengthMeters": 499.0,
      "allocationPerStatedMeter": 103466.93,
      "rangesMeters": [
        [
          403690.0,
          403709.0
        ],
        [
          404470.0,
          404530.0
        ],
        [
          404590.0,
          404620.0
        ],
        [
          404625.0,
          404655.0
        ],
        [
          404685.0,
          404720.0
        ],
        [
          404870.0,
          404915.0
        ],
        [
          405760.0,
          405800.0
        ],
        [
          406090.0,
          406150.0
        ],
        [
          406200.0,
          406240.0
        ],
        [
          406630.0,
          406770.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "182",
      "lengthEvidence": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0403 + 690 - K0403 + 709, K0404 + 470 - K0404 + 530, K0404 + 590 - K0404 + 620, K0404+625 - K0404+655, K0404 + 685 - K0404 + 720, K0404 + 870 - K0404 + 915, K0405 + 760 - K0405 + 800, K0406 + 090 - K0406 + 150, K0406 + 200 - K0406 + 240, K0406 + 630 - K0406 + 770",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 1.12,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0287-003287",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Tinanan Parallel Br. along Magpet-Nowa-Doroluman-Greenfield Rd",
      "office": "Central Office",
      "amountPesos": 51600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Tinanan Parallel Br. along Magpet-Nowa-Doroluman-Greenfield Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0261-002703",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Lamintao Br. (B01209MN) along Maharlika Highway (Lipata-Surigao Sect)",
      "office": "Central Office",
      "amountPesos": 51500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Lamintao Br. (B01209MN) along Maharlika Highway (Lipata-Surigao Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003276",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "La Union Br. (B01129MN) along Jct Manikling-Gov Generoso Rd",
      "office": "Central Office",
      "amountPesos": 51500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "La Union Br. (B01129MN) along Jct Manikling-Gov Generoso Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0175-001201",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Mogpog-Balanacan Port Rd - K0013 + 584 - K0013 + 634",
      "office": "Central Office",
      "amountPesos": 51400000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1028000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 1028000.0,
      "rangesMeters": [
        [
          13584.0,
          13634.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "Mogpog-Balanacan Port Rd - K0013 + 584 - K0013 + 634",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 1.64,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0261-002719",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Tubod Br. (B00858MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "office": "Central Office",
      "amountPesos": 51400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Tubod Br. (B00858MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0202-001644",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0245 + 000 - K0246 + 000",
      "office": "Central Office",
      "amountPesos": 51376000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51376000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 51376.0,
      "rangesMeters": [
        [
          245000.0,
          246000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "202",
      "lengthEvidence": "Puerto Princesa North Rd - K0245 + 000 - K0246 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.01,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0116-000106",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Linamon-Zamboanga Rd - K1598 + 000 - K1598 + 383, K1598 + 419 - K1599 + 000",
      "office": "Central Office",
      "amountPesos": 51349000,
      "lengthKm": 0.964,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 53266597.51,
      "lengthMeters": 964.0,
      "allocationPerStatedMeter": 53266.6,
      "rangesMeters": [
        [
          1598000.0,
          1598383.0
        ],
        [
          1598419.0,
          1599000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Linamon-Zamboanga Rd - K1598 + 000 - K1598 + 383, K1598 + 419 - K1599 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 1.15,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0124-000269",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Noveleta-Naic-Tagaytay Rd - K0043 + 013 - K0043 + 173, K0043 + 193 - K0043 + 303",
      "office": "Central Office",
      "amountPesos": 51310000,
      "lengthKm": 0.27,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 190037037.04,
      "lengthMeters": 270.0,
      "allocationPerStatedMeter": 190037.04,
      "rangesMeters": [
        [
          43013.0,
          43173.0
        ],
        [
          43193.0,
          43303.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Noveleta-Naic-Tagaytay Rd - K0043 + 013 - K0043 + 173, K0043 + 193 - K0043 + 303",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 3.76,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0428-006026",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Amatong to Barangay Rizal, Sta. 0+000 - Sta. 1+165, Odiongan, Romblon",
      "office": "Central Office",
      "amountPesos": 51260000,
      "lengthKm": 1.165,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44000000.0,
      "lengthMeters": 1165.0,
      "allocationPerStatedMeter": 44000.0,
      "rangesMeters": [
        [
          0.0,
          1165.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "428",
      "lengthEvidence": "Construction of Road, Barangay Amatong to Barangay Rizal, Sta. 0+000 - Sta. 1+165, Odiongan, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.76,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0221-002036",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Malilipot Bypass Road, Sta. 0+000 - 1+000, Albay",
      "office": "Central Office",
      "amountPesos": 51190000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51190000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 51190.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Malilipot Bypass Road, Sta. 0+000 - 1+000, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.48,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0212-001856",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Socorro-Nueva Estrella-Barangay Pamosaingan Rd - K0001 + 000 - K0003 + 000",
      "office": "Central Office",
      "amountPesos": 51003000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25501500.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 25501.5,
      "rangesMeters": [
        [
          1000.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Socorro-Nueva Estrella-Barangay Pamosaingan Rd - K0001 + 000 - K0003 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.63,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0128-000329",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagum City Diversion Road K1456 + 135 - K1457 + 000",
      "office": "Central Office",
      "amountPesos": 51000000,
      "lengthKm": 0.865,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 58959537.57,
      "lengthMeters": 865.0,
      "allocationPerStatedMeter": 58959.54,
      "rangesMeters": [
        [
          1456135.0,
          1457000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Tagum City Diversion Road K1456 + 135 - K1457 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.94,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0156-000869",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Gumaca - Pitogo - Mulanay - San Narciso Road, Quezon - K0290 + 000 - K0290 + 306, K0290 + 483 - K0290 + 930",
      "office": "Central Office",
      "amountPesos": 51000000,
      "lengthKm": 0.753,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 67729083.67,
      "lengthMeters": 753.0,
      "allocationPerStatedMeter": 67729.08,
      "rangesMeters": [
        [
          290000.0,
          290306.0
        ],
        [
          290483.0,
          290930.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "Gumaca - Pitogo - Mulanay - San Narciso Road, Quezon - K0290 + 000 - K0290 + 306, K0290 + 483 - K0290 + 930",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 2.04,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0177-001222",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd - K1498 + 364 - K1498 + 403",
      "office": "Central Office",
      "amountPesos": 51000000,
      "lengthKm": 0.039,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1307692307.69,
      "lengthMeters": 39.0,
      "allocationPerStatedMeter": 1307692.31,
      "rangesMeters": [
        [
          1498364.0,
          1498403.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Surigao-Davao Coastal Rd - K1498 + 364 - K1498 + 403",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 6.15,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0220-002019",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Puerto Princesa South Diversion Road II, Phase II, Sta. 049 + 460 - Sta. 049 +760, Puerto Princesa South Road",
      "office": "Central Office",
      "amountPesos": 51000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 170000000.0,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 170000.0,
      "rangesMeters": [
        [
          49460.0,
          49760.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Puerto Princesa South Diversion Road II, Phase II, Sta. 049 + 460 - Sta. 049 +760, Puerto Princesa South Road",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.81,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0260-002701",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Labao Br. (B01794MN) along Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd",
      "office": "Central Office",
      "amountPesos": 51000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Labao Br. (B01794MN) along Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003224",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Cabuluan Br. (B04806LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 51000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Cabuluan Br. (B04806LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0433-006126",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bocana Bridge, Barangay Bocana, Ilog, Negros Occidental",
      "office": "Central Office",
      "amountPesos": 51000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Construction of Bocana Bridge, Barangay Bocana, Ilog, Negros Occidental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0434-006136",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Canghunoghunog to Barangay Cantabon, Siquijor, Siquijor",
      "office": "Central Office",
      "amountPesos": 51000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Construction of Road Barangay Canghunoghunog to Barangay Cantabon, Siquijor, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0437-006206",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Concrete Centro, Barangay Joaquin Macias, Sindangan to Centro Sitio Pase up to riverbank, Barangay Moyo, Siayan, Zamboanga del Norte",
      "office": "Central Office",
      "amountPesos": 51000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Construction of Road Concrete Centro, Barangay Joaquin Macias, Sindangan to Centro Sitio Pase up to riverbank, Barangay Moyo, Siayan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0127-000318",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Liloy-Siocon Rd - K1968 + 488 - K1969 + 106, K1971 + 325 - K1971 + 329, K1971 + 344 - K1971 + 346, K1973 + 103 - K1973 + 108, K1973 + 200 - K1973 + 205, K1977 + 002 - K1977 + 988",
      "office": "Central Office",
      "amountPesos": 50999000,
      "lengthKm": 1.62,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 31480864.2,
      "lengthMeters": 1620.0,
      "allocationPerStatedMeter": 31480.86,
      "rangesMeters": [
        [
          1968488.0,
          1969106.0
        ],
        [
          1971325.0,
          1971329.0
        ],
        [
          1971344.0,
          1971346.0
        ],
        [
          1973103.0,
          1973108.0
        ],
        [
          1973200.0,
          1973205.0
        ],
        [
          1977002.0,
          1977988.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Liloy-Siocon Rd - K1968 + 488 - K1969 + 106, K1971 + 325 - K1971 + 329, K1971 + 344 - K1971 + 346, K1973 + 103 - K1973 + 108, K1973 + 200 - K1973 + 205, K1977 + 002 - K1977 + 988",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 1.03,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0217-001949",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bocaue-Balagtas Diversion Road, Sta. 3+900 - Sta. 3+976.43, Bulacan",
      "office": "Central Office",
      "amountPesos": 50956000,
      "lengthKm": 0.07642999999999983,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 666701556.98,
      "lengthMeters": 76.43,
      "allocationPerStatedMeter": 666701.56,
      "rangesMeters": [
        [
          3900.0,
          3976.43
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Bocaue-Balagtas Diversion Road, Sta. 3+900 - Sta. 3+976.43, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.56,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0113-000047",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Iloilo-Capiz Rd (New Route) - K0004 + 471 - K0006 + 000",
      "office": "Central Office",
      "amountPesos": 50830000,
      "lengthKm": 1.529,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33243950.29,
      "lengthMeters": 1529.0,
      "allocationPerStatedMeter": 33243.95,
      "rangesMeters": [
        [
          4471.0,
          6000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Iloilo-Capiz Rd (New Route) - K0004 + 471 - K0006 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.89,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0150-000769",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0103 + 138 - K0105 + 172",
      "office": "Central Office",
      "amountPesos": 50585000,
      "lengthKm": 2.034,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24869714.85,
      "lengthMeters": 2034.0,
      "allocationPerStatedMeter": 24869.71,
      "rangesMeters": [
        [
          103138.0,
          105172.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0103 + 138 - K0105 + 172",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 0.99,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0176-001218",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1526 + 190 - K1526 + 300, K1530 + 000 - K1530 + 100, K1536 + 960 - K1537 + 030",
      "office": "Central Office",
      "amountPesos": 50560000,
      "lengthKm": 0.28,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 180571428.57,
      "lengthMeters": 280.0,
      "allocationPerStatedMeter": 180571.43,
      "rangesMeters": [
        [
          1526190.0,
          1526300.0
        ],
        [
          1530000.0,
          1530100.0
        ],
        [
          1536960.0,
          1537030.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "176",
      "lengthEvidence": "Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1526 + 190 - K1526 + 300, K1530 + 000 - K1530 + 100, K1536 + 960 - K1537 + 030",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0141-000598",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Milaor-Minalabac-Pili Rd - K0442 + 790 - K0443 + 203; K0443 + 243 - K0444 + 513; K0444 + 543 - K0444 + 599",
      "office": "Central Office",
      "amountPesos": 50544000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          442790.0,
          443203.0
        ],
        [
          443243.0,
          444513.0
        ],
        [
          444543.0,
          444599.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Milaor-Minalabac-Pili Rd - K0442 + 790 - K0443 + 203; K0443 + 243 - K0444 + 513; K0444 + 543 - K0444 + 599",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0256-002596",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Tertiary Roads",
      "projectName": "Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 10118 - Chainage 11698",
      "office": "Central Office",
      "amountPesos": 50518000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "256",
      "lengthEvidence": "Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 10118 - Chainage 11698",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0426-005982",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road along Manggahan St., Barangay Manggahan-Lawin, Sta. 0 + 000 - Sta. 0 + 855, Kawit Cavite",
      "office": "Central Office",
      "amountPesos": 50500000,
      "lengthKm": 0.855,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 59064327.49,
      "lengthMeters": 855.0,
      "allocationPerStatedMeter": 59064.33,
      "rangesMeters": [
        [
          0.0,
          855.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "426",
      "lengthEvidence": "Construction of Road along Manggahan St., Barangay Manggahan-Lawin, Sta. 0 + 000 - Sta. 0 + 855, Kawit Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 3.04,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0140-000583",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Coron-Busuanga Rd - K0034 + 500 - K0038 + 000",
      "office": "Central Office",
      "amountPesos": 50423000,
      "lengthKm": 3.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14406571.43,
      "lengthMeters": 3500.0,
      "allocationPerStatedMeter": 14406.57,
      "rangesMeters": [
        [
          34500.0,
          38000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Coron-Busuanga Rd - K0034 + 500 - K0038 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 0.87,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0127-000319",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Liloy-Siocon Rd - K2020 + 138 - K2023 + 118",
      "office": "Central Office",
      "amountPesos": 50412000,
      "lengthKm": 2.98,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16916778.52,
      "lengthMeters": 2980.0,
      "allocationPerStatedMeter": 16916.78,
      "rangesMeters": [
        [
          2020138.0,
          2023118.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Liloy-Siocon Rd - K2020 + 138 - K2023 + 118",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.84,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0199-001597",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1610 + 454 - K1610 + 908, K1612 + 700 - K1612 + 750, K1612 + 770 - K1614 + 000",
      "office": "Central Office",
      "amountPesos": 50350000,
      "lengthKm": 1.734,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29036908.88,
      "lengthMeters": 1734.0,
      "allocationPerStatedMeter": 29036.91,
      "rangesMeters": [
        [
          1610454.0,
          1610908.0
        ],
        [
          1612700.0,
          1612750.0
        ],
        [
          1612770.0,
          1614000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "199",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1610 + 454 - K1610 + 908, K1612 + 700 - K1612 + 750, K1612 + 770 - K1614 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 0.65,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0288-003290",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Bitan-agan Br. (B00886MN) along Butuan City-Malaybalay Rd",
      "office": "Central Office",
      "amountPesos": 50198000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Bitan-agan Br. (B00886MN) along Butuan City-Malaybalay Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0126-000308",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0136 + 000 - K0139 + 000",
      "office": "Central Office",
      "amountPesos": 50161000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16720333.33,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 16720.33,
      "rangesMeters": [
        [
          136000.0,
          139000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0136 + 000 - K0139 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.83,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0211-001838",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Bani - Agno Rd - K0346 + 358 - K0346 + 658",
      "office": "Central Office",
      "amountPesos": 50124000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 167080000.0,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 167080.0,
      "rangesMeters": [
        [
          346358.0,
          346658.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "211",
      "lengthEvidence": "Bani - Agno Rd - K0346 + 358 - K0346 + 658",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 4.11,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0240-002371",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Hindangon Bridge, Sta. 126+151 - Sta. 126+211, Gingoog City, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 50013000,
      "lengthKm": 0.06,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 60.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          126151.0,
          126211.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Hindangon Bridge, Sta. 126+151 - Sta. 126+211, Gingoog City, Misamis Oriental",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0111-000005",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0280 + 340 - K0282 + 032",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 1.692,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29550827.42,
      "lengthMeters": 1692.0,
      "allocationPerStatedMeter": 29550.83,
      "rangesMeters": [
        [
          280340.0,
          282032.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Manila North Rd - K0280 + 340 - K0282 + 032",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.79,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0111-000007",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0288 + 245 - K0288 + 445, K0289 + 000 - K0291 + 500",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 2.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 18518518.52,
      "lengthMeters": 2700.0,
      "allocationPerStatedMeter": 18518.52,
      "rangesMeters": [
        [
          288245.0,
          288445.0
        ],
        [
          289000.0,
          291500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Manila North Rd - K0288 + 245 - K0288 + 445, K0289 + 000 - K0291 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.49,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0116-000098",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1405 + 000 - K1405 + 033, K1405 + 136 - K1405 + 706, K1405 + 830 - K1406 + 414",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 1.187,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 42122999.16,
      "lengthMeters": 1187.0,
      "allocationPerStatedMeter": 42123.0,
      "rangesMeters": [
        [
          1405000.0,
          1405033.0
        ],
        [
          1405136.0,
          1405706.0
        ],
        [
          1405830.0,
          1406414.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1405 + 000 - K1405 + 033, K1405 + 136 - K1405 + 706, K1405 + 830 - K1406 + 414",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 0.91,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0116-000099",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1406 + 473 - K1406 + 759, K1407 + 456 - K1408 + 909, K1408 + 992 - K1409 + 057, K1410 + 000 - K1410 + 486",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 2.29,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21834061.14,
      "lengthMeters": 2290.0,
      "allocationPerStatedMeter": 21834.06,
      "rangesMeters": [
        [
          1406473.0,
          1406759.0
        ],
        [
          1407456.0,
          1408909.0
        ],
        [
          1408992.0,
          1409057.0
        ],
        [
          1410000.0,
          1410486.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1406 + 473 - K1406 + 759, K1407 + 456 - K1408 + 909, K1408 + 992 - K1409 + 057, K1410 + 000 - K1410 + 486",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.58,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0119-000169",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Victoria-La Paz Rd - K0142 + 574 - K0143 + 773",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.199,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41701417.85,
      "lengthMeters": 1199.0,
      "allocationPerStatedMeter": 41701.42,
      "rangesMeters": [
        [
          142574.0,
          143773.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Victoria-La Paz Rd - K0142 + 574 - K0143 + 773",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 1.06,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0122-000231",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos - Cotabato Sect) - K1618 + 474 - K1618 + 650, K1622 + 600 - K1623 + 000 (6 Lanes)",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.576,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 86805555.56,
      "lengthMeters": 576.0,
      "allocationPerStatedMeter": 86805.56,
      "rangesMeters": [
        [
          1618474.0,
          1618650.0
        ],
        [
          1622600.0,
          1623000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos - Cotabato Sect) - K1618 + 474 - K1618 + 650, K1622 + 600 - K1623 + 000 (6 Lanes)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 1.81,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0122-000232",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos - Cotabato Sect) - K1623+000 - K1623+793 (6 Lanes)",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.793,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 63051702.4,
      "lengthMeters": 793.0,
      "allocationPerStatedMeter": 63051.7,
      "rangesMeters": [
        [
          1623000.0,
          1623793.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos - Cotabato Sect) - K1623+000 - K1623+793 (6 Lanes)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 1.48,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0122-000233",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Kidapawan-Magpet-Pangaoan Rd - K1619+(-675) - K1621+115 (2 Lanes, Outer)",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.79,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17921146.95,
      "lengthMeters": 2790.0,
      "allocationPerStatedMeter": 17921.15,
      "rangesMeters": [
        [
          1618325.0,
          1621115.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Kidapawan-Magpet-Pangaoan Rd - K1619+(-675) - K1621+115 (2 Lanes, Outer)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.48,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0129-000358",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "San Fernando Bypass Rd - K0267 + (-226) - K0269 + 531",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.757,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18135654.7,
      "lengthMeters": 2757.0,
      "allocationPerStatedMeter": 18135.65,
      "rangesMeters": [
        [
          266774.0,
          269531.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "San Fernando Bypass Rd - K0267 + (-226) - K0269 + 531",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.9,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0129-000359",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "San Fernando Bypass Rd Extension - K0271 + (-701) - K0272 + 000, K0272 + 256 - K0272 + 320, K0273 + 000 - K0274 + 000, K0275 + 000 - K0275 + 104",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.869,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 17427675.15,
      "lengthMeters": 2869.0,
      "allocationPerStatedMeter": 17427.68,
      "rangesMeters": [
        [
          270299.0,
          272000.0
        ],
        [
          272256.0,
          272320.0
        ],
        [
          273000.0,
          274000.0
        ],
        [
          275000.0,
          275104.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "San Fernando Bypass Rd Extension - K0271 + (-701) - K0272 + 000, K0272 + 256 - K0272 + 320, K0273 + 000 - K0274 + 000, K0275 + 000 - K0275 + 104",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.87,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0129-000360",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sn Fernando-Bagulin Rd - K0273 + 0001 - K0273 + 373, K0273 + 394 - K0274 + 000, K0274 + 104 - K0276 + 000, K0276 + 968 - K0277 + 142, K0277 + 438 - K0277 + 518, K0278 + 000 - K0279 + 000",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 4.128,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 12112403.1,
      "lengthMeters": 4128.0,
      "allocationPerStatedMeter": 12112.4,
      "rangesMeters": [
        [
          273001.0,
          273373.0
        ],
        [
          273394.0,
          274000.0
        ],
        [
          274104.0,
          276000.0
        ],
        [
          276968.0,
          277142.0
        ],
        [
          277438.0,
          277518.0
        ],
        [
          278000.0,
          279000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Sn Fernando-Bagulin Rd - K0273 + 0001 - K0273 + 373, K0273 + 394 - K0274 + 000, K0274 + 104 - K0276 + 000, K0276 + 968 - K0277 + 142, K0277 + 438 - K0277 + 518, K0278 + 000 - K0279 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.74,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0134-000475",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "MSR JCT-Lopez-Catanauan Rd - K0232 + 200 - K0232 + 400, K0232 + 450 - K0232 + 600, K0233 + 000 - K0233 + 585, K0233 + 633 - K0233 + 745",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.047,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 47755491.88,
      "lengthMeters": 1047.0,
      "allocationPerStatedMeter": 47755.49,
      "rangesMeters": [
        [
          232200.0,
          232400.0
        ],
        [
          232450.0,
          232600.0
        ],
        [
          233000.0,
          233585.0
        ],
        [
          233633.0,
          233745.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "MSR JCT-Lopez-Catanauan Rd - K0232 + 200 - K0232 + 400, K0232 + 450 - K0232 + 600, K0233 + 000 - K0233 + 585, K0233 + 633 - K0233 + 745",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.54,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0135-000490",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Pili-Tigaon-Albay Bdry Rd - K0454 + (-648) - K0454 + 553",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.201,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41631973.36,
      "lengthMeters": 1201.0,
      "allocationPerStatedMeter": 41631.97,
      "rangesMeters": [
        [
          453352.0,
          454553.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Pili-Tigaon-Albay Bdry Rd - K0454 + (-648) - K0454 + 553",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.34,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0138-000545",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagum-Panabo Circum Rd - K1458 + 000 - K1459 + 750",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 1750.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          1458000.0,
          1459750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Tagum-Panabo Circum Rd - K1458 + 000 - K1459 + 750",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.94,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0138-000546",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagum-Panabo Circum Rd - K1476 + 000 - K1477 + 000, K1481 + 205 - K1481 + 935",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.73,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 28901734.1,
      "lengthMeters": 1730.0,
      "allocationPerStatedMeter": 28901.73,
      "rangesMeters": [
        [
          1476000.0,
          1477000.0
        ],
        [
          1481205.0,
          1481935.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Tagum-Panabo Circum Rd - K1476 + 000 - K1477 + 000, K1481 + 205 - K1481 + 935",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.95,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0138-000547",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagum - Panabo Circum Road - K1484+728 -K1486+000",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.272,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39308176.1,
      "lengthMeters": 1272.0,
      "allocationPerStatedMeter": 39308.18,
      "rangesMeters": [
        [
          1484728.0,
          1486000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Tagum - Panabo Circum Road - K1484+728 -K1486+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.26,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0138-000548",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagum-Panabo Circum Rd - K1483 + 000 - K1484 + 728",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.728,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28935185.19,
      "lengthMeters": 1728.0,
      "allocationPerStatedMeter": 28935.19,
      "rangesMeters": [
        [
          1483000.0,
          1484728.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Tagum-Panabo Circum Rd - K1483 + 000 - K1484 + 728",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.95,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0143-000636",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sn Juan-Sn Gabriel Rd - K0278 + (-062) - K0281 + 731, K0281 + 502 - K0281 + 860",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 3.922,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 12748597.65,
      "lengthMeters": 3922.0,
      "allocationPerStatedMeter": 12748.6,
      "rangesMeters": [
        [
          277938.0,
          281731.0
        ],
        [
          281502.0,
          281860.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Sn Juan-Sn Gabriel Rd - K0278 + (-062) - K0281 + 731, K0281 + 502 - K0281 + 860",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 0.87,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0147-000718",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Ayala-La Paz Rd - (S01495MN) Chainage 7000 - Chainage 10400",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Ayala-La Paz Rd - (S01495MN) Chainage 7000 - Chainage 10400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0161-000948",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Gumaca - Pitogo - Mulanay - San Narciso Road, Quezon - K0259 + 900 - K0260 + 714",
      "office": "Quezon 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.814,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 61425061.43,
      "lengthMeters": 814.0,
      "allocationPerStatedMeter": 61425.06,
      "rangesMeters": [
        [
          259900.0,
          260714.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Gumaca - Pitogo - Mulanay - San Narciso Road, Quezon - K0259 + 900 - K0260 + 714",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 1.85,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0165-001031",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Buenavista-Asuncion, Maasin City (Bontoc-Maasin) - K1124 + (-092) - K1125 + 872, K1125 + 897 - K1128 + 000",
      "office": "Southern Leyte 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 4.067,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 12294074.26,
      "lengthMeters": 4067.0,
      "allocationPerStatedMeter": 12294.07,
      "rangesMeters": [
        [
          1123908.0,
          1125872.0
        ],
        [
          1125897.0,
          1128000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Buenavista-Asuncion, Maasin City (Bontoc-Maasin) - K1124 + (-092) - K1125 + 872, K1125 + 897 - K1128 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 0.55,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0169-001105",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Talisay - Laurel - Agoncillo Rd - K0109 + 090 - K0109 + 205",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.115,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 434782608.7,
      "lengthMeters": 115.0,
      "allocationPerStatedMeter": 434782.61,
      "rangesMeters": [
        [
          109090.0,
          109205.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Talisay - Laurel - Agoncillo Rd - K0109 + 090 - K0109 + 205",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 8.03,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0175-001198",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Gumaca Bypass Road - K0192 + 041 - K192 + 077, K0192 + 315 - K0192 + 427, K0193 + 950 - K0194 + 020",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 0.218,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 229357798.17,
      "lengthMeters": 218.0,
      "allocationPerStatedMeter": 229357.8,
      "rangesMeters": [
        [
          192041.0,
          192077.0
        ],
        [
          192315.0,
          192427.0
        ],
        [
          193950.0,
          194020.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "Gumaca Bypass Road - K0192 + 041 - K192 + 077, K0192 + 315 - K0192 + 427, K0193 + 950 - K0194 + 020",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 1.21,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0180-001279",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Jct Milagros-Baleno-Lagta Rd - K0038 + 050 - K0038 + 100",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1000000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 1000000.0,
      "rangesMeters": [
        [
          38050.0,
          38100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Jct Milagros-Baleno-Lagta Rd - K0038 + 050 - K0038 + 100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 1.6,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0180-001280",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Jct Milagros-Baleno-Lagta Rd - K0038 + 100 - K0038 + 150",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1000000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 1000000.0,
      "rangesMeters": [
        [
          38100.0,
          38150.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Jct Milagros-Baleno-Lagta Rd - K0038 + 100 - K0038 + 150",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 1.6,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0186-001380",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 507 - Chainage 552",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 507 - Chainage 552",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0187-001396",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Lumbia-Uguiaban By-Pass Rd - (S00618MN) Chainage 137 - Chainage 864",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "187",
      "lengthEvidence": "Lumbia-Uguiaban By-Pass Rd - (S00618MN) Chainage 137 - Chainage 864",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0187-001403",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Butuan City-Malaybalay Rd - K1253 + 040 - K1253 + 162",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.122,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 409836065.57,
      "lengthMeters": 122.0,
      "allocationPerStatedMeter": 409836.07,
      "rangesMeters": [
        [
          1253040.0,
          1253162.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "187",
      "lengthEvidence": "Butuan City-Malaybalay Rd - K1253 + 040 - K1253 + 162",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 1.1,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0208-001794",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Gate - Bulan Airport Rd, Sorsogon - K0636 + 100 - K0637+601",
      "office": "Sorsogon 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.501,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33311125.92,
      "lengthMeters": 1501.0,
      "allocationPerStatedMeter": 33311.13,
      "rangesMeters": [
        [
          636100.0,
          637601.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Gate - Bulan Airport Rd, Sorsogon - K0636 + 100 - K0637+601",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 0.99,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0210-001815",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Tacloban City Bypass Rd - Chainage 4610 - Chainage 5660",
      "office": "Tacloban City District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Tacloban City Bypass Rd - Chainage 4610 - Chainage 5660",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0212-001858",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Talisay-Laurel-Agoncillo Rd – K0108 + 467 – K0109 + 000",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.533,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 93808630.39,
      "lengthMeters": 533.0,
      "allocationPerStatedMeter": 93808.63,
      "rangesMeters": [
        [
          108467.0,
          109000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Talisay-Laurel-Agoncillo Rd – K0108 + 467 – K0109 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 2.31,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0220-002007",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Real By-Pass Rd, Sta. 0+487 - Sta. 1+090, Real, Quezon",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 0.603,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 82918739.64,
      "lengthMeters": 603.0,
      "allocationPerStatedMeter": 82918.74,
      "rangesMeters": [
        [
          487.0,
          1090.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Real By-Pass Rd, Sta. 0+487 - Sta. 1+090, Real, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.61,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0220-002018",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tagkawayan-Labo Diversion Road (Tagkawayan Section), Sta. 280 + 537 - Sta. 281+607.48, Quezon",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 1.0704799999999814,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46708018.83,
      "lengthMeters": 1070.48,
      "allocationPerStatedMeter": 46708.02,
      "rangesMeters": [
        [
          280537.0,
          281607.48
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "220",
      "lengthEvidence": "Tagkawayan-Labo Diversion Road (Tagkawayan Section), Sta. 280 + 537 - Sta. 281+607.48, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.43,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0222-002048",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Iloilo R-1 Bypass Road, Oton, Iloilo - Sta. 10+206.35 - Sta. 10+599.59",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 0.39323999999999976,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 127148814.97,
      "lengthMeters": 393.24,
      "allocationPerStatedMeter": 127148.81,
      "rangesMeters": [
        [
          10206.35,
          10599.59
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Iloilo R-1 Bypass Road, Oton, Iloilo - Sta. 10+206.35 - Sta. 10+599.59",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 1.0,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0222-002052",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Maayon-Sara Road, Capiz - Sta. 4+818 - Sta. 4+891, Sta. 6+156 - Sta. 6+483, Sta. 7+876 - Sta. 8+227, Sta. 8+893 - Sta. 9+954, Sta. 10+097 - Sta. 10+598",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 2.313,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21616947.69,
      "lengthMeters": 2313.0,
      "allocationPerStatedMeter": 21616.95,
      "rangesMeters": [
        [
          4818.0,
          4891.0
        ],
        [
          6156.0,
          6483.0
        ],
        [
          7876.0,
          8227.0
        ],
        [
          8893.0,
          9954.0
        ],
        [
          10097.0,
          10598.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Maayon-Sara Road, Capiz - Sta. 4+818 - Sta. 4+891, Sta. 6+156 - Sta. 6+483, Sta. 7+876 - Sta. 8+227, Sta. 8+893 - Sta. 9+954, Sta. 10+097 - Sta. 10+598",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.42,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0226-002119",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Claveria-Balingoan Bypass Road, Dahilig Bridge, Barangay Dahilig, Sta. 57+700-Sta. 57+800, Balingoan, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 0.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 100.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          57700.0,
          57800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Claveria-Balingoan Bypass Road, Dahilig Bridge, Barangay Dahilig, Sta. 57+700-Sta. 57+800, Balingoan, Misamis Oriental",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0226-002126",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Iligan City Circumferential Road Extension to Jct. Sta. Felomina-Bonbonon-Digkilaan- Rogongon Road, Barangay Lanipao, Sta. 11+100 - 11+433, Iligan City",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 0.333,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 150150150.15,
      "lengthMeters": 333.0,
      "allocationPerStatedMeter": 150150.15,
      "rangesMeters": [
        [
          11100.0,
          11433.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Iligan City Circumferential Road Extension to Jct. Sta. Felomina-Bonbonon-Digkilaan- Rogongon Road, Barangay Lanipao, Sta. 11+100 - 11+433, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 1.18,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0226-002128",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Jct. Buda, Quezon-Jct. Valencia-Talaingod Road-Kalagangan, San Fernando Alternate/Bypass Road, Barangay Kalagangan Section, Sta. 1+681 - Sta. 2+200, San Fernando, Bukidnon",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 0.519,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 96339113.68,
      "lengthMeters": 519.0,
      "allocationPerStatedMeter": 96339.11,
      "rangesMeters": [
        [
          1681.0,
          2200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Jct. Buda, Quezon-Jct. Valencia-Talaingod Road-Kalagangan, San Fernando Alternate/Bypass Road, Barangay Kalagangan Section, Sta. 1+681 - Sta. 2+200, San Fernando, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.71,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0226-002133",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Magsaysay–Butuan City Coastal Bypass/ Alternate Road (Sta. Cruz, Magsaysay), Sta. 1+550 - Sta. 2+050, Barangay Poblacion, Magsaysay, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          1550.0,
          2050.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Magsaysay–Butuan City Coastal Bypass/ Alternate Road (Sta. Cruz, Magsaysay), Sta. 1+550 - Sta. 2+050, Barangay Poblacion, Magsaysay, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.79,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0229-002170",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Daang Maharlika (Alternate Route) (NRJ - Mayor Democrito D. Plaza II Avenue - Las Nieves - Sibagat), Florida - Bilay Section, , Sta. 13+067 - Sta. 13+187.8, Sta. 24+119 - Sta. 24+548.31, Butuan City",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 0.5501100000000005,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 90890912.73,
      "lengthMeters": 550.11,
      "allocationPerStatedMeter": 90890.91,
      "rangesMeters": [
        [
          13067.0,
          13187.8
        ],
        [
          24119.0,
          24548.31
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Daang Maharlika (Alternate Route) (NRJ - Mayor Democrito D. Plaza II Avenue - Las Nieves - Sibagat), Florida - Bilay Section, , Sta. 13+067 - Sta. 13+187.8, Sta. 24+119 - Sta. 24+548.31, Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.67,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0229-002171",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Daang Maharlika (Alternate Route) NRJ Mayor Democrito D. Plaza II Avenue - Las Nieves - Sibagat), Sta. 13+067 - Sta. 13+097.77, Butuan City",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 0.030770000000000436,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1624959376.02,
      "lengthMeters": 30.77,
      "allocationPerStatedMeter": 1624959.38,
      "rangesMeters": [
        [
          13067.0,
          13097.77
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Daang Maharlika (Alternate Route) NRJ Mayor Democrito D. Plaza II Avenue - Las Nieves - Sibagat), Sta. 13+067 - Sta. 13+097.77, Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 1.36,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0229-002176",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "NRJ Daang Maharlika (Taguibo Section) - Masao Port, Maug-Lumbocan Section, Sta. 8+866.2 - Sta. 9+057.73, Butuan City",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 0.19152999999999884,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 261055709.29,
      "lengthMeters": 191.53,
      "allocationPerStatedMeter": 261055.71,
      "rangesMeters": [
        [
          8866.2,
          9057.73
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "NRJ Daang Maharlika (Taguibo Section) - Masao Port, Maug-Lumbocan Section, Sta. 8+866.2 - Sta. 9+057.73, Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 1.24,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0230-002195",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Guimba - Pura Road, Nueva Ecija, STA. 6+146 - STA. 7+100",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.954,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52410901.47,
      "lengthMeters": 954.0,
      "allocationPerStatedMeter": 52410.9,
      "rangesMeters": [
        [
          6146.0,
          7100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Guimba - Pura Road, Nueva Ecija, STA. 6+146 - STA. 7+100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.49,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0230-002197",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Botolan Bypass Road, Botolan, Zambales Sta. 2+000 - Sta. 2+500",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          2000.0,
          2500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Botolan Bypass Road, Botolan, Zambales Sta. 2+000 - Sta. 2+500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.79,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0230-002198",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bangantalinga-Amungan, Iba, Zambales Sta. 3+000 - Sta. 3+500",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          3000.0,
          3500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Bangantalinga-Amungan, Iba, Zambales Sta. 3+000 - Sta. 3+500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.79,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0230-002200",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Pagbilao-Tayabas-Mauban-Lucban Diversion Road (Lucban Section), Sta. 3+620 - Sta. 4+120, Lucban, Quezon",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          3620.0,
          4120.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Pagbilao-Tayabas-Mauban-Lucban Diversion Road (Lucban Section), Sta. 3+620 - Sta. 4+120, Lucban, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.79,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0230-002204",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Plaridel By-Pass Road - Sta 2 + 050 - Sta 2 + 060, Sta 2 + 282 - Sta 2 + 307, Sta 2+395 - Sta 2+580, Quezon",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 227272727.27,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 227272.73,
      "rangesMeters": [
        [
          2050.0,
          2060.0
        ],
        [
          2282.0,
          2307.0
        ],
        [
          2395.0,
          2580.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Plaridel By-Pass Road - Sta 2 + 050 - Sta 2 + 060, Sta 2 + 282 - Sta 2 + 307, Sta 2+395 - Sta 2+580, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 1.08,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0231-002205",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tagkawayan-Del Gallego Diversion Road, Sta. 1+100 - Sta. 1+950, Tagkawayan, Quezon",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.85,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 58823529.41,
      "lengthMeters": 850.0,
      "allocationPerStatedMeter": 58823.53,
      "rangesMeters": [
        [
          1100.0,
          1950.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Tagkawayan-Del Gallego Diversion Road, Sta. 1+100 - Sta. 1+950, Tagkawayan, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.55,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0231-002206",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
      "office": "Rizal 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 166666666.67,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 166666.67,
      "rangesMeters": [
        [
          24400.0,
          24700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.79,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0231-002207",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 5+000, Albay",
      "office": "Albay 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.04,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 48076923.08,
      "lengthMeters": 1040.0,
      "allocationPerStatedMeter": 48076.92,
      "rangesMeters": [
        [
          3960.0,
          5000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 5+000, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.45,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0231-002214",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Iloilo East Coast-Capiz Rd - K0128 + 022 - K0128 + 487, K0137 + 025 - K0137 + 420, K0143 + 416 - K0144 + 143, K0144 + 291 - K0144 + 405, K0144 + 514 - K0144 + 727",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.914,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 26123301.99,
      "lengthMeters": 1914.0,
      "allocationPerStatedMeter": 26123.3,
      "rangesMeters": [
        [
          128022.0,
          128487.0
        ],
        [
          137025.0,
          137420.0
        ],
        [
          143416.0,
          144143.0
        ],
        [
          144291.0,
          144405.0
        ],
        [
          144514.0,
          144727.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Iloilo East Coast-Capiz Rd - K0128 + 022 - K0128 + 487, K0137 + 025 - K0137 + 420, K0143 + 416 - K0144 + 143, K0144 + 291 - K0144 + 405, K0144 + 514 - K0144 + 727",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.51,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0231-002215",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Panitan By-Pass Road, Barangay Tabuc Norte, Sta. 001 + 020 - Sta. 001 + 152, Capiz",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.132,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 378787878.79,
      "lengthMeters": 132.0,
      "allocationPerStatedMeter": 378787.88,
      "rangesMeters": [
        [
          1020.0,
          1152.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Panitan By-Pass Road, Barangay Tabuc Norte, Sta. 001 + 020 - Sta. 001 + 152, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.32,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0232-002223",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sto. Rosario-Villaba Diversion Road, Sta. 0+425. - Sta. 1+135, Sta. 1+820 - Sta. 2+130, Sta. 1+135 - Sta. 1+225, Sta. 1+225 - Sta. 1+320, Barangay A. Tumamak and Barangay Bugabuga, Villaba, Leyte",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          1820.0,
          2130.0
        ],
        [
          1135.0,
          1225.0
        ],
        [
          1225.0,
          1320.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "Sto. Rosario-Villaba Diversion Road, Sta. 0+425. - Sta. 1+135, Sta. 1+820 - Sta. 2+130, Sta. 1+135 - Sta. 1+225, Sta. 1+225 - Sta. 1+320, Barangay A. Tumamak and Barangay Bugabuga, Villaba, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0232-002225",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Hindang By-Pass Road, Sta. 1+602.40 - 1+753.40, Sta. 1+912 - 2+191.68, Barangay Tabok, Hindang, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.43067999999999984,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 116095476.92,
      "lengthMeters": 430.68,
      "allocationPerStatedMeter": 116095.48,
      "rangesMeters": [
        [
          1602.4,
          1753.4
        ],
        [
          1912.0,
          2191.68
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "Hindang By-Pass Road, Sta. 1+602.40 - 1+753.40, Sta. 1+912 - 2+191.68, Barangay Tabok, Hindang, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.91,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0239-002363",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Iligan City - Cagayan de Oro City Alternate Road (Digkilaan-Bulua Section), Barangay Mainit Section, Sta. 13+320 - Sta. 13+755 (Sec. A), Sta. 14+855 - Sta. 15+751, Iligan City",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 1.331,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 37565740.05,
      "lengthMeters": 1331.0,
      "allocationPerStatedMeter": 37565.74,
      "rangesMeters": [
        [
          13320.0,
          13755.0
        ],
        [
          14855.0,
          15751.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Iligan City - Cagayan de Oro City Alternate Road (Digkilaan-Bulua Section), Barangay Mainit Section, Sta. 13+320 - Sta. 13+755 (Sec. A), Sta. 14+855 - Sta. 15+751, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 0.6,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0241-002395",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "PENRO Apayao (Burot)-San Isidro-Quirino Road, Burot Bridge, Sta. 0+490, Apayao",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "PENRO Apayao (Burot)-San Isidro-Quirino Road, Burot Bridge, Sta. 0+490, Apayao",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0242-002404",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Calauag-Guinayangan-Buenavista-Lopez Road - Sta. 2+275 - Sta. 2+464, Sta. 3+089 - Sta. 3+750",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.85,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 58823529.41,
      "lengthMeters": 850.0,
      "allocationPerStatedMeter": 58823.53,
      "rangesMeters": [
        [
          2275.0,
          2464.0
        ],
        [
          3089.0,
          3750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "242",
      "lengthEvidence": "Calauag-Guinayangan-Buenavista-Lopez Road - Sta. 2+275 - Sta. 2+464, Sta. 3+089 - Sta. 3+750",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 0.6,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0242-002405",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Atimonan-Mauban Road - STA 003+660 - STA 004+460",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 62500000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 62500.0,
      "rangesMeters": [
        [
          3660.0,
          4460.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "242",
      "lengthEvidence": "Atimonan-Mauban Road - STA 003+660 - STA 004+460",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 0.63,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0242-002406",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Calauag-Guinayangan-Buenavista-Lopez Road - Sta. 11 + 770 - Sta. 12 + 970",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          11770.0,
          12970.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "242",
      "lengthEvidence": "Calauag-Guinayangan-Buenavista-Lopez Road - Sta. 11 + 770 - Sta. 12 + 970",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 0.67,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0242-002407",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Quezon - Alabat - Perez Circumferential Road - Sta. 23 + 920 - Sta. 24 + 920",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          23920.0,
          24920.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "242",
      "lengthEvidence": "Quezon - Alabat - Perez Circumferential Road - Sta. 23 + 920 - Sta. 24 + 920",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0245-002446",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Sayre Highway (S00577MN) - K1426 + 728 - K1426 + 751 (RS), K1426 + 945 - K1426 + 1027 (LS), K1427 + (-070) - K1427 + 000 (LS), K1427 + 640 - K1427 + 775 (RS), K1428 + 300 - K1428 + 550 (LS), Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.505,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 99009900.99,
      "lengthMeters": 505.0,
      "allocationPerStatedMeter": 99009.9,
      "rangesMeters": [
        [
          1426728.0,
          1426751.0
        ],
        [
          1426945.0,
          1427027.0
        ],
        [
          1426930.0,
          1427000.0
        ],
        [
          1427640.0,
          1427775.0
        ],
        [
          1428300.0,
          1428550.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Sayre Highway (S00577MN) - K1426 + 728 - K1426 + 751 (RS), K1426 + 945 - K1426 + 1027 (LS), K1427 + (-070) - K1427 + 000 (LS), K1427 + 640 - K1427 + 775 (RS), K1428 + 300 - K1428 + 550 (LS), Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 8.24,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0246-002452",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Linamon - Zamboanga Road - K1587 + 000 - K1588 + 000, K1591 + 040 - K1593 + 774",
      "office": "Lanao del Norte 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 3.734,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 13390465.99,
      "lengthMeters": 3734.0,
      "allocationPerStatedMeter": 13390.47,
      "rangesMeters": [
        [
          1587000.0,
          1588000.0
        ],
        [
          1591040.0,
          1593774.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Linamon - Zamboanga Road - K1587 + 000 - K1588 + 000, K1591 + 040 - K1593 + 774",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 1.11,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0246-002453",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Ozamiz - Pagadian Road, K1668 + 000 - K1669 + 521, K1669 + 541 - K1670 + 325, K1670 + 332 - K1671 + 000",
      "office": "Misamis Occidental 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.973,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 16818028.93,
      "lengthMeters": 2973.0,
      "allocationPerStatedMeter": 16818.03,
      "rangesMeters": [
        [
          1668000.0,
          1669521.0
        ],
        [
          1669541.0,
          1670325.0
        ],
        [
          1670332.0,
          1671000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Ozamiz - Pagadian Road, K1668 + 000 - K1669 + 521, K1669 + 541 - K1670 + 325, K1670 + 332 - K1671 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 1.4,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0248-002486",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Cebu South Coastal Rd - K0011 + 923 (Off-Carriageway Improvement: Flaring of Intersections / Improvement of Intersections)",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "248",
      "lengthEvidence": "Cebu South Coastal Rd - K0011 + 923 (Off-Carriageway Improvement: Flaring of Intersections / Improvement of Intersections)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0249-002499",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Batangas-Quezon Rd - K0134 + (-664) - K0136 + 909 (Solar Roadway Lighting)",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 3.573,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13993842.71,
      "lengthMeters": 3573.0,
      "allocationPerStatedMeter": 13993.84,
      "rangesMeters": [
        [
          133336.0,
          136909.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "249",
      "lengthEvidence": "Batangas-Quezon Rd - K0134 + (-664) - K0136 + 909 (Solar Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.35,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0250-002523",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Roadway Lighting) Along Jct Sh Aglayan-Zamboanguita Rd - K1542 + 306 - K1544 + 831, Barangay Poblacion, Cabanglasan, Bukidnon 2nd LD",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.525,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19801980.2,
      "lengthMeters": 2525.0,
      "allocationPerStatedMeter": 19801.98,
      "rangesMeters": [
        [
          1542306.0,
          1544831.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "250",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Roadway Lighting) Along Jct Sh Aglayan-Zamboanguita Rd - K1542 + 306 - K1544 + 831, Barangay Poblacion, Cabanglasan, Bukidnon 2nd LD",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.91,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0250-002525",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Roadway Lighting) Along Jct. Sayre Hway-Impasug-ong-Patulangan By-Pass Road - K1478 + 000 - K1481 + 472, Barangay Poblacion, Impasug-ong, Bukidnon 2nd LD",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 3.472,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14400921.66,
      "lengthMeters": 3472.0,
      "allocationPerStatedMeter": 14400.92,
      "rangesMeters": [
        [
          1478000.0,
          1481472.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "250",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Roadway Lighting) Along Jct. Sayre Hway-Impasug-ong-Patulangan By-Pass Road - K1478 + 000 - K1481 + 472, Barangay Poblacion, Impasug-ong, Bukidnon 2nd LD",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.39,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0250-002526",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Roadway Lighting) Along Kapalong - Talaingod - Valencia Rd - K1580 + 500 - K1584 + 000, Barangay Halapitan - Barangay Little Baguio, San Fernando, Bukidnon 2nd LD",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 3.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14285714.29,
      "lengthMeters": 3500.0,
      "allocationPerStatedMeter": 14285.71,
      "rangesMeters": [
        [
          1580500.0,
          1584000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "250",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Roadway Lighting) Along Kapalong - Talaingod - Valencia Rd - K1580 + 500 - K1584 + 000, Barangay Halapitan - Barangay Little Baguio, San Fernando, Bukidnon 2nd LD",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.38,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0251-002527",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Roadway Lighting) Along Sayre Highway - K1483 + 000 - K1485 + 000, K1487 + 145 - K1488 + 465, Barangay La Fortuna and Barangay Impalutao, Impasug-ong, Bukidnon 2nd LD",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          1483000.0,
          1485000.0
        ],
        [
          1487145.0,
          1488465.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Roadway Lighting) Along Sayre Highway - K1483 + 000 - K1485 + 000, K1487 + 145 - K1488 + 465, Barangay La Fortuna and Barangay Impalutao, Impasug-ong, Bukidnon 2nd LD",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0251-002528",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "CDO-Airport-Bukidnon Rd - K1440 + (-140) - K1442 + 000",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23364485.98,
      "lengthMeters": 2140.0,
      "allocationPerStatedMeter": 23364.49,
      "rangesMeters": [
        [
          1439860.0,
          1442000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "CDO-Airport-Bukidnon Rd - K1440 + (-140) - K1442 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 2.26,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0251-002533",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd, Barangay Santa Filomena, K1519 + (- 033) - K1525 + 770 (Road Safety: Road Lighting)",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd, Barangay Santa Filomena, K1519 + (- 033) - K1525 + 770 (Road Safety: Road Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0251-002534",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Lanao del Norte Interior Circumferential Road (LDNICR), K1527 + (-567) - K1534 + 340",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 7.907,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 6323510.81,
      "lengthMeters": 7907.0,
      "allocationPerStatedMeter": 6323.51,
      "rangesMeters": [
        [
          1526433.0,
          1534340.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Lanao del Norte Interior Circumferential Road (LDNICR), K1527 + (-567) - K1534 + 340",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.61,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0251-002537",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Construction of Solar Lights along Iligan City Diversion Road, Barangay Tubod, K1529 + 243 - K1534 + 285, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 5.042,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9916699.72,
      "lengthMeters": 5042.0,
      "allocationPerStatedMeter": 9916.7,
      "rangesMeters": [
        [
          1529243.0,
          1534285.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Construction of Solar Lights along Iligan City Diversion Road, Barangay Tubod, K1529 + 243 - K1534 + 285, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.96,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0251-002542",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation of Road Safety Facilities along Nabunturan-Maragusan Road (S00127MN) K1435 + 840 - K1438 + 946",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 3.106,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16097875.08,
      "lengthMeters": 3106.0,
      "allocationPerStatedMeter": 16097.88,
      "rangesMeters": [
        [
          1435840.0,
          1438946.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Installation of Road Safety Facilities along Nabunturan-Maragusan Road (S00127MN) K1435 + 840 - K1438 + 946",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.56,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0254-002571",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Naga-Carolina-Panicuason Rd - K0438 + (-325) - K0438 + 600",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.925,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54054054.05,
      "lengthMeters": 925.0,
      "allocationPerStatedMeter": 54054.05,
      "rangesMeters": [
        [
          437675.0,
          438600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "254",
      "lengthEvidence": "Naga-Carolina-Panicuason Rd - K0438 + (-325) - K0438 + 600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 5.45,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0254-002572",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Juban-Magallanes Rd,Sorsogon - K0620 + 465 - K0620 + 490 (R/S), K0620 + 568 - K0620 + 676 (B/S), K0620 + 676 - K0620 + 772 (R/S), K0620 + 852 - K0621 + 057 (L/S), K0621 + 453 - K0621 + 462 (L/S), K0621 + 462 - K0621 + 582 (B/S), K0621 + 582 - K0621+982 (B/S), K0621+982 - K0622+336 (L/S), K0622+769 - K0622+848 (R/S), K0622+848 - K0622+875 (B/S), K0622+875 - K0622+950 (R/S)",
      "office": "Sorsogon District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.498,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 33377837.12,
      "lengthMeters": 1498.0,
      "allocationPerStatedMeter": 33377.84,
      "rangesMeters": [
        [
          620465.0,
          620490.0
        ],
        [
          620568.0,
          620676.0
        ],
        [
          620676.0,
          620772.0
        ],
        [
          620852.0,
          621057.0
        ],
        [
          621453.0,
          621462.0
        ],
        [
          621462.0,
          621582.0
        ],
        [
          621582.0,
          621982.0
        ],
        [
          621982.0,
          622336.0
        ],
        [
          622769.0,
          622848.0
        ],
        [
          622848.0,
          622875.0
        ],
        [
          622875.0,
          622950.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "254",
      "lengthEvidence": "Juban-Magallanes Rd,Sorsogon - K0620 + 465 - K0620 + 490 (R/S), K0620 + 568 - K0620 + 676 (B/S), K0620 + 676 - K0620 + 772 (R/S), K0620 + 852 - K0621 + 057 (L/S), K0621 + 453 - K0621 + 462 (L/S), K0621 + 462 - K0621 + 582 (B/S), K0621 + 582 - K0621+982 (B/S), K0621+982 - K0622+336 (L/S), K0622+769 - K0622+848 (R/S), K0622+848 - K0622+875 (B/S), K0622+875 - K0622+950 (R/S)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 3.37,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0255-002587",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Cabitoonan-Libertad-Sta Fe-Sta Cruz-Corazon-Consuelo, General Luna Roads (SG00369SG) K0022 + 000 - K0032 + 494",
      "office": "Surigao del Norte 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 10.494,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 4764627.41,
      "lengthMeters": 10494.0,
      "allocationPerStatedMeter": 4764.63,
      "rangesMeters": [
        [
          22000.0,
          32494.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "255",
      "lengthEvidence": "Cabitoonan-Libertad-Sta Fe-Sta Cruz-Corazon-Consuelo, General Luna Roads (SG00369SG) K0022 + 000 - K0032 + 494",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.48,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0255-002588",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Dapa-Union-General Luna Road (SG00364SG), K0001+(961)-K0007+39 (Road Safety: Roadway Lighting)",
      "office": "Surigao del Sur 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 5.078,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9846396.22,
      "lengthMeters": 5078.0,
      "allocationPerStatedMeter": 9846.4,
      "rangesMeters": [
        [
          1961.0,
          7039.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "255",
      "lengthEvidence": "Dapa-Union-General Luna Road (SG00364SG), K0001+(961)-K0007+39 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.99,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0260-002683",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Mambayaan Br. 1 (B01314MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Mambayaan Br. 1 (B01314MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0261-002717",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Sta. Josefa Br. (B00801MN) along NRJ Cuevas-Sampaguita Rd",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Sta. Josefa Br. (B00801MN) along NRJ Cuevas-Sampaguita Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0263-002744",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Mabilo Br. (B05196LZ) along Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd",
      "office": "Camarines Norte District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Mabilo Br. (B05196LZ) along Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0263-002748",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Tagbuane Br. 2 (B00235BH) along The President Carlos P. Garcia Circumferential Rd",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Tagbuane Br. 2 (B00235BH) along The President Carlos P. Garcia Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0264-002764",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Depase Br. (B01559MN) along Jct. Tubod - Lakewood - Bayog Road",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Depase Br. (B01559MN) along Jct. Tubod - Lakewood - Bayog Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0264-002765",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Digon Br. (B01701MN) along Zamboanga del Sur Coastal Rd",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Digon Br. (B01701MN) along Zamboanga del Sur Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0264-002766",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Maculay Br. (B01699MN) along Zamboanga del Sur Coastal Rd",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Maculay Br. (B01699MN) along Zamboanga del Sur Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0264-002767",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Paglaum Br. (B01698MN) along Zamboanga del Sur Coastal Road",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Paglaum Br. (B01698MN) along Zamboanga del Sur Coastal Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0264-002777",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Guibone Br. (B01218MN) along Gingoog-Claveria-Villanueva Rd",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Guibone Br. (B01218MN) along Gingoog-Claveria-Villanueva Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002835",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Magat Br. (B01150LZ) along Santiago-Tuguegarao Rd",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Magat Br. (B01150LZ) along Santiago-Tuguegarao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002956",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Pagalungan Br. (B00305MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Pagalungan Br. (B00305MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003023",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Batang Batang Br. (B00035PW) along Puerto Princesa South Rd",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Batang Batang Br. (B00035PW) along Puerto Princesa South Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003087",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Mambaling Flyover (B00626CB) along N Bacalso Ave (Cebu South Rd)",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Mambaling Flyover (B00626CB) along N Bacalso Ave (Cebu South Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0286-003248",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Mapatong Br. (B00553LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Mapatong Br. (B00553LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003309",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "San Vicente Br. (B01101LZ) along Cagayan Valley Rd (Magapit-Jct Aparri Airport Sect)",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "San Vicente Br. (B01101LZ) along Cagayan Valley Rd (Magapit-Jct Aparri Airport Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0289-003326",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Tamlang Br. (B00118PW) along Puerto Princesa South Rd",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Tamlang Br. (B00118PW) along Puerto Princesa South Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0290-003333",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Balucuan Parallel Br. along Iloilo-Capiz Rd (New Route)",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Balucuan Parallel Br. along Iloilo-Capiz Rd (New Route)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0290-003335",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Talaba Parallel Br. along Capiz-Aklan Rd",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Talaba Parallel Br. along Capiz-Aklan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0292-003374",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Dal-as Br. (B01222MN) along Gingoog-Claveria-Villanueva Rd",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Dal-as Br. (B01222MN) along Gingoog-Claveria-Villanueva Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0292-003376",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Tadia Br. (B01418MN) along Benigno S. Aquino Jr. National Highway",
      "office": "Davao de Oro 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Tadia Br. (B01418MN) along Benigno S. Aquino Jr. National Highway",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0292-003378",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Basak Parallel Br. along Saturnino R. Silva Rd",
      "office": "Davao del Norte 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Basak Parallel Br. along Saturnino R. Silva Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0295-003434",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Pagnamitan Br. Along Guiuan-Sulangan Peninsula Road",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "295",
      "lengthEvidence": "Pagnamitan Br. Along Guiuan-Sulangan Peninsula Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0416-005788",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Danglas Road, Sta. 0+000 - Sta. 1+000, Danglas, Abra",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Rehabilitation of Danglas Road, Sta. 0+000 - Sta. 1+000, Danglas, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 2.0,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0439-006243",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Amai Manabilang Road, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Construction of Amai Manabilang Road, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0441-006275",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Piagapo to Pantao Ragat Provincial Road, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Piagapo to Pantao Ragat Provincial Road, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0444-006333",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 7 Upper Mantalaki to Purok 6 Lower Mantalaki, Barangay Darapuay, Bansalan, Davao del Sur",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "444",
      "lengthEvidence": "Construction of Road, Purok 7 Upper Mantalaki to Purok 6 Lower Mantalaki, Barangay Darapuay, Bansalan, Davao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0445-006353",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Datu Paglas-Columbio-Matanao Road, Sta. 2+500-Sta. 5+500, Columbio, Sultan Kudarat",
      "office": "Central Office",
      "amountPesos": 50000000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16666666.67,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 16666.67,
      "rangesMeters": [
        [
          2500.0,
          5500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Improvement of Datu Paglas-Columbio-Matanao Road, Sta. 2+500-Sta. 5+500, Columbio, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.53,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0450-006438",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Network including Laterals at Barangay Sta. Elena (C. Cruz St., Deguangco St., Zapatero St.), Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "450",
      "lengthEvidence": "Rehabilitation of Road Network including Laterals at Barangay Sta. Elena (C. Cruz St., Deguangco St., Zapatero St.), Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0451-006462",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road and Drainage System with Retarding Pool at BF Homes Phase 1, Barangay 169, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Improvement of Road and Drainage System with Retarding Pool at BF Homes Phase 1, Barangay 169, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006592",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Ugong Norte Quezon City",
      "office": "Quezon City 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Rehabilitation of Road, Barangay Ugong Norte Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006608",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Roads and Drainage System at Barangay 829, Zone 90 and Vicinity Sta. 0 - Sta. 520, Manila City",
      "office": "South Manila District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Roads and Drainage System at Barangay 829, Zone 90 and Vicinity Sta. 0 - Sta. 520, Manila City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006609",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Roads and Drainage System, Zone 92 & 93, Manila City, Sta. 0 - Sta. 670",
      "office": "South Manila District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Roads and Drainage System, Zone 92 & 93, Manila City, Sta. 0 - Sta. 670",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006702",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Manarang,Vintar, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Road, Barangay Manarang,Vintar, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006724",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Pias Norte-Barangay Anggapang Road, Currimao. Ilocos Norte",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Rehabilitation of Road, Barangay Pias Norte-Barangay Anggapang Road, Currimao. Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006742",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Local Road, Barangay Rizal (Guinitaban-Daeng) , Tubao, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Local Road, Barangay Rizal (Guinitaban-Daeng) , Tubao, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006758",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Inabaan Norte, Rosario to Linapew Tubao, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay Inabaan Norte, Rosario to Linapew Tubao, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006805",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of New Bridge, Barangay Siapar, Anda, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of New Bridge, Barangay Siapar, Anda, Pangasinan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006817",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangays Pita - Babuyan, Infanta, Pangasinan, Segment 1 - Start 15.884068, 120.053760 End 15.885816, 120.032157 Segment 2 - Start 15.866220, 120.040878 End 15.876220, 120.036240 Segment 3 - Start 15.878897, 120.032413 End 15.837179, 120.001178",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, Barangays Pita - Babuyan, Infanta, Pangasinan, Segment 1 - Start 15.884068, 120.053760 End 15.885816, 120.032157 Segment 2 - Start 15.866220, 120.040878 End 15.876220, 120.036240 Segment 3 - Start 15.878897, 120.032413 End 15.837179, 120.001178",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006866",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Replacement of Bonuan Boquig Bridge, Barangay Bonuan Boquig, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Replacement of Bonuan Boquig Bridge, Barangay Bonuan Boquig, Dagupan City, Pangasinan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006926",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tomana West - Barangay Tomana East, Rosales, Pangasinan, 15.8950, 120.61638889",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay Tomana West - Barangay Tomana East, Rosales, Pangasinan, 15.8950, 120.61638889",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006945",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Cabangaran - Barangay Casantamaria-an, Barangay Bantog - Barangay Alac, Barangay Zone 3, Barangay Casantamaria-an, Barangay Baligayan, San Quintin, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Rehabilitation of Road, Barangay Cabangaran - Barangay Casantamaria-an, Barangay Bantog - Barangay Alac, Barangay Zone 3, Barangay Casantamaria-an, Barangay Baligayan, San Quintin, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006968",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Ababeng-Domeguiay Road, La Paz and Danglas, Abra",
      "office": "Abra District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Rehabilitation of Ababeng-Domeguiay Road, La Paz and Danglas, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006969",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Budac-Tiker-Gaddani Road, Tayum, Abra",
      "office": "Abra District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Construction of Budac-Tiker-Gaddani Road, Tayum, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006970",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bulbulala-Isit Road, La Paz and Dolores, Abra",
      "office": "Abra District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Construction of Bulbulala-Isit Road, La Paz and Dolores, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006971",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Canan-Lagayan Road to Baybayatin, La Paz and Lagayan, Abra,",
      "office": "Abra District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Rehabilitation of Canan-Lagayan Road to Baybayatin, La Paz and Lagayan, Abra,",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006972",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Garreta-Laskig-San Diego Road, Pidigan, Abra",
      "office": "Abra District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Rehabilitation of Garreta-Laskig-San Diego Road, Pidigan, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006973",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Poblacion-Pulot-Kiwas Road, Lagayan, Abra",
      "office": "Abra District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Rehabilitation of Poblacion-Pulot-Kiwas Road, Lagayan, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006974",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sidongan-Damulog-Danglas Road, Danglas, Abra",
      "office": "Abra District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Construction of Sidongan-Damulog-Danglas Road, Danglas, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006976",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting/Improvement of Sitio Bayugao, Barangay Turod-Barangay Lappa Road, Barangay Turod, Luna, Apayao",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Concreting/Improvement of Sitio Bayugao, Barangay Turod-Barangay Lappa Road, Barangay Turod, Luna, Apayao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006978",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Marag-Macalino Road, Barangay Marag , Luna and Macalino, Calanasan, Apayao",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Improvement of Marag-Macalino Road, Barangay Marag , Luna and Macalino, Calanasan, Apayao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-006995",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Newly-Opened Road from Sitio Besil, Barangay Gumatdang to Sitio Maligaya, Barangay Poblacion, Itogon, Benguet",
      "office": "Benguet 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Improvement of Newly-Opened Road from Sitio Besil, Barangay Gumatdang to Sitio Maligaya, Barangay Poblacion, Itogon, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-006996",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Anovang-Domolpos at Barangay Tinongdan, Itogon, Benguet",
      "office": "Benguet 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Improvement of Road along Anovang-Domolpos at Barangay Tinongdan, Itogon, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-006997",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road from Petican-Camiling-Camisong to National Road at Barangay Loacan, Itogon, Benguet",
      "office": "Benguet 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Improvement of Road from Petican-Camiling-Camisong to National Road at Barangay Loacan, Itogon, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-007001",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Madaymen-Namul-acan-Masala Access Road, Madaymen, Kibungan, Benguet",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Improvement of Madaymen-Namul-acan-Masala Access Road, Madaymen, Kibungan, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007021",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Montabiong-Banao Road, Sta. 14+000 - Sta. 15+500, Lagawe, Ifugao",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          14000.0,
          15500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Construction of Montabiong-Banao Road, Sta. 14+000 - Sta. 15+500, Lagawe, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.38,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0480-007049",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bullaguiyan, Dao, Cagaluan- Balbalan Proper Access Road, Barangays Balbalan Proper and Cagaluan, Balbalan, Pasil, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Bullaguiyan, Dao, Cagaluan- Balbalan Proper Access Road, Barangays Balbalan Proper and Cagaluan, Balbalan, Pasil, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0490-007286",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Barangay Road, Barangay Centro, Sto. Tomas, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Rehabilitation of Barangay Road, Barangay Centro, Sto. Tomas, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007397",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Andabuen-Ara-Capuseran Road, Barangay Andabuen-Ara-Capuseran, Benito Soliven, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Andabuen-Ara-Capuseran Road, Barangay Andabuen-Ara-Capuseran, Benito Soliven, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007407",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Villa Paz, Naguilian, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Barangay Road, Barangay Villa Paz, Naguilian, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007411",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Dimalicu-lico Concrete Bridge at Barangay Dimalicu-lico, Palanan, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Dimalicu-lico Concrete Bridge at Barangay Dimalicu-lico, Palanan, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007420",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Guibang, Gamu, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Construction of Road, Barangay Guibang, Gamu, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007427",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Eco Tourism Road at Camp Vizcarra General Aguinaldo to San Miguel, Ramon, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Rehabilitation of Eco Tourism Road at Camp Vizcarra General Aguinaldo to San Miguel, Ramon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007428",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Junction Provincial Road, Barangay Bunnay to Barangay Lourdes, Angadanan, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Rehabilitation of Junction Provincial Road, Barangay Bunnay to Barangay Lourdes, Angadanan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0499-007470",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Bimmangon, Quirino, Cordon, Isabela, Start 16.677307, 121.455863 End 16.685358, 121.453510",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sitio Bimmangon, Quirino, Cordon, Isabela, Start 16.677307, 121.455863 End 16.685358, 121.453510",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0500-007480",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction and Rehabilitation of Roads, San Fabian, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction and Rehabilitation of Roads, San Fabian, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0500-007497",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Capirpirwan, Cordon, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Road in Barangay Capirpirwan, Cordon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007512",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rizal Bridge Phase 1, Rizal, San Guillermo, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Rizal Bridge Phase 1, Rizal, San Guillermo, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007513",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Burgos - Sitio Dimmalama Bridge Phase 1, Burgos, San Guillermo, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Burgos - Sitio Dimmalama Bridge Phase 1, Burgos, San Guillermo, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007538",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Miguel, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Barangay San Miguel, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0509-007683",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Bulakan - Guiguinto via Balubad Road, Sta. 0+000 - Sta. 1+200, Bulakan, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          1200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Rehabilitation of Bulakan - Guiguinto via Balubad Road, Sta. 0+000 - Sta. 1+200, Bulakan, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.67,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0509-007689",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Pandi-Angat Road, Sta. 0+100 - Sta. 1+100, Pandi, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          100.0,
          1100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Rehabilitation of Pandi-Angat Road, Sta. 0+100 - Sta. 1+100, Pandi, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 2.0,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0512-007748",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Pinagtulayan Bridge, Norzagaray, Bulacan (121.053702, 14.917442)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "512",
      "lengthEvidence": "Construction (Completion) of Pinagtulayan Bridge, Norzagaray, Bulacan (121.053702, 14.917442)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0515-007801",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Linawan Rd., Barangay Dulong Bayan, City of San Jose Del Monte, Bulacan (121.026121, 14.822209)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Construction of Road, Linawan Rd., Barangay Dulong Bayan, City of San Jose Del Monte, Bulacan (121.026121, 14.822209)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0515-007803",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Jose - Sta. Maria Road, City of San Jose del Monte, Bulacan (121.036385, 14.842143)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Construction of Road, San Jose - Sta. Maria Road, City of San Jose del Monte, Bulacan (121.036385, 14.842143)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0515-007812",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation / Improvement of Road, Area I, Barangays San Martin de Porres, Assumption, Sto. Nino I, Sto. Nino II and Lawang Pare, City of San Jose Del Monte, Bulacan (121.066268, 14.863264)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Rehabilitation / Improvement of Road, Area I, Barangays San Martin de Porres, Assumption, Sto. Nino I, Sto. Nino II and Lawang Pare, City of San Jose Del Monte, Bulacan (121.066268, 14.863264)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0515-007814",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road along Balasing to Catmon Road (Sta. 00+000 - Sta. 02+030), Sta. Maria, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24630541.87,
      "lengthMeters": 2030.0,
      "allocationPerStatedMeter": 24630.54,
      "rangesMeters": [
        [
          0.0,
          2030.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Rehabilitation of Road along Balasing to Catmon Road (Sta. 00+000 - Sta. 02+030), Sta. Maria, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.02,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0515-007815",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Matictic Bridge 2 (Bayumbon Bridge), Norzagaray, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Construction of Matictic Bridge 2 (Bayumbon Bridge), Norzagaray, Bulacan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0515-007816",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road along Norzagaray - San Jose Road, Norzagaray, Bulacan (Sta. 00+000 - Sta, 02+030)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Rehabilitation of Road along Norzagaray - San Jose Road, Norzagaray, Bulacan (Sta. 00+000 - Sta, 02+030)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0516-007817",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road along Tigbe - Balasing - Pulong Buhangin Road (Sta. 00+000 - Sta. 02 + 03) Santa Maria, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.003,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24962556.17,
      "lengthMeters": 2003.0,
      "allocationPerStatedMeter": 24962.56,
      "rangesMeters": [
        [
          0.0,
          2003.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road along Tigbe - Balasing - Pulong Buhangin Road (Sta. 00+000 - Sta. 02 + 03) Santa Maria, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.03,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0516-007818",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Patag - Barangay Bulac, (Santa Maria - San Jose Road) Santa Maria, Bulacan (Sta. 00+000 - Sta. 02+030)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24630541.87,
      "lengthMeters": 2030.0,
      "allocationPerStatedMeter": 24630.54,
      "rangesMeters": [
        [
          0.0,
          2030.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road at Barangay Patag - Barangay Bulac, (Santa Maria - San Jose Road) Santa Maria, Bulacan (Sta. 00+000 - Sta. 02+030)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.02,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0516-007821",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage, Barangay Dulong Bayan, City of San Jose del Monte, Bulacan (14.828343, 121.040905)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road with Drainage, Barangay Dulong Bayan, City of San Jose del Monte, Bulacan (14.828343, 121.040905)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0516-007822",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with drainage, Barangay Minuyan Proper, City of San Jose Del Monte, Bulacan (121.080917, 14.836105)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road with drainage, Barangay Minuyan Proper, City of San Jose Del Monte, Bulacan (121.080917, 14.836105)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0516-007823",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage, Barangay Muzon East, City of San Jose del Monte, Bulacan (121.039698, 14.810883)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road with Drainage, Barangay Muzon East, City of San Jose del Monte, Bulacan (121.039698, 14.810883)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0516-007826",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Area A, Barangay Minuyan, City of San Jose Del Monte, Bulacan (121.074213, 14.846183)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road, Area A, Barangay Minuyan, City of San Jose Del Monte, Bulacan (121.074213, 14.846183)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0516-007827",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Area B, Barangay Bagong Buhay City of San Jose Del Monte, Bulacan (121.057753, 14.853254)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road, Area B, Barangay Bagong Buhay City of San Jose Del Monte, Bulacan (121.057753, 14.853254)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0516-007828",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Area C, Barangay San Martin, City of San Jose Del Monte, Bulacan (121.057887, 14.859846)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road, Area C, Barangay San Martin, City of San Jose Del Monte, Bulacan (121.057887, 14.859846)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0516-007829",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Area D, Barangay Sta. Cruz, City of San Jose Del Monte, Bulacan (121.052012, 14.855548)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road, Area D, Barangay Sta. Cruz, City of San Jose Del Monte, Bulacan (121.052012, 14.855548)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0516-007834",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Tubigan Rd., Barangay Gaya-Gaya, City of San Jose Del Monte, Bulacan (121.046324, 14.796644)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road, Tubigan Rd., Barangay Gaya-Gaya, City of San Jose Del Monte, Bulacan (121.046324, 14.796644)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0525-008016",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Cambasi Bridge including approaches, Masantol, Pampanga, Sta. 0+000- Sta. 192.80",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Construction (Completion) of Cambasi Bridge including approaches, Masantol, Pampanga, Sta. 0+000- Sta. 192.80",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0525-008017",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of San Juan Bridge including approaches, San Luis, Pampanga, Sta.0+000 - Sta.145.80",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Construction (Completion) of San Juan Bridge including approaches, San Luis, Pampanga, Sta.0+000 - Sta.145.80",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0528-008102",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Isidro, Sta. Rita, Pampanga",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Construction of Road, Barangay San Isidro, Sta. Rita, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0532-008167",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Drainage along Monastery Road at Barangay San Miguel-La Paz-San Isidro-Sto. Rosario, Magalang, Pampanga",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Construction of Drainage along Monastery Road at Barangay San Miguel-La Paz-San Isidro-Sto. Rosario, Magalang, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0535-008237",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Improvement Jct. Olongapo-Bugallon Road to Barangay Balincaguing, San Felipe, Zambales Sta. 0+000 - Sta. 2+000",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Road Improvement Jct. Olongapo-Bugallon Road to Barangay Balincaguing, San Felipe, Zambales Sta. 0+000 - Sta. 2+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.04,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0536-008243",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Subic Market, Sta. 0+000 - Sta. 550, Sta. 0+000 - Sta. 0+056, Sta. 0+000 - Sta. 0+098, Barangay Baraca-Camachille, Subic, Zambales",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          56.0
        ],
        [
          0.0,
          98.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Road and Drainage at Subic Market, Sta. 0+000 - Sta. 550, Sta. 0+000 - Sta. 0+056, Sta. 0+000 - Sta. 0+098, Barangay Baraca-Camachille, Subic, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0536-008247",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of access road along Castillejos Market , Sta. 0+ 000 - Sta. 0+322,Sta. 0+ 000 - Sta. 0+350,Barangay San Agustin, Castillejos, Zambales",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 142857142.86,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 142857.14,
      "rangesMeters": [
        [
          0.0,
          322.0
        ],
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of access road along Castillejos Market , Sta. 0+ 000 - Sta. 0+322,Sta. 0+ 000 - Sta. 0+350,Barangay San Agustin, Castillejos, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 5.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0537-008266",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Malabnig, Barangay Balatbat, Lobo, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Sitio Malabnig, Barangay Balatbat, Lobo, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008299",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Dalig to San Pedro, Batangas City, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Construction of Bridge, Barangay Dalig to San Pedro, Batangas City, Batangas",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0544-008434",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at BarangayMalagasang 2A to Malagasang 1G, Imus, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road at BarangayMalagasang 2A to Malagasang 1G, Imus, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0544-008439",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Connecting Barangay Luciano and Barangay Aguado, Trece Martires City, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road Connecting Barangay Luciano and Barangay Aguado, Trece Martires City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0544-008441",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage connecting to Imus Integrated School, Sta. 01 + 203 - Sta. 01 + 779, Barangay Pasong Buaya, Imus, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.576,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 86805555.56,
      "lengthMeters": 576.0,
      "allocationPerStatedMeter": 86805.56,
      "rangesMeters": [
        [
          1203.0,
          1779.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road with Drainage connecting to Imus Integrated School, Sta. 01 + 203 - Sta. 01 + 779, Barangay Pasong Buaya, Imus, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 3.55,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0546-008473",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Batino Overpass Bridge along South Luzon Expressway (SLEX) (Westbound) including approaches, Barangay Prinza, Calamba City, Laguna",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Construction of Batino Overpass Bridge along South Luzon Expressway (SLEX) (Westbound) including approaches, Barangay Prinza, Calamba City, Laguna",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008475",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay Macabling, Santa Rosa City, Laguna",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Construction of Road and Drainage, Barangay Macabling, Santa Rosa City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008476",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage, Southville 4, Barangay Pooc to Barangay Caingin, City of Santa Rosa, Laguna",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Rehabilitation of Roads and Drainage, Southville 4, Barangay Pooc to Barangay Caingin, City of Santa Rosa, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008548",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malabahay, Macalelon, Quezon",
      "office": "Quezon 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road, Barangay Malabahay, Macalelon, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0550-008566",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bocboc, Sta. 0+531 - Sta. 1+101, Lopez, Quezon",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.57,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 87719298.25,
      "lengthMeters": 570.0,
      "allocationPerStatedMeter": 87719.3,
      "rangesMeters": [
        [
          531.0,
          1101.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction of Road, Barangay Bocboc, Sta. 0+531 - Sta. 1+101, Lopez, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 3.58,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0551-008582",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Systems, Sitio Ondoy, Ph1 and Ph2, Barangay Muntindilaw, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Construction of Road with Drainage Systems, Sitio Ondoy, Ph1 and Ph2, Barangay Muntindilaw, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0551-008583",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with drainge, Canumay to Casunugan, Barangay San Jose, Antipolo City 2nd L.D.",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Construction of Road with drainge, Canumay to Casunugan, Barangay San Jose, Antipolo City 2nd L.D.",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008606",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Cawit, Boac, Marinduque",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Rehabilitation of Road, Barangay Cawit, Boac, Marinduque",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008609",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Sitio Oma, Barangay Poblacion, Magsaysay, Occidental Mindoro",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Concrete Road, Sitio Oma, Barangay Poblacion, Magsaysay, Occidental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008676",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction/Improvement of Bantulan - Sandoval Airport Access Road, Taytay, Palawan",
      "office": "Palawan 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction/Improvement of Bantulan - Sandoval Airport Access Road, Taytay, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008713",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Kabaliwan-Victoria Access Road, Sta 0+000- 1+120. Barangay Bachawan, San Agustin & Victoria, San Andres, Romblon",
      "office": "Romblon District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.12,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44642857.14,
      "lengthMeters": 1120.0,
      "allocationPerStatedMeter": 44642.86,
      "rangesMeters": [
        [
          0.0,
          1120.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Kabaliwan-Victoria Access Road, Sta 0+000- 1+120. Barangay Bachawan, San Agustin & Victoria, San Andres, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.79,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0556-008715",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Mat - i to Agojo Access Road, Sta. 1+450 - 2+560, Barangay Mat-I, Santa Fe & Barangay Agjo, Looc, Romblon",
      "office": "Romblon District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.11,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45045045.05,
      "lengthMeters": 1110.0,
      "allocationPerStatedMeter": 45045.05,
      "rangesMeters": [
        [
          1450.0,
          2560.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Mat - i to Agojo Access Road, Sta. 1+450 - 2+560, Barangay Mat-I, Santa Fe & Barangay Agjo, Looc, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.8,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0559-008778",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Tablon - Cagmanaba, Oas, Albay",
      "office": "Albay 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Construction of Road at Barangay Tablon - Cagmanaba, Oas, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0562-008833",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sibobo, Calabanga, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction of Road, Barangay Sibobo, Calabanga, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0562-008836",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Pagatpat- Bigaas Road, BarangayPagatpat and Barangay Bigaas, Calabanga,Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction of Pagatpat- Bigaas Road, BarangayPagatpat and Barangay Bigaas, Calabanga,Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0562-008837",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Pili-Curry Road (Barangay San Vicente and Santiago Section), Pili, Camarines",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction of Pili-Curry Road (Barangay San Vicente and Santiago Section), Pili, Camarines",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008863",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay De La Fe and Barangay Salvacion, Buhi, Camarines Sur",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Concreting of Road, Barangay De La Fe and Barangay Salvacion, Buhi, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0564-008882",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ipil to Barangay Lahong, San Fernando, Masbate Sta. 1 +200 - Sta. 1 + 900",
      "office": "Masbate 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 71428571.43,
      "lengthMeters": 700.0,
      "allocationPerStatedMeter": 71428.57,
      "rangesMeters": [
        [
          1200.0,
          1900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Road, Barangay Ipil to Barangay Lahong, San Fernando, Masbate Sta. 1 +200 - Sta. 1 + 900",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 2.92,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0565-008905",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of By-pass Road, Cagang to Luneta Section, Barcelona, Sorsogon",
      "office": "Sorsogon 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of By-pass Road, Cagang to Luneta Section, Barcelona, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0565-008907",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at A. Bonifacio to Somagongsong, Bulan, Sorsogon, Sta. 0+000 - Sta. 2+000",
      "office": "Sorsogon 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Road at A. Bonifacio to Somagongsong, Bulan, Sorsogon, Sta. 0+000 - Sta. 2+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.04,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0565-008908",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Proctol - San Jose - Dancalan Road, Bulusan, Sorsogon, Sta. 0+000 - Sta. 2+000",
      "office": "Sorsogon 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Concreting of Proctol - San Jose - Dancalan Road, Bulusan, Sorsogon, Sta. 0+000 - Sta. 2+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.04,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0565-008909",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction og Bacolod - Putting Sapa - Añog - Rangas Road, Juban, Sorsogon Sta. 0+000 - Sta. 2+000",
      "office": "Sorsogon 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction og Bacolod - Putting Sapa - Añog - Rangas Road, Juban, Sorsogon Sta. 0+000 - Sta. 2+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.04,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0566-008920",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pawala - Barangay Cabugao, Donsol, Sorsogon",
      "office": "Sorsogon District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Road, Barangay Pawala - Barangay Cabugao, Donsol, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008967",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Balighot to Barangay Cabungahan, Maayon, Capiz",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction of Road, Barangay Balighot to Barangay Cabungahan, Maayon, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008972",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cubay to Barangay Bayuyan, President Roxas, Capiz",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction of Road, Barangay Cubay to Barangay Bayuyan, President Roxas, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008973",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Pedro to Barangay Sta. Fe. Pilar, Capiz",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction of Road, Barangay San Pedro to Barangay Sta. Fe. Pilar, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0570-009013",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Piña-Suclaran Road, Sta. 1 + 000 - Sta. 3 +500, Barangay Piña, Buenavista and Barangay Suclaran, San Lorenzo, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 2500.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          1000.0,
          3500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Rehabilitation of Piña-Suclaran Road, Sta. 1 + 000 - Sta. 3 +500, Barangay Piña, Buenavista and Barangay Suclaran, San Lorenzo, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0572-009055",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Balaguiao Bridge, Station 0 + 000 - Station 0 + 075, Barangay Balaguiao, Lambunao, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.075,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 666666666.67,
      "lengthMeters": 75.0,
      "allocationPerStatedMeter": 666666.67,
      "rangesMeters": [
        [
          0.0,
          75.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Balaguiao Bridge, Station 0 + 000 - Station 0 + 075, Barangay Balaguiao, Lambunao, Iloilo",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 1.1,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0575-009110",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 0- Sta. 580, Sta. 3+470 - Sta. 4+738) Jct. Ruins to Banoceh, Talisay, Negros Occidental (10.7150581, 122.9615514)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.268,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39432176.66,
      "lengthMeters": 1268.0,
      "allocationPerStatedMeter": 39432.18,
      "rangesMeters": [
        [
          3470.0,
          4738.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road (Sta. 0- Sta. 580, Sta. 3+470 - Sta. 4+738) Jct. Ruins to Banoceh, Talisay, Negros Occidental (10.7150581, 122.9615514)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.58,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0578-009181",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of San Miguel-Haguimit Overflow Bridge in Barangay San Miguel and Barangay Haguimit, La Carlota City, Negros Occidental",
      "office": "Negros Occidental 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of San Miguel-Haguimit Overflow Bridge in Barangay San Miguel and Barangay Haguimit, La Carlota City, Negros Occidental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009182",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Tabidiao Bridge in Barangay Mailum, Bago City, Negros Occidental",
      "office": "Negros Occidental 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Tabidiao Bridge in Barangay Mailum, Bago City, Negros Occidental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009280",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Camias-Sohoton Road connecting Tagbilaran North Road and Ubujan- Camias Provincial Road, Calape, Bohol Sta. 000+000 - Sta. 001+300",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38461538.46,
      "lengthMeters": 1300.0,
      "allocationPerStatedMeter": 38461.54,
      "rangesMeters": [
        [
          0.0,
          1300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Construction of Camias-Sohoton Road connecting Tagbilaran North Road and Ubujan- Camias Provincial Road, Calape, Bohol Sta. 000+000 - Sta. 001+300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.54,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0583-009281",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bayacabac-Tinibgan (Maribojoc)-Obujan-Tagubaas (Antequera) Provincial Road, Maribojoc and Antequera, Bohol Sta. 000+000 - Sta. 001+300",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38461538.46,
      "lengthMeters": 1300.0,
      "allocationPerStatedMeter": 38461.54,
      "rangesMeters": [
        [
          0.0,
          1300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Construction of Bayacabac-Tinibgan (Maribojoc)-Obujan-Tagubaas (Antequera) Provincial Road, Maribojoc and Antequera, Bohol Sta. 000+000 - Sta. 001+300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.54,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0590-009454",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure, Barangay Sapangdaku, Cebu City, Cebu",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction of Road Slope Protection Structure, Barangay Sapangdaku, Cebu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009455",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Nazareth, Barangay Buhisan, Cebu City, Cebu",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction of Road, Sitio Nazareth, Barangay Buhisan, Cebu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009459",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction/Improvement of Road, Barangay Lucsoon to Barangay Imelda, Naval, Biliran (Sta. 0 + 850 - Sta. 2 + 150)",
      "office": "Biliran District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38461538.46,
      "lengthMeters": 1300.0,
      "allocationPerStatedMeter": 38461.54,
      "rangesMeters": [
        [
          850.0,
          2150.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction/Improvement of Road, Barangay Lucsoon to Barangay Imelda, Naval, Biliran (Sta. 0 + 850 - Sta. 2 + 150)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.54,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0591-009473",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malaintos to Barangay Dapdap, Dolores, Eastern Samar (Sta. 0+000 - Sta. 0+750)",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66666666.67,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 66666.67,
      "rangesMeters": [
        [
          0.0,
          750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Construction of Road, Barangay Malaintos to Barangay Dapdap, Dolores, Eastern Samar (Sta. 0+000 - Sta. 0+750)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 3.43,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0592-009490",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Del Remedio - Can-aybong, Sulat, Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Rehabilitation of Road, Barangay Del Remedio - Can-aybong, Sulat, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0593-009522",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Slope Protection connecting Bridge Approach of Calaguise Br. Along Sambulawan JCT-Calaguise-Calubian Rd",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Road with Slope Protection connecting Bridge Approach of Calaguise Br. Along Sambulawan JCT-Calaguise-Calubian Rd",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0594-009543",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Sta. 2 + 290 - Sta. 3 + 700, Barangay Montealegre, Isabel, Leyte",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.41,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35460992.91,
      "lengthMeters": 1410.0,
      "allocationPerStatedMeter": 35460.99,
      "rangesMeters": [
        [
          2290.0,
          3700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Construction of Concrete Road, Sta. 2 + 290 - Sta. 3 + 700, Barangay Montealegre, Isabel, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.42,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0595-009544",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Sta. 0+130 - Sta. 1+380, Barangay Liberty, Ormoc City, Leyte",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 1250.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          130.0,
          1380.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Concrete Road, Sta. 0+130 - Sta. 1+380, Barangay Liberty, Ormoc City, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.6,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0595-009547",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Sta. 0+130 - Sta. 1+630, Barangay Liberty, Ormoc City, Leyte",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          130.0,
          1630.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Concrete Road, Sta. 0+130 - Sta. 1+630, Barangay Liberty, Ormoc City, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.38,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0596-009577",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Junction Himay-angan-Silago-Abuyog Boundary Road (Kikilo-San Roque-Sta. Lucia), Sta. 0+000 - 4+570, Abuyog, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 4.57,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10940919.04,
      "lengthMeters": 4570.0,
      "allocationPerStatedMeter": 10940.92,
      "rangesMeters": [
        [
          0.0,
          4570.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Junction Himay-angan-Silago-Abuyog Boundary Road (Kikilo-San Roque-Sta. Lucia), Sta. 0+000 - 4+570, Abuyog, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.35,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0596-009585",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Palapag Diversion Road (Sta. 1+350 - Sta.1+600.50), Palapag, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.2505,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 199600798.4,
      "lengthMeters": 250.5,
      "allocationPerStatedMeter": 199600.8,
      "rangesMeters": [
        [
          1350.0,
          1600.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Palapag Diversion Road (Sta. 1+350 - Sta.1+600.50), Palapag, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 6.99,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0597-009588",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Onay - Barangay Aroganga, Laoang, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Road, Barangay Onay - Barangay Aroganga, Laoang, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0597-009605",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Slope Protection Structure along Arteche, Barangay Catumsan-Jipapad- Las Navas-Catubig-Rawis Road (Sta. 9+560 - Sta. 9+640), Barangay Dolores, Las Navas, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.08,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 625000000.0,
      "lengthMeters": 80.0,
      "allocationPerStatedMeter": 625000.0,
      "rangesMeters": [
        [
          9560.0,
          9640.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Slope Protection Structure along Arteche, Barangay Catumsan-Jipapad- Las Navas-Catubig-Rawis Road (Sta. 9+560 - Sta. 9+640), Barangay Dolores, Las Navas, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 17.68,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0600-009646",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malino to Barangay Jidanao to Barangay Nagbac to Barangay Casapa, Jiabong Samar (Sta. 1 + 333.5 - Sta. 2+200)",
      "office": "Samar 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.8665,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 57703404.5,
      "lengthMeters": 866.5,
      "allocationPerStatedMeter": 57703.4,
      "rangesMeters": [
        [
          1333.5,
          2200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Construction of Road, Barangay Malino to Barangay Jidanao to Barangay Nagbac to Barangay Casapa, Jiabong Samar (Sta. 1 + 333.5 - Sta. 2+200)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 2.97,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0600-009648",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Junction National Highway - Ubit Elementary School to Barangay Buahan Road, Barangay Buahan, Lamitan City, Basilan Province",
      "office": "Isabela City District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Construction of Road at Junction National Highway - Ubit Elementary School to Barangay Buahan Road, Barangay Buahan, Lamitan City, Basilan Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0600-009649",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gulangan to Barangay Patao, Maimbung, Sulu, Sta. 00+000 to 01+500",
      "office": "Sulu 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          0.0,
          1500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Construction of Road, Barangay Gulangan to Barangay Patao, Maimbung, Sulu, Sta. 00+000 to 01+500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.38,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0600-009650",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lower Tambaking, Maimbung, Sulu Sta. 00+000 to Sta. 01+500",
      "office": "Sulu 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          0.0,
          1500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Construction of Road, Barangay Lower Tambaking, Maimbung, Sulu Sta. 00+000 to Sta. 01+500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.38,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0600-009651",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Upper Tambaking, Maimbung, Sulu Sta. 00+500 to Sta. 02+000",
      "office": "Sulu 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          500.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Construction of Road, Barangay Upper Tambaking, Maimbung, Sulu Sta. 00+500 to Sta. 02+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.38,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0600-009652",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Darul Jambangan, Maimbung, Sulu Sta 00+000 to Sta. 1+700",
      "office": "Sulu 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          1700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Rehabilitation of Road, Barangay Darul Jambangan, Maimbung, Sulu Sta 00+000 to Sta. 1+700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.22,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0600-009654",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Tandu Patong, Maimbung, Sulu Sta. 00+300 to Sta. 02+000",
      "office": "Sulu 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          300.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Rehabilitation of Road, Barangay Tandu Patong, Maimbung, Sulu Sta. 00+300 to Sta. 02+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.22,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0600-009655",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Tubig Samin, Maimbung, Sulu Sta. 00+000 to Sta. 01+700",
      "office": "Sulu 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          1700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Rehabilitation of Road, Barangay Tubig Samin, Maimbung, Sulu Sta. 00+000 to Sta. 01+700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.22,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0600-009657",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Kahikukuk to Barangay Tambunbun Circumferential Road, Banguingui, Sulu",
      "office": "Sulu 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Construction of Road, Barangay Kahikukuk to Barangay Tambunbun Circumferential Road, Banguingui, Sulu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0600-009662",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Blumentritt St. Corner Aseniero St. To Calamocso Bridge, Barangay Linabo, Dapitan City, Zamboanga del Norte",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Construction of Road, Blumentritt St. Corner Aseniero St. To Calamocso Bridge, Barangay Linabo, Dapitan City, Zamboanga del Norte",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009667",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Calamocso Br. Barangay Linabo to Blumentritt St., Dapitan City, Zamboanga del Norte",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Calamocso Br. Barangay Linabo to Blumentritt St., Dapitan City, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009673",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bulawan-Barangay Fimagas, Katipunan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Barangay Bulawan-Barangay Fimagas, Katipunan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009739",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Maragang to Lourdes, Tigbao, Zamboanga del Sur, Start 7.862135, 123.261848 End 7.870630, 123.268770",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road Maragang to Lourdes, Tigbao, Zamboanga del Sur, Start 7.862135, 123.261848 End 7.870630, 123.268770",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009775",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, New Sagay-Taruc-Santo Rosario-San Isidro Road, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of Access Road, New Sagay-Taruc-Santo Rosario-San Isidro Road, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009776",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Sta Clara, Naga - Barangay Banker, Kabasalan, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of Access Road, Barangay Sta Clara, Naga - Barangay Banker, Kabasalan, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009777",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Upper Tungawan - Langon- San Vicente - Sto. Niño- Lower Tungawan Road, Tungawan, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of Access Road, Upper Tungawan - Langon- San Vicente - Sto. Niño- Lower Tungawan Road, Tungawan, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009784",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bugwak Bridge along Dangcagan-Bugwak-Kadingilan, Bukidnon Bypass Road, Barangay Bugwak Section, Sta. 9+960 - Sta. 10+110, Dangcagan, Bukidnon",
      "office": "Bukidnon 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 150.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          9960.0,
          10110.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of Bugwak Bridge along Dangcagan-Bugwak-Kadingilan, Bukidnon Bypass Road, Barangay Bugwak Section, Sta. 9+960 - Sta. 10+110, Dangcagan, Bukidnon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009858",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Upper Kanangkaan, Barangay Tupsan, Mambajao to Sitio Mapa, Barangay Tupsan Pequeño, Mahinog, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Construction of Road, Upper Kanangkaan, Barangay Tupsan, Mambajao to Sitio Mapa, Barangay Tupsan Pequeño, Mahinog, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009859",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Upper Kanangkaan-Mangapol-Kasaya, Barangay Tupsan, Mambajao, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Construction of Road, Upper Kanangkaan-Mangapol-Kasaya, Barangay Tupsan, Mambajao, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009862",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Catohugan-Minsua Road, Barangay Catohugan and Barangay San Isidro, Mahinog, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Rehabilitation of Catohugan-Minsua Road, Barangay Catohugan and Barangay San Isidro, Mahinog, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009866",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Sto. Niño Alternate Road, Barangay Sto. Niño, Catarman, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Rehabilitation of Sto. Niño Alternate Road, Barangay Sto. Niño, Catarman, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0611-009885",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Baranfay Maguindanao Bridge, Sultan Naga Dimaporo, Lanao del Norte",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Baranfay Maguindanao Bridge, Sultan Naga Dimaporo, Lanao del Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0612-009903",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. Cruz - Puntod, Plaridel Misamis Occidental",
      "office": "Misamis Occidental 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Road, Sta. Cruz - Puntod, Plaridel Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0612-009904",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mobod, Oroquieta City, Misamis Occidental",
      "office": "Misamis Occidental 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Road, Barangay Mobod, Oroquieta City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0612-009907",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Purok 2, Labinay to Barangay Villaba), Sta. 0+000 - Sta. 1+700, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          1700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Road (Purok 2, Labinay to Barangay Villaba), Sta. 0+000 - Sta. 1+700, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.22,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0612-009910",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Mountain Bypass Road, Casilak San Agustin - Namut Section, Sta. 0+000 - Sta. 1+700, Tudela, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          1700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Mountain Bypass Road, Casilak San Agustin - Namut Section, Sta. 0+000 - Sta. 1+700, Tudela, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.22,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0613-009911",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Stimson Abordo - Kinuman Norte, Sta. 0+000 - Sta. 1+700, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          1700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Construction of Road, Barangay Stimson Abordo - Kinuman Norte, Sta. 0+000 - Sta. 1+700, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.22,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0613-009912",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Bagakay - Cogon - Kinuman Norte - Gala Road on intermittent sections along Sta. 0+000 - Sta. 13+300, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 13.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 3759398.5,
      "lengthMeters": 13300.0,
      "allocationPerStatedMeter": 3759.4,
      "rangesMeters": [
        [
          0.0,
          13300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Improvement of Road, Bagakay - Cogon - Kinuman Norte - Gala Road on intermittent sections along Sta. 0+000 - Sta. 13+300, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.12,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0613-009914",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Purok 4 Barangay Colupan Alto - Barangay Tipan), Sta. 0+000 - Sta. 1+700, Sinacaban, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          1700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Construction of Road (Purok 4 Barangay Colupan Alto - Barangay Tipan), Sta. 0+000 - Sta. 1+700, Sinacaban, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.22,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0613-009915",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, (Purok 1 Colupan Alto - Barangay Camanse River), Sta. 0+000 - Sta. 1+700, Sinacaban, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          1700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Construction of Road, (Purok 1 Colupan Alto - Barangay Camanse River), Sta. 0+000 - Sta. 1+700, Sinacaban, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.22,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0613-009923",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, (Purok 3, Capucao P. to Dalapang), Sta. 0+000 - Sta. 1+700, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          1700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Construction of Road, (Purok 3, Capucao P. to Dalapang), Sta. 0+000 - Sta. 1+700, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.22,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0616-009984",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Concreting of Road along Barangay Bagocboc, Opol, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Road Concreting of Road along Barangay Bagocboc, Opol, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009985",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Concreting of Road along Barangay Malanang to Barangay Patag, Opol, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Road Concreting of Road along Barangay Malanang to Barangay Patag, Opol, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009987",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Basak to Barangay Magsaysay (Sta. 0+000 - Sta. 2+800), Nabunturan, Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17857142.86,
      "lengthMeters": 2800.0,
      "allocationPerStatedMeter": 17857.14,
      "rangesMeters": [
        [
          0.0,
          2800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road, Barangay Basak to Barangay Magsaysay (Sta. 0+000 - Sta. 2+800), Nabunturan, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.57,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0617-009988",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Manat (Sta. 0+000 - Sta. 0+546, Sta. 0+000 - Sta. 0+232, Sta. 0+000 - Sta. 0+160, Sta. 0+000 - Sta. 0+344, Sta. 0+000 - Sta. 0+196, Sta. 0+000 - Sta. 0+428, Sta. 0+000 - Sta. 0+300, Sta. 0+000 - Sta. 0+315, Sta. 0+000 - Sta. 0+138, Sta. 0+000 - Sta. 0+558, Sta. 0+000 - Sta. 0+530), Nabunturan, Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.558,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 89605734.77,
      "lengthMeters": 558.0,
      "allocationPerStatedMeter": 89605.73,
      "rangesMeters": [
        [
          0.0,
          546.0
        ],
        [
          0.0,
          232.0
        ],
        [
          0.0,
          160.0
        ],
        [
          0.0,
          344.0
        ],
        [
          0.0,
          196.0
        ],
        [
          0.0,
          428.0
        ],
        [
          0.0,
          300.0
        ],
        [
          0.0,
          315.0
        ],
        [
          0.0,
          138.0
        ],
        [
          0.0,
          558.0
        ],
        [
          0.0,
          530.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Road, Barangay Manat (Sta. 0+000 - Sta. 0+546, Sta. 0+000 - Sta. 0+232, Sta. 0+000 - Sta. 0+160, Sta. 0+000 - Sta. 0+344, Sta. 0+000 - Sta. 0+196, Sta. 0+000 - Sta. 0+428, Sta. 0+000 - Sta. 0+300, Sta. 0+000 - Sta. 0+315, Sta. 0+000 - Sta. 0+138, Sta. 0+000 - Sta. 0+558, Sta. 0+000 - Sta. 0+530), Nabunturan, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 3.66,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0617-009989",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Manat to Barangay Ogao (Sta. 0+000 - Sta. 2+800), Nabunturan, Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17857142.86,
      "lengthMeters": 2800.0,
      "allocationPerStatedMeter": 17857.14,
      "rangesMeters": [
        [
          0.0,
          2800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Road, Barangay Manat to Barangay Ogao (Sta. 0+000 - Sta. 2+800), Nabunturan, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.57,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0617-009990",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Matilo to Barangay Kao (Sta. 0+000 - Sta. 1+900), Nabunturan, Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.9,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26315789.47,
      "lengthMeters": 1900.0,
      "allocationPerStatedMeter": 26315.79,
      "rangesMeters": [
        [
          0.0,
          1900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Road, Barangay Matilo to Barangay Kao (Sta. 0+000 - Sta. 1+900), Nabunturan, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.09,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0617-010006",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Panansalan, (Sta. 5+820 - Sta. 6+620), Compostela, Davao de Oro",
      "office": "Davao de Oro 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 62500000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 62500.0,
      "rangesMeters": [
        [
          5820.0,
          6620.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Road, Panansalan, (Sta. 5+820 - Sta. 6+620), Compostela, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 3.22,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0618-010023",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Tagum -Maco Diversion Road, Tagum City",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Rehabilitation of Tagum -Maco Diversion Road, Tagum City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010032",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road from Barangay New Baclayon to Barangay Tagansule, Malalag, Davao del Sur",
      "office": "Davao del Sur District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Concreting of Road from Barangay New Baclayon to Barangay Tagansule, Malalag, Davao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010033",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road from Barangay New Cebu to Barangay Tanwalang, Sulop, Davao del Sur",
      "office": "Davao del Sur District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Concreting of Road from Barangay New Cebu to Barangay Tanwalang, Sulop, Davao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010034",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road from Sitio Disa to Sitio Malupo to Barangay Alegre, Bansalan, Davao del Sur",
      "office": "Davao del Sur District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Concreting of Road from Sitio Disa to Sitio Malupo to Barangay Alegre, Bansalan, Davao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010036",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Balasiao to Barangay Bulol-Salo, Kiblawan, Davao del Sur",
      "office": "Davao del Sur District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Road, Barangay Balasiao to Barangay Bulol-Salo, Kiblawan, Davao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010037",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Clib to Barangay San Guillermo, Hagonoy, to Barangay Kauswagan, Matanao, Davao del Sur",
      "office": "Davao del Sur District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Road, Barangay Clib to Barangay San Guillermo, Hagonoy, to Barangay Kauswagan, Matanao, Davao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010038",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Goma, Digos City-Sitio Bagong Silang, Managa, Sta. 8+841.896 - Sta. 9+841.896, Bansalan, Davao del Sur",
      "office": "Davao del Sur District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          8841.896,
          9841.896
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Road, Barangay Goma, Digos City-Sitio Bagong Silang, Managa, Sta. 8+841.896 - Sta. 9+841.896, Bansalan, Davao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 2.0,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0621-010073",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Takuran, Barangay Kimadzil, Carmen, Cotabato",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Road, Sitio Takuran, Barangay Kimadzil, Carmen, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010076",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Jct. Albert Morrow Blvd. (Northern Section) connecting to Purok 14, Barangay Katangawan, General Santos City, South Cotabato",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road, Jct. Albert Morrow Blvd. (Northern Section) connecting to Purok 14, Barangay Katangawan, General Santos City, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010083",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road with Drainage, Purok Balakayo, Olympog, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road with Drainage, Purok Balakayo, Olympog, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0622-010095",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Jct. By-pass Road, Barangay San Roque to Barangay Carpenter Hill connecting Marbel-Makar Road, Sta. 0+000 - Sta. 1+140 South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 43859649.12,
      "lengthMeters": 1140.0,
      "allocationPerStatedMeter": 43859.65,
      "rangesMeters": [
        [
          0.0,
          1140.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Construction of Concrete Road, Jct. By-pass Road, Barangay San Roque to Barangay Carpenter Hill connecting Marbel-Makar Road, Sta. 0+000 - Sta. 1+140 South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.75,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0622-010096",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road-Jct. National Highway Tantangan-Norala By-pass Road, Sta. 1+818 - Sta. 4+018 South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 2200.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          1818.0,
          4018.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Construction of Concrete Road-Jct. National Highway Tantangan-Norala By-pass Road, Sta. 1+818 - Sta. 4+018 South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.94,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0622-010097",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Highway Jct. Cotabato - Marbel Road, Barangay Poblacion - Crossing Kipot - Surralah By-pass Road, Sta. 0+000 - Sta. 2+200 Banga, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 2200.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          2200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Construction of Highway Jct. Cotabato - Marbel Road, Barangay Poblacion - Crossing Kipot - Surralah By-pass Road, Sta. 0+000 - Sta. 2+200 Banga, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.94,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0622-010098",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Highway Jct. Marbel-Makar Road Barangay Concepcion - New Pangasinan - San Jose Columbio By-pass Road, Sta. 0+000 - Sta. 2+200 Koronadal City, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 2.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 2200.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          2200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Construction of Highway Jct. Marbel-Makar Road Barangay Concepcion - New Pangasinan - San Jose Columbio By-pass Road, Sta. 0+000 - Sta. 2+200 Koronadal City, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.94,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0626-010171",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Poloy-Poloy, Lebak, Sultan Kudarat",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Construction of Bridge, Barangay Poloy-Poloy, Lebak, Sultan Kudarat",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0627-010193",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Barangay Legaspi to Barangay Benglen) Sta. 0 + 000 - Sta. 1 + 500, Barangay Legaspi, Cagdianao, Dinagat Islands",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          0.0,
          1500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction of Road (Barangay Legaspi to Barangay Benglen) Sta. 0 + 000 - Sta. 1 + 500, Barangay Legaspi, Cagdianao, Dinagat Islands",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.38,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0628-010211",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Jct. Sitio Mating-ob to Sitio Cabayao to Sitio Lawigan, Socorro, Siargao Island, Surigao del Norte",
      "office": "Surigao del Norte 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of Road, Jct. Sitio Mating-ob to Sitio Cabayao to Sitio Lawigan, Socorro, Siargao Island, Surigao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0628-010220",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of access Road to Cemetery including Bridge, Barangay Poblacion, Cortes, Surigao del Sur, Start: 126.189252, 9.274521 End:126.186721",
      "office": "Surigao del Sur 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Concreting of access Road to Cemetery including Bridge, Barangay Poblacion, Cortes, Surigao del Sur, Start: 126.189252, 9.274521 End:126.186721",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0628-010221",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of NRJ Santiago - Cantilan Road, Sta. 39+635 - Sta. 43+635, Surigao del Sur",
      "office": "Surigao del Sur 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12500000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 12500.0,
      "rangesMeters": [
        [
          39635.0,
          43635.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of NRJ Santiago - Cantilan Road, Sta. 39+635 - Sta. 43+635, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.4,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0628-010222",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Jct. Marihatag- Lianga Road to San Miguel (Libas Sud - Poblacion), Surigao del Sur",
      "office": "Surigao del Sur 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of Road, Jct. Marihatag- Lianga Road to San Miguel (Libas Sud - Poblacion), Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0628-010226",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Gacub to Sitio Tabenas, Carmen, Surigao del Sur",
      "office": "Surigao del Sur 1st District Engineering Office",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of Road, Sitio Gacub to Sitio Tabenas, Carmen, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0215-001917",
      "category": "Bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cauayan City Northeast Alternate Route (Alicaocao Bridge and Approaches) (Sta. 0+687.16 - Sta. 1+228.16), City of Cauayan, Isabela",
      "office": "Central Office",
      "amountPesos": 49959000,
      "lengthKm": 0.5410000000000001,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 92345656.19,
      "lengthMeters": 541.0,
      "allocationPerStatedMeter": 92345.66,
      "rangesMeters": [
        [
          687.16,
          1228.16
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Cauayan City Northeast Alternate Route (Alicaocao Bridge and Approaches) (Sta. 0+687.16 - Sta. 1+228.16), City of Cauayan, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0215-001918",
      "category": "Bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cauayan City Northeast Alternate Route (Bridge and Approaches) (Sta 0+000 - Sta 0+340), Isabela",
      "office": "Central Office",
      "amountPesos": 49959000,
      "lengthKm": 0.34,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 146938235.29,
      "lengthMeters": 340.0,
      "allocationPerStatedMeter": 146938.24,
      "rangesMeters": [
        [
          0.0,
          340.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Cauayan City Northeast Alternate Route (Bridge and Approaches) (Sta 0+000 - Sta 0+340), Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0215-001919",
      "category": "Bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cauayan City Northeast Alternate Route (Bridge and Approaches) (Sta. 1+330.97 - Sta. 3+316), Isabela",
      "office": "Central Office",
      "amountPesos": 49959000,
      "lengthKm": 1.98503,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25167881.59,
      "lengthMeters": 1985.03,
      "allocationPerStatedMeter": 25167.88,
      "rangesMeters": [
        [
          1330.97,
          3316.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Cauayan City Northeast Alternate Route (Bridge and Approaches) (Sta. 1+330.97 - Sta. 3+316), Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0121-000202",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod South Rd - K0065+694 - K0067+200",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 49926000,
      "lengthKm": 1.506,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33151394.42,
      "lengthMeters": 1506.0,
      "allocationPerStatedMeter": 33151.39,
      "rangesMeters": [
        [
          65694.0,
          67200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "Bacolod South Rd - K0065+694 - K0067+200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.88,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0431-006091",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Manmuntay - Barangay San Jose, Basud, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 49895110,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road, Barangay Manmuntay - Barangay San Jose, Basud, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0292-003383",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Ibobotoc Br. (B00087MN) along Surigao del Sur Bdry-Davao Or Coastal Rd",
      "office": "Davao Oriental 1st District Engineering Office",
      "amountPesos": 49760000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Ibobotoc Br. (B00087MN) along Surigao del Sur Bdry-Davao Or Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0200-001618",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Jct Blancia-Molave-Josefina Rd - K1670 + 644 - K1672 + 341, K1672 + 657 - K1672 + 940",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 49733000,
      "lengthKm": 1.98,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 25117676.77,
      "lengthMeters": 1980.0,
      "allocationPerStatedMeter": 25117.68,
      "rangesMeters": [
        [
          1670644.0,
          1672341.0
        ],
        [
          1672657.0,
          1672940.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Jct Blancia-Molave-Josefina Rd - K1670 + 644 - K1672 + 341, K1672 + 657 - K1672 + 940",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35178.17,
      "peerRateMultiple": 0.71,
      "peerRecords": 24,
      "peerBand": "≥1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67634.34375000001,
      "graphUpperFence": 88862.58750000002
    },
    {
      "id": "HB10858-3-0571-009017",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barosong Bridge Phase 3, Tigbauan, Iloilo",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 49700000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Barosong Bridge Phase 3, Tigbauan, Iloilo",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0252-002546",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd - K1431 + 365 - K1432 + 957, K1433 + 027 - K1435 + 365 (Off-Carriageway Improvement: Paving of Shoulders)",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 49675000,
      "lengthKm": 3.93,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 12639949.11,
      "lengthMeters": 3930.0,
      "allocationPerStatedMeter": 12639.95,
      "rangesMeters": [
        [
          1431365.0,
          1432957.0
        ],
        [
          1433027.0,
          1435365.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "252",
      "lengthEvidence": "Surigao-Davao Coastal Rd - K1431 + 365 - K1432 + 957, K1433 + 027 - K1435 + 365 (Off-Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.22,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0206-001740",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Rizal Bdry-Famy-Quezon Rd - K0085 + 933 - K0087 + 038",
      "office": "Laguna 1st District Engineering Office",
      "amountPesos": 49586000,
      "lengthKm": 1.105,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44874208.14,
      "lengthMeters": 1105.0,
      "allocationPerStatedMeter": 44874.21,
      "rangesMeters": [
        [
          85933.0,
          87038.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Rizal Bdry-Famy-Quezon Rd - K0085 + 933 - K0087 + 038",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.88,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0121-000207",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod North Rd - K0126+627 - K0129 + 440",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 49574000,
      "lengthKm": 2.813,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17623178.1,
      "lengthMeters": 2813.0,
      "allocationPerStatedMeter": 17623.18,
      "rangesMeters": [
        [
          126627.0,
          129440.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "Bacolod North Rd - K0126+627 - K0129 + 440",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.47,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0487-007229",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Delfin Albano - Sto. Tomas - Cabagan Provincial Road (Sta. 11+390 - Sta. 11+507, Sta. 11+534 - Sta. 11+610, Sta. 11+682 - Sta. 11+868, Sta. 12+348 - Sta. 13+265, Sta. 13+288 - Sta. 14+224, Sta. 14+239 - Sta. 14+309) at Barangay Calinaoan Malasin to Barangay Bagabag, Santo Tomas, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 49400000,
      "lengthKm": 2.302,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21459600.35,
      "lengthMeters": 2302.0,
      "allocationPerStatedMeter": 21459.6,
      "rangesMeters": [
        [
          11390.0,
          11507.0
        ],
        [
          11534.0,
          11610.0
        ],
        [
          11682.0,
          11868.0
        ],
        [
          12348.0,
          13265.0
        ],
        [
          13288.0,
          14224.0
        ],
        [
          14239.0,
          14309.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Rehabilitation of Delfin Albano - Sto. Tomas - Cabagan Provincial Road (Sta. 11+390 - Sta. 11+507, Sta. 11+534 - Sta. 11+610, Sta. 11+682 - Sta. 11+868, Sta. 12+348 - Sta. 13+265, Sta. 13+288 - Sta. 14+224, Sta. 14+239 - Sta. 14+309) at Barangay Calinaoan Malasin to Barangay Bagabag, Santo Tomas, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.89,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0209-001811",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Palompon-Isabel-Merida-Ormoc Rd - K1111 + 417 - K1112 + 338, K1112 + 367 - K1112 + 452, K1112 + 481 - K1113 + 000",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 49354000,
      "lengthKm": 1.525,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 32363278.69,
      "lengthMeters": 1525.0,
      "allocationPerStatedMeter": 32363.28,
      "rangesMeters": [
        [
          1111417.0,
          1112338.0
        ],
        [
          1112367.0,
          1112452.0
        ],
        [
          1112481.0,
          1113000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "Palompon-Isabel-Merida-Ormoc Rd - K1111 + 417 - K1112 + 338, K1112 + 367 - K1112 + 452, K1112 + 481 - K1113 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 0.96,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0259-002651",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Cawayan Br. 2 (B00606LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 49322000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Cawayan Br. 2 (B00606LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0122-000223",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Sindangan-Liloy Rd - K1942 + 000 - K1943 + 499",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "amountPesos": 49255000,
      "lengthKm": 1.499,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32858572.38,
      "lengthMeters": 1499.0,
      "allocationPerStatedMeter": 32858.57,
      "rangesMeters": [
        [
          1942000.0,
          1943499.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Sindangan-Liloy Rd - K1942 + 000 - K1943 + 499",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.88,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0292-003389",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Kabacan Br. (B00253MN) along Kidapawan-Magpet-Pangaoan Rd",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 49200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Kabacan Br. (B00253MN) along Kidapawan-Magpet-Pangaoan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0259-002670",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Oticon Br. (B00598LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 49095000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Oticon Br. (B00598LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0210-001814",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0811 + 700 - K0811 + 940, K0812 + 533 - K0812 + 850",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 49000000,
      "lengthKm": 0.557,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 87971274.69,
      "lengthMeters": 557.0,
      "allocationPerStatedMeter": 87971.27,
      "rangesMeters": [
        [
          811700.0,
          811940.0
        ],
        [
          812533.0,
          812850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0811 + 700 - K0811 + 940, K0812 + 533 - K0812 + 850",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 1.7,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0582-009264",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Luzong to Barangay Cantabon, Siquijor, Siquijor",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 49000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road, Barangay Luzong to Barangay Cantabon, Siquijor, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0544-008442",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Navarro, General Trias City, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 48628000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road, Barangay Navarro, General Trias City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0120-000187",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0041 + 827 - K0042 + 354",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 48457000,
      "lengthKm": 0.527,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 91948766.6,
      "lengthMeters": 527.0,
      "allocationPerStatedMeter": 91948.77,
      "rangesMeters": [
        [
          41827.0,
          42354.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0041 + 827 - K0042 + 354",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 1.92,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0247-002476",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Asin Rd - K0307 + (-440) - K0310 + 329 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Central Office",
      "amountPesos": 48395000,
      "lengthKm": 3.769,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12840275.94,
      "lengthMeters": 3769.0,
      "allocationPerStatedMeter": 12840.28,
      "rangesMeters": [
        [
          306560.0,
          310329.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "Asin Rd - K0307 + (-440) - K0310 + 329 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.24,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0231-002217",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Iloilo R-1 Bypass Road, Tigbauan, Iloilo - Sta. 12+137.40 - Sta. 12+517.40",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 48364000,
      "lengthKm": 0.38,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 127273684.21,
      "lengthMeters": 380.0,
      "allocationPerStatedMeter": 127273.68,
      "rangesMeters": [
        [
          12137.4,
          12517.4
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Iloilo R-1 Bypass Road, Tigbauan, Iloilo - Sta. 12+137.40 - Sta. 12+517.40",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 1.0,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0171-001124",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Iloilo-Capiz Rd (Old Route) - K0084 + 490 - K0087 + 000",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 48343000,
      "lengthKm": 2.51,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19260159.36,
      "lengthMeters": 2510.0,
      "allocationPerStatedMeter": 19260.16,
      "rangesMeters": [
        [
          84490.0,
          87000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Iloilo-Capiz Rd (Old Route) - K0084 + 490 - K0087 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 0.85,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0126-000298",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tablas Circumferential Rd - K0102 + 397 - K0103 + 052, K0117 + 067 - K0117 + 188, K0117 + 550 - K0118 + 042, K0118 + 052 - K0118 + 682, K0120 + 000 - K0120 + 562, K0127 + 602 - K0128 + 447",
      "office": "Central Office",
      "amountPesos": 48188000,
      "lengthKm": 3.305,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14580332.83,
      "lengthMeters": 3305.0,
      "allocationPerStatedMeter": 14580.33,
      "rangesMeters": [
        [
          102397.0,
          103052.0
        ],
        [
          117067.0,
          117188.0
        ],
        [
          117550.0,
          118042.0
        ],
        [
          118052.0,
          118682.0
        ],
        [
          120000.0,
          120562.0
        ],
        [
          127602.0,
          128447.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Tablas Circumferential Rd - K0102 + 397 - K0103 + 052, K0117 + 067 - K0117 + 188, K0117 + 550 - K0118 + 042, K0118 + 052 - K0118 + 682, K0120 + 000 - K0120 + 562, K0127 + 602 - K0128 + 447",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.73,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0121-000208",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod North Rd - K0130 + 919 - K0132 + 233",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 48100000,
      "lengthKm": 1.314,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36605783.87,
      "lengthMeters": 1314.0,
      "allocationPerStatedMeter": 36605.78,
      "rangesMeters": [
        [
          130919.0,
          132233.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "Bacolod North Rd - K0130 + 919 - K0132 + 233",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 0.93,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0130-000379",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Nueva Ecija - Pangasinan Rd K0173+000 - K0175+276",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 48100000,
      "lengthKm": 2.276,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21133567.66,
      "lengthMeters": 2276.0,
      "allocationPerStatedMeter": 21133.57,
      "rangesMeters": [
        [
          173000.0,
          175276.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Nueva Ecija - Pangasinan Rd K0173+000 - K0175+276",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 1.05,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0143-000642",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + 127 - K0523 + 2316",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 48028000,
      "lengthKm": 3.189,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15060520.54,
      "lengthMeters": 3189.0,
      "allocationPerStatedMeter": 15060.52,
      "rangesMeters": [
        [
          522127.0,
          525316.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + 127 - K0523 + 2316",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 0.91,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0200-001613",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0049 + 000 - K0049 + 440, K0050 + 220 - K0050 + 651",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 48020000,
      "lengthKm": 0.871,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 55132032.15,
      "lengthMeters": 871.0,
      "allocationPerStatedMeter": 55132.03,
      "rangesMeters": [
        [
          49000.0,
          49440.0
        ],
        [
          50220.0,
          50651.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0049 + 000 - K0049 + 440, K0050 + 220 - K0050 + 651",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 1.13,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0131-000402",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Palico-Balayan-Batangas Rd - K0147 + 520 - K0148 + 219",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 48000000,
      "lengthKm": 0.699,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 68669527.9,
      "lengthMeters": 699.0,
      "allocationPerStatedMeter": 68669.53,
      "rangesMeters": [
        [
          147520.0,
          148219.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Palico-Balayan-Batangas Rd - K0147 + 520 - K0148 + 219",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 2.13,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0171-001127",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Guimbal-Igbaras-Tubungan-Leon Rd - K0040 + 39 - K0041 + 000, K0043 + 245 - K0043 + 925",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 48000000,
      "lengthKm": 1.641,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29250457.04,
      "lengthMeters": 1641.0,
      "allocationPerStatedMeter": 29250.46,
      "rangesMeters": [
        [
          40039.0,
          41000.0
        ],
        [
          43245.0,
          43925.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Guimbal-Igbaras-Tubungan-Leon Rd - K0040 + 39 - K0041 + 000, K0043 + 245 - K0043 + 925",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 1.29,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0209-001810",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Biliran Circumferential Rd - K1047 + 750 - K1048 + 435, K1048 + 726 - K1049 + 082, K1049 + 243 - K1049 + 320, K1049 + 370 - K1049 + 479",
      "office": "Biliran District Engineering Office",
      "amountPesos": 48000000,
      "lengthKm": 1.227,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 39119804.4,
      "lengthMeters": 1227.0,
      "allocationPerStatedMeter": 39119.8,
      "rangesMeters": [
        [
          1047750.0,
          1048435.0
        ],
        [
          1048726.0,
          1049082.0
        ],
        [
          1049243.0,
          1049320.0
        ],
        [
          1049370.0,
          1049479.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "Biliran Circumferential Rd - K1047 + 750 - K1048 + 435, K1048 + 726 - K1049 + 082, K1049 + 243 - K1049 + 320, K1049 + 370 - K1049 + 479",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.77,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0231-002220",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Barili - Aloguinsan Coastal Road - Sta. 0 + 620 - Sta. 0 + 655, Cebu",
      "office": "Cebu 3rd District Engineering Office",
      "amountPesos": 48000000,
      "lengthKm": 0.035,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1371428571.43,
      "lengthMeters": 35.0,
      "allocationPerStatedMeter": 1371428.57,
      "rangesMeters": [
        [
          620.0,
          655.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Barili - Aloguinsan Coastal Road - Sta. 0 + 620 - Sta. 0 + 655, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 1.14,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0265-002782",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Amoslog Br. (B00977MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Norte 2nd District Engineering Office",
      "amountPesos": 48000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Amoslog Br. (B00977MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0518-007857",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Concepcion, Sto. Domingo, Nueva Ecija Sta. 0+000 - Sta. 0+035",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 47850000,
      "lengthKm": 0.035,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1367142857.14,
      "lengthMeters": 35.0,
      "allocationPerStatedMeter": 1367142.86,
      "rangesMeters": [
        [
          0.0,
          35.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Bridge, Barangay Concepcion, Sto. Domingo, Nueva Ecija Sta. 0+000 - Sta. 0+035",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 0.97,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0146-000695",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Iloilo East Coast-Capiz Rd - K0178 + 684 - K0180 + 000",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 47811000,
      "lengthKm": 1.316,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36330547.11,
      "lengthMeters": 1316.0,
      "allocationPerStatedMeter": 36330.55,
      "rangesMeters": [
        [
          178684.0,
          180000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Iloilo East Coast-Capiz Rd - K0178 + 684 - K0180 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 1.68,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0150-000774",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LT) - K0991 + 600 - K0992 + 000, K0993 + 000 - K0993 + 500, K0996 + 000 - K0996 + 117, K1000 + 177 - K1000 + 873, K1001 + 200 - K1001 + 261",
      "office": "Central Office",
      "amountPesos": 47765000,
      "lengthKm": 1.774,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 26925028.18,
      "lengthMeters": 1774.0,
      "allocationPerStatedMeter": 26925.03,
      "rangesMeters": [
        [
          991600.0,
          992000.0
        ],
        [
          993000.0,
          993500.0
        ],
        [
          996000.0,
          996117.0
        ],
        [
          1000177.0,
          1000873.0
        ],
        [
          1001200.0,
          1001261.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "Maharlika Highway (LT) - K0991 + 600 - K0992 + 000, K0993 + 000 - K0993 + 500, K0996 + 000 - K0996 + 117, K1000 + 177 - K1000 + 873, K1001 + 200 - K1001 + 261",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 1.08,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0487-007231",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 0+000 - Sta. 0+450, Sta. 1+400 - Sta. 2+560, Sta. 3+330 - Sta. 4+040) including Construction of Drainage Structure (Sta. 0+000 - Sta. 0+450) and Slope Protection Structure (Sta. 2+120 - Sta. 2+440) at Barangay Malalam to Barangay Fugu to Barangay Aggassian, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 47750000,
      "lengthKm": 2.32,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20581896.55,
      "lengthMeters": 2320.0,
      "allocationPerStatedMeter": 20581.9,
      "rangesMeters": [
        [
          0.0,
          450.0
        ],
        [
          1400.0,
          2560.0
        ],
        [
          3330.0,
          4040.0
        ],
        [
          0.0,
          450.0
        ],
        [
          2120.0,
          2440.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Rehabilitation of Road (Sta. 0+000 - Sta. 0+450, Sta. 1+400 - Sta. 2+560, Sta. 3+330 - Sta. 4+040) including Construction of Drainage Structure (Sta. 0+000 - Sta. 0+450) and Slope Protection Structure (Sta. 2+120 - Sta. 2+440) at Barangay Malalam to Barangay Fugu to Barangay Aggassian, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.65,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0542-008399",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Dasmarinas - General Trias - Tanza Diversion Road, General Trias Section, Cavite (STA.0+000 - STA. 0+747.9)",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 47750000,
      "lengthKm": 0.7479,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 63845433.88,
      "lengthMeters": 747.9,
      "allocationPerStatedMeter": 63845.43,
      "rangesMeters": [
        [
          0.0,
          747.9
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Construction of Dasmarinas - General Trias - Tanza Diversion Road, General Trias Section, Cavite (STA.0+000 - STA. 0+747.9)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 3.28,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0136-000498",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Bacolod Circumferential Rd - K0008+634 - K0009 + 750",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 47682000,
      "lengthKm": 1.116,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42725806.45,
      "lengthMeters": 1116.0,
      "allocationPerStatedMeter": 42725.81,
      "rangesMeters": [
        [
          8634.0,
          9750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Bacolod Circumferential Rd - K0008+634 - K0009 + 750",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.37,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0158-000913",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "South Super H-way - K0009 + 572 - K0008 + 296",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 47600000,
      "lengthKm": 1.276,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37304075.24,
      "lengthMeters": 1276.0,
      "allocationPerStatedMeter": 37304.08,
      "rangesMeters": [
        [
          8296.0,
          9572.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "South Super H-way - K0009 + 572 - K0008 + 296",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 1.15,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0293-003393",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Kiblis Br. (B01609MN) along Sarangani-Sultan Kudarat Coastal Rd",
      "office": "Sarangani District Engineering Office",
      "amountPesos": 47600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Kiblis Br. (B01609MN) along Sarangani-Sultan Kudarat Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0123-000235",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Jct Lingig-Trento Rd - K1479 + 589 - K1481 + 020",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 47506000,
      "lengthKm": 1.431,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33197763.8,
      "lengthMeters": 1431.0,
      "allocationPerStatedMeter": 33197.76,
      "rangesMeters": [
        [
          1479589.0,
          1481020.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Jct Lingig-Trento Rd - K1479 + 589 - K1481 + 020",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 0.85,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0121-000209",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod North Rd - K0133 + 180 - K0134+471",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 47499000,
      "lengthKm": 1.291,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36792408.99,
      "lengthMeters": 1291.0,
      "allocationPerStatedMeter": 36792.41,
      "rangesMeters": [
        [
          133180.0,
          134471.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "Bacolod North Rd - K0133 + 180 - K0134+471",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 0.94,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0161-000947",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Tayabas-Mainit-Mauban Rd - K0156+000 - K0157+334",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 47403000,
      "lengthKm": 1.334,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35534482.76,
      "lengthMeters": 1334.0,
      "allocationPerStatedMeter": 35534.48,
      "rangesMeters": [
        [
          156000.0,
          157334.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Tayabas-Mainit-Mauban Rd - K0156+000 - K0157+334",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 1.09,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0282-003164",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tual Br. (B01077MN) along Sarangani-Sultan Kudarat Coastal Rd",
      "office": "Sarangani District Engineering Office",
      "amountPesos": 47260000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Tual Br. (B01077MN) along Sarangani-Sultan Kudarat Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0172-001150",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Danlugan-La Dicha Diversion Road (S01219MN), K1733+(-680) to K1734+000",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 47236000,
      "lengthKm": 1.68,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28116666.67,
      "lengthMeters": 1680.0,
      "allocationPerStatedMeter": 28116.67,
      "rangesMeters": [
        [
          1732320.0,
          1734000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "172",
      "lengthEvidence": "Danlugan-La Dicha Diversion Road (S01219MN), K1733+(-680) to K1734+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 1.24,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0161-000952",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0070+100 - K0070+160, K0070+200 - K0070+300, K0074+600 - K0074+650, K0075+020 - K0075+080",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 47200000,
      "lengthKm": 0.27,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 174814814.81,
      "lengthMeters": 270.0,
      "allocationPerStatedMeter": 174814.81,
      "rangesMeters": [
        [
          70100.0,
          70160.0
        ],
        [
          70200.0,
          70300.0
        ],
        [
          74600.0,
          74650.0
        ],
        [
          75020.0,
          75080.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Puerto Princesa North Rd - K0070+100 - K0070+160, K0070+200 - K0070+300, K0074+600 - K0074+650, K0075+020 - K0075+080",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 3.22,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0137-000522",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Catarman-Laoang Rd - K0785 + 380 - K0786 + 575",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 47125000,
      "lengthKm": 1.195,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39435146.44,
      "lengthMeters": 1195.0,
      "allocationPerStatedMeter": 39435.15,
      "rangesMeters": [
        [
          785380.0,
          786575.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Catarman-Laoang Rd - K0785 + 380 - K0786 + 575",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.27,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0121-000211",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0069 + 539 - K0070 + 873",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 47077000,
      "lengthKm": 1.334,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35290104.95,
      "lengthMeters": 1334.0,
      "allocationPerStatedMeter": 35290.1,
      "rangesMeters": [
        [
          69539.0,
          70873.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry) - K0069 + 539 - K0070 + 873",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 0.9,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0182-001313",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd - K1485 + 634 - K1485 + 675",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 47000000,
      "lengthKm": 0.041,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1146341463.41,
      "lengthMeters": 41.0,
      "allocationPerStatedMeter": 1146341.46,
      "rangesMeters": [
        [
          1485634.0,
          1485675.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "182",
      "lengthEvidence": "Surigao-Davao Coastal Rd - K1485 + 634 - K1485 + 675",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 1.83,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0242-002408",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 47000000,
      "lengthKm": 1.248,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37660256.41,
      "lengthMeters": 1248.0,
      "allocationPerStatedMeter": 37660.26,
      "rangesMeters": [
        [
          11052.0,
          12300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "242",
      "lengthEvidence": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 0.6,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0130-000373",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Cabagan-Sta Maria Rd - K0455 + 562 - K0458 + 757, K0458 + 797 - K0459 + 016",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 46924000,
      "lengthKm": 3.414,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 13744581.14,
      "lengthMeters": 3414.0,
      "allocationPerStatedMeter": 13744.58,
      "rangesMeters": [
        [
          455562.0,
          458757.0
        ],
        [
          458797.0,
          459016.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Cabagan-Sta Maria Rd - K0455 + 562 - K0458 + 757, K0458 + 797 - K0459 + 016",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.68,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0182-001309",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K1964 + 018 - K1964 + 037, K1964 + 059 - K1964 + 082, K1964 + 180 - K1964 + 261, K1964 + 483 - K1964 + 510, K1964 + 580 - K1964 + 655",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 46856000,
      "lengthKm": 0.225,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 208248888.89,
      "lengthMeters": 225.0,
      "allocationPerStatedMeter": 208248.89,
      "rangesMeters": [
        [
          1964018.0,
          1964037.0
        ],
        [
          1964059.0,
          1964082.0
        ],
        [
          1964180.0,
          1964261.0
        ],
        [
          1964483.0,
          1964510.0
        ],
        [
          1964580.0,
          1964655.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "182",
      "lengthEvidence": "Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K1964 + 018 - K1964 + 037, K1964 + 059 - K1964 + 082, K1964 + 180 - K1964 + 261, K1964 + 483 - K1964 + 510, K1964 + 580 - K1964 + 655",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 1.1,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0131-000406",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Palico-Balayan-Batangas Rd - K0138 + 604 - K0139 + 760",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 46473000,
      "lengthKm": 1.156,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40201557.09,
      "lengthMeters": 1156.0,
      "allocationPerStatedMeter": 40201.56,
      "rangesMeters": [
        [
          138604.0,
          139760.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Palico-Balayan-Batangas Rd - K0138 + 604 - K0139 + 760",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.29,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0181-001308",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1683 + 125 - K1683 + 190, K1704 + 530 - K1704 + 580, K1704 + 843 - K1704 + 860, K1707 + 435 - K1707 + 460",
      "office": "Davao Occidental District Engineering Office",
      "amountPesos": 46391000,
      "lengthKm": 0.157,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 295484076.43,
      "lengthMeters": 157.0,
      "allocationPerStatedMeter": 295484.08,
      "rangesMeters": [
        [
          1683125.0,
          1683190.0
        ],
        [
          1704530.0,
          1704580.0
        ],
        [
          1704843.0,
          1704860.0
        ],
        [
          1707435.0,
          1707460.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1683 + 125 - K1683 + 190, K1704 + 530 - K1704 + 580, K1704 + 843 - K1704 + 860, K1707 + 435 - K1707 + 460",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 1.55,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0152-000795",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1724 + (-591) - K1724 + 000, K1725 + 905 - K1726 + 098, K1726 + 441 - K1727 + 819, K1727 + 850 - K1729 + 000, K1749 + 618 - K1749 + 650, K1749 + 695 - K1749 + 700",
      "office": "Central Office",
      "amountPesos": 46309000,
      "lengthKm": 3.349,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 13827709.76,
      "lengthMeters": 3349.0,
      "allocationPerStatedMeter": 13827.71,
      "rangesMeters": [
        [
          1723409.0,
          1724000.0
        ],
        [
          1725905.0,
          1726098.0
        ],
        [
          1726441.0,
          1727819.0
        ],
        [
          1727850.0,
          1729000.0
        ],
        [
          1749618.0,
          1749650.0
        ],
        [
          1749695.0,
          1749700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1724 + (-591) - K1724 + 000, K1725 + 905 - K1726 + 098, K1726 + 441 - K1727 + 819, K1727 + 850 - K1729 + 000, K1749 + 618 - K1749 + 650, K1749 + 695 - K1749 + 700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34325.54,
      "peerRateMultiple": 0.4,
      "peerRecords": 23,
      "peerBand": "≥2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134920.34499999997,
      "graphUpperFence": 203174.01999999996
    },
    {
      "id": "HB10858-3-0207-001762",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0555 + 849 - K0556 + 552",
      "office": "Albay 1st District Engineering Office",
      "amountPesos": 46058000,
      "lengthKm": 0.703,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 65516358.46,
      "lengthMeters": 703.0,
      "allocationPerStatedMeter": 65516.36,
      "rangesMeters": [
        [
          555849.0,
          556552.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0555 + 849 - K0556 + 552",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 1.09,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0122-000229",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Linamon-Zamboanga Rd - K1620 + 000 - K1620 + 909",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 46031000,
      "lengthKm": 0.909,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50639163.92,
      "lengthMeters": 909.0,
      "allocationPerStatedMeter": 50639.16,
      "rangesMeters": [
        [
          1620000.0,
          1620909.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Linamon-Zamboanga Rd - K1620 + 000 - K1620 + 909",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 1.19,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0205-001726",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0498 + 893 - K0500 + 251",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 46001000,
      "lengthKm": 1.358,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33874079.53,
      "lengthMeters": 1358.0,
      "allocationPerStatedMeter": 33874.08,
      "rangesMeters": [
        [
          498893.0,
          500251.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0498 + 893 - K0500 + 251",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 1.01,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0139-000555",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd - K1169 + 942 - K1170 + 601, K1179 + 334 - K1181 + 305, K1181 + 767 - K1182 + 000",
      "office": "Surigao del Norte 2nd District Engineering Office",
      "amountPesos": 46000000,
      "lengthKm": 2.863,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 16067062.52,
      "lengthMeters": 2863.0,
      "allocationPerStatedMeter": 16067.06,
      "rangesMeters": [
        [
          1169942.0,
          1170601.0
        ],
        [
          1179334.0,
          1181305.0
        ],
        [
          1181767.0,
          1182000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Surigao-Davao Coastal Rd - K1169 + 942 - K1170 + 601, K1179 + 334 - K1181 + 305, K1181 + 767 - K1182 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.8,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0140-000580",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Bulalacao-Sn Jose-Jct Mapaya Rd - K0223 + 387 - K0224 + 684, K0224 + 696 - K0226 + 000, K0227 + 607 - K0228 + 147",
      "office": "Central Office",
      "amountPesos": 46000000,
      "lengthKm": 3.141,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14645017.51,
      "lengthMeters": 3141.0,
      "allocationPerStatedMeter": 14645.02,
      "rangesMeters": [
        [
          223387.0,
          224684.0
        ],
        [
          224696.0,
          226000.0
        ],
        [
          227607.0,
          228147.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Bulalacao-Sn Jose-Jct Mapaya Rd - K0223 + 387 - K0224 + 684, K0224 + 696 - K0226 + 000, K0227 + 607 - K0228 + 147",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 0.88,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0210-001828",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd, K1800 + 460 - K1802 + 000",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 46000000,
      "lengthKm": 1.54,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29870129.87,
      "lengthMeters": 1540.0,
      "allocationPerStatedMeter": 29870.13,
      "rangesMeters": [
        [
          1800460.0,
          1802000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Surigao-Davao Coastal Rd, K1800 + 460 - K1802 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 0.89,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0536-008246",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Hanjin Villlage-Lawin, Sta. 0+000 - Sta. 1+930, Barangay Nagbunga, Castillejos, Zambales",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 46000000,
      "lengthKm": 1.93,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23834196.89,
      "lengthMeters": 1930.0,
      "allocationPerStatedMeter": 23834.2,
      "rangesMeters": [
        [
          0.0,
          1930.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Road at Hanjin Villlage-Lawin, Sta. 0+000 - Sta. 1+930, Barangay Nagbunga, Castillejos, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.99,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0256-002604",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Tertiary Roads",
      "projectName": "Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 11698 - Chainage 13131",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 45856000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "256",
      "lengthEvidence": "Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 11698 - Chainage 13131",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0155-000854",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Palo-Carigara-Ormoc Rd - K0962 + 526 - K0963 + 000",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 45840000,
      "lengthKm": 0.474,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 96708860.76,
      "lengthMeters": 474.0,
      "allocationPerStatedMeter": 96708.86,
      "rangesMeters": [
        [
          962526.0,
          963000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "Palo-Carigara-Ormoc Rd - K0962 + 526 - K0963 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 4.07,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0256-002602",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Tertiary Roads",
      "projectName": "Lanao del Norte Interior Circum. Rd (LDNICR) - (S00969MN) Chainage 5910 - Chainage 7388",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 45818000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "256",
      "lengthEvidence": "Lanao del Norte Interior Circum. Rd (LDNICR) - (S00969MN) Chainage 5910 - Chainage 7388",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0172-001153",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Jct Bolodbolod-Albor Rd - K0060 + (-809) - K0060 + (-188), K0060 + 000 - K0060 + 817, K0061 + 000 - K0061 + 168",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 45806000,
      "lengthKm": 1.606,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 28521793.28,
      "lengthMeters": 1606.0,
      "allocationPerStatedMeter": 28521.79,
      "rangesMeters": [
        [
          59191.0,
          59812.0
        ],
        [
          60000.0,
          60817.0
        ],
        [
          61000.0,
          61168.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "172",
      "lengthEvidence": "Jct Bolodbolod-Albor Rd - K0060 + (-809) - K0060 + (-188), K0060 + 000 - K0060 + 817, K0061 + 000 - K0061 + 168",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 1.26,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0162-000974",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Nabua-Bato-Libon (Tandaay-Buluang, Bato) Rd - K0487 + 779 - K0489 + 000",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 45714000,
      "lengthKm": 1.221,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37439803.44,
      "lengthMeters": 1221.0,
      "allocationPerStatedMeter": 37439.8,
      "rangesMeters": [
        [
          487779.0,
          489000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Nabua-Bato-Libon (Tandaay-Buluang, Bato) Rd - K0487 + 779 - K0489 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 1.42,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0130-000371",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Kalinga-Abra Rd - K0469 + 000 - K0472 + 078",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 45690000,
      "lengthKm": 3.078,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14844054.58,
      "lengthMeters": 3078.0,
      "allocationPerStatedMeter": 14844.05,
      "rangesMeters": [
        [
          469000.0,
          472078.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Kalinga-Abra Rd - K0469 + 000 - K0472 + 078",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.74,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0153-000823",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Calamba-Sta Cruz-Famy Jct Rd - K0072 + 450 - K0072 + 795, K0073 + 961 - K0074 + 300",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 45667000,
      "lengthKm": 0.684,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 66764619.88,
      "lengthMeters": 684.0,
      "allocationPerStatedMeter": 66764.62,
      "rangesMeters": [
        [
          72450.0,
          72795.0
        ],
        [
          73961.0,
          74300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Calamba-Sta Cruz-Famy Jct Rd - K0072 + 450 - K0072 + 795, K0073 + 961 - K0074 + 300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 2.81,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0182-001310",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K1985 + 090 - K1985 + 170, K1985 + 250 - K1985 + 310, K1985 + 470 - K1985 + 500, K1985 + 560 - K1985 + 600, K1985 + 670 - K1985 + 680, K1988 + 340 - K1988 + 390",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 45620000,
      "lengthKm": 0.27,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 168962962.96,
      "lengthMeters": 270.0,
      "allocationPerStatedMeter": 168962.96,
      "rangesMeters": [
        [
          1985090.0,
          1985170.0
        ],
        [
          1985250.0,
          1985310.0
        ],
        [
          1985470.0,
          1985500.0
        ],
        [
          1985560.0,
          1985600.0
        ],
        [
          1985670.0,
          1985680.0
        ],
        [
          1988340.0,
          1988390.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "182",
      "lengthEvidence": "Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K1985 + 090 - K1985 + 170, K1985 + 250 - K1985 + 310, K1985 + 470 - K1985 + 500, K1985 + 560 - K1985 + 600, K1985 + 670 - K1985 + 680, K1988 + 340 - K1988 + 390",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 0.94,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0625-010151",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, New Egaña Cemetery-Sitio San Joaquin, Barangay D'Lotilla, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 45540000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Concrete Road, New Egaña Cemetery-Sitio San Joaquin, Barangay D'Lotilla, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003175",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Daniog Br. 1 (B00664MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Sur 1st District Engineering Office",
      "amountPesos": 45500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Daniog Br. 1 (B00664MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008602",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Permanent Bridges along Boac Access Road, Barangay Santol, Boac, Marinduque",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 45500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Permanent Bridges along Boac Access Road, Barangay Santol, Boac, Marinduque",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0179-001264",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Mogpog-Balanacan Port Rd - K0015 + 310 - K0015 + 360",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 45400000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 908000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 908000.0,
      "rangesMeters": [
        [
          15310.0,
          15360.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "Mogpog-Balanacan Port Rd - K0015 + 310 - K0015 + 360",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 1.45,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0126-000293",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sibuyan Circumferential Rd - K0004 + 000 - K0005 + 414, K0007 + 200 - K0007 + 313, K0008 + 000 - K0008 + 325, K0008 + 357 - K0009 + 000, K0009 + 135 - K0009 + 365, K0012 + 475 - K0013 + 000",
      "office": "Central Office",
      "amountPesos": 45373000,
      "lengthKm": 3.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 13960923.08,
      "lengthMeters": 3250.0,
      "allocationPerStatedMeter": 13960.92,
      "rangesMeters": [
        [
          4000.0,
          5414.0
        ],
        [
          7200.0,
          7313.0
        ],
        [
          8000.0,
          8325.0
        ],
        [
          8357.0,
          9000.0
        ],
        [
          9135.0,
          9365.0
        ],
        [
          12475.0,
          13000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "126",
      "lengthEvidence": "Sibuyan Circumferential Rd - K0004 + 000 - K0005 + 414, K0007 + 200 - K0007 + 313, K0008 + 000 - K0008 + 325, K0008 + 357 - K0009 + 000, K0009 + 135 - K0009 + 365, K0012 + 475 - K0013 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.69,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0147-000723",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sindangan-Bayog-Lakewood Rd - K1718 + 000 - K1721 + 000",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 45332000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15110666.67,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 15110.67,
      "rangesMeters": [
        [
          1718000.0,
          1721000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Sindangan-Bayog-Lakewood Rd - K1718 + 000 - K1721 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 0.91,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0132-000415",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0045 + (-699) - K0045 + 000, K0045 + 064 - K0045 + 547",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 45143000,
      "lengthKm": 1.182,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 38192047.38,
      "lengthMeters": 1182.0,
      "allocationPerStatedMeter": 38192.05,
      "rangesMeters": [
        [
          44301.0,
          45000.0
        ],
        [
          45064.0,
          45547.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0045 + (-699) - K0045 + 000, K0045 + 064 - K0045 + 547",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.23,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0185-001374",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0422 + 464 - K0422 + 531, K0422 + 815 - K0422 + 880, K0423 + 066 - K0423 + 098, K0423 + 179 - K0423 + 247, K0423 + 286 - K0423 + 361, K0423 + 969 - K0424 + 144, K0424 + 407 - K0424 + 435",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 45121000,
      "lengthKm": 0.51,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 88472549.02,
      "lengthMeters": 510.0,
      "allocationPerStatedMeter": 88472.55,
      "rangesMeters": [
        [
          422464.0,
          422531.0
        ],
        [
          422815.0,
          422880.0
        ],
        [
          423066.0,
          423098.0
        ],
        [
          423179.0,
          423247.0
        ],
        [
          423286.0,
          423361.0
        ],
        [
          423969.0,
          424144.0
        ],
        [
          424407.0,
          424435.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "185",
      "lengthEvidence": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0422 + 464 - K0422 + 531, K0422 + 815 - K0422 + 880, K0423 + 066 - K0423 + 098, K0423 + 179 - K0423 + 247, K0423 + 286 - K0423 + 361, K0423 + 969 - K0424 + 144, K0424 + 407 - K0424 + 435",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 0.95,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0117-000117",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (MN) - (S0060MN) K1459 + 400 - K1459 + 818, (S01391MN) Chainage 2807 - 3225",
      "office": "Central Office",
      "amountPesos": 45000000,
      "lengthKm": 0.418,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 107655502.39,
      "lengthMeters": 418.0,
      "allocationPerStatedMeter": 107655.5,
      "rangesMeters": [
        [
          1459400.0,
          1459818.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Maharlika Highway (MN) - (S0060MN) K1459 + 400 - K1459 + 818, (S01391MN) Chainage 2807 - 3225",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 2.25,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0145-000675",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Calauan-Nagcarlan Bdry Rd - K0080 + 088 - K0081 + 068",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": 0.98,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45918367.35,
      "lengthMeters": 980.0,
      "allocationPerStatedMeter": 45918.37,
      "rangesMeters": [
        [
          80088.0,
          81068.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Calauan-Nagcarlan Bdry Rd - K0080 + 088 - K0081 + 068",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.92,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0145-000682",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Oas Poblacion Rd - K0496+(-290) - K0498+333",
      "office": "Albay 3rd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": 2.623,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17155928.33,
      "lengthMeters": 2623.0,
      "allocationPerStatedMeter": 17155.93,
      "rangesMeters": [
        [
          495710.0,
          498333.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Oas Poblacion Rd - K0496+(-290) - K0498+333",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 1.03,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0161-000943",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Famy-Real-Infanta-Dinahican Port Rd - K0104 + 923 - K0105 + 204, K0107 + 884 - K0108 + 167, K0108 + 687 - K0109 + 250, K0114 + 080 - K0114 + 338",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": 1.385,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 32490974.73,
      "lengthMeters": 1385.0,
      "allocationPerStatedMeter": 32490.97,
      "rangesMeters": [
        [
          104923.0,
          105204.0
        ],
        [
          107884.0,
          108167.0
        ],
        [
          108687.0,
          109250.0
        ],
        [
          114080.0,
          114338.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Famy-Real-Infanta-Dinahican Port Rd - K0104 + 923 - K0105 + 204, K0107 + 884 - K0108 + 167, K0108 + 687 - K0109 + 250, K0114 + 080 - K0114 + 338",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 1.0,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0179-001257",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kalinga-Abra Rd - K0478 + 834 - K0478 + 860, K0481 + 187 - K0481 + 234, K0484 + 615 - K0484 + 648, K0486 + 387 - K0486 + 425, K0487 + 136 - K0487 + 163, K0487 + 659 - K0487 + 680, K0492 + 658 - K0492 + 678, K0503 + 025 - K0503 + 050, K0507 + 1879 - K0509 + 030, K0518 + 451 - K0518 + 471, K0520 + 023 - K0520 + 037, K0520 + 646 - K0520 + 670, K0520 + 971 - K0520 + 1002, K0523 + 204 - K0523 + 225, K0524 + 471 - K0524 + 506, K0525 + 210 - K0525 + 246",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": 0.569,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 79086115.99,
      "lengthMeters": 569.0,
      "allocationPerStatedMeter": 79086.12,
      "rangesMeters": [
        [
          478834.0,
          478860.0
        ],
        [
          481187.0,
          481234.0
        ],
        [
          484615.0,
          484648.0
        ],
        [
          486387.0,
          486425.0
        ],
        [
          487136.0,
          487163.0
        ],
        [
          487659.0,
          487680.0
        ],
        [
          492658.0,
          492678.0
        ],
        [
          503025.0,
          503050.0
        ],
        [
          508879.0,
          509030.0
        ],
        [
          518451.0,
          518471.0
        ],
        [
          520023.0,
          520037.0
        ],
        [
          520646.0,
          520670.0
        ],
        [
          520971.0,
          521002.0
        ],
        [
          523204.0,
          523225.0
        ],
        [
          524471.0,
          524506.0
        ],
        [
          525210.0,
          525246.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "Kalinga-Abra Rd - K0478 + 834 - K0478 + 860, K0481 + 187 - K0481 + 234, K0484 + 615 - K0484 + 648, K0486 + 387 - K0486 + 425, K0487 + 136 - K0487 + 163, K0487 + 659 - K0487 + 680, K0492 + 658 - K0492 + 678, K0503 + 025 - K0503 + 050, K0507 + 1879 - K0509 + 030, K0518 + 451 - K0518 + 471, K0520 + 023 - K0520 + 037, K0520 + 646 - K0520 + 670, K0520 + 971 - K0520 + 1002, K0523 + 204 - K0523 + 225, K0524 + 471 - K0524 + 506, K0525 + 210 - K0525 + 246",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 0.76,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0180-001272",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0072 + 183 - K0072 + 230",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": 0.047,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 957446808.51,
      "lengthMeters": 47.0,
      "allocationPerStatedMeter": 957446.81,
      "rangesMeters": [
        [
          72183.0,
          72230.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Puerto Princesa North Rd - K0072 + 183 - K0072 + 230",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 1.53,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0186-001383",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Logac-Lasam-Gagabutan Rd - K0741 + 819 - K0741 + 957",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": 0.138,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 326086956.52,
      "lengthMeters": 138.0,
      "allocationPerStatedMeter": 326086.96,
      "rangesMeters": [
        [
          741819.0,
          741957.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Jct Logac-Lasam-Gagabutan Rd - K0741 + 819 - K0741 + 957",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 1.87,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0207-001767",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Buenavista-Kawayan Rd - K0052 + 190 - K0052 + 640",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": 0.45,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 450.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          52190.0,
          52640.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Buenavista-Kawayan Rd - K0052 + 190 - K0052 + 640",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 1.93,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0210-001813",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0803 + 235 - K0803 + 745.70",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": 0.5106999999999534,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 88114352.85,
      "lengthMeters": 510.7,
      "allocationPerStatedMeter": 88114.35,
      "rangesMeters": [
        [
          803235.0,
          803745.7
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0803 + 235 - K0803 + 745.70",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 1.7,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0233-002239",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Little Baguio, Imelda - Bella, Alicia, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "233",
      "lengthEvidence": "Little Baguio, Imelda - Bella, Alicia, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0250-002518",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Bayawan-Kabankalan Rd - K0101 + 200 - K0104 + 700 (Road Safety: Roadway Lighting)",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": 3.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12857142.86,
      "lengthMeters": 3500.0,
      "allocationPerStatedMeter": 12857.14,
      "rangesMeters": [
        [
          101200.0,
          104700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "250",
      "lengthEvidence": "Bayawan-Kabankalan Rd - K0101 + 200 - K0104 + 700 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.24,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0258-002634",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Galucan Br. (B02715LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Galucan Br. (B02715LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002638",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Polangui Br. (B00282LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Polangui Br. (B00282LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0261-002724",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Maton Br. (B02263LZ) along Kabugao-Pudtol-Luna-Cagayan Bdry Rd",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Maton Br. (B02263LZ) along Kabugao-Pudtol-Luna-Cagayan Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003284",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Matinao Br. (B01028MN) along Maharlika Highway (Marbel-Makar Rd)",
      "office": "Central Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Matinao Br. (B01028MN) along Maharlika Highway (Marbel-Makar Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0289-003317",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Takad Br. (B03037LZ) along Batangas-Tabangao-Lobo Rd",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Takad Br. (B03037LZ) along Batangas-Tabangao-Lobo Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0290-003339",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Hilaitan Br. (B00137NR) along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Hilaitan Br. (B00137NR) along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0291-003365",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Bobongan Br. (B01178MN) along Liloy-Siocon Rd",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Bobongan Br. (B01178MN) along Liloy-Siocon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006741",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Local Road, Barangay Rizal (Bintucan-Sangbay) , Tubao, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Local Road, Barangay Rizal (Bintucan-Sangbay) , Tubao, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006901",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Access Road leading to San Fabian Beach, Barangay Mabilao, San Fabian, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Rehabilitation of Access Road leading to San Fabian Beach, Barangay Mabilao, San Fabian, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006909",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Baro, Barangay Carosucan Sur, Barangay Cabalitian, Barangay Coldit, Barangay Bobonan, Asingan, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Rehabilitation of Road, Barangay Baro, Barangay Carosucan Sur, Barangay Cabalitian, Barangay Coldit, Barangay Bobonan, Asingan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008392",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge along Rosario-Taysan Road, Rosario, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Construction of Bridge along Rosario-Taysan Road, Rosario, Batangas",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008916",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+014, Barangay Caditaan to Barangay Malbog, Magallanes, Sorsogon",
      "office": "Sorsogon District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": 1.014,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44378698.22,
      "lengthMeters": 1014.0,
      "allocationPerStatedMeter": 44378.7,
      "rangesMeters": [
        [
          0.0,
          1014.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+014, Barangay Caditaan to Barangay Malbog, Magallanes, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.78,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0568-008976",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Box Culvert at Barangay Pinay, Mambusao, Capiz and Barangay Oyong, Sigma, Capiz",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction of Road with Box Culvert at Barangay Pinay, Mambusao, Capiz and Barangay Oyong, Sigma, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0571-009020",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Naclub - Igbugo Road, Barangay Naclub and Igbugo, Miagao, Iloilo",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Naclub - Igbugo Road, Barangay Naclub and Igbugo, Miagao, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009161",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Parallel Bridge - Pana-on Bridge, Barangay II, Sipalay City, Negros Occidental, 9.74, 122.400833",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Parallel Bridge - Pana-on Bridge, Barangay II, Sipalay City, Negros Occidental, 9.74, 122.400833",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0597-009594",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Bangon - G.M. Osias - Lonoy (Sta. 1+824 - Sta. 3+024), Gamay, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37500000.0,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 37500.0,
      "rangesMeters": [
        [
          1824.0,
          3024.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Road, Bangon - G.M. Osias - Lonoy (Sta. 1+824 - Sta. 3+024), Gamay, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.5,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0628-010224",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Hinapuyan to Gacub, Carmen, Surigao del Sur",
      "office": "Surigao del Sur 1st District Engineering Office",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of Road, Hinapuyan to Gacub, Carmen, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0185-001375",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0407 + 284 - K0407 + 300, K0407 + 310 - K0407 + 350, K0407 + 644 - K0407 + 656, K0407 + 712 - K0407 + 806, K0408 + 405 - K0408 + 550, K0408 + 559 - K0408 + 579, K0408 + 753 - K0408 + 786, K0408 + 872 - K0408 + 896, K0409 + 077 - K0409 + 130, K0409 + 157 - K0409 + 184",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 44955000,
      "lengthKm": 0.464,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 96885775.86,
      "lengthMeters": 464.0,
      "allocationPerStatedMeter": 96885.78,
      "rangesMeters": [
        [
          407284.0,
          407300.0
        ],
        [
          407310.0,
          407350.0
        ],
        [
          407644.0,
          407656.0
        ],
        [
          407712.0,
          407806.0
        ],
        [
          408405.0,
          408550.0
        ],
        [
          408559.0,
          408579.0
        ],
        [
          408753.0,
          408786.0
        ],
        [
          408872.0,
          408896.0
        ],
        [
          409077.0,
          409130.0
        ],
        [
          409157.0,
          409184.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "185",
      "lengthEvidence": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0407 + 284 - K0407 + 300, K0407 + 310 - K0407 + 350, K0407 + 644 - K0407 + 656, K0407 + 712 - K0407 + 806, K0408 + 405 - K0408 + 550, K0408 + 559 - K0408 + 579, K0408 + 753 - K0408 + 786, K0408 + 872 - K0408 + 896, K0409 + 077 - K0409 + 130, K0409 + 157 - K0409 + 184",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 1.05,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0163-000981",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Sn Pascual-Claveria Rd - K0000 + 308 - K0000 + 630, K0000 + 762 - K0000 + 855, K0000 + 970 - K0001 + 555",
      "office": "Masbate 1st District Engineering Office",
      "amountPesos": 44874000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 44874000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 44874.0,
      "rangesMeters": [
        [
          308.0,
          630.0
        ],
        [
          762.0,
          855.0
        ],
        [
          970.0,
          1555.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Sn Pascual-Claveria Rd - K0000 + 308 - K0000 + 630, K0000 + 762 - K0000 + 855, K0000 + 970 - K0001 + 555",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 1.7,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0180-001277",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Romblon-Cogon-Sablayan Rd - K0004 + 214 - K0004 + 257",
      "office": "Romblon District Engineering Office",
      "amountPesos": 44690000,
      "lengthKm": 0.043,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1039302325.58,
      "lengthMeters": 43.0,
      "allocationPerStatedMeter": 1039302.33,
      "rangesMeters": [
        [
          4214.0,
          4257.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Romblon-Cogon-Sablayan Rd - K0004 + 214 - K0004 + 257",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 1.66,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0292-003384",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Sta. Fe Br. (B01845MN) along Surigao del Sur Bdry-Davao Or Coastal Rd",
      "office": "Davao Oriental 1st District Engineering Office",
      "amountPesos": 44379000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Sta. Fe Br. (B01845MN) along Surigao del Sur Bdry-Davao Or Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009787",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Jct. Sayre Highway Teacher's Village, Kitaotao - New Cebu, Lourdes - Dangcagan National High School connecting Dangcagan-Bugwak--Kadingilan Highway, Dangcagan, Bukidnon",
      "office": "Bukidnon 2nd District Engineering Office",
      "amountPesos": 44340000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Construction of Road, Jct. Sayre Highway Teacher's Village, Kitaotao - New Cebu, Lourdes - Dangcagan National High School connecting Dangcagan-Bugwak--Kadingilan Highway, Dangcagan, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0163-000980",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Sn Fernando North Rd - K0020 + 187 - K0020 + 220, K0021 + 326 - K0021 + 420, K0021 + 518 - K0021 + 627, K0021 + 710 - K0021 + 820, K0024 + 140 - K0024 + 238, K0024 + 359 - K0024 + 384, K0024 + 434 - K0024 + 622, K0024 + 750 - K0024 + 836",
      "office": "Masbate 1st District Engineering Office",
      "amountPesos": 44267000,
      "lengthKm": 0.743,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 59578734.86,
      "lengthMeters": 743.0,
      "allocationPerStatedMeter": 59578.73,
      "rangesMeters": [
        [
          20187.0,
          20220.0
        ],
        [
          21326.0,
          21420.0
        ],
        [
          21518.0,
          21627.0
        ],
        [
          21710.0,
          21820.0
        ],
        [
          24140.0,
          24238.0
        ],
        [
          24359.0,
          24384.0
        ],
        [
          24434.0,
          24622.0
        ],
        [
          24750.0,
          24836.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Sn Fernando North Rd - K0020 + 187 - K0020 + 220, K0021 + 326 - K0021 + 420, K0021 + 518 - K0021 + 627, K0021 + 710 - K0021 + 820, K0024 + 140 - K0024 + 238, K0024 + 359 - K0024 + 384, K0024 + 434 - K0024 + 622, K0024 + 750 - K0024 + 836",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 1.8,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0146-000706",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Argao-Moalboal Rd - K0072 + 000 - K0074 + 495, K0074 + 554 - K0074 + 724",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 44180000,
      "lengthKm": 2.665,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 16577861.16,
      "lengthMeters": 2665.0,
      "allocationPerStatedMeter": 16577.86,
      "rangesMeters": [
        [
          72000.0,
          74495.0
        ],
        [
          74554.0,
          74724.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Argao-Moalboal Rd - K0072 + 000 - K0074 + 495, K0074 + 554 - K0074 + 724",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 1.0,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0209-001803",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0097 + 371 - K0098 + 100, K0099 + 1475 - K0101 + 551, K0103 + 000 - K0104 + 642",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 44163000,
      "lengthKm": 3.447,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 12812010.44,
      "lengthMeters": 3447.0,
      "allocationPerStatedMeter": 12812.01,
      "rangesMeters": [
        [
          97371.0,
          98100.0
        ],
        [
          100475.0,
          101551.0
        ],
        [
          103000.0,
          104642.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0097 + 371 - K0098 + 100, K0099 + 1475 - K0101 + 551, K0103 + 000 - K0104 + 642",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 0.48,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0209-001802",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0125 + 705 - K0126 + 490, K0127 + 000 - K0127 + 766, K0128 + 993 - K0129 + 921, K0129 + 940 - K0131 + 015",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 44127000,
      "lengthKm": 3.554,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 12416150.82,
      "lengthMeters": 3554.0,
      "allocationPerStatedMeter": 12416.15,
      "rangesMeters": [
        [
          125705.0,
          126490.0
        ],
        [
          127000.0,
          127766.0
        ],
        [
          128993.0,
          129921.0
        ],
        [
          129940.0,
          131015.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0125 + 705 - K0126 + 490, K0127 + 000 - K0127 + 766, K0128 + 993 - K0129 + 921, K0129 + 940 - K0131 + 015",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26715.51,
      "peerRateMultiple": 0.46,
      "peerRecords": 26,
      "peerBand": "≥2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 49876.78375000001,
      "graphUpperFence": 65315.44000000002
    },
    {
      "id": "HB10858-3-0153-000826",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway – K0139 + 400 – K0140 + 080",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 44000000,
      "lengthKm": 0.68,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 64705882.35,
      "lengthMeters": 680.0,
      "allocationPerStatedMeter": 64705.88,
      "rangesMeters": [
        [
          139400.0,
          140080.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Maharlika Highway – K0139 + 400 – K0140 + 080",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 2.73,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0186-001385",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd-K0498 + 150 - K0498 + 253, K0498 + 450 - K0498 + 475, K0498+660 - K0498 + 705, K0500 +095 - K0500 + 120, K0500+260 - K0500 + 295, K0500+672 - K0500+695",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 44000000,
      "lengthKm": 0.256,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 171875000.0,
      "lengthMeters": 256.0,
      "allocationPerStatedMeter": 171875.0,
      "rangesMeters": [
        [
          498150.0,
          498253.0
        ],
        [
          498450.0,
          498475.0
        ],
        [
          498660.0,
          498705.0
        ],
        [
          500095.0,
          500120.0
        ],
        [
          500260.0,
          500295.0
        ],
        [
          500672.0,
          500695.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd-K0498 + 150 - K0498 + 253, K0498 + 450 - K0498 + 475, K0498+660 - K0498 + 705, K0500 +095 - K0500 + 120, K0500+260 - K0500 + 295, K0500+672 - K0500+695",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 0.98,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0249-002498",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Roadway Lighting) along Nueva Ecija - Pangasinan Road K0138+420 - K0142+845, K0143+740- K0144+790 LS, K0147+000- K0147+925 LS, K0153+300- K0157+975 RS, K0158+025- K0159+350, K0172+000- K0174+600",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 44000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          138420.0,
          142845.0
        ],
        [
          143740.0,
          144790.0
        ],
        [
          147000.0,
          147925.0
        ],
        [
          153300.0,
          157975.0
        ],
        [
          158025.0,
          159350.0
        ],
        [
          172000.0,
          174600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "249",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Roadway Lighting) along Nueva Ecija - Pangasinan Road K0138+420 - K0142+845, K0143+740- K0144+790 LS, K0147+000- K0147+925 LS, K0153+300- K0157+975 RS, K0158+025- K0159+350, K0172+000- K0174+600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0292-003386",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Talisay Br. (B01128MN) along Jct Manikling-Gov Generoso Rd",
      "office": "Davao Oriental 2nd District Engineering Office",
      "amountPesos": 44000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Talisay Br. (B01128MN) along Jct Manikling-Gov Generoso Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006717",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Slope Protection, Barangay Pacifico to Barangay Cacafean, Marcos, Ilocos Norte",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "amountPesos": 44000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Road with Slope Protection, Barangay Pacifico to Barangay Cacafean, Marcos, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009263",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Can-asagan, San Juan, Siquijor",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 44000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road, Barangay Can-asagan, San Juan, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0131-000391",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Balayan-Balibago Rd - K0106 + (-216) - K0106 + 785 - K0107 + 000, K0108 + 500 - K0109 + 308, K0112 + 660 - K0112 + 669.30",
      "office": "Batangas 1st District Engineering Office",
      "amountPesos": 43786000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          105784.0,
          106785.0
        ],
        [
          108500.0,
          109308.0
        ],
        [
          112660.0,
          112669.3
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Balayan-Balibago Rd - K0106 + (-216) - K0106 + 785 - K0107 + 000, K0108 + 500 - K0109 + 308, K0112 + 660 - K0112 + 669.30",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0207-001751",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Calapan South Rd - K0019 + 396 - K0020 + 513",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 43750000,
      "lengthKm": 1.117,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39167412.71,
      "lengthMeters": 1117.0,
      "allocationPerStatedMeter": 39167.41,
      "rangesMeters": [
        [
          19396.0,
          20513.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Calapan South Rd - K0019 + 396 - K0020 + 513",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.77,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0232-002227",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "NRJ Blancia-Alang-alang - Lower Tiparak - Tungawan By-Pass Road Sta. 0+000 - Sta. 0+890, Sta. 2+670 - Sta. 3+048",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 43750000,
      "lengthKm": 1.268,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34503154.57,
      "lengthMeters": 1268.0,
      "allocationPerStatedMeter": 34503.15,
      "rangesMeters": [
        [
          0.0,
          890.0
        ],
        [
          2670.0,
          3048.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "NRJ Blancia-Alang-alang - Lower Tiparak - Tungawan By-Pass Road Sta. 0+000 - Sta. 0+890, Sta. 2+670 - Sta. 3+048",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.42,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0232-002228",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "NRJ Camanga- Tabuan- Manlayag-Navalan By-Pass Rd, Zamboanga del Sur Sta. 0+000 - Sta. 0+256, Sta. 13+705 - Sta. 14+700",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 43750000,
      "lengthKm": 1.251,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34972022.38,
      "lengthMeters": 1251.0,
      "allocationPerStatedMeter": 34972.02,
      "rangesMeters": [
        [
          0.0,
          256.0
        ],
        [
          13705.0,
          14700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "NRJ Camanga- Tabuan- Manlayag-Navalan By-Pass Rd, Zamboanga del Sur Sta. 0+000 - Sta. 0+256, Sta. 13+705 - Sta. 14+700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.42,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0232-002229",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "NRJ Dipolo - NRJ San Isidro Bypass Road (NRJ Dipolo - Rizal - Miligan - NRJ San Isidro Bypass Road) By-Pass Road Sta. 4+730-Sta. 5+980",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 43750000,
      "lengthKm": 1.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35000000.0,
      "lengthMeters": 1250.0,
      "allocationPerStatedMeter": 35000.0,
      "rangesMeters": [
        [
          4730.0,
          5980.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "NRJ Dipolo - NRJ San Isidro Bypass Road (NRJ Dipolo - Rizal - Miligan - NRJ San Isidro Bypass Road) By-Pass Road Sta. 4+730-Sta. 5+980",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.42,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0232-002230",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur Sta. 6+738 - Sta. 7+988",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 43750000,
      "lengthKm": 1.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35000000.0,
      "lengthMeters": 1250.0,
      "allocationPerStatedMeter": 35000.0,
      "rangesMeters": [
        [
          6738.0,
          7988.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur Sta. 6+738 - Sta. 7+988",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.42,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0232-002231",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "NRJ Panagaan - Barangay Guripan - Upper Salug Daku By-Pass Road Sta. 2+010.5 - Sta. 2+937.5, Sta. 3.898.5 - Sta. 4+221.5",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 43750000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          2010.5,
          2937.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "NRJ Panagaan - Barangay Guripan - Upper Salug Daku By-Pass Road Sta. 2+010.5 - Sta. 2+937.5, Sta. 3.898.5 - Sta. 4+221.5",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0112-000037",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0475 + 111 - K0475 + 610, K0477 + 840 - K0478 + 014",
      "office": "Central Office",
      "amountPesos": 43736000,
      "lengthKm": 0.673,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 64986627.04,
      "lengthMeters": 673.0,
      "allocationPerStatedMeter": 64986.63,
      "rangesMeters": [
        [
          475111.0,
          475610.0
        ],
        [
          477840.0,
          478014.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Maharlika Highway (LZ) - K0475 + 111 - K0475 + 610, K0477 + 840 - K0478 + 014",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 1.53,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0184-001347",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Ayaga-Sta. Marcela-Flora-Lasam Rd - K0694 + 030 - K0694 + 280",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 43710000,
      "lengthKm": 0.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 174840000.0,
      "lengthMeters": 250.0,
      "allocationPerStatedMeter": 174840.0,
      "rangesMeters": [
        [
          694030.0,
          694280.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Ayaga-Sta. Marcela-Flora-Lasam Rd - K0694 + 030 - K0694 + 280",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0184-001357",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Banaue-Hungduan-Benguet Bdry Rd - K0384 + (-135) - K0384 + (-102), K0384 + 045 - K0384 + 091, K0384 + 803 - K0384 + 813, K0386 + 780 - K0386 + 853, K0381 + 118 - K0381 + 221, K0381 + 488 - K0381 + 504",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 43700000,
      "lengthKm": 0.281,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 155516014.23,
      "lengthMeters": 281.0,
      "allocationPerStatedMeter": 155516.01,
      "rangesMeters": [
        [
          383865.0,
          383898.0
        ],
        [
          384045.0,
          384091.0
        ],
        [
          384803.0,
          384813.0
        ],
        [
          386780.0,
          386853.0
        ],
        [
          381118.0,
          381221.0
        ],
        [
          381488.0,
          381504.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Banaue-Hungduan-Benguet Bdry Rd - K0384 + (-135) - K0384 + (-102), K0384 + 045 - K0384 + 091, K0384 + 803 - K0384 + 813, K0386 + 780 - K0386 + 853, K0381 + 118 - K0381 + 221, K0381 + 488 - K0381 + 504",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 0.89,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0173-001172",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0701 + (-114) - K0701 + 112",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 43690000,
      "lengthKm": 0.226,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 193318584.07,
      "lengthMeters": 226.0,
      "allocationPerStatedMeter": 193318.58,
      "rangesMeters": [
        [
          700886.0,
          701112.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0701 + (-114) - K0701 + 112",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 0.58,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0182-001312",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd - K1468 + 288 - K1468 + 339",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 43500000,
      "lengthKm": 0.051,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 852941176.47,
      "lengthMeters": 51.0,
      "allocationPerStatedMeter": 852941.18,
      "rangesMeters": [
        [
          1468288.0,
          1468339.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "182",
      "lengthEvidence": "Surigao-Davao Coastal Rd - K1468 + 288 - K1468 + 339",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 1.36,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0213-001871",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Matalam-Mlang-Bagontapay Jct Rd - K1650 + 546 - K1651 + 384, K1653 + 103 - K1653 + 138, K1653 + 153 - K1653 + 638, K1654 + 000 - K1654 + 017",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 43496000,
      "lengthKm": 1.375,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 31633454.55,
      "lengthMeters": 1375.0,
      "allocationPerStatedMeter": 31633.45,
      "rangesMeters": [
        [
          1650546.0,
          1651384.0
        ],
        [
          1653103.0,
          1653138.0
        ],
        [
          1653153.0,
          1653638.0
        ],
        [
          1654000.0,
          1654017.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "213",
      "lengthEvidence": "Matalam-Mlang-Bagontapay Jct Rd - K1650 + 546 - K1651 + 384, K1653 + 103 - K1653 + 138, K1653 + 153 - K1653 + 638, K1654 + 000 - K1654 + 017",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.78,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0170-001113",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Sn Pablo-Rizal-Nagcarlan-Liliw Rd - K0083 + 409 - K0085 + 000, K0097 + 429 - K0097 + 440, K0097 + 892 - K0098 + 000, K0098 + 459 - K0098 + 616, K0098 + 654 - K0098 + 672, K0099 + 135 - K0099 + 333, K0099 + 840 - K0100 + 386",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 43471000,
      "lengthKm": 2.629,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 16535184.48,
      "lengthMeters": 2629.0,
      "allocationPerStatedMeter": 16535.18,
      "rangesMeters": [
        [
          83409.0,
          85000.0
        ],
        [
          97429.0,
          97440.0
        ],
        [
          97892.0,
          98000.0
        ],
        [
          98459.0,
          98616.0
        ],
        [
          98654.0,
          98672.0
        ],
        [
          99135.0,
          99333.0
        ],
        [
          99840.0,
          100386.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Sn Pablo-Rizal-Nagcarlan-Liliw Rd - K0083 + 409 - K0085 + 000, K0097 + 429 - K0097 + 440, K0097 + 892 - K0098 + 000, K0098 + 459 - K0098 + 616, K0098 + 654 - K0098 + 672, K0099 + 135 - K0099 + 333, K0099 + 840 - K0100 + 386",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 0.73,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0137-000516",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Palompon-Isabel-Merida-Ormoc Rd - K1126 + 000 - K1127 + 180",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 43400000,
      "lengthKm": 1.18,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36779661.02,
      "lengthMeters": 1180.0,
      "allocationPerStatedMeter": 36779.66,
      "rangesMeters": [
        [
          1126000.0,
          1127180.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Palompon-Isabel-Merida-Ormoc Rd - K1126 + 000 - K1127 + 180",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.18,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0208-001779",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0045 + 300 - K0046 + 155",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 43400000,
      "lengthKm": 0.855,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50760233.92,
      "lengthMeters": 855.0,
      "allocationPerStatedMeter": 50760.23,
      "rangesMeters": [
        [
          45300.0,
          46155.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0045 + 300 - K0046 + 155",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 1.0,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0121-000204",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod South Rd - K0070+250 - K0071+480",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 43383000,
      "lengthKm": 1.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35270731.71,
      "lengthMeters": 1230.0,
      "allocationPerStatedMeter": 35270.73,
      "rangesMeters": [
        [
          70250.0,
          71480.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "Bacolod South Rd - K0070+250 - K0071+480",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 0.9,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0119-000162",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Santiago - Tuguegarao Rd - K0395 + 000 - K0396 + 052",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 43353000,
      "lengthKm": 1.052,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41210076.05,
      "lengthMeters": 1052.0,
      "allocationPerStatedMeter": 41210.08,
      "rangesMeters": [
        [
          395000.0,
          396052.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Santiago - Tuguegarao Rd - K0395 + 000 - K0396 + 052",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 0.89,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0143-000647",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Burgos-Gen Aguinaldo (NIA) Rd - K0343 + 554 - K0347 + 000",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 43302000,
      "lengthKm": 3.446,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12565873.48,
      "lengthMeters": 3446.0,
      "allocationPerStatedMeter": 12565.87,
      "rangesMeters": [
        [
          343554.0,
          347000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Burgos-Gen Aguinaldo (NIA) Rd - K0343 + 554 - K0347 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 0.76,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0263-002758",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Valencia Br. (B00185LT) along Palo-Carigara-Ormoc Rd",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 43260000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Valencia Br. (B00185LT) along Palo-Carigara-Ormoc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0123-000234",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Makilala-Allah Valley Rd - K1638 + 526 - K1639 + 000, K1642 + 861 - K1643 + 000",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 43186000,
      "lengthKm": 0.613,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 70450244.7,
      "lengthMeters": 613.0,
      "allocationPerStatedMeter": 70450.24,
      "rangesMeters": [
        [
          1638526.0,
          1639000.0
        ],
        [
          1642861.0,
          1643000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "123",
      "lengthEvidence": "Makilala-Allah Valley Rd - K1638 + 526 - K1639 + 000, K1642 + 861 - K1643 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 1.66,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0211-001832",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Banisilan-Guiling-Alamada-Libungan Rd - K1689 + 922 - K1692 + 000",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 43110000,
      "lengthKm": 2.078,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20745909.53,
      "lengthMeters": 2078.0,
      "allocationPerStatedMeter": 20745.91,
      "rangesMeters": [
        [
          1689922.0,
          1692000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "211",
      "lengthEvidence": "Banisilan-Guiling-Alamada-Libungan Rd - K1689 + 922 - K1692 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 0.73,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0263-002752",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Pob. Daan Bantayan Br. (B00011CB) along Bogo-Curva-Medellin-Daanbantayan-Maya Rd",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 43000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Pob. Daan Bantayan Br. (B00011CB) along Bogo-Curva-Medellin-Daanbantayan-Maya Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003225",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Calambusing Br. (B02734LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 43000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Calambusing Br. (B02734LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003240",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Binalbagan (Bagacay) Br. (B00379NR) along Hinigaran-Isabela Rd",
      "office": "Central Office",
      "amountPesos": 43000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Binalbagan (Bagacay) Br. (B00379NR) along Hinigaran-Isabela Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007632",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tuyo, City of Balanga, Bataan, 0+000-0+610, 0+000- 0+222",
      "office": "Bataan 2nd District Engineering Office",
      "amountPesos": 43000000,
      "lengthKm": 0.61,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 70491803.28,
      "lengthMeters": 610.0,
      "allocationPerStatedMeter": 70491.8,
      "rangesMeters": [
        [
          0.0,
          610.0
        ],
        [
          0.0,
          222.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Road, Barangay Tuyo, City of Balanga, Bataan, 0+000-0+610, 0+000- 0+222",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 2.88,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0564-008884",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Jct National Road - Barangay Villa Alvarez - Barangay Salvacion, Balud and Mandaon, Masbate, Sta. 4+192 to Sta. 5+122",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 43000000,
      "lengthKm": 0.93,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46236559.14,
      "lengthMeters": 930.0,
      "allocationPerStatedMeter": 46236.56,
      "rangesMeters": [
        [
          4192.0,
          5122.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Jct National Road - Barangay Villa Alvarez - Barangay Salvacion, Balud and Mandaon, Masbate, Sta. 4+192 to Sta. 5+122",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 2.38,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0613-009913",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Isidro D. Tan - Manga Road, Sta. 0+000 - Sta. 1+430, Tangub City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 42980000,
      "lengthKm": 1.43,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30055944.06,
      "lengthMeters": 1430.0,
      "allocationPerStatedMeter": 30055.94,
      "rangesMeters": [
        [
          0.0,
          1430.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Improvement of Road, Isidro D. Tan - Manga Road, Sta. 0+000 - Sta. 1+430, Tangub City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.2,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0140-000582",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Coron-Busuanga Rd - K0018 + 000 - K0020 + 926",
      "office": "Central Office",
      "amountPesos": 42699000,
      "lengthKm": 2.926,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14592959.67,
      "lengthMeters": 2926.0,
      "allocationPerStatedMeter": 14592.96,
      "rangesMeters": [
        [
          18000.0,
          20926.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Coron-Busuanga Rd - K0018 + 000 - K0020 + 926",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 0.88,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0143-000648",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Naguilian-Sn Mariano Rd - K0409 + 297 - K0413 + 000",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 42685000,
      "lengthKm": 3.703,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11527140.16,
      "lengthMeters": 3703.0,
      "allocationPerStatedMeter": 11527.14,
      "rangesMeters": [
        [
          409297.0,
          413000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Naguilian-Sn Mariano Rd - K0409 + 297 - K0413 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 0.79,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0114-000063",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LT) - K0914 + 000 - K0914 + 770, K0915 + 000 - K0915 + 050",
      "office": "Central Office",
      "amountPesos": 42653000,
      "lengthKm": 0.82,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 52015853.66,
      "lengthMeters": 820.0,
      "allocationPerStatedMeter": 52015.85,
      "rangesMeters": [
        [
          914000.0,
          914770.0
        ],
        [
          915000.0,
          915050.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Maharlika Highway (LT) - K0914 + 000 - K0914 + 770, K0915 + 000 - K0915 + 050",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 1.22,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0291-003363",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Bypass Br. 2 (B02410MN) along Zamboanga City Bypass Rd",
      "office": "Zamboanga City 2nd District Engineering Office",
      "amountPesos": 42537000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Bypass Br. 2 (B02410MN) along Zamboanga City Bypass Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0200-001620",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1564 + 162 - K1564 + 1003",
      "office": "Davao del Sur District Engineering Office",
      "amountPesos": 42500000,
      "lengthKm": 0.841,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50535077.29,
      "lengthMeters": 841.0,
      "allocationPerStatedMeter": 50535.08,
      "rangesMeters": [
        [
          1564162.0,
          1565003.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1564 + 162 - K1564 + 1003",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 1.03,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0227-002142",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Barangay Kibention Section, Sta. 54+400 - Sta. 54+432.81, Impasug-ong, Bukidnon",
      "office": "Central Office",
      "amountPesos": 42500000,
      "lengthKm": 0.032809999999997674,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1295336787.56,
      "lengthMeters": 32.81,
      "allocationPerStatedMeter": 1295336.79,
      "rangesMeters": [
        [
          54400.0,
          54432.81
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Barangay Kibention Section, Sta. 54+400 - Sta. 54+432.81, Impasug-ong, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 1.08,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0217-001952",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Lubao -Guagaua-Minalin-Sto Tomas Rd, (Sta 000+285-Sta 000+703.64), Pampanga",
      "office": "Central Office",
      "amountPesos": 42250000,
      "lengthKm": 0.41864,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100922033.25,
      "lengthMeters": 418.64,
      "allocationPerStatedMeter": 100922.03,
      "rangesMeters": [
        [
          285.0,
          703.64
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "217",
      "lengthEvidence": "Lubao -Guagaua-Minalin-Sto Tomas Rd, (Sta 000+285-Sta 000+703.64), Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.79,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0140-000585",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Dapawan-Torrel Rd - K0001 + (-828) - K0001 + 863, K0001 + 881 - K0003 + 085",
      "office": "Central Office",
      "amountPesos": 42237000,
      "lengthKm": 2.895,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14589637.31,
      "lengthMeters": 2895.0,
      "allocationPerStatedMeter": 14589.64,
      "rangesMeters": [
        [
          172.0,
          1863.0
        ],
        [
          1881.0,
          3085.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "140",
      "lengthEvidence": "Dapawan-Torrel Rd - K0001 + (-828) - K0001 + 863, K0001 + 881 - K0003 + 085",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 0.88,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0273-002960",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Makati-Mandaluyong Br. (B04891LZ) along Makati-Mandaluyong Br.",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 42200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Makati-Mandaluyong Br. (B04891LZ) along Makati-Mandaluyong Br.",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0185-001367",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0380+1100 - K0380+1170",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 42100000,
      "lengthKm": 0.07,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 601428571.43,
      "lengthMeters": 70.0,
      "allocationPerStatedMeter": 601428.57,
      "rangesMeters": [
        [
          381100.0,
          381170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "185",
      "lengthEvidence": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0380+1100 - K0380+1170",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 1.61,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0165-001024",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Cebu North Hagnaya Wharf Rd - K0057 + 000 - K0057 + 478, K0062 + 342 - K0062 +700 , K0066+000 - K0066 + 433, K0070 + 013 - K0070 +162, K0070 + 600 - K0071 + 000, K0072 + 400 - K0072 + 710 , K0073 + 694 - K0073 + 771",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 42095000,
      "lengthKm": 2.205,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 19090702.95,
      "lengthMeters": 2205.0,
      "allocationPerStatedMeter": 19090.7,
      "rangesMeters": [
        [
          57000.0,
          57478.0
        ],
        [
          62342.0,
          62700.0
        ],
        [
          66000.0,
          66433.0
        ],
        [
          70013.0,
          70162.0
        ],
        [
          70600.0,
          71000.0
        ],
        [
          72400.0,
          72710.0
        ],
        [
          73694.0,
          73771.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Cebu North Hagnaya Wharf Rd - K0057 + 000 - K0057 + 478, K0062 + 342 - K0062 +700 , K0066+000 - K0066 + 433, K0070 + 013 - K0070 +162, K0070 + 600 - K0071 + 000, K0072 + 400 - K0072 + 710 , K0073 + 694 - K0073 + 771",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 0.85,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0130-000386",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Olongapo-Bugallon Rd - K0131 + 582 - K0132 + 168",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 42000000,
      "lengthKm": 0.586,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 71672354.95,
      "lengthMeters": 586.0,
      "allocationPerStatedMeter": 71672.35,
      "rangesMeters": [
        [
          131582.0,
          132168.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Olongapo-Bugallon Rd - K0131 + 582 - K0132 + 168",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 2.22,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0169-001099",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Apalit-Macabebe-Masantol Rd - K0055 + (-680) - K0055 + (-105)",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 42000000,
      "lengthKm": 0.575,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 73043478.26,
      "lengthMeters": 575.0,
      "allocationPerStatedMeter": 73043.48,
      "rangesMeters": [
        [
          54320.0,
          54895.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Apalit-Macabebe-Masantol Rd - K0055 + (-680) - K0055 + (-105)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 2.3,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0286-003247",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Daguitan Parallel Br. along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 42000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Daguitan Parallel Br. along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010030",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pag-asa, Kapalong, Davao del Norte",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 42000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Road, Barangay Pag-asa, Kapalong, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0184-001362",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Alfonso Lista - Aurora Bdry. Rd - K0455 + 024 - K0455 + 361, K0456 + 007 - K0456 + 257",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 41881000,
      "lengthKm": 0.587,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 71347529.81,
      "lengthMeters": 587.0,
      "allocationPerStatedMeter": 71347.53,
      "rangesMeters": [
        [
          455024.0,
          455361.0
        ],
        [
          456007.0,
          456257.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Alfonso Lista - Aurora Bdry. Rd - K0455 + 024 - K0455 + 361, K0456 + 007 - K0456 + 257",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 0.77,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0198-001584",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1651 + 473 - K1651 + 1070, K1651 + 2121 - K1651 + 2235, K1656 + 2856 - K1659 + 250, K1659 + 2167 - K1659 + 2791",
      "office": "Central Office",
      "amountPesos": 41880000,
      "lengthKm": 1.729,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 24222093.7,
      "lengthMeters": 1729.0,
      "allocationPerStatedMeter": 24222.09,
      "rangesMeters": [
        [
          1651473.0,
          1652070.0
        ],
        [
          1653121.0,
          1653235.0
        ],
        [
          1658856.0,
          1659250.0
        ],
        [
          1661167.0,
          1661791.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1651 + 473 - K1651 + 1070, K1651 + 2121 - K1651 + 2235, K1656 + 2856 - K1659 + 250, K1659 + 2167 - K1659 + 2791",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 0.54,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0490-007275",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Section 1: Sta. 0+765 - Sta. 2+940, Sta. 2+950 - Sta. 3+820, Sta. 3+865 - Sta. 4+020, Section 2: Sta. 0+000 - Sta. 0+310) along Sitio Fugong to Sitio Baccay to Sitio Gapa Road, Barangay San Antonio, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 41800000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          765.0,
          2940.0
        ],
        [
          2950.0,
          3820.0
        ],
        [
          3865.0,
          4020.0
        ],
        [
          0.0,
          310.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Construction of Concrete Road (Section 1: Sta. 0+765 - Sta. 2+940, Sta. 2+950 - Sta. 3+820, Sta. 3+865 - Sta. 4+020, Section 2: Sta. 0+000 - Sta. 0+310) along Sitio Fugong to Sitio Baccay to Sitio Gapa Road, Barangay San Antonio, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0206-001730",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Gov JJ Linao Rd - K0142 + 000 - K0143 + 330, K0143 + 346.40 - K0144 + 000",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 41737000,
      "lengthKm": 1.9836000000000058,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21041036.5,
      "lengthMeters": 1983.6,
      "allocationPerStatedMeter": 21041.04,
      "rangesMeters": [
        [
          142000.0,
          143330.0
        ],
        [
          143346.4,
          144000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Gov JJ Linao Rd - K0142 + 000 - K0143 + 330, K0143 + 346.40 - K0144 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 0.74,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0149-000755",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0209 + 093 - K0209 + 742, K0209 + 764 - K0210 + 261, K0210 + 311 - K0210 + 820, K0210 + 925 - K0211 + 010, K0211 + 070 - K0211 + 126, K0211 + 211 - K0211 + 249, K0211 + 425 - K0211 + 514, K0212 + 132 - K0212 + 149, K0212 + 358 - K0212 + 381, K0212 + 819 - K0212 + 873, K0213 + 050 - K0213 + 100, K0213 + 563 - K0213 + 650",
      "office": "Central Office",
      "amountPesos": 41717000,
      "lengthKm": 2.154,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 19367223.77,
      "lengthMeters": 2154.0,
      "allocationPerStatedMeter": 19367.22,
      "rangesMeters": [
        [
          209093.0,
          209742.0
        ],
        [
          209764.0,
          210261.0
        ],
        [
          210311.0,
          210820.0
        ],
        [
          210925.0,
          211010.0
        ],
        [
          211070.0,
          211126.0
        ],
        [
          211211.0,
          211249.0
        ],
        [
          211425.0,
          211514.0
        ],
        [
          212132.0,
          212149.0
        ],
        [
          212358.0,
          212381.0
        ],
        [
          212819.0,
          212873.0
        ],
        [
          213050.0,
          213100.0
        ],
        [
          213563.0,
          213650.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "149",
      "lengthEvidence": "Maharlika Highway (LZ) - K0209 + 093 - K0209 + 742, K0209 + 764 - K0210 + 261, K0210 + 311 - K0210 + 820, K0210 + 925 - K0211 + 010, K0211 + 070 - K0211 + 126, K0211 + 211 - K0211 + 249, K0211 + 425 - K0211 + 514, K0212 + 132 - K0212 + 149, K0212 + 358 - K0212 + 381, K0212 + 819 - K0212 + 873, K0213 + 050 - K0213 + 100, K0213 + 563 - K0213 + 650",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 0.77,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0206-001729",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Gov JJ Linao Rd - K0141 + (-978) - K0142 + 000",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 41681000,
      "lengthKm": 1.978,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21072295.25,
      "lengthMeters": 1978.0,
      "allocationPerStatedMeter": 21072.3,
      "rangesMeters": [
        [
          140022.0,
          142000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Gov JJ Linao Rd - K0141 + (-978) - K0142 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 0.74,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0262-002736",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Kay Tialo Br. (B00136LZ) along NCR/Bulacan Bdry-Bigte-Ipo Dam Rd",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 41654000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "Kay Tialo Br. (B00136LZ) along NCR/Bulacan Bdry-Bigte-Ipo Dam Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0271-002924",
      "category": "Mixed roads / bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Ragay Bridge (B00437LZ) along Andaya Highway (Package B3-A)",
      "office": "Central Office",
      "amountPesos": 41647000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Ragay Bridge (B00437LZ) along Andaya Highway (Package B3-A)",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0251-002532",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Construction of Solar Lights along Iligan City Diversion Road, Barangay Del Carmen, K1523+267 - K1525+618, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 41580000,
      "lengthKm": 2.351,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17686091.03,
      "lengthMeters": 2351.0,
      "allocationPerStatedMeter": 17686.09,
      "rangesMeters": [
        [
          1523267.0,
          1525618.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Construction of Solar Lights along Iligan City Diversion Road, Barangay Del Carmen, K1523+267 - K1525+618, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.71,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0251-002536",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Construction of Solar Lights along Iligan City Diversion Road, Barangay Pala-o, K1525+618 - K1527+950, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 41580000,
      "lengthKm": 2.332,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17830188.68,
      "lengthMeters": 2332.0,
      "allocationPerStatedMeter": 17830.19,
      "rangesMeters": [
        [
          1525618.0,
          1527950.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Construction of Solar Lights along Iligan City Diversion Road, Barangay Pala-o, K1525+618 - K1527+950, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.72,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0117-000136",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway( Cotabato-Marbel Rd) - K1713 + 452 - K1714 + 275",
      "office": "Central Office",
      "amountPesos": 41578000,
      "lengthKm": 0.823,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50520048.6,
      "lengthMeters": 823.0,
      "allocationPerStatedMeter": 50520.05,
      "rangesMeters": [
        [
          1713452.0,
          1714275.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Maharlika Highway( Cotabato-Marbel Rd) - K1713 + 452 - K1714 + 275",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 1.19,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0207-001759",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0036 + 1477 - K0039 + 000, K0039 + 567 - K0039 + 702",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 41509000,
      "lengthKm": 1.658,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 25035585.04,
      "lengthMeters": 1658.0,
      "allocationPerStatedMeter": 25035.59,
      "rangesMeters": [
        [
          37477.0,
          39000.0
        ],
        [
          39567.0,
          39702.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Puerto Princesa South Rd - K0036 + 1477 - K0039 + 000, K0039 + 567 - K0039 + 702",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 0.88,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0144-000658",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sn Fernando-Lubao Rd - K0080 + 000 - K0082 + 000",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 41452000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20726000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 20726.0,
      "rangesMeters": [
        [
          80000.0,
          82000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Sn Fernando-Lubao Rd - K0080 + 000 - K0082 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 0.69,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0269-002879",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Ibawon Br. (B00710LT) along La Paz-Javier-Bito Rd",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 41400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Ibawon Br. (B00710LT) along La Paz-Javier-Bito Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0201-001624",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1652 + 311 - K1652 + 909, K1653 + 123 - K1653 + 480, K1653 + 692 - K1654 + 100",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 41330000,
      "lengthKm": 1.363,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 30322817.31,
      "lengthMeters": 1363.0,
      "allocationPerStatedMeter": 30322.82,
      "rangesMeters": [
        [
          1652311.0,
          1652909.0
        ],
        [
          1653123.0,
          1653480.0
        ],
        [
          1653692.0,
          1654100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1652 + 311 - K1652 + 909, K1653 + 123 - K1653 + 480, K1653 + 692 - K1654 + 100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 0.68,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0122-000218",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dipolog-Oroquieta National Rd - K1797 + 010 - K1797 + 681",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "amountPesos": 41324000,
      "lengthKm": 0.671,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 61585693.0,
      "lengthMeters": 671.0,
      "allocationPerStatedMeter": 61585.69,
      "rangesMeters": [
        [
          1797010.0,
          1797681.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Dipolog-Oroquieta National Rd - K1797 + 010 - K1797 + 681",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 1.45,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0201-001623",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1651 + 000 - K1652 + 311",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 41297000,
      "lengthKm": 1.311,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31500381.39,
      "lengthMeters": 1311.0,
      "allocationPerStatedMeter": 31500.38,
      "rangesMeters": [
        [
          1651000.0,
          1652311.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1651 + 000 - K1652 + 311",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 0.71,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0207-001758",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0242 + 550 - K0243 + 1048.40",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 41293000,
      "lengthKm": 1.4983999999999942,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27558061.93,
      "lengthMeters": 1498.4,
      "allocationPerStatedMeter": 27558.06,
      "rangesMeters": [
        [
          242550.0,
          244048.4
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Puerto Princesa South Rd - K0242 + 550 - K0243 + 1048.40",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 0.82,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0292-003375",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Mapawa Br. 1 (B01428MN) along Montevista-Compostela-Mati Bdry Rd",
      "office": "Davao de Oro 2nd District Engineering Office",
      "amountPesos": 41280000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Mapawa Br. 1 (B01428MN) along Montevista-Compostela-Mati Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0135-000486",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0561 + 552 - K0562 + 357",
      "office": "Albay 1st District Engineering Office",
      "amountPesos": 41270000,
      "lengthKm": 0.805,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51267080.75,
      "lengthMeters": 805.0,
      "allocationPerStatedMeter": 51267.08,
      "rangesMeters": [
        [
          561552.0,
          562357.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0561 + 552 - K0562 + 357",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.68,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0618-010018",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "NRJ Daang Maharlika Bunawan Proper - San Isidro - Kiotoy - Mabunao - Kauswagan - Jct. Panabo City Fatima - Malabog Road, Panabo City, Davao del Norte - Sta. 0+000 - Sta. 1+000, Sta. 1+100 - Sta. 1+895",
      "office": "Davao del Norte 2nd District Engineering Office",
      "amountPesos": 41250000,
      "lengthKm": 1.795,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22980501.39,
      "lengthMeters": 1795.0,
      "allocationPerStatedMeter": 22980.5,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ],
        [
          1100.0,
          1895.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "NRJ Daang Maharlika Bunawan Proper - San Isidro - Kiotoy - Mabunao - Kauswagan - Jct. Panabo City Fatima - Malabog Road, Panabo City, Davao del Norte - Sta. 0+000 - Sta. 1+000, Sta. 1+100 - Sta. 1+895",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.95,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0147-000726",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Dualing-New Panay-Midsayap Rd - K1696 + 016 - K1697 + 272",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 41229000,
      "lengthKm": 1.256,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32825636.94,
      "lengthMeters": 1256.0,
      "allocationPerStatedMeter": 32825.64,
      "rangesMeters": [
        [
          1696016.0,
          1697272.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Dualing-New Panay-Midsayap Rd - K1696 + 016 - K1697 + 272",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.37,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0209-001805",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Jct (LIR) Carmen-Sagbayan-Bacani Rd - K0179 + 000 - K0179 + 100, K0179 + 350 - K0180 + 000",
      "office": "Bohol 2nd District Engineering Office",
      "amountPesos": 41215000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 54953333.33,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 54953.33,
      "rangesMeters": [
        [
          179000.0,
          179100.0
        ],
        [
          179350.0,
          180000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "Jct (LIR) Carmen-Sagbayan-Bacani Rd - K0179 + 000 - K0179 + 100, K0179 + 350 - K0180 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 0.91,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0131-000401",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Batangas-Lobo Rd - K0130 + 074 - K0131 + 114",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 41120000,
      "lengthKm": 1.04,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39538461.54,
      "lengthMeters": 1040.0,
      "allocationPerStatedMeter": 39538.46,
      "rangesMeters": [
        [
          130074.0,
          131114.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Batangas-Lobo Rd - K0130 + 074 - K0131 + 114",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.27,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0155-000863",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1673 + 000 - K1675 + 000",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 41070000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20535000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 20535.0,
      "rangesMeters": [
        [
          1673000.0,
          1675000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1673 + 000 - K1675 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 0.82,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0213-001868",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Kananga-Tungonan Hot Spring Rd - K0993 + 698 - K0995 + 000",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 41042000,
      "lengthKm": 1.302,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31522273.43,
      "lengthMeters": 1302.0,
      "allocationPerStatedMeter": 31522.27,
      "rangesMeters": [
        [
          993698.0,
          995000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "213",
      "lengthEvidence": "Kananga-Tungonan Hot Spring Rd - K0993 + 698 - K0995 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.78,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0119-000171",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Capas-San Jose-Mayantoc-Malacampa Rd - K0141 + 613 - K0142 + 814",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 41000000,
      "lengthKm": 1.201,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34138218.15,
      "lengthMeters": 1201.0,
      "allocationPerStatedMeter": 34138.22,
      "rangesMeters": [
        [
          141613.0,
          142814.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Capas-San Jose-Mayantoc-Malacampa Rd - K0141 + 613 - K0142 + 814",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 0.87,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0205-001724",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0679 + 360 - K0679 + 850",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 41000000,
      "lengthKm": 0.49,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 83673469.39,
      "lengthMeters": 490.0,
      "allocationPerStatedMeter": 83673.47,
      "rangesMeters": [
        [
          679360.0,
          679850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0679 + 360 - K0679 + 850",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 1.61,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0551-008584",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Slope Protection at Marikina Infanta Highway, Sitio Cabading, Barangay San Jose, Antipolo City (14.633962°N, 121.229422°E)",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 41000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Construction of Road with Slope Protection at Marikina Infanta Highway, Sitio Cabading, Barangay San Jose, Antipolo City (14.633962°N, 121.229422°E)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009259",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Cangmatnog to Barangay Cang-atuyom, Siquijor, Siquijor",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 41000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road Barangay Cangmatnog to Barangay Cang-atuyom, Siquijor, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0181-001295",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Liloy-Siocon Rd (S01330MN) - K2047+180-K2047+207, K2047+465 - K2047+497, K2051+809-K2051+835, K2053+330-K2053+380, K2053+635-K2053+672, K2059+450- K2059+480, K2059+825-K2059+856",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 40836000,
      "lengthKm": 0.233,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 175261802.58,
      "lengthMeters": 233.0,
      "allocationPerStatedMeter": 175261.8,
      "rangesMeters": [
        [
          2047180.0,
          2047207.0
        ],
        [
          2047465.0,
          2047497.0
        ],
        [
          2051809.0,
          2051835.0
        ],
        [
          2053330.0,
          2053380.0
        ],
        [
          2053635.0,
          2053672.0
        ],
        [
          2059450.0,
          2059480.0
        ],
        [
          2059825.0,
          2059856.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Liloy-Siocon Rd (S01330MN) - K2047+180-K2047+207, K2047+465 - K2047+497, K2051+809-K2051+835, K2053+330-K2053+380, K2053+635-K2053+672, K2059+450- K2059+480, K2059+825-K2059+856",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 0.92,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0114-000065",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LT) - K0984 + 350 - K0985 + 000, K0988 + 939 - K0989 + 724",
      "office": "Central Office",
      "amountPesos": 40781000,
      "lengthKm": 1.435,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 28418815.33,
      "lengthMeters": 1435.0,
      "allocationPerStatedMeter": 28418.82,
      "rangesMeters": [
        [
          984350.0,
          985000.0
        ],
        [
          988939.0,
          989724.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Maharlika Highway (LT) - K0984 + 350 - K0985 + 000, K0988 + 939 - K0989 + 724",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 0.72,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0206-001745",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Candelaria Bypass Rd - K0109 + 911 - K0110 + 236",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 40750000,
      "lengthKm": 0.325,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 125384615.38,
      "lengthMeters": 325.0,
      "allocationPerStatedMeter": 125384.62,
      "rangesMeters": [
        [
          109911.0,
          110236.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Candelaria Bypass Rd - K0109 + 911 - K0110 + 236",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 2.51,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0165-001025",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Santander-Barili-Toledo Rd - K0159 + 208 - K0159 + 537, K0159 + 589 - K0160 + 252, K0160 + 267 - K0161 + 000",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 40678000,
      "lengthKm": 1.725,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23581449.28,
      "lengthMeters": 1725.0,
      "allocationPerStatedMeter": 23581.45,
      "rangesMeters": [
        [
          159208.0,
          159537.0
        ],
        [
          159589.0,
          160252.0
        ],
        [
          160267.0,
          161000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Santander-Barili-Toledo Rd - K0159 + 208 - K0159 + 537, K0159 + 589 - K0160 + 252, K0160 + 267 - K0161 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 0.73,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0164-001011",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0187 + 000 - K0188 + 842",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 40677000,
      "lengthKm": 1.842,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22083061.89,
      "lengthMeters": 1842.0,
      "allocationPerStatedMeter": 22083.06,
      "rangesMeters": [
        [
          187000.0,
          188842.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0187 + 000 - K0188 + 842",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 0.98,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0136-000500",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0159 + 000 - K0161 + 484",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 40624000,
      "lengthKm": 2.484,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16354267.31,
      "lengthMeters": 2484.0,
      "allocationPerStatedMeter": 16354.27,
      "rangesMeters": [
        [
          159000.0,
          161484.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0159 + 000 - K0161 + 484",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.81,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0488-007237",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Section 1: Sta. 0+000 - Sta. 1+435, Section 2: Sta. 0+000 - Sta. 1+978), Purok 7 to Purok 1, Barangay San Ignacio, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 40605000,
      "lengthKm": 1.978,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20528311.43,
      "lengthMeters": 1978.0,
      "allocationPerStatedMeter": 20528.31,
      "rangesMeters": [
        [
          0.0,
          1435.0
        ],
        [
          0.0,
          1978.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Construction of Concrete Road (Section 1: Sta. 0+000 - Sta. 1+435, Section 2: Sta. 0+000 - Sta. 1+978), Purok 7 to Purok 1, Barangay San Ignacio, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.85,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0254-002579",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Candoni-Sipalay Rd - K0161 + 740 - K0161 + 855 (Off-Carriageway Improvement: Paving of Shoulders)",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 40600000,
      "lengthKm": 0.115,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 353043478.26,
      "lengthMeters": 115.0,
      "allocationPerStatedMeter": 353043.48,
      "rangesMeters": [
        [
          161740.0,
          161855.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "254",
      "lengthEvidence": "Candoni-Sipalay Rd - K0161 + 740 - K0161 + 855 (Off-Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 35.62,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0179-001258",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kalinga-Abra Rd - K0483 + 264 - K0483 + 279, K0483 + 375 - K0483 + 425, K0483 + 450 - K0483 + 470, K0490 + 382 - K0490 + 397, K0502 + 900 - K0502 + 915, K0505 + 130 - K0505 + 180, K0505 + 770 - K0505 + 795, K0513 + 620 - K0513 + 650",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 40500000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 184090909.09,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 184090.91,
      "rangesMeters": [
        [
          483264.0,
          483279.0
        ],
        [
          483375.0,
          483425.0
        ],
        [
          483450.0,
          483470.0
        ],
        [
          490382.0,
          490397.0
        ],
        [
          502900.0,
          502915.0
        ],
        [
          505130.0,
          505180.0
        ],
        [
          505770.0,
          505795.0
        ],
        [
          513620.0,
          513650.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "Kalinga-Abra Rd - K0483 + 264 - K0483 + 279, K0483 + 375 - K0483 + 425, K0483 + 450 - K0483 + 470, K0490 + 382 - K0490 + 397, K0502 + 900 - K0502 + 915, K0505 + 130 - K0505 + 180, K0505 + 770 - K0505 + 795, K0513 + 620 - K0513 + 650",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 0.97,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0238-002338",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Pasacao-Balatan Tourism Coastal Highway - Sta. 494+600.00 - Sta. 495+800.00",
      "office": "Central Office",
      "amountPesos": 40500000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33750000.0,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 33750.0,
      "rangesMeters": [
        [
          494600.0,
          495800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "238",
      "lengthEvidence": "Pasacao-Balatan Tourism Coastal Highway - Sta. 494+600.00 - Sta. 495+800.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 62500.0,
      "peerRateMultiple": 0.54,
      "peerRecords": 22,
      "peerBand": "989–<1491.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 142911.43250000002,
      "graphUpperFence": 198263.55500000005
    },
    {
      "id": "HB10858-3-0292-003377",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Tarago Br. (B01841MN) along Nabunturan-Maragusan Rd",
      "office": "Davao de Oro 2nd District Engineering Office",
      "amountPesos": 40500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Tarago Br. (B01841MN) along Nabunturan-Maragusan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008717",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Guinhayaan, Sta. 0+100 - Sta. 1+020, Looc, Romblon",
      "office": "Romblon District Engineering Office",
      "amountPesos": 40480000,
      "lengthKm": 0.92,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44000000.0,
      "lengthMeters": 920.0,
      "allocationPerStatedMeter": 44000.0,
      "rangesMeters": [
        [
          100.0,
          1020.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road, Barangay Guinhayaan, Sta. 0+100 - Sta. 1+020, Looc, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 2.26,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0210-001816",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Liloy-Siocon Rd - K2058 + 400 - K2060 + 000",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 40439000,
      "lengthKm": 1.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25274375.0,
      "lengthMeters": 1600.0,
      "allocationPerStatedMeter": 25274.38,
      "rangesMeters": [
        [
          2058400.0,
          2060000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Liloy-Siocon Rd - K2058 + 400 - K2060 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 0.75,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0137-000535",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siocon-Sirawai-Sibuco-Limpapa Rd - K2105 + 000 - K2107 + 696",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 40425000,
      "lengthKm": 2.696,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14994436.2,
      "lengthMeters": 2696.0,
      "allocationPerStatedMeter": 14994.44,
      "rangesMeters": [
        [
          2105000.0,
          2107696.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Siocon-Sirawai-Sibuco-Limpapa Rd - K2105 + 000 - K2107 + 696",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.75,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0187-001393",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose Rd - K0777 + 150 - K0777 + 270, K0777 + 498 - K0777 + 745",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 40370000,
      "lengthKm": 0.367,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 110000000.0,
      "lengthMeters": 367.0,
      "allocationPerStatedMeter": 110000.0,
      "rangesMeters": [
        [
          777150.0,
          777270.0
        ],
        [
          777498.0,
          777745.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "187",
      "lengthEvidence": "Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose Rd - K0777 + 150 - K0777 + 270, K0777 + 498 - K0777 + 745",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 1.19,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0163-000993",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Buenavista-Kawayan Rd - K0058 + 000 - K0058 + 449",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 40320000,
      "lengthKm": 0.449,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 89799554.57,
      "lengthMeters": 449.0,
      "allocationPerStatedMeter": 89799.55,
      "rangesMeters": [
        [
          58000.0,
          58449.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Buenavista-Kawayan Rd - K0058 + 000 - K0058 + 449",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 2.26,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0477-006988",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Fort Del Pilar Barangay, Sta. 0+000 - Sta. 0+502, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 40320000,
      "lengthKm": 0.502,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 80318725.1,
      "lengthMeters": 502.0,
      "allocationPerStatedMeter": 80318.73,
      "rangesMeters": [
        [
          0.0,
          502.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Rehabilitation of Road at Fort Del Pilar Barangay, Sta. 0+000 - Sta. 0+502, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 3.28,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0208-001781",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0053 + 152 - K0053 + 555",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 40300000,
      "lengthKm": 0.403,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 403.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          53152.0,
          53555.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0053 + 152 - K0053 + 555",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 1.93,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0133-000453",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagaytay-Batangas via Tuy Rd - K0060 + 167 - K0061 + 291",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 40178000,
      "lengthKm": 1.124,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35745551.6,
      "lengthMeters": 1124.0,
      "allocationPerStatedMeter": 35745.55,
      "rangesMeters": [
        [
          60167.0,
          61291.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Tagaytay-Batangas via Tuy Rd - K0060 + 167 - K0061 + 291",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.15,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0210-001830",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Babak-Samal-Kaputian Rd - K1512 + 413 - K1513 + 676",
      "office": "Davao del Norte 2nd District Engineering Office",
      "amountPesos": 40154000,
      "lengthKm": 1.263,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31792557.4,
      "lengthMeters": 1263.0,
      "allocationPerStatedMeter": 31792.56,
      "rangesMeters": [
        [
          1512413.0,
          1513676.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Babak-Samal-Kaputian Rd - K1512 + 413 - K1513 + 676",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 0.95,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0136-000508",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Cebu South Coastal Rd - K0015 + 007 - K0016 + 372",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 40152000,
      "lengthKm": 1.365,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29415384.62,
      "lengthMeters": 1365.0,
      "allocationPerStatedMeter": 29415.38,
      "rangesMeters": [
        [
          15007.0,
          16372.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Cebu South Coastal Rd - K0015 + 007 - K0016 + 372",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.95,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0293-003392",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Kapate Br. (B01076MN) along Sarangani-Sultan Kudarat Coastal Rd",
      "office": "Sarangani District Engineering Office",
      "amountPesos": 40100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Kapate Br. (B01076MN) along Sarangani-Sultan Kudarat Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0211-001837",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Dapa-Jct Cancohoy Rd - K0008 + 556 - K0010 + 250",
      "office": "Surigao del Norte 1st District Engineering Office",
      "amountPesos": 40087000,
      "lengthKm": 1.694,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23664108.62,
      "lengthMeters": 1694.0,
      "allocationPerStatedMeter": 23664.11,
      "rangesMeters": [
        [
          8556.0,
          10250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "211",
      "lengthEvidence": "Dapa-Jct Cancohoy Rd - K0008 + 556 - K0010 + 250",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 0.83,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0231-002218",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Anilao Bypass Road, Sta. 0 + 000 - Sta. 2 + 242.73, Iloilo",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 40057000,
      "lengthKm": 2.24273,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17860821.41,
      "lengthMeters": 2242.73,
      "allocationPerStatedMeter": 17860.82,
      "rangesMeters": [
        [
          0.0,
          2242.73
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Anilao Bypass Road, Sta. 0 + 000 - Sta. 2 + 242.73, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.35,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0467-006773",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Luis, Pugo La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 40050000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Barangay San Luis, Pugo La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008864",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Bridge, Zone Mississippi, Barangay Sagrada, Iriga City, Camarines Sur",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 40025000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Concrete Bridge, Zone Mississippi, Barangay Sagrada, Iriga City, Camarines Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0143-000649",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Naguilian-Sn Mariano Rd - K0415 + 238 - K0419 + 000",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 40001000,
      "lengthKm": 3.762,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10632908.03,
      "lengthMeters": 3762.0,
      "allocationPerStatedMeter": 10632.91,
      "rangesMeters": [
        [
          415238.0,
          419000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Naguilian-Sn Mariano Rd - K0415 + 238 - K0419 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 14661.07,
      "peerRateMultiple": 0.73,
      "peerRecords": 22,
      "peerBand": "≥3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25880.607500000006,
      "graphUpperFence": 33671.70500000001
    },
    {
      "id": "HB10858-3-0136-000513",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Camp Lapu-Lapu Rd - (S00041CB) Chainage 000 - Chainage 469",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Camp Lapu-Lapu Rd - (S00041CB) Chainage 000 - Chainage 469",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0136-000514",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Cebu-Balamban Transcentral Highway - K0016 + 163 - K0016 + 320; K0022 + 000 - K0023 + 000, Cebu City",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          16163.0,
          16320.0
        ],
        [
          22000.0,
          23000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Cebu-Balamban Transcentral Highway - K0016 + 163 - K0016 + 320; K0022 + 000 - K0023 + 000, Cebu City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0141-000593",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "PPSR Jct-Poblacion Brookes Pt Rd - K0190 + (-103) - K0191 + 150",
      "office": "Central Office",
      "amountPesos": 40000000,
      "lengthKm": 1.253,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31923383.88,
      "lengthMeters": 1253.0,
      "allocationPerStatedMeter": 31923.38,
      "rangesMeters": [
        [
          189897.0,
          191150.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "PPSR Jct-Poblacion Brookes Pt Rd - K0190 + (-103) - K0191 + 150",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.33,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0144-000663",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Talisay-Laurel-Agoncillo Rd - K0083 + 734 - K0084 + 808",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 1.074,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37243947.86,
      "lengthMeters": 1074.0,
      "allocationPerStatedMeter": 37243.95,
      "rangesMeters": [
        [
          83734.0,
          84808.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Talisay-Laurel-Agoncillo Rd - K0083 + 734 - K0084 + 808",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.56,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0174-001181",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Jct Lingig-Trento Rd - K1477 + 277 - K1477 + 324",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.047,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 851063829.79,
      "lengthMeters": 47.0,
      "allocationPerStatedMeter": 851063.83,
      "rangesMeters": [
        [
          1477277.0,
          1477324.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "174",
      "lengthEvidence": "Jct Lingig-Trento Rd - K1477 + 277 - K1477 + 324",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 2.55,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0180-001289",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Naval-Caibiran Cross Country Road - K1041 + 230 - K1041 + 465",
      "office": "Biliran District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.235,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 170212765.96,
      "lengthMeters": 235.0,
      "allocationPerStatedMeter": 170212.77,
      "rangesMeters": [
        [
          1041230.0,
          1041465.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Naval-Caibiran Cross Country Road - K1041 + 230 - K1041 + 465",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 0.9,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0181-001296",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Zamboanga City-Labuan-Limpapa Rd., K1974 + 150 - K1974 + 800",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.65,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 61538461.54,
      "lengthMeters": 650.0,
      "allocationPerStatedMeter": 61538.46,
      "rangesMeters": [
        [
          1974150.0,
          1974800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Zamboanga City-Labuan-Limpapa Rd., K1974 + 150 - K1974 + 800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 0.59,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0206-001744",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Lopez Bypass Rd - K0216 + (-540) - K0216 + (-163), K0216 + 030 - K0216 + 323, K0217 + 386 - K0217 + 499, K0217 + 725 - K0217 + 775",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.833,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 48019207.68,
      "lengthMeters": 833.0,
      "allocationPerStatedMeter": 48019.21,
      "rangesMeters": [
        [
          215460.0,
          215837.0
        ],
        [
          216030.0,
          216323.0
        ],
        [
          217386.0,
          217499.0
        ],
        [
          217725.0,
          217775.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Lopez Bypass Rd - K0216 + (-540) - K0216 + (-163), K0216 + 030 - K0216 + 323, K0217 + 386 - K0217 + 499, K0217 + 725 - K0217 + 775",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.95,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0216-001928",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Santiago Circumferential Road, Segment 2: Sta. 2+657.9 - Sta. 4+957.27, Isabela",
      "office": "Central Office",
      "amountPesos": 40000000,
      "lengthKm": 2.29937,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17396069.36,
      "lengthMeters": 2299.37,
      "allocationPerStatedMeter": 17396.07,
      "rangesMeters": [
        [
          2657.9,
          4957.27
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Santiago Circumferential Road, Segment 2: Sta. 2+657.9 - Sta. 4+957.27, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51387.46,
      "peerRateMultiple": 0.34,
      "peerRecords": 35,
      "peerBand": "1692.25–<2988.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 110588.92750000002,
      "graphUpperFence": 154689.53500000003
    },
    {
      "id": "HB10858-3-0216-001929",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Santiago Circumferential Road, Segment 3: Sta. 5+033 - Sta. 6+211.18, Isabela",
      "office": "Central Office",
      "amountPesos": 40000000,
      "lengthKm": 1.1781800000000002,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33950669.68,
      "lengthMeters": 1178.18,
      "allocationPerStatedMeter": 33950.67,
      "rangesMeters": [
        [
          5033.0,
          6211.18
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "216",
      "lengthEvidence": "Santiago Circumferential Road, Segment 3: Sta. 5+033 - Sta. 6+211.18, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.41,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0227-002143",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Barangay Maambong - Barangay Sil-ipon Section, Sta. 6+000 - Sta. 7+258.53, Libona, Bukidnon",
      "office": "Central Office",
      "amountPesos": 40000000,
      "lengthKm": 1.2585299999999997,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31783112.04,
      "lengthMeters": 1258.53,
      "allocationPerStatedMeter": 31783.11,
      "rangesMeters": [
        [
          6000.0,
          7258.53
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Barangay Maambong - Barangay Sil-ipon Section, Sta. 6+000 - Sta. 7+258.53, Libona, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.39,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0227-002149",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sayre Highway Parallel Road II (Manolo Fortich Section), Barangay Lingion, Sta. 9+800 - Sta. 10+576.47, Manolo Fortich, Bukidnon",
      "office": "Central Office",
      "amountPesos": 40000000,
      "lengthKm": 0.7764699999999993,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51515190.54,
      "lengthMeters": 776.47,
      "allocationPerStatedMeter": 51515.19,
      "rangesMeters": [
        [
          9800.0,
          10576.47
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Sayre Highway Parallel Road II (Manolo Fortich Section), Barangay Lingion, Sta. 9+800 - Sta. 10+576.47, Manolo Fortich, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.38,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0229-002186",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Major Mane to Kennon Road Bypass Road, Sta. 1 + 917 - Sta. 2 + 202",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.285,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 140350877.19,
      "lengthMeters": 285.0,
      "allocationPerStatedMeter": 140350.88,
      "rangesMeters": [
        [
          1917.0,
          2202.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Major Mane to Kennon Road Bypass Road, Sta. 1 + 917 - Sta. 2 + 202",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.67,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0230-002199",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Malvar-Sto. Tomas Road, Sta. 5+636 - Sta. 5+889, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.253,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 158102766.8,
      "lengthMeters": 253.0,
      "allocationPerStatedMeter": 158102.77,
      "rangesMeters": [
        [
          5636.0,
          5889.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Malvar-Sto. Tomas Road, Sta. 5+636 - Sta. 5+889, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.75,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0230-002201",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Agdangan By-Pass Road, Chainage 400 - Chainage 1860, Chainage 2400 - Chainage 2724, Quezon",
      "office": "Quezon 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Agdangan By-Pass Road, Chainage 400 - Chainage 1860, Chainage 2400 - Chainage 2724, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0233-002249",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan) (Sta. 0+289 - Sta. 0+955.67), Butuan City",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.66667,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 59999700.0,
      "lengthMeters": 666.67,
      "allocationPerStatedMeter": 59999.7,
      "rangesMeters": [
        [
          289.0,
          955.67
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "233",
      "lengthEvidence": "Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan) (Sta. 0+289 - Sta. 0+955.67), Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.44,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0239-002360",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag- Baungon Section), Barangay Lacolac Section, Sta. 12+750 - Sta. 13+275.33, Baungon, Bukidnon",
      "office": "Central Office",
      "amountPesos": 40000000,
      "lengthKm": 0.52533,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 76142615.12,
      "lengthMeters": 525.33,
      "allocationPerStatedMeter": 76142.62,
      "rangesMeters": [
        [
          12750.0,
          13275.33
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag- Baungon Section), Barangay Lacolac Section, Sta. 12+750 - Sta. 13+275.33, Baungon, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 0.77,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0239-002365",
      "category": "Bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Impasug-ong Bdry. Bukidnon (Siloo)-Misamis Oriental (Eureka), Siloo Bridge 2, Barangay San Luis, Sta. 0+000 - Sta. 0+195, Malitbog, Bukidnon",
      "office": "Central Office",
      "amountPesos": 40000000,
      "lengthKm": 0.195,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 205128205.13,
      "lengthMeters": 195.0,
      "allocationPerStatedMeter": 205128.21,
      "rangesMeters": [
        [
          0.0,
          195.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "239",
      "lengthEvidence": "Impasug-ong Bdry. Bukidnon (Siloo)-Misamis Oriental (Eureka), Siloo Bridge 2, Barangay San Luis, Sta. 0+000 - Sta. 0+195, Malitbog, Bukidnon",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 4,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0242-002414",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Columbio - Lutayan - Koronadal Road, Sta. 13 + 242 - Sta. 13 + 352, Columbio, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.11,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 363636363.64,
      "lengthMeters": 110.0,
      "allocationPerStatedMeter": 363636.36,
      "rangesMeters": [
        [
          13242.0,
          13352.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "242",
      "lengthEvidence": "Columbio - Lutayan - Koronadal Road, Sta. 13 + 242 - Sta. 13 + 352, Columbio, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 0.42,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0243-002421",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Cebu North Hagnaya Wharf Rd - K0007 + (-377) (Off-Carriageway Improvement: Flaring of Intersections / Improvement of Intersections)",
      "office": "Central Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "243",
      "lengthEvidence": "Cebu North Hagnaya Wharf Rd - K0007 + (-377) (Off-Carriageway Improvement: Flaring of Intersections / Improvement of Intersections)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0245-002443",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Construction of Pedestrian overpass along Sayre Highway, Barangay Casisang, Malaybalay City, Bukidnon",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Construction of Pedestrian overpass along Sayre Highway, Barangay Casisang, Malaybalay City, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0248-002487",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Mandaue Causeway (Ouano Ave) - (S00369CB) Chainage 903 (Off-Carriageway Improvement: Flaring of Intersections / Improvement of Intersections)",
      "office": "Central Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "248",
      "lengthEvidence": "Mandaue Causeway (Ouano Ave) - (S00369CB) Chainage 903 (Off-Carriageway Improvement: Flaring of Intersections / Improvement of Intersections)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0248-002488",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Ouano Ave. - K0008 + 205 (Off-Carriageway Improvement: Flaring of Intersections / Improvement of Intersections)",
      "office": "Central Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "248",
      "lengthEvidence": "Ouano Ave. - K0008 + 205 (Off-Carriageway Improvement: Flaring of Intersections / Improvement of Intersections)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0249-002503",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0085 + 420 - K0089 + 730 (Road Safety:Road Lighting)",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 4.31,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9280742.46,
      "lengthMeters": 4310.0,
      "allocationPerStatedMeter": 9280.74,
      "rangesMeters": [
        [
          85420.0,
          89730.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "249",
      "lengthEvidence": "Puerto Princesa South Rd - K0085 + 420 - K0089 + 730 (Road Safety:Road Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.9,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0250-002522",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation of Solar LED (Roadway Lighting) along Zamboanga City Bypass Road (S01215MN), K1953+286 - K1961+536 , Zamboanga City",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 8.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 4848484.85,
      "lengthMeters": 8250.0,
      "allocationPerStatedMeter": 4848.48,
      "rangesMeters": [
        [
          1953286.0,
          1961536.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "250",
      "lengthEvidence": "Installation of Solar LED (Roadway Lighting) along Zamboanga City Bypass Road (S01215MN), K1953+286 - K1961+536 , Zamboanga City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.47,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0251-002541",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation of Road Safety Facilities along Surigao-Davao Coastal Rd (S01376MN) K 1790 + 426 - K1792 + 748",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 2.322,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17226528.85,
      "lengthMeters": 2322.0,
      "allocationPerStatedMeter": 17226.53,
      "rangesMeters": [
        [
          1790426.0,
          1792748.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Installation of Road Safety Facilities along Surigao-Davao Coastal Rd (S01376MN) K 1790 + 426 - K1792 + 748",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.66,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0253-002564",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Aliaga-Guimba Road, STA. 4+682 - STA. 21+402 Road Safety Facilities (Roadway Lighting)",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 16.72,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2392344.5,
      "lengthMeters": 16720.0,
      "allocationPerStatedMeter": 2392.34,
      "rangesMeters": [
        [
          4682.0,
          21402.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "253",
      "lengthEvidence": "Aliaga-Guimba Road, STA. 4+682 - STA. 21+402 Road Safety Facilities (Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.24,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0254-002581",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Dumaguete City-Valencia-Bacong Rd - K0003 + (-697) - K0007 + 332 (Road Safety: Roadway Lighting)",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 5.029,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 7953867.57,
      "lengthMeters": 5029.0,
      "allocationPerStatedMeter": 7953.87,
      "rangesMeters": [
        [
          2303.0,
          7332.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "254",
      "lengthEvidence": "Dumaguete City-Valencia-Bacong Rd - K0003 + (-697) - K0007 + 332 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.8,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0261-002704",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Langkilaan Br. (B00931MN) along Maharlika Highway (Agusan-Davao Sect)",
      "office": "Central Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Langkilaan Br. (B00931MN) along Maharlika Highway (Agusan-Davao Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0261-002725",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Naltut Br. (B01056LZ) along Claveria-Calanasan-Kabugao Rd",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Naltut Br. (B01056LZ) along Claveria-Calanasan-Kabugao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0262-002727",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Baguyos Br. (B03270LZ) along Abatan-Mankayan-Cervantes Rd",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "Baguyos Br. (B03270LZ) along Abatan-Mankayan-Cervantes Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0265-002784",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Malibay Br. (SB) (B01859LZ) along Epifanio Delos Santos Ave (EDSA)",
      "office": "Central Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Malibay Br. (SB) (B01859LZ) along Epifanio Delos Santos Ave (EDSA)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002822",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Taguibo Br. (B01989MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "office": "Central Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Taguibo Br. (B01989MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002837",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Kalaklan Br. (B01634LZ) along Olongapo-Bugallon Rd",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Kalaklan Br. (B01634LZ) along Olongapo-Bugallon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0289-003329",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Ayugan Br. (B00410LZ) along Pili-Tigaon Albay Bdry Rd",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Ayugan Br. (B00410LZ) along Pili-Tigaon Albay Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0290-003334",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Sigma Parallel Br. 3 along Iloilo-Capiz Rd (New Route)",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Sigma Parallel Br. 3 along Iloilo-Capiz Rd (New Route)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0292-003373",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Sawaga Br. 2 (B02386MN) along Malaybalay City Bypass Road",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Sawaga Br. 2 (B02386MN) along Malaybalay City Bypass Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0293-003410",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Bigaan Steel Br. (B00759MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Bigaan Steel Br. (B00759MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0293-003412",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Tabon-Bigaan Br. (B00761MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Tabon-Bigaan Br. (B00761MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0294-003426",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Tanqui Br. (B05143LZ) along San Fernando Bypass Rd",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Tanqui Br. (B05143LZ) along San Fernando Bypass Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0294-003427",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Biday Br. (B05142LZ) along San Fernando Bypass Rd",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Biday Br. (B05142LZ) along San Fernando Bypass Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0445-006352",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay Poblacion, Buluan, Maguindanao del Sur",
      "office": "Central Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "445",
      "lengthEvidence": "Improvement of Road, Barangay Poblacion, Buluan, Maguindanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0446-006374",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Riyungan Bridge, Barangay Pandan, South Upi, Maguindanao del Sur",
      "office": "Central Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Rehabilitation of Riyungan Bridge, Barangay Pandan, South Upi, Maguindanao del Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006401",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage, BFRV, Barangay Talon 2, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Rehabilitation of Road and Drainage, BFRV, Barangay Talon 2, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006408",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage at Barangay Elias Aldana to Manuyo, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Rehabilitation of Road and Drainage at Barangay Elias Aldana to Manuyo, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006409",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage at Gathcalian, Barangay Manuyo 2, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Rehabilitation of Road and Drainage at Gathcalian, Barangay Manuyo 2, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006576",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Area B, Chainage 0 + 000 to Chainage 0 + 550, Barangay Batasan Hills, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Rehabilitation of Road at Area B, Chainage 0 + 000 to Chainage 0 + 550, Barangay Batasan Hills, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006583",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Cotabato St., Barangay Batasan Hills, Quezon City, Metro Manila",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Rehabilitation of Road, Cotabato St., Barangay Batasan Hills, Quezon City, Metro Manila",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006948",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Salud, Barangay Cacandungan, Barangay Poblacion East, Barangay Poblacion West - Barangay San Maximo, Barangay Canarem - Barangay Burgos, Barangay San Macario Sur, Natividad, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Rehabilitation of Road, Barangay Salud, Barangay Cacandungan, Barangay Poblacion East, Barangay Poblacion West - Barangay San Maximo, Barangay Canarem - Barangay Burgos, Barangay San Macario Sur, Natividad, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006980",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Pacdal Road to Barangay Gibraltar, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Construction of Road from Pacdal Road to Barangay Gibraltar, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-006986",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage Structure, Salud Mitra Barangay, Baguio City (Site 1, Sta. 0+000 - Sta. 0+225), (Site 2, Sta. 0+000 - Sta. 0+095), (Site 3, Sta. 0+000 - Sta. 0+215)",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.225,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 177777777.78,
      "lengthMeters": 225.0,
      "allocationPerStatedMeter": 177777.78,
      "rangesMeters": [
        [
          0.0,
          225.0
        ],
        [
          0.0,
          95.0
        ],
        [
          0.0,
          215.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Rehabilitation of Road including Drainage Structure, Salud Mitra Barangay, Baguio City (Site 1, Sta. 0+000 - Sta. 0+225), (Site 2, Sta. 0+000 - Sta. 0+095), (Site 3, Sta. 0+000 - Sta. 0+215)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 5.03,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0479-007028",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Nattum Bridge along Barangay Abinuan, Lagawe, Ifugao - Barangay Nattum Road, Mayoyao, Ifugao",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Nattum Bridge along Barangay Abinuan, Lagawe, Ifugao - Barangay Nattum Road, Mayoyao, Ifugao",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007031",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Mongol to Barangay Talboc Access Road, Mongol, Mayoyao, Ifugao",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Barangay Mongol to Barangay Talboc Access Road, Mongol, Mayoyao, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007115",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Dallug Bridge, Barangay Saliok and Barangay Maducayan, Natonin, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Dallug Bridge, Barangay Saliok and Barangay Maducayan, Natonin, Mountain Province",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0491-007304",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Replacement of Bridge (Sta. 0+507 - Sta. 0+544) including Bridge Approaches (Sta. 0+487 - Sta. 0+507, Sta. 0+544 - Sta. 0+564), Barangay Bangag, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.077,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 519480519.48,
      "lengthMeters": 77.0,
      "allocationPerStatedMeter": 519480.52,
      "rangesMeters": [
        [
          507.0,
          544.0
        ],
        [
          487.0,
          507.0
        ],
        [
          544.0,
          564.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Replacement of Bridge (Sta. 0+507 - Sta. 0+544) including Bridge Approaches (Sta. 0+487 - Sta. 0+507, Sta. 0+544 - Sta. 0+564), Barangay Bangag, City of Ilagan, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 0.86,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0497-007421",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Guilingan to Barangay Capuseran, Benito Soliven, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Construction of Road, Barangay Guilingan to Barangay Capuseran, Benito Soliven, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007604",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Dionisio II, Nagtipunan, Quirino",
      "office": "Quirino District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Road, San Dionisio II, Nagtipunan, Quirino",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007610",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road connecting Curing Avanue to Antonino P. Roman Memorial Hospital, Barangay Mulawin to Barangay Dona, Orani, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Road connecting Curing Avanue to Antonino P. Roman Memorial Hospital, Barangay Mulawin to Barangay Dona, Orani, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0509-007684",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Calumpit - Macabebe Road, Sta. 0+000 - Sta. 1+600, City of Malolos, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 1.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 1600.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          1600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Rehabilitation of Calumpit - Macabebe Road, Sta. 0+000 - Sta. 1+600, City of Malolos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 1.04,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0509-007687",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Malolos - San Marcos via Bulihan Road, Sta. 0+000 - Sta. 0+230, City of Malolos, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 173913043.48,
      "lengthMeters": 230.0,
      "allocationPerStatedMeter": 173913.04,
      "rangesMeters": [
        [
          0.0,
          230.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Rehabilitation of Malolos - San Marcos via Bulihan Road, Sta. 0+000 - Sta. 0+230, City of Malolos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 4.92,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0510-007706",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage System at J. Buizon St., Barangay Sto. Cristo, City of Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road with Drainage System at J. Buizon St., Barangay Sto. Cristo, City of Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007767",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal at Barangay Sta. Cruz (By-Pass Road to Caysio) Santa Maria, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road with Drainage Canal at Barangay Sta. Cruz (By-Pass Road to Caysio) Santa Maria, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0514-007787",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Barangay Poblacion I, City of San Jose del Monte, Bulacan (121.044836, 14.811665)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road with Drainage, Barangay Poblacion I, City of San Jose del Monte, Bulacan (121.044836, 14.811665)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0515-007799",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Igay-Montalban Road, City of San Jose Del Monte, Bulacan (121.118639, 14.824134)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Construction of Road, Igay-Montalban Road, City of San Jose Del Monte, Bulacan (121.118639, 14.824134)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0515-007804",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Banga - Hulo - Poblacion Road with Drainage, Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+960 (120.96070833, 14.72641111)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.96,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 960.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          960.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Improvement of Banga - Hulo - Poblacion Road with Drainage, Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+960 (120.96070833, 14.72641111)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 2.14,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0516-007830",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Minuyan II, City of San Jose Del Monte, Bulacan (121.074370, 14.837043)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road, Barangay Minuyan II, City of San Jose Del Monte, Bulacan (121.074370, 14.837043)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007930",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Binbin, Barangay General Luna, Carranglan, Nueva Ecija Sta. 0+000 - Sta. 2+900, Sta. 4+700 - Sta. 5+30",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 3.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 12383900.93,
      "lengthMeters": 3230.0,
      "allocationPerStatedMeter": 12383.9,
      "rangesMeters": [
        [
          0.0,
          2900.0
        ],
        [
          4700.0,
          5030.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Sitio Binbin, Barangay General Luna, Carranglan, Nueva Ecija Sta. 0+000 - Sta. 2+900, Sta. 4+700 - Sta. 5+30",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.39,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0532-008168",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay San Miguel to Sto. Nino, Magalang, Pampanga (15.223640, 120.661694 - 15.239787, 120.711482)",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Construction of Road at Barangay San Miguel to Sto. Nino, Magalang, Pampanga (15.223640, 120.661694 - 15.239787, 120.711482)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0532-008169",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage along Pulung Maragul connecting to Abacan River Bypass Road, Angeles City (Sta. 0+000 to Sta 0+500)",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 80000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 80000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Construction of Road and Drainage along Pulung Maragul connecting to Abacan River Bypass Road, Angeles City (Sta. 0+000 to Sta 0+500)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 3.27,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0537-008259",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Kalabasa, Barangay Biga, Lobo, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Sitio Kalabasa, Barangay Biga, Lobo, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008357",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road along Poblacion-Pinagbayanan Road, Taysan, Batangas START (13.78448611, 121.18392778), END (13.78368889, 121.18438889)",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road along Poblacion-Pinagbayanan Road, Taysan, Batangas START (13.78448611, 121.18392778), END (13.78368889, 121.18438889)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0544-008446",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Arnaldo Highway, Barangay San Francisco, General Trias City, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Improvement of Road along Arnaldo Highway, Barangay San Francisco, General Trias City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008481",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage Canal Along Biñan River, Barangay Malaban, Biñan City, Laguna",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Construction of Road and Drainage Canal Along Biñan River, Barangay Malaban, Biñan City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008488",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Bridge, Barangay Sinalhan, City of Santa Rosa, Laguna",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Rehabilitation of Bridge, Barangay Sinalhan, City of Santa Rosa, Laguna",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008506",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Languyin-Poblacion Road, Polillo, Quezon",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Construction of Languyin-Poblacion Road, Polillo, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008507",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage along Mauban-Cavinti Rd, Barangay Daungan - Barangay Mabato - Barangay Soledad, Mauban, Quezon",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Construction of Road and Drainage along Mauban-Cavinti Rd, Barangay Daungan - Barangay Mabato - Barangay Soledad, Mauban, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008510",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Talisoy-Gango-Bukal-Apad Road, Jomalig, Quezon",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Construction of Talisoy-Gango-Bukal-Apad Road, Jomalig, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0550-008569",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge at Sitio San Joseph, Barangay San Jose, Antipolo City (14.656598°N, 121.267969°E)",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction of Bridge at Sitio San Joseph, Barangay San Jose, Antipolo City (14.656598°N, 121.267969°E)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008786",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Tulay na Lupa, Labo, Camarines Norte",
      "office": "Camarines Norte District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Construction of Barangay Road, Tulay na Lupa, Labo, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008820",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay San Roque, Canaman, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Bridge, Barangay San Roque, Canaman, Camarines Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008830",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Lugsad, Calabanga, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Bridge, Barangay Lugsad, Calabanga, Camarines Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008831",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Harubay, Calabanga, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Bridge, Barangay Harubay, Calabanga, Camarines Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0562-008834",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Siembre to Carolina Road, Barangay Siembre, Bombon and Carolina, Naga City, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction of Siembre to Carolina Road, Barangay Siembre, Bombon and Carolina, Naga City, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0570-009010",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sto. Domingo Road, Sta. 1 + 622 - Sta. 1 + 862, Sta. 2 + 145 - Sta. 4 + 505, Barangay Sto. Domingo, Nueva Valencia, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 2.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 15384615.38,
      "lengthMeters": 2600.0,
      "allocationPerStatedMeter": 15384.62,
      "rangesMeters": [
        [
          1622.0,
          1862.0
        ],
        [
          2145.0,
          4505.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Construction of Sto. Domingo Road, Sta. 1 + 622 - Sta. 1 + 862, Sta. 2 + 145 - Sta. 4 + 505, Barangay Sto. Domingo, Nueva Valencia, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.49,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0571-009023",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Tubungan - Igtuble - San Remegio Road, Iloilo, 19+416 - 20+198",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.782,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51150895.14,
      "lengthMeters": 782.0,
      "allocationPerStatedMeter": 51150.9,
      "rangesMeters": [
        [
          19416.0,
          20198.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Tubungan - Igtuble - San Remegio Road, Iloilo, 19+416 - 20+198",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 2.63,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0572-009054",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Camando to Sitio Miac-ac, Barangay Poblacion, Leon, Iloilo",
      "office": "Iloilo 4th District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay Camando to Sitio Miac-ac, Barangay Poblacion, Leon, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009102",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 4, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Rehabilitation of Road, Barangay 4, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009104",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Piyok Bridge (Sta. 3+128 - Sta 3+178), Sagay City, Negros Occidental (10.8625, 123.3430556)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 800000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 800000.0,
      "rangesMeters": [
        [
          3128.0,
          3178.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Construction of Piyok Bridge (Sta. 3+128 - Sta 3+178), Sagay City, Negros Occidental (10.8625, 123.3430556)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 1.32,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0575-009109",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road from Jct. BANOCEH - Jct. Concepcion Road, Talisay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Concrete Road from Jct. BANOCEH - Jct. Concepcion Road, Talisay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009170",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction of Consuelo to National Highway Road, Barangay Consuelo, Ilog, Negros Occidental",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Reconstruction of Consuelo to National Highway Road, Barangay Consuelo, Ilog, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009270",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Dao (Capitol Valley), Tagbilaran City, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road, Barangay Dao (Capitol Valley), Tagbilaran City, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009445",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure, Barangay Buot, Cebu City, Cebu",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction of Road Slope Protection Structure, Barangay Buot, Cebu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009457",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure, Barangay Sudlon I, Cebu City, Cebu",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction of Road Slope Protection Structure, Barangay Sudlon I, Cebu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0594-009527",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Slope Protection connecting Bridge Approach of Calaguise Bridge (Parallel Bridge), along Sambulawan JCT -Calaguise-Calubian Road",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Construction of Road with Slope Protection connecting Bridge Approach of Calaguise Bridge (Parallel Bridge), along Sambulawan JCT -Calaguise-Calubian Road",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0594-009534",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Catagbacan to Barangay Jalas, Villaba, Leyte (Station 0+000 - 1+000)",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Construction of Road, Barangay Catagbacan to Barangay Jalas, Villaba, Leyte (Station 0+000 - 1+000)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.6,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0594-009540",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Concreting, Barangay Tagbubunga to Barangay Abijao, Villaba, Leyte (Station 0+000 - 1+000)",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Road Concreting, Barangay Tagbubunga to Barangay Abijao, Villaba, Leyte (Station 0+000 - 1+000)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.6,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0596-009587",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Geracdo - Barangay Balugo, Las Navas, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Road, Barangay Geracdo - Barangay Balugo, Las Navas, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0597-009589",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Gandara - Matuguinao - Las Navas Road, Las Navas, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Road, Gandara - Matuguinao - Las Navas Road, Las Navas, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0598-009617",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 2+500 - Sta. 3+880, Barangay Imelda - Barangay Guin- ansan, Almagro, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 1.38,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28985507.25,
      "lengthMeters": 1380.0,
      "allocationPerStatedMeter": 28985.51,
      "rangesMeters": [
        [
          2500.0,
          3880.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Construction of Road, Sta. 2+500 - Sta. 3+880, Barangay Imelda - Barangay Guin- ansan, Almagro, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.16,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0599-009643",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pacao - Barangay Banquil, Villareal, Samar (Sta. 0+000.00 - 0+860.00)",
      "office": "Samar 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 0.86,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46511627.91,
      "lengthMeters": 860.0,
      "allocationPerStatedMeter": 46511.63,
      "rangesMeters": [
        [
          0.0,
          860.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Construction of Road, Barangay Pacao - Barangay Banquil, Villareal, Samar (Sta. 0+000.00 - 0+860.00)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 2.39,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0600-009656",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Sitio Bual to Higad Dagat, Barangay Bual, Luuk Sulu",
      "office": "Sulu 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Construction of Road Sitio Bual to Higad Dagat, Barangay Bual, Luuk Sulu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0600-009658",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Kan Simba -Lingah Road, Luuk, Sulu",
      "office": "Sulu 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Construction of Road, Sitio Kan Simba -Lingah Road, Luuk, Sulu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009701",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Concreting from Barangay San Vicente to Barangay Tipan, Gutalac, Zamboanga del Norte",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Road Concreting from Barangay San Vicente to Barangay Tipan, Gutalac, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0603-009712",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tagaytay, Siocon, Zamboanga del Norte",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road, Barangay Tagaytay, Siocon, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009812",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads in Barangay Kauswagan, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Construction of Roads in Barangay Kauswagan, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009843",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Alternate Bridge, Barangay San Roque, Municipality of Mahinog, Province of Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Alternate Bridge, Barangay San Roque, Municipality of Mahinog, Province of Camiguin",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009845",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Sitio Langcagan, Barangay Poblacion to Sitio Tacangon,Barangay San Miguel, Barangays Poblacion and San Miguel, Mahinog, Camiguin including Approaches",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Bridge, Sitio Langcagan, Barangay Poblacion to Sitio Tacangon,Barangay San Miguel, Barangays Poblacion and San Miguel, Mahinog, Camiguin including Approaches",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0611-009879",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Princesa to Barangay Andil, Baroy Lanao Del Norte",
      "office": "Lanao del Norte 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Road, Barangay Princesa to Barangay Andil, Baroy Lanao Del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0612-009909",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 5 Barangay Tabid - Barangay Litapan Road, Sta. 0+000 - Sta. 1+350, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 1.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29629629.63,
      "lengthMeters": 1350.0,
      "allocationPerStatedMeter": 29629.63,
      "rangesMeters": [
        [
          0.0,
          1350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Road, Purok 5 Barangay Tabid - Barangay Litapan Road, Sta. 0+000 - Sta. 1+350, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.19,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0613-009924",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Purok 5 - Purok 6), Barangay Malaubang, Sta. 0+000 - Sta. 1+350, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 1.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29629629.63,
      "lengthMeters": 1350.0,
      "allocationPerStatedMeter": 29629.63,
      "rangesMeters": [
        [
          0.0,
          1350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Construction of Road (Purok 5 - Purok 6), Barangay Malaubang, Sta. 0+000 - Sta. 1+350, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.19,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0615-009966",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Mintabon to Barangay Sindangan Road, Sta. 0+000 - Sta. 1+240, Talisayan, Misamis Oriental",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 1.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32258064.52,
      "lengthMeters": 1240.0,
      "allocationPerStatedMeter": 32258.06,
      "rangesMeters": [
        [
          0.0,
          1240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Construction of Barangay Mintabon to Barangay Sindangan Road, Sta. 0+000 - Sta. 1+240, Talisayan, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.29,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0616-009973",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Connecting National Road Junction to Misamis Oriental West Diversion Road, Sta.2+750 - Sta.3+750, Lugait To Manticao, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          2750.0,
          3750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road Connecting National Road Junction to Misamis Oriental West Diversion Road, Sta.2+750 - Sta.3+750, Lugait To Manticao, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.6,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0617-009996",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Kingking, Pantukan, Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Road, Barangay Kingking, Pantukan, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0617-009997",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Slope Protection Structure along Golden Valley-Anitapan (Mabini- Elizalde-Malamodao) Road, Maco, Davao De Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Rehabilitation of Road Slope Protection Structure along Golden Valley-Anitapan (Mabini- Elizalde-Malamodao) Road, Maco, Davao De Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0617-009998",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Slope Protection Structure along Tagbaros Maco - New Leyte, Maco, Davao De Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Rehabilitation of Road Slope Protection Structure along Tagbaros Maco - New Leyte, Maco, Davao De Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0617-009999",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Slope Protection Structure along Mawab to Barangay New Astorias, Lapu Lapu Road, Maco, Davao De Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Rehabilitation of Road Slope Protection Structure along Mawab to Barangay New Astorias, Lapu Lapu Road, Maco, Davao De Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0628-010218",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Isidro to Barangay MAHABA, Marihatag, Surigao del Sur",
      "office": "Surigao del Sur 1st District Engineering Office",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of Road, Barangay San Isidro to Barangay MAHABA, Marihatag, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0625-010154",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok 2 - Purok San Martin, Barangay Kudanding, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 39960000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Concrete Road, Purok 2 - Purok San Martin, Barangay Kudanding, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0210-001827",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Gingoog-Claveria-Villanueva Rd., K1374+544 - K1376+000",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 39954000,
      "lengthKm": 1.456,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27440934.07,
      "lengthMeters": 1456.0,
      "allocationPerStatedMeter": 27440.93,
      "rangesMeters": [
        [
          1374544.0,
          1376000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Gingoog-Claveria-Villanueva Rd., K1374+544 - K1376+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 0.82,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0208-001773",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Buenavista-Kawayan Rd - K0062 + 195 - K0063 + 000",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 39950000,
      "lengthKm": 0.805,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49627329.19,
      "lengthMeters": 805.0,
      "allocationPerStatedMeter": 49627.33,
      "rangesMeters": [
        [
          62195.0,
          63000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Buenavista-Kawayan Rd - K0062 + 195 - K0063 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.98,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0289-003316",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Sabit Br. (B00750LZ) along Nueva Ecija-Pangasinan Rd",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 39900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Sabit Br. (B00750LZ) along Nueva Ecija-Pangasinan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0210-001820",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 15395 - Chainage 17000",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 39892000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 15395 - Chainage 17000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0212-001857",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Bauan-Mabini Rd - K0152 + 150 - K0152 + 649, K0152 + 667 - K0152 + 827",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 39875000,
      "lengthKm": 0.659,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 60508345.98,
      "lengthMeters": 659.0,
      "allocationPerStatedMeter": 60508.35,
      "rangesMeters": [
        [
          152150.0,
          152649.0
        ],
        [
          152667.0,
          152827.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Bauan-Mabini Rd - K0152 + 150 - K0152 + 649, K0152 + 667 - K0152 + 827",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.49,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0131-000409",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Batangas-Lobo Rd - K0119 + (-454) - K0119 + (-310), K0120 + 962 - K0120 + 974, K0121 + 114 - K0121 + 197, K0123 + 343 - K0123 + 1020, K0124 + 000 - K0124 + 637, K0125 + 000 - K0125 + 099, K0125 + 784 - K0126 + 000",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 39865000,
      "lengthKm": 1.848,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21571969.7,
      "lengthMeters": 1848.0,
      "allocationPerStatedMeter": 21571.97,
      "rangesMeters": [
        [
          118546.0,
          118690.0
        ],
        [
          120962.0,
          120974.0
        ],
        [
          121114.0,
          121197.0
        ],
        [
          123343.0,
          124020.0
        ],
        [
          124000.0,
          124637.0
        ],
        [
          125000.0,
          125099.0
        ],
        [
          125784.0,
          126000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Batangas-Lobo Rd - K0119 + (-454) - K0119 + (-310), K0120 + 962 - K0120 + 974, K0121 + 114 - K0121 + 197, K0123 + 343 - K0123 + 1020, K0124 + 000 - K0124 + 637, K0125 + 000 - K0125 + 099, K0125 + 784 - K0126 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.71,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0265-002781",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Sarmiento Br. (B00609MN) along Isulan Jct-Ninoy Aquino Rd",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 39858000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Sarmiento Br. (B00609MN) along Isulan Jct-Ninoy Aquino Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0138-000551",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Bukidnon-Cotabato Rd - K1651 + 002 - K1651 + 762",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 39673000,
      "lengthKm": 0.76,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52201315.79,
      "lengthMeters": 760.0,
      "allocationPerStatedMeter": 52201.32,
      "rangesMeters": [
        [
          1651002.0,
          1651762.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Bukidnon-Cotabato Rd - K1651 + 002 - K1651 + 762",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.62,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0293-003406",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Rosita Br. 1 (B00087DG) along Dinagat-Loreto Rd",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 39600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Rosita Br. 1 (B00087DG) along Dinagat-Loreto Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0131-000403",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Palico-Balayan-Batangas Rd - K0143 + 878 - K0144 + 450",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 39581000,
      "lengthKm": 0.572,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 69197552.45,
      "lengthMeters": 572.0,
      "allocationPerStatedMeter": 69197.55,
      "rangesMeters": [
        [
          143878.0,
          144450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Palico-Balayan-Batangas Rd - K0143 + 878 - K0144 + 450",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 2.14,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0148-000733",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Surallah-Lake Sebu-Maitum Rd - K1749 + 668 - K1752 + 000",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 39560000,
      "lengthKm": 2.332,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16963979.42,
      "lengthMeters": 2332.0,
      "allocationPerStatedMeter": 16963.98,
      "rangesMeters": [
        [
          1749668.0,
          1752000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "148",
      "lengthEvidence": "Surallah-Lake Sebu-Maitum Rd - K1749 + 668 - K1752 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 0.56,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0458-006577",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Zabarte Extension's Road and Drainage, Chainage 000 - Chainage 565 at Barangay Kaligayahan, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 39550000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Construction of Zabarte Extension's Road and Drainage, Chainage 000 - Chainage 565 at Barangay Kaligayahan, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0147-000728",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Kidapawan-Ilomavis Tourist Rd - K1632 + 691 - K1634 + 481",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 39477000,
      "lengthKm": 1.79,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22054189.94,
      "lengthMeters": 1790.0,
      "allocationPerStatedMeter": 22054.19,
      "rangesMeters": [
        [
          1632691.0,
          1634481.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Kidapawan-Ilomavis Tourist Rd - K1632 + 691 - K1634 + 481",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 0.73,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0166-001043",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd - K1421 + 260 - K1422 + 131, K1423 + 185 - K1424 + 096",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 39456000,
      "lengthKm": 1.782,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22141414.14,
      "lengthMeters": 1782.0,
      "allocationPerStatedMeter": 22141.41,
      "rangesMeters": [
        [
          1421260.0,
          1422131.0
        ],
        [
          1423185.0,
          1424096.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "166",
      "lengthEvidence": "Surigao-Davao Coastal Rd - K1421 + 260 - K1422 + 131, K1423 + 185 - K1424 + 096",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 0.99,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0165-001021",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Loay Interior Rd - K0182 + 700 - K0184 + 543",
      "office": "Bohol 3rd District Engineering Office",
      "amountPesos": 39421000,
      "lengthKm": 1.843,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21389582.2,
      "lengthMeters": 1843.0,
      "allocationPerStatedMeter": 21389.58,
      "rangesMeters": [
        [
          182700.0,
          184543.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Loay Interior Rd - K0182 + 700 - K0184 + 543",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 0.95,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0262-002737",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "San Felipe Br. 1 (B03436LZ) along Muñoz-Lupao Rd",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 39150000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "San Felipe Br. 1 (B03436LZ) along Muñoz-Lupao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0139-000566",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Santiago-Baluarte-Quirino Bdry Rd - K0330 + 000 - K0331 + 000",
      "office": "Central Office",
      "amountPesos": 39000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 39000.0,
      "rangesMeters": [
        [
          330000.0,
          331000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Santiago-Baluarte-Quirino Bdry Rd - K0330 + 000 - K0331 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.63,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0285-003226",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Kalagdo Br. (B02736LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 39000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Kalagdo Br. (B02736LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0293-003405",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Intusan Br. (B00098DG) along Dinagat-Loreto Rd",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 39000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Intusan Br. (B00098DG) along Dinagat-Loreto Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0457-006569",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage System at Elgin Street (Chainage 0+000 to 0+232), Lyric Street (Chainage 0+000 to 0+185), and Bulova Street (Chainage 0+000 to 0+231) in Barangay Fairview, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 39000000,
      "lengthKm": 0.232,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 168103448.28,
      "lengthMeters": 232.0,
      "allocationPerStatedMeter": 168103.45,
      "rangesMeters": [
        [
          0.0,
          232.0
        ],
        [
          0.0,
          185.0
        ],
        [
          0.0,
          231.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Construction of Road and Drainage System at Elgin Street (Chainage 0+000 to 0+232), Lyric Street (Chainage 0+000 to 0+185), and Bulova Street (Chainage 0+000 to 0+231) in Barangay Fairview, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 4.75,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0510-007707",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage System, along F. Vergel de Dios St., Concepcion, City of Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 39000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road with Drainage System, along F. Vergel de Dios St., Concepcion, City of Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0571-009022",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Igtuba - Barangay Kirayan Tacas Road, narangay Igtuba and Barangay Kirayan Tacas, Miagao, Iloilo",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 39000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Barangay Igtuba - Barangay Kirayan Tacas Road, narangay Igtuba and Barangay Kirayan Tacas, Miagao, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0224-002097",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "NRJ Baluno - La Paz (Sitio Pole) Diversion Road, Zamboanga City",
      "office": "Central Office",
      "amountPesos": 38932000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "224",
      "lengthEvidence": "NRJ Baluno - La Paz (Sitio Pole) Diversion Road, Zamboanga City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0164-001012",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0095 + 512 - K0096 + 511, K0096 + 627 - K0097 + 000",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 38919000,
      "lengthKm": 1.372,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 28366618.08,
      "lengthMeters": 1372.0,
      "allocationPerStatedMeter": 28366.62,
      "rangesMeters": [
        [
          95512.0,
          96511.0
        ],
        [
          96627.0,
          97000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0095 + 512 - K0096 + 511, K0096 + 627 - K0097 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 0.87,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0184-001361",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Kiangan-Tinoc-Buguias Rd - K0361 + 559 - K0361 + 624, K0362 + 184 - K0362 + 252, K0362 + 922 - K0362 + 955, K0363 + 898 - K0363 + 930, K0366 + 435 - K0366 + 466",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 38861000,
      "lengthKm": 0.229,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 169698689.96,
      "lengthMeters": 229.0,
      "allocationPerStatedMeter": 169698.69,
      "rangesMeters": [
        [
          361559.0,
          361624.0
        ],
        [
          362184.0,
          362252.0
        ],
        [
          362922.0,
          362955.0
        ],
        [
          363898.0,
          363930.0
        ],
        [
          366435.0,
          366466.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Kiangan-Tinoc-Buguias Rd - K0361 + 559 - K0361 + 624, K0362 + 184 - K0362 + 252, K0362 + 922 - K0362 + 955, K0363 + 898 - K0363 + 930, K0366 + 435 - K0366 + 466",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 0.97,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0207-001757",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0225 + 918 - K0226 + 231, K0228 + 963 - K0230 + 000",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 38750000,
      "lengthKm": 1.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 28703703.7,
      "lengthMeters": 1350.0,
      "allocationPerStatedMeter": 28703.7,
      "rangesMeters": [
        [
          225918.0,
          226231.0
        ],
        [
          228963.0,
          230000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Puerto Princesa South Rd - K0225 + 918 - K0226 + 231, K0228 + 963 - K0230 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 0.85,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0293-003398",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Pangawan Br. 3 (B01265MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 38740000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Pangawan Br. 3 (B01265MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0146-000707",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Dalaguete-Mantalongon Badian Rd - K0093 + 000 - K0095 + 376",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 38709000,
      "lengthKm": 2.376,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16291666.67,
      "lengthMeters": 2376.0,
      "allocationPerStatedMeter": 16291.67,
      "rangesMeters": [
        [
          93000.0,
          95376.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Dalaguete-Mantalongon Badian Rd - K0093 + 000 - K0095 + 376",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 0.98,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0170-001118",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - (S06317LZ) Chainage 16869 - Chainage 18752",
      "office": "Camarines Norte District Engineering Office",
      "amountPesos": 38690000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - (S06317LZ) Chainage 16869 - Chainage 18752",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0233-002242",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "NRJ Kulasi-an to Balungisan Road, Payao, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 38587000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "233",
      "lengthEvidence": "NRJ Kulasi-an to Balungisan Road, Payao, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0200-001606",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Calamba-Sta Cruz-Famy Jct Rd - K0095 + 028 - K0096 + 000",
      "office": "Laguna 1st District Engineering Office",
      "amountPesos": 38570000,
      "lengthKm": 0.972,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39681069.96,
      "lengthMeters": 972.0,
      "allocationPerStatedMeter": 39681.07,
      "rangesMeters": [
        [
          95028.0,
          96000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Calamba-Sta Cruz-Famy Jct Rd - K0095 + 028 - K0096 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 0.81,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0147-000727",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Dualing-New Panay-Midsayap Rd - K1705 + 673 - K1706 + 911",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 38501000,
      "lengthKm": 1.238,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31099353.8,
      "lengthMeters": 1238.0,
      "allocationPerStatedMeter": 31099.35,
      "rangesMeters": [
        [
          1705673.0,
          1706911.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Dualing-New Panay-Midsayap Rd - K1705 + 673 - K1706 + 911",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.3,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0163-000997",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Iloilo-Antique Rd - K0044 + 000 - K0044 + 388, K0044 + 500 - K0045 + 217",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 38500000,
      "lengthKm": 1.105,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34841628.96,
      "lengthMeters": 1105.0,
      "allocationPerStatedMeter": 34841.63,
      "rangesMeters": [
        [
          44000.0,
          44388.0
        ],
        [
          44500.0,
          45217.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Iloilo-Antique Rd - K0044 + 000 - K0044 + 388, K0044 + 500 - K0045 + 217",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 1.32,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0213-001867",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Iloilo-Capiz Rd (Old Route) - K0096 + 155 - K0096 + 239, K0096 + 307 - K0097 + 005",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 38473000,
      "lengthKm": 0.782,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 49198209.72,
      "lengthMeters": 782.0,
      "allocationPerStatedMeter": 49198.21,
      "rangesMeters": [
        [
          96155.0,
          96239.0
        ],
        [
          96307.0,
          97005.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "213",
      "lengthEvidence": "Iloilo-Capiz Rd (Old Route) - K0096 + 155 - K0096 + 239, K0096 + 307 - K0097 + 005",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.21,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0206-001736",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Paniqui-Camiling-Wawa Rd - K0150 + 1852 - K0152 + 226, K0152 + 329 - K0152 + 783",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 38397000,
      "lengthKm": 0.828,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 46373188.41,
      "lengthMeters": 828.0,
      "allocationPerStatedMeter": 46373.19,
      "rangesMeters": [
        [
          151852.0,
          152226.0
        ],
        [
          152329.0,
          152783.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Paniqui-Camiling-Wawa Rd - K0150 + 1852 - K0152 + 226, K0152 + 329 - K0152 + 783",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.91,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0164-001009",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0109 + 001 - K0110 + 683, K0115 + 879 - K0115 + 996",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 38283000,
      "lengthKm": 1.799,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21280155.64,
      "lengthMeters": 1799.0,
      "allocationPerStatedMeter": 21280.16,
      "rangesMeters": [
        [
          109001.0,
          110683.0
        ],
        [
          115879.0,
          115996.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0109 + 001 - K0110 + 683, K0115 + 879 - K0115 + 996",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 0.95,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0204-001703",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Siocon-Sirawai Rd - K2089 + 400 - K2091 + 000",
      "office": "Central Office",
      "amountPesos": 38276000,
      "lengthKm": 1.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23922500.0,
      "lengthMeters": 1600.0,
      "allocationPerStatedMeter": 23922.5,
      "rangesMeters": [
        [
          2089400.0,
          2091000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Siocon-Sirawai Rd - K2089 + 400 - K2091 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 0.71,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0457-006568",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Redwood St Chainage 000 - Chainage 337, Oak St Chainage 000 - Chainage 147, and Maple St Chainage 0+000 - Chainage 148 in Barangay Fairview, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 38100000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Construction of Road and Drainage at Redwood St Chainage 000 - Chainage 337, Oak St Chainage 000 - Chainage 147, and Maple St Chainage 0+000 - Chainage 148 in Barangay Fairview, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008866",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Bridge, Zone Montañoza, Barangay Sagrada, Iriga City, Camarines Sur",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 38054000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Concrete Bridge, Zone Montañoza, Barangay Sagrada, Iriga City, Camarines Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0133-000455",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagaytay-Batangas via Tuy Rd - K0064 + 000 - K0064 + 990",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 38017000,
      "lengthKm": 0.99,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38401010.1,
      "lengthMeters": 990.0,
      "allocationPerStatedMeter": 38401.01,
      "rangesMeters": [
        [
          64000.0,
          64990.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Tagaytay-Batangas via Tuy Rd - K0064 + 000 - K0064 + 990",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.26,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0179-001270",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0070 + 014 - K0070 + 077",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 38000000,
      "lengthKm": 0.063,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 603174603.17,
      "lengthMeters": 63.0,
      "allocationPerStatedMeter": 603174.6,
      "rangesMeters": [
        [
          70014.0,
          70077.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "Puerto Princesa North Rd - K0070 + 014 - K0070 + 077",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 2.0,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0267-002831",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
      "office": "Quezon City 2nd District Engineering Office",
      "amountPesos": 38000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0291-003370",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Balacayo Br. (B01647MN) along Kapalong-Talaingod-Valencia (Bukidnon) Rd",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 38000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Balacayo Br. (B01647MN) along Kapalong-Talaingod-Valencia (Bukidnon) Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0292-003371",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Baugan Br. (B01648MN) along Kapalong-Talaingod-Valencia (Bukidnon) Rd",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 38000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Baugan Br. (B01648MN) along Kapalong-Talaingod-Valencia (Bukidnon) Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006949",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay San Juan, Barangay Guiset Sur, Barangay Guiset Norte, Barangay San Juan - Barangay Cabacaraan, Barangay Cabaritan, Barangay Sto. Domingo, Barangay Flores - Barangay Narra, San Manuel, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 38000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Rehabilitation of Road, Barangay San Juan, Barangay Guiset Sur, Barangay Guiset Norte, Barangay San Juan - Barangay Cabacaraan, Barangay Cabaritan, Barangay Sto. Domingo, Barangay Flores - Barangay Narra, San Manuel, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008720",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Mabuhay Road, Roxas, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 38000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Barangay Mabuhay Road, Roxas, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0565-008892",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Jct. National Road to Barangay Manamoc,Milagros, Mandaon and Aroroy, Masbate, Sta. 0+000 - Sta. 0+450",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 38000000,
      "lengthKm": 0.45,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 84444444.44,
      "lengthMeters": 450.0,
      "allocationPerStatedMeter": 84444.44,
      "rangesMeters": [
        [
          0.0,
          450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Road, Jct. National Road to Barangay Manamoc,Milagros, Mandaon and Aroroy, Masbate, Sta. 0+000 - Sta. 0+450",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 3.45,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0291-003354",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Linao Br. (B00114LT) along Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 37800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Linao Br. (B00114LT) along Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0171-001129",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Guimbal-Igbaras-Tubungan-Leon Rd - K0060 + 604 - K0061 + 000, K0061 + 000 - K0061 + 550, K0062 + 683 - K0063+030",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 37777000,
      "lengthKm": 1.293,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29216550.66,
      "lengthMeters": 1293.0,
      "allocationPerStatedMeter": 29216.55,
      "rangesMeters": [
        [
          60604.0,
          61000.0
        ],
        [
          61000.0,
          61550.0
        ],
        [
          62683.0,
          63030.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Guimbal-Igbaras-Tubungan-Leon Rd - K0060 + 604 - K0061 + 000, K0061 + 000 - K0061 + 550, K0062 + 683 - K0063+030",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 1.29,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0118-000137",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway( Cotabato-Marbel Rd) - K1715 + 614 - K1716 + 000",
      "office": "Central Office",
      "amountPesos": 37731000,
      "lengthKm": 0.386,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 97748704.66,
      "lengthMeters": 386.0,
      "allocationPerStatedMeter": 97748.7,
      "rangesMeters": [
        [
          1715614.0,
          1716000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Maharlika Highway( Cotabato-Marbel Rd) - K1715 + 614 - K1716 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 2.04,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0138-000542",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 26741 - Chainage 27341, Chainage 30541 - Chainage 31041, Chainage 31841 - Chainage 33255",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 37710000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 26741 - Chainage 27341, Chainage 30541 - Chainage 31041, Chainage 31841 - Chainage 33255",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007350",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road of Barangay Harana, Luna, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 37500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Rehabilitation of Road of Barangay Harana, Luna, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0292-003382",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Carabatuan Br. (B00090MN) along Surigao del Sur Bdry-Davao Or Coastal Rd",
      "office": "Davao Oriental 1st District Engineering Office",
      "amountPesos": 37396000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Carabatuan Br. (B00090MN) along Surigao del Sur Bdry-Davao Or Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0121-000203",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod South Rd - K0069+190 - K0070+250",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 37366000,
      "lengthKm": 1.06,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35250943.4,
      "lengthMeters": 1060.0,
      "allocationPerStatedMeter": 35250.94,
      "rangesMeters": [
        [
          69190.0,
          70250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "Bacolod South Rd - K0069+190 - K0070+250",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 0.76,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0289-003321",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Mayao Br. (B05235LZ) along Pagbilao-Dalahican Port Rd (Old MSR-Mayao-Talao-talao- Dalahican Port)",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 37350000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Mayao Br. (B05235LZ) along Pagbilao-Dalahican Port Rd (Old MSR-Mayao-Talao-talao- Dalahican Port)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0210-001821",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Siocon-Sirawai-Sibuco-Limpapa Rd - K2098 + 500 - K2100 + 000",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 37257000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24838000.0,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 24838.0,
      "rangesMeters": [
        [
          2098500.0,
          2100000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Siocon-Sirawai-Sibuco-Limpapa Rd - K2098 + 500 - K2100 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 0.74,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0290-003343",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Diay Br. (B00058NR) along Bais-Kabankalan Rd",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 37116000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Diay Br. (B00058NR) along Bais-Kabankalan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0178-001242",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0391 + 023 - K0392 + 015",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 37048000,
      "lengthKm": 0.992,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37346774.19,
      "lengthMeters": 992.0,
      "allocationPerStatedMeter": 37346.77,
      "rangesMeters": [
        [
          391023.0,
          392015.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0391 + 023 - K0392 + 015",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 0.36,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0143-000641",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Rizal National Rd (Romualdez-Santor-Calaocan-Sn Pascual Sect) - K0428 + 957 - K0432 + 000",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 37001000,
      "lengthKm": 3.043,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12159382.19,
      "lengthMeters": 3043.0,
      "allocationPerStatedMeter": 12159.38,
      "rangesMeters": [
        [
          428957.0,
          432000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Rizal National Rd (Romualdez-Santor-Calaocan-Sn Pascual Sect) - K0428 + 957 - K0432 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 0.73,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0212-001860",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Talisay-Laurel-Agoncillo Rd - K0103 + -197 - K0104 + 014",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 37000000,
      "lengthKm": 1.211,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30553261.77,
      "lengthMeters": 1211.0,
      "allocationPerStatedMeter": 30553.26,
      "rangesMeters": [
        [
          102803.0,
          104014.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Talisay-Laurel-Agoncillo Rd - K0103 + -197 - K0104 + 014",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.75,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0293-003411",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "San Vicente Br. (B00763MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 37000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "San Vicente Br. (B00763MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006947",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Rizal - Barangay Carmay West, Barangay Carmay East, Barangay Guiling, Barangay Palakipak - Barangay Coliling, Barangay San Bartolome, Barangay Carmen East, Barangay Carmen West, Rosales, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 37000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Rehabilitation of Road, Barangay Rizal - Barangay Carmay West, Barangay Carmay East, Barangay Guiling, Barangay Palakipak - Barangay Coliling, Barangay San Bartolome, Barangay Carmen East, Barangay Carmen West, Rosales, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010071",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Atras Barangay Liliongan, to Sitio Casia, Barangay Kibudtungan, Carmen, Cotabato",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 37000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Road, Sitio Atras Barangay Liliongan, to Sitio Casia, Barangay Kibudtungan, Carmen, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0122-000228",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Linamon-Zamboanga Rd - K1606 + 260 - K1606 + 283, K1606 + 299 - K1607 + 000",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 36916000,
      "lengthKm": 0.724,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 50988950.28,
      "lengthMeters": 724.0,
      "allocationPerStatedMeter": 50988.95,
      "rangesMeters": [
        [
          1606260.0,
          1606283.0
        ],
        [
          1606299.0,
          1607000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Linamon-Zamboanga Rd - K1606 + 260 - K1606 + 283, K1606 + 299 - K1607 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 1.2,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0211-001831",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1615 + 000 - K1616 + 816",
      "office": "Davao Occidental District Engineering Office",
      "amountPesos": 36863000,
      "lengthKm": 1.816,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20299008.81,
      "lengthMeters": 1816.0,
      "allocationPerStatedMeter": 20299.01,
      "rangesMeters": [
        [
          1615000.0,
          1616816.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "211",
      "lengthEvidence": "Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1615 + 000 - K1616 + 816",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 0.71,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0154-000835",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0068 + 293 - K0070 + 000",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 36828000,
      "lengthKm": 1.707,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21574692.44,
      "lengthMeters": 1707.0,
      "allocationPerStatedMeter": 21574.69,
      "rangesMeters": [
        [
          68293.0,
          70000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0068 + 293 - K0070 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 0.86,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0162-000978",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Sn Fernando North Rd - K0003+185 - K0003 + 630, K0003 + 693 - K0003+800, K0003+1003 - K0004+024, K0004+123.5 - K0004+205",
      "office": "Masbate 1st District Engineering Office",
      "amountPesos": 36811000,
      "lengthKm": 0.6545,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 56242933.54,
      "lengthMeters": 654.5,
      "allocationPerStatedMeter": 56242.93,
      "rangesMeters": [
        [
          3185.0,
          3630.0
        ],
        [
          3693.0,
          3800.0
        ],
        [
          4003.0,
          4024.0
        ],
        [
          4123.5,
          4205.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Sn Fernando North Rd - K0003+185 - K0003 + 630, K0003 + 693 - K0003+800, K0003+1003 - K0004+024, K0004+123.5 - K0004+205",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 1.7,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0184-001346",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Apayao-Ilocos Norte Rd - K0663 + 591 - K0663 + 645",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 36810000,
      "lengthKm": 0.054,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 681666666.67,
      "lengthMeters": 54.0,
      "allocationPerStatedMeter": 681666.67,
      "rangesMeters": [
        [
          663591.0,
          663645.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Apayao-Ilocos Norte Rd - K0663 + 591 - K0663 + 645",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 1.82,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0163-000988",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "M.R. Espinosa Airport Rd - (S00024MT) Chainage 570 - Chainage 846",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 36800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "M.R. Espinosa Airport Rd - (S00024MT) Chainage 570 - Chainage 846",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0138-000540",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 23549 - Chainage 26001",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 36780000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 23549 - Chainage 26001",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0121-000213",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0058 + 301 - K0059 + 000",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 36761000,
      "lengthKm": 0.699,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52590844.06,
      "lengthMeters": 699.0,
      "allocationPerStatedMeter": 52590.84,
      "rangesMeters": [
        [
          58301.0,
          59000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0058 + 301 - K0059 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 1.24,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0152-000798",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway( Digos-Makar Rd) - K1589 + 270 - K1589 + 861, K1589 + 903 - K1590 + 000, K1590 + 224 - K1591 + 000",
      "office": "Central Office",
      "amountPesos": 36630000,
      "lengthKm": 1.464,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 25020491.8,
      "lengthMeters": 1464.0,
      "allocationPerStatedMeter": 25020.49,
      "rangesMeters": [
        [
          1589270.0,
          1589861.0
        ],
        [
          1589903.0,
          1590000.0
        ],
        [
          1590224.0,
          1591000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Maharlika Highway( Digos-Makar Rd) - K1589 + 270 - K1589 + 861, K1589 + 903 - K1590 + 000, K1590 + 224 - K1591 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 1.0,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0122-000224",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Sindangan-Liloy Rd - K1961 + 031 - K1961 + 492, K1962 + 551 - K1962 + 726, K1963 + 836 - K1965 + 174",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "amountPesos": 36558000,
      "lengthKm": 1.974,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 18519756.84,
      "lengthMeters": 1974.0,
      "allocationPerStatedMeter": 18519.76,
      "rangesMeters": [
        [
          1961031.0,
          1961492.0
        ],
        [
          1962551.0,
          1962726.0
        ],
        [
          1963836.0,
          1965174.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Sindangan-Liloy Rd - K1961 + 031 - K1961 + 492, K1962 + 551 - K1962 + 726, K1963 + 836 - K1965 + 174",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.49,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0143-000650",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Santiago-Baluarte-Quirino Bdry - K0333+856 - K0335+640",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 36498000,
      "lengthKm": 1.784,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20458520.18,
      "lengthMeters": 1784.0,
      "allocationPerStatedMeter": 20458.52,
      "rangesMeters": [
        [
          333856.0,
          335640.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Santiago-Baluarte-Quirino Bdry - K0333+856 - K0335+640",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 0.95,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0264-002773",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Caromatan Br. (B00957MN) along Linamon-Zamboanga Rd",
      "office": "Lanao del Norte 1st District Engineering Office",
      "amountPesos": 36480000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Caromatan Br. (B00957MN) along Linamon-Zamboanga Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002802",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Linambasan Br. (B00454PN) along Jct Natl Rd-Jamindan-Linambasan-Camp V Peralta Rd",
      "office": "Central Office",
      "amountPesos": 36480000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Linambasan Br. (B00454PN) along Jct Natl Rd-Jamindan-Linambasan-Camp V Peralta Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0135-000495",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0069 + 398 - K0070 + 420",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 36155000,
      "lengthKm": 1.022,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35376712.33,
      "lengthMeters": 1022.0,
      "allocationPerStatedMeter": 35376.71,
      "rangesMeters": [
        [
          69398.0,
          70420.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0069 + 398 - K0070 + 420",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.16,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0200-001611",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Dumaguete South Rd - K0065 + 140.91 - K0065 + 726",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 36129000,
      "lengthKm": 0.5850899999999966,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 61749474.44,
      "lengthMeters": 585.09,
      "allocationPerStatedMeter": 61749.47,
      "rangesMeters": [
        [
          65140.91,
          65726.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Dumaguete South Rd - K0065 + 140.91 - K0065 + 726",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 1.26,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0252-002550",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Manuel Roxas Rd - K0252 + (-565) - K0254 + 462 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Central Office",
      "amountPesos": 36110000,
      "lengthKm": 3.027,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11929302.94,
      "lengthMeters": 3027.0,
      "allocationPerStatedMeter": 11929.3,
      "rangesMeters": [
        [
          251435.0,
          254462.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "252",
      "lengthEvidence": "Manuel Roxas Rd - K0252 + (-565) - K0254 + 462 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 1.2,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0272-002943",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Maludbalud Br. (B00238SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "office": "Central Office",
      "amountPesos": 36102000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Maludbalud Br. (B00238SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0135-000485",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Calapan South Rd - K0153 + 493 - K0153 + 860, K0154 + 1037 - K0155 + 207, K0157 + 662 - K0158 + 000",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 36100000,
      "lengthKm": 0.875,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 41257142.86,
      "lengthMeters": 875.0,
      "allocationPerStatedMeter": 41257.14,
      "rangesMeters": [
        [
          153493.0,
          153860.0
        ],
        [
          155037.0,
          155207.0
        ],
        [
          157662.0,
          158000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Calapan South Rd - K0153 + 493 - K0153 + 860, K0154 + 1037 - K0155 + 207, K0157 + 662 - K0158 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.36,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0130-000383",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Olongapo-Bugallon Road - K0178 + 797 - K0179 + 007, K0181 + 544 - 182 + 005",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 36000000,
      "lengthKm": 0.671,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 53651266.77,
      "lengthMeters": 671.0,
      "allocationPerStatedMeter": 53651.27,
      "rangesMeters": [
        [
          178797.0,
          179007.0
        ],
        [
          181544.0,
          182005.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Olongapo-Bugallon Road - K0178 + 797 - K0179 + 007, K0181 + 544 - 182 + 005",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.66,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0141-000595",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Tagbac-Lubang-Looc Rd - K0001 + 000 - K0001 + 181, K0001 + 946 - K0002 + 553, K0008 + 318 - K0008 + 826, K0010 + 443 - K0011 + 650",
      "office": "Central Office",
      "amountPesos": 36000000,
      "lengthKm": 2.503,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14382740.71,
      "lengthMeters": 2503.0,
      "allocationPerStatedMeter": 14382.74,
      "rangesMeters": [
        [
          1000.0,
          1181.0
        ],
        [
          1946.0,
          2553.0
        ],
        [
          8318.0,
          8826.0
        ],
        [
          10443.0,
          11650.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Tagbac-Lubang-Looc Rd - K0001 + 000 - K0001 + 181, K0001 + 946 - K0002 + 553, K0008 + 318 - K0008 + 826, K0010 + 443 - K0011 + 650",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 0.87,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0143-000637",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Bacnotan-Luna-Balaoan Rd - K0306 + 261 - K0307 + 714",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 36000000,
      "lengthKm": 1.453,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24776324.85,
      "lengthMeters": 1453.0,
      "allocationPerStatedMeter": 24776.32,
      "rangesMeters": [
        [
          306261.0,
          307714.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Bacnotan-Luna-Balaoan Rd - K0306 + 261 - K0307 + 714",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 1.15,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0290-003337",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Bitoclan Br. (B00132NR) along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 36000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Bitoclan Br. (B00132NR) along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007343",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Miguel, Luna, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 36000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road, Barangay San Miguel, Luna, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008479",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Barangay Makiling, Calamba City, Laguna, 14.15027306, 121.14606389",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 36000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Construction of Road and Drainage at Barangay Makiling, Calamba City, Laguna, 14.15027306, 121.14606389",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008677",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Gue, Barangay San Miguel, Linapacan, Palawan",
      "office": "Palawan 1st District Engineering Office",
      "amountPesos": 36000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Concreting of Road, Sitio Gue, Barangay San Miguel, Linapacan, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009968",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Upper Calawag, Barangay Calawag, Section A Sta. 6+300 - Sta. 6+470, Section B Sta. 7+700 - Sta. 8+700, Balingasag, Misamis Oriental",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 36000000,
      "lengthKm": 1.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 30769230.77,
      "lengthMeters": 1170.0,
      "allocationPerStatedMeter": 30769.23,
      "rangesMeters": [
        [
          6300.0,
          6470.0
        ],
        [
          7700.0,
          8700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road, Upper Calawag, Barangay Calawag, Section A Sta. 6+300 - Sta. 6+470, Section B Sta. 7+700 - Sta. 8+700, Balingasag, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.23,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0620-010060",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Magpet (Pangao-An - Don Panaca) to Davao City Via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 36000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Magpet (Pangao-An - Don Panaca) to Davao City Via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0164-000999",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Iloilo East Coast-Capiz Rd - K0234 + 984 - K0236 + 512",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 35994000,
      "lengthKm": 1.528,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23556282.72,
      "lengthMeters": 1528.0,
      "allocationPerStatedMeter": 23556.28,
      "rangesMeters": [
        [
          234984.0,
          236512.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Iloilo East Coast-Capiz Rd - K0234 + 984 - K0236 + 512",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 0.73,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0161-000957",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Sibuyan Circumferential Rd - K0037 + 287 - K0037 + 886",
      "office": "Romblon District Engineering Office",
      "amountPesos": 35940000,
      "lengthKm": 0.599,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 60000000.0,
      "lengthMeters": 599.0,
      "allocationPerStatedMeter": 60000.0,
      "rangesMeters": [
        [
          37287.0,
          37886.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Sibuyan Circumferential Rd - K0037 + 287 - K0037 + 886",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.51,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0121-000201",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod North Rd - K0036 + 952 - K0038 + 203, K0043 + 678 - K0043 + 698, K0061 + 000 - K0061 + 092",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 35854000,
      "lengthKm": 1.363,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 26305209.1,
      "lengthMeters": 1363.0,
      "allocationPerStatedMeter": 26305.21,
      "rangesMeters": [
        [
          36952.0,
          38203.0
        ],
        [
          43678.0,
          43698.0
        ],
        [
          61000.0,
          61092.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "Bacolod North Rd - K0036 + 952 - K0038 + 203, K0043 + 678 - K0043 + 698, K0061 + 000 - K0061 + 092",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 0.67,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0179-001256",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kalinga-Abra Rd - K0467 + 007 - K0467 + 022, K0468 + 361 - K0468 + 403, K0471 + 581 - K0471 + 647, K0474 + 098 - K0474 + 118, K0475 + 061 - K0475 + 085, K0475 + 273 - K0475 + 319, K0475 + 705 - K0475 + 800",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 35748000,
      "lengthKm": 0.308,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 116064935.06,
      "lengthMeters": 308.0,
      "allocationPerStatedMeter": 116064.94,
      "rangesMeters": [
        [
          467007.0,
          467022.0
        ],
        [
          468361.0,
          468403.0
        ],
        [
          471581.0,
          471647.0
        ],
        [
          474098.0,
          474118.0
        ],
        [
          475061.0,
          475085.0
        ],
        [
          475273.0,
          475319.0
        ],
        [
          475705.0,
          475800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "Kalinga-Abra Rd - K0467 + 007 - K0467 + 022, K0468 + 361 - K0468 + 403, K0471 + 581 - K0471 + 647, K0474 + 098 - K0474 + 118, K0475 + 061 - K0475 + 085, K0475 + 273 - K0475 + 319, K0475 + 705 - K0475 + 800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 0.64,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0145-000688",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Juban-Magallanes Rd - K0604 + 801 - K0606 + 000, K0611 + 000 - K0612 + 000",
      "office": "Sorsogon 2nd District Engineering Office",
      "amountPesos": 35635000,
      "lengthKm": 2.199,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 16205093.22,
      "lengthMeters": 2199.0,
      "allocationPerStatedMeter": 16205.09,
      "rangesMeters": [
        [
          604801.0,
          606000.0
        ],
        [
          611000.0,
          612000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Juban-Magallanes Rd - K0604 + 801 - K0606 + 000, K0611 + 000 - K0612 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 0.54,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0206-001731",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Gov JJ Linao Rd - K0144 + 000 - K0145 + 685",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 35580000,
      "lengthKm": 1.685,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21115727.0,
      "lengthMeters": 1685.0,
      "allocationPerStatedMeter": 21115.73,
      "rangesMeters": [
        [
          144000.0,
          145685.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Gov JJ Linao Rd - K0144 + 000 - K0145 + 685",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 0.74,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0244-002429",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Ortigas Avenue - K0012+(-529) - K0014+469, Manila East Rd - K0015+(-478) to K0017+131, Pasig City (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 35576000,
      "lengthKm": 5.607,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 6344925.99,
      "lengthMeters": 5607.0,
      "allocationPerStatedMeter": 6344.93,
      "rangesMeters": [
        [
          11471.0,
          14469.0
        ],
        [
          14522.0,
          17131.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "244",
      "lengthEvidence": "Ortigas Avenue - K0012+(-529) - K0014+469, Manila East Rd - K0015+(-478) to K0017+131, Pasig City (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.53,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0560-008798",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Palaspas to Barangay San Pablo, Sta. 8 + 015.00 to Sta. 8 + 665.00, Del Gallego, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 35575000,
      "lengthKm": 0.65,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54730769.23,
      "lengthMeters": 650.0,
      "allocationPerStatedMeter": 54730.77,
      "rangesMeters": [
        [
          8015.0,
          8665.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay Palaspas to Barangay San Pablo, Sta. 8 + 015.00 to Sta. 8 + 665.00, Del Gallego, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 2.24,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0213-001870",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Magpet-Nowa-Doroluman-Greenfield Rd - K1664 + 946 - K1666 + 061",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 35530000,
      "lengthKm": 1.115,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31865470.85,
      "lengthMeters": 1115.0,
      "allocationPerStatedMeter": 31865.47,
      "rangesMeters": [
        [
          1664946.0,
          1666061.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "213",
      "lengthEvidence": "Magpet-Nowa-Doroluman-Greenfield Rd - K1664 + 946 - K1666 + 061",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.78,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0119-000160",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Santiago-Tuguegarao Rd - K0343 + 843 - K0345 + 000",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 35450000,
      "lengthKm": 1.157,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30639585.13,
      "lengthMeters": 1157.0,
      "allocationPerStatedMeter": 30639.59,
      "rangesMeters": [
        [
          343843.0,
          345000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Santiago-Tuguegarao Rd - K0343 + 843 - K0345 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 0.66,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0209-001812",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Palompon-Isabel-Merida-Ormoc Rd - K1117 + 989 - K1119 + 000",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 35445000,
      "lengthKm": 1.011,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35059347.18,
      "lengthMeters": 1011.0,
      "allocationPerStatedMeter": 35059.35,
      "rangesMeters": [
        [
          1117989.0,
          1119000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "Palompon-Isabel-Merida-Ormoc Rd - K1117 + 989 - K1119 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.69,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0179-001267",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Calapan South Rd - K0051 + 625 - K0051 + 1005",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 35400000,
      "lengthKm": 0.38,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 93157894.74,
      "lengthMeters": 380.0,
      "allocationPerStatedMeter": 93157.89,
      "rangesMeters": [
        [
          51625.0,
          52005.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "Calapan South Rd - K0051 + 625 - K0051 + 1005",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 0.9,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0163-000991",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Masbate-Milagros Rd - K0020 + 851 - K0021 + 470",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 35396000,
      "lengthKm": 0.619,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 57182552.5,
      "lengthMeters": 619.0,
      "allocationPerStatedMeter": 57182.55,
      "rangesMeters": [
        [
          20851.0,
          21470.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Masbate-Milagros Rd - K0020 + 851 - K0021 + 470",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.44,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0289-003313",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Nagtim-og Parallel Br. along Jct Victoria-Maddela-Alicia-Kasibu Bdry Rd (Jct Victoria- Kasibu Bdry)",
      "office": "Quirino District Engineering Office",
      "amountPesos": 35300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Nagtim-og Parallel Br. along Jct Victoria-Maddela-Alicia-Kasibu Bdry Rd (Jct Victoria- Kasibu Bdry)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0133-000443",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Maragondon-Magallanes-Amuyong Rd - K0064 + 070 - K0064 + 567",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 35272000,
      "lengthKm": 0.497,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 70969818.91,
      "lengthMeters": 497.0,
      "allocationPerStatedMeter": 70969.82,
      "rangesMeters": [
        [
          64070.0,
          64567.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Maragondon-Magallanes-Amuyong Rd - K0064 + 070 - K0064 + 567",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 2.2,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0264-002760",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Cagpalale Br. (B00368SM) along Calbayog-Catarman Rd",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 35208000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Cagpalale Br. (B00368SM) along Calbayog-Catarman Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0164-001002",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Iloilo East Coast-Capiz Rd - K0239 + 353 - K0240 + 643",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 35100000,
      "lengthKm": 1.29,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27209302.33,
      "lengthMeters": 1290.0,
      "allocationPerStatedMeter": 27209.3,
      "rangesMeters": [
        [
          239353.0,
          240643.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Iloilo East Coast-Capiz Rd - K0239 + 353 - K0240 + 643",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 0.84,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0518-007856",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge Barangay Sta. Lucia Young, Zaragoza, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 35100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Bridge Barangay Sta. Lucia Young, Zaragoza, Nueva Ecija",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0162-000966",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Presentacion-Maligaya Rd-K0529 + (-065) - K0529 + 086, K0535 + 594 - K0535 + 698, K0540 + 678 - K0540 + 900",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 0.477,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 73375262.05,
      "lengthMeters": 477.0,
      "allocationPerStatedMeter": 73375.26,
      "rangesMeters": [
        [
          528935.0,
          529086.0
        ],
        [
          535594.0,
          535698.0
        ],
        [
          540678.0,
          540900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Presentacion-Maligaya Rd-K0529 + (-065) - K0529 + 086, K0535 + 594 - K0535 + 698, K0540 + 678 - K0540 + 900",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.84,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0180-001283",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Cebu-Balamban Transcentral Highway - K0017 + 159 - K0017 + 185, K0020 + 150 - K0020 + 180, Cebu City",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 0.056,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 625000000.0,
      "lengthMeters": 56.0,
      "allocationPerStatedMeter": 625000.0,
      "rangesMeters": [
        [
          17159.0,
          17185.0
        ],
        [
          20150.0,
          20180.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Cebu-Balamban Transcentral Highway - K0017 + 159 - K0017 + 185, K0020 + 150 - K0020 + 180, Cebu City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0180-001284",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Cebu-Balamban Transcentral Highway - K0020 + 240 - K0020 + 280; K0020 + 330 - K0020 + 350, Cebu City",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          20240.0,
          20280.0
        ],
        [
          20330.0,
          20350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Cebu-Balamban Transcentral Highway - K0020 + 240 - K0020 + 280; K0020 + 330 - K0020 + 350, Cebu City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0181-001307",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1520 + 080 - K1520 + 150",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 0.07,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 500000000.0,
      "lengthMeters": 70.0,
      "allocationPerStatedMeter": 500000.0,
      "rangesMeters": [
        [
          1520080.0,
          1520150.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1520 + 080 - K1520 + 150",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 1.66,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0186-001381",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Logac-Lasam-Gagabutan Rd - K0739 + 575 - K0739 + 675",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 0.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 350000000.0,
      "lengthMeters": 100.0,
      "allocationPerStatedMeter": 350000.0,
      "rangesMeters": [
        [
          739575.0,
          739675.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Jct Logac-Lasam-Gagabutan Rd - K0739 + 575 - K0739 + 675",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.94,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0186-001382",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Logac-Lasam-Gagabutan Rd - K0741 + 685 - K0741 + 775",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 0.09,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 388888888.89,
      "lengthMeters": 90.0,
      "allocationPerStatedMeter": 388888.89,
      "rangesMeters": [
        [
          741685.0,
          741775.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Jct Logac-Lasam-Gagabutan Rd - K0741 + 685 - K0741 + 775",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 1.04,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0187-001402",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Butuan City-Malaybalay Rd - K1261 + 535 - K1261 + 585",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 700000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 700000.0,
      "rangesMeters": [
        [
          1261535.0,
          1261585.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "187",
      "lengthEvidence": "Butuan City-Malaybalay Rd - K1261 + 535 - K1261 + 585",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 1.87,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0230-002191",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cagaluan Bypass Road, Sta. 3+360 - Sta. 4+060, Kalinga",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 0.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 700.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          3360.0,
          4060.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Cagaluan Bypass Road, Sta. 3+360 - Sta. 4+060, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.37,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0233-002248",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Radial Road (NRJ BCIR - NRJ Mayor Democrito D. Plaza II Ave.), (Libertad-Bonbon Section) (Sta. 0+000 - Sta. 0+481, Sta. 1+940 - Sta. 1+960, Sta. 2+000 - Sta. 2+122, Sta. 2+230 - Sta. 2+637), Butuan City",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 1.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 33980582.52,
      "lengthMeters": 1030.0,
      "allocationPerStatedMeter": 33980.58,
      "rangesMeters": [
        [
          0.0,
          481.0
        ],
        [
          1940.0,
          1960.0
        ],
        [
          2000.0,
          2122.0
        ],
        [
          2230.0,
          2637.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "233",
      "lengthEvidence": "Radial Road (NRJ BCIR - NRJ Mayor Democrito D. Plaza II Ave.), (Libertad-Bonbon Section) (Sta. 0+000 - Sta. 0+481, Sta. 1+940 - Sta. 1+960, Sta. 2+000 - Sta. 2+122, Sta. 2+230 - Sta. 2+637), Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.32,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0242-002411",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Olutanga Circumferential Road",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "242",
      "lengthEvidence": "Olutanga Circumferential Road",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0263-002746",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Panganiban Br. (B00469LZ) along Nabua-Balatan Rd",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Panganiban Br. (B00469LZ) along Nabua-Balatan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0268-002855",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Agkawayan Br. (B00008LB) along Tagbac-Lubang-Looc Rd",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Agkawayan Br. (B00008LB) along Tagbac-Lubang-Looc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0286-003255",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Maasin Br. (B02400MN) along Zamboanga City Bypass Rd",
      "office": "Central Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Maasin Br. (B02400MN) along Zamboanga City Bypass Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0286-003263",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Itil Parallel Br. along Maharlika Highway( Cotabato-Malabang-Lanao del Norte Rd)",
      "office": "Central Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Itil Parallel Br. along Maharlika Highway( Cotabato-Malabang-Lanao del Norte Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0290-003346",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Mojon Br. (B00087NR) along Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan)",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Mojon Br. (B00087NR) along Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0441-006283",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road connecting Piagapo Lanao del Sur - Pantao Ragat Lanao del Norte, Linabo Section, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Road connecting Piagapo Lanao del Sur - Pantao Ragat Lanao del Norte, Linabo Section, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006588",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage, West Side, Barangay Commonwealth, Quezon City, Metro Manila",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Rehabilitation of Roads and Drainage, West Side, Barangay Commonwealth, Quezon City, Metro Manila",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006716",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Slope Protection, Barangay Imelda, Marcos, Ilocos Norte",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Road with Slope Protection, Barangay Imelda, Marcos, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007065",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Sitio Salin, Barangay Sadsadan, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Bridge, Sitio Salin, Barangay Sadsadan, Bauko, Mountain Province",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0509-007681",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sulok Bridge, Sta. 1+120 - Sta. 1+145, Florante St., (Sulok), Panginay, Balagtas, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 0.025,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1400000000.0,
      "lengthMeters": 25.0,
      "allocationPerStatedMeter": 1400000.0,
      "rangesMeters": [
        [
          1120.0,
          1145.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Construction of Sulok Bridge, Sta. 1+120 - Sta. 1+145, Florante St., (Sulok), Panginay, Balagtas, Bulacan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 0.99,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0534-008211",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Maluid - Cruz Diversion Road, Sta. 3+263 - Sta. 4+900, Victoria, Tarlac",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 1.637,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21380574.22,
      "lengthMeters": 1637.0,
      "allocationPerStatedMeter": 21380.57,
      "rangesMeters": [
        [
          3263.0,
          4900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction (Completion) of Maluid - Cruz Diversion Road, Sta. 3+263 - Sta. 4+900, Victoria, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.89,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0541-008382",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay Sabang - Barangay Marawoy, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Improvement of Road at Barangay Sabang - Barangay Marawoy, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008477",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Bridge, Barangay Malitlit, City of Santa Rosa, Laguna, 14.26841389, 121.11262528",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Rehabilitation of Bridge, Barangay Malitlit, City of Santa Rosa, Laguna, 14.26841389, 121.11262528",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008487",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Bridge, Barangay Aplaya, City of Santa Rosa, Laguna",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Rehabilitation of Bridge, Barangay Aplaya, City of Santa Rosa, Laguna",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008547",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Buenavista, Buenavista, Quezon",
      "office": "Quezon 3rd District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road, Barangay Buenavista, Buenavista, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0551-008593",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road along NHA Ave., Barangay Dela Paz, Antipolo City (Sta.0+448- 1+430)",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 0.982,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35641547.86,
      "lengthMeters": 982.0,
      "allocationPerStatedMeter": 35641.55,
      "rangesMeters": [
        [
          448.0,
          1430.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Rehabilitation of Road along NHA Ave., Barangay Dela Paz, Antipolo City (Sta.0+448- 1+430)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.83,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0556-008712",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Ilaya Access Road, San Agustin, Romblon",
      "office": "Romblon District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Ilaya Access Road, San Agustin, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008721",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Proper Tiguisan to Barangay Proper Bansud, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Bridge, Barangay Proper Tiguisan to Barangay Proper Bansud, Oriental Mindoro",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008742",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Salvacion - San Antonio Santicon - Napao Road, Malilipot and Bacacay, Albay",
      "office": "Albay 1st District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Construction of Road, Salvacion - San Antonio Santicon - Napao Road, Malilipot and Bacacay, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008780",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Itok-Mabini, Capalonga, Camarines Norte",
      "office": "Camarines Norte District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Construction of Barangay Road, Barangay Itok-Mabini, Capalonga, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0564-008887",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Joljogon to Barangay Tugawe, Mobo, Masbate, Sta. 3+590 to Sta. 4+390",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 43750000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 43750.0,
      "rangesMeters": [
        [
          3590.0,
          4390.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Road, Barangay Joljogon to Barangay Tugawe, Mobo, Masbate, Sta. 3+590 to Sta. 4+390",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 2.25,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0581-009249",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Tayak RCDG Bridge, Siaton, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Tayak RCDG Bridge, Siaton, Negros Oriental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009272",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Sta Cruz, Barangay Bentig, Barangay Magtongtong, Barangay Looc, Barangay Bonbon, Barangay Cabayugan, and Barangay Liboron, Calape, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road at Barangay Sta Cruz, Barangay Bentig, Barangay Magtongtong, Barangay Looc, Barangay Bonbon, Barangay Cabayugan, and Barangay Liboron, Calape, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0592-009489",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Guinpoliran - Barangay Bangon, Balangkayan, Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Construction of Road, Barangay Guinpoliran - Barangay Bangon, Balangkayan, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0596-009583",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Polangi-Gebulwangan-Quezon-Tranque-Mabini, Sta. 010+400 - Sta. 012+227, Catarman, Northern Samar",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 1.827,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19157088.12,
      "lengthMeters": 1827.0,
      "allocationPerStatedMeter": 19157.09,
      "rangesMeters": [
        [
          10400.0,
          12227.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Roads, Polangi-Gebulwangan-Quezon-Tranque-Mabini, Sta. 010+400 - Sta. 012+227, Catarman, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.79,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0596-009584",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Mabini - Palanas - Rufino - Tagan-ayan - San Jose - Epaw - San Isidro - Road (Sta. 0+585 - Sta. 1+320), Las Navas, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 0.735,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 47619047.62,
      "lengthMeters": 735.0,
      "allocationPerStatedMeter": 47619.05,
      "rangesMeters": [
        [
          585.0,
          1320.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Mabini - Palanas - Rufino - Tagan-ayan - San Jose - Epaw - San Isidro - Road (Sta. 0+585 - Sta. 1+320), Las Navas, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.95,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0597-009603",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tinoblan to Barangay Rombang (Sta. 0+000 - Sta. 1+066), Laoang, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 1.066,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32833020.64,
      "lengthMeters": 1066.0,
      "allocationPerStatedMeter": 32833.02,
      "rangesMeters": [
        [
          0.0,
          1066.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Road, Barangay Tinoblan to Barangay Rombang (Sta. 0+000 - Sta. 1+066), Laoang, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.31,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0603-009717",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Labangan-Sominot Bypass Road, Zamboanga del Sur Sta. 00+794 - Sta. 01+669",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 0.875,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 875.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          794.0,
          1669.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road Labangan-Sominot Bypass Road, Zamboanga del Sur Sta. 00+794 - Sta. 01+669",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 2.06,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0618-010028",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay New Sambog to Poblacion, New Corella, Davao del Norte",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Construction of Road, Barangay New Sambog to Poblacion, New Corella, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0622-010103",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Concrete Road, Jct. NHW to Purok Hechanova, Barangay Paraiso,Koronadal City, South Cotabato, 6.482238, 124.798424, 6.482632, 124.798367",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Concreting of Concrete Road, Jct. NHW to Purok Hechanova, Barangay Paraiso,Koronadal City, South Cotabato, 6.482238, 124.798424, 6.482632, 124.798367",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0627-010189",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Farmers Producers Cooperative Nursery Demo and Integrated Farm (Sta. 4+652 - Sta. 8+652), Barangay Tungao, Butuan City",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 35000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8750000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 8750.0,
      "rangesMeters": [
        [
          4652.0,
          8652.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction of Road at Farmers Producers Cooperative Nursery Demo and Integrated Farm (Sta. 4+652 - Sta. 8+652), Barangay Tungao, Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.28,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0182-001311",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K2012 + 240 - K2012 + 320, K2012 + 330 - K2012 + 390, K2012 + 410 - K2012 + 440, K2015 + 030 - K2015 + 110",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 34960000,
      "lengthKm": 0.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 139840000.0,
      "lengthMeters": 250.0,
      "allocationPerStatedMeter": 139840.0,
      "rangesMeters": [
        [
          2012240.0,
          2012320.0
        ],
        [
          2012330.0,
          2012390.0
        ],
        [
          2012410.0,
          2012440.0
        ],
        [
          2015030.0,
          2015110.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "182",
      "lengthEvidence": "Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd - K2012 + 240 - K2012 + 320, K2012 + 330 - K2012 + 390, K2012 + 410 - K2012 + 440, K2015 + 030 - K2015 + 110",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 0.77,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0250-002513",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Bacolod North Rd - K0009 + (-665) - K0011 + 981, K0011 + (-1008) - K0009 + 777 (Road Safety: Roadway Lighting)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 34885000,
      "lengthKm": 3.646,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 9568019.75,
      "lengthMeters": 3646.0,
      "allocationPerStatedMeter": 9568.02,
      "rangesMeters": [
        [
          8335.0,
          11981.0
        ],
        [
          9777.0,
          9992.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "250",
      "lengthEvidence": "Bacolod North Rd - K0009 + (-665) - K0011 + 981, K0011 + (-1008) - K0009 + 777 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.92,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0179-001259",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0466 + 689 - K0466 + 739, K0467 + 045 - K0467 + 182, K0467 + 604 - K0467 + 711, K0468 + 690 - K0468 + 754",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 34881000,
      "lengthKm": 0.358,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 97432960.89,
      "lengthMeters": 358.0,
      "allocationPerStatedMeter": 97432.96,
      "rangesMeters": [
        [
          466689.0,
          466739.0
        ],
        [
          467045.0,
          467182.0
        ],
        [
          467604.0,
          467711.0
        ],
        [
          468690.0,
          468754.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0466 + 689 - K0466 + 739, K0467 + 045 - K0467 + 182, K0467 + 604 - K0467 + 711, K0468 + 690 - K0468 + 754",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 0.94,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0206-001732",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Roman Expressway - K0143 + (-252) - K0144 + 400",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 34854000,
      "lengthKm": 1.652,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21098062.95,
      "lengthMeters": 1652.0,
      "allocationPerStatedMeter": 21098.06,
      "rangesMeters": [
        [
          142748.0,
          144400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Roman Expressway - K0143 + (-252) - K0144 + 400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 0.74,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0143-000644",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Alicia-San Mateo Rd - K0349 + (-581) - K0350 + 594",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 34801000,
      "lengthKm": 2.175,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16000459.77,
      "lengthMeters": 2175.0,
      "allocationPerStatedMeter": 16000.46,
      "rangesMeters": [
        [
          348419.0,
          350594.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Alicia-San Mateo Rd - K0349 + (-581) - K0350 + 594",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 0.53,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0284-003199",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Calao Parallel Br. along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 34800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Calao Parallel Br. along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0136-000512",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Santander-Barili-Toledo Rd - K0155 + 083 - K0156 + 263, K0156 + 398 - K0156 + 436, K0157 + 900 - K0158 + 140",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 34697000,
      "lengthKm": 1.458,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23797668.04,
      "lengthMeters": 1458.0,
      "allocationPerStatedMeter": 23797.67,
      "rangesMeters": [
        [
          155083.0,
          156263.0
        ],
        [
          156398.0,
          156436.0
        ],
        [
          157900.0,
          158140.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Santander-Barili-Toledo Rd - K0155 + 083 - K0156 + 263, K0156 + 398 - K0156 + 436, K0157 + 900 - K0158 + 140",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.77,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0158-000910",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Gil Puyat Ave - K0008 + (-865) - K0008 + 207",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 34678000,
      "lengthKm": 1.072,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32348880.6,
      "lengthMeters": 1072.0,
      "allocationPerStatedMeter": 32348.88,
      "rangesMeters": [
        [
          7135.0,
          8207.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "Gil Puyat Ave - K0008 + (-865) - K0008 + 207",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 1.22,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0151-000778",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0696 + 896 - K0697 + 000, K0697 + 663 - K0698 + 032, K0698 + 877 - K0699 + 039, K0702 + 143 - K0702 + 483, K0703 + 158 - K0703 + 459, K0703 + 853 - K0704 + 000",
      "office": "Central Office",
      "amountPesos": 34565000,
      "lengthKm": 1.423,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 24290231.9,
      "lengthMeters": 1423.0,
      "allocationPerStatedMeter": 24290.23,
      "rangesMeters": [
        [
          696896.0,
          697000.0
        ],
        [
          697663.0,
          698032.0
        ],
        [
          698877.0,
          699039.0
        ],
        [
          702143.0,
          702483.0
        ],
        [
          703158.0,
          703459.0
        ],
        [
          703853.0,
          704000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0696 + 896 - K0697 + 000, K0697 + 663 - K0698 + 032, K0698 + 877 - K0699 + 039, K0702 + 143 - K0702 + 483, K0703 + 158 - K0703 + 459, K0703 + 853 - K0704 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 1.02,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0260-002700",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Labao Br. (B00906MN) along Maharlika Highway (Agusan-Davao Sect)",
      "office": "Central Office",
      "amountPesos": 34560000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Labao Br. (B00906MN) along Maharlika Highway (Agusan-Davao Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0152-000796",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1782 + 200 - K1783 + 000, K1802 + 362 - K1803 + 000, K1806 + 317 - K1806 + 859",
      "office": "Central Office",
      "amountPesos": 34500000,
      "lengthKm": 1.98,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 17424242.42,
      "lengthMeters": 1980.0,
      "allocationPerStatedMeter": 17424.24,
      "rangesMeters": [
        [
          1782200.0,
          1783000.0
        ],
        [
          1802362.0,
          1803000.0
        ],
        [
          1806317.0,
          1806859.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1782 + 200 - K1783 + 000, K1802 + 362 - K1803 + 000, K1806 + 317 - K1806 + 859",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 0.7,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0499-007460",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 2+585, Barangay Wigan, Cordon, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 34500000,
      "lengthKm": 2.585,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13346228.24,
      "lengthMeters": 2585.0,
      "allocationPerStatedMeter": 13346.23,
      "rangesMeters": [
        [
          0.0,
          2585.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 2+585, Barangay Wigan, Cordon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.42,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0143-000645",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Alicia-San Mateo Rd - K0352 + 558 - K0354 + 711",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 34497000,
      "lengthKm": 2.153,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16022758.94,
      "lengthMeters": 2153.0,
      "allocationPerStatedMeter": 16022.76,
      "rangesMeters": [
        [
          352558.0,
          354711.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Alicia-San Mateo Rd - K0352 + 558 - K0354 + 711",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 0.53,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0186-001376",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0410 + 092 - K0410 + 117, K0410+806 - K0410+822, K0410+835 - K0411+028, K0411 + 080 - K0411 + 125, K0411 + 525 - K0411 + 580, K0414 + 690 - K0414 + 755, K0415 + 500 - K0415 + 540, K0415 + 780 - K0415 + 820",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 34466000,
      "lengthKm": 0.479,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 71954070.98,
      "lengthMeters": 479.0,
      "allocationPerStatedMeter": 71954.07,
      "rangesMeters": [
        [
          410092.0,
          410117.0
        ],
        [
          410806.0,
          410822.0
        ],
        [
          410835.0,
          411028.0
        ],
        [
          411080.0,
          411125.0
        ],
        [
          411525.0,
          411580.0
        ],
        [
          414690.0,
          414755.0
        ],
        [
          415500.0,
          415540.0
        ],
        [
          415780.0,
          415820.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0410 + 092 - K0410 + 117, K0410+806 - K0410+822, K0410+835 - K0411+028, K0411 + 080 - K0411 + 125, K0411 + 525 - K0411 + 580, K0414 + 690 - K0414 + 755, K0415 + 500 - K0415 + 540, K0415 + 780 - K0415 + 820",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 0.78,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0178-001252",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Mt Prov-Cagayan via Tabuk-Enrile Rd - K0400 + 924 - K0400 + 994, K0400 + 427 - K0400 + 523",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 34400000,
      "lengthKm": 0.166,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 207228915.66,
      "lengthMeters": 166.0,
      "allocationPerStatedMeter": 207228.92,
      "rangesMeters": [
        [
          400924.0,
          400994.0
        ],
        [
          400427.0,
          400523.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Mt Prov-Cagayan via Tabuk-Enrile Rd - K0400 + 924 - K0400 + 994, K0400 + 427 - K0400 + 523",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 1.09,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0115-000090",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1936 + 947 - K1938 + 000",
      "office": "Central Office",
      "amountPesos": 34278000,
      "lengthKm": 1.053,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32552706.55,
      "lengthMeters": 1053.0,
      "allocationPerStatedMeter": 32552.71,
      "rangesMeters": [
        [
          1936947.0,
          1938000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1936 + 947 - K1938 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 0.71,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0246-002456",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1284 + 370 - K1284 + 850, K1290 + 650 - K1290 + 930, K1300 + 395 - K1300 + 775 (Road Safety: Roadway Lighting)",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 34273000,
      "lengthKm": 1.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 30064035.09,
      "lengthMeters": 1140.0,
      "allocationPerStatedMeter": 30064.04,
      "rangesMeters": [
        [
          1284370.0,
          1284850.0
        ],
        [
          1290650.0,
          1290930.0
        ],
        [
          1300395.0,
          1300775.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1284 + 370 - K1284 + 850, K1290 + 650 - K1290 + 930, K1300 + 395 - K1300 + 775 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 2.5,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0206-001733",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Roman Expressway - K0145 + 623 - K0146 + 904, K0147 + 910 - K0148 + 276",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 34245000,
      "lengthKm": 1.647,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20792349.73,
      "lengthMeters": 1647.0,
      "allocationPerStatedMeter": 20792.35,
      "rangesMeters": [
        [
          145623.0,
          146904.0
        ],
        [
          147910.0,
          148276.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Roman Expressway - K0145 + 623 - K0146 + 904, K0147 + 910 - K0148 + 276",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28512.23,
      "peerRateMultiple": 0.73,
      "peerRecords": 26,
      "peerBand": "1623.5–<2253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56903.575,
      "graphUpperFence": 77994.025
    },
    {
      "id": "HB10858-3-0138-000550",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Bukidnon-Cotabato Rd - K1642 + 677 - K1643 + 809, K1643 + 841 - K1644 + 000",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 34244000,
      "lengthKm": 1.291,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 26525174.28,
      "lengthMeters": 1291.0,
      "allocationPerStatedMeter": 26525.17,
      "rangesMeters": [
        [
          1642677.0,
          1643809.0
        ],
        [
          1643841.0,
          1644000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Bukidnon-Cotabato Rd - K1642 + 677 - K1643 + 809, K1643 + 841 - K1644 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.85,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0268-002843",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Maligaya Br. (B02568LZ) along Maharlika Highway (LZ)",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 34137000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Maligaya Br. (B02568LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0256-002603",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Tertiary Roads",
      "projectName": "Lanao del Norte Interior Circum. Rd (LDNICR) - (S00969MN) Chainage 7388 - Chainage 8488",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 34100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "256",
      "lengthEvidence": "Lanao del Norte Interior Circum. Rd (LDNICR) - (S00969MN) Chainage 7388 - Chainage 8488",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0130-000384",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Olongapo-Bugallon Rd - K0128 + 922 - K0129 + 982",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 34000000,
      "lengthKm": 1.06,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32075471.7,
      "lengthMeters": 1060.0,
      "allocationPerStatedMeter": 32075.47,
      "rangesMeters": [
        [
          128922.0,
          129982.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Olongapo-Bugallon Rd - K0128 + 922 - K0129 + 982",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.03,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0130-000387",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Olongapo-Bugallon Rd - K0132 + 168 - K0133+166",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 34000000,
      "lengthKm": 0.998,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34068136.27,
      "lengthMeters": 998.0,
      "allocationPerStatedMeter": 34068.14,
      "rangesMeters": [
        [
          132168.0,
          133166.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Olongapo-Bugallon Rd - K0132 + 168 - K0133+166",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.12,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0174-001178",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Davao-Bukidnon Rd - K1648 + 731 - K1648 + 765",
      "office": "Davao City 2nd District Engineering Office",
      "amountPesos": 34000000,
      "lengthKm": 0.034,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1000000000.0,
      "lengthMeters": 34.0,
      "allocationPerStatedMeter": 1000000.0,
      "rangesMeters": [
        [
          1648731.0,
          1648765.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "174",
      "lengthEvidence": "Davao-Bukidnon Rd - K1648 + 731 - K1648 + 765",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 3.0,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0274-002986",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Araniw Br. (B00776LZ) along Laoag-Airport Rd",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 34000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Araniw Br. (B00776LZ) along Laoag-Airport Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009183",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in So. Cabungahan to Rizal Proper in Barangay Rizal, San Carlos City, Negros Occidental",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 34000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Road in So. Cabungahan to Rizal Proper in Barangay Rizal, San Carlos City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0592-009488",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bayobay - Barangay Tamoso, Borongan City, Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 34000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Construction of Road, Barangay Bayobay - Barangay Tamoso, Borongan City, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0178-001244",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0408 + 428 - K0408 + 490, K0409 + 247 - K0409 + 340, K0409 + 397 - K0409 + 452, K0410 + 434 - K0410 + 614, K0413 + 413 - K0413 + 489, K0422 + 600 - K0422 + 648, K0422 + 685 - K0422 + 758, K0425 + 176 - K0425 + 318",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 33994000,
      "lengthKm": 0.729,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 46631001.37,
      "lengthMeters": 729.0,
      "allocationPerStatedMeter": 46631.0,
      "rangesMeters": [
        [
          408428.0,
          408490.0
        ],
        [
          409247.0,
          409340.0
        ],
        [
          409397.0,
          409452.0
        ],
        [
          410434.0,
          410614.0
        ],
        [
          413413.0,
          413489.0
        ],
        [
          422600.0,
          422648.0
        ],
        [
          422685.0,
          422758.0
        ],
        [
          425176.0,
          425318.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0408 + 428 - K0408 + 490, K0409 + 247 - K0409 + 340, K0409 + 397 - K0409 + 452, K0410 + 434 - K0410 + 614, K0413 + 413 - K0413 + 489, K0422 + 600 - K0422 + 648, K0422 + 685 - K0422 + 758, K0425 + 176 - K0425 + 318",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 0.45,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0206-001742",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Lipa City - Alaminos Rd - K0079 + 756 - K0080 + 619",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 33850000,
      "lengthKm": 0.863,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39223638.47,
      "lengthMeters": 863.0,
      "allocationPerStatedMeter": 39223.64,
      "rangesMeters": [
        [
          79756.0,
          80619.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Lipa City - Alaminos Rd - K0079 + 756 - K0080 + 619",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.77,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0208-001793",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0093 + 635 - K0094 + 300",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 33850000,
      "lengthKm": 0.665,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50902255.64,
      "lengthMeters": 665.0,
      "allocationPerStatedMeter": 50902.26,
      "rangesMeters": [
        [
          93635.0,
          94300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0093 + 635 - K0094 + 300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 0.85,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0624-010148",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Gate 3 Don Juan, Purok Matahimik, Barangay Kenram, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 33840000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Construction of Concrete Road, Gate 3 Don Juan, Purok Matahimik, Barangay Kenram, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0137-000532",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siocon-Sirawai-Sibuco-Limpapa Rd - (S01151MN) Chainage 20500 - Chainage 21000, Chainage 21400 - Chainage 21800, Chainage 23000 - Chainage 23368, Chainage 29000 - Chainage 29986",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 33810000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Siocon-Sirawai-Sibuco-Limpapa Rd - (S01151MN) Chainage 20500 - Chainage 21000, Chainage 21400 - Chainage 21800, Chainage 23000 - Chainage 23368, Chainage 29000 - Chainage 29986",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0131-000407",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tanauan-Talisay-Tagaytay Rd - K0073 + 606 - K0074 + 396",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 33805000,
      "lengthKm": 0.79,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42791139.24,
      "lengthMeters": 790.0,
      "allocationPerStatedMeter": 42791.14,
      "rangesMeters": [
        [
          73606.0,
          74396.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Tanauan-Talisay-Tagaytay Rd - K0073 + 606 - K0074 + 396",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.41,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0451-006464",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads including Drainage along Alibangbang St. (C 0+000 - C 0+614), Barangay 179, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 33800000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Construction of Roads including Drainage along Alibangbang St. (C 0+000 - C 0+614), Barangay 179, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0489-007264",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Slope Protection Structure (Sta. 0+000 - Sta. 1+920), Barangay Alinguigan 1st to Barangay Cadu, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 33800000,
      "lengthKm": 1.92,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17604166.67,
      "lengthMeters": 1920.0,
      "allocationPerStatedMeter": 17604.17,
      "rangesMeters": [
        [
          0.0,
          1920.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of Road including Slope Protection Structure (Sta. 0+000 - Sta. 1+920), Barangay Alinguigan 1st to Barangay Cadu, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.73,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0626-010176",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Makin Bridge along Barangay Poloy-Poloy to Barangay Keytodac RD, Lebak, Sultan Kudarat",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 33800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Construction of Makin Bridge along Barangay Poloy-Poloy to Barangay Keytodac RD, Lebak, Sultan Kudarat",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003300",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Maramba Br. (B00580LZ) along Sta. Barbara Old Rd",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 33795000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Maramba Br. (B00580LZ) along Sta. Barbara Old Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0184-001351",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Claveria-Calanasan-Kabugao Rd - K0661 + 795 - K0661 + 860",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 33770000,
      "lengthKm": 0.065,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 519538461.54,
      "lengthMeters": 65.0,
      "allocationPerStatedMeter": 519538.46,
      "rangesMeters": [
        [
          661795.0,
          661860.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Claveria-Calanasan-Kabugao Rd - K0661 + 795 - K0661 + 860",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 1.39,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0130-000370",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0348 + 187 - K0349 + 900",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 33744000,
      "lengthKm": 1.713,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19698774.08,
      "lengthMeters": 1713.0,
      "allocationPerStatedMeter": 19698.77,
      "rangesMeters": [
        [
          348187.0,
          349900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0348 + 187 - K0349 + 900",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.65,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0214-001893",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
      "office": "Central Office",
      "amountPesos": 33628000,
      "lengthKm": 0.455,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 73907692.31,
      "lengthMeters": 455.0,
      "allocationPerStatedMeter": 73907.69,
      "rangesMeters": [
        [
          1415.0,
          1830.0
        ],
        [
          4040.0,
          4080.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "214",
      "lengthEvidence": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.58,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0178-001247",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Nueva Vizcaya-Ifugao-Mt Province Rd - K0359 + 473 - K0359 + 563, K0360 + 819 - K0360 + 954, K0361 + 077 - K0361 + 172",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 33600000,
      "lengthKm": 0.32,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 105000000.0,
      "lengthMeters": 320.0,
      "allocationPerStatedMeter": 105000.0,
      "rangesMeters": [
        [
          359473.0,
          359563.0
        ],
        [
          360819.0,
          360954.0
        ],
        [
          361077.0,
          361172.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Nueva Vizcaya-Ifugao-Mt Province Rd - K0359 + 473 - K0359 + 563, K0360 + 819 - K0360 + 954, K0361 + 077 - K0361 + 172",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 0.58,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0144-000661",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Ramos-Pura Rd - K0154 + (-379) - K0155 + 257",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 33572000,
      "lengthKm": 1.636,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20520782.4,
      "lengthMeters": 1636.0,
      "allocationPerStatedMeter": 20520.78,
      "rangesMeters": [
        [
          153621.0,
          155257.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Ramos-Pura Rd - K0154 + (-379) - K0155 + 257",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 0.95,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0472-006900",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Access Road & Seawall at Barangay Nibaliw, Along San Fabian Beach, San Fabian, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 33500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Rehabilitation of Access Road & Seawall at Barangay Nibaliw, Along San Fabian Beach, San Fabian, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007353",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road of Barangay Puroc to BarangayMacañao, Luna, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 33500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Rehabilitation of Road of Barangay Puroc to BarangayMacañao, Luna, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0163-000998",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Iloilo East Coast-Capiz Rd - K0218 + 342 - K0219 + 757",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 33450000,
      "lengthKm": 1.415,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23639575.97,
      "lengthMeters": 1415.0,
      "allocationPerStatedMeter": 23639.58,
      "rangesMeters": [
        [
          218342.0,
          219757.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Iloilo East Coast-Capiz Rd - K0218 + 342 - K0219 + 757",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 0.73,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0290-003345",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Mabaja Br. (B00052NR) along Bais-Kabankalan Rd",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 33420000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Mabaja Br. (B00052NR) along Bais-Kabankalan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0168-001084",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0464 + 000 - K0464 + 640",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 33344000,
      "lengthKm": 0.64,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52100000.0,
      "lengthMeters": 640.0,
      "allocationPerStatedMeter": 52100.0,
      "rangesMeters": [
        [
          464000.0,
          464640.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0464 + 000 - K0464 + 640",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.64,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0146-000696",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Bacolod-City Bdry Rd - K0001 + 224 - K0001 + 373, K0001 + 373 - K0002 + 000, K0002 + 000 - K0002 + 457",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 33328000,
      "lengthKm": 1.233,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 27030008.11,
      "lengthMeters": 1233.0,
      "allocationPerStatedMeter": 27030.01,
      "rangesMeters": [
        [
          1224.0,
          1373.0
        ],
        [
          1373.0,
          2000.0
        ],
        [
          2000.0,
          2457.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Bacolod-City Bdry Rd - K0001 + 224 - K0001 + 373, K0001 + 373 - K0002 + 000, K0002 + 000 - K0002 + 457",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.13,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0206-001734",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Roman Expressway - K0152 + 430 - K0154 + 000",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 33320000,
      "lengthKm": 1.57,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21222929.94,
      "lengthMeters": 1570.0,
      "allocationPerStatedMeter": 21222.93,
      "rangesMeters": [
        [
          152430.0,
          154000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Roman Expressway - K0152 + 430 - K0154 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 0.63,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0137-000518",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Catarman-Laoang Rd - K0765 + (-040) - K0765 + 350",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 33289000,
      "lengthKm": 0.39,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 85356410.26,
      "lengthMeters": 390.0,
      "allocationPerStatedMeter": 85356.41,
      "rangesMeters": [
        [
          764960.0,
          765350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Catarman-Laoang Rd - K0765 + (-040) - K0765 + 350",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 2.65,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0174-001176",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Sayre Highway - K1428 + 000 - K1428 + 250",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 33250000,
      "lengthKm": 0.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 133000000.0,
      "lengthMeters": 250.0,
      "allocationPerStatedMeter": 133000.0,
      "rangesMeters": [
        [
          1428000.0,
          1428250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "174",
      "lengthEvidence": "Sayre Highway - K1428 + 000 - K1428 + 250",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 0.4,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0250-002517",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Bacolod Silay Airport Access Rd K0009 + 507 - K0014 + 917 (Road Safety: Roadway Lighting)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 33240000,
      "lengthKm": 5.41,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 6144177.45,
      "lengthMeters": 5410.0,
      "allocationPerStatedMeter": 6144.18,
      "rangesMeters": [
        [
          9507.0,
          14917.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "250",
      "lengthEvidence": "Bacolod Silay Airport Access Rd K0009 + 507 - K0014 + 917 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.59,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0147-000729",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Magpet-Nowa-Doroluman-Greenfield Rd - K1633 + 023 - K1634 + 598",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 33219000,
      "lengthKm": 1.575,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21091428.57,
      "lengthMeters": 1575.0,
      "allocationPerStatedMeter": 21091.43,
      "rangesMeters": [
        [
          1633023.0,
          1634598.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Magpet-Nowa-Doroluman-Greenfield Rd - K1633 + 023 - K1634 + 598",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 0.98,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0131-000404",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Banay-Banay-Mojon-Cuenca Rd - K0092 + 022 - K0093 + 042",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 33160000,
      "lengthKm": 1.02,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32509803.92,
      "lengthMeters": 1020.0,
      "allocationPerStatedMeter": 32509.8,
      "rangesMeters": [
        [
          92022.0,
          93042.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Banay-Banay-Mojon-Cuenca Rd - K0092 + 022 - K0093 + 042",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.07,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0261-002705",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Lipata Br. (B01208MN) along Maharlika Highway (Lipata-Surigao Sect)",
      "office": "Central Office",
      "amountPesos": 33100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Lipata Br. (B01208MN) along Maharlika Highway (Lipata-Surigao Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0292-003390",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Magpet Br. (B00252MN) along Kidapawan-Magpet-Pangaoan Rd",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 33048000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Magpet Br. (B00252MN) along Kidapawan-Magpet-Pangaoan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0259-002666",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Nahulid Br. (B00595LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 33046000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Nahulid Br. (B00595LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0119-000163",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Santiago-Tuguegarao Rd - K0348 + 421 - K0349 + 506",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 33036000,
      "lengthKm": 1.085,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30447926.27,
      "lengthMeters": 1085.0,
      "allocationPerStatedMeter": 30447.93,
      "rangesMeters": [
        [
          348421.0,
          349506.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Santiago-Tuguegarao Rd - K0348 + 421 - K0349 + 506",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 0.66,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0146-000705",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Argao-Moalboal Rd - K0060 + 000 - K0061 + 521, K0063 + 837 - K0064 + 292",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 33013000,
      "lengthKm": 1.976,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 16706983.81,
      "lengthMeters": 1976.0,
      "allocationPerStatedMeter": 16706.98,
      "rangesMeters": [
        [
          60000.0,
          61521.0
        ],
        [
          63837.0,
          64292.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Argao-Moalboal Rd - K0060 + 000 - K0061 + 521, K0063 + 837 - K0064 + 292",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 0.56,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0159-000924",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Batangas-Lobo Rd - K0117+9.5-K0117+14(LL), K0117+207.9-K0117+212.5(LL), K0117+253.2-K0117+255.6(BL), K0117+257.6-K0117+262.1(LL), K0117+372.2- K0117+398.8(LL), K0117+416.6-K0117+425.5(BL), K0117+443.7-K0117+455.8(BL), K0117+472.8-K0117+477(LL), K0117+477-K0117+481.5(BL), K0117+499.3- K0117+503.6(LL), K0117+521.4-K0117+530.2(BL), K0117+530.2-K0117+539.5(LL), K0117+539.5-K0117+548.5(BL), K0117+576.1-K0117+580.8(LL), K0117+585.4- K0117+604.1(LL), K0117+664-K0117+668.5RL, K0117+682.2-K0117+691.3(BL), K0117+691.3-K0117+700.4(LL), K0117+705-K0117+727.3(BL), K0117+777- K0117+782.5(BL), K0117+846-K0117+855.1(LL), K0117+868.6-K0117+882.2(LL), K0117+980.4-K0118+000(LL), K0118+000-K0118+16(LL), K0118+47-K0118+64.8(LL), K0118+64.8-K0118+81.5(BL), K0118+89.4-K0118+163.2(LL), K0118+163.2- K0118+172.3(BL), K0118+172.3-K0118+249.5(LL), K0118+278.3-K0118+307.5(LL), K0118+328.2-K0118+360.3(LL), K0118+423.4-K0118+445(BL), K0118+525.9- K0118+537.3(BL)",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 33000000,
      "lengthKm": 0.5248000000000611,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 62881097.56,
      "lengthMeters": 524.8,
      "allocationPerStatedMeter": 62881.1,
      "rangesMeters": [
        [
          117009.5,
          117014.0
        ],
        [
          117207.9,
          117212.5
        ],
        [
          117253.2,
          117255.6
        ],
        [
          117257.6,
          117262.1
        ],
        [
          117372.2,
          117398.8
        ],
        [
          117416.6,
          117425.5
        ],
        [
          117443.7,
          117455.8
        ],
        [
          117472.8,
          117477.0
        ],
        [
          117477.0,
          117481.5
        ],
        [
          117499.3,
          117503.6
        ],
        [
          117521.4,
          117530.2
        ],
        [
          117530.2,
          117539.5
        ],
        [
          117539.5,
          117548.5
        ],
        [
          117576.1,
          117580.8
        ],
        [
          117585.4,
          117604.1
        ],
        [
          117664.0,
          117668.5
        ],
        [
          117682.2,
          117691.3
        ],
        [
          117691.3,
          117700.4
        ],
        [
          117705.0,
          117727.3
        ],
        [
          117777.0,
          117782.5
        ],
        [
          117846.0,
          117855.1
        ],
        [
          117868.6,
          117882.2
        ],
        [
          117980.4,
          118000.0
        ],
        [
          118000.0,
          118016.0
        ],
        [
          118047.0,
          118064.8
        ],
        [
          118064.8,
          118081.5
        ],
        [
          118089.4,
          118163.2
        ],
        [
          118163.2,
          118172.3
        ],
        [
          118172.3,
          118249.5
        ],
        [
          118278.3,
          118307.5
        ],
        [
          118328.2,
          118360.3
        ],
        [
          118423.4,
          118445.0
        ],
        [
          118525.9,
          118537.3
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "159",
      "lengthEvidence": "Batangas-Lobo Rd - K0117+9.5-K0117+14(LL), K0117+207.9-K0117+212.5(LL), K0117+253.2-K0117+255.6(BL), K0117+257.6-K0117+262.1(LL), K0117+372.2- K0117+398.8(LL), K0117+416.6-K0117+425.5(BL), K0117+443.7-K0117+455.8(BL), K0117+472.8-K0117+477(LL), K0117+477-K0117+481.5(BL), K0117+499.3- K0117+503.6(LL), K0117+521.4-K0117+530.2(BL), K0117+530.2-K0117+539.5(LL), K0117+539.5-K0117+548.5(BL), K0117+576.1-K0117+580.8(LL), K0117+585.4- K0117+604.1(LL), K0117+664-K0117+668.5RL, K0117+682.2-K0117+691.3(BL), K0117+691.3-K0117+700.4(LL), K0117+705-K0117+727.3(BL), K0117+777- K0117+782.5(BL), K0117+846-K0117+855.1(LL), K0117+868.6-K0117+882.2(LL), K0117+980.4-K0118+000(LL), K0118+000-K0118+16(LL), K0118+47-K0118+64.8(LL), K0118+64.8-K0118+81.5(BL), K0118+89.4-K0118+163.2(LL), K0118+163.2- K0118+172.3(BL), K0118+172.3-K0118+249.5(LL), K0118+278.3-K0118+307.5(LL), K0118+328.2-K0118+360.3(LL), K0118+423.4-K0118+445(BL), K0118+525.9- K0118+537.3(BL)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.58,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0160-000925",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Batangas-Lobo Rd - K0112+494.1-K0112+503.9(BL), K0112+556.2-K0112+563.8(RL), K0112+577.8-K0112+600.4(LL), K0112+609.4-K0112+614.1(LL), K0112+641- K0112+672.9(LL), K0113+860.4-K0113+865(LL), K0113+865-K0113+878.6(BL), K0114+175.7-K0114+184.9(LL), K0114+184.6-K0114+285.1(LL), K0114+405.7- K0114+447(LL), K0114+454.5-K0114+478.5(LL), K0114+568.3-K0114+577.1(BL), K0114+620-K0114+629(LL), K0114+702.9-K0114+712.1(BL), K0114+712.1- K0114+723(LL), K0114+739-K0114+743.3(BL), K0114+743.3-K0114+802.6(LL), K0114+802.6-K0114+811.5(BL), K0114+811.5-K0114+820.7(LL), K0114+820.7- K0114+825.3(BL), K0114+825.3-K0114+829.9(LL), K0114+829.9-K0114+843.2(BL), K0114+843.2-K0114+852.2(LL), K0114+852.2-K0114+856.8(BL), K0114+856.8- K0115+000(LL), K0115+000-K0115+107.5(LL), K0115+115.3-K0115+119.5(LL), K0115+151.1-K0115+155.6(LL), K0115+164.7-K0115+173.7(LL), K0115+184- K0115+238(LL), K0115+250.9-K0115+255.4(LL), K0115+255-K0115+264(RL), K0115+309.4-K0115+318.3(LL), K0115+318.3-K0115+323.5(BL), K0115+322.9- K0115+332(RL), K0115+401.4-K0115+447.7(RL), K0115+447.7-K0115+454(BL), K0115+479.2-K0115+488.1(LL), K0115+524.2-K0115+542.1(LL), K0115+546.7- K0115+551.3(RL), K0115+551.3-K0115+555.7(LL), K0115+609.8-K0115+618.8(LL), K0115+645.9-K0115+668.5(LL), K0115+771.9-K0115+775.9(LL), K0115+826.1- K0115+830.5(LL), K0115+839.6-K0115+843.9(LL)",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 33000000,
      "lengthKm": 0.9160000000000437,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 36026200.87,
      "lengthMeters": 916.0,
      "allocationPerStatedMeter": 36026.2,
      "rangesMeters": [
        [
          112494.1,
          112503.9
        ],
        [
          112556.2,
          112563.8
        ],
        [
          112577.8,
          112600.4
        ],
        [
          112609.4,
          112614.1
        ],
        [
          112641.0,
          112672.9
        ],
        [
          113860.4,
          113865.0
        ],
        [
          113865.0,
          113878.6
        ],
        [
          114175.7,
          114184.9
        ],
        [
          114184.6,
          114285.1
        ],
        [
          114405.7,
          114447.0
        ],
        [
          114454.5,
          114478.5
        ],
        [
          114568.3,
          114577.1
        ],
        [
          114620.0,
          114629.0
        ],
        [
          114702.9,
          114712.1
        ],
        [
          114712.1,
          114723.0
        ],
        [
          114739.0,
          114743.3
        ],
        [
          114743.3,
          114802.6
        ],
        [
          114802.6,
          114811.5
        ],
        [
          114811.5,
          114820.7
        ],
        [
          114820.7,
          114825.3
        ],
        [
          114825.3,
          114829.9
        ],
        [
          114829.9,
          114843.2
        ],
        [
          114843.2,
          114852.2
        ],
        [
          114852.2,
          114856.8
        ],
        [
          114856.8,
          115000.0
        ],
        [
          115000.0,
          115107.5
        ],
        [
          115115.3,
          115119.5
        ],
        [
          115151.1,
          115155.6
        ],
        [
          115164.7,
          115173.7
        ],
        [
          115184.0,
          115238.0
        ],
        [
          115250.9,
          115255.4
        ],
        [
          115255.0,
          115264.0
        ],
        [
          115309.4,
          115318.3
        ],
        [
          115318.3,
          115323.5
        ],
        [
          115322.9,
          115332.0
        ],
        [
          115401.4,
          115447.7
        ],
        [
          115447.7,
          115454.0
        ],
        [
          115479.2,
          115488.1
        ],
        [
          115524.2,
          115542.1
        ],
        [
          115546.7,
          115551.3
        ],
        [
          115551.3,
          115555.7
        ],
        [
          115609.8,
          115618.8
        ],
        [
          115645.9,
          115668.5
        ],
        [
          115771.9,
          115775.9
        ],
        [
          115826.1,
          115830.5
        ],
        [
          115839.6,
          115843.9
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "160",
      "lengthEvidence": "Batangas-Lobo Rd - K0112+494.1-K0112+503.9(BL), K0112+556.2-K0112+563.8(RL), K0112+577.8-K0112+600.4(LL), K0112+609.4-K0112+614.1(LL), K0112+641- K0112+672.9(LL), K0113+860.4-K0113+865(LL), K0113+865-K0113+878.6(BL), K0114+175.7-K0114+184.9(LL), K0114+184.6-K0114+285.1(LL), K0114+405.7- K0114+447(LL), K0114+454.5-K0114+478.5(LL), K0114+568.3-K0114+577.1(BL), K0114+620-K0114+629(LL), K0114+702.9-K0114+712.1(BL), K0114+712.1- K0114+723(LL), K0114+739-K0114+743.3(BL), K0114+743.3-K0114+802.6(LL), K0114+802.6-K0114+811.5(BL), K0114+811.5-K0114+820.7(LL), K0114+820.7- K0114+825.3(BL), K0114+825.3-K0114+829.9(LL), K0114+829.9-K0114+843.2(BL), K0114+843.2-K0114+852.2(LL), K0114+852.2-K0114+856.8(BL), K0114+856.8- K0115+000(LL), K0115+000-K0115+107.5(LL), K0115+115.3-K0115+119.5(LL), K0115+151.1-K0115+155.6(LL), K0115+164.7-K0115+173.7(LL), K0115+184- K0115+238(LL), K0115+250.9-K0115+255.4(LL), K0115+255-K0115+264(RL), K0115+309.4-K0115+318.3(LL), K0115+318.3-K0115+323.5(BL), K0115+322.9- K0115+332(RL), K0115+401.4-K0115+447.7(RL), K0115+447.7-K0115+454(BL), K0115+479.2-K0115+488.1(LL), K0115+524.2-K0115+542.1(LL), K0115+546.7- K0115+551.3(RL), K0115+551.3-K0115+555.7(LL), K0115+609.8-K0115+618.8(LL), K0115+645.9-K0115+668.5(LL), K0115+771.9-K0115+775.9(LL), K0115+826.1- K0115+830.5(LL), K0115+839.6-K0115+843.9(LL)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 1.09,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0231-002212",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Jct. Nato-Sabang Coastal Road, San Jose, Camarines, Sta. 7+446.40 - Sta.7+467, Sta.10+368 - Sta.10+504.70",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 33000000,
      "lengthKm": 0.15730000000000108,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 209790209.79,
      "lengthMeters": 157.3,
      "allocationPerStatedMeter": 209790.21,
      "rangesMeters": [
        [
          7446.4,
          7467.0
        ],
        [
          10368.0,
          10504.7
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Jct. Nato-Sabang Coastal Road, San Jose, Camarines, Sta. 7+446.40 - Sta.7+467, Sta.10+368 - Sta.10+504.70",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 1.0,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0287-003285",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Mumpong Br. (B02138MN) along Hi-Way Tamontaka Jct. Tapian Wharf Rd",
      "office": "Central Office",
      "amountPesos": 33000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Mumpong Br. (B02138MN) along Hi-Way Tamontaka Jct. Tapian Wharf Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007349",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road of Barangay Concepcion to Barangay Puroc, Luna Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 33000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Rehabilitation of Road of Barangay Concepcion to Barangay Puroc, Luna Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008600",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Payagwan River, Barangay San Jose, Antipolo City, Rizal, 14.660900, 121.253124",
      "office": "Rizal 2nd District Engineering Office",
      "amountPesos": 33000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Bridge, Payagwan River, Barangay San Jose, Antipolo City, Rizal, 14.660900, 121.253124",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009266",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Bel-at, Barangay Bogo, Maria, Siquijor",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 33000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road, Sitio Bel-at, Barangay Bogo, Maria, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0261-002715",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Siana Br. (B00859MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "office": "Central Office",
      "amountPesos": 32980000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Siana Br. (B00859MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0138-000554",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Dinagat-Loreto Rd - K0001 + 000 - K0002 + 426, K0002 + 537 - K0003 + 000",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 32920000,
      "lengthKm": 1.889,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 17427210.16,
      "lengthMeters": 1889.0,
      "allocationPerStatedMeter": 17427.21,
      "rangesMeters": [
        [
          1000.0,
          2426.0
        ],
        [
          2537.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Dinagat-Loreto Rd - K0001 + 000 - K0002 + 426, K0002 + 537 - K0003 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.57,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0258-002650",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Cawayan Br. 1 (B00605LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 32916000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Cawayan Br. 1 (B00605LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0208-001777",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0032 + 028 - K0032 + 566",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 32900000,
      "lengthKm": 0.538,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 61152416.36,
      "lengthMeters": 538.0,
      "allocationPerStatedMeter": 61152.42,
      "rangesMeters": [
        [
          32028.0,
          32566.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0032 + 028 - K0032 + 566",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 1.18,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0209-001806",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "The President Carlos P. Garcia Circumferential Rd - K0096 + 262 - K0096 + 869",
      "office": "Bohol 2nd District Engineering Office",
      "amountPesos": 32895000,
      "lengthKm": 0.607,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54192751.24,
      "lengthMeters": 607.0,
      "allocationPerStatedMeter": 54192.75,
      "rangesMeters": [
        [
          96262.0,
          96869.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "The President Carlos P. Garcia Circumferential Rd - K0096 + 262 - K0096 + 869",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 0.9,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0148-000735",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Surallah-Lake Sebu-Maitum Rd - K1753 + 000 - K1753 + 1016",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 32832000,
      "lengthKm": 1.016,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32314960.63,
      "lengthMeters": 1016.0,
      "allocationPerStatedMeter": 32314.96,
      "rangesMeters": [
        [
          1753000.0,
          1754016.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "148",
      "lengthEvidence": "Surallah-Lake Sebu-Maitum Rd - K1753 + 000 - K1753 + 1016",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.35,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0144-000656",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sn Fernando-Lubao Rd - K0077 + 419 - K0079 + 000",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 32763000,
      "lengthKm": 1.581,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20722960.15,
      "lengthMeters": 1581.0,
      "allocationPerStatedMeter": 20722.96,
      "rangesMeters": [
        [
          77419.0,
          79000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Sn Fernando-Lubao Rd - K0077 + 419 - K0079 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 0.96,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0208-001786",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0060 + 901 - K0061 + 500",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 32750000,
      "lengthKm": 0.599,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54674457.43,
      "lengthMeters": 599.0,
      "allocationPerStatedMeter": 54674.46,
      "rangesMeters": [
        [
          60901.0,
          61500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0060 + 901 - K0061 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 0.91,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0163-000984",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Jct Milagros-Baleno-Lagta Rd - K0052 + 147 - K0052 + 574",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 32720000,
      "lengthKm": 0.427,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 76627634.66,
      "lengthMeters": 427.0,
      "allocationPerStatedMeter": 76627.63,
      "rangesMeters": [
        [
          52147.0,
          52574.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Jct Milagros-Baleno-Lagta Rd - K0052 + 147 - K0052 + 574",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.93,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0163-000983",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Jct Milagros-Baleno-Lagta Rd - K0036 + 574 - K0037 + 000",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 32645000,
      "lengthKm": 0.426,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 76631455.4,
      "lengthMeters": 426.0,
      "allocationPerStatedMeter": 76631.46,
      "rangesMeters": [
        [
          36574.0,
          37000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Jct Milagros-Baleno-Lagta Rd - K0036 + 574 - K0037 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.93,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0200-001610",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Dumaguete South Rd - K0064 + 405 - K0064 + 830.77",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 32532000,
      "lengthKm": 0.4257699999999968,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 76407450.03,
      "lengthMeters": 425.77,
      "allocationPerStatedMeter": 76407.45,
      "rangesMeters": [
        [
          64405.0,
          64830.77
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Dumaguete South Rd - K0064 + 405 - K0064 + 830.77",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 1.56,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0121-000198",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Iloilo-Capiz (New Route) - K0054 + 000 - K0054 + 1011",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 32500000,
      "lengthKm": 1.011,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32146389.71,
      "lengthMeters": 1011.0,
      "allocationPerStatedMeter": 32146.39,
      "rangesMeters": [
        [
          54000.0,
          55011.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "Iloilo-Capiz (New Route) - K0054 + 000 - K0054 + 1011",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 0.7,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0167-001062",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Bongao-Pahut-Sanga-Sanga Rd - Chainage 1200 - Chainage 2149",
      "office": "Central Office",
      "amountPesos": 32500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Bongao-Pahut-Sanga-Sanga Rd - Chainage 1200 - Chainage 2149",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0206-001748",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Mindoro West Coastal Rd - K0330 + 000 - K0331 + 000",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 32500000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32500000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 32500.0,
      "rangesMeters": [
        [
          330000.0,
          331000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Mindoro West Coastal Rd - K0330 + 000 - K0331 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.64,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0259-002665",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Mayuga Br. 2 (B00607LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 32500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Mayuga Br. 2 (B00607LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0575-009121",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 3+353 - Sta. 5+669) at Barangay Canlusong, E.B. Magalona, Negros Occidental (10.7556040, 123.1613220)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 32424000,
      "lengthKm": 2.316,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14000000.0,
      "lengthMeters": 2316.0,
      "allocationPerStatedMeter": 14000.0,
      "rangesMeters": [
        [
          3353.0,
          5669.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road (Sta. 3+353 - Sta. 5+669) at Barangay Canlusong, E.B. Magalona, Negros Occidental (10.7556040, 123.1613220)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0264-002772",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Panambongon Br. (B01235MN) along Jct SH-Aglayan-Alanib-Ticalaan Rd (Aglayan- Basak)",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 32400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Panambongon Br. (B01235MN) along Jct SH-Aglayan-Alanib-Ticalaan Rd (Aglayan- Basak)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0625-010152",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, New Egaña to Dukay, Barangay D'Lotilla, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 32400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Concrete Road, New Egaña to Dukay, Barangay D'Lotilla, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0211-001833",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Bukidnon-Cotabato Rd - K1618 + 651 - K1619 + 646",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 32280000,
      "lengthKm": 0.995,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32442211.06,
      "lengthMeters": 995.0,
      "allocationPerStatedMeter": 32442.21,
      "rangesMeters": [
        [
          1618651.0,
          1619646.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "211",
      "lengthEvidence": "Bukidnon-Cotabato Rd - K1618 + 651 - K1619 + 646",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.64,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0137-000533",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siocon-Sirawai-Sibuco-Limpapa Rd - (S01151MN) Chainage 30016 - Chainage 30473, Chainage 30498 - Chainage 31400, Chainage 31700 - Chainage 32000, Chainage 32300 - Chainage 32790",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 32235000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Siocon-Sirawai-Sibuco-Limpapa Rd - (S01151MN) Chainage 30016 - Chainage 30473, Chainage 30498 - Chainage 31400, Chainage 31700 - Chainage 32000, Chainage 32300 - Chainage 32790",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0257-002626",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Inaclagan Br. (B02573LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 32200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Inaclagan Br. (B02573LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0430-006054",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Binatagan Basud, Camarines Norte, Start 14.01652, 122.90254 End 14.01344, 122.89608",
      "office": "Central Office",
      "amountPesos": 32150000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Concreting of Road, Barangay Binatagan Basud, Camarines Norte, Start 14.01652, 122.90254 End 14.01344, 122.89608",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0112-000025",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway ( Manila South Road) - K0044 + 553 - K0045 + 000",
      "office": "Central Office",
      "amountPesos": 32117000,
      "lengthKm": 0.447,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 71850111.86,
      "lengthMeters": 447.0,
      "allocationPerStatedMeter": 71850.11,
      "rangesMeters": [
        [
          44553.0,
          45000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Maharlika Highway ( Manila South Road) - K0044 + 553 - K0045 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 1.5,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0292-003385",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Camogna Br. 2 (B01691MN) along Tibanban-Lavigan Rd",
      "office": "Davao Oriental 2nd District Engineering Office",
      "amountPesos": 32112000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Camogna Br. 2 (B01691MN) along Tibanban-Lavigan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0490-007280",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sta. 2+940 - Sta. 5+040), Barangay Annanuman to Barangay San Vicente, San Pablo, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 32100000,
      "lengthKm": 2.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15285714.29,
      "lengthMeters": 2100.0,
      "allocationPerStatedMeter": 15285.71,
      "rangesMeters": [
        [
          2940.0,
          5040.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Construction of Concrete Road (Sta. 2+940 - Sta. 5+040), Barangay Annanuman to Barangay San Vicente, San Pablo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.63,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0147-000730",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Matalam-Lampayan-Antipas Rd - K1666 + 000 - K1667 + 000",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 32085000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32085000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 32085.0,
      "rangesMeters": [
        [
          1666000.0,
          1667000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Matalam-Lampayan-Antipas Rd - K1666 + 000 - K1667 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.34,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0250-002514",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Jct. Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0017 + (-386) - K0020 + 000 (Road Safety: Roadway Lighting)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 32084000,
      "lengthKm": 3.386,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9475487.3,
      "lengthMeters": 3386.0,
      "allocationPerStatedMeter": 9475.49,
      "rangesMeters": [
        [
          16614.0,
          20000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "250",
      "lengthEvidence": "Jct. Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0017 + (-386) - K0020 + 000 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.92,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0162-000977",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Nabua-Bato-Libon (Tandaay-Buluang, Bato) Rd - K0492 + 873 - K0493 + 728.49",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 32030000,
      "lengthKm": 0.8554899999999906,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37440531.16,
      "lengthMeters": 855.49,
      "allocationPerStatedMeter": 37440.53,
      "rangesMeters": [
        [
          492873.0,
          493728.49
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Nabua-Bato-Libon (Tandaay-Buluang, Bato) Rd - K0492 + 873 - K0493 + 728.49",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 1.13,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0213-001869",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Kidapawan-Calunasan-Mlang Rd - K1629 + 000 - K1629 + 1016",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 32027000,
      "lengthKm": 1.016,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31522637.8,
      "lengthMeters": 1016.0,
      "allocationPerStatedMeter": 31522.64,
      "rangesMeters": [
        [
          1629000.0,
          1630016.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "213",
      "lengthEvidence": "Kidapawan-Calunasan-Mlang Rd - K1629 + 000 - K1629 + 1016",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.78,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0134-000468",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Makiling Park Rd - K0063 + (-273) - K0064 + 000",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 32000000,
      "lengthKm": 1.273,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25137470.54,
      "lengthMeters": 1273.0,
      "allocationPerStatedMeter": 25137.47,
      "rangesMeters": [
        [
          62727.0,
          64000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Makiling Park Rd - K0063 + (-273) - K0064 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.81,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0143-000654",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Cabanatuan City - Carmen Rd, K0133 + 000 - K0133 + 750",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 32000000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42666666.67,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 42666.67,
      "rangesMeters": [
        [
          133000.0,
          133750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Cabanatuan City - Carmen Rd, K0133 + 000 - K0133 + 750",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.78,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0171-001126",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Guimbal-Igbaras-Tubungan-Leon Rd - K0035 + 115 - K0036 + 000",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 32000000,
      "lengthKm": 0.885,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36158192.09,
      "lengthMeters": 885.0,
      "allocationPerStatedMeter": 36158.19,
      "rangesMeters": [
        [
          35115.0,
          36000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Guimbal-Igbaras-Tubungan-Leon Rd - K0035 + 115 - K0036 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.14,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0179-001260",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Batangas-Lobo Rd - K0131 + 100 - K0131 + 206",
      "office": "Batagas 2nd District Engineering Office",
      "amountPesos": 32000000,
      "lengthKm": 0.106,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 301886792.45,
      "lengthMeters": 106.0,
      "allocationPerStatedMeter": 301886.79,
      "rangesMeters": [
        [
          131100.0,
          131206.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "Batangas-Lobo Rd - K0131 + 100 - K0131 + 206",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 1.0,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0184-001343",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Apayao (Calanasan)-Ilocos Norte Rd - (S00644LZ) Chainage 9172 - Chainage 9209, Chainage 9601 - Chainage 9642",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 32000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Apayao (Calanasan)-Ilocos Norte Rd - (S00644LZ) Chainage 9172 - Chainage 9209, Chainage 9601 - Chainage 9642",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0264-002761",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Payapay Br. (B00484LT) along Sn Jose-Manlurip-MacArthur Park Rd",
      "office": "Tacloban City District Engineering Office",
      "amountPesos": 32000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Payapay Br. (B00484LT) along Sn Jose-Manlurip-MacArthur Park Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0264-002776",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Sibugon Br. (B01104MN) along Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd",
      "office": "Misamis Occidental 1st District Engineering Office",
      "amountPesos": 32000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Sibugon Br. (B01104MN) along Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0289-003325",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Apo Aporawan Br. (B00355PW) along Puerto Princesa South Rd",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 32000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Apo Aporawan Br. (B00355PW) along Puerto Princesa South Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006946",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Paitan, Barangay Poblacion East, Barangay Namagbagan, Barangay Cal-litang, Barangay San Vicente - Barangay Poblacion, Barangay Capandanan, Sta. Maria, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 32000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Rehabilitation of Road, Barangay Paitan, Barangay Poblacion East, Barangay Namagbagan, Barangay Cal-litang, Barangay San Vicente - Barangay Poblacion, Barangay Capandanan, Sta. Maria, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0525-008019",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road leading to Aquino Bypass Road, Barangay Panipuan, Mexico, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 32000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Concreting of Road leading to Aquino Bypass Road, Barangay Panipuan, Mexico, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0564-008888",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Jct National Raod to Barangay Managanaga to Barangay Macabug, Aroroy, Masbate, Sta. 3+532 to Sta. 4+282",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 32000000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42666666.67,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 42666.67,
      "rangesMeters": [
        [
          3532.0,
          4282.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Road, Jct National Raod to Barangay Managanaga to Barangay Macabug, Aroroy, Masbate, Sta. 3+532 to Sta. 4+282",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 2.2,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0589-009436",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Valencia Bridge at Barangay Valencia, Alegria, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 32000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Construction of Valencia Bridge at Barangay Valencia, Alegria, Cebu",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0136-000507",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siquijor Circumferential Rd - K0034 + 000 - K0035 + 026",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 31900000,
      "lengthKm": 1.026,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31091617.93,
      "lengthMeters": 1026.0,
      "allocationPerStatedMeter": 31091.62,
      "rangesMeters": [
        [
          34000.0,
          35026.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Siquijor Circumferential Rd - K0034 + 000 - K0035 + 026",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 1.0,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0518-007860",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Narvacan II, Guimba, Nueva Ecija, 15.6950777, 120.749619",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 31850000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Bridge, Barangay Narvacan II, Guimba, Nueva Ecija, 15.6950777, 120.749619",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0210-001825",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Camiguin Circumferential Rd - K0041 + 583 - K0041 + 658, K0041 + 874 - K0042 + 547, K0042 + 794 - K0043 + 003",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 31836000,
      "lengthKm": 0.957,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 33266457.68,
      "lengthMeters": 957.0,
      "allocationPerStatedMeter": 33266.46,
      "rangesMeters": [
        [
          41583.0,
          41658.0
        ],
        [
          41874.0,
          42547.0
        ],
        [
          42794.0,
          43003.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Camiguin Circumferential Rd - K0041 + 583 - K0041 + 658, K0041 + 874 - K0042 + 547, K0042 + 794 - K0043 + 003",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.66,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0200-001617",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Jct Blancia-Molave-Josefina Rd - K1664 + 667 - K1665 + 000, K1665 + 720 - K1666 + 650",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 31814000,
      "lengthKm": 1.263,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 25189231.99,
      "lengthMeters": 1263.0,
      "allocationPerStatedMeter": 25189.23,
      "rangesMeters": [
        [
          1664667.0,
          1665000.0
        ],
        [
          1665720.0,
          1666650.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Jct Blancia-Molave-Josefina Rd - K1664 + 667 - K1665 + 000, K1665 + 720 - K1666 + 650",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 0.56,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0136-000506",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siquijor Circumferential Rd - K0023 + 000 - K0024 + 000",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 31800000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31800000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 31800.0,
      "rangesMeters": [
        [
          23000.0,
          24000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Siquijor Circumferential Rd - K0023 + 000 - K0024 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.05,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0451-006463",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads including Drainage along Acacia St. (C 0+000 - C 0+577), Barangay 179, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 31800000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Construction of Roads including Drainage along Acacia St. (C 0+000 - C 0+577), Barangay 179, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0207-001765",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Buenavista-Kawayan Rd - K0033 + (-558) - K0033 + 075",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 31650000,
      "lengthKm": 0.633,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 633.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          32442.0,
          33075.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Buenavista-Kawayan Rd - K0033 + (-558) - K0033 + 075",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 0.83,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0258-002647",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Bucalan Br. (B00383SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "office": "Central Office",
      "amountPesos": 31600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Bucalan Br. (B00383SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0261-002710",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Pingaping Br. (B00856MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "office": "Central Office",
      "amountPesos": 31560000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Pingaping Br. (B00856MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0208-001772",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Buenavista-Kawayan Rd - K0061 + 440 - K0062 + 070",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 31550000,
      "lengthKm": 0.63,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50079365.08,
      "lengthMeters": 630.0,
      "allocationPerStatedMeter": 50079.37,
      "rangesMeters": [
        [
          61440.0,
          62070.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Buenavista-Kawayan Rd - K0061 + 440 - K0062 + 070",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 0.83,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0264-002774",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Mangga Br. 1 (B00958MN) along Linamon-Zamboanga Rd",
      "office": "Lanao del Norte 1st District Engineering Office",
      "amountPesos": 31520000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Mangga Br. 1 (B00958MN) along Linamon-Zamboanga Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0284-003209",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Maraburab Br. (B01085LZ) along Maharlika Highway ( Cagayan Valley Rd)",
      "office": "Central Office",
      "amountPesos": 31500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Maraburab Br. (B01085LZ) along Maharlika Highway ( Cagayan Valley Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0293-003409",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Matanda Br. (B00736MN) along Surigao - Davao Coastal Rd.",
      "office": "Surigao del Sur 1st District Engineering Office",
      "amountPesos": 31500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Matanda Br. (B00736MN) along Surigao - Davao Coastal Rd.",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007351",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road of Barangay Mambabanga to Barangay San Miguel, Luna Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 31500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Rehabilitation of Road of Barangay Mambabanga to Barangay San Miguel, Luna Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0197-001562",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0263 + 951 - K0264 + 088, K0266 + 822 - K0267 + 053, K0267 + 112 - K0267 + 145",
      "office": "Central Office",
      "amountPesos": 31469000,
      "lengthKm": 0.401,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 78476309.23,
      "lengthMeters": 401.0,
      "allocationPerStatedMeter": 78476.31,
      "rangesMeters": [
        [
          263951.0,
          264088.0
        ],
        [
          266822.0,
          267053.0
        ],
        [
          267112.0,
          267145.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "197",
      "lengthEvidence": "Maharlika Highway (LZ) - K0263 + 951 - K0264 + 088, K0266 + 822 - K0267 + 053, K0267 + 112 - K0267 + 145",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 1.61,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0136-000501",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Vallehermoso-Canlaon City-La Castellana Rd - K0149 + 136 - K0149 + 805, K0150 + 000 - K0150 + 769",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 31435000,
      "lengthKm": 1.438,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21860222.53,
      "lengthMeters": 1438.0,
      "allocationPerStatedMeter": 21860.22,
      "rangesMeters": [
        [
          149136.0,
          149805.0
        ],
        [
          150000.0,
          150769.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Vallehermoso-Canlaon City-La Castellana Rd - K0149 + 136 - K0149 + 805, K0150 + 000 - K0150 + 769",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.7,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0149-000749",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0135 + (-750) - K0135 + (-250), K0135 + 596 - K0135 + 810, K0135 + 818 - K0135 + 832, K0136 + 621 - K0136 + 1002, K0138 + 060 - K0138 + 220, K0138 + 475 - K0138 + 800",
      "office": "Central Office",
      "amountPesos": 31312000,
      "lengthKm": 1.594,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 19643663.74,
      "lengthMeters": 1594.0,
      "allocationPerStatedMeter": 19643.66,
      "rangesMeters": [
        [
          134250.0,
          134750.0
        ],
        [
          135596.0,
          135810.0
        ],
        [
          135818.0,
          135832.0
        ],
        [
          136621.0,
          137002.0
        ],
        [
          138060.0,
          138220.0
        ],
        [
          138475.0,
          138800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "149",
      "lengthEvidence": "Maharlika Highway (LZ) - K0135 + (-750) - K0135 + (-250), K0135 + 596 - K0135 + 810, K0135 + 818 - K0135 + 832, K0136 + 621 - K0136 + 1002, K0138 + 060 - K0138 + 220, K0138 + 475 - K0138 + 800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 0.79,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0246-002458",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1361 + 900 - K1363 + 900 (Road Safety: Roadway Lighting)",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 31234000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15617000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 15617.0,
      "rangesMeters": [
        [
          1361900.0,
          1363900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1361 + 900 - K1363 + 900 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 1.3,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0184-001354",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Claveria-Calanasan-Kabugao Rd - K0682 + 602 - K0682 + 740",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 31200000,
      "lengthKm": 0.138,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 226086956.52,
      "lengthMeters": 138.0,
      "allocationPerStatedMeter": 226086.96,
      "rangesMeters": [
        [
          682602.0,
          682740.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Claveria-Calanasan-Kabugao Rd - K0682 + 602 - K0682 + 740",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 1.29,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0262-002730",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Maramramut Br. (B02041LZ) along Dugo-Sn Vicente Rd (Mission-Sta Ana Sect)",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 31200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "Maramramut Br. (B02041LZ) along Dugo-Sn Vicente Rd (Mission-Sta Ana Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0186-001378",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0438 + 336 - K0438 + 370, K0438 + 473 - K0438 + 514, K0440 + 530 - K0440 + 580, K0457 + 868 - K0457 + 983",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 31138000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 129741666.67,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 129741.67,
      "rangesMeters": [
        [
          438336.0,
          438370.0
        ],
        [
          438473.0,
          438514.0
        ],
        [
          440530.0,
          440580.0
        ],
        [
          457868.0,
          457983.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0438 + 336 - K0438 + 370, K0438 + 473 - K0438 + 514, K0440 + 530 - K0440 + 580, K0457 + 868 - K0457 + 983",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 0.74,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0155-000857",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1850 + 572 - K1852 + 000",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 31080000,
      "lengthKm": 1.428,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21764705.88,
      "lengthMeters": 1428.0,
      "allocationPerStatedMeter": 21764.71,
      "rangesMeters": [
        [
          1850572.0,
          1852000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1850 + 572 - K1852 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 0.87,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0137-000531",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siocon-Sirawai Rd - K2087 + 000 - K2087 + 200, K2088 + 000 - K2090 + 000",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 31035000,
      "lengthKm": 2.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14106818.18,
      "lengthMeters": 2200.0,
      "allocationPerStatedMeter": 14106.82,
      "rangesMeters": [
        [
          2087000.0,
          2087200.0
        ],
        [
          2088000.0,
          2090000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Siocon-Sirawai Rd - K2087 + 000 - K2087 + 200, K2088 + 000 - K2090 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.7,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0136-000504",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siquijor Circumferential Rd - K0015 + 000 - K0016 + 000",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 31000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 31000.0,
      "rangesMeters": [
        [
          15000.0,
          16000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Siquijor Circumferential Rd - K0015 + 000 - K0016 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.02,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0144-000662",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Amungan-Palauig-Banlog Road - K0217 + 467 - K0218 + 083",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 31000000,
      "lengthKm": 0.616,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50324675.32,
      "lengthMeters": 616.0,
      "allocationPerStatedMeter": 50324.68,
      "rangesMeters": [
        [
          217467.0,
          218083.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Amungan-Palauig-Banlog Road - K0217 + 467 - K0218 + 083",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 2.1,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0179-001262",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Marinduque Circumferential Rd - K0016 + 522 - K0016 + 727",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 31000000,
      "lengthKm": 0.205,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 151219512.2,
      "lengthMeters": 205.0,
      "allocationPerStatedMeter": 151219.51,
      "rangesMeters": [
        [
          16522.0,
          16727.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "Marinduque Circumferential Rd - K0016 + 522 - K0016 + 727",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 0.8,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0267-002832",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Katipunan/Boni Serrano Flyover (B03332LZ) along C-5 (Boni Serrano Flyover)",
      "office": "Quezon City 2nd District Engineering Office",
      "amountPesos": 31000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Katipunan/Boni Serrano Flyover (B03332LZ) along C-5 (Boni Serrano Flyover)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003238",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Alicante Br. (B00374NR) along Jct Bagonawa-La Castellana-Isabela Rd",
      "office": "Central Office",
      "amountPesos": 31000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Alicante Br. (B00374NR) along Jct Bagonawa-La Castellana-Isabela Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006553",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage along Deato Subdivision, (C0+000 to C0+798), Barangay Balangkas, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 31000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Roads and Drainage along Deato Subdivision, (C0+000 to C0+798), Barangay Balangkas, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0569-008984",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Road Network with Drainage, Barangay Poblacion, Dumalag, Capiz",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 31000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Road, Road Network with Drainage, Barangay Poblacion, Dumalag, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009386",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road with drainage facilities at Ceres Road, Lapu-Lapu City, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 31000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Concreting of Road with drainage facilities at Ceres Road, Lapu-Lapu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0286-003252",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Gango Br. (B00504MN) along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd)",
      "office": "Central Office",
      "amountPesos": 30975000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "286",
      "lengthEvidence": "Gango Br. (B00504MN) along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0170-001123",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Daraga, Placer-Cawayan Rd - (S00035MT) Chainage 22422 - Chainage 23242",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 30920000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Daraga, Placer-Cawayan Rd - (S00035MT) Chainage 22422 - Chainage 23242",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0290-003338",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Habag Br. (B00460NR) along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 30900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Habag Br. (B00460NR) along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0295-003435",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Construction of Maruing Br. 1 (S01184MN) along Imelda-Bayog-Kumalarang-Lapuyan- Margosatubig Road, Lapuyan, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 30840000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "295",
      "lengthEvidence": "Construction of Maruing Br. 1 (S01184MN) along Imelda-Bayog-Kumalarang-Lapuyan- Margosatubig Road, Lapuyan, Zamboanga del Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0295-003436",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Construction of Maruing Br. 2 (S01184MN) along Imelda-Bayog-Kumalarang-Lapuyan- Margosatubig Road, Lapuyan, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 30840000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "295",
      "lengthEvidence": "Construction of Maruing Br. 2 (S01184MN) along Imelda-Bayog-Kumalarang-Lapuyan- Margosatubig Road, Lapuyan, Zamboanga del Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0133-000456",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagaytay-Cavite via Mendez Rd - K0062 + 732 - K0063 + 446",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 30733000,
      "lengthKm": 0.714,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 43043417.37,
      "lengthMeters": 714.0,
      "allocationPerStatedMeter": 43043.42,
      "rangesMeters": [
        [
          62732.0,
          63446.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Tagaytay-Cavite via Mendez Rd - K0062 + 732 - K0063 + 446",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.33,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0162-000967",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Albay Diversion Rd - K0443 + (-826) - K0443 + 000",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 30664000,
      "lengthKm": 0.826,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37123486.68,
      "lengthMeters": 826.0,
      "allocationPerStatedMeter": 37123.49,
      "rangesMeters": [
        [
          442174.0,
          443000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Albay Diversion Rd - K0443 + (-826) - K0443 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 1.12,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0168-001074",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Ayaga-Sta. Marcela-Flora-Lasam Rd - K0680 + 500 - K0681 + 305",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 30633000,
      "lengthKm": 0.805,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38053416.15,
      "lengthMeters": 805.0,
      "allocationPerStatedMeter": 38053.42,
      "rangesMeters": [
        [
          680500.0,
          681305.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "Ayaga-Sta. Marcela-Flora-Lasam Rd - K0680 + 500 - K0681 + 305",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.2,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0548-008517",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Ibabang Talim, Lucena City, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 30600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Bridge, Barangay Ibabang Talim, Lucena City, Quezon",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0113-000040",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0600 + 315 - K0601 + 000",
      "office": "Central Office",
      "amountPesos": 30525000,
      "lengthKm": 0.685,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44562043.8,
      "lengthMeters": 685.0,
      "allocationPerStatedMeter": 44562.04,
      "rangesMeters": [
        [
          600315.0,
          601000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Maharlika Highway (LZ) - K0600 + 315 - K0601 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 1.05,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0175-001196",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "MSR Jct Lopez-Hondagua Port Rd - K0222 + 489 - K0222 + 546, K0222 + 649 - K0222 + 679, K0224 + 224 - K0224 + 271, K0225 + 020 - K0225 + 144",
      "office": "Central Office",
      "amountPesos": 30500000,
      "lengthKm": 0.258,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 118217054.26,
      "lengthMeters": 258.0,
      "allocationPerStatedMeter": 118217.05,
      "rangesMeters": [
        [
          222489.0,
          222546.0
        ],
        [
          222649.0,
          222679.0
        ],
        [
          224224.0,
          224271.0
        ],
        [
          225020.0,
          225144.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "MSR Jct Lopez-Hondagua Port Rd - K0222 + 489 - K0222 + 546, K0222 + 649 - K0222 + 679, K0224 + 224 - K0224 + 271, K0225 + 020 - K0225 + 144",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 0.65,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0292-003387",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Tawas Br. (B00054MN) along Mati-Maragusan Rd",
      "office": "Davao Oriental 2nd District Engineering Office",
      "amountPesos": 30500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Tawas Br. (B00054MN) along Mati-Maragusan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0263-002759",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Cagnonoc Br. (B00250LT) along Ormoc-Baybay-Southern Leyte Bdry Rd",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 30450000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Cagnonoc Br. (B00250LT) along Ormoc-Baybay-Southern Leyte Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0115-000085",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - (S01638MN) Chainage 000 - Chainage 505",
      "office": "Central Office",
      "amountPesos": 30380000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - (S01638MN) Chainage 000 - Chainage 505",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0144-000671",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Tagaytay-Taal Lake Rd - K0058 + 000 - K0059 + 762",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 30371000,
      "lengthKm": 1.762,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17236662.88,
      "lengthMeters": 1762.0,
      "allocationPerStatedMeter": 17236.66,
      "rangesMeters": [
        [
          58000.0,
          59762.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Tagaytay-Taal Lake Rd - K0058 + 000 - K0059 + 762",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 0.8,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0144-000669",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Isaac O. Tolentino Ave. - K0060 + 000 - K0061 + 400",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 30367000,
      "lengthKm": 1.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21690714.29,
      "lengthMeters": 1400.0,
      "allocationPerStatedMeter": 21690.71,
      "rangesMeters": [
        [
          60000.0,
          61400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Isaac O. Tolentino Ave. - K0060 + 000 - K0061 + 400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 1.01,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0252-002551",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Rimando-Ambiong Rd - K0252 + (-223) - K0254 + 179 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Central Office",
      "amountPesos": 30359000,
      "lengthKm": 2.402,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12639050.79,
      "lengthMeters": 2402.0,
      "allocationPerStatedMeter": 12639.05,
      "rangesMeters": [
        [
          251777.0,
          254179.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "252",
      "lengthEvidence": "Rimando-Ambiong Rd - K0252 + (-223) - K0254 + 179 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 1.28,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0209-001801",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0101 + 830 - K0102 + 390",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 30345000,
      "lengthKm": 0.56,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54187500.0,
      "lengthMeters": 560.0,
      "allocationPerStatedMeter": 54187.5,
      "rangesMeters": [
        [
          101830.0,
          102390.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0101 + 830 - K0102 + 390",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 1.04,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0137-000526",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Liloy-Siocon Rd - K2027 + 000 - K2028 + 985",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 30330000,
      "lengthKm": 1.985,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15279596.98,
      "lengthMeters": 1985.0,
      "allocationPerStatedMeter": 15279.6,
      "rangesMeters": [
        [
          2027000.0,
          2028985.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Liloy-Siocon Rd - K2027 + 000 - K2028 + 985",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.5,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0260-002678",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Tinambacan Br. (B00341SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "office": "Central Office",
      "amountPesos": 30324000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Tinambacan Br. (B00341SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0208-001788",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0074 + 795 - K0075 + 274",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 30150000,
      "lengthKm": 0.479,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 62943632.57,
      "lengthMeters": 479.0,
      "allocationPerStatedMeter": 62943.63,
      "rangesMeters": [
        [
          74795.0,
          75274.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0074 + 795 - K0075 + 274",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 1.21,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0153-000818",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Sta. Rosa - Tarlac Rd, K0118 + 185 - K0119 + 000, K0121 + 591 - K0121 + 722, K0121 + 772 - K0122",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 30100000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          118185.0,
          119000.0
        ],
        [
          121591.0,
          121722.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Sta. Rosa - Tarlac Rd, K0118 + 185 - K0119 + 000, K0121 + 591 - K0121 + 722, K0121 + 772 - K0122",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0210-001819",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Siocon-Sirawai Rd - K2094 + 000 - K2095 + 000",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 30024000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30024000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 30024.0,
      "rangesMeters": [
        [
          2094000.0,
          2095000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Siocon-Sirawai Rd - K2094 + 000 - K2095 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.59,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0120-000193",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Marikina-Victoria Valley-Antipolo Rd - K0020 + 007 - K0020 + 660, K0021 + 372 - K0021 + 008",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.017,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29498525.07,
      "lengthMeters": 1017.0,
      "allocationPerStatedMeter": 29498.53,
      "rangesMeters": [
        [
          20007.0,
          20660.0
        ],
        [
          21008.0,
          21372.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Marikina-Victoria Valley-Antipolo Rd - K0020 + 007 - K0020 + 660, K0021 + 372 - K0021 + 008",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 0.64,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0137-000525",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Liloy-Siocon Rd - K2025 + 011 - K2027 + 000",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.989,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15082956.26,
      "lengthMeters": 1989.0,
      "allocationPerStatedMeter": 15082.96,
      "rangesMeters": [
        [
          2025011.0,
          2027000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Liloy-Siocon Rd - K2025 + 011 - K2027 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.49,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0138-000537",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siocon-Sirawai-Sibuco-Limpapa Rd - K2109 + 000 - K2111 + 000",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 15000.0,
      "rangesMeters": [
        [
          2109000.0,
          2111000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Siocon-Sirawai-Sibuco-Limpapa Rd - K2109 + 000 - K2111 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.49,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0142-000630",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Dapitan St - K0005 + 808 - K0004 + 005",
      "office": "North Manila District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.803,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16638935.11,
      "lengthMeters": 1803.0,
      "allocationPerStatedMeter": 16638.94,
      "rangesMeters": [
        [
          4005.0,
          5808.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "Dapitan St - K0005 + 808 - K0004 + 005",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 0.55,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0145-000685",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Jct Morning-Cataingan-Esperanza-Sorosimbahan Rd - K0084 + 000 - K0085 + 000",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          84000.0,
          85000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Jct Morning-Cataingan-Esperanza-Sorosimbahan Rd - K0084 + 000 - K0085 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.25,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0158-000906",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 7 + 000 to Chainage 8 + 200",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 7 + 000 to Chainage 8 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0158-000908",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Gov. Mamintal M. Adiong Sr. National Rd (S01708MN) - Chainage 4350 - Chainage 5489",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "Gov. Mamintal M. Adiong Sr. National Rd (S01708MN) - Chainage 4350 - Chainage 5489",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0159-000920",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Road - K0443 + 282 - K0443 + 890",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.608,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49342105.26,
      "lengthMeters": 608.0,
      "allocationPerStatedMeter": 49342.11,
      "rangesMeters": [
        [
          443282.0,
          443890.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "159",
      "lengthEvidence": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Road - K0443 + 282 - K0443 + 890",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.24,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0167-001061",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Bongao-Pahut-Sanga-Sanga Rd - Chainage 0 - Chainage 1200",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Bongao-Pahut-Sanga-Sanga Rd - Chainage 0 - Chainage 1200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0173-001166",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Maharlika Highway (MN) - K1443 + 400 - K1443 + 450",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 600000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 600000.0,
      "rangesMeters": [
        [
          1443400.0,
          1443450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Maharlika Highway (MN) - K1443 + 400 - K1443 + 450",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 1.8,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0173-001167",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Maharlika Highway( Digos-Makar Rd) - K1590 + 255 - K1590 + 441",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": 0.186,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 161290322.58,
      "lengthMeters": 186.0,
      "allocationPerStatedMeter": 161290.32,
      "rangesMeters": [
        [
          1590255.0,
          1590441.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Maharlika Highway( Digos-Makar Rd) - K1590 + 255 - K1590 + 441",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 0.48,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0175-001195",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Sn Francisco - Sn Andres - Sn Narciso Rd - K0312 + 650 - K0312 + 750",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": 0.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 300000000.0,
      "lengthMeters": 100.0,
      "allocationPerStatedMeter": 300000.0,
      "rangesMeters": [
        [
          312650.0,
          312750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "175",
      "lengthEvidence": "Sn Francisco - Sn Andres - Sn Narciso Rd - K0312 + 650 - K0312 + 750",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 1.0,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0180-001275",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0081 + 568 - K0081 + 618",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 600000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 600000.0,
      "rangesMeters": [
        [
          81568.0,
          81618.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Puerto Princesa North Rd - K0081 + 568 - K0081 + 618",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 0.96,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0180-001285",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Cebu-Balamban Transcentral Highway - K0025 + (-075) - K0025 + (-025)",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 600000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 600000.0,
      "rangesMeters": [
        [
          24925.0,
          24975.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Cebu-Balamban Transcentral Highway - K0025 + (-075) - K0025 + (-025)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 0.96,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0180-001288",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Biliran Circumferential Rd - K1046 + 029 - K1046 + 450",
      "office": "Biliran District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.421,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 71258907.36,
      "lengthMeters": 421.0,
      "allocationPerStatedMeter": 71258.91,
      "rangesMeters": [
        [
          1046029.0,
          1046450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Biliran Circumferential Rd - K1046 + 029 - K1046 + 450",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 0.69,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0181-001297",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Zamboanga City Bypass Road (S01215MN) K1941 + 414 - K1941 + 468 (L/S), K1941 + 455 - K1941 + 856 (R/S)",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.442,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 67873303.17,
      "lengthMeters": 442.0,
      "allocationPerStatedMeter": 67873.3,
      "rangesMeters": [
        [
          1941414.0,
          1941468.0
        ],
        [
          1941455.0,
          1941856.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Zamboanga City Bypass Road (S01215MN) K1941 + 414 - K1941 + 468 (L/S), K1941 + 455 - K1941 + 856 (R/S)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 0.66,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0181-001303",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Asuncion-San Isidro-Laak-Veruela Rd - K1518 + 934 - K1519 + 000",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.066,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 454545454.55,
      "lengthMeters": 66.0,
      "allocationPerStatedMeter": 454545.45,
      "rangesMeters": [
        [
          1518934.0,
          1519000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Asuncion-San Isidro-Laak-Veruela Rd - K1518 + 934 - K1519 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 1.51,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0181-001304",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Asuncion-San Isidro-Laak-Veruela Rd - K1522 + 743 - K1522 + 840",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.097,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 309278350.52,
      "lengthMeters": 97.0,
      "allocationPerStatedMeter": 309278.35,
      "rangesMeters": [
        [
          1522743.0,
          1522840.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Asuncion-San Isidro-Laak-Veruela Rd - K1522 + 743 - K1522 + 840",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 1.03,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0185-001369",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0379+677 - K0379+753",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.076,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 394736842.11,
      "lengthMeters": 76.0,
      "allocationPerStatedMeter": 394736.84,
      "rangesMeters": [
        [
          379677.0,
          379753.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "185",
      "lengthEvidence": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0379+677 - K0379+753",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 1.06,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0186-001386",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Balabag-Maquina-Cayos-Patlad Rd - K0283 + 120 - K0283 + 699, K0283 + 721 - K0284 + 110, K0284 + 114 - K0284 + 180",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.034,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29013539.65,
      "lengthMeters": 1034.0,
      "allocationPerStatedMeter": 29013.54,
      "rangesMeters": [
        [
          283120.0,
          283699.0
        ],
        [
          283721.0,
          284110.0
        ],
        [
          284114.0,
          284180.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Balabag-Maquina-Cayos-Patlad Rd - K0283 + 120 - K0283 + 699, K0283 + 721 - K0284 + 110, K0284 + 114 - K0284 + 180",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 0.31,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0222-002049",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Iloilo River North Bank Road, Sta. 4+700 - Sta. 5+000, Oton, Iloilo",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          4700.0,
          5000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Iloilo River North Bank Road, Sta. 4+700 - Sta. 5+000, Oton, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.48,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0227-002144",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Lupiagan Br. II, Barangay Lupiagan Section, Sta. 28+600 - Sta. 28+660, Sumilao, Bukidnon",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": 0.06,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 500000000.0,
      "lengthMeters": 60.0,
      "allocationPerStatedMeter": 500000.0,
      "rangesMeters": [
        [
          28600.0,
          28660.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Lupiagan Br. II, Barangay Lupiagan Section, Sta. 28+600 - Sta. 28+660, Sumilao, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.42,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0230-002194",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Aliaga-Guimba Diversion Road (Guimba Section), Nueva Ecija Sta. 14+123.70 - Sta. 14+418.70, Sta. 14+587.70 - Sta. 15+150, Sta. 15+287.60 - Sta. 15+582.60, Sta. 15+676.40 - Sta. 16+021.40",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.4972999999999992,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20036064.92,
      "lengthMeters": 1497.3,
      "allocationPerStatedMeter": 20036.06,
      "rangesMeters": [
        [
          14123.7,
          14418.7
        ],
        [
          14587.7,
          15150.0
        ],
        [
          15287.6,
          15582.6
        ],
        [
          15676.4,
          16021.4
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Aliaga-Guimba Diversion Road (Guimba Section), Nueva Ecija Sta. 14+123.70 - Sta. 14+418.70, Sta. 14+587.70 - Sta. 15+150, Sta. 15+287.60 - Sta. 15+582.60, Sta. 15+676.40 - Sta. 16+021.40",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.24,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0232-002233",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "NRJ Poblacion Bayog Bypass Road, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "NRJ Poblacion Bayog Bypass Road, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0232-002234",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "NRJ Poblacion, Guipos - Lintum Road",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "NRJ Poblacion, Guipos - Lintum Road",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0232-002235",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Sta. 1719+980 - Sta. 1720+646.5, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.6665,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45011252.81,
      "lengthMeters": 666.5,
      "allocationPerStatedMeter": 45011.25,
      "rangesMeters": [
        [
          1719980.0,
          1720646.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Sta. 1719+980 - Sta. 1720+646.5, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.33,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0232-002236",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "San Isidro - Pangi Diversion Rd, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "San Isidro - Pangi Diversion Rd, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0241-002394",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road (Completion of Concrete Bridge), Barangay Nagbabalayan, Kabugao, Apayao",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "Piddig,Carasi (Ilocos Norte)-Calanasan-Langnao-Kabugao Road (Completion of Concrete Bridge), Barangay Nagbabalayan, Kabugao, Apayao",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0241-002399",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Tanudan-Barlig - Ifugao Road (Barlig - Banaue Section) - Sta. 3+600 - Sta. 4+000",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 75000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 75000.0,
      "rangesMeters": [
        [
          3600.0,
          4000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "Tanudan-Barlig - Ifugao Road (Barlig - Banaue Section) - Sta. 3+600 - Sta. 4+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 0.76,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0242-002410",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Jaro-Rubas-Ormoc Road (Ormoc City Side) - Sta. 22 + 708 - Sta. 23 + 208",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 60000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 60000.0,
      "rangesMeters": [
        [
          22708.0,
          23208.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "242",
      "lengthEvidence": "Jaro-Rubas-Ormoc Road (Ormoc City Side) - Sta. 22 + 708 - Sta. 23 + 208",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 0.61,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0245-002439",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0035 + 000 - K0039 + 000 (Road Safety: Roadway Lighting)",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 7500000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 7500.0,
      "rangesMeters": [
        [
          35000.0,
          39000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0035 + 000 - K0039 + 000 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.62,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0250-002521",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Zamboanga City Bypass Road (S01215MN), K1947 + 098.5 - K1953 + 266 (Road Safety: Roadway Lighting)",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 6.1675,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 4864207.54,
      "lengthMeters": 6167.5,
      "allocationPerStatedMeter": 4864.21,
      "rangesMeters": [
        [
          1947098.5,
          1953266.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "250",
      "lengthEvidence": "Zamboanga City Bypass Road (S01215MN), K1947 + 098.5 - K1953 + 266 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.47,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0250-002524",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Construction of Pedestrian Overpass along Aglayan-Zamboanguita Road, Barangay Iba, Cabanglasan, Bukidnon",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "250",
      "lengthEvidence": "Construction of Pedestrian Overpass along Aglayan-Zamboanguita Road, Barangay Iba, Cabanglasan, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0251-002540",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation of Road Safety Facilities along Surigao-Davao Coastal Rd (S01376MN) K1781 + (-536) - K1782 + 1193",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 2.729,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10993037.74,
      "lengthMeters": 2729.0,
      "allocationPerStatedMeter": 10993.04,
      "rangesMeters": [
        [
          1780464.0,
          1783193.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Installation of Road Safety Facilities along Surigao-Davao Coastal Rd (S01376MN) K1781 + (-536) - K1782 + 1193",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.06,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0253-002570",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Polangui Poblacion Rd - K0491 + (-735) - K0491 + (-135) (Paving of Shoulders)",
      "office": "Albay 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          490265.0,
          490865.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "253",
      "lengthEvidence": "Polangui Poblacion Rd - K0491 + (-735) - K0491 + (-135) (Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 5.04,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0258-002639",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Oyungan Br. (B00135PN) along Iloilo-Antique Rd",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Oyungan Br. (B00135PN) along Iloilo-Antique Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0261-002720",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Wawa Br. (B00896MN) along Maharlika Highway (Agusan-Davao Sect)",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Wawa Br. (B00896MN) along Maharlika Highway (Agusan-Davao Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0264-002762",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Guinles Br. (Cantilever) (B00417MN) along Dipolog-Polanco-Piñan-Jct Oroquieta Rd",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Guinles Br. (Cantilever) (B00417MN) along Dipolog-Polanco-Piñan-Jct Oroquieta Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0264-002763",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Bobuan Br. (B01561MN) along Zamboanga Transcentral North Road",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Bobuan Br. (B01561MN) along Zamboanga Transcentral North Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0264-002769",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Salagmanok Br. (B01556MN) along Jct. Tubod - Lakewood - Bayog Road",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Salagmanok Br. (B01556MN) along Jct. Tubod - Lakewood - Bayog Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0264-002770",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "San Pablo Br. 1 (B01703MN) along Zamboanga del Sur Coastal Rd",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "San Pablo Br. 1 (B01703MN) along Zamboanga del Sur Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0264-002771",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "San Pablo Br. 2 (B01704MN) along Zamboanga del Sur Coastal Rd",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "San Pablo Br. 2 (B01704MN) along Zamboanga del Sur Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0270-002904",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002952",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Kalawaig Br. (B02086MN) along Bukidnon Bdry - North Cotabato Rd",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Kalawaig Br. (B02086MN) along Bukidnon Bdry - North Cotabato Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002965",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Delpan Br. (B02291LZ) along M Roxas Jr Bridge",
      "office": "North Manila District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Delpan Br. (B02291LZ) along M Roxas Jr Bridge",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002971",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Mabini Br. (Nagtahan Br.) (B01733LZ) along Nagtahan Bridge / Fly-Over",
      "office": "North Manila District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Mabini Br. (Nagtahan Br.) (B01733LZ) along Nagtahan Bridge / Fly-Over",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003079",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Butuanon Br. 2 (B00589CB) along Cebu North Hagnaya Wharf Rd",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Butuanon Br. 2 (B00589CB) along Cebu North Hagnaya Wharf Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003140",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Panlibatuhan Br. 2 (B02326MN) along Valencia City Bypass Road",
      "office": "Bukidnon 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Panlibatuhan Br. 2 (B02326MN) along Valencia City Bypass Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003165",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Datal Lawa Br. (B01895MN) along Surallah-Lake Sebu-Maitum Rd",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Datal Lawa Br. (B01895MN) along Surallah-Lake Sebu-Maitum Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003310",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Ziminila Br. 1 (B02013LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Ziminila Br. 1 (B02013LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0291-003349",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Macopa Parallel Br. along Naval-Caibiran Cross Country Rd",
      "office": "Biliran District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Macopa Parallel Br. along Naval-Caibiran Cross Country Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0291-003369",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Panganuran Br. (B02018MN) along Liloy-Siocon Rd",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Panganuran Br. (B02018MN) along Liloy-Siocon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0292-003388",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Kapayawi Br. (B01245MN) along Banisilan-Guiling-Alamada-Libungan Rd",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Kapayawi Br. (B01245MN) along Banisilan-Guiling-Alamada-Libungan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0295-003429",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Balabago Br. along Guimaras Circumferential Road, K0049+159 – K0049+174",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.015,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2000000000.0,
      "lengthMeters": 15.0,
      "allocationPerStatedMeter": 2000000.0,
      "rangesMeters": [
        [
          49159.0,
          49174.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "295",
      "lengthEvidence": "Balabago Br. along Guimaras Circumferential Road, K0049+159 – K0049+174",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0295-003430",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Bagumbayan Br. along Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd, K0027 + 543 - K0027 + 569",
      "office": "Iloilo 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.026,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1153846153.85,
      "lengthMeters": 26.0,
      "allocationPerStatedMeter": 1153846.15,
      "rangesMeters": [
        [
          27543.0,
          27569.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "295",
      "lengthEvidence": "Bagumbayan Br. along Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd, K0027 + 543 - K0027 + 569",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0295-003441",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Datal Lawa Br. 2 along Surallah-Lake Sebu-Maitum Road",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "295",
      "lengthEvidence": "Datal Lawa Br. 2 along Surallah-Lake Sebu-Maitum Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0420-005852",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road San Manuel-Villasis Diversion Road Barangay Mangandingay (San Manuel) Sta.1+748.00- Sta 1+1872.90, Tarlac",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": 1.1249,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26669037.25,
      "lengthMeters": 1124.9,
      "allocationPerStatedMeter": 26669.04,
      "rangesMeters": [
        [
          1748.0,
          2872.9
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Construction of Road San Manuel-Villasis Diversion Road Barangay Mangandingay (San Manuel) Sta.1+748.00- Sta 1+1872.90, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.07,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0430-006069",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Rehabilitation) of Diversion Road at Barangay District III, San Miguel, Catanduanes",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Construction (Rehabilitation) of Diversion Road at Barangay District III, San Miguel, Catanduanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0434-006141",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Cantao-an-Cogon Road leading to Naga Valley (NAVA) Industrial Park, Naga City, Cebu",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "434",
      "lengthEvidence": "Cantao-an-Cogon Road leading to Naga Valley (NAVA) Industrial Park, Naga City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0437-006197",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Bangdayan - Bual , Barangay, Bual Luuk, Sulu, Sta. 0 + 000 - Sta. 2 + 000",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 15000.0,
      "rangesMeters": [
        [
          0.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "437",
      "lengthEvidence": "Construction of Road Bangdayan - Bual , Barangay, Bual Luuk, Sulu, Sta. 0 + 000 - Sta. 2 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.62,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0439-006237",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Bago a Ingud, Marawi City, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Construction of Road at Barangay Bago a Ingud, Marawi City, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0441-006276",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Bagumbayan, Amai Manabilang, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Road at Barangay Bagumbayan, Amai Manabilang, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0441-006279",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Basak-Pantar, Marawi City, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Road at Basak-Pantar, Marawi City, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0441-006285",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Masolun to Buadi Arorao Road, Taraka, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Road, Barangay Masolun to Buadi Arorao Road, Taraka, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0442-006294",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Tambo - Ringgib Road, Piagapo, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Construction of Tambo - Ringgib Road, Piagapo, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0442-006300",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Constructuion of Raya Guimba Kabasaran Road, Marawi City, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Constructuion of Raya Guimba Kabasaran Road, Marawi City, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0442-006301",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Saguiran - Piagapo Road, Aposong/Katumbacan Section, Piagapo, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Improvement of Saguiran - Piagapo Road, Aposong/Katumbacan Section, Piagapo, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0449-006427",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Networks including Laterals and Vicinity at Kabayani St. Barangay Malanday, Marikina City, 14.673342, 121.105741",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "449",
      "lengthEvidence": "Rehabilitation of Road Networks including Laterals and Vicinity at Kabayani St. Barangay Malanday, Marikina City, 14.673342, 121.105741",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0449-006428",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Networks including Laterals and Vicinity at M. Roxas St., Barangay San Roque, Marikina City, 14.6218903, 121.0969506",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "449",
      "lengthEvidence": "Rehabilitation of Road Networks including Laterals and Vicinity at M. Roxas St., Barangay San Roque, Marikina City, 14.6218903, 121.0969506",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0450-006436",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Network including Laterals at Barangay Kalumpang, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "450",
      "lengthEvidence": "Rehabilitation of Road Network including Laterals at Barangay Kalumpang, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0450-006437",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Network including Laterals at Barangay San Roque, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "450",
      "lengthEvidence": "Rehabilitation of Road Network including Laterals at Barangay San Roque, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0451-006459",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage Systems at Shelterville Subd., Barangay 171, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Construction of Road and Drainage Systems at Shelterville Subd., Barangay 171, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0451-006465",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage Systems, Shelterville Subd., Barangay 171, Caloocan CIty",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Construction of Road and Drainage Systems, Shelterville Subd., Barangay 171, Caloocan CIty",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006542",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage along Katmon St. (C 0+270 - C 1+043), Barangay 179, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Road including Drainage along Katmon St. (C 0+270 - C 1+043), Barangay 179, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006579",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay Fairview, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Improvement of Road at Barangay Fairview, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006580",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Payatas A - San Vicente, San Lorenzo Ext. (Chainage 0 + 000 to Chainage 0 + 663.9), Barangay Payatas, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Improvement of Road, Payatas A - San Vicente, San Lorenzo Ext. (Chainage 0 + 000 to Chainage 0 + 663.9), Barangay Payatas, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006581",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Roads at Barangay Lagro, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Improvement of Roads at Barangay Lagro, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006582",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage at Barangay San Isidro Labrador, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Rehabilitation of Road and Drainage at Barangay San Isidro Labrador, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006710",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Dagupan-Lipay Bridge, Vintar, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Dagupan-Lipay Bridge, Vintar, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006715",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road leading to the SPARC (Safety, Peace And Resiliency Compound), Barangay Sta. Cecilia, San Nicolas, Ilocos Norte",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Road leading to the SPARC (Safety, Peace And Resiliency Compound), Barangay Sta. Cecilia, San Nicolas, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006734",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of New Bridge along Alilem-Sugpon-Sudipen Rd., Barangay Old Poblacion, Sudipen, La Union",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Construction of New Bridge along Alilem-Sugpon-Sudipen Rd., Barangay Old Poblacion, Sudipen, La Union",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006849",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads at Barangay Poblacion, Bugallon, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Rehabilitation of Roads at Barangay Poblacion, Bugallon, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006850",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads at Barangay Hacienda, Bugallon, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Rehabilitation of Roads at Barangay Hacienda, Bugallon, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006851",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads at Barangay Angarian, Bugallon, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Rehabilitation of Roads at Barangay Angarian, Bugallon, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006982",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Pinesville Road, Fort Del Pilar Barangay, Section 1: Sta. 0+590 - Sta. 0+687, Section 2: Sta. 0+0000 - Sta. 0+255, Section 3: Sta. 0+000 - Sta. 0+278, Section 4: Sta. 0+000 - Sta. 0+100, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          590.0,
          687.0
        ],
        [
          0.0,
          255.0
        ],
        [
          0.0,
          278.0
        ],
        [
          0.0,
          100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Rehabilitation of Road at Pinesville Road, Fort Del Pilar Barangay, Section 1: Sta. 0+590 - Sta. 0+687, Section 2: Sta. 0+0000 - Sta. 0+255, Section 3: Sta. 0+000 - Sta. 0+278, Section 4: Sta. 0+000 - Sta. 0+100, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-006998",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bulalakaw-Otin-Dalipey Access Road, Tacadang, Kibungan",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Construction of Bulalakaw-Otin-Dalipey Access Road, Tacadang, Kibungan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-007002",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Belis-Piloy Local Road, Caliking, Atok, Benguet",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Improvement of Road along Belis-Piloy Local Road, Caliking, Atok, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007007",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Ja'pa-Patapat-Ponopon Local Road, Topdac, Atok, Benguet",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Improvement of Road along Ja'pa-Patapat-Ponopon Local Road, Topdac, Atok, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007008",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Macbas-Botiao Road, Cattubo, Atok, Benguet",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Improvement of Road along Macbas-Botiao Road, Cattubo, Atok, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007009",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Paoay-Upper Englandad-Madeclan Local Road, Paoay, Atok, Benguet",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Improvement of Road along Paoay-Upper Englandad-Madeclan Local Road, Paoay, Atok, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007011",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Sowe-Cabayo Local Road, Poblacion, Atok, Benguet",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Improvement of Road along Sowe-Cabayo Local Road, Poblacion, Atok, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007012",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Tagongtongao-Boneng Road, Paoay, Atok, Benguet",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Improvement of Road along Tagongtongao-Boneng Road, Paoay, Atok, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007013",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Usap-Makidot Local Road, Topdac, Atok, Benguet",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Improvement of Road along Usap-Makidot Local Road, Topdac, Atok, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007024",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Panubtuban-Jolowon Road, Sta. 16+000 - Sta. 16+800, Lamut, Ifugao",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37500000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 37500.0,
      "rangesMeters": [
        [
          16000.0,
          16800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Construction of Panubtuban-Jolowon Road, Sta. 16+000 - Sta. 16+800, Lamut, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.93,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0478-007025",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of O-ong-Dalligan Road, Sta. 2+250 - Sta. 4+000, Kiangan, Ifugao",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17142857.14,
      "lengthMeters": 1750.0,
      "allocationPerStatedMeter": 17142.86,
      "rangesMeters": [
        [
          2250.0,
          4000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Construction of O-ong-Dalligan Road, Sta. 2+250 - Sta. 4+000, Kiangan, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.71,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0479-007038",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Lipit Bridge Along Manaot, Mongayang, Aguinaldo, Ifugao and Lipit, Pinto Alfonso Lista Ifugao Road",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Lipit Bridge Along Manaot, Mongayang, Aguinaldo, Ifugao and Lipit, Pinto Alfonso Lista Ifugao Road",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007057",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Manuel S. Agyao Boulevard, Junction Ileb, Nambaran-Dilag-San Julian- Balong Access Road, Barangays Nambaran, Dilag and Balong, Tabuk City, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Manuel S. Agyao Boulevard, Junction Ileb, Nambaran-Dilag-San Julian- Balong Access Road, Barangays Nambaran, Dilag and Balong, Tabuk City, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007132",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Ableg-Molayong-Malucsad Access Road, Barangays Ableg, Dalupa and Malucsad, Pasil, Kalinga",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Ableg-Molayong-Malucsad Access Road, Barangays Ableg, Dalupa and Malucsad, Pasil, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007140",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Mahat (Sta. 0 + 000 - Sta. 0 + 830), Barangay Savidug, Sabtang, Batanes",
      "office": "Batanes District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.83,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36144578.31,
      "lengthMeters": 830.0,
      "allocationPerStatedMeter": 36144.58,
      "rangesMeters": [
        [
          0.0,
          830.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Construction of Road, Sitio Mahat (Sta. 0 + 000 - Sta. 0 + 830), Barangay Savidug, Sabtang, Batanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.86,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0485-007185",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road along Barangay San Agustin(Marafutu), Abulug, Cagayan",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Road along Barangay San Agustin(Marafutu), Abulug, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0490-007270",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Cabannungan 2nd to Barangay Carrikikan Sur, Ilagan City, Isabela (Sta. 0+000 - Sta. 2+880)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 2.88,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10416666.67,
      "lengthMeters": 2880.0,
      "allocationPerStatedMeter": 10416.67,
      "rangesMeters": [
        [
          0.0,
          2880.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Construction of Road at Barangay Cabannungan 2nd to Barangay Carrikikan Sur, Ilagan City, Isabela (Sta. 0+000 - Sta. 2+880)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.33,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0490-007271",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sta. 1+050 - Sta. 3+450), Barangay Sipay to Barangay Fuyo, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 2.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12500000.0,
      "lengthMeters": 2400.0,
      "allocationPerStatedMeter": 12500.0,
      "rangesMeters": [
        [
          1050.0,
          3450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Construction of Concrete Road (Sta. 1+050 - Sta. 3+450), Barangay Sipay to Barangay Fuyo, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.4,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0490-007277",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sta. 0+000 - Sta. 2+400), Barangay Sto. Rosario, Delfin Albano, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 2.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12500000.0,
      "lengthMeters": 2400.0,
      "allocationPerStatedMeter": 12500.0,
      "rangesMeters": [
        [
          0.0,
          2400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Construction of Concrete Road (Sta. 0+000 - Sta. 2+400), Barangay Sto. Rosario, Delfin Albano, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.4,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0492-007306",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Barucboc-Barangay Aurora, Quezon, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay Barucboc-Barangay Aurora, Quezon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007318",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Mangga-Barangay Alunan-Barangay Santos, Quezon, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay Mangga-Barangay Alunan-Barangay Santos, Quezon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007321",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Samonte-Barangay Lepanto-Barangay Santos, Quezon, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay Samonte-Barangay Lepanto-Barangay Santos, Quezon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007322",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay San Antonio, Roxas, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay San Antonio, Roxas, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007332",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Magagamot Creek, Barangay Minagbag, Quezon, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Concreting of Road, Sitio Magagamot Creek, Barangay Minagbag, Quezon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007341",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Olango to Barangay Centro 2, Mallig, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road, Barangay Olango to Barangay Centro 2, Mallig, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007354",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Bustamante, Luna Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Rehabilitation of Road, Barangay Bustamante, Luna Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007356",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Lalog 1, Luna Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Rehabilitation of Road, Barangay Lalog 1, Luna Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007357",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Puroc, Luna Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Rehabilitation of Road, Barangay Puroc, Luna Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0495-007387",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Loria - Barangay Campanario with Box Culvert, Barangay Loria, Angadanan, Isabela (Sta. 0+000 - STA. 1+861.50)",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.8615,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16116035.46,
      "lengthMeters": 1861.5,
      "allocationPerStatedMeter": 16116.04,
      "rangesMeters": [
        [
          0.0,
          1861.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Barangay Loria - Barangay Campanario with Box Culvert, Barangay Loria, Angadanan, Isabela (Sta. 0+000 - STA. 1+861.50)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.67,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0495-007388",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Luzon, Cabatuan, Isabela (Sta. 0+000 - STA. 1+195.50)",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.1955,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25094102.89,
      "lengthMeters": 1195.5,
      "allocationPerStatedMeter": 25094.1,
      "rangesMeters": [
        [
          0.0,
          1195.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Barangay Luzon, Cabatuan, Isabela (Sta. 0+000 - STA. 1+195.50)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0496-007399",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay District 1-Barangay District 2 Road., Barangay District 1- District 2, Reina Mercedes, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Barangay District 1-Barangay District 2 Road., Barangay District 1- District 2, Reina Mercedes, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0498-007441",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 2+250, Purok 5, Barangay Dabubu Grande, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 2.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 2250.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          2250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 2+250, Purok 5, Barangay Dabubu Grande, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.55,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0499-007468",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 2+200 Barangay Salay, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 2.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13636363.64,
      "lengthMeters": 2200.0,
      "allocationPerStatedMeter": 13636.36,
      "rangesMeters": [
        [
          0.0,
          2200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 2+200 Barangay Salay, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.56,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0499-007478",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads including Drainage, Silauan Sur and Taggappan, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Rehabilitation of Roads including Drainage, Silauan Sur and Taggappan, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0500-007482",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of road, Barangay San Manuel to Barangay Villa Fermin road, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of road, Barangay San Manuel to Barangay Villa Fermin road, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0500-007490",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Licaray-Ramos East Bridge (24 In.m) Licaray, Ramos East, San Isidro, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Licaray-Ramos East Bridge (24 In.m) Licaray, Ramos East, San Isidro, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007606",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Obligacion-Reserva Road, Baler, Aurora, Sta. 0 + 000 - 1 + 900",
      "office": "Aurora District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.9,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15789473.68,
      "lengthMeters": 1900.0,
      "allocationPerStatedMeter": 15789.47,
      "rangesMeters": [
        [
          0.0,
          1900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Obligacion-Reserva Road, Baler, Aurora, Sta. 0 + 000 - 1 + 900",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.65,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0508-007662",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road in Barangay Liciada to Catacte Road, Bustos, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Concreting of Road in Barangay Liciada to Catacte Road, Bustos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0509-007686",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Duhat-Bundukan Road, Sta. 0+000 - Sta. 0+500, Bocaue, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 60000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 60000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Rehabilitation of Duhat-Bundukan Road, Sta. 0+000 - Sta. 0+500, Bocaue, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 2.45,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0509-007690",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Polo - Obando - Bulakan Road, Sta. 0+000 - Sta. 0+700, Bulakan, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42857142.86,
      "lengthMeters": 700.0,
      "allocationPerStatedMeter": 42857.14,
      "rangesMeters": [
        [
          0.0,
          700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Rehabilitation of Polo - Obando - Bulakan Road, Sta. 0+000 - Sta. 0+700, Bulakan, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.75,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0509-007691",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road in Barangay Licada to Catacte Road, Bustos, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Rehabilitation of Road in Barangay Licada to Catacte Road, Bustos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0510-007714",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+220.27, San Roque, Paombong, Bulacan along PUP Road to Sitio Tinaad",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.22027000000000002,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 136196486.13,
      "lengthMeters": 220.27,
      "allocationPerStatedMeter": 136196.49,
      "rangesMeters": [
        [
          0.0,
          220.27
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+220.27, San Roque, Paombong, Bulacan along PUP Road to Sitio Tinaad",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 3.85,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0511-007723",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+320, Bagong Silang, Plaridel, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.32,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 1320.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          1320.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+320, Bagong Silang, Plaridel, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.91,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0511-007726",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Tuktukan - Panginay Road, Sta. 0+000 - Sta. 0+500, Guiguinto, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 60000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 60000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation of Tuktukan - Panginay Road, Sta. 0+000 - Sta. 0+500, Guiguinto, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 2.45,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0513-007760",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Meycauayan East-West Road, Barangay Malhacan, Meycauayan City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Meycauayan East-West Road, Barangay Malhacan, Meycauayan City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0514-007785",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Barangay Graceville, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 00+720",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.72,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 720.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          720.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road with Drainage, Barangay Graceville, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 00+720",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.7,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0514-007788",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Barangay Poblacion, City of San Jose del Monte, Bulacan (121.043616, 14.813899)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road with Drainage, Barangay Poblacion, City of San Jose del Monte, Bulacan (121.043616, 14.813899)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0514-007794",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Matictic Bayan to Barangay Matictic Coral (Junction), Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.066754, 14.915913)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 4.86,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 6172839.51,
      "lengthMeters": 4860.0,
      "allocationPerStatedMeter": 6172.84,
      "rangesMeters": [
        [
          0.0,
          4860.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road, Barangay Matictic Bayan to Barangay Matictic Coral (Junction), Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.066754, 14.915913)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.2,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0514-007795",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Matictic Coral (Junction) to Barangay Baraka, Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.096979, 14.910598)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 4.86,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 6172839.51,
      "lengthMeters": 4860.0,
      "allocationPerStatedMeter": 6172.84,
      "rangesMeters": [
        [
          0.0,
          4860.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road, Barangay Matictic Coral (Junction) to Barangay Baraka, Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.096979, 14.910598)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.2,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0514-007796",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Matictic to Bangkal, Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.081933, 14.921938)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 4.86,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 6172839.51,
      "lengthMeters": 4860.0,
      "allocationPerStatedMeter": 6172.84,
      "rangesMeters": [
        [
          0.0,
          4860.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road, Barangay Matictic to Bangkal, Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.081933, 14.921938)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.2,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0515-007802",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, M. Villarica Road, Barangay Muzon, City of San Jose Del Monte, Bulacan (121.030720, 14.797633)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Construction of Road, M. Villarica Road, Barangay Muzon, City of San Jose Del Monte, Bulacan (121.030720, 14.797633)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0516-007819",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with drainage system, Barangay Muzon South, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 00+720",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.72,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 720.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          720.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road with drainage system, Barangay Muzon South, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 00+720",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.7,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0516-007820",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with drainage system, Barangay Muzon West, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 00+720",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.72,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 720.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          720.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road with drainage system, Barangay Muzon West, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 00+720",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.7,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0516-007824",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with drainage, Barangay Muzon Proper, City of San Jose Del Monte, Bulacan, Sta. 00+000 - Sta. 00+720",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.72,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 720.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          720.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road with drainage, Barangay Muzon Proper, City of San Jose Del Monte, Bulacan, Sta. 00+000 - Sta. 00+720",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.7,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0516-007825",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage, Barangay Sto Cristo, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 00+720",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.72,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 720.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          720.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road with Drainage, Barangay Sto Cristo, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 00+720",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.7,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0516-007831",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Sapang Proper, City of San Jose Del Monte, Bulacan (121.042921, 14.837039)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road, Barangay Sapang Proper, City of San Jose Del Monte, Bulacan (121.042921, 14.837039)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0535-008228",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Santa Cruz - Mangatarem - Lucapon - Uacon - Binabalian, Barangay Lucapon South, Bridge 1, Santa Cruz, Zambales",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Construction of Access Road, Santa Cruz - Mangatarem - Lucapon - Uacon - Binabalian, Barangay Lucapon South, Bridge 1, Santa Cruz, Zambales",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0535-008236",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Mabellegen to Sitio Nagsabong Road, Barangay San Gregorio, San Antonio, Zambales, Sta. 0+000.00 – Sta. 1+505.00",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.505,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19933554.82,
      "lengthMeters": 1505.0,
      "allocationPerStatedMeter": 19933.55,
      "rangesMeters": [
        [
          0.0,
          1505.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Construction of Mabellegen to Sitio Nagsabong Road, Barangay San Gregorio, San Antonio, Zambales, Sta. 0+000.00 – Sta. 1+505.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.83,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0536-008245",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road going to Government Center, Sta. 0+ 000 - Sta. 0+345, Sta. 0+000 - Sta. 0+127, Sta. 0+000 - Sta. 0+137, Sta. 0+000 - Sta. 0+183,Barangay San Nicolas Castillejos, Zambales",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.345,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 86956521.74,
      "lengthMeters": 345.0,
      "allocationPerStatedMeter": 86956.52,
      "rangesMeters": [
        [
          0.0,
          345.0
        ],
        [
          0.0,
          127.0
        ],
        [
          0.0,
          137.0
        ],
        [
          0.0,
          183.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Road going to Government Center, Sta. 0+ 000 - Sta. 0+345, Sta. 0+000 - Sta. 0+127, Sta. 0+000 - Sta. 0+137, Sta. 0+000 - Sta. 0+183,Barangay San Nicolas Castillejos, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 3.04,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0537-008274",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malimatoc II, Mabini, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Barangay Malimatoc II, Mabini, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008279",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Sitio Tibig, Barangay Talahib Pandayan, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Bridge, Sitio Tibig, Barangay Talahib Pandayan, Batangas City",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008370",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Bridge, Barangay Mabato, Rosario, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road with Bridge, Barangay Mabato, Rosario, Batangas",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008404",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Conchu, Trece Martires City, Sta. 0 + 000, Sta. 0 + 433",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Rehabilitation of Road at Barangay Conchu, Trece Martires City, Sta. 0 + 000, Sta. 0 + 433",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008457",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of F. Mendoza-Alfonso Road, Barangay Galicia III, Mendez, Cavite",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Construction of F. Mendoza-Alfonso Road, Barangay Galicia III, Mendez, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008474",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage System at Barangay San Jose, Binan City, Laguna",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Construction of Road and Drainage System at Barangay San Jose, Binan City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008484",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Estrella, San Pedro City, Laguna",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Construction of Road, Barangay Estrella, San Pedro City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008489",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road ang Drainage Along Doctora Street, Barangay Mayapa, Calamba City, Laguna",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Rehabilitation of Road ang Drainage Along Doctora Street, Barangay Mayapa, Calamba City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008499",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Barangay San Roque to Barangay San Benito, Victoria, Laguna",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Rehabilitation of Road Barangay San Roque to Barangay San Benito, Victoria, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008529",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Barangay Mayao Kanluran to Barangay Ilayang Dupay, Lucena City, Quezon, Start 13.966782, 121.635037 End 13.970153, 121.634971",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road with Drainage, Barangay Mayao Kanluran to Barangay Ilayang Dupay, Lucena City, Quezon, Start 13.966782, 121.635037 End 13.970153, 121.634971",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008546",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Approach of Tubigan Bridge, Barangay Pinagbayanan, Pitogo, Quezon",
      "office": "Quezon 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road with Approach of Tubigan Bridge, Barangay Pinagbayanan, Pitogo, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008552",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pagsangahan, Municipality of San Franciso, Quezon",
      "office": "Quezon 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road, Barangay Pagsangahan, Municipality of San Franciso, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008616",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bagong Buhay Road, Naujan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Bagong Buhay Road, Naujan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008617",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Canubing I - Balingayan Road, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Canubing I - Balingayan Road, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008618",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Canubing I - Baruyan Road, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Canubing I - Baruyan Road, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008631",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Maluanluan Road, Pola, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Maluanluan Road, Pola, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008632",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Morangan - Muyod Road, Barangay Alcate, Victoria, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Morangan - Muyod Road, Barangay Alcate, Victoria, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008633",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Mulawin Road, Naujan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Mulawin Road, Naujan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008660",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malvar, Naujan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Malvar, Naujan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008671",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Nag Iba II - San Antonio, Naujan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Nag Iba II - San Antonio, Naujan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008672",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio 6, Aurora, Naujan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Sitio 6, Aurora, Naujan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008673",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sto. Niño - Apitong Road, Naujan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Sto. Niño - Apitong Road, Naujan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008701",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gogognan, Aborlan, Palawan",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Road, Barangay Gogognan, Aborlan, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008710",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road along Barangay 4, Romblon, Romblon",
      "office": "Romblon District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Access Road along Barangay 4, Romblon, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008722",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Villa Pag-asa, Bansud, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Bridge, Barangay Villa Pag-asa, Bansud, Oriental Mindoro",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008740",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of San Andres Bridge, Barangay San Andres, Sto. Domingo, Albay",
      "office": "Albay 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Construction of San Andres Bridge, Barangay San Andres, Sto. Domingo, Albay",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008743",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Fidel Surtida to San Andres Road, Sto. Domingo, Albay",
      "office": "Albay 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Rehabilitation/Improvement of Fidel Surtida to San Andres Road, Sto. Domingo, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008776",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of La Purisima Bridge, Polangui, Albay",
      "office": "Albay 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Construction of La Purisima Bridge, Polangui, Albay",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008779",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Calabaca, Capalonga, Camarines Norte",
      "office": "Camarines Norte District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Construction of Barangay Road, Barangay Calabaca, Capalonga, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008781",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Lugui, Labo, Camarines Norte",
      "office": "Camarines Norte District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Construction of Barangay Road, Barangay Lugui, Labo, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008782",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Rizal, Santa Elena, Camarines Norte",
      "office": "Camarines Norte District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Construction of Barangay Road, Barangay Rizal, Santa Elena, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008783",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay San Vicente, Santa Elena, Camarines Norte",
      "office": "Camarines Norte District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Construction of Barangay Road, Barangay San Vicente, Santa Elena, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008784",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Villa Belen, Capalonga, Camarines Norte",
      "office": "Camarines Norte District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Construction of Barangay Road, Barangay Villa Belen, Capalonga, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008785",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Villa San Isidro, Santa Elena, Camarines Norte",
      "office": "Camarines Norte District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Construction of Barangay Road, Barangay Villa San Isidro, Santa Elena, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008809",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "San Antonio Road along San Antonio, Milaor-Camarines Sur Watersports Complex (CWC), Pili Road, San Antonio Bridge 1 - Sta. 1+078.40 - Sta. 1+100.10, Barangay San Antonio, Milaor, Camarines Sur (13.594135, 123.234521)",
      "office": "Camarines Sur 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.021699999999999817,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 21.7,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          1078.4,
          1100.1
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "San Antonio Road along San Antonio, Milaor-Camarines Sur Watersports Complex (CWC), Pili Road, San Antonio Bridge 1 - Sta. 1+078.40 - Sta. 1+100.10, Barangay San Antonio, Milaor, Camarines Sur (13.594135, 123.234521)",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008811",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Liñaga and Poro, Canaman, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Bridge, Barangay Liñaga and Poro, Canaman, Camarines Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008813",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Sabang, Calabanga, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Bridge, Barangay Sabang, Calabanga, Camarines Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008819",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Dominorog to Balatasan Road, Barangay Dominorog and Balatasan, Calabanga, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Dominorog to Balatasan Road, Barangay Dominorog and Balatasan, Calabanga, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0562-008832",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cadlan, Pili, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction of Road, Barangay Cadlan, Pili, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0564-008881",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (with drainage), San Jose St., Barangay Eastern Poblacion, Baras, Catanduanes",
      "office": "Catanduanes District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Rehabilitation of Road (with drainage), San Jose St., Barangay Eastern Poblacion, Baras, Catanduanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0564-008890",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Jct National Road to Barangay Panique to Barangay Eastern Capsai, Aroroy and Baleno, Masbate, Sta. 5+110 to Sta. 5+810",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42857142.86,
      "lengthMeters": 700.0,
      "allocationPerStatedMeter": 42857.14,
      "rangesMeters": [
        [
          5110.0,
          5810.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Road, Jct National Road to Barangay Panique to Barangay Eastern Capsai, Aroroy and Baleno, Masbate, Sta. 5+110 to Sta. 5+810",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.75,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0566-008917",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+826, Barangay Siuton to Barangay Malbog, Magallanes, Sorsogon",
      "office": "Sorsogon District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.826,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36319612.59,
      "lengthMeters": 826.0,
      "allocationPerStatedMeter": 36319.61,
      "rangesMeters": [
        [
          0.0,
          826.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+826, Barangay Siuton to Barangay Malbog, Magallanes, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.87,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0568-008975",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Bridge, Barangay Bungsuan to Barangay Lawaan, Dumarao, Capiz",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction (Completion) of Bridge, Barangay Bungsuan to Barangay Lawaan, Dumarao, Capiz",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0569-008993",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road SlopeProtection Structure with RoadImprovement, BarangayPoblacion, Jordan, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Road SlopeProtection Structure with RoadImprovement, BarangayPoblacion, Jordan, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009103",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Simplicio A. Palanca Sr. Road (Access Road leading to BREDCO Port), Bacolod City, Negros Occidental",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Rehabilitation of Simplicio A. Palanca Sr. Road (Access Road leading to BREDCO Port), Bacolod City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009177",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Poultry Industry Road in Barangay Napoles, Bago City, Negros Occidental",
      "office": "Negros Occidental 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Poultry Industry Road in Barangay Napoles, Bago City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009234",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Avocado, Barangay Talalak, Santa Catalina, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Sitio Avocado, Barangay Talalak, Santa Catalina, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009253",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road leading to Provincial Abattoir, Barangay Nonoc, Larena, Siquijor",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Access Road leading to Provincial Abattoir, Barangay Nonoc, Larena, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009256",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Poo to Barangay Capalasanan, Lazi, Siquijor (Segment 1: 0 + 000 - 0 + 965)",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.965,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31088082.9,
      "lengthMeters": 965.0,
      "allocationPerStatedMeter": 31088.08,
      "rangesMeters": [
        [
          0.0,
          965.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road Barangay Poo to Barangay Capalasanan, Lazi, Siquijor (Segment 1: 0 + 000 - 0 + 965)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.6,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0584-009309",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge in Barangay Camp 4, Talisay City, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Construction of Bridge in Barangay Camp 4, Talisay City, Cebu",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009394",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Tilhaong, Consolacion, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Bridge, Barangay Tilhaong, Consolacion, Cebu",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009395",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Drainage System at Pak-Pakan road, Barangay Basak, Lapu-Lapu City, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Drainage System at Pak-Pakan road, Barangay Basak, Lapu-Lapu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009458",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure, Barangay Tagba-o, Cebu City, Cebu",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction of Road Slope Protection Structure, Barangay Tagba-o, Cebu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0591-009477",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+700, Phase III, Barangay San Isidro, Lawaan Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42857142.86,
      "lengthMeters": 700.0,
      "allocationPerStatedMeter": 42857.14,
      "rangesMeters": [
        [
          0.0,
          700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+700, Phase III, Barangay San Isidro, Lawaan Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.75,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0592-009485",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay 3 - Barangay 5, Taft, Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Construction of Road, Barangay 3 - Barangay 5, Taft, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0593-009519",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Villalon-Bunacan-Daja Road, (Sta. 3+324-3+925, Sta . 5+930-6+329), Calubian and San Isidro, Leyte",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          3324.0,
          3925.0
        ],
        [
          5930.0,
          6329.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Villalon-Bunacan-Daja Road, (Sta. 3+324-3+925, Sta . 5+930-6+329), Calubian and San Isidro, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.2,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0593-009520",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Villanueva-Kawayanan Road, (Sta. 3=300-Sta. 4+300),Calubian, Leyte",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Villanueva-Kawayanan Road, (Sta. 3=300-Sta. 4+300),Calubian, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0593-009521",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Basud-Cadaruhan-Maasin-Palid II Road, (Sta. 5+308-Sta. 6+308), San Isidro, Leyte",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          5308.0,
          6308.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Basud-Cadaruhan-Maasin-Palid II Road, (Sta. 5+308-Sta. 6+308), San Isidro, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.2,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0593-009523",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of JNR Consuegra-Wague-Butason Road, (Sta. 3+590-Sta. 4+590), Leyte and Tabango, Leyte",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          3590.0,
          4590.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of JNR Consuegra-Wague-Butason Road, (Sta. 3+590-Sta. 4+590), Leyte and Tabango, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.2,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0594-009536",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Jubay, Calubian, Leyte (Station 21+349.3 - 22+169.3)",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.82,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36585365.85,
      "lengthMeters": 820.0,
      "allocationPerStatedMeter": 36585.37,
      "rangesMeters": [
        [
          21349.3,
          22169.3
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Construction of Road, Barangay Jubay, Calubian, Leyte (Station 21+349.3 - 22+169.3)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.88,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0595-009550",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Sta. 4+700 - Sta. 6+700, Barangay Monterico - Barangay Leondoni, Ormoc City, Leyte",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 15000.0,
      "rangesMeters": [
        [
          4700.0,
          6700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Concrete Road, Sta. 4+700 - Sta. 6+700, Barangay Monterico - Barangay Leondoni, Ormoc City, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.62,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0597-009593",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 1+404 - Sta. 1+969) in Barangay Inamlan, Laoang, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.565,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53097345.13,
      "lengthMeters": 565.0,
      "allocationPerStatedMeter": 53097.35,
      "rangesMeters": [
        [
          1404.0,
          1969.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Road (Sta. 1+404 - Sta. 1+969) in Barangay Inamlan, Laoang, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 2.17,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0600-009653",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Duhol Kabbon, Maimbung, Sulu Sta. 00+000 to Sta. 01+000",
      "office": "Sulu 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Rehabilitation of Road, Barangay Duhol Kabbon, Maimbung, Sulu Sta. 00+000 to Sta. 01+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.2,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0601-009663",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Sta. 11+340 - Sta. 11+370.84, Sta. 11+240 - Sta. 11+480, Barangay Magsaysay, Sibutad, Zamboanga del Norte",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 125000000.0,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 125000.0,
      "rangesMeters": [
        [
          11340.0,
          11370.84
        ],
        [
          11240.0,
          11480.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Bridge, Sta. 11+340 - Sta. 11+370.84, Sta. 11+240 - Sta. 11+480, Barangay Magsaysay, Sibutad, Zamboanga del Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 0.21,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0602-009687",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Seaport Road (Miputak-Galas Section), Dipolog City",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Construction of Road, Seaport Road (Miputak-Galas Section), Dipolog City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0603-009709",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Panabutan-Sipakit, Sirawai, Zamboanga del Norte, Sta. 2 + 432 - Sta. 3 + 432",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          2432.0,
          3432.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road, Barangay Panabutan-Sipakit, Sirawai, Zamboanga del Norte, Sta. 2 + 432 - Sta. 3 + 432",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.2,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0603-009710",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay S. Cabral, Siocon, Zamboanga del Norte",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road, Barangay S. Cabral, Siocon, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0603-009711",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Siay, Siocon, Zamboanga del Norte",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road, Barangay Siay, Siocon, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009741",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road along V. Sagun - Margosatubig Rd (Barangay Biu-us Section), Vincenzo Sagun, Zamboanga del Sur, Start 7.5197, 123.1315 End 7.5246, 123.1291",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road along V. Sagun - Margosatubig Rd (Barangay Biu-us Section), Vincenzo Sagun, Zamboanga del Sur, Start 7.5197, 123.1315 End 7.5246, 123.1291",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009778",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Ipil Heights, Ipil, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of Access Road, Barangay Ipil Heights, Ipil, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009780",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Sto. Domingo, San Fernando, Bukidnon, 7.790067, 125.376423",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of Concrete Road, Barangay Sto. Domingo, San Fernando, Bukidnon, 7.790067, 125.376423",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009781",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Guihean, Impasug-ong, Bukidnon, 8.404157, 125.005485",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of Concrete Road, Barangay Guihean, Impasug-ong, Bukidnon, 8.404157, 125.005485",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009782",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Alanib, Lantapan, Bukidnon, 8.040301, 124.966452",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of Concrete Road, Barangay Alanib, Lantapan, Bukidnon, 8.040301, 124.966452",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009871",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Kiwalan, Sta. 0+000 - Sta. 700, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Construction of Road, Barangay Kiwalan, Sta. 0+000 - Sta. 700, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0611-009886",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Maguindanao-Topocon Road, Barangay Maguindanao Section, Sta. 0+000 - Sta. 1+300, Sultan Naga Dimaporo, Lanao del Norte",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23076923.08,
      "lengthMeters": 1300.0,
      "allocationPerStatedMeter": 23076.92,
      "rangesMeters": [
        [
          0.0,
          1300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Maguindanao-Topocon Road, Barangay Maguindanao Section, Sta. 0+000 - Sta. 1+300, Sultan Naga Dimaporo, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.92,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0612-009893",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Submarine Bridge Barangay Pendolonan, Sta. 0+000 - Sta. 0+030, Poona Piagapo, Lanao del Norte",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 0.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1000000000.0,
      "lengthMeters": 30.0,
      "allocationPerStatedMeter": 1000000.0,
      "rangesMeters": [
        [
          0.0,
          30.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Submarine Bridge Barangay Pendolonan, Sta. 0+000 - Sta. 0+030, Poona Piagapo, Lanao del Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 0.71,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0612-009900",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Puntod - Barangay Usocan, Plaridel, Misamis Occidental",
      "office": "Misamis Occidental 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Road Barangay Puntod - Barangay Usocan, Plaridel, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0613-009916",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Purok 2 Barangay Camanse - Colupan Alto), Sta. 0+000 - Sta. 1+000, Sinacaban, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Construction of Road (Purok 2 Barangay Camanse - Colupan Alto), Sta. 0+000 - Sta. 1+000, Sinacaban, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.2,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0613-009919",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, (Banglay to Matugnao), Sta. 0+000 - Sta. 1+000, Tangub City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Construction of Road, (Banglay to Matugnao), Sta. 0+000 - Sta. 1+000, Tangub City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.2,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0617-010007",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road JNC National Highway-Haguimitan, Sta. 0+000 - Sta. 2+200, Monkayo, Davao de Oro",
      "office": "Davao de Oro 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 2.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13636363.64,
      "lengthMeters": 2200.0,
      "allocationPerStatedMeter": 13636.36,
      "rangesMeters": [
        [
          0.0,
          2200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Road JNC National Highway-Haguimitan, Sta. 0+000 - Sta. 2+200, Monkayo, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.56,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0618-010021",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Access road from Purok 10, Bgy Ising to Purok 4A Bgy Sto Nino, Carmen, Davao Del Norte",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Concreting of Access road from Purok 10, Bgy Ising to Purok 4A Bgy Sto Nino, Carmen, Davao Del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010031",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Jct. Kapalong - Loreto Road going to Sitio Kilantang, Barangay Sua - on, Kapalong, Davao del Norte",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Road Jct. Kapalong - Loreto Road going to Sitio Kilantang, Barangay Sua - on, Kapalong, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010067",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Linao to Sitio Santo Cano, Barangay Linao, Matalam, Cotabato",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Road, Barangay Linao to Sitio Santo Cano, Barangay Linao, Matalam, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010069",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay New Rizal, M'lang, Cotabato",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Road, Barangay New Rizal, M'lang, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0622-010104",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Jct.National Highway to Salkan Elementary School, Barangay Paraiso, Koronadal City, South Cotabato, 6.474334, 124.813324, 6.466638, 124.817333",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Construction of Concrete Road, Jct.National Highway to Salkan Elementary School, Barangay Paraiso, Koronadal City, South Cotabato, 6.474334, 124.813324, 6.466638, 124.817333",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0622-010106",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Access Road, Purok Bayanihan, Sta. Cruz to Urban Poor, Barangay San Isidro, Koronadal City, South Cotabato, 6.47951, 124.841985, 6.473342, 124.849325",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Concreting of Access Road, Purok Bayanihan, Sta. Cruz to Urban Poor, Barangay San Isidro, Koronadal City, South Cotabato, 6.47951, 124.841985, 6.473342, 124.849325",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0622-010107",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Mabini to Barangay Esperanza, Koronadal City, South Cotabato, 6.527788, 124.90844, 6.52168, 124.917385",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Construction of Concrete Road, Barangay Mabini to Barangay Esperanza, Koronadal City, South Cotabato, 6.527788, 124.90844, 6.52168, 124.917385",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010112",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok Tuburan, Barangay Sta. Cruz, Koronadal City, South Cotabato, 6.490033, 124.836502, 6.48928, 124.834862",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Construction of Concrete Road, Purok Tuburan, Barangay Sta. Cruz, Koronadal City, South Cotabato, 6.490033, 124.836502, 6.48928, 124.834862",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010141",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Purok Riverside, Barangay Kalawag III, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Construction of Access Road, Purok Riverside, Barangay Kalawag III, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010145",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Purok Santan, Barangay Kalawag III, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Construction of Access Road, Purok Santan, Barangay Kalawag III, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0625-010160",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Kalawag III Access Road, Purok San Francisco, Barangay Kalawag III, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Kalawag III Access Road, Purok San Francisco, Barangay Kalawag III, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0626-010178",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Access Road leading to Agusan Del Sur State University Compound, Bunawan, Agusan del Sur",
      "office": "Agusan del Sur 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Concreting of Access Road leading to Agusan Del Sur State University Compound, Bunawan, Agusan del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0626-010179",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Del Rosario to San Isidro Road, Sta. 0+000 - Sta. 1+000, Barangay San Isidro, Sibagat, Agusan del Sur",
      "office": "Agusan del Sur 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Construction of Del Rosario to San Isidro Road, Sta. 0+000 - Sta. 1+000, Barangay San Isidro, Sibagat, Agusan del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.2,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0627-010201",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Purok 5, Barangay Rosita, Libjo, Dinagat Islands (125.563728, 10.126576)",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction of Bridge, Purok 5, Barangay Rosita, Libjo, Dinagat Islands (125.563728, 10.126576)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0628-010213",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Songkoy-Sering Bridge, Barangay Songkoy, Socorro, Siargao Island, Surigao del Norte",
      "office": "Surigao del Norte 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of Songkoy-Sering Bridge, Barangay Songkoy, Socorro, Siargao Island, Surigao del Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0628-010214",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 1-Purok 4, Barangay Mahanub, Road, Gigaguit, Surigao Del Norte",
      "office": "Surigao del Norte 2nd District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of Road, Purok 1-Purok 4, Barangay Mahanub, Road, Gigaguit, Surigao Del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0628-010223",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Baucawe, Lianga, Surigao del Sur",
      "office": "Surigao del Sur 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of Road, Baucawe, Lianga, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0628-010225",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Magasang, Cantilan, Surigao del Sur",
      "office": "Surigao del Sur 1st District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of Road, Magasang, Cantilan, Surigao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0630-010240",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Causeway at Barangay San Vicente, Olango Island, Lapu-Lapu City, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "630",
      "lengthEvidence": "Construction of Causeway at Barangay San Vicente, Olango Island, Lapu-Lapu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0290-003348",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Samac Br. (B00057NR) along Bais-Kabankalan Rd",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 29880000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Samac Br. (B00057NR) along Bais-Kabankalan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0290-003347",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Naiba Br. (B00059NR) along Bais-Kabankalan Rd",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 29868000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Naiba Br. (B00059NR) along Bais-Kabankalan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0129-000367",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Camiling - Wawa - Bayambang - Malasiqui - Sta. Barbara Road, K0187+000 - K0188+000",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 29860000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29860000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 29860.0,
      "rangesMeters": [
        [
          187000.0,
          188000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Camiling - Wawa - Bayambang - Malasiqui - Sta. Barbara Road, K0187+000 - K0188+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.98,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0207-001770",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Buenavista-Kawayan Rd - K0055 + 203 - K0055 + 800",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 29850000,
      "lengthKm": 0.597,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 597.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          55203.0,
          55800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Buenavista-Kawayan Rd - K0055 + 203 - K0055 + 800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 0.83,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0116-000096",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Zamboanga Transcentral North Road (S01111MN), K1999+(-610) - K2000+024",
      "office": "Central Office",
      "amountPesos": 29822000,
      "lengthKm": 1.634,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18250917.99,
      "lengthMeters": 1634.0,
      "allocationPerStatedMeter": 18250.92,
      "rangesMeters": [
        [
          1998390.0,
          2000024.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "116",
      "lengthEvidence": "Zamboanga Transcentral North Road (S01111MN), K1999+(-610) - K2000+024",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.49,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0147-000724",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Danlugan-La Dicha Diversion Road, K1734+000 to K1735+00",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 29822000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29822000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 29822.0,
      "rangesMeters": [
        [
          1734000.0,
          1735000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Danlugan-La Dicha Diversion Road, K1734+000 to K1735+00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.25,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0119-000166",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Romulo H-way - K0163 + 436 - K0164 + 113, K0164 + 123 - K0164 + 473",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 29796000,
      "lengthKm": 1.027,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29012658.23,
      "lengthMeters": 1027.0,
      "allocationPerStatedMeter": 29012.66,
      "rangesMeters": [
        [
          163436.0,
          164113.0
        ],
        [
          164123.0,
          164473.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Romulo H-way - K0163 + 436 - K0164 + 113, K0164 + 123 - K0164 + 473",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 0.63,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0134-000472",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Lipa City - Alaminos Rd - K0076 + (-849) - K0076 + (-337)",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 29775000,
      "lengthKm": 0.512,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 58154296.88,
      "lengthMeters": 512.0,
      "allocationPerStatedMeter": 58154.3,
      "rangesMeters": [
        [
          75151.0,
          75663.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Lipa City - Alaminos Rd - K0076 + (-849) - K0076 + (-337)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.8,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0575-009118",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 0+000 - Sta. 1+869, Sta. 2+323 - Sta. 2+401) at Hda. Maritaldan to Sitio Palje, Barangay Consing, EB Magalona, Negros Occidental (10.8267610, 123.1097660)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 29750000,
      "lengthKm": 1.947,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 15279917.82,
      "lengthMeters": 1947.0,
      "allocationPerStatedMeter": 15279.92,
      "rangesMeters": [
        [
          0.0,
          1869.0
        ],
        [
          2323.0,
          2401.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road (Sta. 0+000 - Sta. 1+869, Sta. 2+323 - Sta. 2+401) at Hda. Maritaldan to Sitio Palje, Barangay Consing, EB Magalona, Negros Occidental (10.8267610, 123.1097660)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.63,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0171-001139",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Jct Curva Hagnaya-Poblacion-Maaswa Rd - K0114 + 044 - K0115 + 402",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 29722000,
      "lengthKm": 1.358,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21886597.94,
      "lengthMeters": 1358.0,
      "allocationPerStatedMeter": 21886.6,
      "rangesMeters": [
        [
          114044.0,
          115402.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Jct Curva Hagnaya-Poblacion-Maaswa Rd - K0114 + 044 - K0115 + 402",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 0.97,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0185-001371",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0398 + 561 - K0398 + 600, K0399 + 450 - K0399 + 485, K0400 + 375 - K0400 + 450, K0400 + 550 - K0400 + 581, K0400 + 645 - K0400 + 695, K0401 + 475 - K0401 + 530, K0402 + 130 - K0402 + 195, K0402 + 340 - K0402 + 420",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 29701000,
      "lengthKm": 0.43,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 69072093.02,
      "lengthMeters": 430.0,
      "allocationPerStatedMeter": 69072.09,
      "rangesMeters": [
        [
          398561.0,
          398600.0
        ],
        [
          399450.0,
          399485.0
        ],
        [
          400375.0,
          400450.0
        ],
        [
          400550.0,
          400581.0
        ],
        [
          400645.0,
          400695.0
        ],
        [
          401475.0,
          401530.0
        ],
        [
          402130.0,
          402195.0
        ],
        [
          402340.0,
          402420.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "185",
      "lengthEvidence": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0398 + 561 - K0398 + 600, K0399 + 450 - K0399 + 485, K0400 + 375 - K0400 + 450, K0400 + 550 - K0400 + 581, K0400 + 645 - K0400 + 695, K0401 + 475 - K0401 + 530, K0402 + 130 - K0402 + 195, K0402 + 340 - K0402 + 420",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 0.75,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0211-001834",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Sarangani-Sultan Kudarat Coastal Rd - K1725 + 030 - K1726 + 512",
      "office": "Sarangani District Engineering Office",
      "amountPesos": 29662000,
      "lengthKm": 1.482,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20014844.8,
      "lengthMeters": 1482.0,
      "allocationPerStatedMeter": 20014.84,
      "rangesMeters": [
        [
          1725030.0,
          1726512.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "211",
      "lengthEvidence": "Sarangani-Sultan Kudarat Coastal Rd - K1725 + 030 - K1726 + 512",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 0.6,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0620-010059",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Yap Street along Mid-Bal CIS, Sta. 0 + 000 - Sta. 2 + 280, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 29640000,
      "lengthKm": 2.28,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13000000.0,
      "lengthMeters": 2280.0,
      "allocationPerStatedMeter": 13000.0,
      "rangesMeters": [
        [
          0.0,
          2280.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Road, Yap Street along Mid-Bal CIS, Sta. 0 + 000 - Sta. 2 + 280, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.54,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0135-000493",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Buenavista-Kawayan Rd - K0048 + 988 - K0050 + 000",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 29580000,
      "lengthKm": 1.012,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29229249.01,
      "lengthMeters": 1012.0,
      "allocationPerStatedMeter": 29229.25,
      "rangesMeters": [
        [
          48988.0,
          50000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Buenavista-Kawayan Rd - K0048 + 988 - K0050 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.96,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0161-000944",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Famy-Real-Infanta-Dinahican Port Rd - K0100 + 894 - K0101 + 044, K0101 + 074 - K0101 + 622",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 29579000,
      "lengthKm": 0.698,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 42376790.83,
      "lengthMeters": 698.0,
      "allocationPerStatedMeter": 42376.79,
      "rangesMeters": [
        [
          100894.0,
          101044.0
        ],
        [
          101074.0,
          101622.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Famy-Real-Infanta-Dinahican Port Rd - K0100 + 894 - K0101 + 044, K0101 + 074 - K0101 + 622",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 1.28,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0138-000539",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 14741 - Chainage 15241, Chainage 21888 - Chainage 22522, Chainage 22624 - Chainage 23457",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 29505000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 14741 - Chainage 15241, Chainage 21888 - Chainage 22522, Chainage 22624 - Chainage 23457",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0119-000173",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Jose Abad Santos Ave (JASA) - K0124 + 170 - K0124+949",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 29500000,
      "lengthKm": 0.779,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37869062.9,
      "lengthMeters": 779.0,
      "allocationPerStatedMeter": 37869.06,
      "rangesMeters": [
        [
          124170.0,
          124949.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Jose Abad Santos Ave (JASA) - K0124 + 170 - K0124+949",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 0.89,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0147-000725",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Preventive Maintenanance- Tertiary Roads - Talisayan By-Pass Rd - K1350+(-467) - K1350+908",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 29500000,
      "lengthKm": 1.375,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21454545.45,
      "lengthMeters": 1375.0,
      "allocationPerStatedMeter": 21454.55,
      "rangesMeters": [
        [
          1349533.0,
          1350908.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Preventive Maintenanance- Tertiary Roads - Talisayan By-Pass Rd - K1350+(-467) - K1350+908",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 0.99,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0510-007704",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage System along La Rosa Santiago St., Barangay San Jose to Sto. Cristo, City of Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 29500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road with Drainage System along La Rosa Santiago St., Barangay San Jose to Sto. Cristo, City of Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0533-008191",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay Sapalibutad, Angeles City Pampanga, Sta. 0+000 - Sta. 0+285, Sta. 0+000 - Sta. 0+406, Sta. 0+000 - Sta. 0+396, Sta. 0+000 - Sta. 0+259, Sta. 0+000 - Sta. 0+102, Sta. 0+000 - Sta. 0+181, Sta. 0+000 - Sta. 0+067, Sta. 0+000 - Sta. 0+190, Sta. 0+000 - Sta. 0+200, Sta. 0+000 - Sta. 0+185",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 29500000,
      "lengthKm": 0.406,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 72660098.52,
      "lengthMeters": 406.0,
      "allocationPerStatedMeter": 72660.1,
      "rangesMeters": [
        [
          0.0,
          285.0
        ],
        [
          0.0,
          406.0
        ],
        [
          0.0,
          396.0
        ],
        [
          0.0,
          259.0
        ],
        [
          0.0,
          102.0
        ],
        [
          0.0,
          181.0
        ],
        [
          0.0,
          67.0
        ],
        [
          0.0,
          190.0
        ],
        [
          0.0,
          200.0
        ],
        [
          0.0,
          185.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road and Drainage, Barangay Sapalibutad, Angeles City Pampanga, Sta. 0+000 - Sta. 0+285, Sta. 0+000 - Sta. 0+406, Sta. 0+000 - Sta. 0+396, Sta. 0+000 - Sta. 0+259, Sta. 0+000 - Sta. 0+102, Sta. 0+000 - Sta. 0+181, Sta. 0+000 - Sta. 0+067, Sta. 0+000 - Sta. 0+190, Sta. 0+000 - Sta. 0+200, Sta. 0+000 - Sta. 0+185",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 2.97,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0606-009772",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Naga-Naga, Alicia, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 29500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of Road, Barangay Naga-Naga, Alicia, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0206-001739",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Lipa City - Alaminos Rd - K0084 + 680 - K0084 + 820",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 29490000,
      "lengthKm": 0.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 210642857.14,
      "lengthMeters": 140.0,
      "allocationPerStatedMeter": 210642.86,
      "rangesMeters": [
        [
          84680.0,
          84820.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Lipa City - Alaminos Rd - K0084 + 680 - K0084 + 820",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 4.21,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0210-001818",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Siocon-Sirawai Rd - K2084 + 780 - K2086 + 000",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 29478000,
      "lengthKm": 1.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24162295.08,
      "lengthMeters": 1220.0,
      "allocationPerStatedMeter": 24162.3,
      "rangesMeters": [
        [
          2084780.0,
          2086000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Siocon-Sirawai Rd - K2084 + 780 - K2086 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.48,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0275-002998",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Cauayan Br. (B01248LZ) along Nueva Vizcaya-Benguet Rd",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 29424000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Cauayan Br. (B01248LZ) along Nueva Vizcaya-Benguet Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0627-010200",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Sitio Cabalawan, Barangay Garcia, Libjo, Dinagat Islands (125.546894, 10.164221)",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 29400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction of Bridge, Sitio Cabalawan, Barangay Garcia, Libjo, Dinagat Islands (125.546894, 10.164221)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0243-002419",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0011 + 275 - K0012 + 589, K0013 + 226 - K0013 + 468 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Central Office",
      "amountPesos": 29329000,
      "lengthKm": 1.556,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 18848971.72,
      "lengthMeters": 1556.0,
      "allocationPerStatedMeter": 18848.97,
      "rangesMeters": [
        [
          11275.0,
          12589.0
        ],
        [
          13226.0,
          13468.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "243",
      "lengthEvidence": "Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0011 + 275 - K0012 + 589, K0013 + 226 - K0013 + 468 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 1.57,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0150-000773",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LT) - K0975 + 162 - K0975 + 494, K0976 + 000 - K0976 + 152, K0977 + 000 - K0977 + 190, K0980 + 936 - K0981 + 005, K0983 + 862 - K0984 + 000",
      "office": "Central Office",
      "amountPesos": 29323000,
      "lengthKm": 0.881,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 33283768.44,
      "lengthMeters": 881.0,
      "allocationPerStatedMeter": 33283.77,
      "rangesMeters": [
        [
          975162.0,
          975494.0
        ],
        [
          976000.0,
          976152.0
        ],
        [
          977000.0,
          977190.0
        ],
        [
          980936.0,
          981005.0
        ],
        [
          983862.0,
          984000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "Maharlika Highway (LT) - K0975 + 162 - K0975 + 494, K0976 + 000 - K0976 + 152, K0977 + 000 - K0977 + 190, K0980 + 936 - K0981 + 005, K0983 + 862 - K0984 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 1.4,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0524-008010",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Replacement of Bridge, Barangay Sinulatan, Guimba, Nueva Ecija Sta. 0+000 - Sta. 0+012",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 29300000,
      "lengthKm": 0.012,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2441666666.67,
      "lengthMeters": 12.0,
      "allocationPerStatedMeter": 2441666.67,
      "rangesMeters": [
        [
          0.0,
          12.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Replacement of Bridge, Barangay Sinulatan, Guimba, Nueva Ecija Sta. 0+000 - Sta. 0+012",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 1.73,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0510-007700",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage Canal, Sta. 0+156 - Sta. 0+946, Purok 1-4, Sta. Monica, Hagonoy, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 29230000,
      "lengthKm": 0.79,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37000000.0,
      "lengthMeters": 790.0,
      "allocationPerStatedMeter": 37000.0,
      "rangesMeters": [
        [
          156.0,
          946.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road with Drainage Canal, Sta. 0+156 - Sta. 0+946, Purok 1-4, Sta. Monica, Hagonoy, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.9,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0112-000038",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0513 + 870 - K0514 + 000, K0514 + 585 - K0515 + 248",
      "office": "Central Office",
      "amountPesos": 29169000,
      "lengthKm": 0.793,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 36783102.14,
      "lengthMeters": 793.0,
      "allocationPerStatedMeter": 36783.1,
      "rangesMeters": [
        [
          513870.0,
          514000.0
        ],
        [
          514585.0,
          515248.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Maharlika Highway (LZ) - K0513 + 870 - K0514 + 000, K0514 + 585 - K0515 + 248",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 0.87,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0148-000732",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Surallah-Lake Sebu-Maitum Rd - K1737 + 000 - K1737 + 421, K1737 + 601 - K1738 + 000",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 29098000,
      "lengthKm": 0.82,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 35485365.85,
      "lengthMeters": 820.0,
      "allocationPerStatedMeter": 35485.37,
      "rangesMeters": [
        [
          1737000.0,
          1737421.0
        ],
        [
          1737601.0,
          1738000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "148",
      "lengthEvidence": "Surallah-Lake Sebu-Maitum Rd - K1737 + 000 - K1737 + 421, K1737 + 601 - K1738 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.48,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0133-000451",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sta Rosa-Ulat-Tagaytay Rd - K0059 + (-373) - K0059 + 100",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 29070000,
      "lengthKm": 0.473,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 61458773.78,
      "lengthMeters": 473.0,
      "allocationPerStatedMeter": 61458.77,
      "rangesMeters": [
        [
          58627.0,
          59100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Sta Rosa-Ulat-Tagaytay Rd - K0059 + (-373) - K0059 + 100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.9,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0259-002662",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Maac Br. 2 (B00591LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 29068000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Maac Br. 2 (B00591LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0145-000689",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sigma-Mambusao-Jamindan Rd - K0094 + 800 - K0095 + 622",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 29043000,
      "lengthKm": 0.822,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35332116.79,
      "lengthMeters": 822.0,
      "allocationPerStatedMeter": 35332.12,
      "rangesMeters": [
        [
          94800.0,
          95622.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Sigma-Mambusao-Jamindan Rd - K0094 + 800 - K0095 + 622",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.48,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0144-000672",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Bacoor-Dasmariñas National Rd - K0021 + 910 - K0022 +102, K0022 + 397 - K0022 + 601",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 29028000,
      "lengthKm": 0.396,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 73303030.3,
      "lengthMeters": 396.0,
      "allocationPerStatedMeter": 73303.03,
      "rangesMeters": [
        [
          21910.0,
          22102.0
        ],
        [
          22397.0,
          22601.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Bacoor-Dasmariñas National Rd - K0021 + 910 - K0022 +102, K0022 + 397 - K0022 + 601",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 2.23,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0208-001787",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0067 + 052 - K0067 + 632",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 29000000,
      "lengthKm": 0.58,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 580.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          67052.0,
          67632.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0067 + 052 - K0067 + 632",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 0.83,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0291-003359",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Marao Br. (B00201LT) along Libungao-Matag-ob-Palompon Rd",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 29000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Marao Br. (B00201LT) along Libungao-Matag-ob-Palompon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0135-000487",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Libon-Bacolod-Sn Vicente-Marocmoc-Buga Rd - K0489 + (-184) - K0489 + 499, K0489 + 516 - K0489 + 673, K0489 + 690 - K0491 + 949",
      "office": "Albay 3rd District Engineering Office",
      "amountPesos": 28996000,
      "lengthKm": 3.099,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 9356566.63,
      "lengthMeters": 3099.0,
      "allocationPerStatedMeter": 9356.57,
      "rangesMeters": [
        [
          488816.0,
          489499.0
        ],
        [
          489516.0,
          489673.0
        ],
        [
          489690.0,
          491949.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Libon-Bacolod-Sn Vicente-Marocmoc-Buga Rd - K0489 + (-184) - K0489 + 499, K0489 + 516 - K0489 + 673, K0489 + 690 - K0491 + 949",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.47,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0259-002652",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Dakit Br. (B00604LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 28964000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Dakit Br. (B00604LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0259-002658",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Iti Br. (B00593LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 28964000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Iti Br. (B00593LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010055",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Didikon Road along Malu-Ao CIS, Sta. 0 + 000 - Sta. 2 + 220, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 28860000,
      "lengthKm": 2.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13000000.0,
      "lengthMeters": 2220.0,
      "allocationPerStatedMeter": 13000.0,
      "rangesMeters": [
        [
          0.0,
          2220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Didikon Road along Malu-Ao CIS, Sta. 0 + 000 - Sta. 2 + 220, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.54,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0250-002515",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Jct. Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0020 + 000 - K0023 + 000 (Road Safety: Roadway Lighting)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 28845000,
      "lengthKm": 3.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9615000.0,
      "lengthMeters": 3000.0,
      "allocationPerStatedMeter": 9615.0,
      "rangesMeters": [
        [
          20000.0,
          23000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "250",
      "lengthEvidence": "Jct. Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0020 + 000 - K0023 + 000 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.93,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0133-000448",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Noveleta-Naic-Tagaytay Rd - K0044 + 200 - K0044 + 328",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 28832000,
      "lengthKm": 0.128,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 225250000.0,
      "lengthMeters": 128.0,
      "allocationPerStatedMeter": 225250.0,
      "rangesMeters": [
        [
          44200.0,
          44328.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Noveleta-Naic-Tagaytay Rd - K0044 + 200 - K0044 + 328",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 4.45,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0258-002648",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Caaguit-itan Br. 2 (B00241SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "office": "Central Office",
      "amountPesos": 28800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Caaguit-itan Br. 2 (B00241SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0259-002656",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Himay-angan Br. (B00614LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 28750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Himay-angan Br. (B00614LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0571-009024",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Antalon to Camabaan Road, San Joaquin, Iloilo - Sta. 02+200 - Sta. 03+021",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 28750000,
      "lengthKm": 0.821,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35018270.4,
      "lengthMeters": 821.0,
      "allocationPerStatedMeter": 35018.27,
      "rangesMeters": [
        [
          2200.0,
          3021.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Concreting of Antalon to Camabaan Road, San Joaquin, Iloilo - Sta. 02+200 - Sta. 03+021",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.8,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0490-007279",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sta. 2+696 - Sta. 4+076, Sta. 4+276 - Sta. 4+481), Barangay Naganacan, Santa Maria to Barangay Tallag, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 28700000,
      "lengthKm": 1.585,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 18107255.52,
      "lengthMeters": 1585.0,
      "allocationPerStatedMeter": 18107.26,
      "rangesMeters": [
        [
          2696.0,
          4076.0
        ],
        [
          4276.0,
          4481.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Construction of Concrete Road (Sta. 2+696 - Sta. 4+076, Sta. 4+276 - Sta. 4+481), Barangay Naganacan, Santa Maria to Barangay Tallag, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.75,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0185-001370",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0388 + 190 - K0388 + 258, K0388 + 420 - K0388 + 460, K0391 + 533 - K0391 + 561, K0392 + 236 - K0392 + 276, K0392 + 355 - K0392 + 395, K0392 + 835 - K0392 + 910, K0393 + 430 - K0393 + 495, K0394 + 790 - K0394 + 841, K0395 + 150 - K0395 + 182",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 28635000,
      "lengthKm": 0.439,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 65227790.43,
      "lengthMeters": 439.0,
      "allocationPerStatedMeter": 65227.79,
      "rangesMeters": [
        [
          388190.0,
          388258.0
        ],
        [
          388420.0,
          388460.0
        ],
        [
          391533.0,
          391561.0
        ],
        [
          392236.0,
          392276.0
        ],
        [
          392355.0,
          392395.0
        ],
        [
          392835.0,
          392910.0
        ],
        [
          393430.0,
          393495.0
        ],
        [
          394790.0,
          394841.0
        ],
        [
          395150.0,
          395182.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "185",
      "lengthEvidence": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0388 + 190 - K0388 + 258, K0388 + 420 - K0388 + 460, K0391 + 533 - K0391 + 561, K0392 + 236 - K0392 + 276, K0392 + 355 - K0392 + 395, K0392 + 835 - K0392 + 910, K0393 + 430 - K0393 + 495, K0394 + 790 - K0394 + 841, K0395 + 150 - K0395 + 182",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 0.7,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0137-000530",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siocon-Sirawai Rd - K2075 + 018 - K2075 + 500, K2079 + 800 - K2080 + 000, K2084 + 200 - K2084 + 700, K2085 + 000 - K2085 + 700",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 28605000,
      "lengthKm": 1.882,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 15199256.11,
      "lengthMeters": 1882.0,
      "allocationPerStatedMeter": 15199.26,
      "rangesMeters": [
        [
          2075018.0,
          2075500.0
        ],
        [
          2079800.0,
          2080000.0
        ],
        [
          2084200.0,
          2084700.0
        ],
        [
          2085000.0,
          2085700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Siocon-Sirawai Rd - K2075 + 018 - K2075 + 500, K2079 + 800 - K2080 + 000, K2084 + 200 - K2084 + 700, K2085 + 000 - K2085 + 700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.5,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0155-000861",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1344 + 206 - K1345 + 231, K1358 + 541 - K1358 + 611, K1362 + 746 - K1362 + 764",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 28577000,
      "lengthKm": 1.113,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 25675651.39,
      "lengthMeters": 1113.0,
      "allocationPerStatedMeter": 25675.65,
      "rangesMeters": [
        [
          1344206.0,
          1345231.0
        ],
        [
          1358541.0,
          1358611.0
        ],
        [
          1362746.0,
          1362764.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1344 + 206 - K1345 + 231, K1358 + 541 - K1358 + 611, K1362 + 746 - K1362 + 764",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 1.08,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0185-001366",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Tabuk-Banawe via Tanudan-Barlig Rd - K0511 + 370 - K0511 + 388, K0511 + 641 - K0511 + 669, K0514 + 675 - K0514 + 687, K0521 + 477 - K0521 + 514, K0525 + 510 - K0525 + 528, K0529 + 574 - K0529 + 588, K0530 + 286 - K0530 + 298, K0532 + 302 - K0532 + 325, K0536 + 8077 - K0536 + 8145",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 28500000,
      "lengthKm": 0.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 123913043.48,
      "lengthMeters": 230.0,
      "allocationPerStatedMeter": 123913.04,
      "rangesMeters": [
        [
          511370.0,
          511388.0
        ],
        [
          511641.0,
          511669.0
        ],
        [
          514675.0,
          514687.0
        ],
        [
          521477.0,
          521514.0
        ],
        [
          525510.0,
          525528.0
        ],
        [
          529574.0,
          529588.0
        ],
        [
          530286.0,
          530298.0
        ],
        [
          532302.0,
          532325.0
        ],
        [
          544077.0,
          544145.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "185",
      "lengthEvidence": "Tabuk-Banawe via Tanudan-Barlig Rd - K0511 + 370 - K0511 + 388, K0511 + 641 - K0511 + 669, K0514 + 675 - K0514 + 687, K0521 + 477 - K0521 + 514, K0525 + 510 - K0525 + 528, K0529 + 574 - K0529 + 588, K0530 + 286 - K0530 + 298, K0532 + 302 - K0532 + 325, K0536 + 8077 - K0536 + 8145",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 0.71,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0207-001755",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0153 + 069 - K0154 + 130",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 28490000,
      "lengthKm": 1.061,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26852026.39,
      "lengthMeters": 1061.0,
      "allocationPerStatedMeter": 26852.03,
      "rangesMeters": [
        [
          153069.0,
          154130.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Puerto Princesa South Rd - K0153 + 069 - K0154 + 130",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.53,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0137-000534",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siocon-Sirawai-Sibuco-Limpapa Rd - K2102 + 300 - K2102 + 900, K2103 + 300 - K2104 + 400, K2104 + 800 - K2105 + 000",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 28485000,
      "lengthKm": 1.9,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14992105.26,
      "lengthMeters": 1900.0,
      "allocationPerStatedMeter": 14992.11,
      "rangesMeters": [
        [
          2102300.0,
          2102900.0
        ],
        [
          2103300.0,
          2104400.0
        ],
        [
          2104800.0,
          2105000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Siocon-Sirawai-Sibuco-Limpapa Rd - K2102 + 300 - K2102 + 900, K2103 + 300 - K2104 + 400, K2104 + 800 - K2105 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.49,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0549-008562",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Duhat Bridge and Approaches, Barangay Duhat, STA 002+362 - STA 002+382, Plaridel, Quezon, Phase II",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 28400000,
      "lengthKm": 0.02,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1420000000.0,
      "lengthMeters": 20.0,
      "allocationPerStatedMeter": 1420000.0,
      "rangesMeters": [
        [
          2362.0,
          2382.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Duhat Bridge and Approaches, Barangay Duhat, STA 002+362 - STA 002+382, Plaridel, Quezon, Phase II",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 1.01,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0208-001771",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Buenavista-Kawayan Rd - K0056 + 284 - K0056 + 851",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 28350000,
      "lengthKm": 0.567,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 567.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          56284.0,
          56851.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Buenavista-Kawayan Rd - K0056 + 284 - K0056 + 851",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 0.83,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0129-000364",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sn Carlos - Calasiao Road, K0209+128 - K0210+080",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 28340000,
      "lengthKm": 0.952,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29768907.56,
      "lengthMeters": 952.0,
      "allocationPerStatedMeter": 29768.91,
      "rangesMeters": [
        [
          209128.0,
          210080.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Sn Carlos - Calasiao Road, K0209+128 - K0210+080",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.98,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0207-001756",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0165 + 217 - K0166 + 273",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 28303000,
      "lengthKm": 1.056,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26802083.33,
      "lengthMeters": 1056.0,
      "allocationPerStatedMeter": 26802.08,
      "rangesMeters": [
        [
          165217.0,
          166273.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Puerto Princesa South Rd - K0165 + 217 - K0166 + 273",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.53,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0171-001130",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Oton-Buray-Sta Monica-Sn Antonio-Sn Miguel Rd - K0015 + 530 - K0015 + 870, K0015 + 870 - K0016 + 000, K0016 + 000 - K0016 + 340",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 28245000,
      "lengthKm": 0.81,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34870370.37,
      "lengthMeters": 810.0,
      "allocationPerStatedMeter": 34870.37,
      "rangesMeters": [
        [
          15530.0,
          15870.0
        ],
        [
          15870.0,
          16000.0
        ],
        [
          16000.0,
          16340.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Oton-Buray-Sta Monica-Sn Antonio-Sn Miguel Rd - K0015 + 530 - K0015 + 870, K0015 + 870 - K0016 + 000, K0016 + 000 - K0016 + 340",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.1,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0431-006084",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Calabagas, San Vicente, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 28204500,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road, Barangay Calabagas, San Vicente, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0532-008182",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Aniceto Gueco St., Barangay Pampang, Angeles City, Pampanga",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 28200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Rehabilitation of Road at Aniceto Gueco St., Barangay Pampang, Angeles City, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0575-009119",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 0+000 - Sta. 2+013) at Barangay Kapitan Ramon, Silay City, Negros Occidental (10.7665000, 123.1312778)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 28182000,
      "lengthKm": 2.013,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14000000.0,
      "lengthMeters": 2013.0,
      "allocationPerStatedMeter": 14000.0,
      "rangesMeters": [
        [
          0.0,
          2013.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road (Sta. 0+000 - Sta. 2+013) at Barangay Kapitan Ramon, Silay City, Negros Occidental (10.7665000, 123.1312778)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0113-000044",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0622 + 408 - K0623 + 000",
      "office": "Central Office",
      "amountPesos": 28170000,
      "lengthKm": 0.592,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 47584459.46,
      "lengthMeters": 592.0,
      "allocationPerStatedMeter": 47584.46,
      "rangesMeters": [
        [
          622408.0,
          623000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Maharlika Highway (LZ) - K0622 + 408 - K0623 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 0.99,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0232-002226",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Construction of Diversion Road, Barangay Banonong, Dapitan City - Pob. Sibutad Road, Zamboanga del Norte - Sta. 0+000 - Sta. 0+285, Sta. 2+897.10 - Sta. 3+187, Sta. 12+823 - Sta. 12+853",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "amountPesos": 28108000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          285.0
        ],
        [
          2897.1,
          3187.0
        ],
        [
          12823.0,
          12853.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "Construction of Diversion Road, Barangay Banonong, Dapitan City - Pob. Sibutad Road, Zamboanga del Norte - Sta. 0+000 - Sta. 0+285, Sta. 2+897.10 - Sta. 3+187, Sta. 12+823 - Sta. 12+853",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0293-003408",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Catupgas Br. 2 (B01750MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Sur 1st District Engineering Office",
      "amountPesos": 28080000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Catupgas Br. 2 (B01750MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0171-001128",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Oton-Mambog-Cabolo-an-Abilay-Sn Jose Rd-K0012 + 944 - K0013 + 000, K0013 +000 - K0013 +294, K0016 + 266 - K0016 + 550, K0018 + 389 -K0018 + 463",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 28000000,
      "lengthKm": 0.708,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 39548022.6,
      "lengthMeters": 708.0,
      "allocationPerStatedMeter": 39548.02,
      "rangesMeters": [
        [
          12944.0,
          13000.0
        ],
        [
          13000.0,
          13294.0
        ],
        [
          16266.0,
          16550.0
        ],
        [
          18389.0,
          18463.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Oton-Mambog-Cabolo-an-Abilay-Sn Jose Rd-K0012 + 944 - K0013 + 000, K0013 +000 - K0013 +294, K0016 + 266 - K0016 + 550, K0018 + 389 -K0018 + 463",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.24,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0455-006530",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage DAHOA Compound (Lupang Sinilangan) Interconnecting Roads - Phase 1 (C0+000 to C0+750), Barangay Gen. T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 28000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage DAHOA Compound (Lupang Sinilangan) Interconnecting Roads - Phase 1 (C0+000 to C0+750), Barangay Gen. T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0457-006563",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainges along Tangke St. (C0+000 to C0+900), Barangay Malinta, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 28000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Rehabilitation of Roads and Drainges along Tangke St. (C0+000 to C0+900), Barangay Malinta, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006984",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Slope Protection, Honeymoon-Holyghost Barangay to Holyhghost Extension Barangay, Baguio City (Sta. 0+270 - Sta. 0+465)",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 28000000,
      "lengthKm": 0.195,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 143589743.59,
      "lengthMeters": 195.0,
      "allocationPerStatedMeter": 143589.74,
      "rangesMeters": [
        [
          270.0,
          465.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Construction of Road including Slope Protection, Honeymoon-Holyghost Barangay to Holyhghost Extension Barangay, Baguio City (Sta. 0+270 - Sta. 0+465)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 4.06,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0500-007488",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Rizal East, San Isidro, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 28000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Bridge, Rizal East, San Isidro, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0500-007500",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road to Madadamian Elementary School, Sta. 0 + 000 - Sta. 2 + 000, Purok 1 and 2, Madadamian, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 28000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 14000.0,
      "rangesMeters": [
        [
          0.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Road to Madadamian Elementary School, Sta. 0 + 000 - Sta. 2 + 000, Purok 1 and 2, Madadamian, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0503-007550",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Villa Campo to Diasan Road, Sta. 0 + 000 - Sta. 2 + 000, Villa Campo, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 28000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 14000.0,
      "rangesMeters": [
        [
          0.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Construction of Villa Campo to Diasan Road, Sta. 0 + 000 - Sta. 2 + 000, Villa Campo, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0550-008571",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage Canal of Road Lot 107 at Sittio Paenaan Barangay San Jose, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 28000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction of Road and Drainage Canal of Road Lot 107 at Sittio Paenaan Barangay San Jose, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008605",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Bocboc - Puting Buhangin, Mogpog, Marinduque",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 28000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Rehabilitation of Road, Barangay Bocboc - Puting Buhangin, Mogpog, Marinduque",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008685",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Katutubo, Barangay Punta Baja, Rizal, Palawan",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 28000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of Road, Sitio Katutubo, Barangay Punta Baja, Rizal, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0617-010002",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Del Pilar, Mabini, Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 28000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Road, Barangay Del Pilar, Mabini, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0627-010197",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Sta. 0 + 200 - Sta. 1 + 200, Sitio Dapia to Sitio Melody, Barangay San Antonio, Libjo, Dinagat Islands",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 28000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 28000.0,
      "rangesMeters": [
        [
          200.0,
          1200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction of Road Sta. 0 + 200 - Sta. 1 + 200, Sitio Dapia to Sitio Melody, Barangay San Antonio, Libjo, Dinagat Islands",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.12,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0532-008174",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage along Barangay Road, Magalang, Pampanga Sta. Maria (Sta. 0+000.00 - Sta. 0+770.00), San Nicolas II (Sta. 0+000.00 - Sta. 0+770.00), San Pedro II (Sta. 0+000.00 - Sta. 0+770.00)",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 27903000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          770.0
        ],
        [
          0.0,
          770.0
        ],
        [
          0.0,
          770.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Construction of Road and Drainage along Barangay Road, Magalang, Pampanga Sta. Maria (Sta. 0+000.00 - Sta. 0+770.00), San Nicolas II (Sta. 0+000.00 - Sta. 0+770.00), San Pedro II (Sta. 0+000.00 - Sta. 0+770.00)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0263-002753",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Bagahupi Br. (B00051LT) along Leyte-Samar Inter-Provl Rd",
      "office": "Leyte 1st District Engineering Office",
      "amountPesos": 27900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Bagahupi Br. (B00051LT) along Leyte-Samar Inter-Provl Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0206-001747",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Mindoro Oriental/Occidental East Coastal Rd - K0223 + 898 - K0224 + 733",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 27860000,
      "lengthKm": 0.835,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33365269.46,
      "lengthMeters": 835.0,
      "allocationPerStatedMeter": 33365.27,
      "rangesMeters": [
        [
          223898.0,
          224733.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Mindoro Oriental/Occidental East Coastal Rd - K0223 + 898 - K0224 + 733",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.66,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0290-003342",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Canlumbog Br. (Cantilevered) (B00051NR) along Bais-Kabankalan Rd",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 27828000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Canlumbog Br. (Cantilevered) (B00051NR) along Bais-Kabankalan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0135-000484",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Calapan South Rd - K0075 + 040 - K0075 + 850",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 27804000,
      "lengthKm": 0.81,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34325925.93,
      "lengthMeters": 810.0,
      "allocationPerStatedMeter": 34325.93,
      "rangesMeters": [
        [
          75040.0,
          75850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Calapan South Rd - K0075 + 040 - K0075 + 850",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.13,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0122-000217",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Ormoc-Baybay-Southern Leyte Bdry Rd - K1024 + 000 - K1024 + 318, K1024 + 387 - K1024 + 722",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 27740000,
      "lengthKm": 0.653,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 42480857.58,
      "lengthMeters": 653.0,
      "allocationPerStatedMeter": 42480.86,
      "rangesMeters": [
        [
          1024000.0,
          1024318.0
        ],
        [
          1024387.0,
          1024722.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Ormoc-Baybay-Southern Leyte Bdry Rd - K1024 + 000 - K1024 + 318, K1024 + 387 - K1024 + 722",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 1.0,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0131-000397",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Batangas-Lobo Rd - K0109 + 710 - K0110 + 565",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 27696000,
      "lengthKm": 0.855,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32392982.46,
      "lengthMeters": 855.0,
      "allocationPerStatedMeter": 32392.98,
      "rangesMeters": [
        [
          109710.0,
          110565.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Batangas-Lobo Rd - K0109 + 710 - K0110 + 565",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.06,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0617-010008",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Casoon, Monkayo, Davao de Oro, Sta 0 + 000 - Sta. 1 + 050",
      "office": "Davao de Oro 2nd District Engineering Office",
      "amountPesos": 27679000,
      "lengthKm": 1.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26360952.38,
      "lengthMeters": 1050.0,
      "allocationPerStatedMeter": 26360.95,
      "rangesMeters": [
        [
          0.0,
          1050.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Road Barangay Casoon, Monkayo, Davao de Oro, Sta 0 + 000 - Sta. 1 + 050",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.05,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0165-001035",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Zamboanga City-Labuan-Limpapa Rd - K1954 + 000 - K1954 + 622",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 27607000,
      "lengthKm": 0.622,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44384244.37,
      "lengthMeters": 622.0,
      "allocationPerStatedMeter": 44384.24,
      "rangesMeters": [
        [
          1954000.0,
          1954622.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Zamboanga City-Labuan-Limpapa Rd - K1954 + 000 - K1954 + 622",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.12,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0291-003361",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Ligued Br. (B00254SM) along Catarman-Calbayog Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 27600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Ligued Br. (B00254SM) along Catarman-Calbayog Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0120-000184",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Tanza-Trece Martires City-Indang Rd - K0044 + 000 - K0044 + 783",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 27591000,
      "lengthKm": 0.783,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35237547.89,
      "lengthMeters": 783.0,
      "allocationPerStatedMeter": 35237.55,
      "rangesMeters": [
        [
          44000.0,
          44783.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Tanza-Trece Martires City-Indang Rd - K0044 + 000 - K0044 + 783",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 0.83,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0143-000646",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Alicia-San Mateo Rd - K0360 + 256 - K0362 + 000",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 27525000,
      "lengthKm": 1.744,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15782683.49,
      "lengthMeters": 1744.0,
      "allocationPerStatedMeter": 15782.68,
      "rangesMeters": [
        [
          360256.0,
          362000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Alicia-San Mateo Rd - K0360 + 256 - K0362 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 0.73,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0170-001120",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Manguiring-Tomagodtod Rd, K0459 + 460 - K0460 + 333",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 27500000,
      "lengthKm": 0.873,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31500572.74,
      "lengthMeters": 873.0,
      "allocationPerStatedMeter": 31500.57,
      "rangesMeters": [
        [
          459460.0,
          460333.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Manguiring-Tomagodtod Rd, K0459 + 460 - K0460 + 333",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.99,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0209-001807",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Jct (TER)-Jagna-Sierra Bullones Rd - K0080 + 364 - K0080 + 514, K0081 + 000 - K0082 + 000",
      "office": "Bohol 3rd District Engineering Office",
      "amountPesos": 27476000,
      "lengthKm": 1.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23892173.91,
      "lengthMeters": 1150.0,
      "allocationPerStatedMeter": 23892.17,
      "rangesMeters": [
        [
          80364.0,
          80514.0
        ],
        [
          81000.0,
          82000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "Jct (TER)-Jagna-Sierra Bullones Rd - K0080 + 364 - K0080 + 514, K0081 + 000 - K0082 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.47,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0207-001764",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0015 + 000 - K0015 + 429",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 27456000,
      "lengthKm": 0.429,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 64000000.0,
      "lengthMeters": 429.0,
      "allocationPerStatedMeter": 64000.0,
      "rangesMeters": [
        [
          15000.0,
          15429.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0015 + 000 - K0015 + 429",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 1.23,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0164-001016",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Jct DS Benedicto-Spur 16-Calatrava Rd - K0075 + 174 - K0076 + 512",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 27346000,
      "lengthKm": 1.338,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20437967.12,
      "lengthMeters": 1338.0,
      "allocationPerStatedMeter": 20437.97,
      "rangesMeters": [
        [
          75174.0,
          76512.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Jct DS Benedicto-Spur 16-Calatrava Rd - K0075 + 174 - K0076 + 512",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 0.63,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0136-000505",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siquijor Circumferential Rd - K0020 + 137 - K021 + 000",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 27300000,
      "lengthKm": 0.863,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31633835.46,
      "lengthMeters": 863.0,
      "allocationPerStatedMeter": 31633.84,
      "rangesMeters": [
        [
          20137.0,
          21000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Siquijor Circumferential Rd - K0020 + 137 - K021 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.04,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0163-000986",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Jct Tawad-Balud Rd - K0040 + 019 - K0040 + 503",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 27280000,
      "lengthKm": 0.484,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 56363636.36,
      "lengthMeters": 484.0,
      "allocationPerStatedMeter": 56363.64,
      "rangesMeters": [
        [
          40019.0,
          40503.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Jct Tawad-Balud Rd - K0040 + 019 - K0040 + 503",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.42,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0278-003072",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Luyang Br. (B00006CB) along Antonio y De Pio H-way",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 27184000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Luyang Br. (B00006CB) along Antonio y De Pio H-way",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0122-000219",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dipolog-Oroquieta National Rd - K1846 + 000 - K1846 + 256",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 27183000,
      "lengthKm": 0.256,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 106183593.75,
      "lengthMeters": 256.0,
      "allocationPerStatedMeter": 106183.59,
      "rangesMeters": [
        [
          1846000.0,
          1846256.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Dipolog-Oroquieta National Rd - K1846 + 000 - K1846 + 256",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 2.28,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0242-002412",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Columbio - Lutayan - Koronadal Road (Flaring of Intersections), Sta. 1+849, Sta. 2+745, Sta. 4+546, Sta. 23+658, Sta. 23+987, Sta. 24+799, Sta. 25+606, Sta. 26+605, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 27000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "242",
      "lengthEvidence": "Columbio - Lutayan - Koronadal Road (Flaring of Intersections), Sta. 1+849, Sta. 2+745, Sta. 4+546, Sta. 23+658, Sta. 23+987, Sta. 24+799, Sta. 25+606, Sta. 26+605, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0246-002457",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Butuan City - Cagayan de Oro City - Iligan City Rd - K1364 + 870 - K1366 + 392 (Road Safety: Roadway Lighting)",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 27000000,
      "lengthKm": 1.522,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17739816.03,
      "lengthMeters": 1522.0,
      "allocationPerStatedMeter": 17739.82,
      "rangesMeters": [
        [
          1364870.0,
          1366392.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Butuan City - Cagayan de Oro City - Iligan City Rd - K1364 + 870 - K1366 + 392 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 1.48,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0279-003097",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Calingatnan Br. (B00578LT) along Ormoc-Baybay-Southern Leyte Bdry Rd",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 27000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Calingatnan Br. (B00578LT) along Ormoc-Baybay-Southern Leyte Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003227",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Makalukso Br. 1 (B02742LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 27000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Makalukso Br. 1 (B02742LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0295-003432",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Matuog Br. along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 27000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "295",
      "lengthEvidence": "Matuog Br. along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006752",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Benteng-Sapilang ,Rosario, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 27000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay Benteng-Sapilang ,Rosario, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007518",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Dumawing, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 27000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Barangay Dumawing, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009261",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Campalanas Sitio Balugo to Sitio Cadoldolan, Lazi, Siquijor",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 27000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road Barangay Campalanas Sitio Balugo to Sitio Cadoldolan, Lazi, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0457-006571",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Marine (Chainage 0+000 to Chainage 0+338), Barangay Holy Spirit, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 26980000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Rehabilitation of Road at Marine (Chainage 0+000 to Chainage 0+338), Barangay Holy Spirit, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0146-000698",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Bacolod-City Bdry Rd - K0009+306 - K0009+953, K0009+953 - K0010+024",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 26968000,
      "lengthKm": 0.718,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 37559888.58,
      "lengthMeters": 718.0,
      "allocationPerStatedMeter": 37559.89,
      "rangesMeters": [
        [
          9306.0,
          9953.0
        ],
        [
          9953.0,
          10024.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Bacolod-City Bdry Rd - K0009+306 - K0009+953, K0009+953 - K0010+024",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.57,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0268-002852",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Ihatub Br. (B00029MQ) along Marinduque Circumferential Rd",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 26910000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Ihatub Br. (B00029MQ) along Marinduque Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0271-002905",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "EDSA/Ortigas Flyover (B03314LZ) along EDSA/Ortigas Flyover",
      "office": "Central Office",
      "amountPesos": 26900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "EDSA/Ortigas Flyover (B03314LZ) along EDSA/Ortigas Flyover",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0162-000970",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Iriga City-Masoli Rd - K0474 + 000 - K0474 + 050, K0474 + 182 - K0475 + 150",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 26887000,
      "lengthKm": 1.018,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 26411591.36,
      "lengthMeters": 1018.0,
      "allocationPerStatedMeter": 26411.59,
      "rangesMeters": [
        [
          474000.0,
          474050.0
        ],
        [
          474182.0,
          475150.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Iriga City-Masoli Rd - K0474 + 000 - K0474 + 050, K0474 + 182 - K0475 + 150",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 1.0,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0197-001565",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0307 + 900 - K0308 + 383",
      "office": "Central Office",
      "amountPesos": 26879000,
      "lengthKm": 0.483,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55650103.52,
      "lengthMeters": 483.0,
      "allocationPerStatedMeter": 55650.1,
      "rangesMeters": [
        [
          307900.0,
          308383.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "197",
      "lengthEvidence": "Maharlika Highway (LZ) - K0307 + 900 - K0308 + 383",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 1.14,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0162-000961",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Albay West Coast Rd - K0498 + 150 - K0499 + 660",
      "office": "Albay 3rd District Engineering Office",
      "amountPesos": 26835000,
      "lengthKm": 1.51,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17771523.18,
      "lengthMeters": 1510.0,
      "allocationPerStatedMeter": 17771.52,
      "rangesMeters": [
        [
          498150.0,
          499660.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Albay West Coast Rd - K0498 + 150 - K0499 + 660",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 0.55,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0172-001151",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Dobleston-Butadon Rd - K2008 + 000 - K2008 + 924",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 26800000,
      "lengthKm": 0.924,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29004329.0,
      "lengthMeters": 924.0,
      "allocationPerStatedMeter": 29004.33,
      "rangesMeters": [
        [
          2008000.0,
          2008924.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "172",
      "lengthEvidence": "Dobleston-Butadon Rd - K2008 + 000 - K2008 + 924",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.91,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0265-002785",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Badoc Br. (B00564LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 26750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Badoc Br. (B00564LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0170-001119",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - (S06317LZ) Chainage 19452 - Chainage 20752",
      "office": "Camarines Norte District Engineering Office",
      "amountPesos": 26712000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - (S06317LZ) Chainage 19452 - Chainage 20752",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0185-001364",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Ubao-Taang Road - K0399 + (-179) - K0399 + (-120), K0399 + (-034) - K0399 + 000, K0416 + 751 - K0416 + 819, K0416 + 915 - K0416 + 945, K0418 + 826 - K0418 + 859, K0425 + (-008) - K0425 + 066, K0425 + 087 - K0425 + 123, K0425 + 134 - K0425 + 184, K0425 + 205 - K0425 + 387",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 26700000,
      "lengthKm": 0.566,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 47173144.88,
      "lengthMeters": 566.0,
      "allocationPerStatedMeter": 47173.14,
      "rangesMeters": [
        [
          398821.0,
          398880.0
        ],
        [
          398966.0,
          399000.0
        ],
        [
          416751.0,
          416819.0
        ],
        [
          416915.0,
          416945.0
        ],
        [
          418826.0,
          418859.0
        ],
        [
          424992.0,
          425066.0
        ],
        [
          425087.0,
          425123.0
        ],
        [
          425134.0,
          425184.0
        ],
        [
          425205.0,
          425387.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "185",
      "lengthEvidence": "Ubao-Taang Road - K0399 + (-179) - K0399 + (-120), K0399 + (-034) - K0399 + 000, K0416 + 751 - K0416 + 819, K0416 + 915 - K0416 + 945, K0418 + 826 - K0418 + 859, K0425 + (-008) - K0425 + 066, K0425 + 087 - K0425 + 123, K0425 + 134 - K0425 + 184, K0425 + 205 - K0425 + 387",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 0.51,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0269-002881",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Merida Br. (B00212LT) along Palompon-Isabel-Merida-Ormoc Rd",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 26690000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Merida Br. (B00212LT) along Palompon-Isabel-Merida-Ormoc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0208-001776",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0020 + 352 - K0020 + 885",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 26650000,
      "lengthKm": 0.533,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 533.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          20352.0,
          20885.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0020 + 352 - K0020 + 885",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 0.96,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0209-001800",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Aklan West Rd (Kalibo-Nabas) (S00324PN) - K0240 + 739 - K0241 + 248",
      "office": "Aklan District Engineering Office",
      "amountPesos": 26650000,
      "lengthKm": 0.509,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52357563.85,
      "lengthMeters": 509.0,
      "allocationPerStatedMeter": 52357.56,
      "rangesMeters": [
        [
          240739.0,
          241248.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "Aklan West Rd (Kalibo-Nabas) (S00324PN) - K0240 + 739 - K0241 + 248",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 1.01,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0145-000683",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Bagong Silang-Capalonga Rd - K0309 + 776 - K0310 + 1034.55",
      "office": "Camarines Norte District Engineering Office",
      "amountPesos": 26615000,
      "lengthKm": 1.2585499999999883,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21147352.11,
      "lengthMeters": 1258.55,
      "allocationPerStatedMeter": 21147.35,
      "rangesMeters": [
        [
          309776.0,
          311034.55
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Bagong Silang-Capalonga Rd - K0309 + 776 - K0310 + 1034.55",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.88,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0162-000963",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Albay West Coast Rd - K0557 + 855 - K0559 + 249",
      "office": "Albay 3rd District Engineering Office",
      "amountPesos": 26609000,
      "lengthKm": 1.394,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19088235.29,
      "lengthMeters": 1394.0,
      "allocationPerStatedMeter": 19088.24,
      "rangesMeters": [
        [
          557855.0,
          559249.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Albay West Coast Rd - K0557 + 855 - K0559 + 249",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 0.59,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0128-000347",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "PPTA Rd - K0025 + 000 - K0025 + 510, K0028 + 532 - K0028 + 960.70",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 26590000,
      "lengthKm": 0.9387000000000008,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 28326408.86,
      "lengthMeters": 938.7,
      "allocationPerStatedMeter": 28326.41,
      "rangesMeters": [
        [
          25000.0,
          25510.0
        ],
        [
          28532.0,
          28960.7
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "PPTA Rd - K0025 + 000 - K0025 + 510, K0028 + 532 - K0028 + 960.70",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.93,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0276-003034",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Punta Tabuc Br. (B00491PN) along Roxas City-Cagay-Sibaguan-Balijuagan-Cudian- Ivisan Rd",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 26500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Punta Tabuc Br. (B00491PN) along Roxas City-Cagay-Sibaguan-Balijuagan-Cudian- Ivisan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0612-009895",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, from Barangay Abaga (Purok Camanse) to Barangay Maranding, Sta. 0+000 - Sta. 1+300, Lala, Lanao del Norte",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 26500000,
      "lengthKm": 1.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20384615.38,
      "lengthMeters": 1300.0,
      "allocationPerStatedMeter": 20384.62,
      "rangesMeters": [
        [
          0.0,
          1300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Road, from Barangay Abaga (Purok Camanse) to Barangay Maranding, Sta. 0+000 - Sta. 1+300, Lala, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.82,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0452-006475",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads and Drainage System along Diamond Rd., Barangay 166 to Barangay 167 (C0+000 to C0+327) and Section Reblocking along (C0+327 to C0+460), Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 26400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "452",
      "lengthEvidence": "Construction of Roads and Drainage System along Diamond Rd., Barangay 166 to Barangay 167 (C0+000 to C0+327) and Section Reblocking along (C0+327 to C0+460), Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0134-000465",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sta Rosa-Ulat-Tagaytay Rd - K0062 + 671 - K0062 + 761, K0063 + 831 - K0063 + 878, K0069 + 027 - K0069 + 077, K0069 + 167 - K0069 + 238, K0069 + 240 - K0069 + 370, K0069 + 561 - K0069 +584",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 26302000,
      "lengthKm": 0.411,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 63995133.82,
      "lengthMeters": 411.0,
      "allocationPerStatedMeter": 63995.13,
      "rangesMeters": [
        [
          62671.0,
          62761.0
        ],
        [
          63831.0,
          63878.0
        ],
        [
          69027.0,
          69077.0
        ],
        [
          69167.0,
          69238.0
        ],
        [
          69240.0,
          69370.0
        ],
        [
          69561.0,
          69584.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Sta Rosa-Ulat-Tagaytay Rd - K0062 + 671 - K0062 + 761, K0063 + 831 - K0063 + 878, K0069 + 027 - K0069 + 077, K0069 + 167 - K0069 + 238, K0069 + 240 - K0069 + 370, K0069 + 561 - K0069 +584",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.98,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0185-001373",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0420 + 883 - K0420 + 933, K0421 + 055 - K0421 + 091, K0421 + 269 - K0421 + 357, K0421 + 880 - K0421 + 910",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 26220000,
      "lengthKm": 0.204,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 128529411.76,
      "lengthMeters": 204.0,
      "allocationPerStatedMeter": 128529.41,
      "rangesMeters": [
        [
          420883.0,
          420933.0
        ],
        [
          421055.0,
          421091.0
        ],
        [
          421269.0,
          421357.0
        ],
        [
          421880.0,
          421910.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "185",
      "lengthEvidence": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0420 + 883 - K0420 + 933, K0421 + 055 - K0421 + 091, K0421 + 269 - K0421 + 357, K0421 + 880 - K0421 + 910",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 0.74,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0247-002475",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Asin Rd - K0305 + (-564) - K0306 + 508 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Central Office",
      "amountPesos": 26175000,
      "lengthKm": 2.072,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12632722.01,
      "lengthMeters": 2072.0,
      "allocationPerStatedMeter": 12632.72,
      "rangesMeters": [
        [
          304436.0,
          306508.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "Asin Rd - K0305 + (-564) - K0306 + 508 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.22,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0184-001359",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Kiangan-Tinoc-Buguias Rd - K0343 + 757 - K0343 + 804, K0346 + 547 - K0346 + 566, K0348 + 117 - K0348 + 191",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 26125000,
      "lengthKm": 0.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 186607142.86,
      "lengthMeters": 140.0,
      "allocationPerStatedMeter": 186607.14,
      "rangesMeters": [
        [
          343757.0,
          343804.0
        ],
        [
          346547.0,
          346566.0
        ],
        [
          348117.0,
          348191.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Kiangan-Tinoc-Buguias Rd - K0343 + 757 - K0343 + 804, K0346 + 547 - K0346 + 566, K0348 + 117 - K0348 + 191",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 1.07,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0184-001356",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Banaue-Hungduan-Benguet Bdry Rd -K0364+631-K0364+647, K0372 + 511 - K0372 + 536, K0376 + 549 - K0376 + 570, K0376 + 652 - K0376 + 670, K0376 + 694 - K0376 + 724",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 26100000,
      "lengthKm": 0.11,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 237272727.27,
      "lengthMeters": 110.0,
      "allocationPerStatedMeter": 237272.73,
      "rangesMeters": [
        [
          364631.0,
          364647.0
        ],
        [
          372511.0,
          372536.0
        ],
        [
          376549.0,
          376570.0
        ],
        [
          376652.0,
          376670.0
        ],
        [
          376694.0,
          376724.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Banaue-Hungduan-Benguet Bdry Rd -K0364+631-K0364+647, K0372 + 511 - K0372 + 536, K0376 + 549 - K0376 + 570, K0376 + 652 - K0376 + 670, K0376 + 694 - K0376 + 724",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.64,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0289-003314",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Sangbay Parallel Br. along Cordon-Aurora Bdry Rd (Jct Dumabato-Aurora Bdry)",
      "office": "Quirino District Engineering Office",
      "amountPesos": 26100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Sangbay Parallel Br. along Cordon-Aurora Bdry Rd (Jct Dumabato-Aurora Bdry)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0489-007256",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Drainage Structure, Barangay District 3, Tumauini, Isabela (Sta. 0+000 - Sta. 0+980)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 26100000,
      "lengthKm": 0.98,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26632653.06,
      "lengthMeters": 980.0,
      "allocationPerStatedMeter": 26632.65,
      "rangesMeters": [
        [
          0.0,
          980.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of Road including Drainage Structure, Barangay District 3, Tumauini, Isabela (Sta. 0+000 - Sta. 0+980)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.37,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0163-000990",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0016 + 066 - K0016 + 416, K0016 + 644 - K0016 + 722",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 26057000,
      "lengthKm": 0.428,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 60880841.12,
      "lengthMeters": 428.0,
      "allocationPerStatedMeter": 60880.84,
      "rangesMeters": [
        [
          16066.0,
          16416.0
        ],
        [
          16644.0,
          16722.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0016 + 066 - K0016 + 416, K0016 + 644 - K0016 + 722",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.53,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0165-001022",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Loay Interior Rd - K0187 + 000 - K0188 + 200",
      "office": "Bohol 3rd District Engineering Office",
      "amountPesos": 26050000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21708333.33,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 21708.33,
      "rangesMeters": [
        [
          187000.0,
          188200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Loay Interior Rd - K0187 + 000 - K0188 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 0.82,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0119-000164",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Sta. Rosa - Tarlac Rd - K0120+296 - K0121+510 Start: 15.4469474, 120.8193798 End: 15.4482286, 120.8081534",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": 1.214,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21416803.95,
      "lengthMeters": 1214.0,
      "allocationPerStatedMeter": 21416.8,
      "rangesMeters": [
        [
          120296.0,
          121510.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Sta. Rosa - Tarlac Rd - K0120+296 - K0121+510 Start: 15.4469474, 120.8193798 End: 15.4482286, 120.8081534",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 0.55,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0131-000389",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Olongapo-Bugallon Rd - K0153+691 - K0154+643",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": 0.952,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27310924.37,
      "lengthMeters": 952.0,
      "allocationPerStatedMeter": 27310.92,
      "rangesMeters": [
        [
          153691.0,
          154643.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Olongapo-Bugallon Rd - K0153+691 - K0154+643",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.9,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0171-001138",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Dancalan-Candoni-Damutan Valley Rd - K0147 + 715 - K0147 + 775",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": 0.06,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 433333333.33,
      "lengthMeters": 60.0,
      "allocationPerStatedMeter": 433333.33,
      "rangesMeters": [
        [
          147715.0,
          147775.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Dancalan-Candoni-Damutan Valley Rd - K0147 + 715 - K0147 + 775",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 8.0,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0179-001255",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kalinga-Abra Rd - K0465 + 736 - K0465 + 772, K0467 + 432 - K0467 + 463, K0468 + 403 - K0468 + 419, K0468+912 - K0468+976, K0476 + 221 - K0476 + 244, K0476 + 502 - K0476 + 526",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": 0.194,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 134020618.56,
      "lengthMeters": 194.0,
      "allocationPerStatedMeter": 134020.62,
      "rangesMeters": [
        [
          465736.0,
          465772.0
        ],
        [
          467432.0,
          467463.0
        ],
        [
          468403.0,
          468419.0
        ],
        [
          468912.0,
          468976.0
        ],
        [
          476221.0,
          476244.0
        ],
        [
          476502.0,
          476526.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "Kalinga-Abra Rd - K0465 + 736 - K0465 + 772, K0467 + 432 - K0467 + 463, K0468 + 403 - K0468 + 419, K0468+912 - K0468+976, K0476 + 221 - K0476 + 244, K0476 + 502 - K0476 + 526",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 0.71,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0183-001340",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Sn Fernando-Bagulin Rd - K0284 + 770 - K0284 + 822",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": 0.052,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 500000000.0,
      "lengthMeters": 52.0,
      "allocationPerStatedMeter": 500000.0,
      "rangesMeters": [
        [
          284770.0,
          284822.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Sn Fernando-Bagulin Rd - K0284 + 770 - K0284 + 822",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 1.34,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0186-001388",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0925 + 1078 - K0925 + 1208",
      "office": "Leyte 1st District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": 0.13,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 200000000.0,
      "lengthMeters": 130.0,
      "allocationPerStatedMeter": 200000.0,
      "rangesMeters": [
        [
          926078.0,
          926208.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0925 + 1078 - K0925 + 1208",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.54,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0209-001809",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Biliran Circumferential Rd - K1068 + 159 - K1068 + 585",
      "office": "Biliran District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": 0.426,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 61032863.85,
      "lengthMeters": 426.0,
      "allocationPerStatedMeter": 61032.86,
      "rangesMeters": [
        [
          1068159.0,
          1068585.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "Biliran Circumferential Rd - K1068 + 159 - K1068 + 585",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 1.18,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0291-003353",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Hibulangan Br. 2 (B00169LT) along Sto Rosario-Villaba Rd",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Hibulangan Br. 2 (B00169LT) along Sto Rosario-Villaba Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0451-006455",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage along Tanigue St., (C 0+000 - C 0+180), Barangay 14, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Rehabilitation of Roads and Drainage along Tanigue St., (C 0+000 - C 0+180), Barangay 14, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0488-007244",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Paved Road including Construction of Drainage Structure along Road and Construction of Road Slope Protection Structure, Barangay Naguilian Sur to Barangay Lullutan, City of Ilagan, Isabela (Sta. 0+000 - Sta. 0+970)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": 0.97,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26804123.71,
      "lengthMeters": 970.0,
      "allocationPerStatedMeter": 26804.12,
      "rangesMeters": [
        [
          0.0,
          970.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Rehabilitation of Paved Road including Construction of Drainage Structure along Road and Construction of Road Slope Protection Structure, Barangay Naguilian Sur to Barangay Lullutan, City of Ilagan, Isabela (Sta. 0+000 - Sta. 0+970)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.38,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0499-007459",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+950, Barangay Mapalad - Barangay Bautista, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": 1.95,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1950.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          1950.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+950, Barangay Mapalad - Barangay Bautista, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.55,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0499-007474",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+930, Barangay Sagana - Barangay Nabbuan, Santiago City, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": 1.93,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13471502.59,
      "lengthMeters": 1930.0,
      "allocationPerStatedMeter": 13471.5,
      "rangesMeters": [
        [
          0.0,
          1930.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+930, Barangay Sagana - Barangay Nabbuan, Santiago City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.56,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0505-007607",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bayanihan-Quirino Provincial Road, Maria Aurora, Aurora",
      "office": "Aurora District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Bayanihan-Quirino Provincial Road, Maria Aurora, Aurora",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0509-007685",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Dampol Old Road, Sta. 0+000 - Sta. 1+000, Pulilan, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 26000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Rehabilitation of Dampol Old Road, Sta. 0+000 - Sta. 1+000, Pulilan, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.04,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0525-008018",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Camuning Local Road leading to old underpass, Barangay Camuning, Mexico, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Concreting of Barangay Camuning Local Road leading to old underpass, Barangay Camuning, Mexico, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0535-008231",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Amungan, Iba, Zambales",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Construction of Road, Barangay Amungan, Iba, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008426",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge (FB60003LZ) along Daang Hari Road connecting Barangay Pasong Buaya 1 - Barangay Pasong Buaya 2, Imus, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Construction of Bridge (FB60003LZ) along Daang Hari Road connecting Barangay Pasong Buaya 1 - Barangay Pasong Buaya 2, Imus, Cavite",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0544-008427",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge along Daang Hari Road, Barangay Pasong Buaya 2, Imus, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Bridge along Daang Hari Road, Barangay Pasong Buaya 2, Imus, Cavite",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009260",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Campalanas Sitio Cadoldolan, Lazi, Siquijor",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road Barangay Campalanas Sitio Cadoldolan, Lazi, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0612-009896",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, from Barangay Maranding to Barangay Rebe, Sta. 0+260 - Sta. 1+050, Lala, Lanao del Norte",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 26000000,
      "lengthKm": 0.79,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32911392.41,
      "lengthMeters": 790.0,
      "allocationPerStatedMeter": 32911.39,
      "rangesMeters": [
        [
          260.0,
          1050.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Road, from Barangay Maranding to Barangay Rebe, Sta. 0+260 - Sta. 1+050, Lala, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.69,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0247-002483",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "South Drive - K0251 + (-297) - K0252 + 766 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Central Office",
      "amountPesos": 25998000,
      "lengthKm": 2.063,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12602035.87,
      "lengthMeters": 2063.0,
      "allocationPerStatedMeter": 12602.04,
      "rangesMeters": [
        [
          250703.0,
          252766.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "South Drive - K0251 + (-297) - K0252 + 766 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.22,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0162-000979",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Sn Fernando North Rd - K0014 + 855 - K0015 + 077",
      "office": "Masbate 1st District Engineering Office",
      "amountPesos": 25930000,
      "lengthKm": 0.222,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 116801801.8,
      "lengthMeters": 222.0,
      "allocationPerStatedMeter": 116801.8,
      "rangesMeters": [
        [
          14855.0,
          15077.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Sn Fernando North Rd - K0014 + 855 - K0015 + 077",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 2.15,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0221-002029",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Daraga Urban Tourism Eco Route Project, Sta. 525+991.30 - Sta. 526+131.90, Barangay Tagas - Barangay Kilicao Daraga, Albay",
      "office": "Central Office",
      "amountPesos": 25905000,
      "lengthKm": 0.14059999999997672,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 184246088.19,
      "lengthMeters": 140.6,
      "allocationPerStatedMeter": 184246.09,
      "rangesMeters": [
        [
          525991.3,
          526131.9
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "221",
      "lengthEvidence": "Daraga Urban Tourism Eco Route Project, Sta. 525+991.30 - Sta. 526+131.90, Barangay Tagas - Barangay Kilicao Daraga, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.88,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0493-007337",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Caraniogan, San Manuel, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 25900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road, Barangay Caraniogan, San Manuel, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0209-001804",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Jct (LIR) Buenavista-Carmen-Danao-Jetafe Rd - K0174 + 000 - K0174 + 468",
      "office": "Bohol 2nd District Engineering Office",
      "amountPesos": 25890000,
      "lengthKm": 0.468,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55320512.82,
      "lengthMeters": 468.0,
      "allocationPerStatedMeter": 55320.51,
      "rangesMeters": [
        [
          174000.0,
          174468.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "Jct (LIR) Buenavista-Carmen-Danao-Jetafe Rd - K0174 + 000 - K0174 + 468",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 1.07,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0259-002657",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Hinagbungan Br. (B00355SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "office": "Central Office",
      "amountPesos": 25860000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Hinagbungan Br. (B00355SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0132-000433",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0060 + 000 - K0060 + 692, K0061 + 193 - K0061 + 660",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 25813000,
      "lengthKm": 1.159,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22271786.02,
      "lengthMeters": 1159.0,
      "allocationPerStatedMeter": 22271.79,
      "rangesMeters": [
        [
          60000.0,
          60692.0
        ],
        [
          61193.0,
          61660.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0060 + 000 - K0060 + 692, K0061 + 193 - K0061 + 660",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.72,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0245-002437",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Bacolod North Road (S00406NR) K0042 + 280 - K0045 + 000 (Road Safety: Roadway Lighting)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 25800000,
      "lengthKm": 2.72,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9485294.12,
      "lengthMeters": 2720.0,
      "allocationPerStatedMeter": 9485.29,
      "rangesMeters": [
        [
          42280.0,
          45000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Bacolod North Road (S00406NR) K0042 + 280 - K0045 + 000 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.79,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0144-000673",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Balagtas Blvd - (S05782LZ) Chainage 000 - Chainage 727",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 25770000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Balagtas Blvd - (S05782LZ) Chainage 000 - Chainage 727",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007347",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Cagurungan, Barangay Eden, San Manuel, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 25730000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road, Sitio Cagurungan, Barangay Eden, San Manuel, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0136-000503",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siquijor Circumferential Rd - K0014 + 174 - K0015 + 000",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 25700000,
      "lengthKm": 0.826,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31113801.45,
      "lengthMeters": 826.0,
      "allocationPerStatedMeter": 31113.8,
      "rangesMeters": [
        [
          14174.0,
          15000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Siquijor Circumferential Rd - K0014 + 174 - K0015 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 1.02,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0208-001783",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0056 + 500 - K0057 + 000",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 25700000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51400000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 51400.0,
      "rangesMeters": [
        [
          56500.0,
          57000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0056 + 500 - K0057 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 0.99,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0549-008561",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Argosino Bridge and Approaches, STA 005+835 - STA 005+851, Quezon, Quezon, Phase II",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 25600000,
      "lengthKm": 0.016,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1600000000.0,
      "lengthMeters": 16.0,
      "allocationPerStatedMeter": 1600000.0,
      "rangesMeters": [
        [
          5835.0,
          5851.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Barangay Argosino Bridge and Approaches, STA 005+835 - STA 005+851, Quezon, Quezon, Phase II",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 1.13,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0624-010147",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Lilit, Lambayong, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 25560000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Construction of Concrete Road, Barangay Lilit, Lambayong, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0625-010158",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok Terecita, Barangay Kolambog, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 25560000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Concrete Road, Purok Terecita, Barangay Kolambog, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0122-000221",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1852 + 000 - K1853 + 580",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 25512000,
      "lengthKm": 1.58,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16146835.44,
      "lengthMeters": 1580.0,
      "allocationPerStatedMeter": 16146.84,
      "rangesMeters": [
        [
          1852000.0,
          1853580.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1852 + 000 - K1853 + 580",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.43,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0276-003028",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Iwahig Parallel Bridge (B00405PW) along Puerto Princesa South Rd",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 25500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Iwahig Parallel Bridge (B00405PW) along Puerto Princesa South Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009072",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Bridge, Barangay Daja, Maasin, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 25500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Concrete Bridge, Barangay Daja, Maasin, Iloilo",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0122-000227",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Linamon-Zamboanga Rd - K1604 + 000 - K1604 + 502",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 25421000,
      "lengthKm": 0.502,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50639442.23,
      "lengthMeters": 502.0,
      "allocationPerStatedMeter": 50639.44,
      "rangesMeters": [
        [
          1604000.0,
          1604502.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Linamon-Zamboanga Rd - K1604 + 000 - K1604 + 502",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 1.06,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0457-006559",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Mangga St. (C 0+000 - C 0+509), Barangay 179, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 25400000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Mangga St. (C 0+000 - C 0+509), Barangay 179, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0263-002754",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Libas Br. (B00088LT) along Lemon-Leyte-Biliran Rd",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 25308000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Libas Br. (B00088LT) along Lemon-Leyte-Biliran Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0259-002667",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Nailong Br. 1 (B00610LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 25300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Nailong Br. 1 (B00610LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0241-002393",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
      "office": "Abra District Engineering Office",
      "amountPesos": 25284000,
      "lengthKm": 0.86,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29400000.0,
      "lengthMeters": 860.0,
      "allocationPerStatedMeter": 29400.0,
      "rangesMeters": [
        [
          17340.0,
          18200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 0.3,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0200-001614",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Palo-Carigara-Ormoc Rd - K0973 + 612 - K0974 + 543",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 25245000,
      "lengthKm": 0.931,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27116004.3,
      "lengthMeters": 931.0,
      "allocationPerStatedMeter": 27116.0,
      "rangesMeters": [
        [
          973612.0,
          974543.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Palo-Carigara-Ormoc Rd - K0973 + 612 - K0974 + 543",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 0.56,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0292-003379",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "New Camiling Parallel Br. along Saturnino R. Silva Rd",
      "office": "Davao del Norte 2nd District Engineering Office",
      "amountPesos": 25200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "New Camiling Parallel Br. along Saturnino R. Silva Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0488-007234",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sta. 3+170 - Sta. 5+270) at Barangay Villa Imelda, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 25200000,
      "lengthKm": 2.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12000000.0,
      "lengthMeters": 2100.0,
      "allocationPerStatedMeter": 12000.0,
      "rangesMeters": [
        [
          3170.0,
          5270.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Construction of Concrete Road (Sta. 3+170 - Sta. 5+270) at Barangay Villa Imelda, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.5,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0259-002671",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Pangi Br. (B00597LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 25168000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Pangi Br. (B00597LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0165-001020",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Loay Interior Rd - K0179 + 737 - K0181 + 000",
      "office": "Bohol 3rd District Engineering Office",
      "amountPesos": 25123000,
      "lengthKm": 1.263,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19891528.11,
      "lengthMeters": 1263.0,
      "allocationPerStatedMeter": 19891.53,
      "rangesMeters": [
        [
          179737.0,
          181000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Loay Interior Rd - K0179 + 737 - K0181 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 0.61,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0145-000690",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Tapaz-Jamindan-Altavaz Rd - K0091+008 - K0092 + 000, K0097 + 000 - K0097+452",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 25119000,
      "lengthKm": 1.444,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 17395429.36,
      "lengthMeters": 1444.0,
      "allocationPerStatedMeter": 17395.43,
      "rangesMeters": [
        [
          91008.0,
          92000.0
        ],
        [
          97000.0,
          97452.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Tapaz-Jamindan-Altavaz Rd - K0091+008 - K0092 + 000, K0097 + 000 - K0097+452",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 0.81,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0121-000214",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0062 + 000 - K0063 + 000",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          62000.0,
          63000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0062 + 000 - K0063 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 0.54,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0131-000410",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Lipa City - Alaminos Rd - K0088 + 779 - K0089 + 673",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.894,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27964205.82,
      "lengthMeters": 894.0,
      "allocationPerStatedMeter": 27964.21,
      "rangesMeters": [
        [
          88779.0,
          89673.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Lipa City - Alaminos Rd - K0088 + 779 - K0089 + 673",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.92,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0153-000824",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway – K0135 + 596 – K0135 + 990",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.394,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 63451776.65,
      "lengthMeters": 394.0,
      "allocationPerStatedMeter": 63451.78,
      "rangesMeters": [
        [
          135596.0,
          135990.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Maharlika Highway – K0135 + 596 – K0135 + 990",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 2.21,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0158-000917",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Baguio-Bontoc Rd K0322+800 - K0323+300",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          322800.0,
          323300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "Baguio-Bontoc Rd K0322+800 - K0323+300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.26,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0164-001003",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Iloilo East Coast-Capiz Rd - K0217+017 - K0217 + 840",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.823,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30376670.72,
      "lengthMeters": 823.0,
      "allocationPerStatedMeter": 30376.67,
      "rangesMeters": [
        [
          217017.0,
          217840.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Iloilo East Coast-Capiz Rd - K0217+017 - K0217 + 840",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 0.92,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0167-001070",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Gov. T. Santiago (S02206LZ) K0018 + 819 - K0017 + 083",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.736,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14400921.66,
      "lengthMeters": 1736.0,
      "allocationPerStatedMeter": 14400.92,
      "rangesMeters": [
        [
          17083.0,
          18819.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Gov. T. Santiago (S02206LZ) K0018 + 819 - K0017 + 083",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 0.64,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0170-001121",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Pili-Tigaon-Albay Rd, K0454 + (-1044) - K0454 + (-663)",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.381,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 65616797.9,
      "lengthMeters": 381.0,
      "allocationPerStatedMeter": 65616.8,
      "rangesMeters": [
        [
          452956.0,
          453337.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Pili-Tigaon-Albay Rd, K0454 + (-1044) - K0454 + (-663)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 2.06,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0180-001276",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0035 + 861 - K0035 + 912",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.051,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 490196078.43,
      "lengthMeters": 51.0,
      "allocationPerStatedMeter": 490196.08,
      "rangesMeters": [
        [
          35861.0,
          35912.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Puerto Princesa South Rd - K0035 + 861 - K0035 + 912",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 0.78,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0180-001286",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Cebu-Balamban Transcentral Highway - K0025 + 010 - K0025 + 060",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 500000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 500000.0,
      "rangesMeters": [
        [
          25010.0,
          25060.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Cebu-Balamban Transcentral Highway - K0025 + 010 - K0025 + 060",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0180-001287",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Cebu-Balamban Transcentral Highway - K0030 + (-840) - K0030 + (-800)",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.04,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 625000000.0,
      "lengthMeters": 40.0,
      "allocationPerStatedMeter": 625000.0,
      "rangesMeters": [
        [
          29160.0,
          29200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Cebu-Balamban Transcentral Highway - K0030 + (-840) - K0030 + (-800)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0181-001293",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Lemon-Leyte-Biliran Rd - K0996 + 050 - K0996 + 115, K1002 + 600 - K1002 + 740",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.205,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 121951219.51,
      "lengthMeters": 205.0,
      "allocationPerStatedMeter": 121951.22,
      "rangesMeters": [
        [
          996050.0,
          996115.0
        ],
        [
          1002600.0,
          1002740.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Lemon-Leyte-Biliran Rd - K0996 + 050 - K0996 + 115, K1002 + 600 - K1002 + 740",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 0.64,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0181-001301",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Asuncion-San Isidro-Laak-Veruela Rd - K1513 + 000 - K1513 + 050",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 500000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 500000.0,
      "rangesMeters": [
        [
          1513000.0,
          1513050.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Asuncion-San Isidro-Laak-Veruela Rd - K1513 + 000 - K1513 + 050",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0186-001384",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Logac-Lasam-Gagabutan Rd - K0742 + 318 - K0742 + 378",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.06,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 416666666.67,
      "lengthMeters": 60.0,
      "allocationPerStatedMeter": 416666.67,
      "rangesMeters": [
        [
          742318.0,
          742378.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Jct Logac-Lasam-Gagabutan Rd - K0742 + 318 - K0742 + 378",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 1.12,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0208-001784",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0057 + 000 - K0057 + 500",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          57000.0,
          57500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0057 + 000 - K0057 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 0.96,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0242-002402",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Taal Lake Circumferential Road (Agoncillo Section), Agoncillo, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "242",
      "lengthEvidence": "Taal Lake Circumferential Road (Agoncillo Section), Agoncillo, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0245-002440",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Dumaguete South Rd - K0043 + 000 - K0045 + 000 (Road Safety: Roadway Lighting)",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12500000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 12500.0,
      "rangesMeters": [
        [
          43000.0,
          45000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Dumaguete South Rd - K0043 + 000 - K0045 + 000 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 1.04,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0246-002454",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Construction of Pedestrian Overpass at Ozamiz - Oroquieta Rd - K1703 + 124",
      "office": "Misamis Occidental 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Construction of Pedestrian Overpass at Ozamiz - Oroquieta Rd - K1703 + 124",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0246-002455",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Construction of Pedestrian Overpass a t Ozamiz - Pagadian Rd - K1686 + 538",
      "office": "Misamis Occidental 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Construction of Pedestrian Overpass a t Ozamiz - Pagadian Rd - K1686 + 538",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0246-002462",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd., K1460 + 000 - K1461 + 885l (Road Safety: Roadway Lighting)",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.885,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13262599.47,
      "lengthMeters": 1885.0,
      "allocationPerStatedMeter": 13262.6,
      "rangesMeters": [
        [
          1460000.0,
          1461885.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd., K1460 + 000 - K1461 + 885l (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 1.1,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0246-002466",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Surigao-Davao Coastal Rd - K1816+900 (Road Safety: Pedestrian Overpass)",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Surigao-Davao Coastal Rd - K1816+900 (Road Safety: Pedestrian Overpass)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0249-002507",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0033 + 493 - K0033 + 758, K0033 + 788 - K0035 + 117, K0035 + 125 - K0035 + 832, K0047 + 944 - K0049 + 976, K0049 + 1026 - K0050 + 136",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 4.443,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 5626828.72,
      "lengthMeters": 4443.0,
      "allocationPerStatedMeter": 5626.83,
      "rangesMeters": [
        [
          33493.0,
          33758.0
        ],
        [
          33788.0,
          35117.0
        ],
        [
          35125.0,
          35832.0
        ],
        [
          47944.0,
          49976.0
        ],
        [
          50026.0,
          50136.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "249",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0033 + 493 - K0033 + 758, K0033 + 788 - K0035 + 117, K0035 + 125 - K0035 + 832, K0047 + 944 - K0049 + 976, K0049 + 1026 - K0050 + 136",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.54,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0249-002508",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0051+273 - K0053+680",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 2.407,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10386373.08,
      "lengthMeters": 2407.0,
      "allocationPerStatedMeter": 10386.37,
      "rangesMeters": [
        [
          51273.0,
          53680.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "249",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0051+273 - K0053+680",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.0,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0249-002509",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0016 +833 - K0018 + 876, K0018 + 921 - K0021 + 000, K0022 + 926 - K0023 + 790",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 4.986,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 5014039.31,
      "lengthMeters": 4986.0,
      "allocationPerStatedMeter": 5014.04,
      "rangesMeters": [
        [
          16833.0,
          18876.0
        ],
        [
          18921.0,
          21000.0
        ],
        [
          22926.0,
          23790.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "249",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0016 +833 - K0018 + 876, K0018 + 921 - K0021 + 000, K0022 + 926 - K0023 + 790",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.48,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0249-002510",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0056+125-K0058+551",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 2.426,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10305028.85,
      "lengthMeters": 2426.0,
      "allocationPerStatedMeter": 10305.03,
      "rangesMeters": [
        [
          56125.0,
          58551.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "249",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0056+125-K0058+551",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.0,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0249-002511",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0058+551 - K0060+956",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 2.405,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10395010.4,
      "lengthMeters": 2405.0,
      "allocationPerStatedMeter": 10395.01,
      "rangesMeters": [
        [
          58551.0,
          60956.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "249",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0058+551 - K0060+956",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.0,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0250-002512",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0060+956 - K0063+381",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 2.425,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10309278.35,
      "lengthMeters": 2425.0,
      "allocationPerStatedMeter": 10309.28,
      "rangesMeters": [
        [
          60956.0,
          63381.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "250",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Iloilo- Antique Rd - K0060+956 - K0063+381",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 1.0,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0251-002539",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Gingoog- Claveria- Villanueva Rd- K1339 + 884 - K1341 + 283 (Road Safety: Roadway Lighting)",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.399,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17869907.08,
      "lengthMeters": 1399.0,
      "allocationPerStatedMeter": 17869.91,
      "rangesMeters": [
        [
          1339884.0,
          1341283.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Gingoog- Claveria- Villanueva Rd- K1339 + 884 - K1341 + 283 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 1.41,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0254-002573",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal- Igbaras-Tubungan-Leon Rd - K0043 + 262 - K0046 + 638",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 3.376,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 7405213.27,
      "lengthMeters": 3376.0,
      "allocationPerStatedMeter": 7405.21,
      "rangesMeters": [
        [
          43262.0,
          46638.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "254",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal- Igbaras-Tubungan-Leon Rd - K0043 + 262 - K0046 + 638",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.75,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0254-002574",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal- Tubungan Rd - K0029+000 - K0032 + 087",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 3.087,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8098477.49,
      "lengthMeters": 3087.0,
      "allocationPerStatedMeter": 8098.48,
      "rangesMeters": [
        [
          29000.0,
          32087.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "254",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal- Tubungan Rd - K0029+000 - K0032 + 087",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.82,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0254-002575",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal- Tubungan Rd - K0032+087 - K0037+589",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 5.502,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 4543802.25,
      "lengthMeters": 5502.0,
      "allocationPerStatedMeter": 4543.8,
      "rangesMeters": [
        [
          32087.0,
          37589.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "254",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal- Tubungan Rd - K0032+087 - K0037+589",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.46,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0254-002576",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal- Tubungan Rd - K0037+589 - K0040+674",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 3.085,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8103727.71,
      "lengthMeters": 3085.0,
      "allocationPerStatedMeter": 8103.73,
      "rangesMeters": [
        [
          37589.0,
          40674.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "254",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal- Tubungan Rd - K0037+589 - K0040+674",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.82,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0254-002577",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal- Igbaras-Tubungan-Leon Rd - K0058 + 000 - K0063 + 000",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 5.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 5000000.0,
      "lengthMeters": 5000.0,
      "allocationPerStatedMeter": 5000.0,
      "rangesMeters": [
        [
          58000.0,
          63000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "254",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal- Igbaras-Tubungan-Leon Rd - K0058 + 000 - K0063 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.5,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0254-002578",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Tigbauan-Cordova-Leon Rd - K0024 + 862 - K0031 + 403",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 6.541,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 3822045.56,
      "lengthMeters": 6541.0,
      "allocationPerStatedMeter": 3822.05,
      "rangesMeters": [
        [
          24862.0,
          31403.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "254",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Tigbauan-Cordova-Leon Rd - K0024 + 862 - K0031 + 403",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.39,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0260-002681",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Cadapaan Br. (B02112MN) along Marawi-Malabang Road",
      "office": "Central Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Cadapaan Br. (B02112MN) along Marawi-Malabang Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0262-002729",
      "category": "Mixed roads / bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Binwaan Bridge ( B00964LZ) along Kalinga-Abra Road",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "Binwaan Bridge ( B00964LZ) along Kalinga-Abra Road",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0262-002735",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Irrigation Br. (B01731LZ) along Plaridel-Pulilan Div Rd",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "Irrigation Br. (B01731LZ) along Plaridel-Pulilan Div Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0262-002740",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Talaba Br. (B00057MR) along Mindoro Oriental/Occidental East Coastal Rd",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "Talaba Br. (B00057MR) along Mindoro Oriental/Occidental East Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0264-002768",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Pantad Br. (B01707MN) along Zamboanga del Sur Coastal Road",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Pantad Br. (B01707MN) along Zamboanga del Sur Coastal Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003022",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Aramaywan Br. (B00080PW) along Quezon-Aramaywan Rd",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Aramaywan Br. (B00080PW) along Quezon-Aramaywan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0277-003056",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Magballo Br. (B00438NR) along Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Magballo Br. (B00438NR) along Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003089",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Macalpe Br. (B00067BR) along Naval-Caibiran Cross Country Rd",
      "office": "Biliran District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Macalpe Br. (B00067BR) along Naval-Caibiran Cross Country Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003145",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Mariano Lluch Badelles Sr. Br. (B00932MN) along Tambacan Rd-Tubod Natl H-way Jct",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Mariano Lluch Badelles Sr. Br. (B00932MN) along Tambacan Rd-Tubod Natl H-way Jct",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0290-003330",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Belmonte Br. (B00039CN) along Catanduanes Cir Rd",
      "office": "Catanduanes District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Belmonte Br. (B00039CN) along Catanduanes Cir Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0290-003336",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Cabugao Norte Br. (B00552PN) along Leganes-Sta. Barbara Rd",
      "office": "Iloilo 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Cabugao Norte Br. (B00552PN) along Leganes-Sta. Barbara Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0291-003358",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Kinayaban Parallel Br. 1 along Palompon-Isabel-Merida-Ormoc Rd",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Kinayaban Parallel Br. 1 along Palompon-Isabel-Merida-Ormoc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0295-003440",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Construction of Permanent Bridge, Barangay Yumbing, Mambajao, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "295",
      "lengthEvidence": "Construction of Permanent Bridge, Barangay Yumbing, Mambajao, Camiguin",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0438-006213",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Bagoaingud to Barangay Buenavista, Sta. 0+000 - Sta. 1+000, Balabagan, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 25000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Concreting of Road, Barangay Bagoaingud to Barangay Buenavista, Sta. 0+000 - Sta. 1+000, Balabagan, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0438-006228",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Milaya to Barangay Matampay, Kadilingan, Wao, Lanao del Sur, 7.60090322, 124.70257099",
      "office": "Central Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Construction of Road Barangay Milaya to Barangay Matampay, Kadilingan, Wao, Lanao del Sur, 7.60090322, 124.70257099",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0441-006286",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Bialan - Binidayan (Pagayawan) Road, Sta. 0+000 - Sta. 1+250, Barangay Bialan, Pagayawan, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 25000000,
      "lengthKm": 1.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 1250.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          0.0,
          1250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Road, Bialan - Binidayan (Pagayawan) Road, Sta. 0+000 - Sta. 1+250, Barangay Bialan, Pagayawan, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0449-006420",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Katarungan Village, Barangay Poblacion, Muntinlupa City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "449",
      "lengthEvidence": "Rehabilitation of Road, Katarungan Village, Barangay Poblacion, Muntinlupa City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0449-006430",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Cherry, Peach, Champagne, Orange Streets Road Network, Including Laterals, Barangay Concepcion Dos, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "449",
      "lengthEvidence": "Rehabilitation of Cherry, Peach, Champagne, Orange Streets Road Network, Including Laterals, Barangay Concepcion Dos, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0452-006482",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage Systems, Tobias St., Barangay 173, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "452",
      "lengthEvidence": "Rehabilitation of Road and Drainage Systems, Tobias St., Barangay 173, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006538",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage Systems, Greenville Subdivision, Barangay 171, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Road and Drainage Systems, Greenville Subdivision, Barangay 171, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0457-006570",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads and Drainage, Legaspi St., Barangay Payatas, Quezon City, Metro Manila",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Construction of Roads and Drainage, Legaspi St., Barangay Payatas, Quezon City, Metro Manila",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006584",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Ilang Ilang, Barangay Batasan Hills, Quezon City, Metro Manila",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Rehabilitation of Road, Ilang Ilang, Barangay Batasan Hills, Quezon City, Metro Manila",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006590",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Quirino 2-A, Quezon City",
      "office": "Quezon City 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Rehabilitation of Road, Barangay Quirino 2-A, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006591",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Local Road, Barangay Ibabang Talim, Lucena City",
      "office": "Quezon City 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Construction of Local Road, Barangay Ibabang Talim, Lucena City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006606",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Roads and Drainage System along T. San Luis St. and vicinity Sta. 0 - Sta. 375",
      "office": "South Manila District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Roads and Drainage System along T. San Luis St. and vicinity Sta. 0 - Sta. 375",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006614",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Poblacion 3, Adams, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Construction of Bridge, Barangay Poblacion 3, Adams, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006688",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bacsil-Paddagan Road, Bangui, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Bacsil-Paddagan Road, Bangui, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006719",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Caribquib, Banna, Ilocos Norte",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Road, Barangay Caribquib, Banna, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006721",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Saud, Badoc, Ilocos Norte",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Construction of Road, Barangay Saud, Badoc, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006745",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Local Access Road, Barangay Macalva Norte - Sta. Ana, Agoo, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Local Access Road, Barangay Macalva Norte - Sta. Ana, Agoo, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006759",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Inabaan Sur, Rosario, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay Inabaan Sur, Rosario, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007197",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Alituntung - Logung, Amulung, Cagayan (17.837731, 121.677524 - 17.837808, 121.678183)",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Bridge, Barangay Alituntung - Logung, Amulung, Cagayan (17.837731, 121.677524 - 17.837808, 121.678183)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007213",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Iraga to Barangay Malacabibi, Solana, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Iraga to Barangay Malacabibi, Solana, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0488-007238",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sta. 0+000 - Sta. 1+487) including Road Slope Protection Structure (Sta. 0+351 - Sta. 0+600, Sta. 1+010 - Sta. 1+305), Barangay San Ignacio to Barangay Malasin, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          1487.0
        ],
        [
          351.0,
          600.0
        ],
        [
          1010.0,
          1305.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Construction of Concrete Road (Sta. 0+000 - Sta. 1+487) including Road Slope Protection Structure (Sta. 0+351 - Sta. 0+600, Sta. 1+010 - Sta. 1+305), Barangay San Ignacio to Barangay Malasin, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0489-007252",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Ballacong - Barangay Rang-Ayan, City of Ilagan, Isabela (Sta. 0+000 - Sta. 2+660)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 2.66,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9398496.24,
      "lengthMeters": 2660.0,
      "allocationPerStatedMeter": 9398.5,
      "rangesMeters": [
        [
          0.0,
          2660.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of Concrete Road, Barangay Ballacong - Barangay Rang-Ayan, City of Ilagan, Isabela (Sta. 0+000 - Sta. 2+660)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.3,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0489-007255",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Drainage Structure, Barangay Mozzozzin Sur, Santa Maria, Isabela (Sta. 0+128 - Sta. 0+653)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.525,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 47619047.62,
      "lengthMeters": 525.0,
      "allocationPerStatedMeter": 47619.05,
      "rangesMeters": [
        [
          128.0,
          653.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of Road including Drainage Structure, Barangay Mozzozzin Sur, Santa Maria, Isabela (Sta. 0+128 - Sta. 0+653)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.95,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0491-007297",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 0+000 - Sta. 2+000), Barangay Poblacion to Barangay Minanga Sur, San Pablo, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12500000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 12500.0,
      "rangesMeters": [
        [
          0.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Road (Sta. 0+000 - Sta. 2+000), Barangay Poblacion to Barangay Minanga Sur, San Pablo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.52,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0492-007311",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads, Barangay Centro 3 to Barangay Centro 1, Luna Isabela, 16.96798399, 121.73096277",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Rehabilitation of Roads, Barangay Centro 3 to Barangay Centro 1, Luna Isabela, 16.96798399, 121.73096277",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007313",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads, Barangay Macugay to Barangay San Isidro, Luna Isabela, 17.00581613, 121.70315128",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Rehabilitation of Roads, Barangay Macugay to Barangay San Isidro, Luna Isabela, 17.00581613, 121.70315128",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007316",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Malasin to Barangay Bagnos, Aurora, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay Malasin to Barangay Bagnos, Aurora, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007323",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay San Jose Norte I, Mallig, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay San Jose Norte I, Mallig, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007324",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay San Jose Norte II, Mallig, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay San Jose Norte II, Mallig, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007334",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Kalabaza to Barangay Ballesteros, Aurora, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road at Barangay Kalabaza to Barangay Ballesteros, Aurora, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007348",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Caragsakan, Barangay Rizal, Roxas, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road, Sitio Caragsakan, Barangay Rizal, Roxas, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007359",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay San Miguel, Luna Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Rehabilitation of Road, Barangay San Miguel, Luna Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007410",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge Quinalabasa Bridge, Barangay Quinalabasa,(Sta. 0+000.00 - Sta. 0+061.00), Naguilian, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.061,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 409836065.57,
      "lengthMeters": 61.0,
      "allocationPerStatedMeter": 409836.07,
      "rangesMeters": [
        [
          0.0,
          61.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Bridge Quinalabasa Bridge, Barangay Quinalabasa,(Sta. 0+000.00 - Sta. 0+061.00), Naguilian, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 0.68,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0498-007446",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Baluarte, Santiago City, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.875,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1875.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          1875.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Baluarte, Santiago City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.55,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0498-007448",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Villa Gonzaga, Santiago City, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.875,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1875.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          1875.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Villa Gonzaga, Santiago City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.55,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0498-007449",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Bautista, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.875,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1875.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          1875.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Bautista, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.55,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0498-007456",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Lacab, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.875,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1875.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          1875.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Lacab, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.55,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0499-007461",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Santos, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.875,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1875.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          1875.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+875, Barangay Santos, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.55,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0499-007471",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sta. Isabel- Minuri Bridge, Sta. 0+000-Sta.0+150, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 166666666.67,
      "lengthMeters": 150.0,
      "allocationPerStatedMeter": 166666.67,
      "rangesMeters": [
        [
          0.0,
          150.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Sta. Isabel- Minuri Bridge, Sta. 0+000-Sta.0+150, Jones, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 0.27,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0500-007481",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads at Barangay Garit Norte, Barangay San Juan, Barangay San Antonio minit, Echague, isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Rehabilitation of Roads at Barangay Garit Norte, Barangay San Juan, Barangay San Antonio minit, Echague, isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0500-007489",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Diasan-Villacampo Bridge, Barangay Diasan, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Diasan-Villacampo Bridge, Barangay Diasan, Echague, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0500-007493",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Diarao at Barangay Abulan, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Road at Barangay Diarao at Barangay Abulan, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007502",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Arabiat to Barangay Nagassican, Echague and Santiago City, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Barangay Arabiat to Barangay Nagassican, Echague and Santiago City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007536",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Manuel to Barangay Sta. Ana, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Barangay San Manuel to Barangay Sta. Ana, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007581",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road at Aritao Growth Center (AGC), Banganan, Aritao, Nueva Vizcaya",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Access Road at Aritao Growth Center (AGC), Banganan, Aritao, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007592",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Core Local Road at Comon to Bone North, Aritao, Nueva Vizcaya",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Rehabilitation of Core Local Road at Comon to Bone North, Aritao, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007637",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pagalanggang, Dinalupihan, Bataan Sta.0+588- Sta.1+588",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          588.0,
          1588.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Road, Barangay Pagalanggang, Dinalupihan, Bataan Sta.0+588- Sta.1+588",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0507-007638",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Gen Luna, Dinalupihan, Bataan",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Gen Luna, Dinalupihan, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0510-007701",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage Improvement at Aldama St., Virgen Delas Flores, City of Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road with Drainage Improvement at Aldama St., Virgen Delas Flores, City of Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0514-007780",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal, Salem St., Cognac St., Kingfisher St., Rand St., Barangay Pandayan, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+600 (120.96486944, 14.74937500)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road with Drainage Canal, Salem St., Cognac St., Kingfisher St., Rand St., Barangay Pandayan, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+600 (120.96486944, 14.74937500)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.7,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0514-007782",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with drainage of Barasoain Street, Sulok, Barangay Saluysoy, Meycauayan Bulacan, Sta. 00+000 - Sta. 00+600 (120.95424167, 14.74428056)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road with drainage of Barasoain Street, Sulok, Barangay Saluysoy, Meycauayan Bulacan, Sta. 00+000 - Sta. 00+600 (120.95424167, 14.74428056)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.7,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0525-008033",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads including Drainage System, 1st and 4th Street, Alasas Village, Barangay Alasas, City of San Fernando, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Construction of Roads including Drainage System, 1st and 4th Street, Alasas Village, Barangay Alasas, City of San Fernando, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0535-008234",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Casindolan Road (Apostol-Manglicmot), San Felipe, Zambales Sta. 0+000 - Sta. 1+000",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Concreting of Casindolan Road (Apostol-Manglicmot), San Felipe, Zambales Sta. 0+000 - Sta. 1+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0535-008235",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Omaya, San Narciso, Zambales Sta. 0+000 - Sta. 0+700",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35714285.71,
      "lengthMeters": 700.0,
      "allocationPerStatedMeter": 35714.29,
      "rangesMeters": [
        [
          0.0,
          700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Construction of Road, Barangay Omaya, San Narciso, Zambales Sta. 0+000 - Sta. 0+700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.46,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0536-008239",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Graciano Trinidad Street, Barangay Dirita-Baloguen, Iba, Zambales",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Road, Graciano Trinidad Street, Barangay Dirita-Baloguen, Iba, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008308",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Bubuyan, Mataasnakahoy, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road at Barangay Bubuyan, Mataasnakahoy, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008309",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Calingatan, Mataasnakahoy, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road at Barangay Calingatan, Mataasnakahoy, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008356",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge at Barangay Halang, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Construction of Bridge at Barangay Halang, Lipa City, Batangas",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008359",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Including Box Culvert at Barangay Don Luis - Salaban, San Jose, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road Including Box Culvert at Barangay Don Luis - Salaban, San Jose, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008386",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road Along Mabini - San Guillermo Road, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Improvement of Road Along Mabini - San Guillermo Road, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008450",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Inocencio - Fiscal Mundo Road, Trece Martires City, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Rehabilitation of Inocencio - Fiscal Mundo Road, Trece Martires City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008451",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Lagundian Road, Trece Martires City, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Rehabilitation of Lagundian Road, Trece Martires City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008452",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Panungyanan Road, Barangay De Ocampo to Langkaan Road, Trece Martires City, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Rehabilitation of Panungyanan Road, Barangay De Ocampo to Langkaan Road, Trece Martires City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008453",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Panungyanan Road, Barangay San Agustin to Barangay De Ocampo, Trece Martires City, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Rehabilitation of Panungyanan Road, Barangay San Agustin to Barangay De Ocampo, Trece Martires City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008456",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Tres Cruses Road, Trece Martires City, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Rehabilitation of Tres Cruses Road, Trece Martires City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008465",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road with Drainage along Southwoods Avenue, Carmona City, Cavite",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Improvement of Road with Drainage along Southwoods Avenue, Carmona City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008530",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Rehabilitation Barangay Mayao Silangan and Barangay Mayao Kanluran, Lucena City, Quezon, 13.959594, 121.643786",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Road Rehabilitation Barangay Mayao Silangan and Barangay Mayao Kanluran, Lucena City, Quezon, 13.959594, 121.643786",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008682",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of I-Mak Road to San Antonio Boulevard at Barangay Marangas, Bataraza, Palawan",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of I-Mak Road to San Antonio Boulevard at Barangay Marangas, Bataraza, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008683",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Pagkakaisa, Barangay Punta Baja, Rizal, Palawan",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of Road, Purok Pagkakaisa, Barangay Punta Baja, Rizal, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008696",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Magsaysay to Plaridel, Aborlan, Palawan",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Road, Barangay Magsaysay to Plaridel, Aborlan, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008697",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Sta. 06+178 - Sta. 06+208, Phase II, Barangay Magbabadil, Aborlan, Palawan",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 833333333.33,
      "lengthMeters": 30.0,
      "allocationPerStatedMeter": 833333.33,
      "rangesMeters": [
        [
          6178.0,
          6208.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Bridge, Sta. 06+178 - Sta. 06+208, Phase II, Barangay Magbabadil, Aborlan, Palawan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 0.59,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0556-008707",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Juan, Aborlan, Palawan",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Road, Barangay San Juan, Aborlan, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008708",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Monica, Puerto Princesa City, Palawan",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Road, Barangay Sta. Monica, Puerto Princesa City, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0562-008850",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Mananao Bridge Approach), Barangay Mananao, Tinambac, Camarines Sur",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction of Road (Mananao Bridge Approach), Barangay Mananao, Tinambac, Camarines Sur",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0564-008885",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Jct. National Road to Barangay Asid to Barangay Cagay, Masbate City, Masbate, Sta. 0+000 to Sta. 0+560",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.56,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44642857.14,
      "lengthMeters": 560.0,
      "allocationPerStatedMeter": 44642.86,
      "rangesMeters": [
        [
          0.0,
          560.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Jct. National Road to Barangay Asid to Barangay Cagay, Masbate City, Masbate, Sta. 0+000 to Sta. 0+560",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.82,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0564-008889",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Jct National Road to Barangay Pamampangon, Milagros, Masbate, Sta. 6+922 to Sta 7+502",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.58,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 43103448.28,
      "lengthMeters": 580.0,
      "allocationPerStatedMeter": 43103.45,
      "rangesMeters": [
        [
          6922.0,
          7502.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Road, Jct National Road to Barangay Pamampangon, Milagros, Masbate, Sta. 6+922 to Sta 7+502",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.76,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0565-008894",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Badiang, Cataingan to Barangay Guindawahan, Pio V. Corpuz, Masbate, Sta. 5+330 - Sta. 6+163",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.833,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30012004.8,
      "lengthMeters": 833.0,
      "allocationPerStatedMeter": 30012.0,
      "rangesMeters": [
        [
          5330.0,
          6163.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Road, Barangay Badiang, Cataingan to Barangay Guindawahan, Pio V. Corpuz, Masbate, Sta. 5+330 - Sta. 6+163",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.54,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0566-008918",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Caburacan to Barangay Loreto Phase II, Barangay Caburacan to Barangay Loreto, Castilla, Sorsogon",
      "office": "Sorsogon District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Concreting of Road, Barangay Caburacan to Barangay Loreto Phase II, Barangay Caburacan to Barangay Loreto, Castilla, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008938",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mabusao to Barangay Antipolo, Ibajay, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Barangay Mabusao to Barangay Antipolo, Ibajay, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0569-008989",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Gaban to Agsanayan Road (Sitio Pandan), Sta. 1 + 988 - Sta. 3 + 220, Barangay Gaban, San Lorenzo and Barangay Agsanayan, Buenavista, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.232,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20292207.79,
      "lengthMeters": 1232.0,
      "allocationPerStatedMeter": 20292.21,
      "rangesMeters": [
        [
          1988.0,
          3220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Gaban to Agsanayan Road (Sitio Pandan), Sta. 1 + 988 - Sta. 3 + 220, Barangay Gaban, San Lorenzo and Barangay Agsanayan, Buenavista, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.81,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0569-008991",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sitio Carazan - Canatbo - Paho Road, Barangay Avila, Buenavista, Guimaras, Sta. 0 + 000 - Sta. 1 + 100",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 1100.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          1100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Sitio Carazan - Canatbo - Paho Road, Barangay Avila, Buenavista, Guimaras, Sta. 0 + 000 - Sta. 1 + 100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.91,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0570-008999",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Aguilar Proper- Sitio Camansi-Constancia Proper Road, Sta. 3 + 275 - Sta. 4 + 539, Barangay Aguilar and Barangay Constancia, San Lorenzo, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.264,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19778481.01,
      "lengthMeters": 1264.0,
      "allocationPerStatedMeter": 19778.48,
      "rangesMeters": [
        [
          3275.0,
          4539.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Construction of Road, Aguilar Proper- Sitio Camansi-Constancia Proper Road, Sta. 3 + 275 - Sta. 4 + 539, Barangay Aguilar and Barangay Constancia, San Lorenzo, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.79,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0573-009060",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Canauilli to Barangay Agcarope, Janiuay, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Access Road, Barangay Canauilli to Barangay Agcarope, Janiuay, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009093",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Dionisio, Barangay Granada, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Construction of Road, San Dionisio, Barangay Granada, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009096",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Mansilingan, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Construction of Roads, Barangay Mansilingan, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009125",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Hacienda Sicaba to Hacienda Monti, Barangay San Pablo, Municipality of Manapla, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road Hacienda Sicaba to Hacienda Monti, Barangay San Pablo, Municipality of Manapla, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009308",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Magsico to Cabatbatan, San Fernando, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Construction of Concrete Road, Barangay Magsico to Cabatbatan, San Fernando, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009391",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Basak - Agus Road including Drainaige Structure, at Barangay Basak, Lapu-Lapu City",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Basak - Agus Road including Drainaige Structure, at Barangay Basak, Lapu-Lapu City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009404",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Facilities at B. Benedicto St., Barangay Babag, Lapu-Lapu City, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Construction of Road with Drainage Facilities at B. Benedicto St., Barangay Babag, Lapu-Lapu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0592-009484",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 5 to Bliss - Taft National High School, Taft, Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Rehabilitation of Road, Barangay 5 to Bliss - Taft National High School, Taft, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0594-009541",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Concreting, PUP Access Road, Barangay Calaguise, Leyte, Leyte (Station 0+280 - 0+750)",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.47,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53191489.36,
      "lengthMeters": 470.0,
      "allocationPerStatedMeter": 53191.49,
      "rangesMeters": [
        [
          280.0,
          750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Road Concreting, PUP Access Road, Barangay Calaguise, Leyte, Leyte (Station 0+280 - 0+750)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 2.17,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0594-009542",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Concreting, Sitio Simborio Barangay Fatima, Villaba, Leyte (Station 0+170 - 0+670)",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          170.0,
          670.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Road Concreting, Sitio Simborio Barangay Fatima, Villaba, Leyte (Station 0+170 - 0+670)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 2.04,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0596-009586",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Quezon to Magsaysasy Road (Sta. 1+700 - Sta. 2+250), Mapanas, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.55,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45454545.45,
      "lengthMeters": 550.0,
      "allocationPerStatedMeter": 45454.55,
      "rangesMeters": [
        [
          1700.0,
          2250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Quezon to Magsaysasy Road (Sta. 1+700 - Sta. 2+250), Mapanas, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.86,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0597-009604",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Alang-alang - Pio del Pilar - Can Maria Road (Sta. 2+900 - Sta. 3+395), Lapinig, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.495,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50505050.51,
      "lengthMeters": 495.0,
      "allocationPerStatedMeter": 50505.05,
      "rangesMeters": [
        [
          2900.0,
          3395.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Alang-alang - Pio del Pilar - Can Maria Road (Sta. 2+900 - Sta. 3+395), Lapinig, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 2.06,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0598-009616",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+862, Barangay Tarabucan – Barangay Jacinto, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.862,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29002320.19,
      "lengthMeters": 862.0,
      "allocationPerStatedMeter": 29002.32,
      "rangesMeters": [
        [
          0.0,
          862.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+862, Barangay Tarabucan – Barangay Jacinto, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.49,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0599-009641",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+862, Barangay Dagum, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.862,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29002320.19,
      "lengthMeters": 862.0,
      "allocationPerStatedMeter": 29002.32,
      "rangesMeters": [
        [
          0.0,
          862.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+862, Barangay Dagum, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.49,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0603-009713",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Macuyon to Barangay Balatakan, Sirawai, Zamboanga del Norte, Sta. 02 + 000 - Sta. 03+ 000",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          2000.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road, Barangay Macuyon to Barangay Balatakan, Sirawai, Zamboanga del Norte, Sta. 02 + 000 - Sta. 03+ 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0612-009897",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Balintad - Tagoranao Road, Munai, Lanao del Norte",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Balintad - Tagoranao Road, Munai, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0612-009908",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sebac to Barangay Basirang Road with Bridge, Sta. 0+000-Sta. 0+580, Tudela, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.58,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 580.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          580.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Road, Barangay Sebac to Barangay Basirang Road with Bridge, Sta. 0+000-Sta. 0+580, Tudela, Misamis Occidental",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0613-009922",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 2 - Purok 3), Barangay Balintawak, Sta. 0+000 - Sta. 0+850, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.85,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 850.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Concreting of Road (Purok 2 - Purok 3), Barangay Balintawak, Sta. 0+000 - Sta. 0+850, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.51,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0615-009956",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 6 Pulot to Balintawak), Sta. 0+000 - Sta. 0+850, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.85,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 850.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Concreting of Road (Purok 6 Pulot to Balintawak), Sta. 0+000 - Sta. 0+850, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.51,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0615-009957",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 4 to Purok 5), Barangay Pantaon, Sta. 0+000 - Sta. 0+850, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.85,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 850.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Concreting of Road (Purok 4 to Purok 5), Barangay Pantaon, Sta. 0+000 - Sta. 0+850, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.51,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0616-009986",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, leading to Purok 9A (San Isidro), Barangay Nuevo lloco, Mawab, Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road, leading to Purok 9A (San Isidro), Barangay Nuevo lloco, Mawab, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0617-010000",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Pedro, Kiblawan, Davao del Sur",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Road, Barangay San Pedro, Kiblawan, Davao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0617-010003",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pangibiran, Mabini, Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Road, Barangay Pangibiran, Mabini, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0618-010020",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Florida, Kapalong, Davao del Norte",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Construction of Road, Barangay Florida, Kapalong, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0618-010026",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Luna, Kapalong, Davao del Norte",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Construction of Road, Barangay Luna, Kapalong, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0618-010027",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mabantao, Kapalong, Davao del Norte",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Construction of Road, Barangay Mabantao, Kapalong, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010035",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of LAMARISAN Road, Sta. 1+884.16 - Sta. 2+734.16, Malalag, Davao del Sur",
      "office": "Davao del Sur District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.85,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 850.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          1884.1599999999999,
          2734.16
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of LAMARISAN Road, Sta. 1+884.16 - Sta. 2+734.16, Malalag, Davao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.51,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0623-010111",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Sitio Lamtabongong to Sitio Kataan, Barangay Lambingi, Banga, South Cotabato, 6.314620, 124.875674",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Construction of Bridge, Sitio Lamtabongong to Sitio Kataan, Barangay Lambingi, Banga, South Cotabato, 6.314620, 124.875674",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010137",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Morales to Purok Paglaum to Provincial Golf Course, Barangay Paraiso, Koronadal City, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Construction of Concrete Road, Barangay Morales to Purok Paglaum to Provincial Golf Course, Barangay Paraiso, Koronadal City, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0627-010192",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Barangay Coring to Barangay Columbos) Sta. 0 + 000 - Sta. 1 + 000, Barangay Coring, Basilisa, Dinagat Islands",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction of Road (Barangay Coring to Barangay Columbos) Sta. 0 + 000 - Sta. 1 + 000, Barangay Coring, Basilisa, Dinagat Islands",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0627-010198",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Circumferential Road Sta. 0 + 000 - Sta. 1 + 000 (Liberty to Magsaysay), Barangay Liberty, Loreto, Dinagat Islands",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction of Circumferential Road Sta. 0 + 000 - Sta. 1 + 000 (Liberty to Magsaysay), Barangay Liberty, Loreto, Dinagat Islands",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0627-010205",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Sta. 0 + 000 - Sta. 1 + 000 (Bojo to Carmen), Barangay Carmen, Loreto, Dinagat Islands",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction of Road Sta. 0 + 000 - Sta. 1 + 000 (Bojo to Carmen), Barangay Carmen, Loreto, Dinagat Islands",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0627-010206",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of NRJ Sta. Fe-Jubang-Cambas-ac Road, Dapa, Surigao del Norte.",
      "office": "Surigao del Norte 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction of NRJ Sta. Fe-Jubang-Cambas-ac Road, Dapa, Surigao del Norte.",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0628-010210",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Quezon, Del Carmen, Siargao Island, Surigao del Norte",
      "office": "Surigao del Norte 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of Road, Barangay Quezon, Del Carmen, Siargao Island, Surigao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0629-010236",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Coastal Road leading to Bangui Windmill and Municipal Beach, Bangui, Ilocos Norte (18.536111, 120.755833)",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "629",
      "lengthEvidence": "Construction of Coastal Road leading to Bangui Windmill and Municipal Beach, Bangui, Ilocos Norte (18.536111, 120.755833)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0630-010242",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Causeway, Barangay Caohagan, Caohagan Island, Sta. 0+060.00 - Sta. 0+150.00, Lapu-Lapu City, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 25000000,
      "lengthKm": 0.09,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 277777777.78,
      "lengthMeters": 90.0,
      "allocationPerStatedMeter": 277777.78,
      "rangesMeters": [
        [
          60.0,
          150.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "630",
      "lengthEvidence": "Construction of Causeway, Barangay Caohagan, Caohagan Island, Sta. 0+060.00 - Sta. 0+150.00, Lapu-Lapu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 6,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0253-002560",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Jct. Pinagpanaan-Rizal-Pantabangan Road, K0127+644 - K0128+800, K0131+105 - K0132+190",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 24970000,
      "lengthKm": 2.241,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 11142347.17,
      "lengthMeters": 2241.0,
      "allocationPerStatedMeter": 11142.35,
      "rangesMeters": [
        [
          127644.0,
          128800.0
        ],
        [
          131105.0,
          132190.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "253",
      "lengthEvidence": "Jct. Pinagpanaan-Rizal-Pantabangan Road, K0127+644 - K0128+800, K0131+105 - K0132+190",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 1.12,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0143-000651",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Bocaue-Sn Jose Rd - K0034 + K0034 + 230, K0034 + 426 - K0034 + 531, K0034 + 531 - K0034 + 740, K0035 + 051 - K0035 + 346",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 24960000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          34426.0,
          34531.0
        ],
        [
          34531.0,
          34740.0
        ],
        [
          35051.0,
          35346.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Bocaue-Sn Jose Rd - K0034 + K0034 + 230, K0034 + 426 - K0034 + 531, K0034 + 531 - K0034 + 740, K0035 + 051 - K0035 + 346",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0210-001822",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Siocon-Sirawai-Sibuco-Limpapa Rd - K2102 + 000 - K2103 + 000",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 24853000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24853000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 24853.0,
      "rangesMeters": [
        [
          2102000.0,
          2103000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Siocon-Sirawai-Sibuco-Limpapa Rd - K2102 + 000 - K2103 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.49,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0210-001823",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Siocon-Sirawai-Sibuco-Limpapa Rd - K2103 + 000 - K2104 + 000",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 24829000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24829000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 24829.0,
      "rangesMeters": [
        [
          2103000.0,
          2104000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Siocon-Sirawai-Sibuco-Limpapa Rd - K2103 + 000 - K2104 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.49,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0168-001077",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0525 + 187 - K0525 + 242, K0527 + 000 - K0527 + 123, K0527 + 191 - K0527 + 210, K0527 + 399 - K0527 + 472, K0527 + 567 - K0527 + 709, K0527 + 823 - K0528 + 066, K0528 + 192 - K0528 + 300, K0528 + 460 - K0528 + 537, K0528 + 565 - K0528 + 895",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 24810000,
      "lengthKm": 1.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21205128.21,
      "lengthMeters": 1170.0,
      "allocationPerStatedMeter": 21205.13,
      "rangesMeters": [
        [
          525187.0,
          525242.0
        ],
        [
          527000.0,
          527123.0
        ],
        [
          527191.0,
          527210.0
        ],
        [
          527399.0,
          527472.0
        ],
        [
          527567.0,
          527709.0
        ],
        [
          527823.0,
          528066.0
        ],
        [
          528192.0,
          528300.0
        ],
        [
          528460.0,
          528537.0
        ],
        [
          528565.0,
          528895.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0525 + 187 - K0525 + 242, K0527 + 000 - K0527 + 123, K0527 + 191 - K0527 + 210, K0527 + 399 - K0527 + 472, K0527 + 567 - K0527 + 709, K0527 + 823 - K0528 + 066, K0528 + 192 - K0528 + 300, K0528 + 460 - K0528 + 537, K0528 + 565 - K0528 + 895",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 0.94,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0115-000089",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1684 + 598 - K1684 + 682, K1718 + 020 - K1718 + 991",
      "office": "Central Office",
      "amountPesos": 24800000,
      "lengthKm": 1.055,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23507109.0,
      "lengthMeters": 1055.0,
      "allocationPerStatedMeter": 23507.11,
      "rangesMeters": [
        [
          1684598.0,
          1684682.0
        ],
        [
          1718020.0,
          1718991.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1684 + 598 - K1684 + 682, K1718 + 020 - K1718 + 991",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 0.51,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0278-003071",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Cantacoyan Br. (B00002CB) along Sogod-Tabuelan Rd",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 24746000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Cantacoyan Br. (B00002CB) along Sogod-Tabuelan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0272-002939",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Bulongto Br. (B00340SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "office": "Central Office",
      "amountPesos": 24744000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Bulongto Br. (B00340SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0177-001237",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0616 + 066 - K0616 + 120",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 24690000,
      "lengthKm": 0.054,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 457222222.22,
      "lengthMeters": 54.0,
      "allocationPerStatedMeter": 457222.22,
      "rangesMeters": [
        [
          616066.0,
          616120.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0616 + 066 - K0616 + 120",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 0.73,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0278-003070",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Aningan Br. (B00007CB) along Antonio y De Pio H-way",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 24680000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Aningan Br. (B00007CB) along Antonio y De Pio H-way",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0184-001349",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Claveria-Calanasan-Kabugao Rd - K0623 + 557 - K0623 + 598, K0623 + 767 - K0623 + 786.5, K0625 + 185 - K0625 + 233.5",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 24600000,
      "lengthKm": 0.109,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 225688073.39,
      "lengthMeters": 109.0,
      "allocationPerStatedMeter": 225688.07,
      "rangesMeters": [
        [
          623557.0,
          623598.0
        ],
        [
          623767.0,
          623786.5
        ],
        [
          625185.0,
          625233.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Claveria-Calanasan-Kabugao Rd - K0623 + 557 - K0623 + 598, K0623 + 767 - K0623 + 786.5, K0625 + 185 - K0625 + 233.5",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.6,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0163-000982",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Sn Pascual-Claveria Rd - K0003 + 000 - K0003 + 100, K0003 + 141 - K0003 + 157, K0003 + 195 - K0003 + 407, K0003 + 701 - K0003 + 928",
      "office": "Masbate 1st District Engineering Office",
      "amountPesos": 24586000,
      "lengthKm": 0.555,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 44299099.1,
      "lengthMeters": 555.0,
      "allocationPerStatedMeter": 44299.1,
      "rangesMeters": [
        [
          3000.0,
          3100.0
        ],
        [
          3141.0,
          3157.0
        ],
        [
          3195.0,
          3407.0
        ],
        [
          3701.0,
          3928.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Sn Pascual-Claveria Rd - K0003 + 000 - K0003 + 100, K0003 + 141 - K0003 + 157, K0003 + 195 - K0003 + 407, K0003 + 701 - K0003 + 928",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.11,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0112-000028",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila-Batangas Rd - K0068 + 239 - K0068 + 284, K0068 + 567 - K0068 + 716, K0068 + 731 - K0068 + 909",
      "office": "Central Office",
      "amountPesos": 24500000,
      "lengthKm": 0.372,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 65860215.05,
      "lengthMeters": 372.0,
      "allocationPerStatedMeter": 65860.22,
      "rangesMeters": [
        [
          68239.0,
          68284.0
        ],
        [
          68567.0,
          68716.0
        ],
        [
          68731.0,
          68909.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Manila-Batangas Rd - K0068 + 239 - K0068 + 284, K0068 + 567 - K0068 + 716, K0068 + 731 - K0068 + 909",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 1.37,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0185-001365",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Balbalan-Pinukpuk Rd - K0495 + 535 - K0495 + 559, K0498 + 523 - K0498 + 557, K0500 + 296 - K0500 + 313, K0509 + 913 - K0509 + 935, K0511 + 379 - K0511 + 395, K0511 + 438 - K0511 + 450, K0511 + 685 - K0511 + 706, K0517 + 209 - K0517 + 275",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 24500000,
      "lengthKm": 0.212,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 115566037.74,
      "lengthMeters": 212.0,
      "allocationPerStatedMeter": 115566.04,
      "rangesMeters": [
        [
          495535.0,
          495559.0
        ],
        [
          498523.0,
          498557.0
        ],
        [
          500296.0,
          500313.0
        ],
        [
          509913.0,
          509935.0
        ],
        [
          511379.0,
          511395.0
        ],
        [
          511438.0,
          511450.0
        ],
        [
          511685.0,
          511706.0
        ],
        [
          517209.0,
          517275.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "185",
      "lengthEvidence": "Balbalan-Pinukpuk Rd - K0495 + 535 - K0495 + 559, K0498 + 523 - K0498 + 557, K0500 + 296 - K0500 + 313, K0509 + 913 - K0509 + 935, K0511 + 379 - K0511 + 395, K0511 + 438 - K0511 + 450, K0511 + 685 - K0511 + 706, K0517 + 209 - K0517 + 275",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 0.66,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0489-007262",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection (Sta. 2+563 - Sta.2+963) and Rehabilitation of Road (Sta. 2+563 - Sta. 3+163) along Ballacayu to Simanu Norte, Barangay Simanu Norte, San Pablo, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 24500000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          2563.0,
          2963.0
        ],
        [
          2563.0,
          3163.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of Road Slope Protection (Sta. 2+563 - Sta.2+963) and Rehabilitation of Road (Sta. 2+563 - Sta. 3+163) along Ballacayu to Simanu Norte, Barangay Simanu Norte, San Pablo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0154-000829",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bacolod North Rd - K0052 + 000 - K0052 + 245, K0059 + 485 - K0059 + 700, K0066 + 308 - K0066 + 801, K0069 + 585 - K0070 + 043",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 24463000,
      "lengthKm": 1.411,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 17337349.4,
      "lengthMeters": 1411.0,
      "allocationPerStatedMeter": 17337.35,
      "rangesMeters": [
        [
          52000.0,
          52245.0
        ],
        [
          59485.0,
          59700.0
        ],
        [
          66308.0,
          66801.0
        ],
        [
          69585.0,
          70043.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "Bacolod North Rd - K0052 + 000 - K0052 + 245, K0059 + 485 - K0059 + 700, K0066 + 308 - K0066 + 801, K0069 + 585 - K0070 + 043",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 0.73,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0466-006746",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Maoasoas Norte to Barangay San Jose to Barangay Inabaan Sur, Pugo, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 24450000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road Barangay Maoasoas Norte to Barangay San Jose to Barangay Inabaan Sur, Pugo, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0162-000965",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Camarines Sur- Albay Diversion Rd - K0435 + 748 - K0436 + 538",
      "office": "Camarines Sur 2nd District Engineering Office",
      "amountPesos": 24424000,
      "lengthKm": 0.79,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30916455.7,
      "lengthMeters": 790.0,
      "allocationPerStatedMeter": 30916.46,
      "rangesMeters": [
        [
          435748.0,
          436538.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Camarines Sur- Albay Diversion Rd - K0435 + 748 - K0436 + 538",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 0.93,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0271-002920",
      "category": "Mixed roads / bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Mauca Bridge (B00434LZ) along Andaya Highway (Package B3-B)",
      "office": "Central Office",
      "amountPesos": 24403000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Mauca Bridge (B00434LZ) along Andaya Highway (Package B3-B)",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0261-002722",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Nagtahan Link Br. 5 (B01872LZ) along Nagtahan Link Rd 2",
      "office": "South Manila District Engineering Office",
      "amountPesos": 24400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Nagtahan Link Br. 5 (B01872LZ) along Nagtahan Link Rd 2",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0491-007300",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 0+800 - Sta. 3+300) along Barangay Colunguan to Barangay Bubug, Santo Tomas, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 24400000,
      "lengthKm": 2.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9760000.0,
      "lengthMeters": 2500.0,
      "allocationPerStatedMeter": 9760.0,
      "rangesMeters": [
        [
          800.0,
          3300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Road (Sta. 0+800 - Sta. 3+300) along Barangay Colunguan to Barangay Bubug, Santo Tomas, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.31,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0163-000995",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Aklan West Rd (Kalibo-Nabas) - K0235+282 - K0235 + 352, K0236+240 - K0236+430, K0240 + 998 - K0241 + 248, K0241 + 273 - K0241 + 610, K0250+100 - K0250+250, K0250 + 344 - K0250 + 390",
      "office": "Aklan District Engineering Office",
      "amountPesos": 24348000,
      "lengthKm": 1.043,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23344199.42,
      "lengthMeters": 1043.0,
      "allocationPerStatedMeter": 23344.2,
      "rangesMeters": [
        [
          235282.0,
          235352.0
        ],
        [
          236240.0,
          236430.0
        ],
        [
          240998.0,
          241248.0
        ],
        [
          241273.0,
          241610.0
        ],
        [
          250100.0,
          250250.0
        ],
        [
          250344.0,
          250390.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Aklan West Rd (Kalibo-Nabas) - K0235+282 - K0235 + 352, K0236+240 - K0236+430, K0240 + 998 - K0241 + 248, K0241 + 273 - K0241 + 610, K0250+100 - K0250+250, K0250 + 344 - K0250 + 390",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 0.88,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0172-001145",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Dalaguete-Mantalongon Badian Rd - K0095 + 407 - K0096 + 470",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 24310000,
      "lengthKm": 1.063,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22869238.01,
      "lengthMeters": 1063.0,
      "allocationPerStatedMeter": 22869.24,
      "rangesMeters": [
        [
          95407.0,
          96470.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "172",
      "lengthEvidence": "Dalaguete-Mantalongon Badian Rd - K0095 + 407 - K0096 + 470",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 1.01,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0167-001065",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Antonio Arnaiz Ave - K0007 + 800 - K0008 + 246",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 24233000,
      "lengthKm": 0.446,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54334080.72,
      "lengthMeters": 446.0,
      "allocationPerStatedMeter": 54334.08,
      "rangesMeters": [
        [
          7800.0,
          8246.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Antonio Arnaiz Ave - K0007 + 800 - K0008 + 246",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.71,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0187-001399",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Lanao del Norte Interior Circum. Rd (LDNICR) - (S00972MN) Chainage 14183 - Chainage 14443",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 24180000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "187",
      "lengthEvidence": "Lanao del Norte Interior Circum. Rd (LDNICR) - (S00972MN) Chainage 14183 - Chainage 14443",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0167-001064",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Antonio Arnaiz Ave - K0007 + 000 - K0007 + 800",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 24159000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30198750.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 30198.75,
      "rangesMeters": [
        [
          7000.0,
          7800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Antonio Arnaiz Ave - K0007 + 000 - K0007 + 800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.95,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0113-000045",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0631 + 000 - K0631 + 500",
      "office": "Central Office",
      "amountPesos": 24121000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 48242000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 48242.0,
      "rangesMeters": [
        [
          631000.0,
          631500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Maharlika Highway (LZ) - K0631 + 000 - K0631 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 1.01,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0290-003341",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Abis Br. (B00056NR) along Bais-Kabankalan Rd",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 24120000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Abis Br. (B00056NR) along Bais-Kabankalan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0163-000996",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0101 + (-509) - K0101 + 100",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 24108000,
      "lengthKm": 0.609,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39586206.9,
      "lengthMeters": 609.0,
      "allocationPerStatedMeter": 39586.21,
      "rangesMeters": [
        [
          100491.0,
          101100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0101 + (-509) - K0101 + 100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.0,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0208-001789",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0077 + 530 - K0078 + 000",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 24050000,
      "lengthKm": 0.47,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51170212.77,
      "lengthMeters": 470.0,
      "allocationPerStatedMeter": 51170.21,
      "rangesMeters": [
        [
          77530.0,
          78000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0077 + 530 - K0078 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 0.99,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0172-001149",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Dipolog-Polanco-Piñan-Jct Oroquieta Rd - K1813+073 - K1813+541, K1819+912 - K1820+077",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "amountPesos": 24034000,
      "lengthKm": 0.633,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 37968404.42,
      "lengthMeters": 633.0,
      "allocationPerStatedMeter": 37968.4,
      "rangesMeters": [
        [
          1813073.0,
          1813541.0
        ],
        [
          1819912.0,
          1820077.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "172",
      "lengthEvidence": "Dipolog-Polanco-Piñan-Jct Oroquieta Rd - K1813+073 - K1813+541, K1819+912 - K1820+077",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.19,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0136-000511",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Santander-Barili-Toledo Rd - K0153 + 000 - K0154 + 054",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 24020000,
      "lengthKm": 1.054,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22789373.81,
      "lengthMeters": 1054.0,
      "allocationPerStatedMeter": 22789.37,
      "rangesMeters": [
        [
          153000.0,
          154054.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Santander-Barili-Toledo Rd - K0153 + 000 - K0154 + 054",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.73,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0119-000170",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Capas-San Jose-Mayantoc-Malacampa Rd - K0141 + 000 - K0141 + 613",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": 0.613,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39151712.89,
      "lengthMeters": 613.0,
      "allocationPerStatedMeter": 39151.71,
      "rangesMeters": [
        [
          141000.0,
          141613.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Capas-San Jose-Mayantoc-Malacampa Rd - K0141 + 000 - K0141 + 613",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 0.92,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0122-000226",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Sayre Highway (S00577MN) - K1429 + 300 - K1429 + 535",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": 0.235,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 102127659.57,
      "lengthMeters": 235.0,
      "allocationPerStatedMeter": 102127.66,
      "rangesMeters": [
        [
          1429300.0,
          1429535.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Sayre Highway (S00577MN) - K1429 + 300 - K1429 + 535",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 2.19,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0153-000825",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway – K0138 + 060 – K0138 + 800",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": 0.74,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32432432.43,
      "lengthMeters": 740.0,
      "allocationPerStatedMeter": 32432.43,
      "rangesMeters": [
        [
          138060.0,
          138800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Maharlika Highway – K0138 + 060 – K0138 + 800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 1.37,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0159-000923",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Batangas-Lobo Rd - K0116+000-K0116+4.5(LL), K0116+13-K0116+31.6(LL), K0116+31.6-K0116+44.5(LL), K0116+62-K0116+99.1(BL), K0116+201.3- K0116+205.7(LL), K0116+246-K0116+255(BL), K0116+255-K0116+277.5(LL), K0116+277.5-K0116+286.5(BL), K0116+286.5-K0116+300.2(LL), K0116+304.6- K0116+313.7(LL), K0116+304.6-K0116+313.7(LL), K0116+313-K0116+322.6(BL), K0116+322.6-K0116+331.7(LL), K0116+347-K0116+351.5(LL), K0116+363- K0116+376.5(LL), K0116+385-K0116+388.5RL, K0116+388.5-K0116+409.2(LL), K0116+418.3-K0116+427.2(LL), K0116+445.2-K0116+449.5(LL), K0116+485.8- K0116+490.5(LL), K0116+495.1-K0116+508.7(LL), K0116+526.2-K0116+530.8(LL), K0116+535.3-K0116+539.7(LL), K0116+548.9-K0116+562.3(LL), K0116+575.8- K0116+580.3(LL)K0116+607-K0116+611.5(BL), K0116+611.5-K0116+616(LL), K0116+634.3-K0116+697.5(LL), K0116+706.5-K0116+710.7(LL), K0116+742.1- K0116+755.6(LL), K0116+817.4-K0116+821.8(LL), K0116+845-K0116+885.9(LL), K0116+953.9-K0116+967.3(LL), K0116+971.8-K0116+976.2(LL), K0116+985.3- K0116+1005.4(LL), K0116+1008-K0116+1012.5(LL), K0116+1135.2- K0116+1139.8(LL), K0116+1213-K0116+1217.5(LL)",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": 0.44609999999997674,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 53799596.5,
      "lengthMeters": 446.1,
      "allocationPerStatedMeter": 53799.6,
      "rangesMeters": [
        [
          116000.0,
          116004.5
        ],
        [
          116013.0,
          116031.6
        ],
        [
          116031.6,
          116044.5
        ],
        [
          116062.0,
          116099.1
        ],
        [
          116201.3,
          116205.7
        ],
        [
          116246.0,
          116255.0
        ],
        [
          116255.0,
          116277.5
        ],
        [
          116277.5,
          116286.5
        ],
        [
          116286.5,
          116300.2
        ],
        [
          116304.6,
          116313.7
        ],
        [
          116304.6,
          116313.7
        ],
        [
          116313.0,
          116322.6
        ],
        [
          116322.6,
          116331.7
        ],
        [
          116347.0,
          116351.5
        ],
        [
          116363.0,
          116376.5
        ],
        [
          116385.0,
          116388.5
        ],
        [
          116388.5,
          116409.2
        ],
        [
          116418.3,
          116427.2
        ],
        [
          116445.2,
          116449.5
        ],
        [
          116485.8,
          116490.5
        ],
        [
          116495.1,
          116508.7
        ],
        [
          116526.2,
          116530.8
        ],
        [
          116535.3,
          116539.7
        ],
        [
          116548.9,
          116562.3
        ],
        [
          116575.8,
          116580.3
        ],
        [
          116607.0,
          116611.5
        ],
        [
          116611.5,
          116616.0
        ],
        [
          116634.3,
          116697.5
        ],
        [
          116706.5,
          116710.7
        ],
        [
          116742.1,
          116755.6
        ],
        [
          116817.4,
          116821.8
        ],
        [
          116845.0,
          116885.9
        ],
        [
          116953.9,
          116967.3
        ],
        [
          116971.8,
          116976.2
        ],
        [
          116985.3,
          117005.4
        ],
        [
          117008.0,
          117012.5
        ],
        [
          117135.2,
          117139.8
        ],
        [
          117213.0,
          117217.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "159",
      "lengthEvidence": "Batangas-Lobo Rd - K0116+000-K0116+4.5(LL), K0116+13-K0116+31.6(LL), K0116+31.6-K0116+44.5(LL), K0116+62-K0116+99.1(BL), K0116+201.3- K0116+205.7(LL), K0116+246-K0116+255(BL), K0116+255-K0116+277.5(LL), K0116+277.5-K0116+286.5(BL), K0116+286.5-K0116+300.2(LL), K0116+304.6- K0116+313.7(LL), K0116+304.6-K0116+313.7(LL), K0116+313-K0116+322.6(BL), K0116+322.6-K0116+331.7(LL), K0116+347-K0116+351.5(LL), K0116+363- K0116+376.5(LL), K0116+385-K0116+388.5RL, K0116+388.5-K0116+409.2(LL), K0116+418.3-K0116+427.2(LL), K0116+445.2-K0116+449.5(LL), K0116+485.8- K0116+490.5(LL), K0116+495.1-K0116+508.7(LL), K0116+526.2-K0116+530.8(LL), K0116+535.3-K0116+539.7(LL), K0116+548.9-K0116+562.3(LL), K0116+575.8- K0116+580.3(LL)K0116+607-K0116+611.5(BL), K0116+611.5-K0116+616(LL), K0116+634.3-K0116+697.5(LL), K0116+706.5-K0116+710.7(LL), K0116+742.1- K0116+755.6(LL), K0116+817.4-K0116+821.8(LL), K0116+845-K0116+885.9(LL), K0116+953.9-K0116+967.3(LL), K0116+971.8-K0116+976.2(LL), K0116+985.3- K0116+1005.4(LL), K0116+1008-K0116+1012.5(LL), K0116+1135.2- K0116+1139.8(LL), K0116+1213-K0116+1217.5(LL)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.35,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0232-002224",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Baybay City Diversion Road, Sta. 3+839 - 5+180 (RS), Barangay Hipusngo - Barangay Palhi, Baybay City, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": 1.341,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17897091.72,
      "lengthMeters": 1341.0,
      "allocationPerStatedMeter": 17897.09,
      "rangesMeters": [
        [
          3839.0,
          5180.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "Baybay City Diversion Road, Sta. 3+839 - 5+180 (RS), Barangay Hipusngo - Barangay Palhi, Baybay City, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 82451.84,
      "peerRateMultiple": 0.22,
      "peerRecords": 35,
      "peerBand": "1133.86–<1692.25 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 185710.7475,
      "graphUpperFence": 269445.81
    },
    {
      "id": "HB10858-3-0289-003324",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Kabayo Br. (B02850LZ) along Pillila Jct-Jala Jala Rd",
      "office": "Rizal 2nd District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Kabayo Br. (B02850LZ) along Pillila Jct-Jala Jala Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0291-003362",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Lin-ab Br. (B00259SM) along Catarman-Calbayog Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Lin-ab Br. (B00259SM) along Catarman-Calbayog Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0293-003395",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Loel Br. (B00641MN) along Surallah-Lake Sebu-Maitum Rd",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Loel Br. (B00641MN) along Surallah-Lake Sebu-Maitum Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0452-006467",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads and Drainage (Sectional Reblocking) along Balubad St. (C 0+000 - C 0+532), Barangay 179, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "452",
      "lengthEvidence": "Construction of Roads and Drainage (Sectional Reblocking) along Balubad St. (C 0+000 - C 0+532), Barangay 179, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006585",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Kagawad Road, Barangay Batasan Hills, Quezon City, Metro Manila",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Rehabilitation of Road, Kagawad Road, Barangay Batasan Hills, Quezon City, Metro Manila",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0488-007249",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Sta. Victoria to Barangay Fuyo, City of Ilagan, Isabela (Sta. 0+000 - Sta. 2+800)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": 2.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8571428.57,
      "lengthMeters": 2800.0,
      "allocationPerStatedMeter": 8571.43,
      "rangesMeters": [
        [
          0.0,
          2800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Construction of Concrete Road, Barangay Sta. Victoria to Barangay Fuyo, City of Ilagan, Isabela (Sta. 0+000 - Sta. 2+800)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31447.78,
      "peerRateMultiple": 0.27,
      "peerRecords": 128,
      "peerBand": "≥2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87551.88124999999,
      "graphUpperFence": 127821.15499999998
    },
    {
      "id": "HB10858-3-0498-007445",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Contruction of Road, Sta. 0+000 - Sta. 1+800, Barangay Rizaluna - Barangay Villamarzo, Cordon Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": 1.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1800.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          1800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Contruction of Road, Sta. 0+000 - Sta. 1+800, Barangay Rizaluna - Barangay Villamarzo, Cordon Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.55,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0525-008031",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal at Barangay Sta Rita, Macabebe, Pampanga (14.90037222, 121.70156389 - 14.96720556, 121.68369722)",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Construction of Road with Drainage Canal at Barangay Sta Rita, Macabebe, Pampanga (14.90037222, 121.70156389 - 14.96720556, 121.68369722)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0534-008206",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction/Concreting of Road, Barangay Talimundoc Marimla to Panalicsican, Concepcion, Tarlac",
      "office": "Tarlac 2nd District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction/Concreting of Road, Barangay Talimundoc Marimla to Panalicsican, Concepcion, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0535-008232",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construcion of Road, Barangay San Isidro, Cabangan, Zambales",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Construcion of Road, Barangay San Isidro, Cabangan, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0560-008803",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Pedro, Sta. 2 + 141.00 to Sta. 2 + 826.00, Lupi, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 24000000,
      "lengthKm": 0.685,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35036496.35,
      "lengthMeters": 685.0,
      "allocationPerStatedMeter": 35036.5,
      "rangesMeters": [
        [
          2141.0,
          2826.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay San Pedro, Sta. 2 + 141.00 to Sta. 2 + 826.00, Lupi, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.43,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0163-000994",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0089 + 000 - K0089 + 320",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 23962000,
      "lengthKm": 0.32,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 74881250.0,
      "lengthMeters": 320.0,
      "allocationPerStatedMeter": 74881.25,
      "rangesMeters": [
        [
          89000.0,
          89320.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0089 + 000 - K0089 + 320",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 1.38,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0625-010166",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Riverside, Barangay Sampao, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 23946000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Road, Purok Riverside, Barangay Sampao, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0137-000527",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Liloy-Siocon Rd - K2059 + 011 - K2059 + 800, K2061 + 000 - K2061 + 470, K2061 + 670 - K2062 + 000",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 23925000,
      "lengthKm": 1.589,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 15056639.4,
      "lengthMeters": 1589.0,
      "allocationPerStatedMeter": 15056.64,
      "rangesMeters": [
        [
          2059011.0,
          2059800.0
        ],
        [
          2061000.0,
          2061470.0
        ],
        [
          2061670.0,
          2062000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Liloy-Siocon Rd - K2059 + 011 - K2059 + 800, K2061 + 000 - K2061 + 470, K2061 + 670 - K2062 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.49,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0166-001040",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Asuncion-San Isidro-Laak-Veruela Rd - K1528 + 000 - K1530 + 000",
      "office": "Agusan del Sur 2nd District Engineering Office",
      "amountPesos": 23795000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11897500.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 11897.5,
      "rangesMeters": [
        [
          1528000.0,
          1530000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "166",
      "lengthEvidence": "Asuncion-San Isidro-Laak-Veruela Rd - K1528 + 000 - K1530 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 0.53,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0210-001817",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Siocon-Sirawai Rd - K2081 + 000 - K2081 + 957",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 23786000,
      "lengthKm": 0.957,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24854754.44,
      "lengthMeters": 957.0,
      "allocationPerStatedMeter": 24854.75,
      "rangesMeters": [
        [
          2081000.0,
          2081957.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Siocon-Sirawai Rd - K2081 + 000 - K2081 + 957",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.49,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0290-003344",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Langao Br. (Cantilevered) (B00053NR) along Bais-Kabankalan Rd",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 23760000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Langao Br. (Cantilevered) (B00053NR) along Bais-Kabankalan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0453-006488",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads including Drainage along Kamuning St. (C 0+000 - C 0+592), Barangay 179, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 23700000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "453",
      "lengthEvidence": "Construction of Roads including Drainage along Kamuning St. (C 0+000 - C 0+592), Barangay 179, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0206-001737",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Paniqui-Camiling-Wawa Rd - K0164 + 837 - K0166 + 000",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 23656000,
      "lengthKm": 1.163,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20340498.71,
      "lengthMeters": 1163.0,
      "allocationPerStatedMeter": 20340.5,
      "rangesMeters": [
        [
          164837.0,
          166000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Paniqui-Camiling-Wawa Rd - K0164 + 837 - K0166 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.4,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0151-000777",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0684 + 565 - K0685 + 165, K0687 + 268 - K0687 + 332, K0687 + 968 - K0689 + 000",
      "office": "Central Office",
      "amountPesos": 23652000,
      "lengthKm": 1.696,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 13945754.72,
      "lengthMeters": 1696.0,
      "allocationPerStatedMeter": 13945.75,
      "rangesMeters": [
        [
          684565.0,
          685165.0
        ],
        [
          687268.0,
          687332.0
        ],
        [
          687968.0,
          689000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0684 + 565 - K0685 + 165, K0687 + 268 - K0687 + 332, K0687 + 968 - K0689 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 0.56,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0167-001067",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "JP Rizal St - K0005 + 797 - K0006 + 372",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 23550000,
      "lengthKm": 0.575,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40956521.74,
      "lengthMeters": 575.0,
      "allocationPerStatedMeter": 40956.52,
      "rangesMeters": [
        [
          5797.0,
          6372.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "JP Rizal St - K0005 + 797 - K0006 + 372",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.29,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0268-002844",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Talaba Br. (B02569LZ) along Maharlika Highway (LZ)",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 23542000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Talaba Br. (B02569LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0264-002775",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Mangga Br. 2 (B00959MN) along Linamon-Zamboanga Rd",
      "office": "Lanao del Norte 1st District Engineering Office",
      "amountPesos": 23520000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Mangga Br. 2 (B00959MN) along Linamon-Zamboanga Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0289-003327",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Sta. Cruz Br. (B00388PW) along Puerto Princesa North Rd",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 23500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Sta. Cruz Br. (B00388PW) along Puerto Princesa North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0121-000206",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dumaguete South Rd - K0096 + 000 - K0096 + 016, K0096 + 208 - K0096 + 630.592",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 23457000,
      "lengthKm": 0.4385920000000042,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 53482507.66,
      "lengthMeters": 438.592,
      "allocationPerStatedMeter": 53482.51,
      "rangesMeters": [
        [
          96000.0,
          96016.0
        ],
        [
          96208.0,
          96630.592
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "Dumaguete South Rd - K0096 + 000 - K0096 + 016, K0096 + 208 - K0096 + 630.592",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 1.12,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0132-000413",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Cavite-Batangas Rd - K0020 + 270 - K0021 + 231",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 23448000,
      "lengthKm": 0.961,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24399583.77,
      "lengthMeters": 961.0,
      "allocationPerStatedMeter": 24399.58,
      "rangesMeters": [
        [
          20270.0,
          21231.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Cavite-Batangas Rd - K0020 + 270 - K0021 + 231",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0282-003169",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Namat Paido Br. (B01871MN) along Awang-Upi-Lebak-Kalamansig-Palimbang- Sarangani Rd",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 23439000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Namat Paido Br. (B01871MN) along Awang-Upi-Lebak-Kalamansig-Palimbang- Sarangani Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0262-002741",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Danat Br. (B00276PW) along Puerto Princesa North Rd",
      "office": "Palawan 1st District Engineering Office",
      "amountPesos": 23430000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "Danat Br. (B00276PW) along Puerto Princesa North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006765",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Palina, Pugo, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 23400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Barangay Palina, Pugo, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0144-000667",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0036 + 643 - K0037 + 000, K0037 + 337 - K0039 + 000",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 23384000,
      "lengthKm": 2.02,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 11576237.62,
      "lengthMeters": 2020.0,
      "allocationPerStatedMeter": 11576.24,
      "rangesMeters": [
        [
          36643.0,
          37000.0
        ],
        [
          37337.0,
          39000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0036 + 643 - K0037 + 000, K0037 + 337 - K0039 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30038.43,
      "peerRateMultiple": 0.39,
      "peerRecords": 22,
      "peerBand": "1787–<2354 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 52355.79875000001,
      "graphUpperFence": 73706.54000000001
    },
    {
      "id": "HB10858-3-0558-008741",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Pili-Banao-Bical Road, Bacacay, Albay",
      "office": "Albay 1st District Engineering Office",
      "amountPesos": 23278000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Rehabilitation of Pili-Banao-Bical Road, Bacacay, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0164-001014",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0103 + 537 - K0104+638",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 23268000,
      "lengthKm": 1.101,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21133514.99,
      "lengthMeters": 1101.0,
      "allocationPerStatedMeter": 21133.51,
      "rangesMeters": [
        [
          103537.0,
          104638.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0103 + 537 - K0104+638",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 0.8,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0524-008009",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Replacement of Bridge, Barangay Camiing, Guimba, Nueva Ecija Sta. 0+000 - Sta. 0+015",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 23250000,
      "lengthKm": 0.015,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1550000000.0,
      "lengthMeters": 15.0,
      "allocationPerStatedMeter": 1550000.0,
      "rangesMeters": [
        [
          0.0,
          15.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Replacement of Bridge, Barangay Camiing, Guimba, Nueva Ecija Sta. 0+000 - Sta. 0+015",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 1.1,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0493-007340",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nueva Era, San Manuel, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 23240000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road, Barangay Nueva Era, San Manuel, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0263-002756",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Cagnoling Br. (B00176LT) along Palo-Carigara-Ormoc Rd",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 23237000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Cagnoling Br. (B00176LT) along Palo-Carigara-Ormoc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0291-003352",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Guinkayangan Br. (B00167LT) along Sto Rosario-Villaba Rd",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 23200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Guinkayangan Br. (B00167LT) along Sto Rosario-Villaba Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0291-003355",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Sambulawan Br. (B00089LT) along Lemon-Leyte-Biliran Rd",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 23200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Sambulawan Br. (B00089LT) along Lemon-Leyte-Biliran Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0544-008428",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road along Bisita St., Barangay Balsahan-Bisita, Sta. 0 + 000 - Sta. 0 + 323, Kawit Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 23200000,
      "lengthKm": 0.323,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 71826625.39,
      "lengthMeters": 323.0,
      "allocationPerStatedMeter": 71826.63,
      "rangesMeters": [
        [
          0.0,
          323.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road along Bisita St., Barangay Balsahan-Bisita, Sta. 0 + 000 - Sta. 0 + 323, Kawit Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 2.51,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0135-000488",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Libon-Bacolod-Sn Vicente-Marocmoc-Buga Rd - K0491 + 949 - K0492 + 457, K0492 + 590 - K0492 + 816, K0492 + 856 - K0493 + 551, K0493 + 568 - K0494 + 622",
      "office": "Albay 3rd District Engineering Office",
      "amountPesos": 23199000,
      "lengthKm": 2.483,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 9343133.31,
      "lengthMeters": 2483.0,
      "allocationPerStatedMeter": 9343.13,
      "rangesMeters": [
        [
          491949.0,
          492457.0
        ],
        [
          492590.0,
          492816.0
        ],
        [
          492856.0,
          493551.0
        ],
        [
          493568.0,
          494622.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Libon-Bacolod-Sn Vicente-Marocmoc-Buga Rd - K0491 + 949 - K0492 + 457, K0492 + 590 - K0492 + 816, K0492 + 856 - K0493 + 551, K0493 + 568 - K0494 + 622",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.46,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0118-000138",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway( Cotabato-Marbel Rd) - K1722 + 774 - K1723 + 006",
      "office": "Central Office",
      "amountPesos": 23197000,
      "lengthKm": 0.232,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 99987068.97,
      "lengthMeters": 232.0,
      "allocationPerStatedMeter": 99987.07,
      "rangesMeters": [
        [
          1722774.0,
          1723006.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Maharlika Highway( Cotabato-Marbel Rd) - K1722 + 774 - K1723 + 006",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 2.15,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0170-001111",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Calamba-Tagaytay Rd - K0051 + (-564) - K0051 + (-120), K0051 + 571 - K0051 + 669, K0051 + 850 - K0052 + 543, K0053 + 150 - K0053 + 553, K0055 + 000 - K0055 + 215, K0064 + 115 - K0064 + 218",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 23138000,
      "lengthKm": 1.956,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 11829243.35,
      "lengthMeters": 1956.0,
      "allocationPerStatedMeter": 11829.24,
      "rangesMeters": [
        [
          50436.0,
          50880.0
        ],
        [
          51571.0,
          51669.0
        ],
        [
          51850.0,
          52543.0
        ],
        [
          53150.0,
          53553.0
        ],
        [
          55000.0,
          55215.0
        ],
        [
          64115.0,
          64218.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Calamba-Tagaytay Rd - K0051 + (-564) - K0051 + (-120), K0051 + 571 - K0051 + 669, K0051 + 850 - K0052 + 543, K0053 + 150 - K0053 + 553, K0055 + 000 - K0055 + 215, K0064 + 115 - K0064 + 218",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 0.52,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0163-000987",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Lagta-Crossing Malinta Rd - K0099 + 925 - K0100 + 243",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 23091000,
      "lengthKm": 0.318,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 72613207.55,
      "lengthMeters": 318.0,
      "allocationPerStatedMeter": 72613.21,
      "rangesMeters": [
        [
          99925.0,
          100243.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Lagta-Crossing Malinta Rd - K0099 + 925 - K0100 + 243",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 1.34,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0131-000398",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Batangas-Lobo Rd - K0131 + 925 - K0131 + 1275",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 23083000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 65951428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 65951.43,
      "rangesMeters": [
        [
          131925.0,
          132275.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Batangas-Lobo Rd - K0131 + 925 - K0131 + 1275",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 2.04,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0198-001568",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0632 + 470 - K0633 + 600",
      "office": "Central Office",
      "amountPesos": 23070000,
      "lengthKm": 1.13,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20415929.2,
      "lengthMeters": 1130.0,
      "allocationPerStatedMeter": 20415.93,
      "rangesMeters": [
        [
          632470.0,
          633600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Maharlika Highway (LZ) - K0632 + 470 - K0633 + 600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 0.46,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0245-002438",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Bacolod North Road (S00406NR) K0045 + 000 - K0048 + 245 (Road Safety: Roadway Lighting)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 23070000,
      "lengthKm": 3.245,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 7109399.08,
      "lengthMeters": 3245.0,
      "allocationPerStatedMeter": 7109.4,
      "rangesMeters": [
        [
          45000.0,
          48245.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Bacolod North Road (S00406NR) K0045 + 000 - K0048 + 245 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.59,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0626-010175",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nuling to Barangay Barurao I, Lebak, Sultan Kudarat",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 23026000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Construction of Road, Barangay Nuling to Barangay Barurao I, Lebak, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0161-000945",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Jct Lucban-Luisiana Rd - K0130 + 000 - K0130 + 650",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 23000000,
      "lengthKm": 0.65,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35384615.38,
      "lengthMeters": 650.0,
      "allocationPerStatedMeter": 35384.62,
      "rangesMeters": [
        [
          130000.0,
          130650.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Jct Lucban-Luisiana Rd - K0130 + 000 - K0130 + 650",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 1.07,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0179-001261",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "MSR Jct-Lopez-Buenavista Rd - K0230 + 900 - K0230 + 940, K0235 + 546 - K0235 + 591, K0235 + 874 - K0235 + 910",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 23000000,
      "lengthKm": 0.121,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 190082644.63,
      "lengthMeters": 121.0,
      "allocationPerStatedMeter": 190082.64,
      "rangesMeters": [
        [
          230900.0,
          230940.0
        ],
        [
          235546.0,
          235591.0
        ],
        [
          235874.0,
          235910.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "MSR Jct-Lopez-Buenavista Rd - K0230 + 900 - K0230 + 940, K0235 + 546 - K0235 + 591, K0235 + 874 - K0235 + 910",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 1.0,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0187-001401",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Demoloc-Little Baguio-Alabel Rd - K1668 + 150 - K1668 + 165, K1668 + 670 - K1668 + 690",
      "office": "Sarangani District Engineering Office",
      "amountPesos": 23000000,
      "lengthKm": 0.035,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 657142857.14,
      "lengthMeters": 35.0,
      "allocationPerStatedMeter": 657142.86,
      "rangesMeters": [
        [
          1668150.0,
          1668165.0
        ],
        [
          1668670.0,
          1668690.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "187",
      "lengthEvidence": "Demoloc-Little Baguio-Alabel Rd - K1668 + 150 - K1668 + 165, K1668 + 670 - K1668 + 690",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 1.76,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0200-001605",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Tarlac-Guimba Rd via Victoria - K0129 + 752 - K0130 + 375",
      "office": "Tarlac 2nd District Engineering Office",
      "amountPesos": 23000000,
      "lengthKm": 0.623,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36918138.04,
      "lengthMeters": 623.0,
      "allocationPerStatedMeter": 36918.14,
      "rangesMeters": [
        [
          129752.0,
          130375.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Tarlac-Guimba Rd via Victoria - K0129 + 752 - K0130 + 375",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 0.76,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0242-002401",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Taal Lake Circumferential Road (Tanauan Section), Tanauan City, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 23000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "242",
      "lengthEvidence": "Taal Lake Circumferential Road (Tanauan Section), Tanauan City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0244-002435",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Construction of Pedestrian Overpass along Sumulong Highway Fronting the old Barangay Mambugan Hall, Barangay Mambugan, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 23000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "244",
      "lengthEvidence": "Construction of Pedestrian Overpass along Sumulong Highway Fronting the old Barangay Mambugan Hall, Barangay Mambugan, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0292-003372",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Panoon Br. (B01247MN) along Jct Sayre H-way-Impasugong-Patulangan By-Pass Rd",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 23000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Panoon Br. (B01247MN) along Jct Sayre H-way-Impasugong-Patulangan By-Pass Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0453-006486",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads including Drainage along Anapla St. (C0+000 - C0+267), Barangay 179, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 23000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "453",
      "lengthEvidence": "Construction of Roads including Drainage along Anapla St. (C0+000 - C0+267), Barangay 179, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006533",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/ Upgrading of Bridges, Paso De Blas Bridge along Polo-Novaliches Road, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 23000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation/ Upgrading of Bridges, Paso De Blas Bridge along Polo-Novaliches Road, Valenzuela City",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007194",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Sitio Maasin, Barangay Iraga, Solana, Cagayan (0+000 - 1+250)",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 23000000,
      "lengthKm": 1.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18400000.0,
      "lengthMeters": 1250.0,
      "allocationPerStatedMeter": 18400.0,
      "rangesMeters": [
        [
          0.0,
          1250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Rehabilitation of Road at Sitio Maasin, Barangay Iraga, Solana, Cagayan (0+000 - 1+250)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.74,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0547-008502",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Sta. Maria Magdalena, San Pablo City, Laguna",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 23000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Rehabilitation of Road, Barangay Sta. Maria Magdalena, San Pablo City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008963",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of access road, Sta. 2+790 - Sta. 3+790, from sitio Camansi,Bgy Fatima,Tobias Fornier to Bgy. Tagaytay,Anini-y,Antique",
      "office": "Antique District Engineering Office",
      "amountPesos": 23000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 23000.0,
      "rangesMeters": [
        [
          2790.0,
          3790.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Concreting of access road, Sta. 2+790 - Sta. 3+790, from sitio Camansi,Bgy Fatima,Tobias Fornier to Bgy. Tagaytay,Anini-y,Antique",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.92,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0581-009255",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Cang-asagan leading to Cang-asagan Elementary School, San Juan, Siquijor (0 + 000 - 0 + 600)",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 23000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38333333.33,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 38333.33,
      "rangesMeters": [
        [
          0.0,
          600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Road Barangay Cang-asagan leading to Cang-asagan Elementary School, San Juan, Siquijor (0 + 000 - 0 + 600)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.57,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0213-001864",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Mintac Port Rd - K0085 + (-065) - K0086 + 000",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 22909000,
      "lengthKm": 1.065,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21510798.12,
      "lengthMeters": 1065.0,
      "allocationPerStatedMeter": 21510.8,
      "rangesMeters": [
        [
          84935.0,
          86000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "213",
      "lengthEvidence": "Mintac Port Rd - K0085 + (-065) - K0086 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.53,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0615-009961",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Calamcam to Barangay Magkarila Road, Sta. 0+000 - Sta. 0+850, Talisayan, Misamis Oriental",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 22900000,
      "lengthKm": 0.85,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26941176.47,
      "lengthMeters": 850.0,
      "allocationPerStatedMeter": 26941.18,
      "rangesMeters": [
        [
          0.0,
          850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Construction of Barangay Calamcam to Barangay Magkarila Road, Sta. 0+000 - Sta. 0+850, Talisayan, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.39,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0271-002918",
      "category": "Mixed roads / bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Malangog Bridge (B00431LZ) along Andaya Highway (Package B3-B)",
      "office": "Central Office",
      "amountPesos": 22895000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Malangog Bridge (B00431LZ) along Andaya Highway (Package B3-B)",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0145-000693",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Concepcion-Sn Dionisio Rd - K0223 + 126 - K0224 + 000",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 22870000,
      "lengthKm": 0.874,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26167048.05,
      "lengthMeters": 874.0,
      "allocationPerStatedMeter": 26167.05,
      "rangesMeters": [
        [
          223126.0,
          224000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Concepcion-Sn Dionisio Rd - K0223 + 126 - K0224 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.09,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0120-000182",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Tanza-Trece Martires City-Indang Rd - K0036 + 380 - K0037 + 018",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 22696000,
      "lengthKm": 0.638,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35573667.71,
      "lengthMeters": 638.0,
      "allocationPerStatedMeter": 35573.67,
      "rangesMeters": [
        [
          36380.0,
          37018.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Tanza-Trece Martires City-Indang Rd - K0036 + 380 - K0037 + 018",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 0.84,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0133-000459",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagaytay-Manila via Silang Rd - K0057 + (-576) - K0057 + 000",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 22694000,
      "lengthKm": 0.576,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39399305.56,
      "lengthMeters": 576.0,
      "allocationPerStatedMeter": 39399.31,
      "rangesMeters": [
        [
          56424.0,
          57000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Tagaytay-Manila via Silang Rd - K0057 + (-576) - K0057 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.22,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0132-000428",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0052 + (-120) - K0052 + 450",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 22629000,
      "lengthKm": 0.57,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39700000.0,
      "lengthMeters": 570.0,
      "allocationPerStatedMeter": 39700.0,
      "rangesMeters": [
        [
          51880.0,
          52450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0052 + (-120) - K0052 + 450",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.23,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0162-000958",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Sibuyan Circumferential Rd - K0053 + 800 - K0054 + 000, K0055 + 600 - K0055 + 700",
      "office": "Romblon District Engineering Office",
      "amountPesos": 22620000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 75400000.0,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 75400.0,
      "rangesMeters": [
        [
          53800.0,
          54000.0
        ],
        [
          55600.0,
          55700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Sibuyan Circumferential Rd - K0053 + 800 - K0054 + 000, K0055 + 600 - K0055 + 700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 1.39,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0498-007455",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Constructin of Road, Sta. 0+000 - Sta. 1+695, Barangay 2, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 22600000,
      "lengthKm": 1.695,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1695.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          1695.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Constructin of Road, Sta. 0+000 - Sta. 1+695, Barangay 2, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.55,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0119-000159",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Judge Jose De Venecia Sr. Avenue Road, K0207+617 - K0207+996",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 22588000,
      "lengthKm": 0.379,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 59598944.59,
      "lengthMeters": 379.0,
      "allocationPerStatedMeter": 59598.94,
      "rangesMeters": [
        [
          207617.0,
          207996.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Judge Jose De Venecia Sr. Avenue Road, K0207+617 - K0207+996",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 1.24,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0184-001352",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Claveria-Calanasan-Kabugao Rd - K0666 + 740 - K0666 + 790",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 22545000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 450900000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 450900.0,
      "rangesMeters": [
        [
          666740.0,
          666790.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Claveria-Calanasan-Kabugao Rd - K0666 + 740 - K0666 + 790",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 1.21,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0232-002232",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 22540000,
      "lengthKm": 0.614,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36710097.72,
      "lengthMeters": 614.0,
      "allocationPerStatedMeter": 36710.1,
      "rangesMeters": [
        [
          14196.0,
          14810.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.27,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0143-000638",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Bacnotan-Luna-Balaoan Rd - K0306 + 007 - K0307 + 704",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 22536000,
      "lengthKm": 1.697,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13279905.72,
      "lengthMeters": 1697.0,
      "allocationPerStatedMeter": 13279.91,
      "rangesMeters": [
        [
          306007.0,
          307704.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Bacnotan-Luna-Balaoan Rd - K0306 + 007 - K0307 + 704",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 0.62,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0161-000955",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Sibuyan Circumferential Rd - K0002 + 834 - K0002 + 974, K0003 + 845 - K0004 + 000",
      "office": "Romblon District Engineering Office",
      "amountPesos": 22500000,
      "lengthKm": 0.295,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 76271186.44,
      "lengthMeters": 295.0,
      "allocationPerStatedMeter": 76271.19,
      "rangesMeters": [
        [
          2834.0,
          2974.0
        ],
        [
          3845.0,
          4000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Sibuyan Circumferential Rd - K0002 + 834 - K0002 + 974, K0003 + 845 - K0004 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 1.4,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0208-001774",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Buenavista-Kawayan Rd - K0063 + 000 - K0063 + 450",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 22500000,
      "lengthKm": 0.45,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 450.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          63000.0,
          63450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Buenavista-Kawayan Rd - K0063 + 000 - K0063 + 450",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 0.96,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0279-003093",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Cabadiangan Br. (B00498LT) along Mayorga-Lapaz Rd",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 22500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Cabadiangan Br. (B00498LT) along Mayorga-Lapaz Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0289-003318",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Piela Br. (West) (B04244LZ) along Juanito R. Remulla, Sr. Rd",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 22500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Piela Br. (West) (B04244LZ) along Juanito R. Remulla, Sr. Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0290-003340",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Panlaya-an Br. (B00115NR) along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 22500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Panlaya-an Br. (B00115NR) along Dumaguete North Rd (Jct Bais-Kabankalan-Negros Occ Bdry)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0291-003356",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Tabing Br. (B00499LT) along Tabing-Kawayan-Sta Rosa-Lawis-Tabango Rd",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 22500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Tabing Br. (B00499LT) along Tabing-Kawayan-Sta Rosa-Lawis-Tabango Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006744",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Local Access Road at Sitio Bitag, Manga, Aringay, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 22500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Local Access Road at Sitio Bitag, Manga, Aringay, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006754",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Camil-Bucutan, San Fermin, Caba, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 22500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay Camil-Bucutan, San Fermin, Caba, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0489-007254",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road including Construction of Road Slope Protection Structure, Barangay Poblacion 1 to Barangay Poblacion 3, Santa Maria, Isabela (Sta. 0+000 - Sta. 1+150| Sta. 0+000 - Sta. 0+920)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 22500000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          1150.0
        ],
        [
          0.0,
          920.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of Concrete Road including Construction of Road Slope Protection Structure, Barangay Poblacion 1 to Barangay Poblacion 3, Santa Maria, Isabela (Sta. 0+000 - Sta. 1+150| Sta. 0+000 - Sta. 0+920)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0490-007269",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Section 1:Sta. 5+296 - Sta. 6+887, Section 2: Sta. 0+000 -Sta. 0+219) including Construction of Concrete Road (Section 3: Sta. 0+000 - Sta. 0+290), Barangay Cabeseria 14 and 16, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 22500000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          5296.0,
          6887.0
        ],
        [
          0.0,
          219.0
        ],
        [
          0.0,
          290.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Rehabilitation of Road (Section 1:Sta. 5+296 - Sta. 6+887, Section 2: Sta. 0+000 -Sta. 0+219) including Construction of Concrete Road (Section 3: Sta. 0+000 - Sta. 0+290), Barangay Cabeseria 14 and 16, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0591-009481",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Campesao, Borongan City, Eastern Samar (Sta. 0+000 - Sta. 0+433)",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 22500000,
      "lengthKm": 0.433,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51963048.5,
      "lengthMeters": 433.0,
      "allocationPerStatedMeter": 51963.05,
      "rangesMeters": [
        [
          0.0,
          433.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Construction of Road, Barangay Campesao, Borongan City, Eastern Samar (Sta. 0+000 - Sta. 0+433)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 2.12,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0269-002883",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Tinag-an Br. (B00584LT) along Ormoc-Baybay-Southern Leyte Bdry Rd",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 22483000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Tinag-an Br. (B00584LT) along Ormoc-Baybay-Southern Leyte Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0247-002480",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Leonard Wood Rd - K0250 + (-375) - K0251 + 398 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Central Office",
      "amountPesos": 22459000,
      "lengthKm": 1.773,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12667230.68,
      "lengthMeters": 1773.0,
      "allocationPerStatedMeter": 12667.23,
      "rangesMeters": [
        [
          249625.0,
          251398.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "Leonard Wood Rd - K0250 + (-375) - K0251 + 398 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 1.0,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0137-000524",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Jct Pulauan Port Rd - K1827 + 450 - K1828 + 000",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "amountPesos": 22439000,
      "lengthKm": 0.55,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40798181.82,
      "lengthMeters": 550.0,
      "allocationPerStatedMeter": 40798.18,
      "rangesMeters": [
        [
          1827450.0,
          1828000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Jct Pulauan Port Rd - K1827 + 450 - K1828 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.26,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0471-006867",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Replacement of Bolosan Bridge, Barangay Bolosan, Sta 0+000 - Sta 0+041.6, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 22415000,
      "lengthKm": 0.0416,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 538822115.38,
      "lengthMeters": 41.6,
      "allocationPerStatedMeter": 538822.12,
      "rangesMeters": [
        [
          0.0,
          41.6
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Replacement of Bolosan Bridge, Barangay Bolosan, Sta 0+000 - Sta 0+041.6, Dagupan City, Pangasinan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 0.89,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0249-002500",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Lipa City - Alaminos Rd - K0077 + 000 - K0079 + 756, K0079 + 915 - K0080 + 059, K0081 + 389 - K0082 + 262 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 22401000,
      "lengthKm": 3.773,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 5937185.26,
      "lengthMeters": 3773.0,
      "allocationPerStatedMeter": 5937.19,
      "rangesMeters": [
        [
          77000.0,
          79756.0
        ],
        [
          79915.0,
          80059.0
        ],
        [
          81389.0,
          82262.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "249",
      "lengthEvidence": "Lipa City - Alaminos Rd - K0077 + 000 - K0079 + 756, K0079 + 915 - K0080 + 059, K0081 + 389 - K0082 + 262 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.57,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0134-000473",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Candelaria Bypass Rd - K0105 + (-446) - K0105 + (-289), K0105 + (-259) - K0105 + 307",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 22399000,
      "lengthKm": 0.723,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 30980636.24,
      "lengthMeters": 723.0,
      "allocationPerStatedMeter": 30980.64,
      "rangesMeters": [
        [
          104554.0,
          104711.0
        ],
        [
          104741.0,
          105307.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Candelaria Bypass Rd - K0105 + (-446) - K0105 + (-289), K0105 + (-259) - K0105 + 307",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.96,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0154-000845",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0082 + 000 - K0083 + 000",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 22390000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22390000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 22390.0,
      "rangesMeters": [
        [
          82000.0,
          83000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0082 + 000 - K0083 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 0.94,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0155-000852",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0127 + 231 - K0128 + 224",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 22390000,
      "lengthKm": 0.993,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22547834.84,
      "lengthMeters": 993.0,
      "allocationPerStatedMeter": 22547.83,
      "rangesMeters": [
        [
          127231.0,
          128224.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0127 + 231 - K0128 + 224",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 0.95,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0467-006768",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pongpong, Sto Tomas, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 22320000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Barangay Pongpong, Sto Tomas, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0141-000592",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Parpagoha (Marigondon)-Binoog Rd - K0017 + (-272) - K0017 + (-112), K0019 + 500 - K0020 + 000, K0022 + 000 - K0022 + 500, K0023 + 000 - K0023 + 383",
      "office": "Central Office",
      "amountPesos": 22286000,
      "lengthKm": 1.543,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14443292.29,
      "lengthMeters": 1543.0,
      "allocationPerStatedMeter": 14443.29,
      "rangesMeters": [
        [
          16728.0,
          16888.0
        ],
        [
          19500.0,
          20000.0
        ],
        [
          22000.0,
          22500.0
        ],
        [
          23000.0,
          23383.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "141",
      "lengthEvidence": "Parpagoha (Marigondon)-Binoog Rd - K0017 + (-272) - K0017 + (-112), K0019 + 500 - K0020 + 000, K0022 + 000 - K0022 + 500, K0023 + 000 - K0023 + 383",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 0.67,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0117-000114",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (MN) - (S01364MN) K1469 + 368 - K1469 + 517, K1470 + 161 - K1470 + 457, (S01390MN) K1471 + 595 - K1471 + 891, K1471 + 1431 - K1471 + 1580",
      "office": "Central Office",
      "amountPesos": 22218000,
      "lengthKm": 0.89,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 24964044.94,
      "lengthMeters": 890.0,
      "allocationPerStatedMeter": 24964.04,
      "rangesMeters": [
        [
          1469368.0,
          1469517.0
        ],
        [
          1470161.0,
          1470457.0
        ],
        [
          1471595.0,
          1471891.0
        ],
        [
          1472431.0,
          1472580.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Maharlika Highway (MN) - (S01364MN) K1469 + 368 - K1469 + 517, K1470 + 161 - K1470 + 457, (S01390MN) K1471 + 595 - K1471 + 891, K1471 + 1431 - K1471 + 1580",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 0.59,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0178-001246",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Nueva Vizcaya-Ifugao-Mt Province Rd - K0343 + 740 - K0343 + 763, K0344 + 670 - K0344 + 697, K0345 + 049 - K0345 + 094, K0348 + 287 - K0348 + 350, K0348 + 434 - K0348 + 446, K0349 + 223 - K0349 + 251, K0349 + 289 - K0349 + 341, K0350 + 192 - K0350 + 228, K0350 + 582 - K0350 + 595, K0351 + 462 - K0351 + 479, K0360 + 400 - K0360 + 424",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 22214000,
      "lengthKm": 0.34,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 65335294.12,
      "lengthMeters": 340.0,
      "allocationPerStatedMeter": 65335.29,
      "rangesMeters": [
        [
          343740.0,
          343763.0
        ],
        [
          344670.0,
          344697.0
        ],
        [
          345049.0,
          345094.0
        ],
        [
          348287.0,
          348350.0
        ],
        [
          348434.0,
          348446.0
        ],
        [
          349223.0,
          349251.0
        ],
        [
          349289.0,
          349341.0
        ],
        [
          350192.0,
          350228.0
        ],
        [
          350582.0,
          350595.0
        ],
        [
          351462.0,
          351479.0
        ],
        [
          360400.0,
          360424.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Nueva Vizcaya-Ifugao-Mt Province Rd - K0343 + 740 - K0343 + 763, K0344 + 670 - K0344 + 697, K0345 + 049 - K0345 + 094, K0348 + 287 - K0348 + 350, K0348 + 434 - K0348 + 446, K0349 + 223 - K0349 + 251, K0349 + 289 - K0349 + 341, K0350 + 192 - K0350 + 228, K0350 + 582 - K0350 + 595, K0351 + 462 - K0351 + 479, K0360 + 400 - K0360 + 424",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 0.36,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0144-000655",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Gapan-Fort Magsaysay Rd - K0095 + 093 - K0096 + 000, K0097 + 073 - K0099 + 237",
      "office": "Nueva Ecija 2nd District Engineering Office",
      "amountPesos": 22203000,
      "lengthKm": 3.071,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 7229892.54,
      "lengthMeters": 3071.0,
      "allocationPerStatedMeter": 7229.89,
      "rangesMeters": [
        [
          95093.0,
          96000.0
        ],
        [
          97073.0,
          99237.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Gapan-Fort Magsaysay Rd - K0095 + 093 - K0096 + 000, K0097 + 073 - K0099 + 237",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16577.86,
      "peerRateMultiple": 0.44,
      "peerRecords": 23,
      "peerBand": "2354–<3630 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 51138.87500000001,
      "graphUpperFence": 73067.42000000001
    },
    {
      "id": "HB10858-3-0293-003400",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Sewod Br. (B00614MN) along Isulan Jct-Ninoy Aquino Rd",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 22152000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Sewod Br. (B00614MN) along Isulan Jct-Ninoy Aquino Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0145-000686",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Poblacion-Mahayahay Port Rd - (S00036MT) Chainage 008 - Chainage 743",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 22050000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Poblacion-Mahayahay Port Rd - (S00036MT) Chainage 008 - Chainage 743",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0170-001114",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Quezon-Alabat-Perez Rd - K0003 + 230 - K0003 + 275, K0017 + 670 - K0017 + 800, K0220 + 328 - K0020 + 513",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 22005000,
      "lengthKm": 199.99,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 110030.5,
      "lengthMeters": 199990.0,
      "allocationPerStatedMeter": 110.03,
      "rangesMeters": [
        [
          3230.0,
          3275.0
        ],
        [
          17670.0,
          17800.0
        ],
        [
          20513.0,
          220328.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Quezon-Alabat-Perez Rd - K0003 + 230 - K0003 + 275, K0017 + 670 - K0017 + 800, K0220 + 328 - K0020 + 513",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 0.0,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0130-000377",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Nueva Ecija-Pangasinan Rd - K0165 + 000 - K0166 + 000",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 22000.0,
      "rangesMeters": [
        [
          165000.0,
          166000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Nueva Ecija-Pangasinan Rd - K0165 + 000 - K0166 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.72,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0172-001147",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "MC Briones St - (S00122CB) Chainage 000 - Chainage 290",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "172",
      "lengthEvidence": "MC Briones St - (S00122CB) Chainage 000 - Chainage 290",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0178-001251",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Baguio-Bontoc Rd - K0358 + 700 - K0358 + 803",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": 0.103,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 213592233.01,
      "lengthMeters": 103.0,
      "allocationPerStatedMeter": 213592.23,
      "rangesMeters": [
        [
          358700.0,
          358803.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Baguio-Bontoc Rd - K0358 + 700 - K0358 + 803",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 0.71,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0181-001298",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1549 + 140 - K1549 + 212",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": 0.072,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 305555555.56,
      "lengthMeters": 72.0,
      "allocationPerStatedMeter": 305555.56,
      "rangesMeters": [
        [
          1549140.0,
          1549212.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1549 + 140 - K1549 + 212",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 1.02,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0229-002185",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": 0.41819000000000006,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52607666.37,
      "lengthMeters": 418.19,
      "allocationPerStatedMeter": 52607.67,
      "rangesMeters": [
        [
          1594.0,
          2012.19
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.41,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0257-002610",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Maragayap East Br. (B02654LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 22000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Maragayap East Br. (B02654LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0289-003328",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Tabuan Br. (B00411LZ) along Pili-Tigaon Albay Bdry Rd",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Tabuan Br. (B00411LZ) along Pili-Tigaon Albay Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0291-003366",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Lux Br. 1 (B01184MN) along Liloy-Siocon Rd",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Lux Br. 1 (B01184MN) along Liloy-Siocon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006511",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along I. Marcelo St. (C0+000 to C0+589), Barangay Malanday, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along I. Marcelo St. (C0+000 to C0+589), Barangay Malanday, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006718",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Caraitan, Badoc, Ilocos Norte",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Road, Barangay Caraitan, Badoc, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006720",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pagsanahan Sur, Badoc, Ilocos Norte",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Construction of Road, Barangay Pagsanahan Sur, Badoc, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006844",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Urbiztondo, Pangasinan, Start 15.819427, 120.35594 End 15.819416, 120.355928",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Improvement of Road at Urbiztondo, Pangasinan, Start 15.819427, 120.35594 End 15.819416, 120.355928",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0489-007261",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of of Concrete Road (Sta.5+900-Sta.7+100) at Sito Bating, Barangay Namnama, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18333333.33,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 18333.33,
      "rangesMeters": [
        [
          5900.0,
          7100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of of Concrete Road (Sta.5+900-Sta.7+100) at Sito Bating, Barangay Namnama, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.73,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0489-007267",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of of Concrete Road (Sta.5+900-Sta.7+100) at Sito Bating, Barangay Namnama, Cit of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18333333.33,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 18333.33,
      "rangesMeters": [
        [
          5900.0,
          7100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of of Concrete Road (Sta.5+900-Sta.7+100) at Sito Bating, Barangay Namnama, Cit of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.73,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0538-008284",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Calo to Barangay San Miguel, Lobo, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Construction of Road, Barangay Calo to Barangay San Miguel, Lobo, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0544-008447",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, General Trias City, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Improvement of Road, General Trias City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008472",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Barangay Burol, Majayjay, Laguna, Start 14.167255, 121.465026, End 14.16675, 121.46886111",
      "office": "Laguna 1st District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Concreting of Road at Barangay Burol, Majayjay, Laguna, Start 14.167255, 121.465026, End 14.16675, 121.46886111",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008686",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Taritien, Narra, Palawan",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of Road, Barangay Taritien, Narra, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0570-009002",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Oracon - Sitio Bankiling - Sitio Casilian Road, Sta. 0 + 600 - Sta. 1 + 800, Barangay Oracon Sur and Barangay Oracon Norte, Sibunag and Nueva Valencia, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18333333.33,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 18333.33,
      "rangesMeters": [
        [
          600.0,
          1800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Construction of Road, Oracon - Sitio Bankiling - Sitio Casilian Road, Sta. 0 + 600 - Sta. 1 + 800, Barangay Oracon Sur and Barangay Oracon Norte, Sibunag and Nueva Valencia, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.73,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0570-009007",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Tibwason - Paho, Sta. 1 + 350 - Sta. 2 + 450, Barangay Ayangan, Sibunag, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": 1.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 1100.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          1350.0,
          2450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Construction of Road, Sitio Tibwason - Paho, Sta. 1 + 350 - Sta. 2 + 450, Barangay Ayangan, Sibunag, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0598-009610",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road leading to Buray Bagsakan and Buray Terminal, Buray, Paranas, Samar, 11.770044, 125.039969",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Construction of Access Road leading to Buray Bagsakan and Buray Terminal, Buray, Paranas, Samar, 11.770044, 125.039969",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0625-010170",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Junction National Highway to Lasedeco Road, Barangay Kalawag I, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 22000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Road, Junction National Highway to Lasedeco Road, Barangay Kalawag I, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0133-000441",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Maragondon-Magallanes-Amuyong Rd - K0056 + 000 - K0056 + 545, K0057 + 833 - K0058 + 000",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 21974000,
      "lengthKm": 0.712,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 30862359.55,
      "lengthMeters": 712.0,
      "allocationPerStatedMeter": 30862.36,
      "rangesMeters": [
        [
          56000.0,
          56545.0
        ],
        [
          57833.0,
          58000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Maragondon-Magallanes-Amuyong Rd - K0056 + 000 - K0056 + 545, K0057 + 833 - K0058 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.96,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0131-000400",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Palico-Balayan-Batangas Rd - K0141 + 330 - K0141 + 644",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 21936000,
      "lengthKm": 0.314,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 69859872.61,
      "lengthMeters": 314.0,
      "allocationPerStatedMeter": 69859.87,
      "rangesMeters": [
        [
          141330.0,
          141644.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Palico-Balayan-Batangas Rd - K0141 + 330 - K0141 + 644",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 1.38,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0206-001738",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Batangas-Quezon Rd - K0134 + (-439) - K0134 + (-216)",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 21887000,
      "lengthKm": 0.223,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 98147982.06,
      "lengthMeters": 223.0,
      "allocationPerStatedMeter": 98147.98,
      "rangesMeters": [
        [
          133561.0,
          133784.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Batangas-Quezon Rd - K0134 + (-439) - K0134 + (-216)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 1.96,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0122-000225",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Jct Blancia-Molave-Josefina Rd - K1659 + 000 - K1659 + 340",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 21871000,
      "lengthKm": 0.34,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 64326470.59,
      "lengthMeters": 340.0,
      "allocationPerStatedMeter": 64326.47,
      "rangesMeters": [
        [
          1659000.0,
          1659340.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Jct Blancia-Molave-Josefina Rd - K1659 + 000 - K1659 + 340",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 1.34,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0295-003437",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Contsruction of Sagasan Br. (S01167MN), along Zamboanga del Sur Coastal Road, San Pablo, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 21840000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "295",
      "lengthEvidence": "Contsruction of Sagasan Br. (S01167MN), along Zamboanga del Sur Coastal Road, San Pablo, Zamboanga del Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0295-003438",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Replacement of Miasin Br. (Box Culvert to Permanent Br.), S01167MN, along Zamboanga del Sur Coastal Road, (Culasian-Jct. Barangay Aplaya Section), San Pablo, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 21840000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "295",
      "lengthEvidence": "Replacement of Miasin Br. (Box Culvert to Permanent Br.), S01167MN, along Zamboanga del Sur Coastal Road, (Culasian-Jct. Barangay Aplaya Section), San Pablo, Zamboanga del Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0575-009117",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 0+000 - Sta. 1+560) at Kauswagan - Esperanza Circumferential Road, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 21840000,
      "lengthKm": 1.56,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14000000.0,
      "lengthMeters": 1560.0,
      "allocationPerStatedMeter": 14000.0,
      "rangesMeters": [
        [
          0.0,
          1560.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road (Sta. 0+000 - Sta. 1+560) at Kauswagan - Esperanza Circumferential Road, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0575-009120",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 2+753 - Sta. 4+309) Barangay X, Victorias City, Negros Occidental (10.8278732, 123.1661662)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 21784000,
      "lengthKm": 1.556,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14000000.0,
      "lengthMeters": 1556.0,
      "allocationPerStatedMeter": 14000.0,
      "rangesMeters": [
        [
          2753.0,
          4309.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road (Sta. 2+753 - Sta. 4+309) Barangay X, Victorias City, Negros Occidental (10.8278732, 123.1661662)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0147-000721",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sn Ramon Penal Colony Rd - (S01195MN) Chainage 000 - Chainage 1349",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 21782000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Sn Ramon Penal Colony Rd - (S01195MN) Chainage 000 - Chainage 1349",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0187-001397",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Dobleston-Butadon Rd - K1994+376 - K1994+520, K2002+280 - K2002+347, K2006+047 - K2006+097, K2007+503 - K2007+546",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 21774000,
      "lengthKm": 0.304,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 71625000.0,
      "lengthMeters": 304.0,
      "allocationPerStatedMeter": 71625.0,
      "rangesMeters": [
        [
          1994376.0,
          1994520.0
        ],
        [
          2002280.0,
          2002347.0
        ],
        [
          2006047.0,
          2006097.0
        ],
        [
          2007503.0,
          2007546.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "187",
      "lengthEvidence": "Dobleston-Butadon Rd - K1994+376 - K1994+520, K2002+280 - K2002+347, K2006+047 - K2006+097, K2007+503 - K2007+546",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 0.77,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0200-001619",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Jct Switch-Jct Monte Alegre Rd - K1642 + 624 - K1643 + 296, K1645 + 000 - K1645 + 1071, K1646 + 909 - K1647 + 000",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 21736000,
      "lengthKm": 1.834,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 11851690.29,
      "lengthMeters": 1834.0,
      "allocationPerStatedMeter": 11851.69,
      "rangesMeters": [
        [
          1642624.0,
          1643296.0
        ],
        [
          1645000.0,
          1646071.0
        ],
        [
          1646909.0,
          1647000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Jct Switch-Jct Monte Alegre Rd - K1642 + 624 - K1643 + 296, K1645 + 000 - K1645 + 1071, K1646 + 909 - K1647 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 44673.54,
      "peerRateMultiple": 0.27,
      "peerRecords": 23,
      "peerBand": "1011.5–<1870 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87350.03750000002,
      "graphUpperFence": 121213.10000000003
    },
    {
      "id": "HB10858-3-0137-000536",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siocon-Sirawai-Sibuco-Limpapa Rd - K2108 + (-448) - K2109 + 000",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 21720000,
      "lengthKm": 1.448,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15000000.0,
      "lengthMeters": 1448.0,
      "allocationPerStatedMeter": 15000.0,
      "rangesMeters": [
        [
          2107552.0,
          2109000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Siocon-Sirawai-Sibuco-Limpapa Rd - K2108 + (-448) - K2109 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.48,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0162-000976",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Nabua-Bato-Libon (Tandaay-Buluang, Bato) Rd - K0492 + 170 - K0492 + 750",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 21715000,
      "lengthKm": 0.58,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37439655.17,
      "lengthMeters": 580.0,
      "allocationPerStatedMeter": 37439.66,
      "rangesMeters": [
        [
          492170.0,
          492750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Nabua-Bato-Libon (Tandaay-Buluang, Bato) Rd - K0492 + 170 - K0492 + 750",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.94,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0453-006483",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads and Drainage System along Silanganan Sudivison (Yakal St. - C0+000 to C0+141 and Kamagong St. - C0+000 to C0+192), Barangay 167, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 21700000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "453",
      "lengthEvidence": "Construction of Roads and Drainage System along Silanganan Sudivison (Yakal St. - C0+000 to C0+141 and Kamagong St. - C0+000 to C0+192), Barangay 167, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0153-000817",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Manila North Rd - K0056 + 431.73 - K0056 + 525, K0056 + 602 - K0056 + 690, K0058 + 040 - K0058 + 088.80",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 21694000,
      "lengthKm": 0.23006999999999972,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 94293041.25,
      "lengthMeters": 230.07,
      "allocationPerStatedMeter": 94293.04,
      "rangesMeters": [
        [
          56431.73,
          56525.0
        ],
        [
          56602.0,
          56690.0
        ],
        [
          58040.0,
          58088.8
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Manila North Rd - K0056 + 431.73 - K0056 + 525, K0056 + 602 - K0056 + 690, K0058 + 040 - K0058 + 088.80",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 2.37,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0131-000396",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Nasugbu-Lian-Calatagan Rd - K0122 + 000 - K0123 + 000",
      "office": "Batangas 1st District Engineering Office",
      "amountPesos": 21613000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21613000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 21613.0,
      "rangesMeters": [
        [
          122000.0,
          123000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Nasugbu-Lian-Calatagan Rd - K0122 + 000 - K0123 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.71,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0291-003360",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Camambanan Br. (B00542SM) along Catarman-Laoang Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 21600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Camambanan Br. (B00542SM) along Catarman-Laoang Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0293-003407",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "San Jose Br. 1 (B00089DG) along Dinagat-Loreto Rd",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 21600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "San Jose Br. 1 (B00089DG) along Dinagat-Loreto Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0625-010156",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok Riverside (Barangay Hall), Maparbemco, Barangay Mapantig, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 21600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Concrete Road, Purok Riverside (Barangay Hall), Maparbemco, Barangay Mapantig, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0131-000394",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Balayan-Balibago Rd - K0116 + 000 - K0117 + 000",
      "office": "Batangas 1st District Engineering Office",
      "amountPesos": 21592000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21592000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 21592.0,
      "rangesMeters": [
        [
          116000.0,
          117000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Balayan-Balibago Rd - K0116 + 000 - K0117 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.71,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0131-000392",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Balayan-Balibago Rd - K0109 + 309 - K0110 + 306",
      "office": "Batangas 1st District Engineering Office",
      "amountPesos": 21527000,
      "lengthKm": 0.997,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21591775.33,
      "lengthMeters": 997.0,
      "allocationPerStatedMeter": 21591.78,
      "rangesMeters": [
        [
          109309.0,
          110306.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Balayan-Balibago Rd - K0109 + 309 - K0110 + 306",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.71,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0133-000454",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagaytay-Batangas via Tuy Rd - K0062 + 380 - K0062 + 930",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 21505000,
      "lengthKm": 0.55,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39100000.0,
      "lengthMeters": 550.0,
      "allocationPerStatedMeter": 39100.0,
      "rangesMeters": [
        [
          62380.0,
          62930.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Tagaytay-Batangas via Tuy Rd - K0062 + 380 - K0062 + 930",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.21,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0185-001368",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0380+2173 - K0380+2250",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 21500000,
      "lengthKm": 0.077,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 279220779.22,
      "lengthMeters": 77.0,
      "allocationPerStatedMeter": 279220.78,
      "rangesMeters": [
        [
          382173.0,
          382250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "185",
      "lengthEvidence": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0380+2173 - K0380+2250",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.75,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0415-005751",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge at Barangay Poponto - Primicias, Bautista, Pangasinan",
      "office": "Central Office",
      "amountPesos": 21500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Bridge at Barangay Poponto - Primicias, Bautista, Pangasinan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007198",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Centro, Amulung, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 21500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road at Barangay Centro, Amulung, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0626-010177",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Campo 3, Barangay Masiag to Barangay Sumilil, Barangay Masiag and Barangay Sumilil, Bagumbayan, Sultan Kudarat",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 21500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Construction of Road, Campo 3, Barangay Masiag to Barangay Sumilil, Barangay Masiag and Barangay Sumilil, Bagumbayan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0168-001076",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Rizal National Rd (Romualdez-Santor-Calaocan-Sn Pascual Sect) - K0424 + 721 - K0424 + 874, K0424 + 922 - K0424 + 961, K0425 + 538 - K0425 + 541, K0425 + 852 - K0425 + 862, K0426 + 022 - K0426 + 059, K0426 + 178 - K0426 + 238, K0426 + 252 - K0426 + 287, K0426 + 412 - K0426 + 441, K0426 + 473 - K0426 + 515, K0428 + 056 - K0428 + 079, K0428 + 127 - K0428 + 172, K0432 + 000 - K0432 + 543",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 21443000,
      "lengthKm": 1.019,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21043179.59,
      "lengthMeters": 1019.0,
      "allocationPerStatedMeter": 21043.18,
      "rangesMeters": [
        [
          424721.0,
          424874.0
        ],
        [
          424922.0,
          424961.0
        ],
        [
          425538.0,
          425541.0
        ],
        [
          425852.0,
          425862.0
        ],
        [
          426022.0,
          426059.0
        ],
        [
          426178.0,
          426238.0
        ],
        [
          426252.0,
          426287.0
        ],
        [
          426412.0,
          426441.0
        ],
        [
          426473.0,
          426515.0
        ],
        [
          428056.0,
          428079.0
        ],
        [
          428127.0,
          428172.0
        ],
        [
          432000.0,
          432543.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "Rizal National Rd (Romualdez-Santor-Calaocan-Sn Pascual Sect) - K0424 + 721 - K0424 + 874, K0424 + 922 - K0424 + 961, K0425 + 538 - K0425 + 541, K0425 + 852 - K0425 + 862, K0426 + 022 - K0426 + 059, K0426 + 178 - K0426 + 238, K0426 + 252 - K0426 + 287, K0426 + 412 - K0426 + 441, K0426 + 473 - K0426 + 515, K0428 + 056 - K0428 + 079, K0428 + 127 - K0428 + 172, K0432 + 000 - K0432 + 543",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 0.93,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0183-001339",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Sn Fernando-Bagulin Rd - K0276 + 139 - K0276 + 262",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 21400000,
      "lengthKm": 0.123,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 173983739.84,
      "lengthMeters": 123.0,
      "allocationPerStatedMeter": 173983.74,
      "rangesMeters": [
        [
          276139.0,
          276262.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Sn Fernando-Bagulin Rd - K0276 + 139 - K0276 + 262",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.47,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0245-002445",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1426 + 000 - K1426 + 980, K1427 + 080 - K1427 + 333, K1427 + 411 - K1428 + 000 (Road Safety: Roadway Lighting)",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 21359000,
      "lengthKm": 1.822,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 11722832.05,
      "lengthMeters": 1822.0,
      "allocationPerStatedMeter": 11722.83,
      "rangesMeters": [
        [
          1426000.0,
          1426980.0
        ],
        [
          1427080.0,
          1427333.0
        ],
        [
          1427411.0,
          1428000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1426 + 000 - K1426 + 980, K1427 + 080 - K1427 + 333, K1427 + 411 - K1428 + 000 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.98,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0259-002654",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Gakat Br. (B00592LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 21294000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Gakat Br. (B00592LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0575-009116",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 0+000 - Sta. 1+520) at Barangay XII, Victorias City, Negros Occidental (10.8711260, 123.1132960)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 21280000,
      "lengthKm": 1.52,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14000000.0,
      "lengthMeters": 1520.0,
      "allocationPerStatedMeter": 14000.0,
      "rangesMeters": [
        [
          0.0,
          1520.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road (Sta. 0+000 - Sta. 1+520) at Barangay XII, Victorias City, Negros Occidental (10.8711260, 123.1132960)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0133-000446",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Maragondon-Magallanes-Amuyong Rd - K0084 + 016 - K0084 + 552",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 21268000,
      "lengthKm": 0.536,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39679104.48,
      "lengthMeters": 536.0,
      "allocationPerStatedMeter": 39679.1,
      "rangesMeters": [
        [
          84016.0,
          84552.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Maragondon-Magallanes-Amuyong Rd - K0084 + 016 - K0084 + 552",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.23,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0168-001080",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0464 + 640 - K0465 + 260",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 21256000,
      "lengthKm": 0.62,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34283870.97,
      "lengthMeters": 620.0,
      "allocationPerStatedMeter": 34283.87,
      "rangesMeters": [
        [
          464640.0,
          465260.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0464 + 640 - K0465 + 260",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.08,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0259-002677",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Tigbao Br. 2 (B00600LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 21242000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Tigbao Br. 2 (B00600LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002645",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Bagasong Br. 2 (B00602LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 21229000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Bagasong Br. 2 (B00602LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0242-002403",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "General Aguinaldo-Magallanes-Nasugbu Rd (East-West Rd), Sta. 71+817 - Sta. 71+862.7, Sta. 72+084.84 - Sta. 72+300, Gen. Emilio Aguinaldo Section, Cavite",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 21200000,
      "lengthKm": 0.2608600000000006,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 81269646.55,
      "lengthMeters": 260.86,
      "allocationPerStatedMeter": 81269.65,
      "rangesMeters": [
        [
          71817.0,
          71862.7
        ],
        [
          72084.84,
          72300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "242",
      "lengthEvidence": "General Aguinaldo-Magallanes-Nasugbu Rd (East-West Rd), Sta. 71+817 - Sta. 71+862.7, Sta. 72+084.84 - Sta. 72+300, Gen. Emilio Aguinaldo Section, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 0.09,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0284-003206",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Guiddam Br. (B04772LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 21200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Guiddam Br. (B04772LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0133-000438",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0071 + 230 - K0072 + 411",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 21168000,
      "lengthKm": 1.181,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17923793.4,
      "lengthMeters": 1181.0,
      "allocationPerStatedMeter": 17923.79,
      "rangesMeters": [
        [
          71230.0,
          72411.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0071 + 230 - K0072 + 411",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.58,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0133-000452",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sta Rosa-Ulat-Tagaytay Rd - K0060 + 000 - K0060 + 978",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 21138000,
      "lengthKm": 0.978,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21613496.93,
      "lengthMeters": 978.0,
      "allocationPerStatedMeter": 21613.5,
      "rangesMeters": [
        [
          60000.0,
          60978.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Sta Rosa-Ulat-Tagaytay Rd - K0060 + 000 - K0060 + 978",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.71,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0111-000015",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0311+721 - K0312+000",
      "office": "Central Office",
      "amountPesos": 21100000,
      "lengthKm": 0.279,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 75627240.14,
      "lengthMeters": 279.0,
      "allocationPerStatedMeter": 75627.24,
      "rangesMeters": [
        [
          311721.0,
          312000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Maharlika Highway (LZ) - K0311+721 - K0312+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 1.62,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0133-000462",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Ternate-Nasugbu Rd - K0073 + 000 - K0074 + 171.72",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 21091000,
      "lengthKm": 1.1717200000000012,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18000034.14,
      "lengthMeters": 1171.72,
      "allocationPerStatedMeter": 18000.03,
      "rangesMeters": [
        [
          73000.0,
          74171.72
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Ternate-Nasugbu Rd - K0073 + 000 - K0074 + 171.72",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.58,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0166-001039",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1684 + 993 - K1685 + 990, K1686 + 240 - K1686 + 285",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 21049000,
      "lengthKm": 1.042,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20200575.82,
      "lengthMeters": 1042.0,
      "allocationPerStatedMeter": 20200.58,
      "rangesMeters": [
        [
          1684993.0,
          1685990.0
        ],
        [
          1686240.0,
          1686285.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "166",
      "lengthEvidence": "Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1684 + 993 - K1685 + 990, K1686 + 240 - K1686 + 285",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 0.76,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0171-001125",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Jct Natl Rd-Ayuyan-Tinaytayan Rd - K0094 + 148 - K0094 + 596, K0094 + 731 - K0095 + 175",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 21008000,
      "lengthKm": 0.892,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23551569.51,
      "lengthMeters": 892.0,
      "allocationPerStatedMeter": 23551.57,
      "rangesMeters": [
        [
          94148.0,
          94596.0
        ],
        [
          94731.0,
          95175.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Jct Natl Rd-Ayuyan-Tinaytayan Rd - K0094 + 148 - K0094 + 596, K0094 + 731 - K0095 + 175",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.74,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0129-000355",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Pres Quirino Ave - K0007 + 475 - K0006 + 000",
      "office": "South Manila District Engineering Office",
      "amountPesos": 21000000,
      "lengthKm": 1.475,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14237288.14,
      "lengthMeters": 1475.0,
      "allocationPerStatedMeter": 14237.29,
      "rangesMeters": [
        [
          6000.0,
          7475.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Pres Quirino Ave - K0007 + 475 - K0006 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.46,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0134-000469",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Mayapa-Canlubang Cadre Rd - K0050 + (-690) - K0050 + 000",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 21000000,
      "lengthKm": 0.69,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30434782.61,
      "lengthMeters": 690.0,
      "allocationPerStatedMeter": 30434.78,
      "rangesMeters": [
        [
          49310.0,
          50000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Mayapa-Canlubang Cadre Rd - K0050 + (-690) - K0050 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.94,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0232-002237",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Buug By-Pass Road",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 21000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "Buug By-Pass Road",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0259-002676",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Telegrafo Br. 1 (B00039LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 21000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Telegrafo Br. 1 (B00039LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006586",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Pook Pag-Asa, Barangay Batasan Hills, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 21000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Rehabilitation of Road, Pook Pag-Asa, Barangay Batasan Hills, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006595",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Pedro Gil St. from Taft Ave to P. Quirino Ave. Manila City",
      "office": "South Manila District Engineering Office",
      "amountPesos": 21000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Road along Pedro Gil St. from Taft Ave to P. Quirino Ave. Manila City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006610",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge connecting Barangay Alsem and Barangay Dipilat , Vintar, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 21000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Construction of Bridge connecting Barangay Alsem and Barangay Dipilat , Vintar, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006636",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Parparya Bridge, Barangay Barbaqueso, Carasi, Ilocos Norte (18.140400, 120.823500 - 18.140500, 120.827000)",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 21000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Construction of Parparya Bridge, Barangay Barbaqueso, Carasi, Ilocos Norte (18.140400, 120.823500 - 18.140500, 120.827000)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0498-007458",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Sta. 0+000 - Sta. 1+575, Barangay Quimalabasa Norte - Barangay Mapalad, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 21000000,
      "lengthKm": 1.575,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1575.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          1575.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road Sta. 0+000 - Sta. 1+575, Barangay Quimalabasa Norte - Barangay Mapalad, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.55,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0525-008015",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Aquino Byway Extension Road, Barangay Panipuan, Mexico, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 21000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Concreting of Aquino Byway Extension Road, Barangay Panipuan, Mexico, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008915",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+525, Sitio Cagdagat, Boton, Casiguran, Sorsogon",
      "office": "Sorsogon District Engineering Office",
      "amountPesos": 21000000,
      "lengthKm": 0.525,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 525.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          0.0,
          525.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+525, Sitio Cagdagat, Boton, Casiguran, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.63,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0212-001863",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Guinobatan Poblacion Rd - K0511 + 159 - K0511 + 783",
      "office": "Albay 3rd District Engineering Office",
      "amountPesos": 20990000,
      "lengthKm": 0.624,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33637820.51,
      "lengthMeters": 624.0,
      "allocationPerStatedMeter": 33637.82,
      "rangesMeters": [
        [
          511159.0,
          511783.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Guinobatan Poblacion Rd - K0511 + 159 - K0511 + 783",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.83,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0164-001018",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Dumaguete South Rd - K0107 + 000 - K0108 + 000",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 20972000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20972000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 20972.0,
      "rangesMeters": [
        [
          107000.0,
          108000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Dumaguete South Rd - K0107 + 000 - K0108 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 0.79,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0200-001607",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Calamba-Sta Cruz-Famy Jct Rd - K0105 + 740 - K0105 + 970, K0105 + 973 - K0106 + 299, K0106 + 305 - K0106 + 465",
      "office": "Laguna 1st District Engineering Office",
      "amountPesos": 20919000,
      "lengthKm": 0.716,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29216480.45,
      "lengthMeters": 716.0,
      "allocationPerStatedMeter": 29216.48,
      "rangesMeters": [
        [
          105740.0,
          105970.0
        ],
        [
          105973.0,
          106299.0
        ],
        [
          106305.0,
          106465.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Calamba-Sta Cruz-Famy Jct Rd - K0105 + 740 - K0105 + 970, K0105 + 973 - K0106 + 299, K0106 + 305 - K0106 + 465",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 0.6,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0210-001824",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Camiguin Circumferential Rd - K0034 + 180 - K0034 + 615, K0057 + 197 - K0057 + 543, K0057 + 553 - K0057 + 700",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 20919000,
      "lengthKm": 0.928,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22542025.86,
      "lengthMeters": 928.0,
      "allocationPerStatedMeter": 22542.03,
      "rangesMeters": [
        [
          34180.0,
          34615.0
        ],
        [
          57197.0,
          57543.0
        ],
        [
          57553.0,
          57700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Camiguin Circumferential Rd - K0034 + 180 - K0034 + 615, K0057 + 197 - K0057 + 543, K0057 + 553 - K0057 + 700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.44,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0144-000659",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sn Fernando-Lubao Rd - K0082 + 000 - K0083 + 153",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 20891000,
      "lengthKm": 1.153,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18118820.47,
      "lengthMeters": 1153.0,
      "allocationPerStatedMeter": 18118.82,
      "rangesMeters": [
        [
          82000.0,
          83153.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Sn Fernando-Lubao Rd - K0082 + 000 - K0083 + 153",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.76,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0280-003112",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Paticua Br. (B00258SM) along Catarman-Calbayog Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 20865000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Paticua Br. (B00258SM) along Catarman-Calbayog Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0121-000212",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0051 + 000 - K0051 + 355",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 20828000,
      "lengthKm": 0.355,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 58670422.54,
      "lengthMeters": 355.0,
      "allocationPerStatedMeter": 58670.42,
      "rangesMeters": [
        [
          51000.0,
          51355.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0051 + 000 - K0051 + 355",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 1.22,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0184-001350",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Claveria-Calanasan-Kabugao Rd - K0650 + 061 - K0650 + 095, K0650 + 162 - K0650 + 194.5",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 20810000,
      "lengthKm": 0.0665,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 312932330.83,
      "lengthMeters": 66.5,
      "allocationPerStatedMeter": 312932.33,
      "rangesMeters": [
        [
          650061.0,
          650095.0
        ],
        [
          650162.0,
          650194.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Claveria-Calanasan-Kabugao Rd - K0650 + 061 - K0650 + 095, K0650 + 162 - K0650 + 194.5",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.84,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0164-001001",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Iloilo East Coast-Capiz Rd - K0244 + 053 - K0244 + 900",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 20800000,
      "lengthKm": 0.847,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24557260.92,
      "lengthMeters": 847.0,
      "allocationPerStatedMeter": 24557.26,
      "rangesMeters": [
        [
          244053.0,
          244900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Iloilo East Coast-Capiz Rd - K0244 + 053 - K0244 + 900",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 0.74,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0593-009507",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Macanip - Barangay Pitogo, Jaro, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 20800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Road, Barangay Macanip - Barangay Pitogo, Jaro, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0133-000460",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagaytay-Manila via Silang Rd - K0057 + 000 - K0057 + 512",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 20793000,
      "lengthKm": 0.512,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40611328.12,
      "lengthMeters": 512.0,
      "allocationPerStatedMeter": 40611.33,
      "rangesMeters": [
        [
          57000.0,
          57512.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Tagaytay-Manila via Silang Rd - K0057 + 000 - K0057 + 512",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.26,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0170-001115",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Tagbac-Lubang-Looc Rd - K0015 + 765 - K0016 + 451",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 20782000,
      "lengthKm": 0.686,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30294460.64,
      "lengthMeters": 686.0,
      "allocationPerStatedMeter": 30294.46,
      "rangesMeters": [
        [
          15765.0,
          16451.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Tagbac-Lubang-Looc Rd - K0015 + 765 - K0016 + 451",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.95,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0135-000491",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Albay Diversion Rd - K0450 + 770 - K0452 + 000",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 20772000,
      "lengthKm": 1.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16887804.88,
      "lengthMeters": 1230.0,
      "allocationPerStatedMeter": 16887.8,
      "rangesMeters": [
        [
          450770.0,
          452000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Albay Diversion Rd - K0450 + 770 - K0452 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.54,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0160-000928",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Indang-Alfonso via Luksuhin Rd - K0066 + 1397 - K0067 + 919",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 20767000,
      "lengthKm": 0.522,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39783524.9,
      "lengthMeters": 522.0,
      "allocationPerStatedMeter": 39783.52,
      "rangesMeters": [
        [
          67397.0,
          67919.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "160",
      "lengthEvidence": "Indang-Alfonso via Luksuhin Rd - K0066 + 1397 - K0067 + 919",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.0,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0129-000363",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sn Carlos - Calasiao Road, K0204+(-1000) - K0204+(-040)",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 20700000,
      "lengthKm": 0.96,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21562500.0,
      "lengthMeters": 960.0,
      "allocationPerStatedMeter": 21562.5,
      "rangesMeters": [
        [
          203000.0,
          203960.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Sn Carlos - Calasiao Road, K0204+(-1000) - K0204+(-040)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.71,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0246-002465",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Surigao-Davao Coastal Rd - K1787 + 800 (Road Safety: Pedestrian Overpass)",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 20700000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Surigao-Davao Coastal Rd - K1787 + 800 (Road Safety: Pedestrian Overpass)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0457-006561",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainages along Gonzales St. (C0+000 to C0+380), Barangay Canumay West, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 20700000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Rehabilitation of Roads and Drainages along Gonzales St. (C0+000 to C0+380), Barangay Canumay West, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008865",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Concreting of J. Mrtinez Highway, San Rafael, Iriga City.",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 20602000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Road Concreting of J. Mrtinez Highway, San Rafael, Iriga City.",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008455",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of San Agustin - Lapidario Road, Trece Martires City, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 20600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Rehabilitation of San Agustin - Lapidario Road, Trece Martires City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0118-000148",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "C-5 Road - K0011 + (-975) - K0011 + 420",
      "office": "Quezon City 2nd District Engineering Office",
      "amountPesos": 20573000,
      "lengthKm": 1.395,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14747670.25,
      "lengthMeters": 1395.0,
      "allocationPerStatedMeter": 14747.67,
      "rangesMeters": [
        [
          10025.0,
          11420.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "C-5 Road - K0011 + (-975) - K0011 + 420",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 0.38,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0269-002878",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Hiagsam Br. (B00524LT) along Palo-Carigara-Ormoc Rd",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 20565000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Hiagsam Br. (B00524LT) along Palo-Carigara-Ormoc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006508",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along F. Bautista St. (C0+000 to C0+540), Barangay Marulas, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 20500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along F. Bautista St. (C0+000 to C0+540), Barangay Marulas, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0499-007472",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+520, Barangay Nemmatan, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 20500000,
      "lengthKm": 1.52,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13486842.11,
      "lengthMeters": 1520.0,
      "allocationPerStatedMeter": 13486.84,
      "rangesMeters": [
        [
          0.0,
          1520.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+520, Barangay Nemmatan, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.56,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0544-008449",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Bayog Road at Barangay Lapidario, Trece Martires City, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 20500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Rehabilitation of Bayog Road at Barangay Lapidario, Trece Martires City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0144-000657",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sn Fernando-Lubao Rd - K0079 + 000 - K0080 + 000",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 20377000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20377000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 20377.0,
      "rangesMeters": [
        [
          79000.0,
          80000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Sn Fernando-Lubao Rd - K0079 + 000 - K0080 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.85,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0168-001081",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0460 + 000 - K0460 + 509",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 20360000,
      "lengthKm": 0.509,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 509.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          460000.0,
          460509.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0460 + 000 - K0460 + 509",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.26,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0133-000445",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Maragondon-Magallanes-Amuyong Rd - K0080 + 830 - K0081 + 302",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 20340000,
      "lengthKm": 0.472,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 43093220.34,
      "lengthMeters": 472.0,
      "allocationPerStatedMeter": 43093.22,
      "rangesMeters": [
        [
          80830.0,
          81302.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Maragondon-Magallanes-Amuyong Rd - K0080 + 830 - K0081 + 302",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.34,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0593-009508",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Chainage 1 + 104.20 - Chainage 2 + 132, Sitio Iphag, Barangay Pange - Sitio Gapas, Barangay Sta. Cruz - Sitio Cabalagnan, Barangay Batug, Jaro, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 20300000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Concrete Road, Chainage 1 + 104.20 - Chainage 2 + 132, Sitio Iphag, Barangay Pange - Sitio Gapas, Barangay Sta. Cruz - Sitio Cabalagnan, Barangay Batug, Jaro, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0155-000850",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0123 + 045 - K0123 + 121, K0123 + 221 - K0124 + 000",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 20286000,
      "lengthKm": 0.855,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23726315.79,
      "lengthMeters": 855.0,
      "allocationPerStatedMeter": 23726.32,
      "rangesMeters": [
        [
          123045.0,
          123121.0
        ],
        [
          123221.0,
          124000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0123 + 045 - K0123 + 121, K0123 + 221 - K0124 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 1.0,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0205-001725",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0486 + 830 - K0488 + 090",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 20282000,
      "lengthKm": 1.26,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16096825.4,
      "lengthMeters": 1260.0,
      "allocationPerStatedMeter": 16096.83,
      "rangesMeters": [
        [
          486830.0,
          488090.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0486 + 830 - K0488 + 090",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33592.6,
      "peerRateMultiple": 0.48,
      "peerRecords": 26,
      "peerBand": "1253.5–<1623.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87741.06875,
      "graphUpperFence": 123903.58249999999
    },
    {
      "id": "HB10858-3-0582-009267",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at C.P.G. East Avenue, Bool-Mansasa District, Tagbilaran City connecting TagbilaranNorth Road,Tagbilaran City, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 20275000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road at C.P.G. East Avenue, Bool-Mansasa District, Tagbilaran City connecting TagbilaranNorth Road,Tagbilaran City, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0187-001398",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Lanao del Norte Interior Circum. Rd (LDNICR) - K1580+020 - K1580+115, K1580+676 - K1580+740, K1583+327 - K1583+392, K1584+703 - K1584+808",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 20202000,
      "lengthKm": 0.329,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 61404255.32,
      "lengthMeters": 329.0,
      "allocationPerStatedMeter": 61404.26,
      "rangesMeters": [
        [
          1580020.0,
          1580115.0
        ],
        [
          1580676.0,
          1580740.0
        ],
        [
          1583327.0,
          1583392.0
        ],
        [
          1584703.0,
          1584808.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "187",
      "lengthEvidence": "Lanao del Norte Interior Circum. Rd (LDNICR) - K1580+020 - K1580+115, K1580+676 - K1580+740, K1583+327 - K1583+392, K1584+703 - K1584+808",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 0.66,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0132-000429",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0053 + 367 - K0054 + 000",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 20143000,
      "lengthKm": 0.633,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31821484.99,
      "lengthMeters": 633.0,
      "allocationPerStatedMeter": 31821.48,
      "rangesMeters": [
        [
          53367.0,
          54000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0053 + 367 - K0054 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.99,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0135-000483",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Bongabong-Sagana-Roxas-Sn Aquilino Rd - K0104 + 000 - K0105 + 000, K0105 + 772 - K0106 + 195",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 20101000,
      "lengthKm": 1.423,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14125790.58,
      "lengthMeters": 1423.0,
      "allocationPerStatedMeter": 14125.79,
      "rangesMeters": [
        [
          104000.0,
          105000.0
        ],
        [
          105772.0,
          106195.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Bongabong-Sagana-Roxas-Sn Aquilino Rd - K0104 + 000 - K0105 + 000, K0105 + 772 - K0106 + 195",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.45,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0265-002779",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Lipaga Br. 1 (B00147MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 20085000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Lipaga Br. 1 (B00147MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0265-002780",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Lipaga Br. 2 (B00149MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 20079000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Lipaga Br. 2 (B00149MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0138-000541",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 2548 - Chainage 3065, Chainage 13521 - Chainage 14341",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 20055000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 2548 - Chainage 3065, Chainage 13521 - Chainage 14341",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0131-000390",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Olongapo-Bugallon Rd - K0147+392 - K0147+713",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 20012000,
      "lengthKm": 0.321,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 62342679.13,
      "lengthMeters": 321.0,
      "allocationPerStatedMeter": 62342.68,
      "rangesMeters": [
        [
          147392.0,
          147713.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Olongapo-Bugallon Rd - K0147+392 - K0147+713",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.93,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0119-000158",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Pangasinan-La Union Inter-Provl Road K0383 + 400 - K0384 + 700",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15384615.38,
      "lengthMeters": 1300.0,
      "allocationPerStatedMeter": 15384.62,
      "rangesMeters": [
        [
          383400.0,
          384700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Pangasinan-La Union Inter-Provl Road K0383 + 400 - K0384 + 700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 0.39,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0119-000176",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila-Batangas Rd - K0082 + 154 - K0082 + 645",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.491,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40733197.56,
      "lengthMeters": 491.0,
      "allocationPerStatedMeter": 40733.2,
      "rangesMeters": [
        [
          82154.0,
          82645.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Manila-Batangas Rd - K0082 + 154 - K0082 + 645",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 0.85,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0120-000194",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Marikina-Victoria Valley-Antipolo Rd - K0027 + 179 - K0027 + 251, K0027 + 252 - K0027 + 587",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.407,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 49140049.14,
      "lengthMeters": 407.0,
      "allocationPerStatedMeter": 49140.05,
      "rangesMeters": [
        [
          27179.0,
          27251.0
        ],
        [
          27252.0,
          27587.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Marikina-Victoria Valley-Antipolo Rd - K0027 + 179 - K0027 + 251, K0027 + 252 - K0027 + 587",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 1.03,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0129-000369",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Carmen Jct - Bayambang - Manat Road, K0204+928 - K0206+000",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.072,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18656716.42,
      "lengthMeters": 1072.0,
      "allocationPerStatedMeter": 18656.72,
      "rangesMeters": [
        [
          204928.0,
          206000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Carmen Jct - Bayambang - Manat Road, K0204+928 - K0206+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.6,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0151-000791",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1669 + 349 - K1670 + 000",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": 0.651,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30721966.21,
      "lengthMeters": 651.0,
      "allocationPerStatedMeter": 30721.97,
      "rangesMeters": [
        [
          1669349.0,
          1670000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1669 + 349 - K1670 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 1.29,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0152-000806",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Manila North Rd - K0288÷445 - K0289+000",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Manila North Rd - K0288÷445 - K0289+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0161-000946",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Rd - K0132 + 334 - K0132 + 800",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.466,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42918454.94,
      "lengthMeters": 466.0,
      "allocationPerStatedMeter": 42918.45,
      "rangesMeters": [
        [
          132334.0,
          132800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Rd - K0132 + 334 - K0132 + 800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.08,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0161-000953",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0019+956 - K0020+150",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.194,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 103092783.51,
      "lengthMeters": 194.0,
      "allocationPerStatedMeter": 103092.78,
      "rangesMeters": [
        [
          19956.0,
          20150.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Puerto Princesa South Rd - K0019+956 - K0020+150",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 1.9,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0173-001165",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Maharlika Highway (MN) - K1442 + 500 - K1442 + 593",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": 0.093,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 215053763.44,
      "lengthMeters": 93.0,
      "allocationPerStatedMeter": 215053.76,
      "rangesMeters": [
        [
          1442500.0,
          1442593.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Maharlika Highway (MN) - K1442 + 500 - K1442 + 593",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 0.65,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0177-001228",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Apayao-Kalinga-Abra Rd (Buluan-Sacpil-Wagud-Tawang-Salegseg Sect.) (S00695LZ) - Chainage 750 - Chainage 830, Chainage 1201- Chainage 1239, Chainage 1343.80 - Chainage 1384.80, Chainage 1388.80 - Chainage 1414.80, Chainage 1415 - Chainage 1476.80, Chainage 1743.70 - Chainage 1769.90, Chainage 2832.30 - Chainage 2846.30, Chainage 3044.10 - Chainage 3084.40 (LS), Chainage 3051.20 - Chainage 3084.40 (RS), Chainage 3279.90 - Chainage 3322.90, Chainage 3350.50 - Chainage 3395.50, Chainage 3438.40 - Chainage 3463.40, Chainage 3550.40 - Chainage 3584.40",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Apayao-Kalinga-Abra Rd (Buluan-Sacpil-Wagud-Tawang-Salegseg Sect.) (S00695LZ) - Chainage 750 - Chainage 830, Chainage 1201- Chainage 1239, Chainage 1343.80 - Chainage 1384.80, Chainage 1388.80 - Chainage 1414.80, Chainage 1415 - Chainage 1476.80, Chainage 1743.70 - Chainage 1769.90, Chainage 2832.30 - Chainage 2846.30, Chainage 3044.10 - Chainage 3084.40 (LS), Chainage 3051.20 - Chainage 3084.40 (RS), Chainage 3279.90 - Chainage 3322.90, Chainage 3350.50 - Chainage 3395.50, Chainage 3438.40 - Chainage 3463.40, Chainage 3550.40 - Chainage 3584.40",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0177-001229",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Apayao-Kalinga-Abra Rd (Buluan-Sacpil-Wagud-Tawang-Salegseg Sect.) (S00695LZ) - Chainage 8458 - Chainage 8465, Chainage 8465 - Chainage 8571, Chainage 8851 - Chainage 8946",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Apayao-Kalinga-Abra Rd (Buluan-Sacpil-Wagud-Tawang-Salegseg Sect.) (S00695LZ) - Chainage 8458 - Chainage 8465, Chainage 8465 - Chainage 8571, Chainage 8851 - Chainage 8946",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0179-001265",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Calapan South Rd - K0047 + 1053 - K0048 + 000",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.053,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 377358490.57,
      "lengthMeters": 53.0,
      "allocationPerStatedMeter": 377358.49,
      "rangesMeters": [
        [
          48000.0,
          48053.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "Calapan South Rd - K0047 + 1053 - K0048 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 0.6,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0180-001290",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Biliran Circumferential Rd - K1060 + 800 - K1060 + 900",
      "office": "Biliran District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 200000000.0,
      "lengthMeters": 100.0,
      "allocationPerStatedMeter": 200000.0,
      "rangesMeters": [
        [
          1060800.0,
          1060900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Biliran Circumferential Rd - K1060 + 800 - K1060 + 900",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 0.66,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0181-001291",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Biliran Circumferential Rd - K1109 + 784 - K1110 + 032",
      "office": "Biliran District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.248,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 80645161.29,
      "lengthMeters": 248.0,
      "allocationPerStatedMeter": 80645.16,
      "rangesMeters": [
        [
          1109784.0,
          1110032.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Biliran Circumferential Rd - K1109 + 784 - K1110 + 032",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 0.45,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0181-001300",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1570 + 660 - K1570 + 723",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.063,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 317460317.46,
      "lengthMeters": 63.0,
      "allocationPerStatedMeter": 317460.32,
      "rangesMeters": [
        [
          1570660.0,
          1570723.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1570 + 660 - K1570 + 723",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 1.05,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0181-001302",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Asuncion-San Isidro-Laak-Veruela Rd - K1518 + 605 - K1518 + 635",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 666666666.67,
      "lengthMeters": 30.0,
      "allocationPerStatedMeter": 666666.67,
      "rangesMeters": [
        [
          1518605.0,
          1518635.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Asuncion-San Isidro-Laak-Veruela Rd - K1518 + 605 - K1518 + 635",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 3.13,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0186-001379",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Cagayan-Apayao Rd (Tuao-Rizal Sect) - K0535 + 737 - K0535 + 802",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.065,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 307692307.69,
      "lengthMeters": 65.0,
      "allocationPerStatedMeter": 307692.31,
      "rangesMeters": [
        [
          535737.0,
          535802.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Cagayan-Apayao Rd (Tuao-Rizal Sect) - K0535 + 737 - K0535 + 802",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.82,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0200-001621",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1572 + 500 - K1573 + 023",
      "office": "Davao del Sur District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.523,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38240917.78,
      "lengthMeters": 523.0,
      "allocationPerStatedMeter": 38240.92,
      "rangesMeters": [
        [
          1572500.0,
          1573023.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1572 + 500 - K1573 + 023",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 0.78,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0205-001727",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Nambaran-Isabela Rd - K0511 + 251 - K0511 + 581",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.33,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 60606060.61,
      "lengthMeters": 330.0,
      "allocationPerStatedMeter": 60606.06,
      "rangesMeters": [
        [
          511251.0,
          511581.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Nambaran-Isabela Rd - K0511 + 251 - K0511 + 581",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 1.21,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0222-002063",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 10+178 - Sta. 10+861, Bacolod City",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": 0.683,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29282576.87,
      "lengthMeters": 683.0,
      "allocationPerStatedMeter": 29282.58,
      "rangesMeters": [
        [
          10178.0,
          10861.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "222",
      "lengthEvidence": "Bacolod Negros Occidental Economic Highway (BANOCEH), Sta. 10+178 - Sta. 10+861, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.22,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0228-002157",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Alternate Road from Region X to Region XI (Jct. Diversion Road Catalunan Grande- Talandang-Sumimao-Pañalum-Tapak-Cabanlasan-Aplaya, Malaybalay), Barangay Sumimao Section, Sta. 1512+100.000 - Sta. 1512+650.81, Davao City",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": 0.5508100000000559,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36310161.4,
      "lengthMeters": 550.81,
      "allocationPerStatedMeter": 36310.16,
      "rangesMeters": [
        [
          1512100.0,
          1512650.81
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Alternate Road from Region X to Region XI (Jct. Diversion Road Catalunan Grande- Talandang-Sumimao-Pañalum-Tapak-Cabanlasan-Aplaya, Malaybalay), Barangay Sumimao Section, Sta. 1512+100.000 - Sta. 1512+650.81, Davao City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.27,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0228-002159",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Jct. Daang Maharlika Road (Mahayag Section) - Gatungan - Jct. Callawa Diversion Road, Barangay Gatungan, Sta. 1498+840.000 - Sta. 1499+050.000, Sta. 1499+185.000 - Sta. 1499+280.000, Davao City",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          1498840.0,
          1499050.0
        ],
        [
          1499185.0,
          1499280.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "228",
      "lengthEvidence": "Jct. Daang Maharlika Road (Mahayag Section) - Gatungan - Jct. Callawa Diversion Road, Barangay Gatungan, Sta. 1498+840.000 - Sta. 1499+050.000, Sta. 1499+185.000 - Sta. 1499+280.000, Davao City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0229-002173",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Las Nieves Bridge along NRJ Agusan-Malaybalay Road-Barangay Ambacon-Barangay Malicato-NRJ Daang Maharlika, (0 + 450.30 - 0 + 518.89), Barangay Ambacon - Barangay Malicato Section, Agusan del Norte",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": 0.06858999999999997,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 68.59,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          450.3,
          518.89
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Las Nieves Bridge along NRJ Agusan-Malaybalay Road-Barangay Ambacon-Barangay Malicato-NRJ Daang Maharlika, (0 + 450.30 - 0 + 518.89), Barangay Ambacon - Barangay Malicato Section, Agusan del Norte",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0229-002175",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "NRJ Agusan-Malaybalay Road-Barangay Ambacon-Barangay Malicato-NRJ Daang Maharlika, (Sta. 7+630 - Sta. 7+852.29), Agusan del Norte",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": 0.22228999999999996,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 89972558.37,
      "lengthMeters": 222.29,
      "allocationPerStatedMeter": 89972.56,
      "rangesMeters": [
        [
          7630.0,
          7852.29
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "NRJ Agusan-Malaybalay Road-Barangay Ambacon-Barangay Malicato-NRJ Daang Maharlika, (Sta. 7+630 - Sta. 7+852.29), Agusan del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.43,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0229-002177",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Rosario-Marfil-Tagbina Road, (Rosario Section), Barangay Marfil to Ugoban, Sta. 13+923.5 - Sta. 14+214.21, Rosario, Agusan del Sur",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": 0.29070999999999914,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 68797083.0,
      "lengthMeters": 290.71,
      "allocationPerStatedMeter": 68797.08,
      "rangesMeters": [
        [
          13923.5,
          14214.21
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Rosario-Marfil-Tagbina Road, (Rosario Section), Barangay Marfil to Ugoban, Sta. 13+923.5 - Sta. 14+214.21, Rosario, Agusan del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.33,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0229-002179",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Surigao-Agusan West Coastal Road, (Sta. 9+825 - Sta. 9+981.47), Barangay Binuangan - Barangay La Fraternidad, Tubay, Agusan del Norte",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": 0.15646999999999933,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 127820029.4,
      "lengthMeters": 156.47,
      "allocationPerStatedMeter": 127820.03,
      "rangesMeters": [
        [
          9825.0,
          9981.47
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Surigao-Agusan West Coastal Road, (Sta. 9+825 - Sta. 9+981.47), Barangay Binuangan - Barangay La Fraternidad, Tubay, Agusan del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.61,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0229-002183",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Trento-Lingig Road, Trento, Sta. 9+665 - Sta. 10+481.67, Agusan del Sur",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": 0.8166700000000001,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24489695.96,
      "lengthMeters": 816.67,
      "allocationPerStatedMeter": 24489.7,
      "rangesMeters": [
        [
          9665.0,
          10481.67
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Trento-Lingig Road, Trento, Sta. 9+665 - Sta. 10+481.67, Agusan del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 107563.51,
      "peerRateMultiple": 0.23,
      "peerRecords": 34,
      "peerBand": "778.58–<1133.86 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 324466.15875000006,
      "graphUpperFence": 477839.11500000005
    },
    {
      "id": "HB10858-3-0231-002208",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Camarines Sur Expressway Project - Catanusan Overpass - (Sta. 436 + 690 - Sta. 436 + 710), Camarines Sur",
      "office": "Camarines Sur 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.02,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1000000000.0,
      "lengthMeters": 20.0,
      "allocationPerStatedMeter": 1000000.0,
      "rangesMeters": [
        [
          436690.0,
          436710.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Camarines Sur Expressway Project - Catanusan Overpass - (Sta. 436 + 690 - Sta. 436 + 710), Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.83,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0231-002209",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Milaor-Pili Bypass Road - Sta. 433+978 - Sta. 434+062.3, Barangay Cabugao, Milaor, Camarines Sur",
      "office": "Camarines Sur 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.08429999999998836,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 237247924.08,
      "lengthMeters": 84.3,
      "allocationPerStatedMeter": 237247.92,
      "rangesMeters": [
        [
          433978.0,
          434062.3
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Milaor-Pili Bypass Road - Sta. 433+978 - Sta. 434+062.3, Barangay Cabugao, Milaor, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.2,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0231-002210",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Naga-Jct. Magarao-Canaman- Libmanan Jct. PPH Road (Skybridge) - Sta. 418+490 - Sta. 418+762, Barangay Umalo Section, Libmanan, Camarines Sur",
      "office": "Camarines Sur 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.272,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 73529411.76,
      "lengthMeters": 272.0,
      "allocationPerStatedMeter": 73529.41,
      "rangesMeters": [
        [
          418490.0,
          418762.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Naga-Jct. Magarao-Canaman- Libmanan Jct. PPH Road (Skybridge) - Sta. 418+490 - Sta. 418+762, Barangay Umalo Section, Libmanan, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.35,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0231-002211",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Pamplona-San Fernando Bypass Road - Sta. 426+526 - Sta. 426+620.53, Barangay Del Pilar, San Fernando, Camarines Sur",
      "office": "Camarines Sur 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.09453000000002794,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 211573045.59,
      "lengthMeters": 94.53,
      "allocationPerStatedMeter": 211573.05,
      "rangesMeters": [
        [
          426526.0,
          426620.53
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Pamplona-San Fernando Bypass Road - Sta. 426+526 - Sta. 426+620.53, Barangay Del Pilar, San Fernando, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.18,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0231-002219",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Barili - Aloguinsan Coastal Road - Sta. 0 + 000 - Sta. 0 + 620, Cebu",
      "office": "Cebu 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.62,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32258064.52,
      "lengthMeters": 620.0,
      "allocationPerStatedMeter": 32258.06,
      "rangesMeters": [
        [
          0.0,
          620.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Barili - Aloguinsan Coastal Road - Sta. 0 + 000 - Sta. 0 + 620, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 136111.11,
      "peerRateMultiple": 0.24,
      "peerRecords": 34,
      "peerBand": "505.98–<778.58 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 380628.9700000001,
      "graphUpperFence": 558059.2825000002
    },
    {
      "id": "HB10858-3-0231-002221",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Barili - Aloguinsan Coastal Road - Sta. 4 + 400 - Sta. 4 + 415, Cebu",
      "office": "Cebu 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.015,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1333333333.33,
      "lengthMeters": 15.0,
      "allocationPerStatedMeter": 1333333.33,
      "rangesMeters": [
        [
          4400.0,
          4415.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Barili - Aloguinsan Coastal Road - Sta. 4 + 400 - Sta. 4 + 415, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 1.11,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0233-002243",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Gingoog Bypass Road, Barangay 26 Section, Sta. 4+278 - Sta. 4+348, Gingoog City, Misamis Oriental",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.07,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 285714285.71,
      "lengthMeters": 70.0,
      "allocationPerStatedMeter": 285714.29,
      "rangesMeters": [
        [
          4278.0,
          4348.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "233",
      "lengthEvidence": "Gingoog Bypass Road, Barangay 26 Section, Sta. 4+278 - Sta. 4+348, Gingoog City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.24,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0233-002247",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.3791000000000004,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52756528.62,
      "lengthMeters": 379.1,
      "allocationPerStatedMeter": 52756.53,
      "rangesMeters": [
        [
          4749.5,
          5128.6
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "233",
      "lengthEvidence": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.41,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0242-002400",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Tanudan-Barlig - Ifugao Road (Tanudan-Barlig Section) - Sta. 1+396 - Sta. 1+796",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          1396.0,
          1796.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "242",
      "lengthEvidence": "Tanudan-Barlig - Ifugao Road (Tanudan-Barlig Section) - Sta. 1+396 - Sta. 1+796",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 98823.53,
      "peerRateMultiple": 0.51,
      "peerRecords": 22,
      "peerBand": "308–<989 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 280681.04875,
      "graphUpperFence": 403918.28500000003
    },
    {
      "id": "HB10858-3-0245-002442",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Dumaguete South Rd - K0096 + 000 - K0098 + 000 (Road Safety: Roadway Lighting)",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 10000.0,
      "rangesMeters": [
        [
          96000.0,
          98000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Dumaguete South Rd - K0096 + 000 - K0098 + 000 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.83,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0245-002451",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Construction of Pedestrian Overpass along Sayre Highway (Puerto Market - TH Cagayan), Barangay Puerto, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Construction of Pedestrian Overpass along Sayre Highway (Puerto Market - TH Cagayan), Barangay Puerto, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0246-002463",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Butuan City - Cagayan de Oro City - Iligan City Rd., K1401 + 060 (Road Safety: Pedestrian Overpass)",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Butuan City - Cagayan de Oro City - Iligan City Rd., K1401 + 060 (Road Safety: Pedestrian Overpass)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0248-002491",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd (S01376MN) K1817 + 648 - K1819 + 156 (Road Safety: Roadway Lighting)",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": 1.508,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13262599.47,
      "lengthMeters": 1508.0,
      "allocationPerStatedMeter": 13262.6,
      "rangesMeters": [
        [
          1817648.0,
          1819156.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "248",
      "lengthEvidence": "Surigao-Davao Coastal Rd (S01376MN) K1817 + 648 - K1819 + 156 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 1.05,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0251-002538",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Construction of Solar Lights along Iligan City Diversion Road, Barangay Ubaldo Laya, K1527 + 950 - K1529 + 243, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.293,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15467904.1,
      "lengthMeters": 1293.0,
      "allocationPerStatedMeter": 15467.9,
      "rangesMeters": [
        [
          1527950.0,
          1529243.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Construction of Solar Lights along Iligan City Diversion Road, Barangay Ubaldo Laya, K1527 + 950 - K1529 + 243, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 1.22,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0251-002543",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Tagum - Panabo Circumferential Road K1482+500 - K1484+ 500",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 10000.0,
      "rangesMeters": [
        [
          1482500.0,
          1484500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Tagum - Panabo Circumferential Road K1482+500 - K1484+ 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.97,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0252-002556",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Rizal National Rd (Romualdez-Santor-Calaocan-Sn Pascual Sect) K0420 + (-370) - K0423 + 233 (Road Safety: Roadway Lighting)",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 3.603,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 5550929.78,
      "lengthMeters": 3603.0,
      "allocationPerStatedMeter": 5550.93,
      "rangesMeters": [
        [
          419630.0,
          423233.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "252",
      "lengthEvidence": "Rizal National Rd (Romualdez-Santor-Calaocan-Sn Pascual Sect) K0420 + (-370) - K0423 + 233 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.56,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0253-002563",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Guimba-Pura Road, Chainage 0 - Chainage 8109 Road Safety Facilities (Roadway Lighting)",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "253",
      "lengthEvidence": "Guimba-Pura Road, Chainage 0 - Chainage 8109 Road Safety Facilities (Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0254-002584",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Installation of Solar LED (Roadway Lighting) along Ayala - La Paz Rd (S01495MN) Rd Chainage 000 - Chainage 3000",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "254",
      "lengthEvidence": "Installation of Solar LED (Roadway Lighting) along Ayala - La Paz Rd (S01495MN) Rd Chainage 000 - Chainage 3000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0260-002694",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Alip Br. (B02156MN) along Kidapawan-Allah Junction Rd",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Alip Br. (B02156MN) along Kidapawan-Allah Junction Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0261-002723",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Subec Br. (B04740LZ) along Manila North Rd",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Subec Br. (B04740LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0262-002738",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Cuyapa Br. 2 (B00118LZ) along Jct Tablang-Gabaldon Rd",
      "office": "Nueva Ecija 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "Cuyapa Br. 2 (B00118LZ) along Jct Tablang-Gabaldon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0263-002747",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Lalao Br. (B00011SJ) along Siquijor Circumferential Rd",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Lalao Br. (B00011SJ) along Siquijor Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0263-002749",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Vaño Br. (B00026BH) along Jct (TER) Dauis-Panglao Rd",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Vaño Br. (B00026BH) along Jct (TER) Dauis-Panglao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0265-002795",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Sicsican Br. (B01963LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Sicsican Br. (B01963LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002803",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Bago Br. (B00195NR) along Bacolod South By-Pass Rd",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Bago Br. (B00195NR) along Bacolod South By-Pass Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002817",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Klolang Br. (B02239MN) along General Santos City-T'Boli-Surallah Rd",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Klolang Br. (B02239MN) along General Santos City-T'Boli-Surallah Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002818",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Palkan Br. (B01031MN) along Maharlika Highway (Marbel-Makar Rd)",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Palkan Br. (B01031MN) along Maharlika Highway (Marbel-Makar Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002821",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Taguibo Br. (B00820MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Taguibo Br. (B00820MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002827",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Upper Palico Br. (East) (B01811LZ) along South Super H-way East Service Rd",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Upper Palico Br. (East) (B01811LZ) along South Super H-way East Service Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002828",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "R-10 Br. 3 (B04765LZ) along R-10",
      "office": "Malabon Navotas District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "R-10 Br. 3 (B04765LZ) along R-10",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0268-002860",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Panalingaan Br. (B00354PW) along Palawan Circum. Rd",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Panalingaan Br. (B00354PW) along Palawan Circum. Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0270-002887",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Inobulan Br. (B01306MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Inobulan Br. (B01306MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0270-002888",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "May-Ang Br. (B01310MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "May-Ang Br. (B01310MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0270-002889",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Napaliran Br. (B01313MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Napaliran Br. (B01313MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0270-002890",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Salay Br. 2 (B01308MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Salay Br. 2 (B01308MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0270-002901",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Balnabu Br. (B01025MN) along Makar-Kiamba Rd",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Balnabu Br. (B01025MN) along Makar-Kiamba Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0271-002908",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Edsa-Tramo Fly-Over (B01040LZ) along EDSA-Tramo Flyover",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Edsa-Tramo Fly-Over (B01040LZ) along EDSA-Tramo Flyover",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0271-002909",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Pancian Br. (B00549LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Pancian Br. (B00549LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0271-002911",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Cut-Cut Br. 2 (B02094LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Cut-Cut Br. 2 (B02094LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0272-002938",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Syjuco Br. (B00479PN) along Leganes-Sta. Barbara Rd",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Syjuco Br. (B00479PN) along Leganes-Sta. Barbara Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002970",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "M Roxas Jr. Br. (B03353LZ) along M Roxas Jr Bridge",
      "office": "North Manila District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "M Roxas Jr. Br. (B03353LZ) along M Roxas Jr Bridge",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-002997",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Benay Br. (B01253LZ) along Aritao-Quirino Rd",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Benay Br. (B01253LZ) along Aritao-Quirino Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-003009",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Sapang Alat Br. (B00141LZ) along Gen Alejo Santos Highway",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Sapang Alat Br. (B00141LZ) along Gen Alejo Santos Highway",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003020",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Patrick Br. (B00101MR) along Mindoro West Coastal Rd",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Patrick Br. (B00101MR) along Mindoro West Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0277-003055",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Culipapa Br. (B00263NR) along Bacolod South Rd (Kabankalan-Hinobaan Section)",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Culipapa Br. (B00263NR) along Bacolod South Rd (Kabankalan-Hinobaan Section)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003080",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Mandaue Fly-over (B00590CB) along Mandaue Flyover",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Mandaue Fly-over (B00590CB) along Mandaue Flyover",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003088",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Bagongbong Br. (B00034BR) along Biliran Circumferential Rd",
      "office": "Biliran District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Bagongbong Br. (B00034BR) along Biliran Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003133",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Manuto Br. (B01380MN) along Bukidnon-Davao City Rd",
      "office": "Bukidnon 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Manuto Br. (B01380MN) along Bukidnon-Davao City Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003141",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Puntod-Kauswagan Br. (B02323MN) along Cagayan de Oro City Coastal Bypass Rd",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Puntod-Kauswagan Br. (B02323MN) along Cagayan de Oro City Coastal Bypass Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003188",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Baag Br. (B04590LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Baag Br. (B04590LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0284-003195",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Gayaman Br. (B02149LZ) along Pangasinan-Zambales Rd",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Gayaman Br. (B02149LZ) along Pangasinan-Zambales Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0284-003200",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Caroronan Br. (B04773LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Caroronan Br. (B04773LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0287-003288",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Bayanacon Parallel Br. along Maharlika Highway (Agusan-Davao Sect)",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "287",
      "lengthEvidence": "Bayanacon Parallel Br. along Maharlika Highway (Agusan-Davao Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003301",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Abagao Br. 1 (B02016LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Abagao Br. 1 (B02016LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003302",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Abagao Br. 2 (B02017LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Abagao Br. 2 (B02017LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003303",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Afunan Br. 2 (B02012LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Afunan Br. 2 (B02012LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003306",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Cullit Br. 3 (B02020LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Cullit Br. 3 (B02020LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003308",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Luec Br. (B02015LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Luec Br. (B02015LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0289-003312",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Alibadabad Br. (B01177LZ) along Naguilian-Sn Mariano Rd",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Alibadabad Br. (B01177LZ) along Naguilian-Sn Mariano Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0291-003364",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Construction of Bridge Approach - Piao Br. (Parallel Bridge) - K1854+160 - K1854+299.78, K1854+378.62 - K1854+540",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.30115999999991616,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 66409881.79,
      "lengthMeters": 301.16,
      "allocationPerStatedMeter": 66409.88,
      "rangesMeters": [
        [
          1854160.0,
          1854299.78
        ],
        [
          1854378.62,
          1854540.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Construction of Bridge Approach - Piao Br. (Parallel Bridge) - K1854+160 - K1854+299.78, K1854+378.62 - K1854+540",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 1,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0292-003380",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Kinuskusan Br. (B00160MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "office": "Davao del Sur District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Kinuskusan Br. (B00160MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0292-003381",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Miral Br. 2 (B01611MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "office": "Davao del Sur District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Miral Br. 2 (B01611MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0293-003404",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Mat-i Parallel Br. along Agusan-Malaybalay Rd",
      "office": "Agusan del Norte District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Mat-i Parallel Br. along Agusan-Malaybalay Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0294-003425",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Buyon Br. along Manila North Rd K0492 + 095",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Buyon Br. along Manila North Rd K0492 + 095",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0294-003428",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Malagaw Br. (K0023 + 302 - K0023 + 308) along San Vicente-Savidug-Chavayan- Sumnanga-Nakanmuan Rd",
      "office": "Batanes District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.006,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 3333333333.33,
      "lengthMeters": 6.0,
      "allocationPerStatedMeter": 3333333.33,
      "rangesMeters": [
        [
          23302.0,
          23308.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "294",
      "lengthEvidence": "Malagaw Br. (K0023 + 302 - K0023 + 308) along San Vicente-Savidug-Chavayan- Sumnanga-Nakanmuan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": true,
      "rateReview": "Very short printed range · verify length first"
    },
    {
      "id": "HB10858-3-0295-003433",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Construction of Pungtod Br. along N. Bacalso Ave. (Cebu South Rd.), Oslob, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "295",
      "lengthEvidence": "Construction of Pungtod Br. along N. Bacalso Ave. (Cebu South Rd.), Oslob, Cebu",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0295-003439",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Construction of Permanent Bridge, Barangay Compol, Catarman, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "295",
      "lengthEvidence": "Construction of Permanent Bridge, Barangay Compol, Catarman, Camiguin",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005762",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Talogtog - Barangay Banuar, Laoac, Pangasinan",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Road at Barangay Talogtog - Barangay Banuar, Laoac, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005764",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bantay Insik - Bulaoen East (via Caniogan), Sison, Pangasinan",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Road, Barangay Bantay Insik - Bulaoen East (via Caniogan), Sison, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005768",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion, Binalonan, Pangasinan",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Road, Barangay Poblacion, Binalonan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0432-006113",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of NIA Road (Alawihao-Calintaan) Daet- Talisay Camarines Norte",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Rehabilitation of NIA Road (Alawihao-Calintaan) Daet- Talisay Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0435-006160",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Inayagan-Cantao-an Road leading to Naga Valley (NAVA) Industrial Park, Naga City, Cebu",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "435",
      "lengthEvidence": "Inayagan-Cantao-an Road leading to Naga Valley (NAVA) Industrial Park, Naga City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0438-006214",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Baya to Barangay Balintad, Sta. 0+000 - Sta. 0+800, Ganassi, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Concreting of Road, Barangay Baya to Barangay Balintad, Sta. 0+000 - Sta. 0+800, Ganassi, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.29,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0439-006239",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Roads, Saarenas Ave. Road, Cagayan de Oro City, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Improvement of Roads, Saarenas Ave. Road, Cagayan de Oro City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0441-006278",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Ranao Ibaning, Amai Manabilang, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Road at Barangay Ranao Ibaning, Amai Manabilang, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0441-006287",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Linindingan, Sta. 0+000 - Sta. 0+800, Pagayawan, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Road, Barangay Linindingan, Sta. 0+000 - Sta. 0+800, Pagayawan, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.29,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0442-006306",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sitio Codongan to Sitio Camalig, Barangay Pantaon, Sta. 0+000 - Sta. 0+800, Calanogas, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "442",
      "lengthEvidence": "Rehabilitation of Road, Sitio Codongan to Sitio Camalig, Barangay Pantaon, Sta. 0+000 - Sta. 0+800, Calanogas, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.29,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0446-006366",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Salman from the National Highway, Barangay Salman, Ampatuan, Maguindanao del Sur",
      "office": "Central Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "446",
      "lengthEvidence": "Construction of Road Barangay Salman from the National Highway, Barangay Salman, Ampatuan, Maguindanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006402",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Espeleta Pantalan (Sta.0+000 - Sta. 0+200), Barangay Poblacion, Muntinlupa City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Construction of Road and Drainage at Espeleta Pantalan (Sta.0+000 - Sta. 0+200), Barangay Poblacion, Muntinlupa City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 2.83,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0448-006403",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Pulong Eng Eng (Sta. 0+000 - Sta. 0+200), Barangay Poblacion, Muntinlupa City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Construction of Road and Drainage at Pulong Eng Eng (Sta. 0+000 - Sta. 0+200), Barangay Poblacion, Muntinlupa City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 2.83,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0448-006404",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Victoria Homes, Muntinlupa City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Construction of Road and Drainage, Victoria Homes, Muntinlupa City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0449-006421",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Soldiers Hills, Barangay Putatan, Muntinlupa City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "449",
      "lengthEvidence": "Rehabilitation of Road, Soldiers Hills, Barangay Putatan, Muntinlupa City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0449-006422",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Villa Carolina, Barangay Tunasan, Muntinlupa City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "449",
      "lengthEvidence": "Rehabilitation of Road, Villa Carolina, Barangay Tunasan, Muntinlupa City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0450-006435",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Network along Panday Pira, Palaris, Cruz Compound Streets Including Laterals, Barangay Parang, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "450",
      "lengthEvidence": "Rehabilitation of Road Network along Panday Pira, Palaris, Cruz Compound Streets Including Laterals, Barangay Parang, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0450-006442",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Network, Including Laterals at Fairlane Subdivision, Galant, Monterey Streets, Barangay Concepcion Uno, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "450",
      "lengthEvidence": "Rehabilitation of Road Network, Including Laterals at Fairlane Subdivision, Galant, Monterey Streets, Barangay Concepcion Uno, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0451-006457",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads and Drainage Systems along Union Village (Phase 2), Barangay 171, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Construction of Roads and Drainage Systems along Union Village (Phase 2), Barangay 171, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0451-006460",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage Systems along Quintos Village and Zabarte Road, Barangay172, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Rehabilitation of Road and Drainage Systems along Quintos Village and Zabarte Road, Barangay172, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0452-006481",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction/Rehabilitation of Road and Drainage Systems along NPC Road and Herrera St., Barangay 163, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "452",
      "lengthEvidence": "Construction/Rehabilitation of Road and Drainage Systems along NPC Road and Herrera St., Barangay 163, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0453-006484",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage Systems along Salvador St., Barangay 160, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "453",
      "lengthEvidence": "Rehabilitation of Road and Drainage Systems along Salvador St., Barangay 160, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0453-006485",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads and Drainage Systems, Union Village, Barangay 171, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "453",
      "lengthEvidence": "Construction of Roads and Drainage Systems, Union Village, Barangay 171, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0453-006490",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road and Drainage Systems, Villa Reform III Phase 2, Barangay 167, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "453",
      "lengthEvidence": "Improvement of Road and Drainage Systems, Villa Reform III Phase 2, Barangay 167, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006516",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Magnolia St. (C0+000 to C0+200) and Camella St. (C0+000 to C0+210), Barangay Paso De Blas, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Magnolia St. (C0+000 to C0+200) and Camella St. (C0+000 to C0+210), Barangay Paso De Blas, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006518",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Manukan (F. Francisco) (C0+000 to C0+277) , Barangay Parada, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Manukan (F. Francisco) (C0+000 to C0+277) , Barangay Parada, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006524",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along S. Donesa Street (Sectional Reblocking along C0+000 to C0+900), Barangay Canumay West, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along S. Donesa Street (Sectional Reblocking along C0+000 to C0+900), Barangay Canumay West, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006532",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Hillside Subdivision, Interconnecting Roads (C0+000 to C0+513), Barangay Ugong, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Hillside Subdivision, Interconnecting Roads (C0+000 to C0+513), Barangay Ugong, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006543",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage Improvement along Sapang Bakaw Street (C0+000 to C0+800), Barangay Lawang Bato, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Road with Drainage Improvement along Sapang Bakaw Street (C0+000 to C0+800), Barangay Lawang Bato, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0457-006558",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainages along Assumption Ville - Interconnecting Roads (C0+000 to C0+480) Barangay Lingunan, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Rehabilitation of Roads and Drainages along Assumption Ville - Interconnecting Roads (C0+000 to C0+480) Barangay Lingunan, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0457-006564",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads including Drainage along Sto. Niño and Saint Jude St. (C0+000 to C0+360), Barangay 186, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Rehabilitation of Roads including Drainage along Sto. Niño and Saint Jude St. (C0+000 to C0+360), Barangay 186, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006573",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage System at Villa Socorro Street (Chainage 0+000 - Chainage 0+221, Barangay Bahay Toro, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Rehabilitation of Road and Drainage System at Villa Socorro Street (Chainage 0+000 - Chainage 0+221, Barangay Bahay Toro, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006589",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Loyola Heights, Quezon City",
      "office": "Quezon City 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Rehabilitation of Road, Barangay Loyola Heights, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006605",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Roads and Drainage System along Industria St. and vicinity Sta. 0 - Sta. 367",
      "office": "South Manila District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Roads and Drainage System along Industria St. and vicinity Sta. 0 - Sta. 367",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006693",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 48-B Cabungaan South,Laoag City, Ilocos Norte Start 120.5577, 18.1856 End 120.5562, 18.1838",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Rehabilitation of Road, Barangay 48-B Cabungaan South,Laoag City, Ilocos Norte Start 120.5577, 18.1856 End 120.5562, 18.1838",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006695",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Tarrag-Aggasi-Baduang, Barangays Tarrag, Aggasi and Baduang, Pagudpud, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Rehabilitation of Road, Barangay Tarrag-Aggasi-Baduang, Barangays Tarrag, Aggasi and Baduang, Pagudpud, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006696",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road leading to Kabigan Falls, Barangay Balaoi, Pagudpud, Ilocos Norte, Start 18.59472, 120.85529 End 18.59431, 120.85518",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Road leading to Kabigan Falls, Barangay Balaoi, Pagudpud, Ilocos Norte, Start 18.59472, 120.85529 End 18.59431, 120.85518",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006697",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Kibakib, Barangay Subec, Pagudpud,Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Road, Kibakib, Barangay Subec, Pagudpud,Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006703",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Alsem-Salsalamagui-P.F. Alviar-Abkir Road,Vintar, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Rehabilitation of Alsem-Salsalamagui-P.F. Alviar-Abkir Road,Vintar, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006707",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Sitio Borbor Barangay 26 Canaam, Vintar, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Bridge, Sitio Borbor Barangay 26 Canaam, Vintar, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006711",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Loing-Bimmanga Bridge, Piddig, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Loing-Bimmanga Bridge, Piddig, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006712",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Utoy Bridge, Barangay Estancia, Piddig, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Utoy Bridge, Barangay Estancia, Piddig, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006723",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Aglipay, Pinili, Ilocos Norte",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Rehabilitation of Road, Barangay Aglipay, Pinili, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006726",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sabang-Daclapan Road, Cabugao, Ilocos Sur",
      "office": "Ilocos Sur 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Construction of Road, Sabang-Daclapan Road, Cabugao, Ilocos Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006733",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road Going to Sitio Apaleng, Barangay Old Central, Sudipen, La Union, Start 16.892804, 120.48183 End 16.8922804, 120.48183",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Concreting of Road Going to Sitio Apaleng, Barangay Old Central, Sudipen, La Union, Start 16.892804, 120.48183 End 16.8922804, 120.48183",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006803",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sabangan, Alaminos City, Pangasinan, Start 16.160044, 120.026227 End 16.157934, 120.028959",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangay Sabangan, Alaminos City, Pangasinan, Start 16.160044, 120.026227 End 16.157934, 120.028959",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006808",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Viga, Agno to Barangay Cabanaetan, Mabini, Pangasinan, Start 16.127927, 119.866104 End 16.122324, 119.874629",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangay Viga, Agno to Barangay Cabanaetan, Mabini, Pangasinan, Start 16.127927, 119.866104 End 16.122324, 119.874629",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006820",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion - Baquioen, Sual, Pangasinan, Start 16.07025099, 120.09664486 End 16.07144617, 120.09704952",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, Barangay Poblacion - Baquioen, Sual, Pangasinan, Start 16.07025099, 120.09664486 End 16.07144617, 120.09704952",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006903",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Pangaoan, Rosales, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road at Barangay Pangaoan, Rosales, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006906",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Canarem (Natividad) - Barangay Carriedo (Tayug) - Barangay Legaspi (Tayug), Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Road, Barangay Canarem (Natividad) - Barangay Carriedo (Tayug) - Barangay Legaspi (Tayug), Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006929",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Salvacion, Rosales, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay Salvacion, Rosales, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006962",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Calasiao Diversion Road, Doña Maria Road, Calasiao, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Calasiao Diversion Road, Doña Maria Road, Calasiao, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006975",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting/Improvement of Luttuacan-Magabta-Bulu Road, Barangay Bulu, Kabugao, Apayao, Start 18.01416667, 121.19527778 End 18.02333333, 121.19416667",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Concreting/Improvement of Luttuacan-Magabta-Bulu Road, Barangay Bulu, Kabugao, Apayao, Start 18.01416667, 121.19527778 End 18.02333333, 121.19416667",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006981",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Drainage Structure including Road, Sta. 0+000 - Sta. 0+225, Barangay Poliwes, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.225,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 88888888.89,
      "lengthMeters": 225.0,
      "allocationPerStatedMeter": 88888.89,
      "rangesMeters": [
        [
          0.0,
          225.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Rehabilitation of Drainage Structure including Road, Sta. 0+000 - Sta. 0+225, Barangay Poliwes, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 2.51,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0477-006990",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Including Drainage Structure, Sta. 0+000 - Sta. 0+235, Sta. 0+000 - Sta. 0+070, Barangay Brookside, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.235,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 85106382.98,
      "lengthMeters": 235.0,
      "allocationPerStatedMeter": 85106.38,
      "rangesMeters": [
        [
          0.0,
          235.0
        ],
        [
          0.0,
          70.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Rehabilitation of Road Including Drainage Structure, Sta. 0+000 - Sta. 0+235, Sta. 0+000 - Sta. 0+070, Barangay Brookside, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 2.41,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0477-006999",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement along Bewak-Guiweng Barangay Road, Mankayan, Benguet",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Improvement along Bewak-Guiweng Barangay Road, Mankayan, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-007000",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement along Cot-Cot-Gawaan barangay Road, Mankayan, Benguet",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Improvement along Cot-Cot-Gawaan barangay Road, Mankayan, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-007003",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Boneng-Egang Local Road, Naguey, Atok, Benguet",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Improvement of Road along Boneng-Egang Local Road, Naguey, Atok, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-007004",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Crusher-Loakan Local Road, Cattubo, Atok, Benguet",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Improvement of Road along Crusher-Loakan Local Road, Cattubo, Atok, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-007005",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Crusher-Washington Local Road, Cattubo, Atok, Benguet",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Improvement of Road along Crusher-Washington Local Road, Cattubo, Atok, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-007006",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Inuman-Pangkiwa Local Road, Pasdong, Atok, Benguet",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Improvement of Road along Inuman-Pangkiwa Local Road, Pasdong, Atok, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007010",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Sapuan Local Road, Abiang, Atok, Benguet",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Improvement of Road along Sapuan Local Road, Abiang, Atok, Benguet",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007046",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Ballayangon-Ab-abaan Access Road, Barangays Ballayangon and Ab- abaan, Pinukpuk, Balbalan, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Ballayangon-Ab-abaan Access Road, Barangays Ballayangon and Ab- abaan, Pinukpuk, Balbalan, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007064",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Taga-Nambucayan Access Road, Barangay Mallango, Tinglayan, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Taga-Nambucayan Access Road, Barangay Mallango, Tinglayan, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007114",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Mabbay-Mabisil via Kanipawan Diversion Road, Barangay Antadao, Sagada, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Rehabilitation of Mabbay-Mabisil via Kanipawan Diversion Road, Barangay Antadao, Sagada, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007133",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road leading to Mt. Chumanchil, Sta. 1+506.5 - Sta. 2+006.5, Kalinga",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          1506.5,
          2006.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Access Road leading to Mt. Chumanchil, Sta. 1+506.5 - Sta. 2+006.5, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.63,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0484-007152",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road at Barangay Tanglagan, Gattaran, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road at Barangay Tanglagan, Gattaran, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007174",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Felipe Tuzon in Calamaniugan, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Construction of Road, Barangay Felipe Tuzon in Calamaniugan, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007175",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Rambo Drive, Buyun, Santa Teresita, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Construction of Road, Rambo Drive, Buyun, Santa Teresita, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007179",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road along Barangay Libertad, Abulug, Cagayan",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Road along Barangay Libertad, Abulug, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007187",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Simayung-Canayun Road, Barangay Simayung and Barangay Canayun, Abulug, Cagayan",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Construction of Barangay Simayung-Canayun Road, Barangay Simayung and Barangay Canayun, Abulug, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007199",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Centro, Solana, Cagayan (Sta. 0+700 - Sta. 0+856)",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.156,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 128205128.21,
      "lengthMeters": 156.0,
      "allocationPerStatedMeter": 128205.13,
      "rangesMeters": [
        [
          700.0,
          856.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road at Barangay Centro, Solana, Cagayan (Sta. 0+700 - Sta. 0+856)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 3.63,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0486-007203",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay La Suerte - Nagsabaran, Amulung, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay La Suerte - Nagsabaran, Amulung, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007211",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Manalo-Dadda-Magogod, Amulung, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Manalo-Dadda-Magogod, Amulung, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0487-007221",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Calinaoan Sur - Barangay Villaluz, Delfin Albano, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Calinaoan Sur - Barangay Villaluz, Delfin Albano, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0488-007245",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Paved Road, Barangay Cumabao, Tumauini, Isabela (Sta. 0+000 - Sta. 1+700)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11764705.88,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 11764.71,
      "rangesMeters": [
        [
          0.0,
          1700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Rehabilitation of Paved Road, Barangay Cumabao, Tumauini, Isabela (Sta. 0+000 - Sta. 1+700)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.49,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0488-007246",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Paved Road, Barangay Dy-Abra, Tumauini, Isabela (Sta. 0+000 - Sta. 1+700)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11764705.88,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 11764.71,
      "rangesMeters": [
        [
          0.0,
          1700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Rehabilitation of Paved Road, Barangay Dy-Abra, Tumauini, Isabela (Sta. 0+000 - Sta. 1+700)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.49,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0489-007257",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Fuyo to Barangay Sta. Catalina, City of Ilagan, Isabela (Sta. 0+000 - Sta. 1+900)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.9,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10526315.79,
      "lengthMeters": 1900.0,
      "allocationPerStatedMeter": 10526.32,
      "rangesMeters": [
        [
          0.0,
          1900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of Concrete Road, Barangay Fuyo to Barangay Sta. Catalina, City of Ilagan, Isabela (Sta. 0+000 - Sta. 1+900)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.44,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0490-007281",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road at Barangay Limbauan, San Pablo, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Construction of Concrete Road at Barangay Limbauan, San Pablo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0491-007303",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 7+500 - Sta. 8+100, Sta. 8+400 - Sta. 9+000) including Construction of Road Slope Protection Structure (Sta. 7+500 - Sta. 8+100, Sta. 8+400 - Sta. 9+000), Barangay Dalena, San Pablo, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          7500.0,
          8100.0
        ],
        [
          8400.0,
          9000.0
        ],
        [
          7500.0,
          8100.0
        ],
        [
          8400.0,
          9000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Road (Sta. 7+500 - Sta. 8+100, Sta. 8+400 - Sta. 9+000) including Construction of Road Slope Protection Structure (Sta. 7+500 - Sta. 8+100, Sta. 8+400 - Sta. 9+000), Barangay Dalena, San Pablo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007310",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Centro 2, Luna Isabela, Start 16.9680465, 121.72772484 End 16.9687982, 121.72718654",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Construction of Roads, Barangay Centro 2, Luna Isabela, Start 16.9680465, 121.72772484 End 16.9687982, 121.72718654",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007315",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pulay to Barangay Concepcion, Luna Isabela, 16.97247183, 121.70428222",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Construction of Road, Barangay Pulay to Barangay Concepcion, Luna Isabela, 16.97247183, 121.70428222",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007328",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Purok 2, Purok 1, Purok 5, Barangay Barucboc Norte",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Concreting of Road, Purok 2, Purok 1, Purok 5, Barangay Barucboc Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007329",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Purok 7, Premicias Street, Barangay Alunan, Quezon, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Concreting of Road, Purok 7, Premicias Street, Barangay Alunan, Quezon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007336",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Simimbaan, Roxas, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road at Barangay Simimbaan, Roxas, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007338",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Luyao, Luna, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road, Barangay Luyao, Luna, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007346",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Victoria to San Jose Sur",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road, Barangay Victoria to San Jose Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007355",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Concepcion, Luna Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Rehabilitation of Road, Barangay Concepcion, Luna Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007366",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road leading to Housing Project of Barangay Napaccu Pequeño, Reina Mercedes, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Construction of Access Road leading to Housing Project of Barangay Napaccu Pequeño, Reina Mercedes, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0495-007386",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 1-5 (NIA Road), Barangay Rizaluna, Alicia, Isabela (Sta. 0+000 - STA. 0+867.00)",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.867,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23068050.75,
      "lengthMeters": 867.0,
      "allocationPerStatedMeter": 23068.05,
      "rangesMeters": [
        [
          0.0,
          867.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Purok 1-5 (NIA Road), Barangay Rizaluna, Alicia, Isabela (Sta. 0+000 - STA. 0+867.00)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.19,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0495-007389",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay General Aguinaldo, Ramon, Isabela (0+000.00- 1+843.00)",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.843,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10851871.95,
      "lengthMeters": 1843.0,
      "allocationPerStatedMeter": 10851.87,
      "rangesMeters": [
        [
          0.0,
          1843.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Barangay General Aguinaldo, Ramon, Isabela (0+000.00- 1+843.00)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.45,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0495-007392",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bacarreña - Mapuroc Road, Barangay Bacarreña and Mapuroc, San Mateo, Isabela (0+000.00-0+687.00)",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.687,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29112081.51,
      "lengthMeters": 687.0,
      "allocationPerStatedMeter": 29112.08,
      "rangesMeters": [
        [
          0.0,
          687.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Barangay Bacarreña - Mapuroc Road, Barangay Bacarreña and Mapuroc, San Mateo, Isabela (0+000.00-0+687.00)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.19,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0495-007395",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road of Barangay Dialawyao to Barangay Culasi, Barangay, Dialawyao, Palanan, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Access Road of Barangay Dialawyao to Barangay Culasi, Barangay, Dialawyao, Palanan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007400",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Burgos, Naguilian, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Barangay Road, Barangay Burgos, Naguilian, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007402",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Minallo, Naguilian, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Barangay Road, Barangay Minallo, Naguilian, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007426",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Main Road to Barangay Lenzon, Gamu, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Construction of Road, Main Road to Barangay Lenzon, Gamu, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007433",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Quezon Road, Quezon, San Isidro, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Concreting of Quezon Road, Quezon, San Isidro, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007438",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Access road from Bgy. Sto. Domingo to Bgy Dumawig, Jones, Isabela (0+000 -1+500)",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          1500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Concreting of Access road from Bgy. Sto. Domingo to Bgy Dumawig, Jones, Isabela (0+000 -1+500)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.55,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0498-007440",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sinaoangan Norte-Salay Road, Sta. 0+000 - Sta. 1+500, Barangay Sinaongan Norte and Barangay Salay, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          1500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Sinaoangan Norte-Salay Road, Sta. 0+000 - Sta. 1+500, Barangay Sinaongan Norte and Barangay Salay, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.55,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0499-007477",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+480, Barangay San Juan - Barangay Villa Marzo, Cordon, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.48,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13513513.51,
      "lengthMeters": 1480.0,
      "allocationPerStatedMeter": 13513.51,
      "rangesMeters": [
        [
          0.0,
          1480.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+480, Barangay San Juan - Barangay Villa Marzo, Cordon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.56,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0500-007483",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Villaflor, San Isidro, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Bridge, Villaflor, San Isidro, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007522",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Madadamian , Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Barangay Madadamian , Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0503-007551",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Maligaya, Cauayan City, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Rehabilitation of Road, Barangay Maligaya, Cauayan City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0503-007552",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay San Pablo to Barangay Casalatan, Cauayan City, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Rehabilitation of Road, Barangay San Pablo to Barangay Casalatan, Cauayan City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007602",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Matmad, Nagtipunan, Quirino",
      "office": "Quirino District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Road, Matmad, Nagtipunan, Quirino",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007631",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Landing to Kitang, Barangay Kitang, Limay, Bataan, Sta. 0+000 - Sta. 0+800",
      "office": "Bataan 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Road from Landing to Kitang, Barangay Kitang, Limay, Bataan, Sta. 0+000 - Sta. 0+800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.29,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0506-007636",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Concreting, JJ Linao-Bagac-Mariveles Road, Bagac, Bataan",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Road Concreting, JJ Linao-Bagac-Mariveles Road, Bagac, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0508-007671",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Sta. 0+075 - Sta. 0+145, Sta. 0+120 - Sta. 0+245, & Sta. 0+120 - Sta. 0+360, St. Peter Compound, Borol 2nd, Balagtas, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.285,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 70175438.6,
      "lengthMeters": 285.0,
      "allocationPerStatedMeter": 70175.44,
      "rangesMeters": [
        [
          75.0,
          145.0
        ],
        [
          120.0,
          245.0
        ],
        [
          120.0,
          360.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Construction of Road with Drainage, Sta. 0+075 - Sta. 0+145, Sta. 0+120 - Sta. 0+245, & Sta. 0+120 - Sta. 0+360, St. Peter Compound, Borol 2nd, Balagtas, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 2.46,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0509-007697",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 1+003.62, Lopez Jaena St., Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.00362,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19927861.14,
      "lengthMeters": 1003.62,
      "allocationPerStatedMeter": 19927.86,
      "rangesMeters": [
        [
          0.0,
          1003.62
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 1+003.62, Lopez Jaena St., Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0510-007712",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.135,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 148148148.15,
      "lengthMeters": 135.0,
      "allocationPerStatedMeter": 148148.15,
      "rangesMeters": [
        [
          0.0,
          135.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 4.19,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0510-007716",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+513.28, Sitio Kulis, San Jose, Paombong, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.51328,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38965087.28,
      "lengthMeters": 513.28,
      "allocationPerStatedMeter": 38965.09,
      "rangesMeters": [
        [
          0.0,
          513.28
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+513.28, Sitio Kulis, San Jose, Paombong, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.59,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0511-007720",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+897.91, Sikad Road, Kapitangan, Paombong, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.89791,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22273947.28,
      "lengthMeters": 897.91,
      "allocationPerStatedMeter": 22273.95,
      "rangesMeters": [
        [
          0.0,
          897.91
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+897.91, Sikad Road, Kapitangan, Paombong, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.15,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0511-007721",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+059.26, NIA Road, Pinagbarilan, Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.05926,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18881105.68,
      "lengthMeters": 1059.26,
      "allocationPerStatedMeter": 18881.11,
      "rangesMeters": [
        [
          0.0,
          1059.26
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+059.26, NIA Road, Pinagbarilan, Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.76,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0511-007727",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Road and Drainage at Barangay Maysantol, Bulakan, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation/Improvement of Road and Drainage at Barangay Maysantol, Bulakan, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0512-007750",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Baybay Bridge, Barangay Baybay, Angat, Bulacan (121.039853, 14.939544)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "512",
      "lengthEvidence": "Construction of Baybay Bridge, Barangay Baybay, Angat, Bulacan (121.039853, 14.939544)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0512-007751",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Local Road from Barangay Sta. Cruz to Barangay Sulucan, Angat, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "512",
      "lengthEvidence": "Construction of Concrete Local Road from Barangay Sta. Cruz to Barangay Sulucan, Angat, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0512-007753",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Drainage Canal along Igay-Montalban Road, Barangay Sto Cristo, City of San Jose Del Monte, Bulacan (121.062416, 14.788425)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "512",
      "lengthEvidence": "Construction of Drainage Canal along Igay-Montalban Road, Barangay Sto Cristo, City of San Jose Del Monte, Bulacan (121.062416, 14.788425)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007764",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Pulong Yantok, Angat, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road at Barangay Pulong Yantok, Angat, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007765",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road California Avenue, Barangay Encanto, Angat, Bulacan, Sta. 00+000 - Sta. 00+735",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.735,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27210884.35,
      "lengthMeters": 735.0,
      "allocationPerStatedMeter": 27210.88,
      "rangesMeters": [
        [
          0.0,
          735.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road California Avenue, Barangay Encanto, Angat, Bulacan, Sta. 00+000 - Sta. 00+735",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.11,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0514-007783",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage of Requino Street, Sulok, Barangay Saluysoy, Meycauayan Bulacan, Sta. 00+000 - Sta. 00+480 (120.95575556, 14.74309167)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.48,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 480.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          480.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road with Drainage of Requino Street, Sulok, Barangay Saluysoy, Meycauayan Bulacan, Sta. 00+000 - Sta. 00+480 (120.95575556, 14.74309167)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.7,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0514-007797",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion II, Marilao, Bulacan Sta. 00+000 - Sta. 00+810 (120.94205, 14.75783)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.81,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24691358.02,
      "lengthMeters": 810.0,
      "allocationPerStatedMeter": 24691.36,
      "rangesMeters": [
        [
          0.0,
          810.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road, Barangay Poblacion II, Marilao, Bulacan Sta. 00+000 - Sta. 00+810 (120.94205, 14.75783)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.27,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0516-007833",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Eugenia Heights Subdv., Barangay Kaypian, City of San Jose Del Monte, Bulacan (121.068151, 14.808241)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road, Eugenia Heights Subdv., Barangay Kaypian, City of San Jose Del Monte, Bulacan (121.068151, 14.808241)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0517-007854",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 8, Barangay Capihan, San Rafael, Bulacan, Sta. 00+000 - Sta. 00+685",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.685,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29197080.29,
      "lengthMeters": 685.0,
      "allocationPerStatedMeter": 29197.08,
      "rangesMeters": [
        [
          0.0,
          685.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Purok 8, Barangay Capihan, San Rafael, Bulacan, Sta. 00+000 - Sta. 00+685",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.19,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0518-007858",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Kapitulo to Pag-asa Rd., Barangay Sta. Barbara, Llanera, Nueva Ecija Road A - Sta. 0+000 - Sta. 1+100, Road B - Sta. 0+000 - Sta. 0+690",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          1100.0
        ],
        [
          0.0,
          690.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Road at Sitio Kapitulo to Pag-asa Rd., Barangay Sta. Barbara, Llanera, Nueva Ecija Road A - Sta. 0+000 - Sta. 1+100, Road B - Sta. 0+000 - Sta. 0+690",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007901",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bentigan Cuyapo to Nampicuan Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Bentigan Cuyapo to Nampicuan Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007931",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Bridge, Barangay Cabisuculan, Science City of Muñoz, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Rehabilitation of Bridge, Barangay Cabisuculan, Science City of Muñoz, Nueva Ecija",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007973",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Andres, Muñoz, Nueva Ecija Sta. 0+000 - Sta. 1+700",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11764705.88,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 11764.71,
      "rangesMeters": [
        [
          0.0,
          1700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Andres, Muñoz, Nueva Ecija Sta. 0+000 - Sta. 1+700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.49,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0525-008027",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal at Barangay Sta Maria, Minalin, Pampanga 0+000 - STA. 0+303",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.303,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66006600.66,
      "lengthMeters": 303.0,
      "allocationPerStatedMeter": 66006.6,
      "rangesMeters": [
        [
          0.0,
          303.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Construction of Road with Drainage Canal at Barangay Sta Maria, Minalin, Pampanga 0+000 - STA. 0+303",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 2.31,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0525-008030",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of San Rafael Road with Slope Protection works at Barangay San Rafael, Macabebe, Pampanga, 0+000 - STA. 0+410",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.41,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 48780487.8,
      "lengthMeters": 410.0,
      "allocationPerStatedMeter": 48780.49,
      "rangesMeters": [
        [
          0.0,
          410.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Improvement of San Rafael Road with Slope Protection works at Barangay San Rafael, Macabebe, Pampanga, 0+000 - STA. 0+410",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.99,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0526-008047",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of San Juan Bridge, San Luis, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction (Completion) of San Juan Bridge, San Luis, Pampanga",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008048",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of San Esteban Bridge, Macabebe, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction (Completion) of San Esteban Bridge, Macabebe, Pampanga",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0528-008094",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Upgrading and Concreting of Road at Barangay Balucuc, Apalit, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Upgrading and Concreting of Road at Barangay Balucuc, Apalit, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0528-008095",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Upgrading and Concreting of Road at Barangay Cansinala, Apalit, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Upgrading and Concreting of Road at Barangay Cansinala, Apalit, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0529-008115",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Barangay Road with Lined Canal at Sta. Ursula, Betis, Guagua, Pampanga, Sta.0+000 - Sta.0+930",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.93,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21505376.34,
      "lengthMeters": 930.0,
      "allocationPerStatedMeter": 21505.38,
      "rangesMeters": [
        [
          0.0,
          930.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Improvement of Barangay Road with Lined Canal at Sta. Ursula, Betis, Guagua, Pampanga, Sta.0+000 - Sta.0+930",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.11,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0531-008154",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure along Porac River, Mabical Section, Floridablanca, Pampanga, Sta. 0 + 000 - Sta. 0 + 182.46",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.18246,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 109613065.88,
      "lengthMeters": 182.46,
      "allocationPerStatedMeter": 109613.07,
      "rangesMeters": [
        [
          0.0,
          182.46
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "531",
      "lengthEvidence": "Construction of Road Slope Protection Structure along Porac River, Mabical Section, Floridablanca, Pampanga, Sta. 0 + 000 - Sta. 0 + 182.46",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 3.1,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0531-008155",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure along Porac River, Valdez Section, Floridablanca, Pampanga, Sta. 0 + 000 - Sta. 0 + 182.35",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.18234999999999998,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 109679188.37,
      "lengthMeters": 182.35,
      "allocationPerStatedMeter": 109679.19,
      "rangesMeters": [
        [
          0.0,
          182.35
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "531",
      "lengthEvidence": "Construction of Road Slope Protection Structure along Porac River, Valdez Section, Floridablanca, Pampanga, Sta. 0 + 000 - Sta. 0 + 182.35",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 3.1,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0534-008218",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal at Barangay Balingcanaway, Tarlac City, Tarlac",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction of Road with Drainage Canal at Barangay Balingcanaway, Tarlac City, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0535-008230",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Agustin, Iba, Zambales Sta. 0+000 - Sta. 1+000",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Construction of Road, Barangay San Agustin, Iba, Zambales Sta. 0+000 - Sta. 1+000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0535-008233",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Santa Cruz - Mangatarem - Lucapon - Uacon - Binabalian, Barangay Uacon, Bridge 2, Candelaria, Zambales",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Construction of Bridge, Santa Cruz - Mangatarem - Lucapon - Uacon - Binabalian, Barangay Uacon, Bridge 2, Candelaria, Zambales",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0536-008238",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Drainage, Liwliwa, Barangay Sto. Niño, San Felipe, Zambales Sta. 0+000 - Sta 0+750",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26666666.67,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 26666.67,
      "rangesMeters": [
        [
          0.0,
          750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Road including Drainage, Liwliwa, Barangay Sto. Niño, San Felipe, Zambales Sta. 0+000 - Sta 0+750",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.37,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0536-008241",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Drainage at Mangan-Vaca Road, Sta. 0 + 000 - Sta. 0 + 880, Barangay Mangan-Vaca, Subic, Zambales",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.88,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 880.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          880.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Drainage at Mangan-Vaca Road, Sta. 0 + 000 - Sta. 0 + 880, Barangay Mangan-Vaca, Subic, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.17,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0536-008242",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Higher Agusuhin, Sta. 0 + 000 - Sta. 0 + 910, Barangay Cawag, Subic, Zambales",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.91,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21978021.98,
      "lengthMeters": 910.0,
      "allocationPerStatedMeter": 21978.02,
      "rangesMeters": [
        [
          0.0,
          910.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Road and Drainage at Higher Agusuhin, Sta. 0 + 000 - Sta. 0 + 910, Barangay Cawag, Subic, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.13,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0538-008286",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Alitagtag-Bauan Road (Mataas na Lupa-Ilat South Section), including Drainage Facilities, San Pascual, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Construction of Alitagtag-Bauan Road (Mataas na Lupa-Ilat South Section), including Drainage Facilities, San Pascual, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008288",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of San Francisco Barangay Road, Mabini, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Construction of San Francisco Barangay Road, Mabini, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008301",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay Paharang Kanluran, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Improvement of Road, Barangay Paharang Kanluran, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008333",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Nangkaan - Kinalaglagan Road, Mataasnakahoy, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Improvement of Nangkaan - Kinalaglagan Road, Mataasnakahoy, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008342",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road in San Nicolas, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Rehabilitation of Road in San Nicolas, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008381",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008383",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008389",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Poblacion, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Improvement of Road at Poblacion, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008394",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Provincial Road along Barangay Mabayabas, Taysan, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Rehabilitation of Provincial Road along Barangay Mabayabas, Taysan, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0544-008448",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction of Bridge at Langkaan Road, Barangay De Ocampo, Trece Martires City, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Reconstruction of Bridge at Langkaan Road, Barangay De Ocampo, Trece Martires City, Cavite",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008458",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Bridge, Barangay Biga I, Silang, Cavite",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Construction (Completion) of Bridge, Barangay Biga I, Silang, Cavite",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008482",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, San Isidro Village, Barangay Dela Paz, Biñan City, Laguna",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Construction of Road and Drainage, San Isidro Village, Barangay Dela Paz, Biñan City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008494",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation (Reconstruction) of Road, Barangay San Juan, San Pablo City, Laguna, Start 14.092878, 121.293251 End 14.098843, 121.290689",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Rehabilitation (Reconstruction) of Road, Barangay San Juan, San Pablo City, Laguna, Start 14.092878, 121.293251 End 14.098843, 121.290689",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008501",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Luquin, Liliw, Laguna",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Rehabilitation of Road, Barangay Luquin, Liliw, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008509",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Patnanungan Norte-Luod Road, Patnanungan, Quezon",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Construction of Patnanungan Norte-Luod Road, Patnanungan, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008514",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Calumpang - Baguio Road, Sta. 0+000 - Sta. 0+050, Sta. 1+270 - Sta. 1+350, Sta. 2+740 - Sta. 2+745, Sta. 2+830 - Sta. 2+900, Sta. 3+150 - Sta. 3+495, Barangay Calumpang to Barangay Baguio, Tayabas City, Quezon",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.55,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 36363636.36,
      "lengthMeters": 550.0,
      "allocationPerStatedMeter": 36363.64,
      "rangesMeters": [
        [
          0.0,
          50.0
        ],
        [
          1270.0,
          1350.0
        ],
        [
          2740.0,
          2745.0
        ],
        [
          2830.0,
          2900.0
        ],
        [
          3150.0,
          3495.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Rehabilitation of Calumpang - Baguio Road, Sta. 0+000 - Sta. 0+050, Sta. 1+270 - Sta. 1+350, Sta. 2+740 - Sta. 2+745, Sta. 2+830 - Sta. 2+900, Sta. 3+150 - Sta. 3+495, Barangay Calumpang to Barangay Baguio, Tayabas City, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.49,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0548-008524",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ibabang Iyam, Lucena City, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Barangay Ibabang Iyam, Lucena City, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008539",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Magsaysay, San Antonio, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Bridge, Barangay Magsaysay, San Antonio, Quezon",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008555",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of A. Mabini - Sta. Maria Road, Sta. 0+083 - Sta. 0+617, Guinayangan, Quezon",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.534,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37453183.52,
      "lengthMeters": 534.0,
      "allocationPerStatedMeter": 37453.18,
      "rangesMeters": [
        [
          83.0,
          617.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of A. Mabini - Sta. Maria Road, Sta. 0+083 - Sta. 0+617, Guinayangan, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.53,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0549-008556",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Capuluan Tulon to San Isidro Road, Sta. 0+120 - Sta. 0+652, Guinayangan, Quezon",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.532,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37593984.96,
      "lengthMeters": 532.0,
      "allocationPerStatedMeter": 37593.98,
      "rangesMeters": [
        [
          120.0,
          652.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Capuluan Tulon to San Isidro Road, Sta. 0+120 - Sta. 0+652, Guinayangan, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.54,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0549-008557",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Cogorin Ilaya to Binahian B. Barangay Road, Sta. 0+400 - Sta. 1+000, Lopez, Quezon",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          400.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Cogorin Ilaya to Binahian B. Barangay Road, Sta. 0+400 - Sta. 1+000, Lopez, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.36,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0549-008560",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Bahay Serena, Sta. 0+000 - Sta. 0+310, Gumaca, Quezon",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.31,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 64516129.03,
      "lengthMeters": 310.0,
      "allocationPerStatedMeter": 64516.13,
      "rangesMeters": [
        [
          0.0,
          310.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road Bahay Serena, Sta. 0+000 - Sta. 0+310, Gumaca, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 2.26,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0550-008567",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sto. Niño-Cagascas-Del Rosario Road, Sta. 0+650 - Sta. 0+750, Sta. 3+250 - Sta. 3+385, Sta. 5+520 -Sta. 5+655, Sta. 4+600 - Sta. 4+735, Tagkawayan, Quezon",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.505,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 39603960.4,
      "lengthMeters": 505.0,
      "allocationPerStatedMeter": 39603.96,
      "rangesMeters": [
        [
          650.0,
          750.0
        ],
        [
          3250.0,
          3385.0
        ],
        [
          5520.0,
          5655.0
        ],
        [
          4600.0,
          4735.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction of Sto. Niño-Cagascas-Del Rosario Road, Sta. 0+650 - Sta. 0+750, Sta. 3+250 - Sta. 3+385, Sta. 5+520 -Sta. 5+655, Sta. 4+600 - Sta. 4+735, Tagkawayan, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.62,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0550-008574",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Center Canal at Sitio Masikap, Barangay San Jose, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction of Road with Center Canal at Sitio Masikap, Barangay San Jose, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0550-008575",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage and Slope Protection at Sitio San Ysiro to Sta. Ynez, Barangay San Jose, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction of Road with Drainage and Slope Protection at Sitio San Ysiro to Sta. Ynez, Barangay San Jose, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008601",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Matandang Gasan, Gasan, Marinduque",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Access Road, Barangay Matandang Gasan, Gasan, Marinduque",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008607",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Tapuyan, Gasan, Marinduque",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Rehabilitation of Road, Barangay Tapuyan, Gasan, Marinduque",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008655",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sapul, Calapan City, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Sapul, Calapan City, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008663",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Isabel, Calapan City, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Sta. Isabel, Calapan City, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008667",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay San Isidro, Naujan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Rehabilitation of Road, Barangay San Isidro, Naujan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008714",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Looban - Upper Dapawan Access Road, Odiongan, Romblon",
      "office": "Romblon District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Looban - Upper Dapawan Access Road, Odiongan, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008716",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Mat-I - Agojo Access Road, Sta 01+020 - Sta 01+450, Barangay Mat-I, Santa Fe & Barangay Agojo, Looc, Romblon",
      "office": "Romblon District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.43,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46511627.91,
      "lengthMeters": 430.0,
      "allocationPerStatedMeter": 46511.63,
      "rangesMeters": [
        [
          1020.0,
          1450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Mat-I - Agojo Access Road, Sta 01+020 - Sta 01+450, Barangay Mat-I, Santa Fe & Barangay Agojo, Looc, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.9,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0557-008726",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Bagong Sikat to Barangay Maujao, Bulalacao, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road at Barangay Bagong Sikat to Barangay Maujao, Bulalacao, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008727",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Balatasan, Bulalacao, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road at Barangay Balatasan, Bulalacao, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008777",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Agol-Barangay Basicao Interior-Barangay Malapay- Barangay Nablangbulod Road including Drainage Facilities, Pio Duran, Albay. STA. 0+600-STA.1+300",
      "office": "Albay 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 700.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          600.0,
          1300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Construction of Road, Barangay Agol-Barangay Basicao Interior-Barangay Malapay- Barangay Nablangbulod Road including Drainage Facilities, Pio Duran, Albay. STA. 0+600-STA.1+300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.17,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0560-008797",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malaguico (Zone 2) to Barangay Azucena (Zone 1), Sipocot, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay Malaguico (Zone 2) to Barangay Azucena (Zone 1), Sipocot, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008816",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Pangpang to Del Rosario Road, Barangay Pangpang, Dinaga and Del Rosario, Canaman, Camarin� es � S�ur�",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Pangpang to Del Rosario Road, Barangay Pangpang, Dinaga and Del Rosario, Canaman, Camarin� es � S�ur�",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008818",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Juan, Canaman, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Road, Barangay San Juan, Canaman, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0564-008886",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Kinamaligan Settlement Road, Masbate City, Masbate, Sta. 0+700 to Sta. 1+350",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.65,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30769230.77,
      "lengthMeters": 650.0,
      "allocationPerStatedMeter": 30769.23,
      "rangesMeters": [
        [
          700.0,
          1350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Kinamaligan Settlement Road, Masbate City, Masbate, Sta. 0+700 to Sta. 1+350",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.26,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0565-008896",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Candelaria, Uson, Masbate",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Road, Barangay Candelaria, Uson, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0565-008897",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Madbad to Barangay Libertad, Cawayan, Masbate",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Road, Barangay Madbad to Barangay Libertad, Cawayan, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0565-008899",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nainday, Placer, Masbate",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Road, Barangay Nainday, Placer, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0565-008901",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Jose to Barangay Madao, Uson, Masbate",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Road, Barangay San Jose to Barangay Madao, Uson, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0565-008911",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Barcelona Poblacion Road Network to Luneta, Barcelona, Sorsogon",
      "office": "Sorsogon 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Rehabilitation/Improvement of Barcelona Poblacion Road Network to Luneta, Barcelona, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008919",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Tagas to Barangay Cagbolo, Magallanes, Sorsogon",
      "office": "Sorsogon District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Rehabilitation of Road, Barangay Tagas to Barangay Cagbolo, Magallanes, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008965",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Access Road, Sta. 2+680 - Sta. 3+680, in Bgy. Tamayok to Sitio Panacawon, Patnongon Antique",
      "office": "Antique District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          2680.0,
          3680.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Concreting of Access Road, Sta. 2+680 - Sta. 3+680, in Bgy. Tamayok to Sitio Panacawon, Patnongon Antique",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0568-008966",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Access road, Sta. 0+000 - Sta. 1+000, From National road to Bgy Igbonglo, San jose, Antique",
      "office": "Antique District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Concreting of Access road, Sta. 0+000 - Sta. 1+000, From National road to Bgy Igbonglo, San jose, Antique",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0568-008969",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Libas, Roxas City, Capiz",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction of Road, Barangay Libas, Roxas City, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0569-008982",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pangabat, Jamindan, Capiz",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Road, Barangay Pangabat, Jamindan, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0569-008990",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Baran, Nazaret -Cagay, East Valencia Road,Barangay Nazaret and BarangayEast Valencia, Buenavista,Guimaras, Sta. 0 + 972 - Sta. 1 +102, Sta. 1 + 117 - Sta. 1 + 630,Sta. 1 + 645 - Sta. 2 + 102",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 18181818.18,
      "lengthMeters": 1100.0,
      "allocationPerStatedMeter": 18181.82,
      "rangesMeters": [
        [
          972.0,
          1102.0
        ],
        [
          1117.0,
          1630.0
        ],
        [
          1645.0,
          2102.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Baran, Nazaret -Cagay, East Valencia Road,Barangay Nazaret and BarangayEast Valencia, Buenavista,Guimaras, Sta. 0 + 972 - Sta. 1 +102, Sta. 1 + 117 - Sta. 1 + 630,Sta. 1 + 645 - Sta. 2 + 102",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.73,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0569-008997",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Pin-as-Malbag-Fundacion Road, Sta. 0 + 500 - Sta. 1 + 600, Barangay Sebaste, Sibunag, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18181818.18,
      "lengthMeters": 1100.0,
      "allocationPerStatedMeter": 18181.82,
      "rangesMeters": [
        [
          500.0,
          1600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Pin-as-Malbag-Fundacion Road, Sta. 0 + 500 - Sta. 1 + 600, Barangay Sebaste, Sibunag, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.73,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0570-009000",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Balaan Bukid, Sta. 0 + 959 - Sta. 1 + 259, Barangay Hoskyn, Jordan, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66666666.67,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 66666.67,
      "rangesMeters": [
        [
          959.0,
          1259.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Construction of Road, Balaan Bukid, Sta. 0 + 959 - Sta. 1 + 259, Barangay Hoskyn, Jordan, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 2.33,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0570-009008",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Surudlan-Canhawan-Sta. Maria-Salvacion, Sta. 1 + 400 - Sta. 2 + 500, Barangay Canhawan, Nueva Valencia, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18181818.18,
      "lengthMeters": 1100.0,
      "allocationPerStatedMeter": 18181.82,
      "rangesMeters": [
        [
          1400.0,
          2500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Construction of Road, Surudlan-Canhawan-Sta. Maria-Salvacion, Sta. 1 + 400 - Sta. 2 + 500, Barangay Canhawan, Nueva Valencia, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.73,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0572-009044",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Calapdan - Barangay Lonoy, Estancia, Iloilo",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay Calapdan - Barangay Lonoy, Estancia, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009049",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0 + 000 - Sta. 1 + 200, Barangay Macatunao - Barangay Tambaliza, Concepcion, Iloilo",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16666666.67,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 16666.67,
      "rangesMeters": [
        [
          0.0,
          1200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Sta. 0 + 000 - Sta. 1 + 200, Barangay Macatunao - Barangay Tambaliza, Concepcion, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.67,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0572-009057",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Agmanaphao to Barangay Singay, Mina, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay Agmanaphao to Barangay Singay, Mina, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009061",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Barasan, Sitio Ilaud, Pototan, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay Barasan, Sitio Ilaud, Pototan, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009067",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mañacabac to Barangay Carigangan, Janiuay, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay Mañacabac to Barangay Carigangan, Janiuay, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009083",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Hermelinda Homes, Barangay Mansilingan, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Construction of Roads, Hermelinda Homes, Barangay Mansilingan, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009085",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Junction BANOCEH to Junction Murcia Bypass, Bacolod City, Negros Occidental, 10.610612, 123.004671",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Construction of Road from Junction BANOCEH to Junction Murcia Bypass, Bacolod City, Negros Occidental, 10.610612, 123.004671",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009086",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Puentebella Subdivision, Barangay Taculing, Bacolod City, 10.644674, 122.960080",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Rehabilitation of Road, Puentebella Subdivision, Barangay Taculing, Bacolod City, 10.644674, 122.960080",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009089",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Puentebella Subd., Barangay Taculing, Bacolod City, 10.644674, 122.960080",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Rehabilitation of Road, Puentebella Subd., Barangay Taculing, Bacolod City, 10.644674, 122.960080",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009094",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Granada, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Construction of Roads, Barangay Granada, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009124",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Hacienda Bjormaine to Barangay Tadlong, Barangay Tadlong, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road Hacienda Bjormaine to Barangay Tadlong, Barangay Tadlong, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009151",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Riverside, Isabela, Negros Occidental, Sta. 08+648 to Sta. 09+648",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          8648.0,
          9648.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Road at Barangay Riverside, Isabela, Negros Occidental, Sta. 08+648 to Sta. 09+648",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0577-009158",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction of Road in Barangay Aguisan to Barangay Nabali-an to Barangay Cabanbanan to Barangay Libacao, Himamaylan City, Negros Occidental",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Reconstruction of Road in Barangay Aguisan to Barangay Nabali-an to Barangay Cabanbanan to Barangay Libacao, Himamaylan City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009159",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Dancalan to Goce Road, Barangay Dancalan, Ilog, Negros Occidental",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Dancalan to Goce Road, Barangay Dancalan, Ilog, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009165",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Gil Montilla, Sipalay, Negros Occidental",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Road in Barangay Gil Montilla, Sipalay, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009201",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangays Tiguib-Manogtong, Ayungon, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Road, Barangays Tiguib-Manogtong, Ayungon, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009229",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, North Poblacion to Negros Oriental State University, Poblacion, Mabinay, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, North Poblacion to Negros Oriental State University, Poblacion, Mabinay, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009230",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Cangmamok, Barangay Mantiquil, Siaton, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road at Sitio Cangmamok, Barangay Mantiquil, Siaton, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009231",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Apoloy, Siaton, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Apoloy, Siaton, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009232",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Maglinao, Basay, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Maglinao, Basay, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009235",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Tigba to Sitio Canggabi, Barangay Narra, Bayawan City, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Sitio Tigba to Sitio Canggabi, Barangay Narra, Bayawan City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009237",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Bolaw, Barangay Manduao, Bayawan City, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Road, Sitio Bolaw, Barangay Manduao, Bayawan City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009243",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Sitio Lumang-e, Barangay Maluay to Sitio Lumang-e, Barangay Nasig-id, Zamboanguita, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Road from Sitio Lumang-e, Barangay Maluay to Sitio Lumang-e, Barangay Nasig-id, Zamboanguita, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009245",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road to Sitio Jumalon, Barangay Maloh, Siaton, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Road to Sitio Jumalon, Barangay Maloh, Siaton, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009250",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Villanueva Street from Barangay Poblacion I to Barangay Poblacion IV, Barangay Poblacion IV, Siaton, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Improvement of Road, Villanueva Street from Barangay Poblacion I to Barangay Poblacion IV, Barangay Poblacion IV, Siaton, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009269",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road going to Tagbilaran Friendship Park,Tagbilaran City, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road going to Tagbilaran Friendship Park,Tagbilaran City, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009279",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Bunacan and Barangay Bosongon, Tubigon, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Construction of Road at Barangay Bunacan and Barangay Bosongon, Tubigon, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009286",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Bridge at Purok 7,BarangayPanadtaran, Tubigon, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Construction of Concrete Bridge at Purok 7,BarangayPanadtaran, Tubigon, Bohol",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009426",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road at Barangay Salagmaya, Alcantara, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Construction of Concrete Road at Barangay Salagmaya, Alcantara, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009428",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Langin leading to Langin Barangay Hall and Langin NHS, Ronda, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Construction of Road at Barangay Langin leading to Langin Barangay Hall and Langin NHS, Ronda, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009450",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Bridge, Sta. 2+700, Sitio Biasong, Barangay Bonbon, Cebu City",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction of Concrete Bridge, Sta. 2+700, Sitio Biasong, Barangay Bonbon, Cebu City",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0591-009465",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Casiawan to Barangay Caanibongan, Cabucgayan, Biliran (Sta. 3+921 - Sta. 4+921)",
      "office": "Biliran District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          3921.0,
          4921.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Rehabilitation of Road, Barangay Casiawan to Barangay Caanibongan, Cabucgayan, Biliran (Sta. 3+921 - Sta. 4+921)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0591-009471",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/ Major Repair of Permanent Bridges - Mother Mary Bridge, Barangay Larrazabal, Naval, Biliran (124.408929, 11.571975)",
      "office": "Biliran District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Rehabilitation/ Major Repair of Permanent Bridges - Mother Mary Bridge, Barangay Larrazabal, Naval, Biliran (124.408929, 11.571975)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0591-009472",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Paypayon to Barangay San Roque, Oras, Eastern Samar (Sta. 0+000 - Sta. 0+690)",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.69,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28985507.25,
      "lengthMeters": 690.0,
      "allocationPerStatedMeter": 28985.51,
      "rangesMeters": [
        [
          0.0,
          690.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Rehabilitation of Road, Barangay Paypayon to Barangay San Roque, Oras, Eastern Samar (Sta. 0+000 - Sta. 0+690)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.18,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0591-009474",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Pasak, Barangay Aroganga, Dolores, Eastern Samar (Sta. 0+000 - Sta. 0+478)",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.478,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41841004.18,
      "lengthMeters": 478.0,
      "allocationPerStatedMeter": 41841.0,
      "rangesMeters": [
        [
          0.0,
          478.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Construction of Road, Sitio Pasak, Barangay Aroganga, Dolores, Eastern Samar (Sta. 0+000 - Sta. 0+478)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.71,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0592-009482",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Barangay Malaintos - Barangay Bonghon, Dolores, Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Rehabilitation of Road Barangay Malaintos - Barangay Bonghon, Dolores, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0592-009483",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay 15, Dolores, Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Construction of Road, Barangay 15, Dolores, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0592-009486",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Cotins Drive, Barangay 4, Guiuan, Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Rehabilitation of Road, Cotins Drive, Barangay 4, Guiuan, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0592-009493",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of A-et Bridge, Sulat, Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Construction of A-et Bridge, Sulat, Eastern Samar",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0593-009524",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of JNR bangkal-Sitio Alegria Road, (Sta. 0+775-Sta. 1+774(, Villaba, Leyte",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.999,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20020020.02,
      "lengthMeters": 999.0,
      "allocationPerStatedMeter": 20020.02,
      "rangesMeters": [
        [
          775.0,
          1774.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of JNR bangkal-Sitio Alegria Road, (Sta. 0+775-Sta. 1+774(, Villaba, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.03,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0594-009525",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Calbugos-Sitio Naga-Capiñahan Road, (Sta. 2+135-Sta.2+885), Villaba Leyte",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26666666.67,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 26666.67,
      "rangesMeters": [
        [
          2135.0,
          2885.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Construction of Calbugos-Sitio Naga-Capiñahan Road, (Sta. 2+135-Sta.2+885), Villaba Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.37,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0594-009526",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of JNR Consuegra Consuegra-Tapol Road, (Sta. 1+680- 2+680), Leyte, Leyte",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          1680.0,
          2680.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Concreting of JNR Consuegra Consuegra-Tapol Road, (Sta. 1+680- 2+680), Leyte, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0594-009528",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads, Kawayanan Junction to Ruburan, Calubian, Leyte 11.453134, 124.381547",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Concreting of Roads, Kawayanan Junction to Ruburan, Calubian, Leyte 11.453134, 124.381547",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0594-009529",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Labtic to Bunacan, Calubian, Leyte 11.494748, 124.347568",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Concreting of Road, Labtic to Bunacan, Calubian, Leyte 11.494748, 124.347568",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0594-009530",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road Catagbacan to Tinghub, Villaba, Leyte 11.189180, 124.409403",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Concreting of Road Catagbacan to Tinghub, Villaba, Leyte 11.189180, 124.409403",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0594-009531",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road Tabunok, Villaba Leyte 11.245741, 124.426452",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Concreting of Road Tabunok, Villaba Leyte 11.245741, 124.426452",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0594-009537",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Kawayanan to Barangay Tuburan, Calubian, Leyte (Station 0+000 - 0+600)",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          0.0,
          600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Construction of Road, Barangay Kawayanan to Barangay Tuburan, Calubian, Leyte (Station 0+000 - 0+600)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.36,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0594-009538",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Labtic to Barangay Bunacan, San Isidro, Leyte (Station 3+326 - 3+926)",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          3326.0,
          3926.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Construction of Road, Barangay Labtic to Barangay Bunacan, San Isidro, Leyte (Station 3+326 - 3+926)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.36,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0595-009545",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+510, Barangay Sumangga, Ormoc City, Leyte",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.51,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39215686.27,
      "lengthMeters": 510.0,
      "allocationPerStatedMeter": 39215.69,
      "rangesMeters": [
        [
          0.0,
          510.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+510, Barangay Sumangga, Ormoc City, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.6,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0595-009546",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure, Barangay Alta Vista, Ormoc City, Leyte",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road Slope Protection Structure, Barangay Alta Vista, Ormoc City, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0595-009548",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road Sta. 0+000 - Sta. 1+150, Barangay Monte Alegre, Isabel, Leyte",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17391304.35,
      "lengthMeters": 1150.0,
      "allocationPerStatedMeter": 17391.3,
      "rangesMeters": [
        [
          0.0,
          1150.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Concrete Road Sta. 0+000 - Sta. 1+150, Barangay Monte Alegre, Isabel, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.7,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0597-009595",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bulao, Las Navas - Barangay Bonifacio, Catubig, (Sta. 0+000 - Sta. 1+049), Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.049,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19065776.93,
      "lengthMeters": 1049.0,
      "allocationPerStatedMeter": 19065.78,
      "rangesMeters": [
        [
          0.0,
          1049.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Road, Barangay Bulao, Las Navas - Barangay Bonifacio, Catubig, (Sta. 0+000 - Sta. 1+049), Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.76,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0599-009644",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road leading to Sports Complex in Catbalogan City, Samar , Sta. 0+000.00 - Sta. 0+230.00",
      "office": "Samar 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 86956521.74,
      "lengthMeters": 230.0,
      "allocationPerStatedMeter": 86956.52,
      "rangesMeters": [
        [
          0.0,
          230.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Construction of Access Road leading to Sports Complex in Catbalogan City, Samar , Sta. 0+000.00 - Sta. 0+230.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 2.46,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0600-009659",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Kan Sucuban Road - Kan Simba, Omar, Sulu",
      "office": "Sulu 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Construction of Road, Sitio Kan Sucuban Road - Kan Simba, Omar, Sulu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009666",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sikitan- Barangay Luzvilla, Piñan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Barangay Sikitan- Barangay Luzvilla, Piñan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009699",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Lawigan, Labason, Zamboanga del Norte",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Construction of Road in Barangay Lawigan, Labason, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0603-009706",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Busikong-Sta. Maria-Pangatangan-Panubigan- Balagunan Road, Siocon, Zamboanga del Norte",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Concrete Road, Busikong-Sta. Maria-Pangatangan-Panubigan- Balagunan Road, Siocon, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0603-009707",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malayal, Sibuco, Zamboanga del Norte, Sta. 2 + 710 - Sta. 3 + 710",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          2710.0,
          3710.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road, Barangay Malayal, Sibuco, Zamboanga del Norte, Sta. 2 + 710 - Sta. 3 + 710",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0603-009708",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Minanga-Danganon, Sirawai, Zamboanga del Norte, Sta. 01+732 - Sta. 02+732",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          1732.0,
          2732.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road, Barangay Minanga-Danganon, Sirawai, Zamboanga del Norte, Sta. 01+732 - Sta. 02+732",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0603-009714",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Barangay Cumarom - Barangay Cabaluran, Midsalip, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road from Barangay Cumarom - Barangay Cabaluran, Midsalip, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0603-009718",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Barangay Lourmah - Sitio Sandal, Barangay San Isidro, Mahayag, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road from Barangay Lourmah - Sitio Sandal, Barangay San Isidro, Mahayag, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0603-009720",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Barangay Sto. Niño - Barangay Baroy, Sominot, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road from Barangay Sto. Niño - Barangay Baroy, Sominot, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0603-009721",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Barangay Upper Campo Islam to Barangay San Isidro, Labangan, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road from Barangay Upper Campo Islam to Barangay San Isidro, Labangan, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009724",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Dao, Pagadian City, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road in Barangay Dao, Pagadian City, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009728",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Limamaan, Tambulig, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road in Barangay Limamaan, Tambulig, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009733",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Tinotungan - Barangay Balimbingan, Tukuran, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road in Barangay Tinotungan - Barangay Balimbingan, Tukuran, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009735",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malating - Barangay Bagong Opon, Ramon Magsaysay, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road, Barangay Malating - Barangay Bagong Opon, Ramon Magsaysay, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009743",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Baganian, Tabina, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road, Barangay Baganian, Tabina, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009745",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Guinlin, Tigbao, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road, Barangay Guinlin, Tigbao, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009746",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Liba - Barangay Bantal, Bayog, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road, Barangay Liba - Barangay Bantal, Bayog, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009747",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Piniglibano, Dumalinao, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road, Barangay Piniglibano, Dumalinao, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009748",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion - Barangay Dansal, Lapuyan, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road, Barangay Poblacion - Barangay Dansal, Lapuyan, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009749",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion - Barangay Sayog - Barangay Lantawan, San Miguel, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road, Barangay Poblacion - Barangay Sayog - Barangay Lantawan, San Miguel, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009751",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tiniguangan - Barangay Sumbato, Dimataling, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road, Barangay Tiniguangan - Barangay Sumbato, Dimataling, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009752",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tiwales - Barangay Dagum, Lakewood, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road, Barangay Tiwales - Barangay Dagum, Lakewood, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009753",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tulapok, Margosatubig, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road, Barangay Tulapok, Margosatubig, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009755",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Malangas Boulevard, Malangas, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road Malangas Boulevard, Malangas, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009773",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Jct. at Sibugay Circumferential Road leading to Barangay Milagrosa-Barangay Payongan, Alicia, Zamboanga Sibugay in support of the Coconut and Seaweeds Industries",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Jct. at Sibugay Circumferential Road leading to Barangay Milagrosa-Barangay Payongan, Alicia, Zamboanga Sibugay in support of the Coconut and Seaweeds Industries",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009779",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of New Tampilisan-Diampak-Shiolan Road, Barangay New Tampilisan, Kabasalan, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of New Tampilisan-Diampak-Shiolan Road, Barangay New Tampilisan, Kabasalan, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009850",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Sitio Eastern Pandan, Barangay Pandan to Maslog, Barangay Balbagon, Mambajao, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Road Sitio Eastern Pandan, Barangay Pandan to Maslog, Barangay Balbagon, Mambajao, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009851",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Linsobong Kabuhi to Maslog Kabuhi, Barangay Pandan, Mambajao, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Road, Sitio Linsobong Kabuhi to Maslog Kabuhi, Barangay Pandan, Mambajao, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009852",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Linsobong Kabuhi, Barangay Pandan to Sitio Quiboro, Barangay Poblacion, Mambajao, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Construction of Road, Sitio Linsobong Kabuhi, Barangay Pandan to Sitio Quiboro, Barangay Poblacion, Mambajao, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009855",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Lubo, Barangay North Poblacion to Barangay Butay, Guinsiliban, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Construction of Road, Sitio Lubo, Barangay North Poblacion to Barangay Butay, Guinsiliban, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009856",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Quiboro to Sitio Quipasa, Barangay Poblacion, Mambajao, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Construction of Road, Sitio Quiboro to Sitio Quipasa, Barangay Poblacion, Mambajao, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009864",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Mabini to Saay, Quipasa Road (Sta. 0+000 - Sta. 2 +000), Barangay Poblacion, Mambajao, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 2.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10000000.0,
      "lengthMeters": 2000.0,
      "allocationPerStatedMeter": 10000.0,
      "rangesMeters": [
        [
          0.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Rehabilitation of Mabini to Saay, Quipasa Road (Sta. 0+000 - Sta. 2 +000), Barangay Poblacion, Mambajao, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.41,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0610-009865",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Quipasa to Saay Road, Barangay Poblacion, Mambajao, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Rehabilitation of Quipasa to Saay Road, Barangay Poblacion, Mambajao, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0611-009878",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road leading to Balo-i Springs, Barangay Abaga, Balo-i, Lanao del Norte",
      "office": "Lanao del Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Road leading to Balo-i Springs, Barangay Abaga, Balo-i, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0611-009881",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 1A Sitio Talisay, Pigcarangan to Baybay Bucana, Barangay Pigcarangan, Tubod Lanao del Norte",
      "office": "Lanao del Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Road, Purok 1A Sitio Talisay, Pigcarangan to Baybay Bucana, Barangay Pigcarangan, Tubod Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0611-009882",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 2 to Purok 5 Barangay Pualas, Tubod Lanao del Norte",
      "office": "Lanao del Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Road, Purok 2 to Purok 5 Barangay Pualas, Tubod Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0611-009883",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 3 Barangay Pigcarangan to Purok 1 Barangay Tangueguiron, Tubod Lanao del Norte",
      "office": "Lanao del Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Road, Purok 3 Barangay Pigcarangan to Purok 1 Barangay Tangueguiron, Tubod Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0611-009884",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 4 to Purok 6 Sitio Palo 12, Barangay San Antonio, Tubod, Lanao del Norte",
      "office": "Lanao del Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Road, Purok 4 to Purok 6 Sitio Palo 12, Barangay San Antonio, Tubod, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0612-009899",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Usocan-Barangay Bato, Plaridel, Misamis Occidental",
      "office": "Misamis Occidental 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Road Barangay Usocan-Barangay Bato, Plaridel, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0612-009901",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Sapang Ama-Macabibo, Sapang Dalaga, Misamis Occidental",
      "office": "Misamis Occidental 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Concreting of Road, Barangay Sapang Ama-Macabibo, Sapang Dalaga, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0612-009905",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Construction of Barangay Roxas to Sinampongan, Aloran, Misamis Occidental",
      "office": "Misamis Occidental 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Road Construction of Barangay Roxas to Sinampongan, Aloran, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0614-009933",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Barangay Estrella - Barangay Katipunan), Sta. 0+000 - Sta. 0+670, Sinacaban, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.67,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29850746.27,
      "lengthMeters": 670.0,
      "allocationPerStatedMeter": 29850.75,
      "rangesMeters": [
        [
          0.0,
          670.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Concreting of Road (Barangay Estrella - Barangay Katipunan), Sta. 0+000 - Sta. 0+670, Sinacaban, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.22,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0614-009934",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 4, Barangay San Isidro Alto, Sta. 0+000 - Sta. 0+670, Sinacaban, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.67,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29850746.27,
      "lengthMeters": 670.0,
      "allocationPerStatedMeter": 29850.75,
      "rangesMeters": [
        [
          0.0,
          670.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Construction of Road, Purok 4, Barangay San Isidro Alto, Sta. 0+000 - Sta. 0+670, Sinacaban, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.22,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0615-009967",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Manaol, Lagonglong, Misamis Oriental",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Construction of Road, Barangay Manaol, Lagonglong, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009972",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Corrales, Jasaan to Barangay Imelda, Villanueva, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road, Barangay Corrales, Jasaan to Barangay Imelda, Villanueva, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009976",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lanao - Benigwayan - Alubijid Road, Alubijid, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road, Barangay Lanao - Benigwayan - Alubijid Road, Alubijid, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009978",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malagana to Sitio Cogon Road, Claveria, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road, Barangay Malagana to Sitio Cogon Road, Claveria, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009982",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Taboo - Bitaugo - Tangkub, Libertad, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road, Barangay Taboo - Bitaugo - Tangkub, Libertad, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0617-009991",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Purok 1 (Masunurin), Barangay Binuangan, Maco, Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Bridge, Purok 1 (Masunurin), Barangay Binuangan, Maco, Davao de Oro",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0617-009992",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok. 10, Barangay Andili, Mawab , Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Road, Purok. 10, Barangay Andili, Mawab , Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0617-009993",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Widening of Road, Capitol Area, Barangay Cabidianan, Nabunturan, Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Widening of Road, Capitol Area, Barangay Cabidianan, Nabunturan, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0617-010005",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Purok 7, Barangay Andili, Mawab, Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Bridge, Purok 7, Barangay Andili, Mawab, Davao de Oro",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0618-010019",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Del Pilar, New Corella, Davao del Norte",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Construction of Road, Barangay Del Pilar, New Corella, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0618-010022",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Access Road from Purok 11,12 and 13 All of Bgy Carmen, Davao Del Norte",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Concreting of Access Road from Purok 11,12 and 13 All of Bgy Carmen, Davao Del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0618-010025",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehab/Reconstruction Road including Drainage at Barangay Poblacion, Sawata, Davao del Norte",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Rehab/Reconstruction Road including Drainage at Barangay Poblacion, Sawata, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010061",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of New Israel-Kamandag Road, Barangay New Israel, Makilala, North Cotabato",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of New Israel-Kamandag Road, Barangay New Israel, Makilala, North Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010075",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Poblacion, Malapatan, sarangani Province",
      "office": "Sarangani District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road, Barangay Poblacion, Malapatan, sarangani Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010080",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road with Drainage, Fabian Natad, Barangay Lagao, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road with Drainage, Fabian Natad, Barangay Lagao, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010087",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok 3, Barangay Olympog, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road, Purok 3, Barangay Olympog, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0622-010105",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, JCT. Pioneer Settlers Avenue to Barangay Mambukal, Barangay Sta. Cruz, Koronadal City, South Cotabato, 6.475532, 124.838173, 6.471365, 124.834733",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Construction of Concrete Road, JCT. Pioneer Settlers Avenue to Barangay Mambukal, Barangay Sta. Cruz, Koronadal City, South Cotabato, 6.475532, 124.838173, 6.471365, 124.834733",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0625-010159",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Junction Provincial Road, Purok 6 to Barangay Bual (Proper), Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Junction Provincial Road, Purok 6 to Barangay Bual (Proper), Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0625-010163",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Junction National Highway to Pax Peace Village, Purok Mangudadatu, Barangay Dansuli, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Road, Junction National Highway to Pax Peace Village, Purok Mangudadatu, Barangay Dansuli, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0625-010168",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Kimundo, Barangay Lagandang to Barangay New Pangasinan, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Road, Sitio Kimundo, Barangay Lagandang to Barangay New Pangasinan, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0626-010173",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Hall to Sitio Pigel, Barangay Bolebak, Lebak, Sultan Kudarat",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Construction of Road, Barangay Hall to Sitio Pigel, Barangay Bolebak, Lebak, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0626-010174",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road from Purok Bougainvillea I to Purok Mangga, Barangay Obial, Kalamansig, Sultan Kudarat",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Concreting of Road from Purok Bougainvillea I to Purok Mangga, Barangay Obial, Kalamansig, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0627-010195",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road Sta. 0 + 000 - Sta. 1 + 000, Sitio Cabalawan, Barangay Garcia, Libjo, Dinagat Islands",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Concreting of Road Sta. 0 + 000 - Sta. 1 + 000, Sitio Cabalawan, Barangay Garcia, Libjo, Dinagat Islands",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.8,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0627-010199",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Sta. 0 + 000 - Sta. 0 + 800, Barangay Malinao, Tubajon, Dinagat Islands",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction of Road Sta. 0 + 000 - Sta. 0 + 800, Barangay Malinao, Tubajon, Dinagat Islands",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.29,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0627-010203",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Improvement) of Road Sta. 0 + 000 - Sta. 0 + 500, Sitio Maraging to Barangay Gen. Aguinaldo, Libjo, Dinagat Islands",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction (Improvement) of Road Sta. 0 + 000 - Sta. 0 + 500, Sitio Maraging to Barangay Gen. Aguinaldo, Libjo, Dinagat Islands",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.63,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0628-010212",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Songkoy - Honrado Bridge, Barangay Honrado, Socorro, Surigao del Norte.",
      "office": "Surigao del Norte 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of Songkoy - Honrado Bridge, Barangay Honrado, Socorro, Surigao del Norte.",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0628-010216",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Barangay Sani-Sani to Barangay Lakandula to Barangay Lakandula to Barangay Ellaperal, (0+000 - 0+600), Placer, Surigao del Norte",
      "office": "Surigao del Norte 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          0.0,
          600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of Road from Barangay Sani-Sani to Barangay Lakandula to Barangay Lakandula to Barangay Ellaperal, (0+000 - 0+600), Placer, Surigao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.36,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0628-010219",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Completion of Bridge at Barangay Bitaugan West, Cagwait, Surigao del Sur, Start:126.316697, 8.869581 End:126.316719, 8.86935",
      "office": "Surigao del Sur 1st District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Completion of Bridge at Barangay Bitaugan West, Cagwait, Surigao del Sur, Start:126.316697, 8.869581 End:126.316719, 8.86935",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0629-010239",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Coastal Diversion Road in Barangay I Poblacion, Hinigaran, Negros Occidental",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "629",
      "lengthEvidence": "Construction of Coastal Diversion Road in Barangay I Poblacion, Hinigaran, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0630-010241",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Causeway at Barangay Suba Basbas, Lapu-Lapu City, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "630",
      "lengthEvidence": "Construction of Causeway at Barangay Suba Basbas, Lapu-Lapu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0118-000151",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0505 + 979 - K0506 + 922",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 19975000,
      "lengthKm": 0.943,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21182396.61,
      "lengthMeters": 943.0,
      "allocationPerStatedMeter": 21182.4,
      "rangesMeters": [
        [
          505979.0,
          506922.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Manila North Rd - K0505 + 979 - K0506 + 922",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 0.46,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0166-001038",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1651 + 663 - K1652 + 813",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 19962000,
      "lengthKm": 1.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17358260.87,
      "lengthMeters": 1150.0,
      "allocationPerStatedMeter": 17358.26,
      "rangesMeters": [
        [
          1651663.0,
          1652813.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "166",
      "lengthEvidence": "Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1651 + 663 - K1652 + 813",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 0.66,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0161-000956",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Sibuyan Circumferential Rd - K0019 + 000 - K0019 + 120, K0019 + 380 - K0019 + 592",
      "office": "Romblon District Engineering Office",
      "amountPesos": 19920000,
      "lengthKm": 0.332,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 60000000.0,
      "lengthMeters": 332.0,
      "allocationPerStatedMeter": 60000.0,
      "rangesMeters": [
        [
          19000.0,
          19120.0
        ],
        [
          19380.0,
          19592.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Sibuyan Circumferential Rd - K0019 + 000 - K0019 + 120, K0019 + 380 - K0019 + 592",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 1.1,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0416-005782",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Palao-Calaba Bypass Road , Sta. 4+600- Sta. 5+330, Bangued, Abra",
      "office": "Central Office",
      "amountPesos": 19910000,
      "lengthKm": 0.73,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27273972.6,
      "lengthMeters": 730.0,
      "allocationPerStatedMeter": 27273.97,
      "rangesMeters": [
        [
          4600.0,
          5330.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Palao-Calaba Bypass Road , Sta. 4+600- Sta. 5+330, Bangued, Abra",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.11,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0625-010157",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok Salaligan-Purok Paglaum A, Barangay Impao, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 19800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Concrete Road, Purok Salaligan-Purok Paglaum A, Barangay Impao, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0112-000026",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway ( Manila South Road) - K0048 + 016 - K0048 + 349, K0049 + 945 - K0050 + 000",
      "office": "Central Office",
      "amountPesos": 19711000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          48016.0,
          48349.0
        ],
        [
          49945.0,
          50000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Maharlika Highway ( Manila South Road) - K0048 + 016 - K0048 + 349, K0049 + 945 - K0050 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0433-006115",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/ Reconstruction of Road, Barangay Gaboc, Mercedes, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 19705550,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "433",
      "lengthEvidence": "Rehabilitation/ Reconstruction of Road, Barangay Gaboc, Mercedes, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0625-010165",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Masagana Road, Barangay Kalawag II, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 19683000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Road, Masagana Road, Barangay Kalawag II, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0271-002919",
      "category": "Mixed roads / bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Manangle Bridge (B00432LZ) along Andaya Highway (Package B3-B)",
      "office": "Central Office",
      "amountPesos": 19654000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Manangle Bridge (B00432LZ) along Andaya Highway (Package B3-B)",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006782",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Centro, Barangay San Cornelio, Caba ,La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 19650000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Sitio Centro, Barangay San Cornelio, Caba ,La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0138-000543",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Pagadian City Airport Rd - K1664 + (-953.30) - K1664 + (-373)",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 19639000,
      "lengthKm": 0.5803000000000466,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33842839.91,
      "lengthMeters": 580.3,
      "allocationPerStatedMeter": 33842.84,
      "rangesMeters": [
        [
          1663046.7,
          1663627.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Pagadian City Airport Rd - K1664 + (-953.30) - K1664 + (-373)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.05,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0259-002675",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Tabugon Br. (B00615LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 19543000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Tabugon Br. (B00615LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0431-006086",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Daculang Bolo, San Lorenzo Ruiz, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 19542340,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road, Barangay Daculang Bolo, San Lorenzo Ruiz, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0135-000494",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0021 + 257 - K0021 + 898",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 19530000,
      "lengthKm": 0.641,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30468018.72,
      "lengthMeters": 641.0,
      "allocationPerStatedMeter": 30468.02,
      "rangesMeters": [
        [
          21257.0,
          21898.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0021 + 257 - K0021 + 898",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.94,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0184-001345",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Apayao (Calanasan)-Ilocos Norte Rd - K0616 + 870 - K0616 + 924.5",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 19520000,
      "lengthKm": 0.0545,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 358165137.61,
      "lengthMeters": 54.5,
      "allocationPerStatedMeter": 358165.14,
      "rangesMeters": [
        [
          616870.0,
          616924.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Apayao (Calanasan)-Ilocos Norte Rd - K0616 + 870 - K0616 + 924.5",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.96,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0272-002947",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Coloy Br. (B00483MN) along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd)",
      "office": "Central Office",
      "amountPesos": 19500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Coloy Br. (B00483MN) along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006522",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Interconnecting Roads (Atis St., Road Runner St., Ostritch St., Peacock St.), (C0+000 to C0+475), Barangay Gen. T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 19500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Interconnecting Roads (Atis St., Road Runner St., Ostritch St., Peacock St.), (C0+000 to C0+475), Barangay Gen. T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006757",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gumot-Nagcolaran, Rosario, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 19500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay Gumot-Nagcolaran, Rosario, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008518",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bagong Niing, San Antonio, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 19500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Barangay Bagong Niing, San Antonio, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0615-009962",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lunao, Sta. 0 + 180 - Sta. 1 + 180 , Gingoog City, Misamis Oriental",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 19500000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19500000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 19500.0,
      "rangesMeters": [
        [
          180.0,
          1180.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Construction of Road, Barangay Lunao, Sta. 0 + 180 - Sta. 1 + 180 , Gingoog City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.78,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0156-000880",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Tablas Circumferential Rd - K0044 + 000 - K0044 + 216",
      "office": "Central Office",
      "amountPesos": 19476000,
      "lengthKm": 0.216,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 90166666.67,
      "lengthMeters": 216.0,
      "allocationPerStatedMeter": 90166.67,
      "rangesMeters": [
        [
          44000.0,
          44216.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "156",
      "lengthEvidence": "Tablas Circumferential Rd - K0044 + 000 - K0044 + 216",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 1.66,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0561-008810",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "San Antonio Road along San Antonio, Milaor-Camarines Sur Watersports Complex (CWC), Pili Road - Sta. 0+000 - Sta. 0+036, Sta. 0+072 - Sta. 0+153, Sta. 1+104.10 - Sta. 1+214.10, Barangay San Antonio, Milaor, Camarines Sur",
      "office": "Camarines Sur 2nd District Engineering Office",
      "amountPesos": 19472000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          36.0
        ],
        [
          72.0,
          153.0
        ],
        [
          1104.1,
          1214.1
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "San Antonio Road along San Antonio, Milaor-Camarines Sur Watersports Complex (CWC), Pili Road - Sta. 0+000 - Sta. 0+036, Sta. 0+072 - Sta. 0+153, Sta. 1+104.10 - Sta. 1+214.10, Barangay San Antonio, Milaor, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0565-008906",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Ariman to Tabi Road, Gubat, Sorsogon, Sta. 0+000 - 0+800",
      "office": "Sorsogon 2nd District Engineering Office",
      "amountPesos": 19460000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24325000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 24325.0,
      "rangesMeters": [
        [
          0.0,
          800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Ariman to Tabi Road, Gubat, Sorsogon, Sta. 0+000 - 0+800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.25,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0184-001344",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Apayao (Calanasan)-Ilocos Norte Rd - K0611 + 480 - K0611 + 522",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 19410000,
      "lengthKm": 0.042,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 462142857.14,
      "lengthMeters": 42.0,
      "allocationPerStatedMeter": 462142.86,
      "rangesMeters": [
        [
          611480.0,
          611522.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Apayao (Calanasan)-Ilocos Norte Rd - K0611 + 480 - K0611 + 522",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 1.24,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0487-007222",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Ilagan-Gamu Road (Sta. 0+000 - Sta. 0+454, Sta. 1+973 - Sta. 2+415, Sta. 2+905 - Sta. 3+569, Sta. 3+928 - Sta. 4+042, Sta. 4+920 - Sta. 5+178), Barangay Lullutan to Barangay Cabannungan 1st to Barangay Cabannungan 2nd to Barangay Arusip, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 19300000,
      "lengthKm": 1.932,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 9989648.03,
      "lengthMeters": 1932.0,
      "allocationPerStatedMeter": 9989.65,
      "rangesMeters": [
        [
          0.0,
          454.0
        ],
        [
          1973.0,
          2415.0
        ],
        [
          2905.0,
          3569.0
        ],
        [
          3928.0,
          4042.0
        ],
        [
          4920.0,
          5178.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Rehabilitation of Ilagan-Gamu Road (Sta. 0+000 - Sta. 0+454, Sta. 1+973 - Sta. 2+415, Sta. 2+905 - Sta. 3+569, Sta. 3+928 - Sta. 4+042, Sta. 4+920 - Sta. 5+178), Barangay Lullutan to Barangay Cabannungan 1st to Barangay Cabannungan 2nd to Barangay Arusip, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.41,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0154-000847",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0087 + 000 - K0087 + 395, K0087 + 480 - K0087 + 928",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 19280000,
      "lengthKm": 0.843,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22870699.88,
      "lengthMeters": 843.0,
      "allocationPerStatedMeter": 22870.7,
      "rangesMeters": [
        [
          87000.0,
          87395.0
        ],
        [
          87480.0,
          87928.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0087 + 000 - K0087 + 395, K0087 + 480 - K0087 + 928",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 0.96,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0212-001861",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Tejero-Gen Trias Amadeo-Tagaytay Rd - K0043 + 761 - K0043 + 900, K0043 + 913 - K0043 + 969, K0043 + 979 - K0043 +994, K0044 + 005 - K0044 + 538",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 19250000,
      "lengthKm": 0.743,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 25908479.14,
      "lengthMeters": 743.0,
      "allocationPerStatedMeter": 25908.48,
      "rangesMeters": [
        [
          43761.0,
          43900.0
        ],
        [
          43913.0,
          43969.0
        ],
        [
          43979.0,
          43994.0
        ],
        [
          44005.0,
          44538.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Tejero-Gen Trias Amadeo-Tagaytay Rd - K0043 + 761 - K0043 + 900, K0043 + 913 - K0043 + 969, K0043 + 979 - K0043 +994, K0044 + 005 - K0044 + 538",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.64,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0172-001148",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Calbayog Diversion Rd - K0727 + 142 - K0727 + 640",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 19209000,
      "lengthKm": 0.498,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38572289.16,
      "lengthMeters": 498.0,
      "allocationPerStatedMeter": 38572.29,
      "rangesMeters": [
        [
          727142.0,
          727640.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "172",
      "lengthEvidence": "Calbayog Diversion Rd - K0727 + 142 - K0727 + 640",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.21,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0270-002898",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Dalapuay Br. (B00224MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 19200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Dalapuay Br. (B00224MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0121-000199",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Iloilo-Capiz Rd (Old Route) - K0001 + (-463) - K0001 + 274.31",
      "office": "Iloilo City District Engineering Office",
      "amountPesos": 19170000,
      "lengthKm": 0.7373099999999999,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25999918.62,
      "lengthMeters": 737.31,
      "allocationPerStatedMeter": 25999.92,
      "rangesMeters": [
        [
          537.0,
          1274.31
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "Iloilo-Capiz Rd (Old Route) - K0001 + (-463) - K0001 + 274.31",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 0.61,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0132-000421",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tanza-Trece Martires City-Indang Rd - K0056 + 713 - K0057 + 121, K0057 + 185 - K0057 + 528",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 19167000,
      "lengthKm": 0.751,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 25521970.71,
      "lengthMeters": 751.0,
      "allocationPerStatedMeter": 25521.97,
      "rangesMeters": [
        [
          56713.0,
          57121.0
        ],
        [
          57185.0,
          57528.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Tanza-Trece Martires City-Indang Rd - K0056 + 713 - K0057 + 121, K0057 + 185 - K0057 + 528",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.79,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0272-002942",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Malajog Br. (B00339SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "office": "Central Office",
      "amountPesos": 19104000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Malajog Br. (B00339SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0210-001826",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Camiguin Circumferential Rd - K0043 + 003 - K0043 + 967, K0044 + 047 - K0044 + 190",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 19091000,
      "lengthKm": 1.107,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 17245709.12,
      "lengthMeters": 1107.0,
      "allocationPerStatedMeter": 17245.71,
      "rangesMeters": [
        [
          43003.0,
          43967.0
        ],
        [
          44047.0,
          44190.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Camiguin Circumferential Rd - K0043 + 003 - K0043 + 967, K0044 + 047 - K0044 + 190",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.34,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0467-006767",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion west-conception, Rosario, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 19080000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Barangay Poblacion west-conception, Rosario, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0160-000932",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Maragondon-Magallanes-Amuyong Rd - K0066 + 000 - K0067 + 000",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 19000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 19000.0,
      "rangesMeters": [
        [
          66000.0,
          67000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "160",
      "lengthEvidence": "Maragondon-Magallanes-Amuyong Rd - K0066 + 000 - K0067 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 0.72,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0160-000934",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Maragondon-Magallanes-Amuyong Rd - K0079 + 000 - K0080 + 000",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 19000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 19000.0,
      "rangesMeters": [
        [
          79000.0,
          80000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "160",
      "lengthEvidence": "Maragondon-Magallanes-Amuyong Rd - K0079 + 000 - K0080 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 0.72,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0249-002502",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0002 + 380 (Road Safety: Pedestrian Overpass)",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 19000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "249",
      "lengthEvidence": "Puerto Princesa South Rd - K0002 + 380 (Road Safety: Pedestrian Overpass)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0258-002636",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Magatip Br. (B02707LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 19000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Magatip Br. (B02707LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0263-002745",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Tulay na Lupa Br. (B05194LZ) along Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd",
      "office": "Camarines Norte District Engineering Office",
      "amountPesos": 19000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Tulay na Lupa Br. (B05194LZ) along Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0291-003367",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Lux Br. 2 (B01185MN) along Liloy-Siocon Rd",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "amountPesos": 19000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Lux Br. 2 (B01185MN) along Liloy-Siocon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006546",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage (Sectional Reblocking) Purok 2, along Dahlia Road 1 (C0+000 - C0+182.60) and Dahlia Road 2 (C0+000 - C0+236.50), Barangay 185, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 19000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Roads and Drainage (Sectional Reblocking) Purok 2, along Dahlia Road 1 (C0+000 - C0+182.60) and Dahlia Road 2 (C0+000 - C0+236.50), Barangay 185, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006788",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road - Access Road Leading to Mangrove Park Boulevard / Esplanade, Alaminos City, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 19000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road - Access Road Leading to Mangrove Park Boulevard / Esplanade, Alaminos City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0491-007296",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 0+000 - Sta. 1+500), Barangay Bungad, San Pablo, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 19000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12666666.67,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 12666.67,
      "rangesMeters": [
        [
          0.0,
          1500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Road (Sta. 0+000 - Sta. 1+500), Barangay Bungad, San Pablo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.52,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0526-008049",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) Cambasi Bridge, Masantol Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 19000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction (Completion) Cambasi Bridge, Masantol Pampanga",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008050",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Sagrada Bridge, Masantol, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 19000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction (Completion) of Sagrada Bridge, Masantol, Pampanga",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008343",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay San Vicente, Sto. Tomas City, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 19000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Rehabilitation of Road, Barangay San Vicente, Sto. Tomas City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0560-008792",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Biong to Barangay Pandan, Cabusao, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 19000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay Biong to Barangay Pandan, Cabusao, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0611-009880",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Baroy Daku, Baroy, Lanao del Norte",
      "office": "Lanao del Norte 1st District Engineering Office",
      "amountPesos": 19000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Road, Barangay Baroy Daku, Baroy, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0615-009959",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Drainage Structure along Road, Barangay Mintabon, Sta. 0 + 000 - Sta. 0 + 680, Talisayan, Misamis Oriental",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 19000000,
      "lengthKm": 0.68,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27941176.47,
      "lengthMeters": 680.0,
      "allocationPerStatedMeter": 27941.18,
      "rangesMeters": [
        [
          0.0,
          680.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Construction of Drainage Structure along Road, Barangay Mintabon, Sta. 0 + 000 - Sta. 0 + 680, Talisayan, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.14,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0258-002649",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Carayman Br. (B00348SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "office": "Central Office",
      "amountPesos": 18924000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "258",
      "lengthEvidence": "Carayman Br. (B00348SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0168-001079",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0470 + 526 - K0471 + 000",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 18920000,
      "lengthKm": 0.474,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39915611.81,
      "lengthMeters": 474.0,
      "allocationPerStatedMeter": 39915.61,
      "rangesMeters": [
        [
          470526.0,
          471000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0470 + 526 - K0471 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.25,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0132-000432",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0057 + 315 - K0057 + 782",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 18911000,
      "lengthKm": 0.467,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40494646.68,
      "lengthMeters": 467.0,
      "allocationPerStatedMeter": 40494.65,
      "rangesMeters": [
        [
          57315.0,
          57782.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0057 + 315 - K0057 + 782",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.26,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0155-000858",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Dipolog-Sindangan-Liloy Rd - K1855 + 408 - K1856 + 216",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 18910000,
      "lengthKm": 0.808,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23403465.35,
      "lengthMeters": 808.0,
      "allocationPerStatedMeter": 23403.47,
      "rangesMeters": [
        [
          1855408.0,
          1856216.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "Dipolog-Sindangan-Liloy Rd - K1855 + 408 - K1856 + 216",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 0.99,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0544-008436",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Lamuan Road, Barangay Pangil, Amadeo, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 18900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road at Lamuan Road, Barangay Pangil, Amadeo, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0575-009115",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 0+000 - Sta. 1+350) at Prk. Wawa Sta. Rosa - Nabalian Minoyan Road, Barangay Sta. Rosa, Murcia, Negros Occidental (10.5623561, 123.1147955)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 18900000,
      "lengthKm": 1.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14000000.0,
      "lengthMeters": 1350.0,
      "allocationPerStatedMeter": 14000.0,
      "rangesMeters": [
        [
          0.0,
          1350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road (Sta. 0+000 - Sta. 1+350) at Prk. Wawa Sta. Rosa - Nabalian Minoyan Road, Barangay Sta. Rosa, Murcia, Negros Occidental (10.5623561, 123.1147955)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.56,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0624-010146",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Bambad, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 18810000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Construction of Concrete Road, Barangay Bambad, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0289-003315",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Umilan Parallel Br. along Jct Victoria-Maddela-Alicia-Kasibu Bdry Rd (Jct Victoria-Kasibu Bdry)",
      "office": "Quirino District Engineering Office",
      "amountPesos": 18800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Umilan Parallel Br. along Jct Victoria-Maddela-Alicia-Kasibu Bdry Rd (Jct Victoria-Kasibu Bdry)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0213-001872",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0028 + 439 - K0029 + 175",
      "office": "Surigao del Norte 1st District Engineering Office",
      "amountPesos": 18796000,
      "lengthKm": 0.736,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25538043.48,
      "lengthMeters": 736.0,
      "allocationPerStatedMeter": 25538.04,
      "rangesMeters": [
        [
          28439.0,
          29175.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "213",
      "lengthEvidence": "Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0028 + 439 - K0029 + 175",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.63,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0466-006764",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay of San Cornelio-Bautista, Caba, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 18750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay of San Cornelio-Bautista, Caba, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0284-003201",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Dackel Danum Br. (B01002LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 18736000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Dackel Danum Br. (B01002LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0131-000405",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Lipa City - Alaminos Rd - K0085 + 934 - K0086 + 287",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 18717000,
      "lengthKm": 0.353,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53022662.89,
      "lengthMeters": 353.0,
      "allocationPerStatedMeter": 53022.66,
      "rangesMeters": [
        [
          85934.0,
          86287.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Lipa City - Alaminos Rd - K0085 + 934 - K0086 + 287",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.64,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0208-001780",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0051 + 640 - K0052 + 000",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 18700000,
      "lengthKm": 0.36,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51944444.44,
      "lengthMeters": 360.0,
      "allocationPerStatedMeter": 51944.44,
      "rangesMeters": [
        [
          51640.0,
          52000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0051 + 640 - K0052 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 1.04,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0133-000458",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagaytay-Manila via Silang Rd - K0055 + 000 - K0055 + 467",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 18695000,
      "lengthKm": 0.467,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40032119.91,
      "lengthMeters": 467.0,
      "allocationPerStatedMeter": 40032.12,
      "rangesMeters": [
        [
          55000.0,
          55467.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Tagaytay-Manila via Silang Rd - K0055 + 000 - K0055 + 467",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.24,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0270-002896",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Balugan Br. (B00226MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 18600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Balugan Br. (B00226MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0270-002897",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Bulatukan Br. (B00227MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 18600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Bulatukan Br. (B00227MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006525",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along San Baraquel Street (C0+000 to C0+368), Barangay Punturin, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 18600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along San Baraquel Street (C0+000 to C0+368), Barangay Punturin, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002808",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Jubasan Br. 2 (B00248SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "office": "Central Office",
      "amountPesos": 18560000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Jubasan Br. 2 (B00248SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0178-001240",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0365 + 154 - K0365 + 182, K0365 + 284 - K0365 + 317, K0365 + 580 - K0365 + 665, K0366 + (-020) - K0366 + 052, K0369 + 715 - K0369 + 752, K0371 + 111 - K0371 + 137",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 18546000,
      "lengthKm": 0.281,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 66000000.0,
      "lengthMeters": 281.0,
      "allocationPerStatedMeter": 66000.0,
      "rangesMeters": [
        [
          365154.0,
          365182.0
        ],
        [
          365284.0,
          365317.0
        ],
        [
          365580.0,
          365665.0
        ],
        [
          365980.0,
          366052.0
        ],
        [
          369715.0,
          369752.0
        ],
        [
          371111.0,
          371137.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0365 + 154 - K0365 + 182, K0365 + 284 - K0365 + 317, K0365 + 580 - K0365 + 665, K0366 + (-020) - K0366 + 052, K0369 + 715 - K0369 + 752, K0371 + 111 - K0371 + 137",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 0.37,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0135-000480",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Calapan South Rd - K0045 + 462 - K0046 + 000",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 18539000,
      "lengthKm": 0.538,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34459107.81,
      "lengthMeters": 538.0,
      "allocationPerStatedMeter": 34459.11,
      "rangesMeters": [
        [
          45462.0,
          46000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Calapan South Rd - K0045 + 462 - K0046 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.07,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0209-001798",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Aklan West Rd (Kalibo-Nabas) (S00324PN) - K0241 + 890 - K0242 + 233",
      "office": "Aklan District Engineering Office",
      "amountPesos": 18530000,
      "lengthKm": 0.343,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54023323.62,
      "lengthMeters": 343.0,
      "allocationPerStatedMeter": 54023.32,
      "rangesMeters": [
        [
          241890.0,
          242233.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "Aklan West Rd (Kalibo-Nabas) (S00324PN) - K0241 + 890 - K0242 + 233",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 1.08,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0209-001799",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Aklan West Rd (Kalibo-Nabas) (S00324PN) - K0234 + 583 - K0234 + 763, K0235 + 690 - K0235 + 708, K0242 + 363 - K0242 + 382, K0252 + 350 - K0252 + 411, K0253 + 263 - K0253 + 328",
      "office": "Aklan District Engineering Office",
      "amountPesos": 18530000,
      "lengthKm": 0.343,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 54023323.62,
      "lengthMeters": 343.0,
      "allocationPerStatedMeter": 54023.32,
      "rangesMeters": [
        [
          234583.0,
          234763.0
        ],
        [
          235690.0,
          235708.0
        ],
        [
          242363.0,
          242382.0
        ],
        [
          252350.0,
          252411.0
        ],
        [
          253263.0,
          253328.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "Aklan West Rd (Kalibo-Nabas) (S00324PN) - K0234 + 583 - K0234 + 763, K0235 + 690 - K0235 + 708, K0242 + 363 - K0242 + 382, K0252 + 350 - K0252 + 411, K0253 + 263 - K0253 + 328",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 1.08,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0168-001071",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "A Rivera St - K0004 + (-154) - K0004 + 351",
      "office": "North Manila District Engineering Office",
      "amountPesos": 18500000,
      "lengthKm": 0.505,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36633663.37,
      "lengthMeters": 505.0,
      "allocationPerStatedMeter": 36633.66,
      "rangesMeters": [
        [
          3846.0,
          4351.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "A Rivera St - K0004 + (-154) - K0004 + 351",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.15,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0168-001072",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "M Roxas Service Rd - (S02371LZ) Chainage 000 - Chainage 222",
      "office": "North Manila District Engineering Office",
      "amountPesos": 18500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "M Roxas Service Rd - (S02371LZ) Chainage 000 - Chainage 222",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0291-003351",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Guardabahan Br. (B00106LT) along Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 18500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Guardabahan Br. (B00106LT) along Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010139",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Crossing Peres - Barangay Proper Road, Barangay Maan, T'boli, South Cotabato, 6.073821,124.994811, 6.064016,124.989548",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 18500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Construction of Crossing Peres - Barangay Proper Road, Barangay Maan, T'boli, South Cotabato, 6.073821,124.994811, 6.064016,124.989548",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0131-000408",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tanauan-Talisay-Tagaytay Rd - K0078 + 344 - K0079 + 339",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 18434000,
      "lengthKm": 0.995,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18526633.17,
      "lengthMeters": 995.0,
      "allocationPerStatedMeter": 18526.63,
      "rangesMeters": [
        [
          78344.0,
          79339.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Tanauan-Talisay-Tagaytay Rd - K0078 + 344 - K0079 + 339",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.61,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0291-003357",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Tabunok Br. 2 (B00107LT) along Cabunga-an-Tabunok-Consuegra Rd",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 18400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Tabunok Br. 2 (B00107LT) along Cabunga-an-Tabunok-Consuegra Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007344",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta Cruz, San Manuel, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 18400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road, Barangay Sta Cruz, San Manuel, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0162-000964",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 004 - Chainage 287",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 18395000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 004 - Chainage 287",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0259-002668",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Nailong Br. 2 (B00611LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 18285000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Nailong Br. 2 (B00611LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0207-001769",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Buenavista-Kawayan Rd - K0054 + 135 - K0054 + 500",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 18250000,
      "lengthKm": 0.365,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 365.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          54135.0,
          54500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Buenavista-Kawayan Rd - K0054 + 135 - K0054 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 0.96,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0572-009045",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Quiasan - Barangay Zaragosa, Balasan, Iloilo",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 18250000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay Quiasan - Barangay Zaragosa, Balasan, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0155-000851",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0125 + 448 - K0126 + 274",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 18244000,
      "lengthKm": 0.826,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22087167.07,
      "lengthMeters": 826.0,
      "allocationPerStatedMeter": 22087.17,
      "rangesMeters": [
        [
          125448.0,
          126274.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0125 + 448 - K0126 + 274",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 0.93,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0162-000962",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Albay West Coast Rd - K0545 + 568 - K0546 + 677",
      "office": "Albay 3rd District Engineering Office",
      "amountPesos": 18187000,
      "lengthKm": 1.109,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16399458.97,
      "lengthMeters": 1109.0,
      "allocationPerStatedMeter": 16399.46,
      "rangesMeters": [
        [
          545568.0,
          546677.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Albay West Coast Rd - K0545 + 568 - K0546 + 677",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 0.62,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0250-002516",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Jct. Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0023 + 000 - K0024 + 1026 (Road Safety: Roadway Lighting)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 18164000,
      "lengthKm": 2.026,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8965449.16,
      "lengthMeters": 2026.0,
      "allocationPerStatedMeter": 8965.45,
      "rangesMeters": [
        [
          23000.0,
          25026.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "250",
      "lengthEvidence": "Jct. Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd - K0023 + 000 - K0024 + 1026 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.87,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0164-001008",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0105 + 1513 - K0105+1952, K0108 + 588 - K0108 + 1013",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 18144000,
      "lengthKm": 0.864,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21000000.0,
      "lengthMeters": 864.0,
      "allocationPerStatedMeter": 21000.0,
      "rangesMeters": [
        [
          106513.0,
          106952.0
        ],
        [
          108588.0,
          109013.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0105 + 1513 - K0105+1952, K0108 + 588 - K0108 + 1013",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 0.63,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0208-001785",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0060 + 428 - K0060 + 790",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 18100000,
      "lengthKm": 0.362,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 362.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          60428.0,
          60790.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0060 + 428 - K0060 + 790",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0133-000449",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Noveleta-Naic-Tagaytay Rd - K0046 + 000 - K0046 + 748",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 18063000,
      "lengthKm": 0.748,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24148395.72,
      "lengthMeters": 748.0,
      "allocationPerStatedMeter": 24148.4,
      "rangesMeters": [
        [
          46000.0,
          46748.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Noveleta-Naic-Tagaytay Rd - K0046 + 000 - K0046 + 748",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.75,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0111-000009",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0311 + 000 - K0312 + 348",
      "office": "Central Office",
      "amountPesos": 18000000,
      "lengthKm": 1.348,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13353115.73,
      "lengthMeters": 1348.0,
      "allocationPerStatedMeter": 13353.12,
      "rangesMeters": [
        [
          311000.0,
          312348.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Manila North Rd - K0311 + 000 - K0312 + 348",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 0.34,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0262-002733",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Kitang Br. (B00077LZ) along Jct Layac-Balanga-Mariveles Port Rd",
      "office": "Bataan 2nd District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "Kitang Br. (B00077LZ) along Jct Layac-Balanga-Mariveles Port Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0262-002739",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "MSR Br. (B02498LZ) along MSR Passing Poblacion Rd",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "MSR Br. (B02498LZ) along MSR Passing Poblacion Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-003004",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Capitangan Br. (B00058LZ) along Roman Expressway",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Capitangan Br. (B00058LZ) along Roman Expressway",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0292-003391",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Nowa Br. (B01809MN) along Magpet-Nowa-Doroluman-Greenfield Rd",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "292",
      "lengthEvidence": "Nowa Br. (B01809MN) along Magpet-Nowa-Doroluman-Greenfield Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0449-006424",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Barangay Concepcion Uno Road Network at D. Mariano St. (Chainage 0+000 - Chainage 0+114), Gallant St. Fairlane Neighborhood (Chainage 0+000 - Chainage 0+248), Savoy St. Fairlane Neighborhood (Chainage 0+000 - Chainage 0+175), Monterey St. Fairlane Neighborhood(Chainage 0+000 - Chainage 0+225), Teodora Park St. (Chainage 0+000 - 0+154), V. Mapa St. (Chainage 0+000 - Chainage 0+246), Mercado Compound Road (Chainage 0+000 - Chainage 0+200), Mercado Compound Ext. (Chainage 0+000 - Chainage 0+049), Barangay Concepcion Uno, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          154.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "449",
      "lengthEvidence": "Rehabilitation of Barangay Concepcion Uno Road Network at D. Mariano St. (Chainage 0+000 - Chainage 0+114), Gallant St. Fairlane Neighborhood (Chainage 0+000 - Chainage 0+248), Savoy St. Fairlane Neighborhood (Chainage 0+000 - Chainage 0+175), Monterey St. Fairlane Neighborhood(Chainage 0+000 - Chainage 0+225), Teodora Park St. (Chainage 0+000 - 0+154), V. Mapa St. (Chainage 0+000 - Chainage 0+246), Mercado Compound Road (Chainage 0+000 - Chainage 0+200), Mercado Compound Ext. (Chainage 0+000 - Chainage 0+049), Barangay Concepcion Uno, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0451-006456",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads including Drainage (Sectional Reblocking) along Dao St. (C 0+000 - C 0+628), Barangay 179, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Construction of Roads including Drainage (Sectional Reblocking) along Dao St. (C 0+000 - C 0+628), Barangay 179, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006505",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Clemente Compound (C0+000 to C0+700), Barangay Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Clemente Compound (C0+000 to C0+700), Barangay Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0457-006560",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainages along CJ Santos St. (C0+000 to C0+255), Poblacion I, Barangay Malinta, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Rehabilitation of Roads and Drainages along CJ Santos St. (C0+000 to C0+255), Poblacion I, Barangay Malinta, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007204",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Liwan Norte - San Antonio, Enrile, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Liwan Norte - San Antonio, Enrile, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0488-007235",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 0+339 - Sta. 0+778) including Construction of Drainage Structure, Barangay Baculod, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": 0.439,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41002277.9,
      "lengthMeters": 439.0,
      "allocationPerStatedMeter": 41002.28,
      "rangesMeters": [
        [
          339.0,
          778.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Rehabilitation of Road (Sta. 0+339 - Sta. 0+778) including Construction of Drainage Structure, Barangay Baculod, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.67,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0498-007444",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+350, Barangay Dallao, Cordon, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": 1.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1350.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          1350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+350, Barangay Dallao, Cordon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.53,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0501-007524",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Masaya Norte, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Barangay Masaya Norte, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0509-007696",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 0+732.37, P. De Guzman St., Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": 0.73237,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24577740.76,
      "lengthMeters": 732.37,
      "allocationPerStatedMeter": 24577.74,
      "rangesMeters": [
        [
          0.0,
          732.37
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 0+732.37, P. De Guzman St., Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.0,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0510-007708",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage System, along R.E. Chico St., Concepcion, City of Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road with Drainage System, along R.E. Chico St., Concepcion, City of Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0511-007719",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+895.41, NIA Road, Bagong Nayon, Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": 0.8954099999999999,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20102522.87,
      "lengthMeters": 895.41,
      "allocationPerStatedMeter": 20102.52,
      "rangesMeters": [
        [
          0.0,
          895.41
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+895.41, NIA Road, Bagong Nayon, Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.03,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0514-007784",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Barangay Francisco Homes - Yakal, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 00+430",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": 0.43,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41860465.12,
      "lengthMeters": 430.0,
      "allocationPerStatedMeter": 41860.47,
      "rangesMeters": [
        [
          0.0,
          430.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road with Drainage, Barangay Francisco Homes - Yakal, City of San Jose del Monte, Bulacan, Sta. 00+000 - Sta. 00+430",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.71,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0550-008564",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Barangay Villa Hiwasayan Bridge and Approaches, STA. 007+700 - STA. 007+725, Guinayangan, Quezon",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": 0.025,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 720000000.0,
      "lengthMeters": 25.0,
      "allocationPerStatedMeter": 720000.0,
      "rangesMeters": [
        [
          7700.0,
          7725.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction (Completion) of Barangay Villa Hiwasayan Bridge and Approaches, STA. 007+700 - STA. 007+725, Guinayangan, Quezon",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 0.51,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0550-008565",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Bridge and Approaches, Barangay Villa Gomez, STA 008+005 - STA 008+030, Quezon, Quezon",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": 0.025,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 720000000.0,
      "lengthMeters": 25.0,
      "allocationPerStatedMeter": 720000.0,
      "rangesMeters": [
        [
          8005.0,
          8030.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction (Completion) of Bridge and Approaches, Barangay Villa Gomez, STA 008+005 - STA 008+030, Quezon, Quezon",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 0.51,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0551-008589",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road and Drainage Syatem at Pinugay Road, Sittio Riza Barangay San Jose, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Improvement of Road and Drainage Syatem at Pinugay Road, Sittio Riza Barangay San Jose, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008699",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Isaub to San Juan, Aborlan, Palawan",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Road, Isaub to San Juan, Aborlan, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009274",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay San Isidro, Barangay Songculan, Barangay Dao and Barangay Bingag, Dauis, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road at Barangay San Isidro, Barangay Songculan, Barangay Dao and Barangay Bingag, Dauis, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0591-009470",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sitio Lomboy, Barangay Calumpang, Naval, Biliran (Sta. 0+084 - Sta. 0+380; Sta. 0+550 - Sta. 0+604; Sta. 0+793 - Sta. 1+163)",
      "office": "Biliran District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          84.0,
          380.0
        ],
        [
          550.0,
          604.0
        ],
        [
          793.0,
          1163.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Rehabilitation of Road, Sitio Lomboy, Barangay Calumpang, Naval, Biliran (Sta. 0+084 - Sta. 0+380; Sta. 0+550 - Sta. 0+604; Sta. 0+793 - Sta. 1+163)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0596-009580",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion 5 to Barangay Sawang, Capul, Northern Samar",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Road, Barangay Poblacion 5 to Barangay Sawang, Capul, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0617-009994",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Purok 7, Barangay Panibasan, Maco, Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Bridge, Purok 7, Barangay Panibasan, Maco, Davao de Oro",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0618-010017",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Drainage Structure along Road, Barangay New Visayas, Panabo City, Davao del Norte",
      "office": "Davao del Norte 2nd District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Construction of Drainage Structure along Road, Barangay New Visayas, Panabo City, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0626-010172",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Paved Road, Purok Molave 1A to Purok Mahogany 1B, Barangay Aurelio F. Freires Sr., Lebak, Sultan Kudarat",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Rehabilitation of Paved Road, Purok Molave 1A to Purok Mahogany 1B, Barangay Aurelio F. Freires Sr., Lebak, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0146-000708",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Dalaguete-Mantalongon Badian Rd - K0100 + 612 - K0100 + 900, K0101 + 000 - K0101 + 807",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 17991000,
      "lengthKm": 1.095,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 16430136.99,
      "lengthMeters": 1095.0,
      "allocationPerStatedMeter": 16430.14,
      "rangesMeters": [
        [
          100612.0,
          100900.0
        ],
        [
          101000.0,
          101807.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Dalaguete-Mantalongon Badian Rd - K0100 + 612 - K0100 + 900, K0101 + 000 - K0101 + 807",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.69,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0133-000436",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0068 + 000 - K0069 + 000",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 17964000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17964000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 17964.0,
      "rangesMeters": [
        [
          68000.0,
          69000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0068 + 000 - K0069 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.59,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0271-002925",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Makabubos Br. (B02741LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 17950000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Makabubos Br. (B02741LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0150-000772",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LT) - K0960 + 750 - K0960 + 955, K0962 + 013 - K0962 + 300, K0965 + 130 - K0965 + 600, K0966 + 971 - K0967 + 820, K0974 + 505 - K0974 + 700",
      "office": "Central Office",
      "amountPesos": 17942000,
      "lengthKm": 2.006,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 8944167.5,
      "lengthMeters": 2006.0,
      "allocationPerStatedMeter": 8944.17,
      "rangesMeters": [
        [
          960750.0,
          960955.0
        ],
        [
          962013.0,
          962300.0
        ],
        [
          965130.0,
          965600.0
        ],
        [
          966971.0,
          967820.0
        ],
        [
          974505.0,
          974700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "Maharlika Highway (LT) - K0960 + 750 - K0960 + 955, K0962 + 013 - K0962 + 300, K0965 + 130 - K0965 + 600, K0966 + 971 - K0967 + 820, K0974 + 505 - K0974 + 700",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 0.36,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0242-002413",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Columbio - Lutayan - Koronadal Road, Sta. 10 + 085 - Sta. 10 + 135, Lutayan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 17937000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 358740000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 358740.0,
      "rangesMeters": [
        [
          10085.0,
          10135.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "242",
      "lengthEvidence": "Columbio - Lutayan - Koronadal Road, Sta. 10 + 085 - Sta. 10 + 135, Lutayan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 0.41,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0119-000174",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila-Batangas Rd - K0097 + 788 - K0098 + 000",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 17917000,
      "lengthKm": 0.212,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 84514150.94,
      "lengthMeters": 212.0,
      "allocationPerStatedMeter": 84514.15,
      "rangesMeters": [
        [
          97788.0,
          98000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Manila-Batangas Rd - K0097 + 788 - K0098 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 1.82,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0164-001013",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0098 + 000 - K0098 + 468, K0099 + 512 - K0099 + 735, K0099 + 1014 - K0099 + 1085",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 17912000,
      "lengthKm": 0.762,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23506561.68,
      "lengthMeters": 762.0,
      "allocationPerStatedMeter": 23506.56,
      "rangesMeters": [
        [
          98000.0,
          98468.0
        ],
        [
          99512.0,
          99735.0
        ],
        [
          100014.0,
          100085.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0098 + 000 - K0098 + 468, K0099 + 512 - K0099 + 735, K0099 + 1014 - K0099 + 1085",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 0.71,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0456-006536",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage system, Del Rey Ville I, Barangay 163 (C0+000 to C0+310), Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 17900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Road and Drainage system, Del Rey Ville I, Barangay 163 (C0+000 to C0+310), Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0207-001750",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Mindoro West Coastal Rd - K0404 + 822 - K0405 + 390",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 17870000,
      "lengthKm": 0.568,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31461267.61,
      "lengthMeters": 568.0,
      "allocationPerStatedMeter": 31461.27,
      "rangesMeters": [
        [
          404822.0,
          405390.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Mindoro West Coastal Rd - K0404 + 822 - K0405 + 390",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 0.52,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0161-000940",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Cavite-Batangas Rd - K0049 + 450 - K0050 + 000, K0051 + 661 - K0051 + 726",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 17855000,
      "lengthKm": 0.615,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29032520.33,
      "lengthMeters": 615.0,
      "allocationPerStatedMeter": 29032.52,
      "rangesMeters": [
        [
          49450.0,
          50000.0
        ],
        [
          51661.0,
          51726.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Cavite-Batangas Rd - K0049 + 450 - K0050 + 000, K0051 + 661 - K0051 + 726",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.73,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0208-001791",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0079 + 493 - K0079 + 850",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 17850000,
      "lengthKm": 0.357,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 357.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          79493.0,
          79850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0079 + 493 - K0079 + 850",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0136-000509",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Consolacion-Tayud-Liloan Rd - K0017 + (-653) - K0017 + (-418), K0019 + 614 - K0019 + 668, K0019 + 703 - K0019 + 800, K0019 + 900 - K0020 + 058",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 17795000,
      "lengthKm": 0.544,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 32711397.06,
      "lengthMeters": 544.0,
      "allocationPerStatedMeter": 32711.4,
      "rangesMeters": [
        [
          16347.0,
          16582.0
        ],
        [
          19614.0,
          19668.0
        ],
        [
          19703.0,
          19800.0
        ],
        [
          19900.0,
          20058.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Consolacion-Tayud-Liloan Rd - K0017 + (-653) - K0017 + (-418), K0019 + 614 - K0019 + 668, K0019 + 703 - K0019 + 800, K0019 + 900 - K0020 + 058",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.01,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0467-006779",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Bucutan, Barangay San Fermin, Caba, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 17700000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Sitio Bucutan, Barangay San Fermin, Caba, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0491-007301",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 1+251 - Sta. 2+951), Barangay Dalena to Barangay San Vicente, San Pablo, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 17700000,
      "lengthKm": 1.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10411764.71,
      "lengthMeters": 1700.0,
      "allocationPerStatedMeter": 10411.76,
      "rangesMeters": [
        [
          1251.0,
          2951.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Road (Sta. 1+251 - Sta. 2+951), Barangay Dalena to Barangay San Vicente, San Pablo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.43,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0488-007242",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Slope Protection Structure (Sta. 0+000 - Sta. 0+410), Barangay Rizal to Barangay Ragan Almacen, Delfin Albano, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 17600000,
      "lengthKm": 0.41,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42926829.27,
      "lengthMeters": 410.0,
      "allocationPerStatedMeter": 42926.83,
      "rangesMeters": [
        [
          0.0,
          410.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Construction of Road including Slope Protection Structure (Sta. 0+000 - Sta. 0+410), Barangay Rizal to Barangay Ragan Almacen, Delfin Albano, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.75,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0186-001387",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Pototan-Tabugon Rd - K0041+060 - K0041+260, K0042+364.20 - K0042+391.20, K0042+400.40 - K0042+422.90, K0042+423.00 - K0042+441.00",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 17566000,
      "lengthKm": 0.2675,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 65667289.72,
      "lengthMeters": 267.5,
      "allocationPerStatedMeter": 65667.29,
      "rangesMeters": [
        [
          41060.0,
          41260.0
        ],
        [
          42364.2,
          42391.2
        ],
        [
          42400.4,
          42422.9
        ],
        [
          42423.0,
          42441.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Pototan-Tabugon Rd - K0041+060 - K0041+260, K0042+364.20 - K0042+391.20, K0042+400.40 - K0042+422.90, K0042+423.00 - K0042+441.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 0.38,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0138-000553",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Makar-Marbel Rd - (S00243MN) Chainage 299 - Chainage 505",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 17556000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Makar-Marbel Rd - (S00243MN) Chainage 299 - Chainage 505",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0119-000172",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Jose Abad Santos Ave (JASA) - K0118 + 565 - K0119 + 022",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 17500000,
      "lengthKm": 0.457,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38293216.63,
      "lengthMeters": 457.0,
      "allocationPerStatedMeter": 38293.22,
      "rangesMeters": [
        [
          118565.0,
          119022.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Jose Abad Santos Ave (JASA) - K0118 + 565 - K0119 + 022",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 0.8,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0232-002238",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 17500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003026",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Langogan Parallel (B00406PW) along Puerto Princesa North Rd",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 17500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Langogan Parallel (B00406PW) along Puerto Princesa North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007314",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay San Isidro to Barangay Lalog 2,Luna Isabela, 17.00822497, 121.71706176",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 17500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Construction of Roads, Barangay San Isidro to Barangay Lalog 2,Luna Isabela, 17.00822497, 121.71706176",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0499-007469",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Sta. 0+000 - Sta. 1+310, Barangay Capirpirwan - Barangay Wigan, Cordon, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 17500000,
      "lengthKm": 1.31,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13358778.63,
      "lengthMeters": 1310.0,
      "allocationPerStatedMeter": 13358.78,
      "rangesMeters": [
        [
          0.0,
          1310.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road Sta. 0+000 - Sta. 1+310, Barangay Capirpirwan - Barangay Wigan, Cordon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.53,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0626-010186",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, CARBDP Levee Service Road, Barangay Maon to Barangay Pangabugan (Sta. 0 + 000.00 - Sta. 0 + 760.00), Butuan City, Agusan del Norte",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 17480000,
      "lengthKm": 0.76,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23000000.0,
      "lengthMeters": 760.0,
      "allocationPerStatedMeter": 23000.0,
      "rangesMeters": [
        [
          0.0,
          760.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Construction of Road, CARBDP Levee Service Road, Barangay Maon to Barangay Pangabugan (Sta. 0 + 000.00 - Sta. 0 + 760.00), Butuan City, Agusan del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.18,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0185-001372",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0417 + 520 - K0417 + 550, K0417 + 570 - K0417 + 620, K0417 + 682 - K0417 + 706, K0418 + 155 - K0418 + 200, K0418 + 992 - K0418 + 1027, K0420 + 536 - K0420 + 562",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 17463000,
      "lengthKm": 0.21,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 83157142.86,
      "lengthMeters": 210.0,
      "allocationPerStatedMeter": 83157.14,
      "rangesMeters": [
        [
          417520.0,
          417550.0
        ],
        [
          417570.0,
          417620.0
        ],
        [
          417682.0,
          417706.0
        ],
        [
          418155.0,
          418200.0
        ],
        [
          418992.0,
          419027.0
        ],
        [
          420536.0,
          420562.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "185",
      "lengthEvidence": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0417 + 520 - K0417 + 550, K0417 + 570 - K0417 + 620, K0417 + 682 - K0417 + 706, K0418 + 155 - K0418 + 200, K0418 + 992 - K0418 + 1027, K0420 + 536 - K0420 + 562",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 0.48,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0132-000434",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0066 + 000 - K0066 + 970",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 17460000,
      "lengthKm": 0.97,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18000000.0,
      "lengthMeters": 970.0,
      "allocationPerStatedMeter": 18000.0,
      "rangesMeters": [
        [
          66000.0,
          66970.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0066 + 000 - K0066 + 970",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.59,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0130-000382",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Paniqui-Camiling-Wawa Rd - K0166 + 000 - K0166 + 425",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 17442000,
      "lengthKm": 0.425,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41040000.0,
      "lengthMeters": 425.0,
      "allocationPerStatedMeter": 41040.0,
      "rangesMeters": [
        [
          166000.0,
          166425.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Paniqui-Camiling-Wawa Rd - K0166 + 000 - K0166 + 425",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.27,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0420-005857",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Camuning, Mexico, Pampanga, Sta. 0 + 000 - Sta. 0 + 300",
      "office": "Central Office",
      "amountPesos": 17400000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 58000000.0,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 58000.0,
      "rangesMeters": [
        [
          0.0,
          300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "420",
      "lengthEvidence": "Construction of Road, Barangay Camuning, Mexico, Pampanga, Sta. 0 + 000 - Sta. 0 + 300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 2.03,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0452-006474",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads and Drainage System along Del Mundo Rd., Barangay 167 (C0+000 to C0+300), Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 17400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "452",
      "lengthEvidence": "Construction of Roads and Drainage System along Del Mundo Rd., Barangay 167 (C0+000 to C0+300), Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0164-001000",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Iloilo East Coast-Capiz Rd - K0189 + 926 - K0190 + 643",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 17380000,
      "lengthKm": 0.717,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24239888.42,
      "lengthMeters": 717.0,
      "allocationPerStatedMeter": 24239.89,
      "rangesMeters": [
        [
          189926.0,
          190643.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Iloilo East Coast-Capiz Rd - K0189 + 926 - K0190 + 643",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 0.73,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0158-000914",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Tagudin-Cervantes Rd - K0328 + 000 - K0328 + 500",
      "office": "Ilocos Sur 2nd District Engineering Office",
      "amountPesos": 17300000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34600000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 34600.0,
      "rangesMeters": [
        [
          328000.0,
          328500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "Tagudin-Cervantes Rd - K0328 + 000 - K0328 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.87,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0169-001098",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Cabanatuan City - Carmen Rd, K0135 + 439 - K0135 + 492, K0135 + 941 - K0136 + 000, K0139 + 613 - K0139 + 736, K0140 + 471 - K0141 + 043",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 17300000,
      "lengthKm": 0.807,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21437422.55,
      "lengthMeters": 807.0,
      "allocationPerStatedMeter": 21437.42,
      "rangesMeters": [
        [
          135439.0,
          135492.0
        ],
        [
          135941.0,
          136000.0
        ],
        [
          139613.0,
          139736.0
        ],
        [
          140471.0,
          141043.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Cabanatuan City - Carmen Rd, K0135 + 439 - K0135 + 492, K0135 + 941 - K0136 + 000, K0139 + 613 - K0139 + 736, K0140 + 471 - K0141 + 043",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.67,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0487-007224",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road including Slope Protection (Sta. 0+000 - Sta. 0+385) going to Malasi Lakes, Barangay San Antonio, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 17300000,
      "lengthKm": 0.385,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 44935064.94,
      "lengthMeters": 385.0,
      "allocationPerStatedMeter": 44935.06,
      "rangesMeters": [
        [
          0.0,
          385.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Construction of Concrete Road including Slope Protection (Sta. 0+000 - Sta. 0+385) going to Malasi Lakes, Barangay San Antonio, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.84,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0133-000444",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Maragondon-Magallanes-Amuyong Rd - K0073 + 200 - K0073 + 455",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 17290000,
      "lengthKm": 0.255,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 67803921.57,
      "lengthMeters": 255.0,
      "allocationPerStatedMeter": 67803.92,
      "rangesMeters": [
        [
          73200.0,
          73455.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Maragondon-Magallanes-Amuyong Rd - K0073 + 200 - K0073 + 455",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 1.34,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0246-002464",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Davao-Bukidnon Rd - K1643 + 504 - K1646 + 000 (Off-Carriageway Improvement: Paving of Shoulders)",
      "office": "Davao City 2nd District Engineering Office",
      "amountPesos": 17283000,
      "lengthKm": 2.496,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 6924278.85,
      "lengthMeters": 2496.0,
      "allocationPerStatedMeter": 6924.28,
      "rangesMeters": [
        [
          1643504.0,
          1646000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Davao-Bukidnon Rd - K1643 + 504 - K1646 + 000 (Off-Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.58,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0611-009887",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Suso Road, Barangay Suso Section, Sta. 0+260 - Sta. 1+175, Kapatagan, Lanao del Norte",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 17250000,
      "lengthKm": 0.915,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18852459.02,
      "lengthMeters": 915.0,
      "allocationPerStatedMeter": 18852.46,
      "rangesMeters": [
        [
          260.0,
          1175.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Suso Road, Barangay Suso Section, Sta. 0+260 - Sta. 1+175, Kapatagan, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.97,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0268-002846",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Inagbuhan Br. (B02574LZ) along Maharlika Highway (LZ)",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 17201000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Inagbuhan Br. (B02574LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0171-001131",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Oton-Buray-Sta Monica-Sn Antonio-Sn Miguel Rd - K0020 + 000 - K0020 + 489",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 17200000,
      "lengthKm": 0.489,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35173824.13,
      "lengthMeters": 489.0,
      "allocationPerStatedMeter": 35173.82,
      "rangesMeters": [
        [
          20000.0,
          20489.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Oton-Buray-Sta Monica-Sn Antonio-Sn Miguel Rd - K0020 + 000 - K0020 + 489",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.11,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0544-008435",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Bukol Road, Barangay Pangil, Amadeo, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 17200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road at Bukol Road, Barangay Pangil, Amadeo, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0152-000799",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (Surigao-Agusan Sect) - K1199 + 600 - K1199 + 737",
      "office": "Central Office",
      "amountPesos": 17173000,
      "lengthKm": 0.137,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 125350364.96,
      "lengthMeters": 137.0,
      "allocationPerStatedMeter": 125350.36,
      "rangesMeters": [
        [
          1199600.0,
          1199737.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Maharlika Highway (Surigao-Agusan Sect) - K1199 + 600 - K1199 + 737",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 3.16,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0160-000937",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Maragondon-Magallanes-Amuyong Rd - K0088 + 000 - K0088 + 914",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 17152000,
      "lengthKm": 0.914,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18765864.33,
      "lengthMeters": 914.0,
      "allocationPerStatedMeter": 18765.86,
      "rangesMeters": [
        [
          88000.0,
          88914.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "160",
      "lengthEvidence": "Maragondon-Magallanes-Amuyong Rd - K0088 + 000 - K0088 + 914",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 0.57,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0132-000418",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tanza-Trece Martires City-Indang Rd - K0048 + 000 - K0048 + 470",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 17119000,
      "lengthKm": 0.47,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36423404.26,
      "lengthMeters": 470.0,
      "allocationPerStatedMeter": 36423.4,
      "rangesMeters": [
        [
          48000.0,
          48470.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Tanza-Trece Martires City-Indang Rd - K0048 + 000 - K0048 + 470",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.13,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0183-001338",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Sn Fernando-Bagulin Rd - K0275 + 372 - K0275 + 410",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 17100000,
      "lengthKm": 0.038,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 450000000.0,
      "lengthMeters": 38.0,
      "allocationPerStatedMeter": 450000.0,
      "rangesMeters": [
        [
          275372.0,
          275410.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Sn Fernando-Bagulin Rd - K0275 + 372 - K0275 + 410",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 1.2,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0209-001797",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Aklan West Rd (Kalibo-Nabas) - K0257 + 368 - K0258 + 006, K0258 + 058 - K0258 + 145",
      "office": "Aklan District Engineering Office",
      "amountPesos": 17041000,
      "lengthKm": 0.725,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23504827.59,
      "lengthMeters": 725.0,
      "allocationPerStatedMeter": 23504.83,
      "rangesMeters": [
        [
          257368.0,
          258006.0
        ],
        [
          258058.0,
          258145.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "Aklan West Rd (Kalibo-Nabas) - K0257 + 368 - K0258 + 006, K0258 + 058 - K0258 + 145",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 0.39,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0130-000385",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Olongapo-Bugallon Rd - K0130+000 - K0130+300",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 56666666.67,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 56666.67,
      "rangesMeters": [
        [
          130000.0,
          130300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Olongapo-Bugallon Rd - K0130+000 - K0130+300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 1.12,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0252-002547",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Sn Juan-Sn Gabriel Rd - K0280 + 421 - K0280 + 751 (Road Safety: Roller Barrier)",
      "office": "Central Office",
      "amountPesos": 17000000,
      "lengthKm": 0.33,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51515151.52,
      "lengthMeters": 330.0,
      "allocationPerStatedMeter": 51515.15,
      "rangesMeters": [
        [
          280421.0,
          280751.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "252",
      "lengthEvidence": "Sn Juan-Sn Gabriel Rd - K0280 + 421 - K0280 + 751 (Road Safety: Roller Barrier)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 5.2,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0267-002826",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "San Guillermo Br. (B01809LZ) along Alabang-Muntinlupa Rd",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "San Guillermo Br. (B01809LZ) along Alabang-Muntinlupa Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002959",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Ortigas/C5 Flyover (B03321LZ) along Ortigas-C5 Flyover",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Ortigas/C5 Flyover (B03321LZ) along Ortigas-C5 Flyover",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003096",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Talisayan Br. (B00496LT) along La Paz-Javier-Bito Rd",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Talisayan Br. (B00496LT) along La Paz-Javier-Bito Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0295-003431",
      "category": "Bridges",
      "program": "Construction of New Bridges",
      "projectName": "Baticulan Br. along Bacolod North Rd",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "295",
      "lengthEvidence": "Baticulan Br. along Bacolod North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0488-007241",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 2+540 - Sta. 4+040), Barangay Dicatian, Divilacan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11333333.33,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 11333.33,
      "rangesMeters": [
        [
          2540.0,
          4040.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Construction of Road (Sta. 2+540 - Sta. 4+040), Barangay Dicatian, Divilacan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.47,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0493-007352",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road of Barangay Mambabanga, Luna, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Rehabilitation of Road of Barangay Mambabanga, Luna, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0499-007467",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+825 - Sta. 2+100, Barangay Quimalabasa Sur - Barangay San Antonio, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": 1.275,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1275.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          825.0,
          2100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+825 - Sta. 2+100, Barangay Quimalabasa Sur - Barangay San Antonio, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.53,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0500-007499",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road of San Carlos, Sta. 0 + 000 - Sta. 1 + 200, Barangay San Carlos, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14166666.67,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 14166.67,
      "rangesMeters": [
        [
          0.0,
          1200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Road of San Carlos, Sta. 0 + 000 - Sta. 1 + 200, Barangay San Carlos, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.57,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0510-007705",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage System Along P. Angeles St., Barangay Sto. Cristo, City of Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road with Drainage System Along P. Angeles St., Barangay Sto. Cristo, City of Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0534-008210",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal at Magsaysay Subd Extension at Barangay San Vicente Tarlac City (15.476630, 120.583006 - 15.476186, 120.58294)",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction of Road with Drainage Canal at Magsaysay Subd Extension at Barangay San Vicente Tarlac City (15.476630, 120.583006 - 15.476186, 120.58294)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0536-008252",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Mainit, Mabini, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Road at Barangay Mainit, Mabini, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0551-008586",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Bridge at Sittio Singalong Barangay San Jose, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Improvement of Bridge at Sittio Singalong Barangay San Jose, Antipolo City",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009178",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Malingin, Bago City, Negros Occidental",
      "office": "Negros Occidental 4th District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Road in Barangay Malingin, Bago City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009179",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Sitio Esperanza to Barangay Balingasag, Bago City, Negros Occidental",
      "office": "Negros Occidental 4th District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Road in Sitio Esperanza to Barangay Balingasag, Bago City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0592-009487",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Luis, Taft, Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 17000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Construction of Road, Barangay San Luis, Taft, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0206-001735",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Roman Expressway - K0154 + 000 - K0154 + 557, K0154 + 753 - K0155 + 000",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 16975000,
      "lengthKm": 0.804,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21113184.08,
      "lengthMeters": 804.0,
      "allocationPerStatedMeter": 21113.18,
      "rangesMeters": [
        [
          154000.0,
          154557.0
        ],
        [
          154753.0,
          155000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Roman Expressway - K0154 + 000 - K0154 + 557, K0154 + 753 - K0155 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50760.23,
      "peerRateMultiple": 0.42,
      "peerRecords": 51,
      "peerBand": "802–<1253.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 93815.73000000001,
      "graphUpperFence": 130622.505
    },
    {
      "id": "HB10858-3-0467-006785",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Kimmallugong, Barangay Libtong, Burgos, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 16950000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Sitio Kimmallugong, Barangay Libtong, Burgos, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0230-002190",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Quirino Highway (Baguio-Bauang Road) to Quezon Hill Road Drive By-pass Road, Sta. 0+980 - Sta. 1+554.79, Sta. 1+900 - Sta. 2+504.79, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 16948000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          980.0,
          1554.79
        ],
        [
          1900.0,
          2504.79
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Quirino Highway (Baguio-Bauang Road) to Quezon Hill Road Drive By-pass Road, Sta. 0+980 - Sta. 1+554.79, Sta. 1+900 - Sta. 2+504.79, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0178-001239",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0346 + 646 - K0346 + 652, K0349 + 835 - K0349 + 891, K0349 + 908 - K0349 + 971, K0352 + 284 - K0352 + 322, K0358 + 110 - K0358 + 137, K0360 + 188 - K0360 + 213, K0360 + 855 - K0360 + 932",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 16911000,
      "lengthKm": 0.292,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 57914383.56,
      "lengthMeters": 292.0,
      "allocationPerStatedMeter": 57914.38,
      "rangesMeters": [
        [
          346646.0,
          346652.0
        ],
        [
          349835.0,
          349891.0
        ],
        [
          349908.0,
          349971.0
        ],
        [
          352284.0,
          352322.0
        ],
        [
          358110.0,
          358137.0
        ],
        [
          360188.0,
          360213.0
        ],
        [
          360855.0,
          360932.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0346 + 646 - K0346 + 652, K0349 + 835 - K0349 + 891, K0349 + 908 - K0349 + 971, K0352 + 284 - K0352 + 322, K0358 + 110 - K0358 + 137, K0360 + 188 - K0360 + 213, K0360 + 855 - K0360 + 932",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 0.32,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0184-001355",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Claveria-Calanasan-Kabugao Rd - K0700 + 1115 - K0700 + 1151.5",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 16890000,
      "lengthKm": 0.0365,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 462739726.03,
      "lengthMeters": 36.5,
      "allocationPerStatedMeter": 462739.73,
      "rangesMeters": [
        [
          701115.0,
          701151.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Claveria-Calanasan-Kabugao Rd - K0700 + 1115 - K0700 + 1151.5",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 1.24,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0120-000190",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Calamba-Sta Cruz-Famy Jct Rd - K0053 + 000 - K0053 + 700, K0053 + 820 - K0055 + 972",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 16858000,
      "lengthKm": 2.852,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 5910939.69,
      "lengthMeters": 2852.0,
      "allocationPerStatedMeter": 5910.94,
      "rangesMeters": [
        [
          53000.0,
          53700.0
        ],
        [
          53820.0,
          55972.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Calamba-Sta Cruz-Famy Jct Rd - K0053 + 000 - K0053 + 700, K0053 + 820 - K0055 + 972",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 34827.22,
      "peerRateMultiple": 0.17,
      "peerRecords": 28,
      "peerBand": "≥2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82224.0925,
      "graphUpperFence": 116130.96999999999
    },
    {
      "id": "HB10858-3-0241-002396",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 16845000,
      "lengthKm": 0.037209999999999126,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 452700886.86,
      "lengthMeters": 37.21,
      "allocationPerStatedMeter": 452700.89,
      "rangesMeters": [
        [
          32514.0,
          32551.21
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 0.52,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0145-000684",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Daraga, Placer-Cawayan Rd - (S00035MT) Chainage 15454 - Chainage 16453",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 16837000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Daraga, Placer-Cawayan Rd - (S00035MT) Chainage 15454 - Chainage 16453",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0148-000736",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Surallah-Lake Sebu-Maitum Rd - K1758 + 000 - K1759 + 000",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 16803000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16803000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 16803.0,
      "rangesMeters": [
        [
          1758000.0,
          1759000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "148",
      "lengthEvidence": "Surallah-Lake Sebu-Maitum Rd - K1758 + 000 - K1759 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.7,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0251-002530",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Don A Velez St - K1438 + 292 (Road Safety: Pedestrian Overpass)",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 16800000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Don A Velez St - K1438 + 292 (Road Safety: Pedestrian Overpass)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0269-002870",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Malitbog Br. 1 (B00259PN) along Iloilo-Capiz Rd (Old Route)",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 16800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Malitbog Br. 1 (B00259PN) along Iloilo-Capiz Rd (Old Route)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0491-007302",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 3+350 - Sta. 4+449) at Barangay Fugu Sur to Barangay Fugu Norte, Tumauini, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 16750000,
      "lengthKm": 1.099,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15241128.3,
      "lengthMeters": 1099.0,
      "allocationPerStatedMeter": 15241.13,
      "rangesMeters": [
        [
          3350.0,
          4449.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Road (Sta. 3+350 - Sta. 4+449) at Barangay Fugu Sur to Barangay Fugu Norte, Tumauini, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.61,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0264-002778",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Manticao Br. (B01336MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 16724000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "264",
      "lengthEvidence": "Manticao Br. (B01336MN) along Butuan City-Cagayan de Oro City-Iligan City Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002829",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Calatagan Br. (B01801LZ) along South Super H-way",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 16663000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Calatagan Br. (B01801LZ) along South Super H-way",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006760",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Las-ud to Barangay Poblacion Sur, Caba, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 16650000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay Las-ud to Barangay Poblacion Sur, Caba, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0256-002599",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Tertiary Roads",
      "projectName": "Zamboanga del Sur Coastal Rd - (S01186MN) Chainage 14708 - Chainage 15300",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 16576000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "256",
      "lengthEvidence": "Zamboanga del Sur Coastal Rd - (S01186MN) Chainage 14708 - Chainage 15300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002830",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Makati Div. Channel Br. (B01802LZ) along South Super H-way",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 16560000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Makati Div. Channel Br. (B01802LZ) along South Super H-way",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0167-001066",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "JP Rizal St - K0005 + (-109) - K0005 + 411",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 16540000,
      "lengthKm": 0.52,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31807692.31,
      "lengthMeters": 520.0,
      "allocationPerStatedMeter": 31807.69,
      "rangesMeters": [
        [
          4891.0,
          5411.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "JP Rizal St - K0005 + (-109) - K0005 + 411",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.0,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0230-002203",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Unisan Diversion Road, Chainage 860 - Chainage 1492, Quezon",
      "office": "Quezon 3rd District Engineering Office",
      "amountPesos": 16500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Unisan Diversion Road, Chainage 860 - Chainage 1492, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0244-002433",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Maharlika Highway , K136+702 - K140+436, K142+510 - K145+810 Road Safety Facilities (Roadway Lighting)",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 16500000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          136702.0,
          140436.0
        ],
        [
          142510.0,
          145810.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "244",
      "lengthEvidence": "Maharlika Highway , K136+702 - K140+436, K142+510 - K145+810 Road Safety Facilities (Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-003006",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Gatao Br. (B01569LZ) along Gov JJ Linao Rd",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 16500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Gatao Br. (B01569LZ) along Gov JJ Linao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0488-007233",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sta. 2+690 - Sta. 4+060) at Barangay Sta. Isabel Sur to Barangay Carikkikan Norte, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 16500000,
      "lengthKm": 1.37,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12043795.62,
      "lengthMeters": 1370.0,
      "allocationPerStatedMeter": 12043.8,
      "rangesMeters": [
        [
          2690.0,
          4060.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Construction of Concrete Road (Sta. 2+690 - Sta. 4+060) at Barangay Sta. Isabel Sur to Barangay Carikkikan Norte, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.48,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0571-009034",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cali, Dumangas, Iloilo",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 16500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Road, Barangay Cali, Dumangas, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0432-006101",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Atag - Sitio Dipdipon, Barangay Sto. Domingo, Vinzons, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 16478550,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Construction of Road, Sitio Atag - Sitio Dipdipon, Barangay Sto. Domingo, Vinzons, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003311",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Bayabo Br. (B01930LZ) along Cagayan-Apayao Rd",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 16455000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Bayabo Br. (B01930LZ) along Cagayan-Apayao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0259-002661",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Lourdes Br. (B00543LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 16445000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "Lourdes Br. (B00543LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0626-010187",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Estipona Subdivision Road, Barangay Libertad (Sta. 0 + 000.00 - Sta. 0 + 715.00), Butuan City, Agusan del Norte",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 16445000,
      "lengthKm": 0.715,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23000000.0,
      "lengthMeters": 715.0,
      "allocationPerStatedMeter": 23000.0,
      "rangesMeters": [
        [
          0.0,
          715.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Construction of Road, Estipona Subdivision Road, Barangay Libertad (Sta. 0 + 000.00 - Sta. 0 + 715.00), Butuan City, Agusan del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.94,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0466-006755",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cataguintingan-Benteng, Rosario, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 16440000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay Cataguintingan-Benteng, Rosario, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0271-002921",
      "category": "Mixed roads / bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Panaytayan Bridge (B00438LZ) along Andaya Highway (Package B3-A)",
      "office": "Central Office",
      "amountPesos": 16404000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Panaytayan Bridge (B00438LZ) along Andaya Highway (Package B3-A)",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006783",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Centro, Barangay San Fermin, Caba, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 16350000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Sitio Centro, Barangay San Fermin, Caba, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0120-000186",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0039 + 885 - K0040 + 064",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 16273000,
      "lengthKm": 0.179,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 90910614.53,
      "lengthMeters": 179.0,
      "allocationPerStatedMeter": 90910.61,
      "rangesMeters": [
        [
          39885.0,
          40064.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0039 + 885 - K0040 + 064",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 1.95,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0152-000802",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Paranaque-Sucat Rd - K0018 + 238 - K0018 + 483",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 16250000,
      "lengthKm": 0.245,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66326530.61,
      "lengthMeters": 245.0,
      "allocationPerStatedMeter": 66326.53,
      "rangesMeters": [
        [
          18238.0,
          18483.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Paranaque-Sucat Rd - K0018 + 238 - K0018 + 483",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 2.31,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0611-009888",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Slip Protection, Barangay Durano, Kapatagan, Lanao del Norte",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 16250000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Road with Slip Protection, Barangay Durano, Kapatagan, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0166-001041",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Asuncion-San Isidro-Laak-Veruela Rd - K1531 + 163 - K1531 + 213, K1531 + 949 - K1532 + 176, K1540 + 822 - K1540 + 882, K1543 + 930 - K1544 + 000, K1552 + 127 - K1552 + 196",
      "office": "Agusan del Sur 2nd District Engineering Office",
      "amountPesos": 16205000,
      "lengthKm": 0.476,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34044117.65,
      "lengthMeters": 476.0,
      "allocationPerStatedMeter": 34044.12,
      "rangesMeters": [
        [
          1531163.0,
          1531213.0
        ],
        [
          1531949.0,
          1532176.0
        ],
        [
          1540822.0,
          1540882.0
        ],
        [
          1543930.0,
          1544000.0
        ],
        [
          1552127.0,
          1552196.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "166",
      "lengthEvidence": "Asuncion-San Isidro-Laak-Veruela Rd - K1531 + 163 - K1531 + 213, K1531 + 949 - K1532 + 176, K1540 + 822 - K1540 + 882, K1543 + 930 - K1544 + 000, K1552 + 127 - K1552 + 196",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.86,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0293-003399",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "San Roque Br. (B00396MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 16185000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "San Roque Br. (B00396MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003075",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Soso Br. 2 (B00658CB) along Antonio y De Pio H-way",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 16163000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Soso Br. 2 (B00658CB) along Antonio y De Pio H-way",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0179-001263",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Marinduque Circumferential Rd - K0017 + 500 - K0017 + 577",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 16150000,
      "lengthKm": 0.077,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 209740259.74,
      "lengthMeters": 77.0,
      "allocationPerStatedMeter": 209740.26,
      "rangesMeters": [
        [
          17500.0,
          17577.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "Marinduque Circumferential Rd - K0017 + 500 - K0017 + 577",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 0.7,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0133-000440",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Mahogany Ave - K0059 + 000 - K0059 + 375",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 16145000,
      "lengthKm": 0.375,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 43053333.33,
      "lengthMeters": 375.0,
      "allocationPerStatedMeter": 43053.33,
      "rangesMeters": [
        [
          59000.0,
          59375.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Mahogany Ave - K0059 + 000 - K0059 + 375",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.33,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0488-007247",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Paved Road, Barangay Lingaling, Tumauini, Isabela (Sta. 0+000 - Sta. 1+140)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 16100000,
      "lengthKm": 1.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14122807.02,
      "lengthMeters": 1140.0,
      "allocationPerStatedMeter": 14122.81,
      "rangesMeters": [
        [
          0.0,
          1140.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Rehabilitation of Paved Road, Barangay Lingaling, Tumauini, Isabela (Sta. 0+000 - Sta. 1+140)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.56,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0502-007533",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Sta. 0+000 - Sta. 1+235, Barangay Dumawing, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 16100000,
      "lengthKm": 1.235,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13036437.25,
      "lengthMeters": 1235.0,
      "allocationPerStatedMeter": 13036.44,
      "rangesMeters": [
        [
          0.0,
          1235.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road Sta. 0+000 - Sta. 1+235, Barangay Dumawing, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.52,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0153-000827",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Sagbat-Pililla Div Rd - K0047 + 000 + K0047 + 474",
      "office": "Rizal 2nd District Engineering Office",
      "amountPesos": 16065000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Sagbat-Pililla Div Rd - K0047 + 000 + K0047 + 474",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0137-000529",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Liloy-Siocon Rd - K2072 + 000 - K2073 + 000",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 16050000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16050000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 16050.0,
      "rangesMeters": [
        [
          2072000.0,
          2073000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Liloy-Siocon Rd - K2072 + 000 - K2073 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.53,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0154-000840",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bais-Kabankalan Rd - K0100 + 201 - K0100 + 666",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 16043000,
      "lengthKm": 0.465,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34501075.27,
      "lengthMeters": 465.0,
      "allocationPerStatedMeter": 34501.08,
      "rangesMeters": [
        [
          100201.0,
          100666.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "Bais-Kabankalan Rd - K0100 + 201 - K0100 + 666",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 1.45,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0118-000156",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0303 + 111.5 - K0303 + 837",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": 0.7255,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22053756.03,
      "lengthMeters": 725.5,
      "allocationPerStatedMeter": 22053.76,
      "rangesMeters": [
        [
          303111.5,
          303837.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Manila North Rd - K0303 + 111.5 - K0303 + 837",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 0.52,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0122-000220",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dipolog-Oroquieta National Rd - K1837 + 845 - K1838 + 284",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": 0.439,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36446469.25,
      "lengthMeters": 439.0,
      "allocationPerStatedMeter": 36446.47,
      "rangesMeters": [
        [
          1837845.0,
          1838284.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Dipolog-Oroquieta National Rd - K1837 + 845 - K1838 + 284",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 0.76,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0263-002751",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Avante Br. (B00021CB) along Antonio y De Pio H-way",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Avante Br. (B00021CB) along Antonio y De Pio H-way",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-003007",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Pagsakian Br. 1 (B01575LZ) along Gov JJ Linao Rd",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Pagsakian Br. 1 (B01575LZ) along Gov JJ Linao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-003008",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Pagsakian Br. 2 (B01576LZ) along Gov JJ Linao Rd",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Pagsakian Br. 2 (B01576LZ) along Gov JJ Linao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005750",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bailey Bridge Connecting Barangay Killo, Sison to Barangay Rosario, Pozorrubio, Pangasinan",
      "office": "Central Office",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Bailey Bridge Connecting Barangay Killo, Sison to Barangay Rosario, Pozorrubio, Pangasinan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0450-006443",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads at Tricarben, Corinthians, Thessalonians Streets, Including Laterals, Barangay Concepcion Uno, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "450",
      "lengthEvidence": "Rehabilitation of Roads at Tricarben, Corinthians, Thessalonians Streets, Including Laterals, Barangay Concepcion Uno, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006531",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Interconnecting Roads - Feliza St. - Salazar St. and Ador St. (C0+000 to C0+465), Barangay Parada, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Interconnecting Roads - Feliza St. - Salazar St. and Ador St. (C0+000 to C0+465), Barangay Parada, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0498-007450",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+200, Barangay Calaocan, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          1200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+200, Barangay Calaocan, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.53,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0518-007861",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Betes, Aliaga, Nueva Ecija, Sta. 0+000 - Sta. 1+424",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": 1.424,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11235955.06,
      "lengthMeters": 1424.0,
      "allocationPerStatedMeter": 11235.96,
      "rangesMeters": [
        [
          0.0,
          1424.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Road, Barangay Betes, Aliaga, Nueva Ecija, Sta. 0+000 - Sta. 1+424",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.45,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0533-008183",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay Pulung Cacutud, Angeles City Pampanga, Sta. 0+000 - Sta. 0+300, Sta. 0+000 - Sta. 0+295, Sta. 0+000 - Sta. 0+560, Sta. 0+000 - Sta. 0+392",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": 0.56,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 560.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          300.0
        ],
        [
          0.0,
          295.0
        ],
        [
          0.0,
          560.0
        ],
        [
          0.0,
          392.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road and Drainage, Barangay Pulung Cacutud, Angeles City Pampanga, Sta. 0+000 - Sta. 0+300, Sta. 0+000 - Sta. 0+295, Sta. 0+000 - Sta. 0+560, Sta. 0+000 - Sta. 0+392",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.17,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0535-008224",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Barangay Road with Drainage Canal at Barangay Pao, San Jose Tarlac",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Rehabilitation of Barangay Road with Drainage Canal at Barangay Pao, San Jose Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008543",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tagbakin, Tiaong, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road, Barangay Tagbakin, Tiaong, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008603",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mampaitan, Mogpog, Marinduque",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Road, Barangay Mampaitan, Mogpog, Marinduque",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008690",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Daan, Barangay Apurawan, Municipality of Aborlan, Province of Palawan, Start 9.559906, 118.415508 End 9.559053, 118.420709",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of Road, Sitio Daan, Barangay Apurawan, Municipality of Aborlan, Province of Palawan, Start 9.559906, 118.415508 End 9.559053, 118.420709",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009098",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Paglaum Village, Barangay Mansilingan, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Construction of Roads, Paglaum Village, Barangay Mansilingan, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009257",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Cang-asa to Barangay Cang-atuyom, Siquijor, Siquijor",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road Barangay Cang-asa to Barangay Cang-atuyom, Siquijor, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009283",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Fausto Budlong Street, UbujanDistrict, Tagbilaran City, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Construction of Road at Fausto Budlong Street, UbujanDistrict, Tagbilaran City, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010109",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Jct. Marbel-Columbio Road to Purok Poticar, Barangay GPS, Koronadal City, South Cotabato, 6.509386, 124.850557, 6.505980, 124.854631",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Jct. Marbel-Columbio Road to Purok Poticar, Barangay GPS, Koronadal City, South Cotabato, 6.509386, 124.850557, 6.505980, 124.854631",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010150",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Chua Road, Barangay Kalawag II, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Construction of Road, Chua Road, Barangay Kalawag II, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0134-000470",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Mayapa-Canlubang Cadre Rd - K0050 + 260 - K0050 + 420, K0050 + 580 - K0050 + 800, K0051 + 000 - K0051 + 205, K0051 + 727 - K0051 + 863",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 15874000,
      "lengthKm": 0.721,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22016643.55,
      "lengthMeters": 721.0,
      "allocationPerStatedMeter": 22016.64,
      "rangesMeters": [
        [
          50260.0,
          50420.0
        ],
        [
          50580.0,
          50800.0
        ],
        [
          51000.0,
          51205.0
        ],
        [
          51727.0,
          51863.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Mayapa-Canlubang Cadre Rd - K0050 + 260 - K0050 + 420, K0050 + 580 - K0050 + 800, K0051 + 000 - K0051 + 205, K0051 + 727 - K0051 + 863",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.68,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0169-001100",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Arayat-Magalang Rd - K0094 + 220 - K0094 + 459.52",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 15862000,
      "lengthKm": 0.23952000000000406,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66224114.9,
      "lengthMeters": 239.52,
      "allocationPerStatedMeter": 66224.11,
      "rangesMeters": [
        [
          94220.0,
          94459.52
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Arayat-Magalang Rd - K0094 + 220 - K0094 + 459.52",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 2.08,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0626-010184",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road going to Chinese Cemetery, Barangay Bancasi (Sta. 0 + 000.00 - Sta. 0 + 458.00, Sta. 0 + 000.00 - Sta. 0 + 230.00), Butuan City, Agusan del Norte",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 15824000,
      "lengthKm": 0.458,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34550218.34,
      "lengthMeters": 458.0,
      "allocationPerStatedMeter": 34550.22,
      "rangesMeters": [
        [
          0.0,
          458.0
        ],
        [
          0.0,
          230.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Construction of Road going to Chinese Cemetery, Barangay Bancasi (Sta. 0 + 000.00 - Sta. 0 + 458.00, Sta. 0 + 000.00 - Sta. 0 + 230.00), Butuan City, Agusan del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.41,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0163-000985",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Jct Tawad-Balud Rd - K0033 + 252 - K0034 + 060",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 15821000,
      "lengthKm": 0.808,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19580445.54,
      "lengthMeters": 808.0,
      "allocationPerStatedMeter": 19580.45,
      "rangesMeters": [
        [
          33252.0,
          34060.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Jct Tawad-Balud Rd - K0033 + 252 - K0034 + 060",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 0.59,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0178-001254",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Baguio-Bontoc Rd - K0362 + 985 - K0363 + 018, K0364 + 255 - K0364 + 264, K0364 + 657 - K0364 + 705",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 15800000,
      "lengthKm": 0.09,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 175555555.56,
      "lengthMeters": 90.0,
      "allocationPerStatedMeter": 175555.56,
      "rangesMeters": [
        [
          362985.0,
          363018.0
        ],
        [
          364255.0,
          364264.0
        ],
        [
          364657.0,
          364705.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Baguio-Bontoc Rd - K0362 + 985 - K0363 + 018, K0364 + 255 - K0364 + 264, K0364 + 657 - K0364 + 705",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 0.58,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0208-001790",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0078 + 858 - K0079 + 150",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 15800000,
      "lengthKm": 0.292,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54109589.04,
      "lengthMeters": 292.0,
      "allocationPerStatedMeter": 54109.59,
      "rangesMeters": [
        [
          78858.0,
          79150.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0078 + 858 - K0079 + 150",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 1.08,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0582-009262",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Ytaya to Barangay Kimba, Lazi, Siquijor",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 15800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road Barangay Ytaya to Barangay Kimba, Lazi, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008558",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Duhat-Kulawit Road, Atimonan, Quezon",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 15750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Duhat-Kulawit Road, Atimonan, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007423",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay New Magsaysay to Barangay Sinipit, Benito Soliven, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 15661000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Construction of Road, Barangay New Magsaysay to Barangay Sinipit, Benito Soliven, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0138-000552",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Albert Morrow Blvd - K1663 + 729 - K1664 + 711.95",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 15660000,
      "lengthKm": 0.9829499999999535,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15931634.37,
      "lengthMeters": 982.95,
      "allocationPerStatedMeter": 15931.63,
      "rangesMeters": [
        [
          1663729.0,
          1664711.95
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Albert Morrow Blvd - K1663 + 729 - K1664 + 711.95",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.52,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0489-007250",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Drainage Structure, Barangay San Pedro, Tumauini, Isabela (Sta. 0+333 - Sta. 0+668; Sta. 0+108 - Sta. 0+668)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 15650000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          333.0,
          668.0
        ],
        [
          108.0,
          668.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of Road including Drainage Structure, Barangay San Pedro, Tumauini, Isabela (Sta. 0+333 - Sta. 0+668; Sta. 0+108 - Sta. 0+668)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0145-000681",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sto Domingo Poblacion Rd - K0541 + (-074) - K0541 + 777",
      "office": "Albay 1st District Engineering Office",
      "amountPesos": 15622000,
      "lengthKm": 0.851,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18357226.79,
      "lengthMeters": 851.0,
      "allocationPerStatedMeter": 18357.23,
      "rangesMeters": [
        [
          540926.0,
          541777.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Sto Domingo Poblacion Rd - K0541 + (-074) - K0541 + 777",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.77,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0588-009402",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage V. Albano St., Barangay Maguikay, Mandaue City, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 15620000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Construction of Road with Drainage V. Albano St., Barangay Maguikay, Mandaue City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0206-001743",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Lipa City - Alaminos Rd - K0080 + 756 - K0081 + 261",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 15606000,
      "lengthKm": 0.505,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30902970.3,
      "lengthMeters": 505.0,
      "allocationPerStatedMeter": 30902.97,
      "rangesMeters": [
        [
          80756.0,
          81261.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Lipa City - Alaminos Rd - K0080 + 756 - K0081 + 261",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 0.6,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0270-002900",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Lamitan Br. (Old) (B00231MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 15600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Lamitan Br. (Old) (B00231MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0131-000411",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sn Juan-Laiya Rd - K0142 + 919 - K0143 + 327, K0151 + 815 - K0152 + 000",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 15580000,
      "lengthKm": 0.593,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 26273187.18,
      "lengthMeters": 593.0,
      "allocationPerStatedMeter": 26273.19,
      "rangesMeters": [
        [
          142919.0,
          143327.0
        ],
        [
          151815.0,
          152000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Sn Juan-Laiya Rd - K0142 + 919 - K0143 + 327, K0151 + 815 - K0152 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.81,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0154-000848",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0090 + 158 - K0090 + 836",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 15506000,
      "lengthKm": 0.678,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22870206.49,
      "lengthMeters": 678.0,
      "allocationPerStatedMeter": 22870.21,
      "rangesMeters": [
        [
          90158.0,
          90836.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0090 + 158 - K0090 + 836",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 0.96,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0483-007134",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Ab-abaan Access Road, Sta. 15+006 - Sta. 16+256 Barangay Ab- abaan, Balbalan, Kalinga",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 15500000,
      "lengthKm": 1.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12400000.0,
      "lengthMeters": 1250.0,
      "allocationPerStatedMeter": 12400.0,
      "rangesMeters": [
        [
          15006.0,
          16256.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Ab-abaan Access Road, Sta. 15+006 - Sta. 16+256 Barangay Ab- abaan, Balbalan, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.5,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0499-007476",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+140, Barangay Nabbuan - Barangay Naggasican, Santiago City, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 15500000,
      "lengthKm": 1.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13596491.23,
      "lengthMeters": 1140.0,
      "allocationPerStatedMeter": 13596.49,
      "rangesMeters": [
        [
          0.0,
          1140.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+140, Barangay Nabbuan - Barangay Naggasican, Santiago City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.54,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0534-008200",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay San Francisco, Magalang, Pampanga, Sta. 0+000 - Sta. 1+030, Sta. 0+000 - Sta. 0+300",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 15500000,
      "lengthKm": 1.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 15048543.69,
      "lengthMeters": 1030.0,
      "allocationPerStatedMeter": 15048.54,
      "rangesMeters": [
        [
          0.0,
          1030.0
        ],
        [
          0.0,
          300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction of Road Barangay San Francisco, Magalang, Pampanga, Sta. 0+000 - Sta. 1+030, Sta. 0+000 - Sta. 0+300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.6,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0622-010108",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (with Line Canal), JCT. National Highway (Marbel-Makar Rd) Doña Lourdes St., Barangay Zone II, Koronadal City, South Cotabato, 6.49743, 124.84724, 6.50172, 124.85097",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 15500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Construction of Concrete Road (with Line Canal), JCT. National Highway (Marbel-Makar Rd) Doña Lourdes St., Barangay Zone II, Koronadal City, South Cotabato, 6.49743, 124.84724, 6.50172, 124.85097",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0135-000489",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Libon-Bacolod-Sn Vicente-Marocmoc-Buga Rd - K0503 + 000 - K0503 + 606, K0503 + 615 - K0504 + 669",
      "office": "Albay 3rd District Engineering Office",
      "amountPesos": 15491000,
      "lengthKm": 1.66,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 9331927.71,
      "lengthMeters": 1660.0,
      "allocationPerStatedMeter": 9331.93,
      "rangesMeters": [
        [
          503000.0,
          503606.0
        ],
        [
          503615.0,
          504669.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Libon-Bacolod-Sn Vicente-Marocmoc-Buga Rd - K0503 + 000 - K0503 + 606, K0503 + 615 - K0504 + 669",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.31,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0625-010155",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok Hiso-Purok Mamantal, Barangay Kalawag III, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 15480000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Concrete Road, Purok Hiso-Purok Mamantal, Barangay Kalawag III, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0254-002582",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Bayawan-Mabinay Rd - K0131 + 500 - K0133 + 205 (Off-Carriageway Improvement: Paving of Shoulders)",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 15471000,
      "lengthKm": 1.705,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9073900.29,
      "lengthMeters": 1705.0,
      "allocationPerStatedMeter": 9073.9,
      "rangesMeters": [
        [
          131500.0,
          133205.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "254",
      "lengthEvidence": "Bayawan-Mabinay Rd - K0131 + 500 - K0133 + 205 (Off-Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.92,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0132-000425",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Isaac O. Tolentino Ave. - K0057 + (-1060) - K0057 + (-762)",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 15453000,
      "lengthKm": 0.298,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51855704.7,
      "lengthMeters": 298.0,
      "allocationPerStatedMeter": 51855.7,
      "rangesMeters": [
        [
          55940.0,
          56238.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Isaac O. Tolentino Ave. - K0057 + (-1060) - K0057 + (-762)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 1.03,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0129-000353",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Fairview Ave - K0024 + 678 - K0025 + 111",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 15400000,
      "lengthKm": 0.433,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35565819.86,
      "lengthMeters": 433.0,
      "allocationPerStatedMeter": 35565.82,
      "rangesMeters": [
        [
          24678.0,
          25111.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Fairview Ave - K0024 + 678 - K0025 + 111",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.1,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0284-003213",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Zitanga Br. (B01030LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 15400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Zitanga Br. (B01030LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0498-007454",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+155, Barangay Virgoneza, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 15400000,
      "lengthKm": 1.155,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1155.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          1155.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+155, Barangay Virgoneza, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.53,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0132-000431",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0055 + 755 - K0056 + 239",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 15389000,
      "lengthKm": 0.484,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31795454.55,
      "lengthMeters": 484.0,
      "allocationPerStatedMeter": 31795.45,
      "rangesMeters": [
        [
          55755.0,
          56239.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0055 + 755 - K0056 + 239",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.99,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0121-000210",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod North Rd - K0146+901 - K0147 + 336",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 15340000,
      "lengthKm": 0.435,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35264367.82,
      "lengthMeters": 435.0,
      "allocationPerStatedMeter": 35264.37,
      "rangesMeters": [
        [
          146901.0,
          147336.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "Bacolod North Rd - K0146+901 - K0147 + 336",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 0.74,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0160-000931",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0055 + 170 - K0055 + 578",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 15313000,
      "lengthKm": 0.408,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37531862.75,
      "lengthMeters": 408.0,
      "allocationPerStatedMeter": 37531.86,
      "rangesMeters": [
        [
          55170.0,
          55578.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "160",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0055 + 170 - K0055 + 578",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.94,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0206-001749",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Mindoro West Coastal Rd - K0387 + 982 - K0388 + 459",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 15300000,
      "lengthKm": 0.477,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32075471.7,
      "lengthMeters": 477.0,
      "allocationPerStatedMeter": 32075.47,
      "rangesMeters": [
        [
          387982.0,
          388459.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Mindoro West Coastal Rd - K0387 + 982 - K0388 + 459",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 0.62,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0266-002805",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Bagalongon Br. (B00542LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 15300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Bagalongon Br. (B00542LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003094",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Masalago Br. (B00007LT) along Palo-Carigara-Ormoc Rd",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 15300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Masalago Br. (B00007LT) along Palo-Carigara-Ormoc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0625-010153",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok 1B, Kudanding to Purok Magsaysay, Bambad, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 15300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Concrete Road, Purok 1B, Kudanding to Purok Magsaysay, Bambad, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0177-001238",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0652 + 373 - K0652 + 450",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 15280000,
      "lengthKm": 0.077,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 198441558.44,
      "lengthMeters": 77.0,
      "allocationPerStatedMeter": 198441.56,
      "rangesMeters": [
        [
          652373.0,
          652450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0652 + 373 - K0652 + 450",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 0.66,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0133-000439",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Mahogany Ave - K0059 + (-300) - K0059 + 000",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 15259000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50863333.33,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 50863.33,
      "rangesMeters": [
        [
          58700.0,
          59000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Mahogany Ave - K0059 + (-300) - K0059 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 1.01,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0117-000135",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway( Cotabato-Marbel Rd) - K1713 + 000 - K1713 + 452",
      "office": "Central Office",
      "amountPesos": 15205000,
      "lengthKm": 0.452,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33639380.53,
      "lengthMeters": 452.0,
      "allocationPerStatedMeter": 33639.38,
      "rangesMeters": [
        [
          1713000.0,
          1713452.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Maharlika Highway( Cotabato-Marbel Rd) - K1713 + 000 - K1713 + 452",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 0.7,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0590-009460",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Access Road Villa Caneja – Anislagan Road connecting to Anislagan Ceramics Producers Association (ACPA), Naval, Biliran (Sta. 0 + 140 - Sta. 0+ 820, Sta. 0 + 260 - Sta. 0 + 560)",
      "office": "Biliran District Engineering Office",
      "amountPesos": 15200000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          140.0,
          820.0
        ],
        [
          260.0,
          560.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Improvement of Access Road Villa Caneja – Anislagan Road connecting to Anislagan Ceramics Producers Association (ACPA), Naval, Biliran (Sta. 0 + 140 - Sta. 0+ 820, Sta. 0 + 260 - Sta. 0 + 560)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007209",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Larion Alto to Barangay Libag Sur, Tuguegarao City, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 15181000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Larion Alto to Barangay Libag Sur, Tuguegarao City, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0163-000989",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Masbate Circumferential Rd - K0003 + 979 - K0004 + 000, K0004 + 175 - K0004 + 439",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 15168000,
      "lengthKm": 0.285,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 53221052.63,
      "lengthMeters": 285.0,
      "allocationPerStatedMeter": 53221.05,
      "rangesMeters": [
        [
          3979.0,
          4000.0
        ],
        [
          4175.0,
          4439.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Masbate Circumferential Rd - K0003 + 979 - K0004 + 000, K0004 + 175 - K0004 + 439",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 0.98,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0271-002922",
      "category": "Mixed roads / bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Pangaluan Bridge (B00436LZ) along Andaya Highway (Package B3-A)",
      "office": "Central Office",
      "amountPesos": 15099000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Pangaluan Bridge (B00436LZ) along Andaya Highway (Package B3-A)",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0168-001075",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Claveria-Calanasan-Kabugao Rd - K0707 + 557 - K0707 + 952",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 15070000,
      "lengthKm": 0.395,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38151898.73,
      "lengthMeters": 395.0,
      "allocationPerStatedMeter": 38151.9,
      "rangesMeters": [
        [
          707557.0,
          707952.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "Claveria-Calanasan-Kabugao Rd - K0707 + 557 - K0707 + 952",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.2,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0119-000165",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Sta. Rosa - Tarlac Rd - K0120+296 - K0121+510",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 1.214,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12355848.43,
      "lengthMeters": 1214.0,
      "allocationPerStatedMeter": 12355.85,
      "rangesMeters": [
        [
          120296.0,
          121510.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Sta. Rosa - Tarlac Rd - K0120+296 - K0121+510",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 0.31,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0130-000378",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Nueva Ecija - Pangasinan Rd K0168+889 - K0169+596",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.707,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21216407.36,
      "lengthMeters": 707.0,
      "allocationPerStatedMeter": 21216.41,
      "rangesMeters": [
        [
          168889.0,
          169596.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Nueva Ecija - Pangasinan Rd K0168+889 - K0169+596",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.66,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0135-000481",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Puerto Princesa South Diversion Rd - K0036+196 - K0037+353",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 1.157,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12964563.53,
      "lengthMeters": 1157.0,
      "allocationPerStatedMeter": 12964.56,
      "rangesMeters": [
        [
          36196.0,
          37353.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Puerto Princesa South Diversion Rd - K0036+196 - K0037+353",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.42,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0146-000710",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sogod-Tabuelan Rd - K0120 + 950 - K0121 + 460, K0122 + 704 - K0122 + 867",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.673,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22288261.52,
      "lengthMeters": 673.0,
      "allocationPerStatedMeter": 22288.26,
      "rangesMeters": [
        [
          120950.0,
          121460.0
        ],
        [
          122704.0,
          122867.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Sogod-Tabuelan Rd - K0120 + 950 - K0121 + 460, K0122 + 704 - K0122 + 867",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.93,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0146-000711",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sogod-Tabuelan Rd - K0123 + 097 - K0123 + 724",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.627,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23923444.98,
      "lengthMeters": 627.0,
      "allocationPerStatedMeter": 23923.44,
      "rangesMeters": [
        [
          123097.0,
          123724.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Sogod-Tabuelan Rd - K0123 + 097 - K0123 + 724",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 1.0,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0165-001026",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Cebu-Balamban Transcentral Highway - K0011 + 274 - K0011 + 405",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.131,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 114503816.79,
      "lengthMeters": 131.0,
      "allocationPerStatedMeter": 114503.82,
      "rangesMeters": [
        [
          11274.0,
          11405.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Cebu-Balamban Transcentral Highway - K0011 + 274 - K0011 + 405",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 2.2,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0165-001027",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Biliran Circumferential Rd - K1015 + 889 - K1015 + 995",
      "office": "Biliran District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.106,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 141509433.96,
      "lengthMeters": 106.0,
      "allocationPerStatedMeter": 141509.43,
      "rangesMeters": [
        [
          1015889.0,
          1015995.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Biliran Circumferential Rd - K1015 + 889 - K1015 + 995",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 2.72,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0165-001028",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Biliran Circumferential Rd - K1070 + 925 - K1070 + 975",
      "office": "Biliran District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 300000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 300000.0,
      "rangesMeters": [
        [
          1070925.0,
          1070975.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Biliran Circumferential Rd - K1070 + 925 - K1070 + 975",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 5.77,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0165-001029",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Biliran Circumferential Rd - K1111 + 735 - K1111 + 785",
      "office": "Biliran District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 300000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 300000.0,
      "rangesMeters": [
        [
          1111735.0,
          1111785.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Biliran Circumferential Rd - K1111 + 735 - K1111 + 785",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 5.77,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0180-001271",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0071 + 114 - K0071 + 141",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.027,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 555555555.56,
      "lengthMeters": 27.0,
      "allocationPerStatedMeter": 555555.56,
      "rangesMeters": [
        [
          71114.0,
          71141.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Puerto Princesa North Rd - K0071 + 114 - K0071 + 141",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 2.61,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0183-001341",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Sn Juan-Sn Gabriel Rd - K0280 + 833 - K0280 + 858",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.025,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 600000000.0,
      "lengthMeters": 25.0,
      "allocationPerStatedMeter": 600000.0,
      "rangesMeters": [
        [
          280833.0,
          280858.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Sn Juan-Sn Gabriel Rd - K0280 + 833 - K0280 + 858",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 1.61,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0212-001859",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Talisay-Laurel-Agoncillo Rd K0088 + 892 - K0089+119",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.227,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66079295.15,
      "lengthMeters": 227.0,
      "allocationPerStatedMeter": 66079.3,
      "rangesMeters": [
        [
          88892.0,
          89119.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Talisay-Laurel-Agoncillo Rd K0088 + 892 - K0089+119",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.63,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0226-002130",
      "category": "Mixed roads / bridges",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Jct. Buda, Quezon-Jct. Valencia-Talaingod Road-Kalagangan, San Fernando Alternate/Bypass Road, Salug Bridge 2, Barangay Kalagangan, Sta. 0+581, San Fernando, Bukidnon",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "226",
      "lengthEvidence": "Jct. Buda, Quezon-Jct. Valencia-Talaingod Road-Kalagangan, San Fernando Alternate/Bypass Road, Salug Bridge 2, Barangay Kalagangan, Sta. 0+581, San Fernando, Bukidnon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0229-002184",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1 + 594 - Sta. 1+844.04, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.25004,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 59990401.54,
      "lengthMeters": 250.04,
      "allocationPerStatedMeter": 59990.4,
      "rangesMeters": [
        [
          1594.0,
          1844.04
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1 + 594 - Sta. 1+844.04, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.29,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0229-002187",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Marcos Hi-way to Kennon Road Diversion Road, Sta. 0 + 600 - Sta. 0 + 717, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.117,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 128205128.21,
      "lengthMeters": 117.0,
      "allocationPerStatedMeter": 128205.13,
      "rangesMeters": [
        [
          600.0,
          717.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "229",
      "lengthEvidence": "Marcos Hi-way to Kennon Road Diversion Road, Sta. 0 + 600 - Sta. 0 + 717, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.11,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0230-002188",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Marcos Hi-way to Kennon Road Diversion Road, Sta. 0+600 - Sta. 0+843.75, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.24375,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 61538461.54,
      "lengthMeters": 243.75,
      "allocationPerStatedMeter": 61538.46,
      "rangesMeters": [
        [
          600.0,
          843.75
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Marcos Hi-way to Kennon Road Diversion Road, Sta. 0+600 - Sta. 0+843.75, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.29,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0230-002189",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Quezon Hill Road 1 to Magsaysay West Service Bypass Road, Sta. 1+524 - Sta. 1+742, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.218,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 68807339.45,
      "lengthMeters": 218.0,
      "allocationPerStatedMeter": 68807.34,
      "rangesMeters": [
        [
          1524.0,
          1742.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Quezon Hill Road 1 to Magsaysay West Service Bypass Road, Sta. 1+524 - Sta. 1+742, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.33,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0230-002196",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Licab - Victoria Diversion Road, Nueva Ecija Sta. 4+067.00 - Sta. 4+554.95",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.48794999999999983,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30740854.6,
      "lengthMeters": 487.95,
      "allocationPerStatedMeter": 30740.85,
      "rangesMeters": [
        [
          4067.0,
          4554.95
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Licab - Victoria Diversion Road, Nueva Ecija Sta. 4+067.00 - Sta. 4+554.95",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.24,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0244-002430",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Road (Calanan-Pinukpuk Junction Section), K0519+000 -K0523+000 (Road Safety: Roadway Lighting)",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 4.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 3750000.0,
      "lengthMeters": 4000.0,
      "allocationPerStatedMeter": 3750.0,
      "rangesMeters": [
        [
          519000.0,
          523000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "244",
      "lengthEvidence": "Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Road (Calanan-Pinukpuk Junction Section), K0519+000 -K0523+000 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.31,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0246-002460",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd., K1476 + 880 - K1478 + 068 (Road Safety: Roadway Lighting)",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 1.188,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12626262.63,
      "lengthMeters": 1188.0,
      "allocationPerStatedMeter": 12626.26,
      "rangesMeters": [
        [
          1476880.0,
          1478068.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd., K1476 + 880 - K1478 + 068 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 1.05,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0249-002505",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Construction of Pedestrian Overpass along Masbate-Cataingan-Placer Rd - K0046 + 634 - K0046 + 784",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 100000000.0,
      "lengthMeters": 150.0,
      "allocationPerStatedMeter": 100000.0,
      "rangesMeters": [
        [
          46634.0,
          46784.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "249",
      "lengthEvidence": "Construction of Pedestrian Overpass along Masbate-Cataingan-Placer Rd - K0046 + 634 - K0046 + 784",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 7.91,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0249-002506",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Construction of Pedestrian Overpass along Masbate-Cataingan-Placer Rd - K0074 + 446 - K0074 + 641",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.195,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 76923076.92,
      "lengthMeters": 195.0,
      "allocationPerStatedMeter": 76923.08,
      "rangesMeters": [
        [
          74446.0,
          74641.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "249",
      "lengthEvidence": "Construction of Pedestrian Overpass along Masbate-Cataingan-Placer Rd - K0074 + 446 - K0074 + 641",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 6.09,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0260-002697",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Tinabon Br. (B02140MN) along Hi-Way Tamontaka Jct. Tapian Wharf Rd",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Tinabon Br. (B02140MN) along Hi-Way Tamontaka Jct. Tapian Wharf Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0260-002698",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Cabadbaran Br. (B00843MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "260",
      "lengthEvidence": "Cabadbaran Br. (B00843MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0262-002728",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Tabbac Bridge (FB32352LZ) along Sagada-Besao-Quirino Rd",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "Tabbac Bridge (FB32352LZ) along Sagada-Besao-Quirino Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0262-002731",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Capitangan Br. 2 (B01567LZ) along Jct Layac-Balanga-Mariveles Port Rd",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "Capitangan Br. 2 (B01567LZ) along Jct Layac-Balanga-Mariveles Port Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0262-002734",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Tukok Br. (B03437LZ) along Bagac-Mariveles Rd",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "Tukok Br. (B03437LZ) along Bagac-Mariveles Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0263-002743",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Caloglog Br. (B00500LZ) along Talobatib-Jose Panganiban Pob-Port Rd",
      "office": "Camarines Norte District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Caloglog Br. (B00500LZ) along Talobatib-Jose Panganiban Pob-Port Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0265-002794",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Digdig Br. (B00121LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Digdig Br. (B00121LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0265-002796",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Dulangan Br. (B00189MR) along Calapan North Rd",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Dulangan Br. (B00189MR) along Calapan North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0265-002797",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Mainao Br. (B00025MR) along CSR Jct-Minas Rd",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Mainao Br. (B00025MR) along CSR Jct-Minas Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0269-002866",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Humaguichic Br. 1 (B00028TL) along Tablas Circumferential Rd",
      "office": "Romblon District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Humaguichic Br. 1 (B00028TL) along Tablas Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0270-002902",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Banwalan Br. (B01024MN) along Makar-Kiamba Rd",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Banwalan Br. (B01024MN) along Makar-Kiamba Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0270-002903",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Upper Makar Br. (B01674MN) along Albert Morrow Blvd",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Upper Makar Br. (B01674MN) along Albert Morrow Blvd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0271-002912",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Cabaong Br. (B04540LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Cabaong Br. (B04540LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002977",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Nagtahan Fly-Over (B03338LZ) along Nagtahan Bridge / Fly-Over",
      "office": "North Manila District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Nagtahan Fly-Over (B03338LZ) along Nagtahan Bridge / Fly-Over",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-003005",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Bridge M (B01631LZ) along EPZA By-Pass (Baraso Country Rd)",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Bridge M (B01631LZ) along EPZA By-Pass (Baraso Country Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003019",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Lipata Br. (B00041AB) along Quezon-Alabat-Perez Rd",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Lipata Br. (B00041AB) along Quezon-Alabat-Perez Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003027",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tagbarungis (B00182PW) along PPSR Jct-Napsan-Apurawan Rd",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Tagbarungis (B00182PW) along PPSR Jct-Napsan-Apurawan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003033",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Capiz Br. (B00240PN) along Iloilo-Capiz Rd (New Route)",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Capiz Br. (B00240PN) along Iloilo-Capiz Rd (New Route)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0277-003054",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Campisang Br. (B00246NR) along Bacolod South Rd (Kabankalan-Hinobaan Section)",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Campisang Br. (B00246NR) along Bacolod South Rd (Kabankalan-Hinobaan Section)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0277-003057",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tabla Br. (B00213NR) along Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Tabla Br. (B00213NR) along Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0277-003058",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tauangan Br. (B00245NR) along Bacolod South Rd (Kabankalan-Hinobaan Section)",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Tauangan Br. (B00245NR) along Bacolod South Rd (Kabankalan-Hinobaan Section)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003073",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Poblacion Tabuelan Parallel Br. (B00682CB) along Antonio y De Pio H-way",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Poblacion Tabuelan Parallel Br. (B00682CB) along Antonio y De Pio H-way",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003084",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Arellano-Tejero Br. (B00413CB) along Arellano Blvd",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Arellano-Tejero Br. (B00413CB) along Arellano Blvd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003090",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Dispo Br. (B00053BR) along Naval-Caibiran Cross Country Rd",
      "office": "Biliran District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Dispo Br. (B00053BR) along Naval-Caibiran Cross Country Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003092",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Santol Br. (B00028BR) along Biliran Circumferential Rd",
      "office": "Biliran District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Santol Br. (B00028BR) along Biliran Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003135",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Baguik-ikan Br. (B01437MN) along Maramag-Maradugao Rd",
      "office": "Bukidnon 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Baguik-ikan Br. (B01437MN) along Maramag-Maradugao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003137",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Malingon Br. 2 (B02325MN) along Valencia City Bypass Road",
      "office": "Bukidnon 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Malingon Br. 2 (B02325MN) along Valencia City Bypass Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003139",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Mulita Upper Br. (B01439MN) along Maramag-Maradugao Rd",
      "office": "Bukidnon 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Mulita Upper Br. (B01439MN) along Maramag-Maradugao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003156",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Maniki Bridge Along Tagum-Panabo Circum Rd",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Maniki Bridge Along Tagum-Panabo Circum Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003162",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Pangao-an Br. (B00254MN) along Kidapawan-Magpet-Pangaoan Rd",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Pangao-an Br. (B00254MN) along Kidapawan-Magpet-Pangaoan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003163",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Small Mateo Br. (B01238MN) along Kidapawan-Ilomavis Tourist Rd",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Small Mateo Br. (B01238MN) along Kidapawan-Ilomavis Tourist Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003174",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Mapaga Br. (B01013MN) along NJR Bah-Bah-Talacogon Rd",
      "office": "Agusan del Sur 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Mapaga Br. (B01013MN) along NJR Bah-Bah-Talacogon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003189",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Buagao Br. (B00538LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Buagao Br. (B00538LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003296",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Bol-og Br. (B00774LZ) along Laoag-Sarrat-Piddig-Solsona Rd",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Bol-og Br. (B00774LZ) along Laoag-Sarrat-Piddig-Solsona Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0289-003319",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Buenavista Br (B05282LZ) along Calauan-Nagcarlan Bdry Rd",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Buenavista Br (B05282LZ) along Calauan-Nagcarlan Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0290-003331",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Tambak Br. (B00567PN) along Jaime Cardinal Sin Ave",
      "office": "Aklan District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Tambak Br. (B00567PN) along Jaime Cardinal Sin Ave",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0293-003403",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Magus Parallel Br. along Agusan-Malaybalay Rd",
      "office": "Agusan del Norte District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Magus Parallel Br. along Agusan-Malaybalay Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005759",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Canarvacanan, Binalonan, Pangasinan",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Road at Barangay Canarvacanan, Binalonan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0425-005967",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge Approach, Barangay Tubo-Tubo North, Santa Cruz, Zambales",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "425",
      "lengthEvidence": "Construction of Bridge Approach, Barangay Tubo-Tubo North, Santa Cruz, Zambales",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0438-006226",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Gambai - Siwagat, Lumba Bayabao, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Construction of Road at Barangay Gambai - Siwagat, Lumba Bayabao, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0439-006229",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Milaya to Barangay Kimanait-Pangantucan, Wao, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Construction of Road Barangay Milaya to Barangay Kimanait-Pangantucan, Wao, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0439-006235",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Lati, Municipality of Balindong, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Construction of Bridge, Lati, Municipality of Balindong, Lanao del Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0441-006277",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Kadingilan, Wao, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Road at Barangay Kadingilan, Wao, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0441-006281",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Carigongan, Bubong, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Road Barangay Carigongan, Bubong, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0441-006282",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Timbangalan to Barangay Caloocan, Marawi City, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Road Barangay Timbangalan to Barangay Caloocan, Marawi City, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0441-006284",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Kabasaran to Barangay Malimo, Marawi City, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "441",
      "lengthEvidence": "Construction of Road, Barangay Kabasaran to Barangay Malimo, Marawi City, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006416",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage CV Starr Ave, Barangay Pamplona 2, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Rehabilitation of Road including Drainage CV Starr Ave, Barangay Pamplona 2, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0449-006432",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Rancho Road Network, at Starlight St. (Chainage 0+000 - Chainage 0+271), Jersey St. (Chainage 0+000 - Chainage 0+333), Panorama St. (Chainage 0+000 - Chainage 1+160) Barangay Concepcion Dos, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "449",
      "lengthEvidence": "Rehabilitation of Rancho Road Network, at Starlight St. (Chainage 0+000 - Chainage 0+271), Jersey St. (Chainage 0+000 - Chainage 0+333), Panorama St. (Chainage 0+000 - Chainage 1+160) Barangay Concepcion Dos, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0450-006433",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Network along Dahlia, Rosas, Jasper, Shale, Diego Silang, Lopez Jaena, Lakandula Extension Streets Including Laterals, Barangay Parang, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "450",
      "lengthEvidence": "Rehabilitation of Road Network along Dahlia, Rosas, Jasper, Shale, Diego Silang, Lopez Jaena, Lakandula Extension Streets Including Laterals, Barangay Parang, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0450-006444",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads Including Laterals,at Agoho, Naranghita, Chico, Calamansi, Chico, Avocado Streets, Barangay Concepcion Uno, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "450",
      "lengthEvidence": "Rehabilitation of Roads Including Laterals,at Agoho, Naranghita, Chico, Calamansi, Chico, Avocado Streets, Barangay Concepcion Uno, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0451-006449",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage along Pascual, Barangay San Antonio, Parañaque City, 14.464941, 121.022865",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Construction of Road and Drainage along Pascual, Barangay San Antonio, Parañaque City, 14.464941, 121.022865",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0451-006450",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Old Santolan (C0+000 to C0+381), Barangay Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Old Santolan (C0+000 to C0+381), Barangay Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0451-006458",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of NPC Road and Drainage systems, Magdalena St., Barangay 163, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Rehabilitation of NPC Road and Drainage systems, Magdalena St., Barangay 163, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0451-006461",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage Systems, Zenia St., Area B, Barangay 174, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Rehabilitation of Road and Drainage Systems, Zenia St., Area B, Barangay 174, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0452-006472",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads and Drainage along Kupang St (C 0+015 - C 0+368), Barangay 179, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "452",
      "lengthEvidence": "Construction of Roads and Drainage along Kupang St (C 0+015 - C 0+368), Barangay 179, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006534",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Disiplina Road (C0+000 to C0+350) to Disiplina Village, Barangay Ugong, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Disiplina Road (C0+000 to C0+350) to Disiplina Village, Barangay Ugong, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006539",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage Systems, Kalikasan and MBA Subdivision, Barangay 171, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Road and Drainage Systems, Kalikasan and MBA Subdivision, Barangay 171, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006607",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Roads and Drainage System at Barangay 681, Zone 74, Manila",
      "office": "South Manila District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Roads and Drainage System at Barangay 681, Zone 74, Manila",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006628",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Cadaratan, Bacarra, Ilocos Norte, Start 18.2924, 120.5933 End 18.2926, 120.5930",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Construction of Bridge, Barangay Cadaratan, Bacarra, Ilocos Norte, Start 18.2924, 120.5933 End 18.2926, 120.5930",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006635",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion, Burgos, Ilocos Norte (18.514000, 120.648500 - 18.513657, 120.648201)",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Construction of Road, Barangay Poblacion, Burgos, Ilocos Norte (18.514000, 120.648500 - 18.513657, 120.648201)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006725",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay San Marcos, San Nicolas, Ilocos Norte",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Rehabilitation of Road, Barangay San Marcos, San Nicolas, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006727",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Saoay, City of San Fernando, La Union",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Construction of Barangay Road, Barangay Saoay, City of San Fernando, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006728",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Coastal Road, Barangay Catbangen, City of San Fernando, La Union",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Construction of Coastal Road, Barangay Catbangen, City of San Fernando, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006729",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Urbiztondo, San Juan, La Union",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Construction of Road, Barangay Urbiztondo, San Juan, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006739",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Barangay Road, Barangay Masicong, City of San Fernando, La Union",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Rehabilitation of Barangay Road, Barangay Masicong, City of San Fernando, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006747",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Sitio Kabidayan to Kaniogan Barangay San Cornelio, Caba, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road Barangay Sitio Kabidayan to Kaniogan Barangay San Cornelio, Caba, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006771",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Fermin, Caba, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Barangay San Fermin, Caba, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006778",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Basca East, Barangay Cadumanian, Rosario, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Sitio Basca East, Barangay Cadumanian, Rosario, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006802",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangays Pogo- San Jose, Alaminos City Pangasinan, Start 16.173716, 119.953733 End 16.1778777, 119.959037",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangays Pogo- San Jose, Alaminos City Pangasinan, Start 16.173716, 119.953733 End 16.1778777, 119.959037",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006823",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Coastal Road, Macaboboni, Agno, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Coastal Road, Macaboboni, Agno, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006840",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Cadre Road, Libsong West, Lingayen, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Cadre Road, Libsong West, Lingayen, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007015",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Camandag - Duli Bridge, Camandag, Asipulo, Ifugao",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Construction of Camandag - Duli Bridge, Camandag, Asipulo, Ifugao",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007026",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Tungngod-Boliwong Road, Sta. 2+260 - Sta. 2+690, Lagawe, Ifugao",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.43,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34883720.93,
      "lengthMeters": 430.0,
      "allocationPerStatedMeter": 34883.72,
      "rangesMeters": [
        [
          2260.0,
          2690.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Construction of Tungngod-Boliwong Road, Sta. 2+260 - Sta. 2+690, Lagawe, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.42,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0479-007030",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Inwaloy - Barangay Epeng - Barangay Magulon Access Road, Epeng, Mayoyao, Ifugao",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Barangay Inwaloy - Barangay Epeng - Barangay Magulon Access Road, Epeng, Mayoyao, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007045",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Roads including Facilities along Mt. Province Bdry.-Calanan-Pinukpuk- Abbut Road (Calanan-Pinukpuk Junction Section), Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Improvement of Roads including Facilities along Mt. Province Bdry.-Calanan-Pinukpuk- Abbut Road (Calanan-Pinukpuk Junction Section), Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007047",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Ballayangon-Ab-abaan Access Road, Tabuk City, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Ballayangon-Ab-abaan Access Road, Tabuk City, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007060",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Rizal National Road Junction, Santor-Liwan East Access Road, Barangays Santor and Liwan East, Rizal, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Rizal National Road Junction, Santor-Liwan East Access Road, Barangays Santor and Liwan East, Rizal, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007182",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Calog Bridge 2, Barangay Calog Sur, Abulug, Cagayan",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Construction of Calog Bridge 2, Barangay Calog Sur, Abulug, Cagayan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007192",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabasan, Peñablanca, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Cabasan, Peñablanca, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007210",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Anquiray, Amulung, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Rehabilitation of Road, Barangay Anquiray, Amulung, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007212",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Quibal, Peñablanca, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Quibal, Peñablanca, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0487-007215",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Baliuag, Peñablanca, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Construction of Road, Barangay Baliuag, Peñablanca, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0487-007216",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road - Barangay Sisim to Minanga, Peñablanca, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Rehabilitation of Road - Barangay Sisim to Minanga, Peñablanca, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0487-007223",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge (Sta. 3+000 - Sta. 3+015), Barangay Angancasilian, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.015,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1000000000.0,
      "lengthMeters": 15.0,
      "allocationPerStatedMeter": 1000000.0,
      "rangesMeters": [
        [
          3000.0,
          3015.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Construction of Bridge (Sta. 3+000 - Sta. 3+015), Barangay Angancasilian, Cabagan, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 0.71,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0488-007248",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Annafunan to Barangay Sta. Catalina, Tumauini, Isabela (Sta. 0+985 - Sta. 2+475)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 1.49,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10067114.09,
      "lengthMeters": 1490.0,
      "allocationPerStatedMeter": 10067.11,
      "rangesMeters": [
        [
          985.0,
          2475.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Construction of Concrete Road, Barangay Annafunan to Barangay Sta. Catalina, Tumauini, Isabela (Sta. 0+985 - Sta. 2+475)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.42,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0489-007253",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Bliss to Barangay Baligatan, City of Ilagan, Isabela (Sta. 0+000 - Sta. 1+500)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10000000.0,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 10000.0,
      "rangesMeters": [
        [
          0.0,
          1500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of Concrete Road, Barangay Bliss to Barangay Baligatan, City of Ilagan, Isabela (Sta. 0+000 - Sta. 1+500)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.41,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0491-007291",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Concrete Road with Slope Protection at Barangay Pilig Abajo, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Concrete Road with Slope Protection at Barangay Pilig Abajo, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007312",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Dadap, Luna Isabela, 16.95580988, 121.73891719",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Construction of Roads, Barangay Dadap, Luna Isabela, 16.95580988, 121.73891719",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007339",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mambabanga, Luna Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road, Barangay Mambabanga, Luna Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007358",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Rizalina, Aurora, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Rehabilitation of Road, Barangay Rizalina, Aurora, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007363",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road Leading to Barangay Gomez, Benito Soliven, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Construction of Access Road Leading to Barangay Gomez, Benito Soliven, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007368",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road Leading to Barangay Gomez, Benito Soliven, Isabela, Start 16.920478, 121.961619 End 16.912331, 121.980437",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Construction of Access Road Leading to Barangay Gomez, Benito Soliven, Isabela, Start 16.920478, 121.961619 End 16.912331, 121.980437",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007370",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Pablo - Barangay Bagnos, Barangay San Pablo, Alicia, Isabela, Start 16.791509, 121.645875 End 16.811682, 121.632696",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Construction of Road, Barangay San Pablo - Barangay Bagnos, Barangay San Pablo, Alicia, Isabela, Start 16.791509, 121.645875 End 16.811682, 121.632696",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007371",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Burgos - Barangay San Francisco, Barangay Burgos, Alicia, Isabela, Start 16.812524, 121.662664 End 16.838396, 121.722006",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Construction of Road, Barangay Burgos - Barangay San Francisco, Barangay Burgos, Alicia, Isabela, Start 16.812524, 121.662664 End 16.838396, 121.722006",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007372",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mataas na Kahoy - Barangay Amistad, Barangay Mataas na Kahoy, Alicia, Isabela, Start 16.850913, 121.65439 End 16.862805, 121.65804",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Construction of Road, Barangay Mataas na Kahoy - Barangay Amistad, Barangay Mataas na Kahoy, Alicia, Isabela, Start 16.850913, 121.65439 End 16.862805, 121.65804",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0495-007379",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Raniag - Sitio Bayabat, Barangay Raniag, Ramon, Isabela (Sta. 0+000 -Sta. 1+033.50)",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 1.0335,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14513788.1,
      "lengthMeters": 1033.5,
      "allocationPerStatedMeter": 14513.79,
      "rangesMeters": [
        [
          0.0,
          1033.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Barangay Raniag - Sitio Bayabat, Barangay Raniag, Ramon, Isabela (Sta. 0+000 -Sta. 1+033.50)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.58,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0495-007381",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Salinungan West, San Mateo, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Barangay Salinungan West, San Mateo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0495-007382",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Roque, San Mateo, Isabela (Sta. 0+000 - Sta. 0+923.50",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.9235,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16242555.5,
      "lengthMeters": 923.5,
      "allocationPerStatedMeter": 16242.56,
      "rangesMeters": [
        [
          0.0,
          923.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Barangay San Roque, San Mateo, Isabela (Sta. 0+000 - Sta. 0+923.50",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.84,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0495-007393",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads, Barangay Aniog- Barangay Loria, Angadanan, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Rehabilitation of Roads, Barangay Aniog- Barangay Loria, Angadanan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007422",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lourdes to Barangay Sto. Niño, Angadanan, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Construction of Road, Barangay Lourdes to Barangay Sto. Niño, Angadanan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007424",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Salay to Bangkero Trail (Cagayan River) with Box Culvert, Barangay Salay, Angadanan, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Construction of Road, Barangay Salay to Bangkero Trail (Cagayan River) with Box Culvert, Barangay Salay, Angadanan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007431",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Local Road Barangay Ramos East, San Isidro, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Concreting of Local Road Barangay Ramos East, San Isidro, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007432",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Local Road, Ramos West, San Isidro, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Concreting of Local Road, Ramos West, San Isidro, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007435",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Villaflor Road, Villaflor, San Isidro, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Concreting of Villaflor Road, Villaflor, San Isidro, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0500-007479",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Reconstruction of Roads including drainage, Barangay Silauan Norte, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Rehabilitation/Reconstruction of Roads including drainage, Barangay Silauan Norte, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0500-007484",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road at Purok 5 to Purok 7, Barangay Salay, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Barangay Road at Purok 5 to Purok 7, Barangay Salay, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0500-007485",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road at Purok 6 to Purok 7, Barangay Sinaoangan Norte, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Barangay Road at Purok 6 to Purok 7, Barangay Sinaoangan Norte, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0500-007491",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Masirit Bridge, Masirit, Rizal East, San Isidro, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Masirit Bridge, Masirit, Rizal East, San Isidro, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0500-007494",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Nagbukel, Nagbukel, San Isidro, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Road at Nagbukel, Nagbukel, San Isidro, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0500-007498",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Drainage Dist. Albano, Sta. 0 + 000 - Sta. 0 + 450, Barangay Quezon, San Isidro, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.45,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 450.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          0.0,
          450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Road including Drainage Dist. Albano, Sta. 0 + 000 - Sta. 0 + 450, Barangay Quezon, San Isidro, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.36,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0501-007519",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gucab, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Barangay Gucab, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007521",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Libertad , Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Barangay Libertad , Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007526",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nilumisu, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Barangay Nilumisu, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0503-007553",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay San Pablo to Barangay Villa Luna, Cauayan City, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Rehabilitation of Road, Barangay San Pablo to Barangay Villa Luna, Cauayan City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007601",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Mataddi, Nagtipunan, Quirino",
      "office": "Quirino District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Road, Mataddi, Nagtipunan, Quirino",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007605",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sangbay – Anak, Nagtipunan, Quirino",
      "office": "Quirino District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Road, Sangbay – Anak, Nagtipunan, Quirino",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007617",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Munting Pulo, Barangay Kabalutan, Orani, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Bridge, Munting Pulo, Barangay Kabalutan, Orani, Bataan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0508-007668",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Drainage, Sta. 0+000- Sta. 0+618, Bolacan, Bocaue, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.618,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24271844.66,
      "lengthMeters": 618.0,
      "allocationPerStatedMeter": 24271.84,
      "rangesMeters": [
        [
          0.0,
          618.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Construction of Road including Drainage, Sta. 0+000- Sta. 0+618, Bolacan, Bocaue, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.99,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0508-007674",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+432, Batia, Bocaue, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.432,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34722222.22,
      "lengthMeters": 432.0,
      "allocationPerStatedMeter": 34722.22,
      "rangesMeters": [
        [
          0.0,
          432.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+432, Batia, Bocaue, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.42,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0511-007730",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Road at Barangay Balayong, City of Malolos, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation/Improvement of Road at Barangay Balayong, City of Malolos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0511-007731",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Road at Barangay Bangkal, City of Malolos, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation/Improvement of Road at Barangay Bangkal, City of Malolos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0511-007734",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Road at Barangay Caniogan, City of Malolos, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation/Improvement of Road at Barangay Caniogan, City of Malolos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0512-007743",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads with Drainage Canal, Camalig-Pajo Rd., Barangay Pajo, Meycauayan City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "512",
      "lengthEvidence": "Construction of Roads with Drainage Canal, Camalig-Pajo Rd., Barangay Pajo, Meycauayan City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0516-007832",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Del Monte Heights Subdv., Barangay Kaypian, City of San Jose Del Monte, Bulacan (121.067373, 14.815813)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Rehabilitation of Road, Del Monte Heights Subdv., Barangay Kaypian, City of San Jose Del Monte, Bulacan (121.067373, 14.815813)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0518-007862",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cawayang Bugtong, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 1+223",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 1.223,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12264922.32,
      "lengthMeters": 1223.0,
      "allocationPerStatedMeter": 12264.92,
      "rangesMeters": [
        [
          0.0,
          1223.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Road, Barangay Cawayang Bugtong, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 1+223",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.49,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0519-007892",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Agcano to Barangay Nagpandayan, Guimba, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay Agcano to Barangay Nagpandayan, Guimba, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007927",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gen. Luna, Llanera, Nueva Ecija Sta. 0+000 - Sta. 1+500",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 1.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10000000.0,
      "lengthMeters": 1500.0,
      "allocationPerStatedMeter": 10000.0,
      "rangesMeters": [
        [
          0.0,
          1500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Gen. Luna, Llanera, Nueva Ecija Sta. 0+000 - Sta. 1+500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.41,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0522-007950",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malbang, Pantabangan, Nueva Ecija Sta. 0+000 - Sta. 1+340",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 1.34,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11194029.85,
      "lengthMeters": 1340.0,
      "allocationPerStatedMeter": 11194.03,
      "rangesMeters": [
        [
          0.0,
          1340.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Malbang, Pantabangan, Nueva Ecija Sta. 0+000 - Sta. 1+340",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.45,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0524-008003",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Victoria, Llanera, Nueva Ecija Sta. 0+000 - Sta. 1+790",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 1.79,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8379888.27,
      "lengthMeters": 1790.0,
      "allocationPerStatedMeter": 8379.89,
      "rangesMeters": [
        [
          0.0,
          1790.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Victoria, Llanera, Nueva Ecija Sta. 0+000 - Sta. 1+790",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.35,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0525-008020",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. Lucia, San Luis, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Rehabilitation of Road, Sta. Lucia, San Luis, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0525-008025",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal at Barangay San Nicolas, Minalin, Pampanga 0+000 - STA. 0+304",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.304,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49342105.26,
      "lengthMeters": 304.0,
      "allocationPerStatedMeter": 49342.11,
      "rangesMeters": [
        [
          0.0,
          304.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Construction of Road with Drainage Canal at Barangay San Nicolas, Minalin, Pampanga 0+000 - STA. 0+304",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.73,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0525-008026",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal at Barangay Sta Rita, Minalin, Pampanga STA. 0+000 - STA. 0+303",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.303,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49504950.5,
      "lengthMeters": 303.0,
      "allocationPerStatedMeter": 49504.95,
      "rangesMeters": [
        [
          0.0,
          303.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Construction of Road with Drainage Canal at Barangay Sta Rita, Minalin, Pampanga STA. 0+000 - STA. 0+303",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.73,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0525-008028",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal at Barangay Dela Paz, San Simon, Pampanga STA. 0+000 - STA. 0+305",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.305,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49180327.87,
      "lengthMeters": 305.0,
      "allocationPerStatedMeter": 49180.33,
      "rangesMeters": [
        [
          0.0,
          305.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Construction of Road with Drainage Canal at Barangay Dela Paz, San Simon, Pampanga STA. 0+000 - STA. 0+305",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.72,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0525-008029",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal at Barangay San Isidro, San Simon, Pampanga 0+000 - STA. 0+305",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.305,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49180327.87,
      "lengthMeters": 305.0,
      "allocationPerStatedMeter": 49180.33,
      "rangesMeters": [
        [
          0.0,
          305.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Construction of Road with Drainage Canal at Barangay San Isidro, San Simon, Pampanga 0+000 - STA. 0+305",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.72,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0526-008034",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of \"Tete Matsin\" Bridge along Purok 3 And Purok 4, Barangay Mangga Cacutud, Arayat, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Rehabilitation of \"Tete Matsin\" Bridge along Purok 3 And Purok 4, Barangay Mangga Cacutud, Arayat, Pampanga",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008035",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road including Lined Canal, Barangay San Felipe, City of San Fernando, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Concreting of Road including Lined Canal, Barangay San Felipe, City of San Fernando, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0528-008093",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Cabalantian Road, Bacolor Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Rehabilitation/Improvement of Cabalantian Road, Bacolor Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0528-008096",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Upgrading and Concreting of Road at Barangay Paligui, Apalit, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Upgrading and Concreting of Road at Barangay Paligui, Apalit, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0528-008101",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Lined Canal, Brgy. San Nicolas 1st, Lubao, Pampanga",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Rehabilitation of Road with Lined Canal, Brgy. San Nicolas 1st, Lubao, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0529-008117",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Access Road at Purok 5 and 6, Pabanlag, Floridablanca, Pampanga, Sta. 0+000 - Sta. 1+400",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 1.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10714285.71,
      "lengthMeters": 1400.0,
      "allocationPerStatedMeter": 10714.29,
      "rangesMeters": [
        [
          0.0,
          1400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Barangay Access Road at Purok 5 and 6, Pabanlag, Floridablanca, Pampanga, Sta. 0+000 - Sta. 1+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.43,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0530-008140",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at VDLR Home Owners at Phase 1, 2 Zone 4, Brgy. Diladila, Sta.Rita, Pampanga, Sec. A: Sta.0+000 - Sta.0+450, Sec. B: Sta.0+000 - Sta.0+250",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.45,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 450.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          0.0,
          450.0
        ],
        [
          0.0,
          250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Road at VDLR Home Owners at Phase 1, 2 Zone 4, Brgy. Diladila, Sta.Rita, Pampanga, Sec. A: Sta.0+000 - Sta.0+450, Sec. B: Sta.0+000 - Sta.0+250",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.36,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0530-008146",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Brgy. San Agustin, Lubao, Pampanga, Sta.0+000 - Sta.0+980",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.98,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15306122.45,
      "lengthMeters": 980.0,
      "allocationPerStatedMeter": 15306.12,
      "rangesMeters": [
        [
          0.0,
          980.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Barangay Road, Brgy. San Agustin, Lubao, Pampanga, Sta.0+000 - Sta.0+980",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.79,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0531-008149",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Brgy. Sta. Cruz, Lubao, Pampanga, Sta.0+000 - Sta.0+426",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.426,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35211267.61,
      "lengthMeters": 426.0,
      "allocationPerStatedMeter": 35211.27,
      "rangesMeters": [
        [
          0.0,
          426.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "531",
      "lengthEvidence": "Construction of Barangay Road, Brgy. Sta. Cruz, Lubao, Pampanga, Sta.0+000 - Sta.0+426",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.44,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0531-008158",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Lined Canal at Purok 1 and Purok 2, Barangay Jalung, Porac, Pampanga, Sec. A: Sta.0+000 - Sta.0+553, Sec. B: Sta.0+000 - Sta.0+481",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.553,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 27124773.96,
      "lengthMeters": 553.0,
      "allocationPerStatedMeter": 27124.77,
      "rangesMeters": [
        [
          0.0,
          553.0
        ],
        [
          0.0,
          481.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "531",
      "lengthEvidence": "Construction of Road with Lined Canal at Purok 1 and Purok 2, Barangay Jalung, Porac, Pampanga, Sec. A: Sta.0+000 - Sta.0+553, Sec. B: Sta.0+000 - Sta.0+481",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.11,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0534-008208",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Service Road at Barangay Maliwalo, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+904.60",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.9046000000000001,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16581914.66,
      "lengthMeters": 904.6,
      "allocationPerStatedMeter": 16581.91,
      "rangesMeters": [
        [
          0.0,
          904.6
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction of Barangay Service Road at Barangay Maliwalo, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+904.60",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.85,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0534-008217",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage at Barangay Sapang Tagalog, Tarlac City, Tarlac",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction of Road with Drainage at Barangay Sapang Tagalog, Tarlac City, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0536-008240",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Mambog Road, Botolan, Zambales",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Road, Mambog Road, Botolan, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008260",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Alalum-Sta. Elena-Ilat North, San Pascual, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Alalum-Sta. Elena-Ilat North, San Pascual, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008269",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Mariano, San Pascual, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Barangay San Mariano, San Pascual, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008276",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bulacan, Mabini, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Barangay Bulacan, Mabini, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008282",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tinga Itaas, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Construction of Road, Barangay Tinga Itaas, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008291",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Poblacion Road, San Pascual, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Improvement of Road along Poblacion Road, San Pascual, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008295",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay Balete, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Improvement of Road, Barangay Balete, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008306",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Maruclap, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Rehabilitation of Road, Barangay Maruclap, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008312",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road in Barangay Santa Clara, Sto. Tomas, Batangas (14.0180489, 121.2112937 - 14.0191309, 121.2153415)",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Access Road in Barangay Santa Clara, Sto. Tomas, Batangas (14.0180489, 121.2112937 - 14.0191309, 121.2153415)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008379",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008398",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge (FB60002LZ) along Daang Hari Road, Barangay Pasong Buaya 1, Imus, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Construction of Bridge (FB60002LZ) along Daang Hari Road, Barangay Pasong Buaya 1, Imus, Cavite",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008408",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Cabuco, Trece Martires City, Cavite, Sta. 0 + 000, Sta. 0 + 433",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads at Barangay Cabuco, Trece Martires City, Cavite, Sta. 0 + 000, Sta. 0 + 433",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008420",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Kayquit, Indang, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads at Barangay Kayquit, Indang, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008422",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads (Segment 2) at Barangay Pangil, Amadeo, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads (Segment 2) at Barangay Pangil, Amadeo, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008423",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Banaba Lejos, Indang, Cavite, Sta. 0+000 - Sta. 0+210",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.21,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 71428571.43,
      "lengthMeters": 210.0,
      "allocationPerStatedMeter": 71428.57,
      "rangesMeters": [
        [
          0.0,
          210.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Rehabilitation of Road, Barangay Banaba Lejos, Indang, Cavite, Sta. 0+000 - Sta. 0+210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 2.02,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0543-008424",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Lumampong Balagbag, Indang, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Rehabilitation of Road, Barangay Lumampong Balagbag, Indang, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008425",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Mahabang Kahoy Lejos, Indang, Cavite, Sta. 0+000 - Sta. 0+210",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.21,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 71428571.43,
      "lengthMeters": 210.0,
      "allocationPerStatedMeter": 71428.57,
      "rangesMeters": [
        [
          0.0,
          210.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Rehabilitation of Road, Barangay Mahabang Kahoy Lejos, Indang, Cavite, Sta. 0+000 - Sta. 0+210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 2.02,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0544-008429",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road along Navarro Road, Barangay Pasong Camachile II, General Trias City, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road along Navarro Road, Barangay Pasong Camachile II, General Trias City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0544-008433",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Tamacan, Amadeo, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road at Barangay Tamacan, Amadeo, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008464",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Congressional Road, General Mariano Alvarez, Cavite",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Improvement of Congressional Road, General Mariano Alvarez, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008492",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Del Remedio (ADB), San Pablo City, Laguna",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Construction of Road, Barangay Del Remedio (ADB), San Pablo City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008493",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Del Remedio to Barangay San Lucas II, San Pablo City, Laguna",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Construction of Road, Barangay Del Remedio to Barangay San Lucas II, San Pablo City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008495",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Kanlurang Bukal to Barangay Novaliches, Liliw, Laguna",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Construction of Road, Barangay Kanlurang Bukal to Barangay Novaliches, Liliw, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008496",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Luquin to Barangay Novaliches, Liliw, Laguna",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Construction of Road, Barangay Luquin to Barangay Novaliches, Liliw, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008503",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, M.L. Quezon St., San Pablo City, Laguna",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Rehabilitation of Road, M.L. Quezon St., San Pablo City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008519",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bukal, Tiaong, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Barangay Bukal, Tiaong, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008521",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Mateo, Dolores, Quezon, Start 13.989337, 121.395337 End 13.984012, 121.390306",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Barangay San Mateo, Dolores, Quezon, Start 13.989337, 121.395337 End 13.984012, 121.390306",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008525",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Corazon, San Antonio, Quezon, Start 13.883993, 121.291867 End 13.883993, 121.291867",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Barangay Corazon, San Antonio, Quezon, Start 13.883993, 121.291867 End 13.883993, 121.291867",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008538",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Paved Road, Barangay Kinatihan 1, Candelaria, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Rehabilitation of Paved Road, Barangay Kinatihan 1, Candelaria, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008540",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lutucan 1, Sariaya, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road, Barangay Lutucan 1, Sariaya, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008541",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pulo to Balat Atis, San Antonio, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road, Barangay Pulo to Balat Atis, San Antonio, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008542",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sampaga, San Antonio, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road, Barangay Sampaga, San Antonio, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008544",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Talisay, Tiaong, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road, Barangay Talisay, Tiaong, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0550-008568",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge along Ondoy Creek, Barangay San Jose, Antipolo City 2nd L.D.",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction of Bridge along Ondoy Creek, Barangay San Jose, Antipolo City 2nd L.D.",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0550-008570",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road at Upper Dos Rough Road Sta. Francesca St., Barangay Cupang, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction of Concrete Road at Upper Dos Rough Road Sta. Francesca St., Barangay Cupang, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0550-008572",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Maclang, Sitio Pasong Palanas, Barangay San Juan, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction of Road at Maclang, Sitio Pasong Palanas, Barangay San Juan, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0550-008577",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage connecting Maagay to Kalakad, Barangay Inarawan, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction of Road with Drainage connecting Maagay to Kalakad, Barangay Inarawan, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0550-008579",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage System, Sitio Malaking Parang, Barangay San Jose, Antipolo 2nd L.D.",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction of Road with Drainage System, Sitio Malaking Parang, Barangay San Jose, Antipolo 2nd L.D.",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0550-008580",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Systems, Emerald Hills, Barangay Sta.Cruz, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction of Road with Drainage Systems, Emerald Hills, Barangay Sta.Cruz, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0551-008596",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage System, Lawaan St. Barangay San Luis Antipolo City 2nd L.D.",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Rehabilitation of Road with Drainage System, Lawaan St. Barangay San Luis Antipolo City 2nd L.D.",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008611",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road connecting Barangay Laste and Barangay Alibog, Magsaysay, Occidental Mindoro",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Road connecting Barangay Laste and Barangay Alibog, Magsaysay, Occidental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008614",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Rumbang, Rizal, Occidental Mindoro",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Road, Barangay Rumbang, Rizal, Occidental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008619",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Fortuna Bridge, Barangay Fortuna, Socorro, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Fortuna Bridge, Barangay Fortuna, Socorro, Oriental Mindoro",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008666",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Parang - Barangay Maidlang, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Parang - Barangay Maidlang, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008680",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, So. Demegan Barangay Poblacion,Busuanga,Palawan",
      "office": "Palawan 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of Road, So. Demegan Barangay Poblacion,Busuanga,Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008684",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road of Narra Integrated School, Narra, Palawan",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of Access Road of Narra Integrated School, Narra, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008687",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Access Road Leading to Sitio Tagaud, Barangay Irawan, Puerto Princesa City, Palawan",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of Road, Access Road Leading to Sitio Tagaud, Barangay Irawan, Puerto Princesa City, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008704",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Maruyogon, Puerto Princesa City, Palawan",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Road, Barangay Maruyogon, Puerto Princesa City, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008709",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Pagkakaisa, Forbes Hill, Barangay Santa Monica, Puerto Princesa City, Palawan",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Road, Purok Pagkakaisa, Forbes Hill, Barangay Santa Monica, Puerto Princesa City, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008718",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Bajay Access Road, Odiongan, Romblon",
      "office": "Romblon District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Rehabilitation of Bajay Access Road, Odiongan, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008719",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Dapawan - Amatong Access Road, Odiongan, Romblon",
      "office": "Romblon District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Rehabilitation of Dapawan - Amatong Access Road, Odiongan, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008723",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Sitio Naswak, Sta. 0 + 000.000 - Sta. 0 + 216.00, Barangay Lisap, Bongabong, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.216,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 69444444.44,
      "lengthMeters": 216.0,
      "allocationPerStatedMeter": 69444.44,
      "rangesMeters": [
        [
          0.0,
          216.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Bridge, Sitio Naswak, Sta. 0 + 000.000 - Sta. 0 + 216.00, Barangay Lisap, Bongabong, Oriental Mindoro",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 607142.86,
      "peerRateMultiple": 0.11,
      "peerRecords": 21,
      "peerBand": "≥40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3006198.3449999997,
      "graphUpperFence": 4512396.6899999995
    },
    {
      "id": "HB10858-3-0557-008737",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Villa Pag-asa, Bansud, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road, Barangay Villa Pag-asa, Bansud, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0560-008791",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Belwang, Lupi, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay Belwang, Lupi, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0560-008793",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Buenasuerte (Sitio Ilawod), Lupi, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay Buenasuerte (Sitio Ilawod), Lupi, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0560-008794",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bulawan Sr. (Sitio Bunacan) to Barangay Cabutagan, Lupi, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay Bulawan Sr. (Sitio Bunacan) to Barangay Cabutagan, Lupi, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0560-008795",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Godofredo Reyes Sr., Ragay, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay Godofredo Reyes Sr., Ragay, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0560-008796",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lower Omon, Ragay, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay Lower Omon, Ragay, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0560-008800",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Samay, Ragay, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay Samay, Ragay, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0560-008808",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction of Gainza Main Road, - Sta. 0+000 - Sta. 0+350, Barangay District I to Barangay District II, Gainza, Camarines Sur",
      "office": "Camarines Sur 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42857142.86,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 42857.14,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Reconstruction of Gainza Main Road, - Sta. 0+000 - Sta. 0+350, Barangay District I to Barangay District II, Gainza, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.5,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0561-008815",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Botonga Road, Barangay Fundadoand San Roque, Canamanand Casuray, Magarao, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Botonga Road, Barangay Fundadoand San Roque, Canamanand Casuray, Magarao, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008825",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sua, Camaligan, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Road, Barangay Sua, Camaligan, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008826",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Zone 3, Barangay Ayugan, Ocampo, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Road at Zone 3, Barangay Ayugan, Ocampo, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008827",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Zone 1 and 2, Barangay Cabariwan, Ocampo, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Road at Zone 1 and 2, Barangay Cabariwan, Ocampo, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008828",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Jose Oras, Pili, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Road, Barangay San Jose Oras, Pili, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008853",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Agay-Ayan to Sitio Maslog, Tinambac",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Roads, Barangay Agay-Ayan to Sitio Maslog, Tinambac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008854",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Lagha, Presentacion, Camarines Sur",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Roads, Barangay Lagha, Presentacion, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008855",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Olag Grande, Tinambac to Barangay Maysalay, Goa, Camarines Sur",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Roads, Barangay Olag Grande, Tinambac to Barangay Maysalay, Goa, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008856",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Pag-asa to Barangay Tamban, Tinambac, Camarines Sur",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Roads, Barangay Pag-asa to Barangay Tamban, Tinambac, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008857",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Sagrada to Barangay Pag-asa, Tinambac, Camarines Sur",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Roads, Barangay Sagrada to Barangay Pag-asa, Tinambac, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008862",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Antipolo, Baao, Camarines Sur",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Concreting of Road, Barangay Antipolo, Baao, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008869",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, NIA Service Road, Barangay Sto. Domingo - Barangay Santiago, Iriga City, Camarines Sur, Sta. 6+223.80 - Sta. 6+741.80",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.518,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28957528.96,
      "lengthMeters": 518.0,
      "allocationPerStatedMeter": 28957.53,
      "rangesMeters": [
        [
          6223.8,
          6741.8
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Road, NIA Service Road, Barangay Sto. Domingo - Barangay Santiago, Iriga City, Camarines Sur, Sta. 6+223.80 - Sta. 6+741.80",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.18,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0565-008895",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabayugan, Cawayan, Masbate",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Road, Barangay Cabayugan, Cawayan, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0565-008902",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tan-awan to Barangay Libas, Placer, Masbate",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Road, Barangay Tan-awan to Barangay Libas, Placer, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0569-008988",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sitio Marubrob, Barangay Parian, Sigma, Capiz",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Rehabilitation of Road, Sitio Marubrob, Barangay Parian, Sigma, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0569-008992",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Proper -Putat - Sto. Niño - Banaba Road,Barangay Cabano, San Lorenzo,Guimaras, Sta. 0 + 000 - Sta. 0 +800",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18750000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 18750.0,
      "rangesMeters": [
        [
          0.0,
          800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Road, Proper -Putat - Sto. Niño - Banaba Road,Barangay Cabano, San Lorenzo,Guimaras, Sta. 0 + 000 - Sta. 0 +800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.96,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0569-008995",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Junction to National Road Sitio Minoro-Sitio San Andres (M.Chavez)- Sitio Proper (Cabungahan) Road, Sta. 0 + 400 - Sta. 0 + 940, Sta. 1 + 518 - Sta. 1 + 813, Barangay Mchavez and Barangay Cabungahan, San Lorenzo, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          400.0,
          940.0
        ],
        [
          1518.0,
          1813.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Junction to National Road Sitio Minoro-Sitio San Andres (M.Chavez)- Sitio Proper (Cabungahan) Road, Sta. 0 + 400 - Sta. 0 + 940, Sta. 1 + 518 - Sta. 1 + 813, Barangay Mchavez and Barangay Cabungahan, San Lorenzo, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0570-009011",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sto. Domingo Road, Sta. 4 + 505 - Sta. 5 + 253, Barangay Sto. Domingo, Nueva Valencia, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.748,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20053475.94,
      "lengthMeters": 748.0,
      "allocationPerStatedMeter": 20053.48,
      "rangesMeters": [
        [
          4505.0,
          5253.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Construction of Sto. Domingo Road, Sta. 4 + 505 - Sta. 5 + 253, Barangay Sto. Domingo, Nueva Valencia, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 1.03,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0571-009030",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge at Barangay Tabucan to Barangay Jardin, Dumangas, Iloilo",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Bridge at Barangay Tabucan to Barangay Jardin, Dumangas, Iloilo",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0571-009031",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge at Barangay Tabucan to Barangay Jardin, Dumangas, Iloilo, 10.8193, 122.7116",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Bridge at Barangay Tabucan to Barangay Jardin, Dumangas, Iloilo, 10.8193, 122.7116",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009056",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Abat, Mina to Barangay Bitaoyan, Badiangan, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay Abat, Mina to Barangay Bitaoyan, Badiangan, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009078",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Purok Miranda, Barangay Granada, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Bridge, Purok Miranda, Barangay Granada, Bacolod City",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009081",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mansilingan, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay Mansilingan, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009101",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 17, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Rehabilitation of Road, Barangay 17, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009160",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Lambo Road, Barangay Locotan, Kabankalan, Negros Occidental",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Lambo Road, Barangay Locotan, Kabankalan, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009162",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Canlamay, Ilog, Negros Occidental",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Road, Barangay Canlamay, Ilog, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009163",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Molobolo Road, Barangay Camansi, Kabankalan, Negros Occidental",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Molobolo Road, Barangay Camansi, Kabankalan, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009164",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Paghimukan Road, Barangay Oringao, Kabankalan, Negros Occidental",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Paghimukan Road, Barangay Oringao, Kabankalan, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009166",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sandana II Road, Barangay Tagoc, Kabankalan, Negros Occidental",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Sandana II Road, Barangay Tagoc, Kabankalan, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009196",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Puan, Vallehermoso, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Road, Barangay Puan, Vallehermoso, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009208",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Box Culvert Bridge, Barangay Banawe, Pamplona, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Box Culvert Bridge, Barangay Banawe, Pamplona, Negros Oriental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009233",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tubod to Barangay Tabuan, Bayawan City, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Tubod to Barangay Tabuan, Bayawan City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009241",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Casalaan, Siaton, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Road Barangay Casalaan, Siaton, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009242",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Sitio Cambat-aw to Sitio Bago-Bago, Barangay Nagbalaye, Santa Catalina, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Road from Sitio Cambat-aw to Sitio Bago-Bago, Barangay Nagbalaye, Santa Catalina, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009244",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road going to Sitio Tubod near Fatima Shrine, Barangay Inalad, Siaton, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Road going to Sitio Tubod near Fatima Shrine, Barangay Inalad, Siaton, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009246",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay East Balabag, Valencia, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Road, Barangay East Balabag, Valencia, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009247",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Fatima, Santa Catalina, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Road, Barangay Fatima, Santa Catalina, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009251",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road from Proper A to Sitio Baong, Banaybanay, Bayawan City, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Rehabilitation of Road from Proper A to Sitio Baong, Banaybanay, Bayawan City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009252",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road from Sitio Manngupo to Sitio Baco, Barangay Tayawan, Bayawan City, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Rehabilitation of Road from Sitio Manngupo to Sitio Baco, Barangay Tayawan, Bayawan City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009268",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tiptip (St. Vincent Drive),Tagbilaran City, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road, Barangay Tiptip (St. Vincent Drive),Tagbilaran City, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009271",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Dasitam, Barangay Payahan and Barangay San Juan Buenaventura, Baclayon, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road at Barangay Dasitam, Barangay Payahan and Barangay San Juan Buenaventura, Baclayon, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009273",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Canangcaan, Corella, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road at Canangcaan, Corella, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009307",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (including Box Culvert) at Barangay Tabionan, San Fernando, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Construction of Concrete Road (including Box Culvert) at Barangay Tabionan, San Fernando, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009393",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Nangka, Consolacion, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Bridge, Barangay Nangka, Consolacion, Cebu",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009429",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Patong-Basak Road at Barangay Patong, Badian, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Construction of Patong-Basak Road at Barangay Patong, Badian, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009433",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Lower Banigon, Lupok, Barangay Salamanca, Ginatilan, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Construction of Road at Sitio Lower Banigon, Lupok, Barangay Salamanca, Ginatilan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009439",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Tunga-Bugho-Poblacion East Road at Barangay Tunga, Poblacion East and Bugho, Moalboal, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Construction of Tunga-Bugho-Poblacion East Road at Barangay Tunga, Poblacion East and Bugho, Moalboal, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0592-009491",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Completion of Amandewing Bridge, Dolores, Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Completion of Amandewing Bridge, Dolores, Eastern Samar",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0592-009492",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Japitan Bridge, Dolores, Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Construction of Japitan Bridge, Dolores, Eastern Samar",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0592-009498",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Burabod - Barangay Anibongon, Jaro, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Construction of Road, Barangay Burabod - Barangay Anibongon, Jaro, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0594-009535",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Hinabuyan, Villaba, Leyte (Station 0+340 - 0+690)",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42857142.86,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 42857.14,
      "rangesMeters": [
        [
          340.0,
          690.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Construction of Road, Barangay Hinabuyan, Villaba, Leyte (Station 0+340 - 0+690)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.5,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0597-009590",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bugtosan - Barangay Lourdes, Las Navas, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Road, Barangay Bugtosan - Barangay Lourdes, Las Navas, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0597-009599",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Hangi - Barangay Tagab-iran, (Sta. 0+300 - Sta. 0+615), Las Navas, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.315,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 47619047.62,
      "lengthMeters": 315.0,
      "allocationPerStatedMeter": 47619.05,
      "rangesMeters": [
        [
          300.0,
          615.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Road, Barangay Hangi - Barangay Tagab-iran, (Sta. 0+300 - Sta. 0+615), Las Navas, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.67,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0597-009601",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Perez - Barangay San Miguel, (Sta. 5+160 - Sta. 5+475), Las Navas, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.315,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 47619047.62,
      "lengthMeters": 315.0,
      "allocationPerStatedMeter": 47619.05,
      "rangesMeters": [
        [
          5160.0,
          5475.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Road, Barangay Perez - Barangay San Miguel, (Sta. 5+160 - Sta. 5+475), Las Navas, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.67,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0597-009602",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Quirino - Barangay Imelda (Sta. 0+500 - Sta. 0+815), Las Navas, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.315,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 47619047.62,
      "lengthMeters": 315.0,
      "allocationPerStatedMeter": 47619.05,
      "rangesMeters": [
        [
          500.0,
          815.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Road, Barangay Quirino - Barangay Imelda (Sta. 0+500 - Sta. 0+815), Las Navas, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.67,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0600-009645",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, New DPWH Building, Samar 2nd DEO, Catbalogan City, Samar, Start 11.757841, 124.9057 End 11.75784, 124.9057",
      "office": "Samar 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Construction of Access Road, New DPWH Building, Samar 2nd DEO, Catbalogan City, Samar, Start 11.757841, 124.9057 End 11.75784, 124.9057",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0600-009647",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation / Strengthening of Bridge, Tinoon Steel Bridge, Barangay Lokilokon, Paranas, Samar, 11.802441, 125.102497",
      "office": "Samar 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Rehabilitation / Strengthening of Bridge, Tinoon Steel Bridge, Barangay Lokilokon, Paranas, Samar, 11.802441, 125.102497",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0603-009715",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Barangay Ebarle - Masapak Falls, Barangay Ebarle, Dumingag, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road from Barangay Ebarle - Masapak Falls, Barangay Ebarle, Dumingag, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0603-009723",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Dalaon, Molave, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road in Barangay Dalaon, Molave, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009727",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Gonosan, Molave, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road in Barangay Gonosan, Molave, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009729",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Lower Pulacan Labangan, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road in Barangay Lower Pulacan Labangan, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009730",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Mabuhay, Molave, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road in Barangay Mabuhay, Molave, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009731",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay New Labangan, Labangan, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road in Barangay New Labangan, Labangan, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009732",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Rizal, Molave, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road in Barangay Rizal, Molave, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009740",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road along NRJ Pob. Lapuyan - Tipasan - Asinan - Tiguian - NRJ Pob. Margosatubig Diversion Road, Zamboanga del Sur, Start 7.630323, 123.203669 End 7.625741, 123.202000",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road along NRJ Pob. Lapuyan - Tipasan - Asinan - Tiguian - NRJ Pob. Margosatubig Diversion Road, Zamboanga del Sur, Start 7.630323, 123.203669 End 7.625741, 123.202000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009783",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Iba, Municipality of Cabanglasan, Bukidnon",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Concreting of Road, Barangay Iba, Municipality of Cabanglasan, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009813",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Roads in Barangay Dansolihon, Cagayan de Oro City, Misamis Oriental",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Construction of Access Roads in Barangay Dansolihon, Cagayan de Oro City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009870",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Safety Structures along Iligan City Diversion Rd (S01383MN), Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Construction of Road Safety Structures along Iligan City Diversion Rd (S01383MN), Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0612-009891",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sitio Slide Bridge 1, Kapatagan, Lanao del Norte",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Sitio Slide Bridge 1, Kapatagan, Lanao del Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0612-009892",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sitio Slide Bridge 2, Kapatagan, Lanao del Norte",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Sitio Slide Bridge 2, Kapatagan, Lanao del Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0612-009902",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Bigaan, Mabini, Baliangao Misamis Occidental",
      "office": "Misamis Occidental 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Road, Sitio Bigaan, Mabini, Baliangao Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0614-009946",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Purok 9), Stimson Abordo, Sta. 0+000 - Sta. 0+500, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Construction of Road (Purok 9), Stimson Abordo, Sta. 0+000 - Sta. 0+500, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.23,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0615-009951",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Purok 3 to Purok 7), Barangay Trigos, Sta. 0+000 - Sta. 0+500, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Construction of Road (Purok 3 to Purok 7), Barangay Trigos, Sta. 0+000 - Sta. 0+500, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.23,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0615-009953",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Purok 3), Barangay Sangay Diot, Sta. 0+000 - Sta. 0+500, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Construction of Road (Purok 3), Barangay Sangay Diot, Sta. 0+000 - Sta. 0+500, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.23,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0615-009955",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 1), Barangay Sinuza, Sta. 0+000 - Sta. 0+500, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Concreting of Road (Purok 1), Barangay Sinuza, Sta. 0+000 - Sta. 0+500, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.23,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0616-009969",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Sinalac - Tagpako - Mahayag Road, Initao, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Concreting of Barangay Sinalac - Tagpako - Mahayag Road, Initao, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0618-010024",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge along New Balamban to New Bohol Road, Barangay New Bohol, New Corella, Davao del Norte",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Construction of Bridge along New Balamban to New Bohol Road, Barangay New Bohol, New Corella, Davao del Norte",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010051",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Sitio Rebi, Barangay Pigcawaran, Alamada, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Concrete Road, Sitio Rebi, Barangay Pigcawaran, Alamada, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010072",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Magoncia, Barangay Kibudoc, Matalam, Cotabato",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Road, Sitio Magoncia, Barangay Kibudoc, Matalam, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010077",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, FVR Road, Brangay Tambler, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road, FVR Road, Brangay Tambler, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010084",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok Nopol Road, Barangay Conel, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road, Purok Nopol Road, Barangay Conel, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010110",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Jct. By-Pass Road, Barangay Paraiso-Barangay Carpenter Hill to Purok Beldad, Barangay Sta. Cruz, Koronadal City, South Cotabato, 6.470743, 124.835432, 6.474960, 124.838892",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Construction of Concrete Road, Jct. By-Pass Road, Barangay Paraiso-Barangay Carpenter Hill to Purok Beldad, Barangay Sta. Cruz, Koronadal City, South Cotabato, 6.470743, 124.835432, 6.474960, 124.838892",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0626-010180",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Purok 9A, Barangay Libertad, Butuan City, Agusan del Norte",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Construction of Road at Purok 9A, Barangay Libertad, Butuan City, Agusan del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0626-010182",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sta. 0+000 - Sta. 0+525, Purok 17, Barangay Maguinda, Butuan City",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.525,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 525.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          525.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Concreting of Road, Sta. 0+000 - Sta. 0+525, Purok 17, Barangay Maguinda, Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.17,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0626-010183",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sta. 0+000 - Sta. 0+525, Purok 6, Barangay De Oro, Butuan City",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.525,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 525.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          525.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Concreting of Road, Sta. 0+000 - Sta. 0+525, Purok 6, Barangay De Oro, Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.17,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0627-010191",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction Road Caraga State University, Barangay Ampayon, Butuan City",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction Road Caraga State University, Barangay Ampayon, Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0627-010194",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Improvement) of Road Sta. 0 + 000 - Sta. 0 + 300, Purok 1, Barangay Wadas, Dinagat, Dinagat Islands",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          0.0,
          300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction (Improvement) of Road Sta. 0 + 000 - Sta. 0 + 300, Purok 1, Barangay Wadas, Dinagat, Dinagat Islands",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.75,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0628-010208",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concretiong Rizal Bridge to Sitio Calumutan along Socorro Public Cementery Purok 1, Barangay Rizal, Socorro, Surigao del Norte",
      "office": "Surigao del Norte 1st District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Concretiong Rizal Bridge to Sitio Calumutan along Socorro Public Cementery Purok 1, Barangay Rizal, Socorro, Surigao del Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0628-010217",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Poyo, Purok 7, Barangay Poniente, Road, Gigaquit, Surigao Del Norte",
      "office": "Surigao del Norte 2nd District Engineering Office",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of Road, Sitio Poyo, Purok 7, Barangay Poniente, Road, Gigaquit, Surigao Del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003136",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Bugwak Br. (B01090MN) along Barandias-Dominorog Rd",
      "office": "Bukidnon 4th District Engineering Office",
      "amountPesos": 14976000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Bugwak Br. (B01090MN) along Barandias-Dominorog Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0145-000678",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Paterno St - (S06050LZ) Chainage 000 - Chainage 274",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 14856000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Paterno St - (S06050LZ) Chainage 000 - Chainage 274",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007412",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay San Jose to Barangay Casala, San Mariano, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 14844000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Road Barangay San Jose to Barangay Casala, San Mariano, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0247-002477",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Gen Luna Rd - K0251 + (-866) - K0251 + 307 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Central Office",
      "amountPesos": 14826000,
      "lengthKm": 1.173,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12639386.19,
      "lengthMeters": 1173.0,
      "allocationPerStatedMeter": 12639.39,
      "rangesMeters": [
        [
          250134.0,
          251307.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "Gen Luna Rd - K0251 + (-866) - K0251 + 307 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 1.0,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0253-002565",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Roadway Lighting) along Guimba - Talugtug - Umingan Road K0153+850 - K0155+670",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 14800000,
      "lengthKm": 1.82,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8131868.13,
      "lengthMeters": 1820.0,
      "allocationPerStatedMeter": 8131.87,
      "rangesMeters": [
        [
          153850.0,
          155670.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "253",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Roadway Lighting) along Guimba - Talugtug - Umingan Road K0153+850 - K0155+670",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.82,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0253-002566",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct. Pinagpanaan - Rizal - Pantabangan Road",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 14800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "253",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct. Pinagpanaan - Rizal - Pantabangan Road",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0165-001034",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Zamboanga City-Labuan-Limpapa Rd - K1951 + 735 - K1952 + 000, K1964 + 722 - K1964 + 757, K1964 + 971 - K1965 + 021",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 14756000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 42160000.0,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 42160.0,
      "rangesMeters": [
        [
          1951735.0,
          1952000.0
        ],
        [
          1964722.0,
          1964757.0
        ],
        [
          1964971.0,
          1965021.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Zamboanga City-Labuan-Limpapa Rd - K1951 + 735 - K1952 + 000, K1964 + 722 - K1964 + 757, K1964 + 971 - K1965 + 021",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.06,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0174-001180",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Davao-Bukidnon Rd - K1665 + 688 - K1665 + 707",
      "office": "Davao City 2nd District Engineering Office",
      "amountPesos": 14750000,
      "lengthKm": 0.019,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 776315789.47,
      "lengthMeters": 19.0,
      "allocationPerStatedMeter": 776315.79,
      "rangesMeters": [
        [
          1665688.0,
          1665707.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "174",
      "lengthEvidence": "Davao-Bukidnon Rd - K1665 + 688 - K1665 + 707",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 2.33,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0268-002841",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Malusak Br. (B04968LZ) along Talaba-Summit-Panaon Rd",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 14697000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Malusak Br. (B04968LZ) along Talaba-Summit-Panaon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0145-000679",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Regidor St - (S05816LZ) Chainage 000 - Chainage 264",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 14679000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Regidor St - (S05816LZ) Chainage 000 - Chainage 264",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0575-009114",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 0+000 - Sta. 1+046) at Damsite Proper - Prk. Cabarles Road, Barangay Damsite, Murcia, Negros Occidental (10.5479109, 123.0072410)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 14644000,
      "lengthKm": 1.046,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14000000.0,
      "lengthMeters": 1046.0,
      "allocationPerStatedMeter": 14000.0,
      "rangesMeters": [
        [
          0.0,
          1046.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road (Sta. 0+000 - Sta. 1+046) at Damsite Proper - Prk. Cabarles Road, Barangay Damsite, Murcia, Negros Occidental (10.5479109, 123.0072410)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.56,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0178-001243",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0401 + 161 - K0401 + 212, K0401 + 225 - K0401 + 408, K0401 + 429 - K0401 + 469",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 14607000,
      "lengthKm": 0.274,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 53310218.98,
      "lengthMeters": 274.0,
      "allocationPerStatedMeter": 53310.22,
      "rangesMeters": [
        [
          401161.0,
          401212.0
        ],
        [
          401225.0,
          401408.0
        ],
        [
          401429.0,
          401469.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0401 + 161 - K0401 + 212, K0401 + 225 - K0401 + 408, K0401 + 429 - K0401 + 469",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 180571.43,
      "peerRateMultiple": 0.3,
      "peerRecords": 21,
      "peerBand": "235.5–<356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 557988.2249999999,
      "graphUpperFence": 829781.1599999999
    },
    {
      "id": "HB10858-3-0146-000694",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sara-Concepcion Rd - K0217 + 391 - K0217 + 800",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 14593000,
      "lengthKm": 0.409,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35679706.6,
      "lengthMeters": 409.0,
      "allocationPerStatedMeter": 35679.71,
      "rangesMeters": [
        [
          217391.0,
          217800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Sara-Concepcion Rd - K0217 + 391 - K0217 + 800",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 1.09,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0211-001835",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Midsayap-Marbel Rd (S00275MN) - K1781 + 393 - K1782 + 000",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 14500000,
      "lengthKm": 0.607,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23887973.64,
      "lengthMeters": 607.0,
      "allocationPerStatedMeter": 23887.97,
      "rangesMeters": [
        [
          1781393.0,
          1782000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "211",
      "lengthEvidence": "Midsayap-Marbel Rd (S00275MN) - K1781 + 393 - K1782 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 0.4,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0498-007439",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of access road at Bgy Sinaoangan Sur to Bgy. Salay, San Agustin, Isabela, Sta. 0+000 Sta. 1+220",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 14500000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Concreting of access road at Bgy Sinaoangan Sur to Bgy. Salay, San Agustin, Isabela, Sta. 0+000 Sta. 1+220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0603-009705",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Concreting in Barangay Tiniguiban, Leon T. Postigo, Zamboanga del Norte",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "amountPesos": 14500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Road Concreting in Barangay Tiniguiban, Leon T. Postigo, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0161-000942",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Lipa City - Alaminos Rd - K0076 + (-011) - K0076 + 255",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 14455000,
      "lengthKm": 0.266,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54342105.26,
      "lengthMeters": 266.0,
      "allocationPerStatedMeter": 54342.11,
      "rangesMeters": [
        [
          75989.0,
          76255.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Lipa City - Alaminos Rd - K0076 + (-011) - K0076 + 255",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 1.0,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0169-001096",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Eastern Bulacan Rd - K0077 + 294 - K0078 + 027",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 14446000,
      "lengthKm": 0.733,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19708049.11,
      "lengthMeters": 733.0,
      "allocationPerStatedMeter": 19708.05,
      "rangesMeters": [
        [
          77294.0,
          78027.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Eastern Bulacan Rd - K0077 + 294 - K0078 + 027",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.62,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0200-001612",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Dumaguete South Rd - K0068 + 856 - K0069 + 081",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 14400000,
      "lengthKm": 0.225,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 64000000.0,
      "lengthMeters": 225.0,
      "allocationPerStatedMeter": 64000.0,
      "rangesMeters": [
        [
          68856.0,
          69081.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Dumaguete South Rd - K0068 + 856 - K0069 + 081",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 1.31,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0477-006989",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Dominican Hill-Mirador Barangay, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 14400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Rehabilitation of Road Dominican Hill-Mirador Barangay, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0132-000426",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Isaac O. Tolentino Ave. - K0057 + 385 - K0057 + 730, K0057 + 975 - K0057 + 1051",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 14394000,
      "lengthKm": 0.421,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 34190023.75,
      "lengthMeters": 421.0,
      "allocationPerStatedMeter": 34190.02,
      "rangesMeters": [
        [
          57385.0,
          57730.0
        ],
        [
          57975.0,
          58051.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Isaac O. Tolentino Ave. - K0057 + 385 - K0057 + 730, K0057 + 975 - K0057 + 1051",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.06,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0168-001083",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Paracelis-Mallig-Roxas Rd - Chainage 3345 - Chainage 3590",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 14300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "Paracelis-Mallig-Roxas Rd - Chainage 3345 - Chainage 3590",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0144-000664",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Talisay-Laurel-Agoncillo Rd - K0085 + 642 - K0086 + 168, K0086 + 736 - K0086 + 811",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 14258000,
      "lengthKm": 0.601,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23723793.68,
      "lengthMeters": 601.0,
      "allocationPerStatedMeter": 23723.79,
      "rangesMeters": [
        [
          85642.0,
          86168.0
        ],
        [
          86736.0,
          86811.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Talisay-Laurel-Agoncillo Rd - K0085 + 642 - K0086 + 168, K0086 + 736 - K0086 + 811",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.99,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0118-000152",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0526 + 331 - K0527 + 010",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 14229000,
      "lengthKm": 0.679,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20955817.38,
      "lengthMeters": 679.0,
      "allocationPerStatedMeter": 20955.82,
      "rangesMeters": [
        [
          526331.0,
          527010.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Manila North Rd - K0526 + 331 - K0527 + 010",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 0.49,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0166-001045",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd - K1495 + 775 - K1496 + 350",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 14224000,
      "lengthKm": 0.575,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24737391.3,
      "lengthMeters": 575.0,
      "allocationPerStatedMeter": 24737.39,
      "rangesMeters": [
        [
          1495775.0,
          1496350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "166",
      "lengthEvidence": "Surigao-Davao Coastal Rd - K1495 + 775 - K1496 + 350",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.62,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0489-007260",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Paved Road, Barangay Bantug, Tumauini, Isabela (Sta. 0+000 - Sta. 1+510)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 14160000,
      "lengthKm": 1.51,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9377483.44,
      "lengthMeters": 1510.0,
      "allocationPerStatedMeter": 9377.48,
      "rangesMeters": [
        [
          0.0,
          1510.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Rehabilitation of Paved Road, Barangay Bantug, Tumauini, Isabela (Sta. 0+000 - Sta. 1+510)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.39,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0165-001023",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0142 + (-625) - K0142 + (-006)",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 14157000,
      "lengthKm": 0.619,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22870759.29,
      "lengthMeters": 619.0,
      "allocationPerStatedMeter": 22870.76,
      "rangesMeters": [
        [
          141375.0,
          141994.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0142 + (-625) - K0142 + (-006)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.57,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0134-000479",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Marikina-Infanta Rd - K0071 + 389 - K0071 + 793",
      "office": "Rizal 2nd District Engineering Office",
      "amountPesos": 14118000,
      "lengthKm": 0.404,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34945544.55,
      "lengthMeters": 404.0,
      "allocationPerStatedMeter": 34945.54,
      "rangesMeters": [
        [
          71389.0,
          71793.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Marikina-Infanta Rd - K0071 + 389 - K0071 + 793",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.08,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0533-008193",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay Sta Lucia, Magalang, Pampanga, Sta. 0+000 - Sta. 0+937, Sta. 0+000 - Sta. 0+371",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 14100000,
      "lengthKm": 0.937,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 15048025.61,
      "lengthMeters": 937.0,
      "allocationPerStatedMeter": 15048.03,
      "rangesMeters": [
        [
          0.0,
          937.0
        ],
        [
          0.0,
          371.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road and Drainage, Barangay Sta Lucia, Magalang, Pampanga, Sta. 0+000 - Sta. 0+937, Sta. 0+000 - Sta. 0+371",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.77,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0246-002467",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1667 + 207 - K1668 + 369 (Off- Carriageway Improvement: Paving of Shoulders)",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 14076000,
      "lengthKm": 1.162,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12113597.25,
      "lengthMeters": 1162.0,
      "allocationPerStatedMeter": 12113.6,
      "rangesMeters": [
        [
          1667207.0,
          1668369.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1667 + 207 - K1668 + 369 (Off- Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 1.01,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0133-000447",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Maragondon-Magallanes-Amuyong Rd - K0090 + 783 - K0091 + 116",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 14070000,
      "lengthKm": 0.333,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42252252.25,
      "lengthMeters": 333.0,
      "allocationPerStatedMeter": 42252.25,
      "rangesMeters": [
        [
          90783.0,
          91116.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Maragondon-Magallanes-Amuyong Rd - K0090 + 783 - K0091 + 116",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.31,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0201-001622",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1708 + 951 - K1709 + 249",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 14047000,
      "lengthKm": 0.298,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 47137583.89,
      "lengthMeters": 298.0,
      "allocationPerStatedMeter": 47137.58,
      "rangesMeters": [
        [
          1708951.0,
          1709249.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "201",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1708 + 951 - K1709 + 249",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 0.97,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0132-000423",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Indang-Alfonso via Luksuhin Rd - K0072 + 1001 - K0073 + 608",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 14005000,
      "lengthKm": 0.607,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23072487.64,
      "lengthMeters": 607.0,
      "allocationPerStatedMeter": 23072.49,
      "rangesMeters": [
        [
          73001.0,
          73608.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Indang-Alfonso via Luksuhin Rd - K0072 + 1001 - K0073 + 608",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.72,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0119-000168",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0127 + 808 - K0128 + 000",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": 0.192,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 72916666.67,
      "lengthMeters": 192.0,
      "allocationPerStatedMeter": 72916.67,
      "rangesMeters": [
        [
          127808.0,
          128000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Manila North Rd - K0127 + 808 - K0128 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 1.57,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0166-001037",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Sindangan-Siayan-Dumingag-Mahayag Rd (Mahayag-Dumingag Sect) - K1672 + 000 - K1672 + 350",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          1672000.0,
          1672350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "166",
      "lengthEvidence": "Sindangan-Siayan-Dumingag-Mahayag Rd (Mahayag-Dumingag Sect) - K1672 + 000 - K1672 + 350",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 1.01,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0178-001253",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Mt Prov-Cagayan via Tabuk-Enrile Rd - K0394 + 384 - K0394 + 398, K0395 + 941 - K0395 + 954, K0396 + 100 - K0396 + 155, K0396 + 524 - K0396 + 541",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": 0.099,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 141414141.41,
      "lengthMeters": 99.0,
      "allocationPerStatedMeter": 141414.14,
      "rangesMeters": [
        [
          394384.0,
          394398.0
        ],
        [
          395941.0,
          395954.0
        ],
        [
          396100.0,
          396155.0
        ],
        [
          396524.0,
          396541.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Mt Prov-Cagayan via Tabuk-Enrile Rd - K0394 + 384 - K0394 + 398, K0395 + 941 - K0395 + 954, K0396 + 100 - K0396 + 155, K0396 + 524 - K0396 + 541",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 0.47,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0179-001266",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Calapan South Rd - K0051 + 445 - K0051 + 595",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": 0.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 93333333.33,
      "lengthMeters": 150.0,
      "allocationPerStatedMeter": 93333.33,
      "rangesMeters": [
        [
          51445.0,
          51595.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "Calapan South Rd - K0051 + 445 - K0051 + 595",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 0.49,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0180-001282",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Passi-Sn Rafael-Lemery-Sara Rd - K0053 + 460 - K0053 + 611, K0062 + 180 - K0062 + 220, K0062 + 380 - K0062 + 420, K0062 + 740 - K0062 + 780, K0063 + 600 - K0063 + 654, K0063 + 754 - K0063 + 808, K0065 + 480 - K0065 + 520",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": 0.419,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 33412887.83,
      "lengthMeters": 419.0,
      "allocationPerStatedMeter": 33412.89,
      "rangesMeters": [
        [
          53460.0,
          53611.0
        ],
        [
          62180.0,
          62220.0
        ],
        [
          62380.0,
          62420.0
        ],
        [
          62740.0,
          62780.0
        ],
        [
          63600.0,
          63654.0
        ],
        [
          63754.0,
          63808.0
        ],
        [
          65480.0,
          65520.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Passi-Sn Rafael-Lemery-Sara Rd - K0053 + 460 - K0053 + 611, K0062 + 180 - K0062 + 220, K0062 + 380 - K0062 + 420, K0062 + 740 - K0062 + 780, K0063 + 600 - K0063 + 654, K0063 + 754 - K0063 + 808, K0065 + 480 - K0065 + 520",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 103448.28,
      "peerRateMultiple": 0.32,
      "peerRecords": 21,
      "peerBand": "≥356 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 236748.00999999995,
      "graphUpperFence": 336041.47
    },
    {
      "id": "HB10858-3-0198-001586",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1799 + 1182 - K1800 + 166, K1800 + 370 - K1800 + 598",
      "office": "Central Office",
      "amountPesos": 14000000,
      "lengthKm": 0.244,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 57377049.18,
      "lengthMeters": 244.0,
      "allocationPerStatedMeter": 57377.05,
      "rangesMeters": [
        [
          1800166.0,
          1800182.0
        ],
        [
          1800370.0,
          1800598.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1799 + 1182 - K1800 + 166, K1800 + 370 - K1800 + 598",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 1.17,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0230-002193",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Claveria Diversion Road, Sta 14 + 500 - Sta. 14 + 960, Cagayan",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": 0.46,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30434782.61,
      "lengthMeters": 460.0,
      "allocationPerStatedMeter": 30434.78,
      "rangesMeters": [
        [
          14500.0,
          14960.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Claveria Diversion Road, Sta 14 + 500 - Sta. 14 + 960, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.24,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0248-002497",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Jct. Ayaga (Abulug)-Ballesteros-Aparri Rd - K0691 + 000 - K0692 + 000 (Off- Carriageway Improvement: Paving of Shoulders)",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14000000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 14000.0,
      "rangesMeters": [
        [
          691000.0,
          692000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "248",
      "lengthEvidence": "Jct. Ayaga (Abulug)-Ballesteros-Aparri Rd - K0691 + 000 - K0692 + 000 (Off- Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 1.11,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0251-002529",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Don A Velez St - K1438 + (-140) - K1439 + 168 (Road Safety: Roadway Lighting)",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": 1.308,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10703363.91,
      "lengthMeters": 1308.0,
      "allocationPerStatedMeter": 10703.36,
      "rangesMeters": [
        [
          1437860.0,
          1439168.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Don A Velez St - K1438 + (-140) - K1439 + 168 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 0.85,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0263-002750",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Buayahan Br. (B00112BH) along Jct (LIR) Carmen-Sagbayan-Bacani Rd",
      "office": "Bohol 3rd District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Buayahan Br. (B00112BH) along Jct (LIR) Carmen-Sagbayan-Bacani Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002838",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Kaysabong Br. (B04368LZ) along Ternate-Nasugbu Rd",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Kaysabong Br. (B04368LZ) along Ternate-Nasugbu Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002839",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Pajo Br. (B04425LZ) along Indang-Alfonso via Luksuhin Rd",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Pajo Br. (B04425LZ) along Indang-Alfonso via Luksuhin Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0269-002874",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Gabayan Br. (B00009SJ) along Siquijor Circumferential Rd",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Gabayan Br. (B00009SJ) along Siquijor Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0269-002875",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Lotloton Br. (B00005SJ) along Siquijor Circumferential Rd",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Lotloton Br. (B00005SJ) along Siquijor Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006411",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage along San Jose Alleys, Barangay Daniel Fajardo, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Construction of Road and Drainage along San Jose Alleys, Barangay Daniel Fajardo, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0449-006419",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage Mercury St and Neptune St, Barangay Pulanglupa 1, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "449",
      "lengthEvidence": "Rehabilitation of Road including Drainage Mercury St and Neptune St, Barangay Pulanglupa 1, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0450-006434",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Network along P. Lopez, General Meñez, Aquarius Streets Including Laterals, Barangay Parang, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "450",
      "lengthEvidence": "Rehabilitation of Road Network along P. Lopez, General Meñez, Aquarius Streets Including Laterals, Barangay Parang, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0450-006447",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of SMMH Community Road Network, Including Laterals, at Park 23 Alleys (Chainage 0+000 - Chainage 0+235) Barangay Marikina Heights, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "450",
      "lengthEvidence": "Rehabilitation of SMMH Community Road Network, Including Laterals, at Park 23 Alleys (Chainage 0+000 - Chainage 0+235) Barangay Marikina Heights, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006526",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along T. Concepcion - Lower Catador St. (C0+000 to C0+370), Barangay Marulas, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along T. Concepcion - Lower Catador St. (C0+000 to C0+370), Barangay Marulas, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006587",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Samson St., Barangay Batasan Hills, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Rehabilitation of Road, Samson St., Barangay Batasan Hills, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0499-007464",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+050, Barangay Minuri, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": 1.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 1050.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          1050.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+050, Barangay Minuri, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.53,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0508-007666",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage, Dela Cruz and Manalac Street, Poblacion, Guiguinto, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Rehabilitation of Road including Drainage, Dela Cruz and Manalac Street, Poblacion, Guiguinto, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0551-008585",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road With Slope Protection Wall at Ruhat 3 Barangay Mambugan, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Construction of Road With Slope Protection Wall at Ruhat 3 Barangay Mambugan, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008946",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Malay Public Market to National Highway, Barangay Caticlan, Malay, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Malay Public Market to National Highway, Barangay Caticlan, Malay, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0593-009504",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Chainage 4 + 002.60 - Chainage 5 + 120.60, Sitio Maitom Barangay San Agustin - Barangay San Pedro, Jaro, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Concrete Road, Chainage 4 + 002.60 - Chainage 5 + 120.60, Sitio Maitom Barangay San Agustin - Barangay San Pedro, Jaro, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0625-010167",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Baton, Barangay Bual, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Road, Sitio Baton, Barangay Bual, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0265-002789",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Baculi Br. (B01088LZ) along Maharlika Highway ( Cagayan Valley Rd)",
      "office": "Central Office",
      "amountPesos": 13965000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Baculi Br. (B01088LZ) along Maharlika Highway ( Cagayan Valley Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0143-000640",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sn Fernando-Bagulin Rd - K0282 + 000 - K0283 + 000",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 13945000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13945000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 13945.0,
      "rangesMeters": [
        [
          282000.0,
          283000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Sn Fernando-Bagulin Rd - K0282 + 000 - K0283 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.58,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0118-000153",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0552 + 334 - K0553 + 000",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 13934000,
      "lengthKm": 0.666,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20921921.92,
      "lengthMeters": 666.0,
      "allocationPerStatedMeter": 20921.92,
      "rangesMeters": [
        [
          552334.0,
          553000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Manila North Rd - K0552 + 334 - K0553 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 0.49,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0115-000083",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - K1648 + (-258) - K1648 + 246",
      "office": "Central Office",
      "amountPesos": 13900000,
      "lengthKm": 0.504,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27579365.08,
      "lengthMeters": 504.0,
      "allocationPerStatedMeter": 27579.37,
      "rangesMeters": [
        [
          1647742.0,
          1648246.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - K1648 + (-258) - K1648 + 246",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 0.58,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0268-002845",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Lumutan Br. (B05218LZ) along Maharlika Highway (LZ)",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 13897000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Lumutan Br. (B05218LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0173-001171",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0692 + 230 - K0692 + 307",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 13860000,
      "lengthKm": 0.077,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 180000000.0,
      "lengthMeters": 77.0,
      "allocationPerStatedMeter": 180000.0,
      "rangesMeters": [
        [
          692230.0,
          692307.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0692 + 230 - K0692 + 307",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 0.54,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0136-000499",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sto Niño-Banago Rd (North) - K0001 + (-422) - K0001 + (-181), K0001 + (-018) - K0001 + 464",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 13838000,
      "lengthKm": 0.723,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 19139695.71,
      "lengthMeters": 723.0,
      "allocationPerStatedMeter": 19139.7,
      "rangesMeters": [
        [
          578.0,
          819.0
        ],
        [
          982.0,
          1464.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Sto Niño-Banago Rd (North) - K0001 + (-422) - K0001 + (-181), K0001 + (-018) - K0001 + 464",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.59,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0247-002482",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Session Rd #2 - K0251 + (-127) - K0252 + 047 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Central Office",
      "amountPesos": 13802000,
      "lengthKm": 1.174,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11756388.42,
      "lengthMeters": 1174.0,
      "allocationPerStatedMeter": 11756.39,
      "rangesMeters": [
        [
          250873.0,
          252047.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "Session Rd #2 - K0251 + (-127) - K0252 + 047 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 0.93,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0533-008187",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay San Pablo, Magalang, Pampanga, Sta. 0+000 - Sta. 0+415",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 13800000,
      "lengthKm": 0.415,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33253012.05,
      "lengthMeters": 415.0,
      "allocationPerStatedMeter": 33253.01,
      "rangesMeters": [
        [
          0.0,
          415.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road and Drainage, Barangay San Pablo, Magalang, Pampanga, Sta. 0+000 - Sta. 0+415",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.36,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0121-000216",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Palo-Carigara-Ormoc Rd - K0974 + 000 - K0974 + 543",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 13798000,
      "lengthKm": 0.543,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25410681.4,
      "lengthMeters": 543.0,
      "allocationPerStatedMeter": 25410.68,
      "rangesMeters": [
        [
          974000.0,
          974543.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "Palo-Carigara-Ormoc Rd - K0974 + 000 - K0974 + 543",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 0.53,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0207-001752",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Calapan South Rd - K0033 + 181 - K0033 + 545",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 13737000,
      "lengthKm": 0.364,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37739010.99,
      "lengthMeters": 364.0,
      "allocationPerStatedMeter": 37739.01,
      "rangesMeters": [
        [
          33181.0,
          33545.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Calapan South Rd - K0033 + 181 - K0033 + 545",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 0.75,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0132-000417",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Noveleta-Naic-Tagaytay Rd - K0065 + 313 - K0065 + 939",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 13727000,
      "lengthKm": 0.626,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21928115.02,
      "lengthMeters": 626.0,
      "allocationPerStatedMeter": 21928.12,
      "rangesMeters": [
        [
          65313.0,
          65939.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Noveleta-Naic-Tagaytay Rd - K0065 + 313 - K0065 + 939",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.68,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0142-000633",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "A Maceda St - K0005 + 304 - K0006 + 000",
      "office": "North Manila District Engineering Office",
      "amountPesos": 13700000,
      "lengthKm": 0.696,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19683908.05,
      "lengthMeters": 696.0,
      "allocationPerStatedMeter": 19683.91,
      "rangesMeters": [
        [
          5304.0,
          6000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "A Maceda St - K0005 + 304 - K0006 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.82,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0452-006480",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads and Drainage System along Pleasant View with Reinforced Concrete Box Culvert (C0+000 to C0+260), Barangay 165 , Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 13700000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "452",
      "lengthEvidence": "Construction of Roads and Drainage System along Pleasant View with Reinforced Concrete Box Culvert (C0+000 to C0+260), Barangay 165 , Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0133-000437",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0070 + 497 - K0071 + 230",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 13698000,
      "lengthKm": 0.733,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18687585.27,
      "lengthMeters": 733.0,
      "allocationPerStatedMeter": 18687.59,
      "rangesMeters": [
        [
          70497.0,
          71230.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0070 + 497 - K0071 + 230",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.58,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0171-001142",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Luyang-Poo-Lazi Rd - K0010 + 411 - K0010 + 631, K0016 + 814 - K0016 + 852, K0017 + 309 - K0017 + 378",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 13679000,
      "lengthKm": 0.327,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 41831804.28,
      "lengthMeters": 327.0,
      "allocationPerStatedMeter": 41831.8,
      "rangesMeters": [
        [
          10411.0,
          10631.0
        ],
        [
          16814.0,
          16852.0
        ],
        [
          17309.0,
          17378.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Luyang-Poo-Lazi Rd - K0010 + 411 - K0010 + 631, K0016 + 814 - K0016 + 852, K0017 + 309 - K0017 + 378",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.32,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0611-009877",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Drainage System at Bacayo-Mercy Road, Barangay Tubod, Sta. 0+000 - 0+343, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 13660000,
      "lengthKm": 0.343,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39825072.89,
      "lengthMeters": 343.0,
      "allocationPerStatedMeter": 39825.07,
      "rangesMeters": [
        [
          0.0,
          343.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Rehabilitation/Improvement of Drainage System at Bacayo-Mercy Road, Barangay Tubod, Sta. 0+000 - 0+343, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.39,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0113-000041",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0607 + 700 - K0608 + 000",
      "office": "Central Office",
      "amountPesos": 13620000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45400000.0,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 45400.0,
      "rangesMeters": [
        [
          607700.0,
          608000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Maharlika Highway (LZ) - K0607 + 700 - K0608 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 0.98,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0247-002479",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Kisad Rd - K0249 + (-745) - K0249 + 330 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Central Office",
      "amountPesos": 13587000,
      "lengthKm": 1.075,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12639069.77,
      "lengthMeters": 1075.0,
      "allocationPerStatedMeter": 12639.07,
      "rangesMeters": [
        [
          248255.0,
          249330.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "Kisad Rd - K0249 + (-745) - K0249 + 330 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 1.0,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0171-001140",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Prosperidad-Quezon-Cabaron Rd - K0067 + 364 - K0067 + 680, K0071 + 659 - K0072 + 000",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 13574000,
      "lengthKm": 0.657,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20660578.39,
      "lengthMeters": 657.0,
      "allocationPerStatedMeter": 20660.58,
      "rangesMeters": [
        [
          67364.0,
          67680.0
        ],
        [
          71659.0,
          72000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Prosperidad-Quezon-Cabaron Rd - K0067 + 364 - K0067 + 680, K0071 + 659 - K0072 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.65,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0268-002854",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Matandang Gasan Br. (B00021MQ) along Marinduque Circumferential Rd",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 13524000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Matandang Gasan Br. (B00021MQ) along Marinduque Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0207-001766",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Buenavista-Kawayan Rd - K0048 + 230 - K0048 + 500",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 13500000,
      "lengthKm": 0.27,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 270.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          48230.0,
          48500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Buenavista-Kawayan Rd - K0048 + 230 - K0048 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0293-003394",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Kings Br. (B00643MN) along Surallah-Lake Sebu-Maitum Rd",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 13500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Kings Br. (B00643MN) along Surallah-Lake Sebu-Maitum Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0452-006478",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Flood Control Structure along Tullahan River (Road 7 Extension), C0+000 to C0+050), Barangay 164, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 13500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "452",
      "lengthEvidence": "Rehabilitation of Flood Control Structure along Tullahan River (Road 7 Extension), C0+000 to C0+050), Barangay 164, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0487-007220",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 0+080 - Sta. 1+005) at Barangay Santa, Tumauini, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 13500000,
      "lengthKm": 0.925,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14594594.59,
      "lengthMeters": 925.0,
      "allocationPerStatedMeter": 14594.59,
      "rangesMeters": [
        [
          80.0,
          1005.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Rehabilitation of Road (Sta. 0+080 - Sta. 1+005) at Barangay Santa, Tumauini, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.75,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0534-008214",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Camiling - Bayambang Diversion Road (Segment 2), Camiling, Tarlac",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 13500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction of Camiling - Bayambang Diversion Road (Segment 2), Camiling, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008346",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay San Andres, Malvar, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 13500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Rehabilitation of Road, Barangay San Andres, Malvar, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0593-009514",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Combado, Barangay Rubas - Barangay Tinambacan, Jaro, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 13500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Road, Sitio Combado, Barangay Rubas - Barangay Tinambacan, Jaro, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0272-002944",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Solsogon Br. (B00352SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "office": "Central Office",
      "amountPesos": 13440000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Solsogon Br. (B00352SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003166",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Lutayan Br. (B00642MN) along Surallah-Lake Sebu-Maitum Rd",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 13440000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Lutayan Br. (B00642MN) along Surallah-Lake Sebu-Maitum Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0154-000831",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bacolod North Rd - K0100+125 - K0100 + 404, K0106+027 - K0106 + 330",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 13386000,
      "lengthKm": 0.582,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23000000.0,
      "lengthMeters": 582.0,
      "allocationPerStatedMeter": 23000.0,
      "rangesMeters": [
        [
          100125.0,
          100404.0
        ],
        [
          106027.0,
          106330.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "Bacolod North Rd - K0100+125 - K0100 + 404, K0106+027 - K0106 + 330",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 0.97,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0122-000230",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Davao-Bukidnon Rd - K1655 + 895 - K1658 + 000",
      "office": "Davao City 2nd District Engineering Office",
      "amountPesos": 13367000,
      "lengthKm": 2.105,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 6350118.76,
      "lengthMeters": 2105.0,
      "allocationPerStatedMeter": 6350.12,
      "rangesMeters": [
        [
          1655895.0,
          1658000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Davao-Bukidnon Rd - K1655 + 895 - K1658 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.17,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0162-000968",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Albay Diversion Rd - K0444 + 310 - K0444 + 667",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 13366000,
      "lengthKm": 0.357,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37439775.91,
      "lengthMeters": 357.0,
      "allocationPerStatedMeter": 37439.78,
      "rangesMeters": [
        [
          444310.0,
          444667.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Albay Diversion Rd - K0444 + 310 - K0444 + 667",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.94,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0153-000816",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Jose Abad Santos Ave (JASA) - K0074 + 1188 - K0074 + 1387.26",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 13330000,
      "lengthKm": 0.19925999999999477,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66897520.83,
      "lengthMeters": 199.26,
      "allocationPerStatedMeter": 66897.52,
      "rangesMeters": [
        [
          75188.0,
          75387.26
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Jose Abad Santos Ave (JASA) - K0074 + 1188 - K0074 + 1387.26",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 1.68,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0268-002842",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Magsaysay Br. (B02566LZ) along Maharlika Highway (LZ)",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 13330000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Magsaysay Br. (B02566LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0160-000936",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Maragondon-Magallanes-Amuyong Rd - K0087 + 300 - K0088 + 000",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 13300000,
      "lengthKm": 0.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19000000.0,
      "lengthMeters": 700.0,
      "allocationPerStatedMeter": 19000.0,
      "rangesMeters": [
        [
          87300.0,
          88000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "160",
      "lengthEvidence": "Maragondon-Magallanes-Amuyong Rd - K0087 + 300 - K0088 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 0.57,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0113-000042",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0608 + 654 - K0608 + 901, K0609 + 064 - K0609 + 095",
      "office": "Central Office",
      "amountPesos": 13261000,
      "lengthKm": 0.278,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 47701438.85,
      "lengthMeters": 278.0,
      "allocationPerStatedMeter": 47701.44,
      "rangesMeters": [
        [
          608654.0,
          608901.0
        ],
        [
          609064.0,
          609095.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "113",
      "lengthEvidence": "Maharlika Highway (LZ) - K0608 + 654 - K0608 + 901, K0609 + 064 - K0609 + 095",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 1.02,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0147-000717",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Edwin Andrews Airbase Rd - (S01211MN) Chainage 300 - Chainage 837, Chainage 1021 - Chainage 1304",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 13240000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Edwin Andrews Airbase Rd - (S01211MN) Chainage 300 - Chainage 837, Chainage 1021 - Chainage 1304",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0489-007251",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Drainage Structure, Barangay District 4, Tumauini, Isabela (Sta. 0+163 - Sta. 0+483)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 13240000,
      "lengthKm": 0.32,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41375000.0,
      "lengthMeters": 320.0,
      "allocationPerStatedMeter": 41375.0,
      "rangesMeters": [
        [
          163.0,
          483.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of Road including Drainage Structure, Barangay District 4, Tumauini, Isabela (Sta. 0+163 - Sta. 0+483)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.45,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0137-000528",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Liloy-Siocon Rd - K2064 + 000 - K2064 + 400, K2065 + 000 - K2065 + 480",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 13200000,
      "lengthKm": 0.88,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 15000000.0,
      "lengthMeters": 880.0,
      "allocationPerStatedMeter": 15000.0,
      "rangesMeters": [
        [
          2064000.0,
          2064400.0
        ],
        [
          2065000.0,
          2065480.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Liloy-Siocon Rd - K2064 + 000 - K2064 + 400, K2065 + 000 - K2065 + 480",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30430.0,
      "peerRateMultiple": 0.49,
      "peerRecords": 38,
      "peerBand": "775–<1024 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 61692.649999999994,
      "graphUpperFence": 85740.36499999999
    },
    {
      "id": "HB10858-3-0282-003161",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Ilustre Br. (B00271MN) along Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 13200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Ilustre Br. (B00271MN) along Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0533-008199",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay San Antonio, Magalang, Pampanga, Sta. 0+000 - Sta. 0+910, Sta. 0+000 - Sta. 0+218",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 13200000,
      "lengthKm": 0.91,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14505494.51,
      "lengthMeters": 910.0,
      "allocationPerStatedMeter": 14505.49,
      "rangesMeters": [
        [
          0.0,
          910.0
        ],
        [
          0.0,
          218.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road Barangay San Antonio, Magalang, Pampanga, Sta. 0+000 - Sta. 0+910, Sta. 0+000 - Sta. 0+218",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.75,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0160-000927",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Labanan sa Binakayan Div Rd - K0022 + 868 - K0023 + 256",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 13151000,
      "lengthKm": 0.388,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33894329.9,
      "lengthMeters": 388.0,
      "allocationPerStatedMeter": 33894.33,
      "rangesMeters": [
        [
          22868.0,
          23256.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "160",
      "lengthEvidence": "Labanan sa Binakayan Div Rd - K0022 + 868 - K0023 + 256",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.85,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0288-003298",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Cuenca Br. (B00829LZ) along Rosario-Pugo Rd",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 13100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Cuenca Br. (B00829LZ) along Rosario-Pugo Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0154-000842",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Dumaguete South Rd - K0028+729 - K0029 + 071",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 13001000,
      "lengthKm": 0.342,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38014619.88,
      "lengthMeters": 342.0,
      "allocationPerStatedMeter": 38014.62,
      "rangesMeters": [
        [
          28729.0,
          29071.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "Dumaguete South Rd - K0028+729 - K0029 + 071",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 1.33,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0111-000008",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0268 + 347 - K0268 + 700, K0279 + 522 - K0279 + 612",
      "office": "Central Office",
      "amountPesos": 13000000,
      "lengthKm": 0.443,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29345372.46,
      "lengthMeters": 443.0,
      "allocationPerStatedMeter": 29345.37,
      "rangesMeters": [
        [
          268347.0,
          268700.0
        ],
        [
          279522.0,
          279612.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "111",
      "lengthEvidence": "Manila North Rd - K0268 + 347 - K0268 + 700, K0279 + 522 - K0279 + 612",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 0.61,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0129-000357",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Laoag-Airport Rd - K0489 + 316 - K0490 + 574",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": 1.258,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10333863.28,
      "lengthMeters": 1258.0,
      "allocationPerStatedMeter": 10333.86,
      "rangesMeters": [
        [
          489316.0,
          490574.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Laoag-Airport Rd - K0489 + 316 - K0490 + 574",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.33,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0130-000388",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Olongapo-Bugallon Rd - K0133 + 241 - K0133+476",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": 0.235,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55319148.94,
      "lengthMeters": 235.0,
      "allocationPerStatedMeter": 55319.15,
      "rangesMeters": [
        [
          133241.0,
          133476.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Olongapo-Bugallon Rd - K0133 + 241 - K0133+476",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 1.09,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0172-001146",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Lapu-Lapu St - (S00113CB) Chainage 000 - Chainage 261",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "172",
      "lengthEvidence": "Lapu-Lapu St - (S00113CB) Chainage 000 - Chainage 261",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002834",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Laguinday Br. (B01164LZ) along Santiago-Tuguegarao Rd",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Laguinday Br. (B01164LZ) along Santiago-Tuguegarao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002836",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Maragatto Br. (B01163LZ) along Santiago-Tuguegarao Rd",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Maragatto Br. (B01163LZ) along Santiago-Tuguegarao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003230",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Santol Br. (B04502LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Santol Br. (B04502LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0293-003397",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Pangawan Br. 2 (B01264MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Pangawan Br. 2 (B01264MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0439-006242",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Pantaon, Sta. 0+000 - Sta. 0+500, Madamba, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 13000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 26000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Concreting of Road, Barangay Pantaon, Sta. 0+000 - Sta. 0+500, Madamba, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.06,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0453-006499",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Abalos St. (C0+000 to C0+274), Barangay Marulas, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "453",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Abalos St. (C0+000 to C0+274), Barangay Marulas, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006500",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Avocado St., Barangay Gen T. De Leon (C0+000 to C0+340), Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Avocado St., Barangay Gen T. De Leon (C0+000 to C0+340), Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006507",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along E. Lagdameo St. (C0+000 to C0+340), Barangay Parada, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along E. Lagdameo St. (C0+000 to C0+340), Barangay Parada, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006521",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along P. Angeles St. (C0+000 to C0+340), Barangay Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along P. Angeles St. (C0+000 to C0+340), Barangay Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006547",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage (Sectional Reblocking) Purok 6, along Warayan Road (C0+000 - C0+412.80), Barangay 185, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Roads and Drainage (Sectional Reblocking) Purok 6, along Warayan Road (C0+000 - C0+412.80), Barangay 185, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006552",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage along Castillo St. (C 0+000 - C 0+150) and San Diego St. (C 0+000 - C 0+174), Barangay 24, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Roads and Drainage along Castillo St. (C 0+000 - C 0+150) and San Diego St. (C 0+000 - C 0+174), Barangay 24, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006574",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage System at Dona Carmen Street (Chainage 0+000 - Chainage 0+187, Barangay Pag-Ibig sa Nayon, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Rehabilitation of Road and Drainage System at Dona Carmen Street (Chainage 0+000 - Chainage 0+187, Barangay Pag-Ibig sa Nayon, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006599",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road and Drainage System along Layug Street Street, Barangay 2 Zone 1 and its vicinity, Pasay City",
      "office": "South Manila District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Road and Drainage System along Layug Street Street, Barangay 2 Zone 1 and its vicinity, Pasay City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007066",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Guinzadan Central Road, Barangay Guinzadan Central, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Guinzadan Central Road, Barangay Guinzadan Central, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0508-007664",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage Canal at Barangay Paltao, Pulilan, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Construction of Road and Drainage Canal at Barangay Paltao, Pulilan, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0510-007703",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage System along Gil Carlos St., Virgen Delas Flores, City of Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road with Drainage System along Gil Carlos St., Virgen Delas Flores, City of Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0512-007744",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads with Drainage Canal, Peso St., Barangay Pandayan, City of Meycauayan, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "512",
      "lengthEvidence": "Construction of Roads with Drainage Canal, Peso St., Barangay Pandayan, City of Meycauayan, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0533-008184",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay San Isidro, Magalang, Pampanga, Sta. 0+000 - Sta. 0+420, Sta. 0+000 - Sta. 0+158, Sta. 0+000 - Sta. 0+585",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": 0.585,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22222222.22,
      "lengthMeters": 585.0,
      "allocationPerStatedMeter": 22222.22,
      "rangesMeters": [
        [
          0.0,
          420.0
        ],
        [
          0.0,
          158.0
        ],
        [
          0.0,
          585.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road and Drainage, Barangay San Isidro, Magalang, Pampanga, Sta. 0+000 - Sta. 0+420, Sta. 0+000 - Sta. 0+158, Sta. 0+000 - Sta. 0+585",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.91,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0541-008358",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Purok 1 and Purok 5, Barangay San Benito, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Rehabilitation of Road, Purok 1 and Purok 5, Barangay San Benito, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0560-008799",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion Ilaod, Ragay, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay Poblacion Ilaod, Ragay, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0562-008843",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mabca to Barangay Sto. Niño, Sagñay, Camarines Sur",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction of Road, Barangay Mabca to Barangay Sto. Niño, Sagñay, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0571-009021",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concrete Reconstruction of Igtalongon Road, Barangay Igtalongon, Igbaras, Iloilo",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Concrete Reconstruction of Igtalongon Road, Barangay Igtalongon, Igbaras, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0593-009509",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mag-Aso - Barangay Anibongon, Jaro, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Road, Barangay Mag-Aso - Barangay Anibongon, Jaro, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0593-009510",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Manaybanay - Sitio Moroboro Barangay Lanauan, Pastrana, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Road, Barangay Manaybanay - Sitio Moroboro Barangay Lanauan, Pastrana, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0597-009592",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Replacement of Bangon Bridge, Barangay Bangon, Gamay, Northern Samar (12.363663, 125.234747)",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Replacement of Bangon Bridge, Barangay Bangon, Gamay, Northern Samar (12.363663, 125.234747)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010056",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Barongis, Libungan, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Road, Barangay Barongis, Libungan, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010078",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Guinto St., Barangay San Isidro, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road, Guinto St., Barangay San Isidro, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010085",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Salinda St., Barangay Lagao, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 13000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road, Salinda St., Barangay Lagao, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0127-000316",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Basilan Circumferential Rd (Isabela-Lamitan Rd) - K0025 + 1586 - K0027 + 143",
      "office": "Central Office",
      "amountPesos": 12996000,
      "lengthKm": 0.557,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23332136.45,
      "lengthMeters": 557.0,
      "allocationPerStatedMeter": 23332.14,
      "rangesMeters": [
        [
          26586.0,
          27143.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "127",
      "lengthEvidence": "Basilan Circumferential Rd (Isabela-Lamitan Rd) - K0025 + 1586 - K0027 + 143",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.72,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0147-000716",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Ormoc-Albuera Div Rd - K1012 + (-515) - K1012 + 195",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 12946000,
      "lengthKm": 0.71,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18233802.82,
      "lengthMeters": 710.0,
      "allocationPerStatedMeter": 18233.8,
      "rangesMeters": [
        [
          1011485.0,
          1012195.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Ormoc-Albuera Div Rd - K1012 + (-515) - K1012 + 195",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.76,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0532-008172",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Road at Barangay San Agustin, Magalang, Pampanga",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 12915000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Rehabilitation/Improvement of Road at Barangay San Agustin, Magalang, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0452-006469",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads and Drainage (Sectional Reblocking) along Santol St. (C0+000 - C0+181) and Mangga St. (C0+000 - C0+202), Barangay 188, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 12900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "452",
      "lengthEvidence": "Construction of Roads and Drainage (Sectional Reblocking) along Santol St. (C0+000 - C0+181) and Mangga St. (C0+000 - C0+202), Barangay 188, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0289-003320",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Guisguis Br. (B02947LZ) along Lutucan-Guisguis Port Rd",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 12870000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Guisguis Br. (B02947LZ) along Lutucan-Guisguis Port Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0160-000938",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Maragondon-Magallanes-Amuyong Rd - K0090 + 108 - K0090 + 783",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 12825000,
      "lengthKm": 0.675,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19000000.0,
      "lengthMeters": 675.0,
      "allocationPerStatedMeter": 19000.0,
      "rangesMeters": [
        [
          90108.0,
          90783.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "160",
      "lengthEvidence": "Maragondon-Magallanes-Amuyong Rd - K0090 + 108 - K0090 + 783",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 33150.54,
      "peerRateMultiple": 0.57,
      "peerRecords": 20,
      "peerBand": "636–<923.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 80288.4325,
      "graphUpperFence": 114733.53999999998
    },
    {
      "id": "HB10858-3-0491-007295",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 0+000 - Sta. 1+000) including Construction of Slope Protection Structure (Sta. 0+396 - Sta. 0+477) at Barangay Ugad, Tumauini, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 12800000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 12800000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 12800.0,
      "rangesMeters": [
        [
          0.0,
          1000.0
        ],
        [
          396.0,
          477.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Road (Sta. 0+000 - Sta. 1+000) including Construction of Slope Protection Structure (Sta. 0+396 - Sta. 0+477) at Barangay Ugad, Tumauini, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.51,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0247-002481",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Military Cut-off Rd - K0249 + (-830) - K0249 + 182 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Central Office",
      "amountPesos": 12791000,
      "lengthKm": 1.012,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12639328.06,
      "lengthMeters": 1012.0,
      "allocationPerStatedMeter": 12639.33,
      "rangesMeters": [
        [
          248170.0,
          249182.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "Military Cut-off Rd - K0249 + (-830) - K0249 + 182 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 1.0,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0477-006994",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Rehabilitation at Barangay Atok Trail, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 12765000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Road Rehabilitation at Barangay Atok Trail, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0158-000916",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0624 + 489 - K0625 + 000",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 12742000,
      "lengthKm": 0.511,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24935420.74,
      "lengthMeters": 511.0,
      "allocationPerStatedMeter": 24935.42,
      "rangesMeters": [
        [
          624489.0,
          625000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0624 + 489 - K0625 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.63,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0119-000175",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila-Batangas Rd - K0104 + 166 - K0104 + 332",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 12686000,
      "lengthKm": 0.166,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 76421686.75,
      "lengthMeters": 166.0,
      "allocationPerStatedMeter": 76421.69,
      "rangesMeters": [
        [
          104166.0,
          104332.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Manila-Batangas Rd - K0104 + 166 - K0104 + 332",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 1.64,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0144-000670",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Isaac O. Tolentino Ave. - K0062 + 146 - K0062 + 850",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 12672000,
      "lengthKm": 0.704,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18000000.0,
      "lengthMeters": 704.0,
      "allocationPerStatedMeter": 18000.0,
      "rangesMeters": [
        [
          62146.0,
          62850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Isaac O. Tolentino Ave. - K0062 + 146 - K0062 + 850",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.75,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0208-001795",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Aklan East Rd - K0285 + 605 - K0285 + 714, K0285 + 877 - K0286 + 071",
      "office": "Aklan District Engineering Office",
      "amountPesos": 12652000,
      "lengthKm": 0.303,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 41755775.58,
      "lengthMeters": 303.0,
      "allocationPerStatedMeter": 41755.78,
      "rangesMeters": [
        [
          285605.0,
          285714.0
        ],
        [
          285877.0,
          286071.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Aklan East Rd - K0285 + 605 - K0285 + 714, K0285 + 877 - K0286 + 071",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 0.84,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0133-000450",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Noveleta-Naic-Tagaytay Rd - K0049 + 621 - K0050 + 043",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 12636000,
      "lengthKm": 0.422,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29943127.96,
      "lengthMeters": 422.0,
      "allocationPerStatedMeter": 29943.13,
      "rangesMeters": [
        [
          49621.0,
          50043.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Noveleta-Naic-Tagaytay Rd - K0049 + 621 - K0050 + 043",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.93,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0164-001007",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0093+934 - K0094 + 533",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 12621000,
      "lengthKm": 0.599,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21070116.86,
      "lengthMeters": 599.0,
      "allocationPerStatedMeter": 21070.12,
      "rangesMeters": [
        [
          93934.0,
          94533.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0093+934 - K0094 + 533",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.53,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0293-003396",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Bolibac Br. 1 (B00619MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 12610000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Bolibac Br. 1 (B00619MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0533-008188",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay San Roque, Magalang, Pampanga, Sta. 0+000 - Sta. 0+400, Sta. 0+000 - Sta. 0+755",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 12600000,
      "lengthKm": 0.755,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 16688741.72,
      "lengthMeters": 755.0,
      "allocationPerStatedMeter": 16688.74,
      "rangesMeters": [
        [
          0.0,
          400.0
        ],
        [
          0.0,
          755.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road and Drainage, Barangay San Roque, Magalang, Pampanga, Sta. 0+000 - Sta. 0+400, Sta. 0+000 - Sta. 0+755",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.86,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0143-000639",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sn Fernando-Bagulin Rd - K0274 + 1044 - K0276 + 000",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 12593000,
      "lengthKm": 0.956,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13172594.14,
      "lengthMeters": 956.0,
      "allocationPerStatedMeter": 13172.59,
      "rangesMeters": [
        [
          275044.0,
          276000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Sn Fernando-Bagulin Rd - K0274 + 1044 - K0276 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.55,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0120-000191",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Calamba-Sta Cruz-Famy Jct Rd - K0057 + 939 - K0058 + 400, K0059 + 599 - K0059 + 712",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 12558000,
      "lengthKm": 0.574,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21878048.78,
      "lengthMeters": 574.0,
      "allocationPerStatedMeter": 21878.05,
      "rangesMeters": [
        [
          57939.0,
          58400.0
        ],
        [
          59599.0,
          59712.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Calamba-Sta Cruz-Famy Jct Rd - K0057 + 939 - K0058 + 400, K0059 + 599 - K0059 + 712",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 0.46,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0131-000399",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Batangas-Quezon Rd - K0134 + 683 - K0134 + 854",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 12514000,
      "lengthKm": 0.171,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 73181286.55,
      "lengthMeters": 171.0,
      "allocationPerStatedMeter": 73181.29,
      "rangesMeters": [
        [
          134683.0,
          134854.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Batangas-Quezon Rd - K0134 + 683 - K0134 + 854",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 1.45,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0129-000349",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "AH Lacson Ave - K0010 + (-337.40) - K0010 + 077",
      "office": "North Manila District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": 0.41439999999999966,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30164092.66,
      "lengthMeters": 414.4,
      "allocationPerStatedMeter": 30164.09,
      "rangesMeters": [
        [
          9662.6,
          10077.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "AH Lacson Ave - K0010 + (-337.40) - K0010 + 077",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.93,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0290-003332",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Supa Br. (B00314PN) along Iloilo-Antique Rd",
      "office": "Antique District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "290",
      "lengthEvidence": "Supa Br. (B00314PN) along Iloilo-Antique Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006537",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage Systems, General Mascardo, Barangay 137, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Road and Drainage Systems, General Mascardo, Barangay 137, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006545",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage (Sectional Reblocking) along St. John St.(C0+000 - C0+143) and Gumamela St. (C0+143 - C0+360), Barangay 186 and 185, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Roads and Drainage (Sectional Reblocking) along St. John St.(C0+000 - C0+143) and Gumamela St. (C0+143 - C0+360), Barangay 186 and 185, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006686",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Anat-Anuplig Falls Road, Adams, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Anat-Anuplig Falls Road, Adams, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006749",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ambalite, Pugo, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay Ambalite, Pugo, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006772",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Fermin-San Jose, Caba, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Barangay San Fermin-San Jose, Caba, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006786",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Puraw Kadaratan, Purok 5 Barangay Ambalite, Pugo, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Sitio Puraw Kadaratan, Purok 5 Barangay Ambalite, Pugo, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0489-007265",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Paved Road (Sta. 0+000 -Sta. 0+647. Sta. 0+668 - Sta. 1+021), Brarangay Carmencita, Delfin Albano, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 12500000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 12500.0,
      "rangesMeters": [
        [
          0.0,
          647.0
        ],
        [
          668.0,
          1021.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Rehabilitation of Paved Road (Sta. 0+000 -Sta. 0+647. Sta. 0+668 - Sta. 1+021), Brarangay Carmencita, Delfin Albano, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.5,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0500-007486",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Purok 2, Purok 6, and Purok 7, Barangay Masaya Norte, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Barangay Road, Purok 2, Purok 6, and Purok 7, Barangay Masaya Norte, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0532-008176",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay Ayala, Magalang, Pampanga, Sta. 0+000 - Sta. 0+568",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": 0.568,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22007042.25,
      "lengthMeters": 568.0,
      "allocationPerStatedMeter": 22007.04,
      "rangesMeters": [
        [
          0.0,
          568.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Construction of Road and Drainage, Barangay Ayala, Magalang, Pampanga, Sta. 0+000 - Sta. 0+568",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.9,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0571-009028",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Napnapan Norte Bridge, Barangay Napnapan Norte, Tigbauan, Iloilo",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Napnapan Norte Bridge, Barangay Napnapan Norte, Tigbauan, Iloilo",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009427",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Langin - Barangay Bullogan, Dumanjug, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Construction of Road at Barangay Langin - Barangay Bullogan, Dumanjug, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009430",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Balhaan, Barangay Looc - Sitio Kaigatan, Ginatilan, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Construction of Road at Sitio Balhaan, Barangay Looc - Sitio Kaigatan, Ginatilan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009431",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Colansehan - Sitio Libo, Barangay Lepanto, Alegria, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Construction of Road at Sitio Colansehan - Sitio Libo, Barangay Lepanto, Alegria, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009435",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Upper Banigon, Barangay Salamanca, Ginatilan, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 12500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Construction of Road at Sitio Upper Banigon, Barangay Salamanca, Ginatilan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0133-000457",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagaytay-Manila via Silang Rd - K0054 + 600 - K0054 + 876",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 12492000,
      "lengthKm": 0.276,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45260869.57,
      "lengthMeters": 276.0,
      "allocationPerStatedMeter": 45260.87,
      "rangesMeters": [
        [
          54600.0,
          54876.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Tagaytay-Manila via Silang Rd - K0054 + 600 - K0054 + 876",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.9,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0120-000183",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Tanza-Trece Martires City-Indang Rd - K0040 + 701 - K0041 + 056",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 12471000,
      "lengthKm": 0.355,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35129577.46,
      "lengthMeters": 355.0,
      "allocationPerStatedMeter": 35129.58,
      "rangesMeters": [
        [
          40701.0,
          41056.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Tanza-Trece Martires City-Indang Rd - K0040 + 701 - K0041 + 056",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 0.73,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0150-000771",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LT) - K0952 + 400 - K0953 + 138, K0955 + 383.15 - K0955 + 550",
      "office": "Central Office",
      "amountPesos": 12431000,
      "lengthKm": 0.9048499999999767,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 13738188.65,
      "lengthMeters": 904.85,
      "allocationPerStatedMeter": 13738.19,
      "rangesMeters": [
        [
          952400.0,
          953138.0
        ],
        [
          955383.15,
          955550.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "150",
      "lengthEvidence": "Maharlika Highway (LT) - K0952 + 400 - K0953 + 138, K0955 + 383.15 - K0955 + 550",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 0.58,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0132-000430",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0055 + 000 - K0055 + 170, K0055 + 587 - K0055 + 737",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 12427000,
      "lengthKm": 0.32,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 38834375.0,
      "lengthMeters": 320.0,
      "allocationPerStatedMeter": 38834.38,
      "rangesMeters": [
        [
          55000.0,
          55170.0
        ],
        [
          55587.0,
          55737.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0055 + 000 - K0055 + 170, K0055 + 587 - K0055 + 737",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 1.2,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0570-009003",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Oracon - Sitio Bankiling- Sitio Casilian Road, Sta. 1 + 800 - Sta. 2 + 420, Barangay Oracon Sur and Barangay Oracon Norte, Sibunag and Nueva Valencia, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 12400000,
      "lengthKm": 0.62,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 620.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          1800.0,
          2420.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Construction of Road, Oracon - Sitio Bankiling- Sitio Casilian Road, Sta. 1 + 800 - Sta. 2 + 420, Barangay Oracon Sur and Barangay Oracon Norte, Sibunag and Nueva Valencia, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.82,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0132-000422",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Indang-Alfonso via Luksuhin Rd - K0065 + 239 - K0065 + 796",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 12312000,
      "lengthKm": 0.557,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22104129.26,
      "lengthMeters": 557.0,
      "allocationPerStatedMeter": 22104.13,
      "rangesMeters": [
        [
          65239.0,
          65796.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Indang-Alfonso via Luksuhin Rd - K0065 + 239 - K0065 + 796",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.69,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0488-007236",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 0+820 - Sta. 2+158), Barangay Alinguigan 2nd to Barangay Alinguigan 1st, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 12250000,
      "lengthKm": 1.338,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9155455.9,
      "lengthMeters": 1338.0,
      "allocationPerStatedMeter": 9155.46,
      "rangesMeters": [
        [
          820.0,
          2158.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Rehabilitation of Road (Sta. 0+820 - Sta. 2+158), Barangay Alinguigan 2nd to Barangay Alinguigan 1st, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.37,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0457-006562",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainges along P. Marcos St. (C0+000 to C0+110), Barangay Malinta, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 12246000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Rehabilitation of Roads and Drainges along P. Marcos St. (C0+000 to C0+110), Barangay Malinta, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003035",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Salocon Br. (B00279PN) along Roxas City Bdry-Panitan-Bailan Rd",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 12230000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Salocon Br. (B00279PN) along Roxas City Bdry-Panitan-Bailan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0137-000520",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Catarman-Laoang Rd - K0778 + 765 - K0778 + 1000",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 12224000,
      "lengthKm": 0.235,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52017021.28,
      "lengthMeters": 235.0,
      "allocationPerStatedMeter": 52017.02,
      "rangesMeters": [
        [
          778765.0,
          779000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Catarman-Laoang Rd - K0778 + 765 - K0778 + 1000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 1.03,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0487-007228",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Section 1: Sta. 0+017 - Sta. 0+592, Section 2: Sta. 0+370 - Sta. 0+820) at Barangay Fugu Abajo, Tumauini, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 12210000,
      "lengthKm": 0.803,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 15205479.45,
      "lengthMeters": 803.0,
      "allocationPerStatedMeter": 15205.48,
      "rangesMeters": [
        [
          17.0,
          592.0
        ],
        [
          370.0,
          820.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Rehabilitation of Road (Section 1: Sta. 0+017 - Sta. 0+592, Section 2: Sta. 0+370 - Sta. 0+820) at Barangay Fugu Abajo, Tumauini, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.78,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0169-001092",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Gamu-Roxas Rd - K0391 + 1130 - K0393 + 000",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 12200000,
      "lengthKm": 0.87,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14022988.51,
      "lengthMeters": 870.0,
      "allocationPerStatedMeter": 14022.99,
      "rangesMeters": [
        [
          392130.0,
          393000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Gamu-Roxas Rd - K0391 + 1130 - K0393 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.44,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0590-009456",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Labangon, Cebu City, Cebu",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 12200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction of Road, Barangay Labangon, Cebu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0265-002791",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Nalbu Br. (B01089LZ) along Maharlika Highway ( Cagayan Valley Rd)",
      "office": "Central Office",
      "amountPesos": 12195000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Nalbu Br. (B01089LZ) along Maharlika Highway ( Cagayan Valley Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0146-000697",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Bacolod-City Bdry Rd - K0005 + 652.12 - K0006 + 000",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 12160000,
      "lengthKm": 0.34788000000000013,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34954582.04,
      "lengthMeters": 347.88,
      "allocationPerStatedMeter": 34954.58,
      "rangesMeters": [
        [
          5652.12,
          6000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Bacolod-City Bdry Rd - K0005 + 652.12 - K0006 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 1.07,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0206-001746",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Mindoro Oriental/Occidental East Coastal Rd - K0218 + 000 - K0218 + 380",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 12150000,
      "lengthKm": 0.38,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31973684.21,
      "lengthMeters": 380.0,
      "allocationPerStatedMeter": 31973.68,
      "rangesMeters": [
        [
          218000.0,
          218380.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Mindoro Oriental/Occidental East Coastal Rd - K0218 + 000 - K0218 + 380",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 0.62,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0138-000538",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 030 - Chainage 839",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "amountPesos": 12135000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Zamboanga West Coastal Rd (Sibuco-Limpapa Section) - (S01152MN) Chainage 030 - Chainage 839",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0144-000660",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Paniqui-Ramos Rd - K0149 + 904 - K0150 + 562",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 12107000,
      "lengthKm": 0.658,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18399696.05,
      "lengthMeters": 658.0,
      "allocationPerStatedMeter": 18399.7,
      "rangesMeters": [
        [
          149904.0,
          150562.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Paniqui-Ramos Rd - K0149 + 904 - K0150 + 562",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.77,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0279-003095",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "San Benito Br. (B00085LT) along Sta Fe-Pastrana-Dagami Rd",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 12105000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "San Benito Br. (B00085LT) along Sta Fe-Pastrana-Dagami Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0491-007293",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Section 1: Sta. 11+360 - Sta. 11+560, Section 2: Sta. 0+000 - Sta. 0+445) including Construction of Slope Protection Structure (Section 2: Sta. 0+000 - Sta. 0+100, Sta. 0+200 - Sta. 0+445) at Barangay Caligayan, Tumauini, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 12100000,
      "lengthKm": 0.645,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 18759689.92,
      "lengthMeters": 645.0,
      "allocationPerStatedMeter": 18759.69,
      "rangesMeters": [
        [
          11360.0,
          11560.0
        ],
        [
          0.0,
          445.0
        ],
        [
          0.0,
          100.0
        ],
        [
          200.0,
          445.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Road (Section 1: Sta. 11+360 - Sta. 11+560, Section 2: Sta. 0+000 - Sta. 0+445) including Construction of Slope Protection Structure (Section 2: Sta. 0+000 - Sta. 0+100, Sta. 0+200 - Sta. 0+445) at Barangay Caligayan, Tumauini, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.77,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0137-000517",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Catarman-Calbayog Rd - K0763 + 106 - K0763 + 503, K0763 + 642 - K0764 + 000, K0764 + 667 - K0765 + 145",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 12094000,
      "lengthKm": 1.233,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 9808596.92,
      "lengthMeters": 1233.0,
      "allocationPerStatedMeter": 9808.6,
      "rangesMeters": [
        [
          763106.0,
          763503.0
        ],
        [
          763642.0,
          764000.0
        ],
        [
          764667.0,
          765145.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Catarman-Calbayog Rd - K0763 + 106 - K0763 + 503, K0763 + 642 - K0764 + 000, K0764 + 667 - K0765 + 145",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.32,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0251-002535",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Construction of Solar Lights along Iligan City Diversion Road, Barangay Hinaplanon, K1523 + (-820) - K1523 + 267, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 12080000,
      "lengthKm": 1.087,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11113155.47,
      "lengthMeters": 1087.0,
      "allocationPerStatedMeter": 11113.16,
      "rangesMeters": [
        [
          1522180.0,
          1523267.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Construction of Solar Lights along Iligan City Diversion Road, Barangay Hinaplanon, K1523 + (-820) - K1523 + 267, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 0.88,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0112-000039",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0519 + 000 - K0519 + 249, K0536 + 120 - K0536 + 190",
      "office": "Central Office",
      "amountPesos": 12074000,
      "lengthKm": 0.319,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 37849529.78,
      "lengthMeters": 319.0,
      "allocationPerStatedMeter": 37849.53,
      "rangesMeters": [
        [
          519000.0,
          519249.0
        ],
        [
          536120.0,
          536190.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Maharlika Highway (LZ) - K0519 + 000 - K0519 + 249, K0536 + 120 - K0536 + 190",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 0.81,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0171-001132",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Balasan-Carles Rd - K0176 + 683 - K0177 + 067",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 12034000,
      "lengthKm": 0.384,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31338541.67,
      "lengthMeters": 384.0,
      "allocationPerStatedMeter": 31338.54,
      "rangesMeters": [
        [
          176683.0,
          177067.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Balasan-Carles Rd - K0176 + 683 - K0177 + 067",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.99,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0128-000348",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Zapote-Alabang Rd - K0023 + 408 - K0023 + 538",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 12030000,
      "lengthKm": 0.13,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 92538461.54,
      "lengthMeters": 130.0,
      "allocationPerStatedMeter": 92538.46,
      "rangesMeters": [
        [
          23408.0,
          23538.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Zapote-Alabang Rd - K0023 + 408 - K0023 + 538",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 1.83,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0275-003011",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Labi Br. (B05024LZ) along Nueva Ecija-Aurora Rd",
      "office": "Nueva Ecija 2nd District Engineering Office",
      "amountPesos": 12020000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Labi Br. (B05024LZ) along Nueva Ecija-Aurora Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0212-001862",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Coron-Busuanga Rd - K0007 + 932 - K0008 + 009, K0008 + 187 - K0008 + 250, K0008 + 427 - K0008 + 548",
      "office": "Palawan 1st District Engineering Office",
      "amountPesos": 12006000,
      "lengthKm": 0.261,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 46000000.0,
      "lengthMeters": 261.0,
      "allocationPerStatedMeter": 46000.0,
      "rangesMeters": [
        [
          7932.0,
          8009.0
        ],
        [
          8187.0,
          8250.0
        ],
        [
          8427.0,
          8548.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Coron-Busuanga Rd - K0007 + 932 - K0008 + 009, K0008 + 187 - K0008 + 250, K0008 + 427 - K0008 + 548",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.13,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0135-000482",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0058+293 - K0076+883 (Intermittent)",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": 18.59,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 645508.34,
      "lengthMeters": 18590.0,
      "allocationPerStatedMeter": 645.51,
      "rangesMeters": [
        [
          58293.0,
          76883.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Puerto Princesa South Rd - K0058+293 - K0076+883 (Intermittent)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 16462.86,
      "peerRateMultiple": 0.04,
      "peerRecords": 38,
      "peerBand": "≥3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 41132.131250000006,
      "graphUpperFence": 57035.51000000001
    },
    {
      "id": "HB10858-3-0142-000631",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Ma. Clara St. (S02454LZ) K0008 + 421 - K0008 + 749",
      "office": "North Manila District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": 0.328,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36585365.85,
      "lengthMeters": 328.0,
      "allocationPerStatedMeter": 36585.37,
      "rangesMeters": [
        [
          8421.0,
          8749.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "Ma. Clara St. (S02454LZ) K0008 + 421 - K0008 + 749",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 1.12,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0181-001292",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1015 + 160 - K1015 + 196",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": 0.036,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 333333333.33,
      "lengthMeters": 36.0,
      "allocationPerStatedMeter": 333333.33,
      "rangesMeters": [
        [
          1015160.0,
          1015196.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1015 + 160 - K1015 + 196",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 1.57,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0211-001836",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Midsayap-Marbel Rd (S00275MN) - K1788 + 849 - K1789 + 246",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": 0.397,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30226700.25,
      "lengthMeters": 397.0,
      "allocationPerStatedMeter": 30226.7,
      "rangesMeters": [
        [
          1788849.0,
          1789246.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "211",
      "lengthEvidence": "Midsayap-Marbel Rd (S00275MN) - K1788 + 849 - K1789 + 246",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 0.58,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0242-002409",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Asid-Tigbao-Bara-Malbug Road (Construction of Tagbon Bridge), Masbate, Sta. 22+730",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "242",
      "lengthEvidence": "Asid-Tigbao-Bara-Malbug Road (Construction of Tagbon Bridge), Masbate, Sta. 22+730",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002824",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Pasong Diablo Br. (East) (B01810LZ) along South Super H-way East Service Rd",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Pasong Diablo Br. (East) (B01810LZ) along South Super H-way East Service Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002825",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Pasong Diablo Br. (West) (B01852LZ) along South Super H-way West Service Rd",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Pasong Diablo Br. (West) (B01852LZ) along South Super H-way West Service Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0268-002856",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Macatoc Br. (B00026MR) along CSR Jct-Minas Rd",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Macatoc Br. (B00026MR) along CSR Jct-Minas Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0268-002861",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Sumorong Br. (B00352PW) along Palawan Circum. Rd",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Sumorong Br. (B00352PW) along Palawan Circum. Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0268-002863",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Bangon Br. 1 (B00045TL) along Tablas Circumferential Rd",
      "office": "Romblon District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Bangon Br. 1 (B00045TL) along Tablas Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0269-002876",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Poo Br. (B00013SJ) along Luyang-Poo-Lazi Rd",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Poo Br. (B00013SJ) along Luyang-Poo-Lazi Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0272-002934",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tiniguiban Br. (B00391LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Tiniguiban Br. (B00391LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002951",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Bauyan Br. (B01803MN) along Maharlika Highway( Malabang-Dobleston-Tukuran Rd)",
      "office": "Central Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Bauyan Br. (B01803MN) along Maharlika Highway( Malabang-Dobleston-Tukuran Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0277-003044",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Casalsagan Br. (B00457PN) along Cabatuan-New Lucena-Banga-Bante Rd",
      "office": "Iloilo 4th District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Casalsagan Br. (B00457PN) along Cabatuan-New Lucena-Banga-Bante Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003083",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Arellano-Palma Br. (B00422CB) along Arellano Blvd",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Arellano-Palma Br. (B00422CB) along Arellano Blvd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003098",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Lunsoc Br. (B00244LT) along Ormoc-Baybay-Southern Leyte Bdry Rd",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Lunsoc Br. (B00244LT) along Ormoc-Baybay-Southern Leyte Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003143",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Ladi Br. (B02197MN) along Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Ladi Br. (B02197MN) along Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003181",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tuwao-an Br. (B00768MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Tuwao-an Br. (B00768MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003183",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Ugpason Br. 3 (B00785MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Ugpason Br. 3 (B00785MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0291-003368",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Osukan Br. (B01181MN) along Liloy-Siocon Rd",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Osukan Br. (B01181MN) along Liloy-Siocon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006406",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Drainage at Golden Acres, Barangay Talon 1, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Construction of Road including Drainage at Golden Acres, Barangay Talon 1, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0450-006445",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads, Barangay Fortune Road Network at Sunnyville 3 Subdivision (Chainage 0+000 - Chainage 0+426), El Rosario Village (Chainage 0+000 - Chainage 0+316), Barangay Fortune, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "450",
      "lengthEvidence": "Rehabilitation of Roads, Barangay Fortune Road Network at Sunnyville 3 Subdivision (Chainage 0+000 - Chainage 0+426), El Rosario Village (Chainage 0+000 - Chainage 0+316), Barangay Fortune, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0450-006446",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of San Isidro Village 1 Road Network, Including Laterals, at Cardinal St. (Chainage 0+000 - Chainage 0+054), Galatians St. (Chainage 0+000 - Chainage 0+165), Colossians St. (Chainage 0+000 - Chainage 0+188), Spring St. (Chainage 0+000 - Chainage 0+300), Corinthians St. (Chainage 0+000 - Chainage 0+080), Barangay Concepcion Uno, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "450",
      "lengthEvidence": "Rehabilitation of San Isidro Village 1 Road Network, Including Laterals, at Cardinal St. (Chainage 0+000 - Chainage 0+054), Galatians St. (Chainage 0+000 - Chainage 0+165), Colossians St. (Chainage 0+000 - Chainage 0+188), Spring St. (Chainage 0+000 - Chainage 0+300), Corinthians St. (Chainage 0+000 - Chainage 0+080), Barangay Concepcion Uno, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006510",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Hermogena St. (C0+000 to C0+291), Barangay Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Hermogena St. (C0+000 to C0+291), Barangay Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0457-006556",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage along Sabalo Street (C 0+000 - C 0+300), Barangay 14, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Rehabilitation of Roads and Drainage along Sabalo Street (C 0+000 - C 0+300), Barangay 14, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006762",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nagtagaan, Rosario La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay Nagtagaan, Rosario La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006979",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Modern Site West, Aurora Hill, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Construction of Road at Barangay Modern Site West, Aurora Hill, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-006993",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Pinsao Proper, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Rehabilitation of Road, Barangay Pinsao Proper, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007177",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road along Barangay Libertad (Sinamar), Abulug, Cagayan",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Road along Barangay Libertad (Sinamar), Abulug, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007178",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road along Barangay Libertad (Siniata), Abulug, Cagayan",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Road along Barangay Libertad (Siniata), Abulug, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007189",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Lapi, Peñablanca, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Construction of Bridge, Barangay Lapi, Peñablanca, Cagayan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007190",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Minanga, Peñablanca, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Bridge, Barangay Minanga, Peñablanca, Cagayan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007195",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Tana, Amulung, Cagayan (17.821435, 121.687557 - 17.821315, 121.689155)",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Bridge, Barangay Tana, Amulung, Cagayan (17.821435, 121.687557 - 17.821315, 121.689155)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0489-007263",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 6+175 - Sta. 6+975), Barangay Mozzozzin Sur-Buenavista- Naganacan, Santa Maria, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15000000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 15000.0,
      "rangesMeters": [
        [
          6175.0,
          6975.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of Road (Sta. 6+175 - Sta. 6+975), Barangay Mozzozzin Sur-Buenavista- Naganacan, Santa Maria, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.77,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0499-007473",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+860, Barangay Bannawag - Barangay San Jose, Santiago City, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": 0.86,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13953488.37,
      "lengthMeters": 860.0,
      "allocationPerStatedMeter": 13953.49,
      "rangesMeters": [
        [
          0.0,
          860.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+860, Barangay Bannawag - Barangay San Jose, Santiago City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.72,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0501-007514",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+560 - Sta. 1+460, Barangay Diarao - Barangay San Sebastian, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": 0.9,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 900.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          560.0,
          1460.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Sta. 0+560 - Sta. 1+460, Barangay Diarao - Barangay San Sebastian, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.69,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0511-007737",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Road at Barangay Sumapang Matanda, City of Malolos, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation/Improvement of Road at Barangay Sumapang Matanda, City of Malolos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0518-007863",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Aliaga IS, Barangay Santiago, Aliaga Nueva Ecija (KATUBIGAN- Kalsada Tungo sa Patubigan), Sta. 0+000 - Sta. 1+068",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": 1.068,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11235955.06,
      "lengthMeters": 1068.0,
      "allocationPerStatedMeter": 11235.96,
      "rangesMeters": [
        [
          0.0,
          1068.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Road, Aliaga IS, Barangay Santiago, Aliaga Nueva Ecija (KATUBIGAN- Kalsada Tungo sa Patubigan), Sta. 0+000 - Sta. 1+068",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.45,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0528-008104",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road with Drainage Canal at Purok 1 to 6, Brgy. Rizal, Guagua, Pampanga, Sta.0+000 - Sta.0+850",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": 0.85,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14117647.06,
      "lengthMeters": 850.0,
      "allocationPerStatedMeter": 14117.65,
      "rangesMeters": [
        [
          0.0,
          850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Improvement of Road with Drainage Canal at Purok 1 to 6, Brgy. Rizal, Guagua, Pampanga, Sta.0+000 - Sta.0+850",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.73,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0528-008105",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road with Drainage Canal at Purok 1 to 6, Brgy. Rizal, Guagua, Pampanga, Sta.0+000 - Sta.0+850",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": 0.85,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14117647.06,
      "lengthMeters": 850.0,
      "allocationPerStatedMeter": 14117.65,
      "rangesMeters": [
        [
          0.0,
          850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Improvement of Road with Drainage Canal at Purok 1 to 6, Brgy. Rizal, Guagua, Pampanga, Sta.0+000 - Sta.0+850",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.73,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0541-008366",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay San Guillermo, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road at Barangay San Guillermo, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008397",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge (FB00007LZ) along Punta - Open Canal Diversion Road, Barangay Anabu - Barangay Malagasang, Imus, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Construction of Bridge (FB00007LZ) along Punta - Open Canal Diversion Road, Barangay Anabu - Barangay Malagasang, Imus, Cavite",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008486",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Roque, San Pedro City, Laguna",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Construction of Road, Barangay San Roque, San Pedro City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008535",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Domoit, Lucena City, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Barangay Domoit, Lucena City, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008536",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Guisguis Talon, Sariaya, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Barangay Guisguis Talon, Sariaya, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009084",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Bartolome Extension and Andrew Street, Barangay Taculing, Bacolod City, 10.6603, 122.9588",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Rehabilitation of Road at Bartolome Extension and Andrew Street, Barangay Taculing, Bacolod City, 10.6603, 122.9588",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009258",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Cantabon, Siquijor, Siquijor",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road Barangay Cantabon, Siquijor, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009265",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pisong B, Maria, Siquijor",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road, Barangay Pisong B, Maria, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009410",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Kanguha - Kabalaasnan - Kambanog Road at Barangays Kanguha, Kabalaasnan and Kambanog, Dumanjug, Cebu, Start 10.007358, 123.479 End 10.005599, 123.481198",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Construction of Kanguha - Kabalaasnan - Kambanog Road at Barangays Kanguha, Kabalaasnan and Kambanog, Dumanjug, Cebu, Start 10.007358, 123.479 End 10.005599, 123.481198",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009444",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Tubod-Bitoon - Kanghumaod Road at Barangay Tubod- Bitoon, Dumanjug, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Improvement of Tubod-Bitoon - Kanghumaod Road at Barangay Tubod- Bitoon, Dumanjug, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0597-009591",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of San Jose - San Antonio - Bonifacio Road (Sta. 0+370 - Sta. 0+850) Catubig, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": 0.48,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 480.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          370.0,
          850.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of San Jose - San Antonio - Bonifacio Road (Sta. 0+370 - Sta. 0+850) Catubig, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.02,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0599-009636",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+414, Purok 3, Barangay Payahan, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": 0.414,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28985507.25,
      "lengthMeters": 414.0,
      "allocationPerStatedMeter": 28985.51,
      "rangesMeters": [
        [
          0.0,
          414.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+414, Purok 3, Barangay Payahan, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.18,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0602-009700",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Concreting from Barangay Mangop to Barangay Morob, Leon T. Postigo, Zamboanga del Norte",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Road Concreting from Barangay Mangop to Barangay Morob, Leon T. Postigo, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009703",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Concreting in Barangay Balas, Labason, Zamboanga del Norte",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Road Concreting in Barangay Balas, Labason, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009844",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sitio Quiboro Road, Barangay Poblacion to Sitio Campana Road, Barangay Pandan, Municipality of Mambajao, Province of Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Sitio Quiboro Road, Barangay Poblacion to Sitio Campana Road, Barangay Pandan, Municipality of Mambajao, Province of Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009848",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Mambajao Central School), Barangay Poblacion, Municipality of Mambajao, Province of Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Road (Mambajao Central School), Barangay Poblacion, Municipality of Mambajao, Province of Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009849",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Mambajao National High School), Barangay Poblacion, Municipality of Mambajao, Province of Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Road (Mambajao National High School), Barangay Poblacion, Municipality of Mambajao, Province of Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0626-010181",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sta. 0+000 - Sta. 0+420, Purok 1A, Barangay Ampayon, Butuan City",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 12000000,
      "lengthKm": 0.42,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 420.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          420.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Concreting of Road, Sta. 0+000 - Sta. 0+420, Purok 1A, Barangay Ampayon, Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.17,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0172-001144",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Argao-Moalboal Rd - K0064 + 404 - K0064 + 995",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 11999000,
      "lengthKm": 0.591,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20302876.48,
      "lengthMeters": 591.0,
      "allocationPerStatedMeter": 20302.88,
      "rangesMeters": [
        [
          64404.0,
          64995.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "172",
      "lengthEvidence": "Argao-Moalboal Rd - K0064 + 404 - K0064 + 995",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.64,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0233-002245",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Banga-Tupi-Malungon Road (Banga-Tupi Section) - Sta. 17+285 - Sta. 17+316.5, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 11970000,
      "lengthKm": 0.0315,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 380000000.0,
      "lengthMeters": 31.5,
      "allocationPerStatedMeter": 380000.0,
      "rangesMeters": [
        [
          17285.0,
          17316.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "233",
      "lengthEvidence": "Banga-Tupi-Malungon Road (Banga-Tupi Section) - Sta. 17+285 - Sta. 17+316.5, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.32,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0162-000969",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Albay Diversion Rd - K0446 + 621 - K0446 + 807, K0448 + 926.50 - K0449 + 323",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 11968000,
      "lengthKm": 0.5825,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20545922.75,
      "lengthMeters": 582.5,
      "allocationPerStatedMeter": 20545.92,
      "rangesMeters": [
        [
          446621.0,
          446807.0
        ],
        [
          448926.5,
          449323.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Albay Diversion Rd - K0446 + 621 - K0446 + 807, K0448 + 926.50 - K0449 + 323",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.52,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0268-002853",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Landy Br. (B00004MQ) along Marinduque Circumferential Rd",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 11960000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Landy Br. (B00004MQ) along Marinduque Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0161-000954",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Romblon-Cogon-Sablayan Rd - K0014 + 701 - K0014 + 775, K0015 + 000 - K0015 + 125",
      "office": "Romblon District Engineering Office",
      "amountPesos": 11940000,
      "lengthKm": 0.199,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 60000000.0,
      "lengthMeters": 199.0,
      "allocationPerStatedMeter": 60000.0,
      "rangesMeters": [
        [
          14701.0,
          14775.0
        ],
        [
          15000.0,
          15125.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Romblon-Cogon-Sablayan Rd - K0014 + 701 - K0014 + 775, K0015 + 000 - K0015 + 125",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 1.1,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0154-000846",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0085 + 500 - K0086 + 000",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 11870000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23740000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 23740.0,
      "rangesMeters": [
        [
          85500.0,
          86000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0085 + 500 - K0086 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 1.0,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0131-000395",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Nasugbu-Lian-Calatagan Rd - K0112 + 361 - K0112 + 910",
      "office": "Batangas 1st District Engineering Office",
      "amountPesos": 11866000,
      "lengthKm": 0.549,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21613843.35,
      "lengthMeters": 549.0,
      "allocationPerStatedMeter": 21613.84,
      "rangesMeters": [
        [
          112361.0,
          112910.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Nasugbu-Lian-Calatagan Rd - K0112 + 361 - K0112 + 910",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.67,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0132-000424",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Indang-Alfonso via Luksuhin Rd - K0072 + 349 - K0072 + 885",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 11866000,
      "lengthKm": 0.536,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22138059.7,
      "lengthMeters": 536.0,
      "allocationPerStatedMeter": 22138.06,
      "rangesMeters": [
        [
          72349.0,
          72885.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Indang-Alfonso via Luksuhin Rd - K0072 + 349 - K0072 + 885",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.69,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0169-001093",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Naguilian-Sn Mariano Rd - K0384 + (-155) - K0384 + 611",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": 0.766,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15404699.74,
      "lengthMeters": 766.0,
      "allocationPerStatedMeter": 15404.7,
      "rangesMeters": [
        [
          383845.0,
          384611.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Naguilian-Sn Mariano Rd - K0384 + (-155) - K0384 + 611",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.48,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0178-001249",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0528 + 656 - K0528 + 664, K0530 + 627 - K0530 + 654, K0533 + 222 - K0533 + 241, K0533 + 508 - K0533 + 525",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": 0.071,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 166197183.1,
      "lengthMeters": 71.0,
      "allocationPerStatedMeter": 166197.18,
      "rangesMeters": [
        [
          528656.0,
          528664.0
        ],
        [
          530627.0,
          530654.0
        ],
        [
          533222.0,
          533241.0
        ],
        [
          533508.0,
          533525.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0528 + 656 - K0528 + 664, K0530 + 627 - K0530 + 654, K0533 + 222 - K0533 + 241, K0533 + 508 - K0533 + 525",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 0.55,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0460-006629",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Lanao, Bangui, Ilocos Norte, Start 18.53093, 125.96167 End 18.53141, 125.96167, 120.80383",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Construction of Bridge, Barangay Lanao, Bangui, Ilocos Norte, Start 18.53093, 125.96167 End 18.53141, 125.96167, 120.80383",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0532-008170",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage Barangay San Ildefonso, Magalang, Pampanga, Sta. 0+000 - Sta. 0+592, Sta. 0+000 - Sta. 0+220",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": 0.592,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 19932432.43,
      "lengthMeters": 592.0,
      "allocationPerStatedMeter": 19932.43,
      "rangesMeters": [
        [
          0.0,
          592.0
        ],
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Construction of Road and Drainage Barangay San Ildefonso, Magalang, Pampanga, Sta. 0+000 - Sta. 0+592, Sta. 0+000 - Sta. 0+220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.81,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0532-008177",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay Capaya, Angeles City Pampanga, Sta. 0 + 000 - Sta. 1 + 038, Sta. 0 + 000 - Sta. 0 + 105",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": 1.038,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 11368015.41,
      "lengthMeters": 1038.0,
      "allocationPerStatedMeter": 11368.02,
      "rangesMeters": [
        [
          0.0,
          1038.0
        ],
        [
          0.0,
          105.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Construction of Road and Drainage, Barangay Capaya, Angeles City Pampanga, Sta. 0 + 000 - Sta. 1 + 038, Sta. 0 + 000 - Sta. 0 + 105",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.45,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0532-008178",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay Duquit, Mabalacat City, Pampanga, Sta. 0+000 - Sta. 0+138, Sta. 0+000 - Sta. 0+120, Sta. 0+000 - Sta. 0+260, Sta. 0+000 - Sta. 0+234, Sta. 0+000 - Sta. 0+285",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": 0.285,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 41403508.77,
      "lengthMeters": 285.0,
      "allocationPerStatedMeter": 41403.51,
      "rangesMeters": [
        [
          0.0,
          138.0
        ],
        [
          0.0,
          120.0
        ],
        [
          0.0,
          260.0
        ],
        [
          0.0,
          234.0
        ],
        [
          0.0,
          285.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Construction of Road and Drainage, Barangay Duquit, Mabalacat City, Pampanga, Sta. 0+000 - Sta. 0+138, Sta. 0+000 - Sta. 0+120, Sta. 0+000 - Sta. 0+260, Sta. 0+000 - Sta. 0+234, Sta. 0+000 - Sta. 0+285",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.45,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0532-008179",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay La Paz, Magalang, Pampanga, Sta. 0+000 - Sta. 0+608",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": 0.608,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19407894.74,
      "lengthMeters": 608.0,
      "allocationPerStatedMeter": 19407.89,
      "rangesMeters": [
        [
          0.0,
          608.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Construction of Road and Drainage, Barangay La Paz, Magalang, Pampanga, Sta. 0+000 - Sta. 0+608",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.79,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0532-008181",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay Paralayunan, Mabalacat City, Pampanga, Sta. 0+000.00 - Sta. 0+457.00",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": 0.457,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25820568.93,
      "lengthMeters": 457.0,
      "allocationPerStatedMeter": 25820.57,
      "rangesMeters": [
        [
          0.0,
          457.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Construction of Road and Drainage, Barangay Paralayunan, Mabalacat City, Pampanga, Sta. 0+000.00 - Sta. 0+457.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.05,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0533-008185",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay San Jose, Magalang, Pampanga, Street 1 Sta. 0+000- Sta. 0+400, Street 2 Sta. 0+000- Sta. 0+305",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29500000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 29500.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ],
        [
          0.0,
          305.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road and Drainage, Barangay San Jose, Magalang, Pampanga, Street 1 Sta. 0+000- Sta. 0+400, Street 2 Sta. 0+000- Sta. 0+305",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.2,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0533-008189",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay San Vicente, Magalang, Pampanga, Sta. 0+000 - Sta. 0+618",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": 0.618,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19093851.13,
      "lengthMeters": 618.0,
      "allocationPerStatedMeter": 19093.85,
      "rangesMeters": [
        [
          0.0,
          618.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road and Drainage, Barangay San Vicente, Magalang, Pampanga, Sta. 0+000 - Sta. 0+618",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.78,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0533-008190",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay Santo Rosario, Magalang, Pampanga, Street 1 Sta. 0+000- Sta. 0+384, Street 2 Sta. 0+000- Sta. ; 0+265, Street 3 Sta. 0+000- Sta. 0+416",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          384.0
        ],
        [
          0.0,
          416.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road and Drainage, Barangay Santo Rosario, Magalang, Pampanga, Street 1 Sta. 0+000- Sta. 0+384, Street 2 Sta. 0+000- Sta. ; 0+265, Street 3 Sta. 0+000- Sta. 0+416",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0533-008192",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay Sapangbato, Angeles City Pampanga, Sta. 0+000 - Sta. 1+111",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": 1.111,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10621062.11,
      "lengthMeters": 1111.0,
      "allocationPerStatedMeter": 10621.06,
      "rangesMeters": [
        [
          0.0,
          1111.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road and Drainage, Barangay Sapangbato, Angeles City Pampanga, Sta. 0+000 - Sta. 1+111",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.42,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0533-008194",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay Sto. Cristo, Angeles City Pampanga, Sta. 0+000 - Sta. 0+191, Sta. 0+000 - Sta. 0+130, Sta. 0+000 - Sta. 0+285",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": 0.285,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 41403508.77,
      "lengthMeters": 285.0,
      "allocationPerStatedMeter": 41403.51,
      "rangesMeters": [
        [
          0.0,
          191.0
        ],
        [
          0.0,
          130.0
        ],
        [
          0.0,
          285.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road and Drainage, Barangay Sto. Cristo, Angeles City Pampanga, Sta. 0+000 - Sta. 0+191, Sta. 0+000 - Sta. 0+130, Sta. 0+000 - Sta. 0+285",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.45,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0533-008195",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay Sto. Rosario, Mabalacat City, Pampanga, Sta. 0+000.00 - Sta. 0+482.00",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": 0.482,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24481327.8,
      "lengthMeters": 482.0,
      "allocationPerStatedMeter": 24481.33,
      "rangesMeters": [
        [
          0.0,
          482.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road and Drainage, Barangay Sto. Rosario, Mabalacat City, Pampanga, Sta. 0+000.00 - Sta. 0+482.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.0,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0533-008197",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Navaling, Magalang, Pampanga, Sta. 0+000 - Sta.0+890.00",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": 0.89,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13258426.97,
      "lengthMeters": 890.0,
      "allocationPerStatedMeter": 13258.43,
      "rangesMeters": [
        [
          0.0,
          890.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road Barangay Navaling, Magalang, Pampanga, Sta. 0+000 - Sta.0+890.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.68,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0534-008201",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Sapangbalen, Mabalacat City, Pampanga, Sta. 0+000.00 - Sta. 1+010.00",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 11800000,
      "lengthKm": 1.01,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11683168.32,
      "lengthMeters": 1010.0,
      "allocationPerStatedMeter": 11683.17,
      "rangesMeters": [
        [
          0.0,
          1010.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction of Road Barangay Sapangbalen, Mabalacat City, Pampanga, Sta. 0+000.00 - Sta. 1+010.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.47,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0153-000813",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Manila North Rd - K0227 + 569 - K0227 + 849",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 11760000,
      "lengthKm": 0.28,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42000000.0,
      "lengthMeters": 280.0,
      "allocationPerStatedMeter": 42000.0,
      "rangesMeters": [
        [
          227569.0,
          227849.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Manila North Rd - K0227 + 569 - K0227 + 849",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 1.47,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0120-000185",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0035 + 233 - K0035 + 687, K0036 + 467 - K0036 + 542",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 11759000,
      "lengthKm": 0.529,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22228733.46,
      "lengthMeters": 529.0,
      "allocationPerStatedMeter": 22228.73,
      "rangesMeters": [
        [
          35233.0,
          35687.0
        ],
        [
          36467.0,
          36542.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0035 + 233 - K0035 + 687, K0036 + 467 - K0036 + 542",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 0.46,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0524-007999",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sto. Tomas, Aliaga, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 11754500,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Sto. Tomas, Aliaga, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0293-003401",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Sinandigan Br. (B01628MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 11700000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "Sinandigan Br. (B01628MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0145-000687",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Irosin-Sn Roque-Bulusan Lake Rd - K0624 + (-492) - K0624 + 197",
      "office": "Sorsogon 2nd District Engineering Office",
      "amountPesos": 11636000,
      "lengthKm": 0.689,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16888243.83,
      "lengthMeters": 689.0,
      "allocationPerStatedMeter": 16888.24,
      "rangesMeters": [
        [
          623508.0,
          624197.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Irosin-Sn Roque-Bulusan Lake Rd - K0624 + (-492) - K0624 + 197",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.71,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0454-006506",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Duhat St. (C 0+000 - C 0+232), Barangay 179, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 11600000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Duhat St. (C 0+000 - C 0+232), Barangay 179, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0491-007299",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 0+040 - Sta. 1+140) at Barangay San Mateo, Tumauini, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 11600000,
      "lengthKm": 1.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10545454.55,
      "lengthMeters": 1100.0,
      "allocationPerStatedMeter": 10545.45,
      "rangesMeters": [
        [
          40.0,
          1140.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Road (Sta. 0+040 - Sta. 1+140) at Barangay San Mateo, Tumauini, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.42,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0115-000091",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - (S01632MN) Chainage 000 - Chainage 110, Chainage 140 - Chainage 270, Chainage 300 - Chainage 436",
      "office": "Central Office",
      "amountPesos": 11595000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - (S01632MN) Chainage 000 - Chainage 110, Chainage 140 - Chainage 270, Chainage 300 - Chainage 436",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0138-000549",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Midsayap-Makar Rd - K1695 + 260 - K1695 + 440",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 11550000,
      "lengthKm": 0.18,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 64166666.67,
      "lengthMeters": 180.0,
      "allocationPerStatedMeter": 64166.67,
      "rangesMeters": [
        [
          1695260.0,
          1695440.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Midsayap-Makar Rd - K1695 + 260 - K1695 + 440",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 1.27,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0148-000739",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0318+131 - K0318+600",
      "office": "Central Office",
      "amountPesos": 11538000,
      "lengthKm": 0.469,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24601279.32,
      "lengthMeters": 469.0,
      "allocationPerStatedMeter": 24601.28,
      "rangesMeters": [
        [
          318131.0,
          318600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "148",
      "lengthEvidence": "Maharlika Highway (LZ) - K0318+131 - K0318+600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 1.04,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0575-009113",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 0+000 - Sta. 0+824) at Barangay E. Lopez, Silay City, Negros Occidental (10.8190271, 123.0395456)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 11536000,
      "lengthKm": 0.824,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14000000.0,
      "lengthMeters": 824.0,
      "allocationPerStatedMeter": 14000.0,
      "rangesMeters": [
        [
          0.0,
          824.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road (Sta. 0+000 - Sta. 0+824) at Barangay E. Lopez, Silay City, Negros Occidental (10.8190271, 123.0395456)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.72,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0159-000921",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Nueva Ecija - Pangasinan Rd K0149 + 444 - K0150 + 000",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 11500000,
      "lengthKm": 0.556,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20683453.24,
      "lengthMeters": 556.0,
      "allocationPerStatedMeter": 20683.45,
      "rangesMeters": [
        [
          149444.0,
          150000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "159",
      "lengthEvidence": "Nueva Ecija - Pangasinan Rd K0149 + 444 - K0150 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.52,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0174-001179",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Davao-Bukidnon Rd - K1658 + 762 - K1658 + 782",
      "office": "Davao City 2nd District Engineering Office",
      "amountPesos": 11500000,
      "lengthKm": 0.02,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 575000000.0,
      "lengthMeters": 20.0,
      "allocationPerStatedMeter": 575000.0,
      "rangesMeters": [
        [
          1658762.0,
          1658782.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "174",
      "lengthEvidence": "Davao-Bukidnon Rd - K1658 + 762 - K1658 + 782",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 1.73,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0253-002562",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Cabanatuan City-Carmen Road, K129+270 - K132+050, K138+575- K141+000 Road Safety Facilities (Roadway Lighting)",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 11500000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          129270.0,
          132050.0
        ],
        [
          138575.0,
          141000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "253",
      "lengthEvidence": "Cabanatuan City-Carmen Road, K129+270 - K132+050, K138+575- K141+000 Road Safety Facilities (Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0268-002862",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Balogo Br. (B00024TL) along Tablas Circumferential Rd",
      "office": "Romblon District Engineering Office",
      "amountPesos": 11500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Balogo Br. (B00024TL) along Tablas Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0271-002926",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Makalukso Br. 2 (B02743LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 11500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Makalukso Br. 2 (B02743LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003025",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Anilawan Br (B00097PW) along Puerto Princesa North Rd",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 11500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Anilawan Br (B00097PW) along Puerto Princesa North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006513",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Justisya St. (C0+000 to C0+300) , Barangay Karuhatan, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 11500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Justisya St. (C0+000 to C0+300) , Barangay Karuhatan, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0498-007442",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+860, Barangay San Juan, Cordon, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 11500000,
      "lengthKm": 0.86,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13372093.02,
      "lengthMeters": 860.0,
      "allocationPerStatedMeter": 13372.09,
      "rangesMeters": [
        [
          0.0,
          860.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+860, Barangay San Juan, Cordon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.69,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0615-009960",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Dahilig, Sta. 0 + 000 - Sta. 0 + 400, Balingoan, Misamis Oriental",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 11500000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28750000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 28750.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Construction of Road, Barangay Dahilig, Sta. 0 + 000 - Sta. 0 + 400, Balingoan, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.17,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0467-006781",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Canubat, Barangay San Jose, Caba, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 11490000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Sitio Canubat, Barangay San Jose, Caba, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0268-002847",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Inalakanan Br. (B02590LZ) along Maharlika Highway (LZ)",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 11469000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Inalakanan Br. (B02590LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0183-001342",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Apayao (Calanasan)-Ilocos Norte Rd - (S00644LZ) Chainage 2488 - Chainage 2523",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 11430000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Apayao (Calanasan)-Ilocos Norte Rd - (S00644LZ) Chainage 2488 - Chainage 2523",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0158-000915",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Camiling - Wawa - Bayambang - Malasiqui - Sta. Barbara Rd, K0201+(-200) - K0201+050",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 11400000,
      "lengthKm": 0.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45600000.0,
      "lengthMeters": 250.0,
      "allocationPerStatedMeter": 45600.0,
      "rangesMeters": [
        [
          200800.0,
          201050.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "Camiling - Wawa - Bayambang - Malasiqui - Sta. Barbara Rd, K0201+(-200) - K0201+050",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 0.84,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0284-003210",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Pagga Br. (B01031LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 11400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Pagga Br. (B01031LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0508-007667",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Drainage at Barangay Sto. Rosario, City of Malolos, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 11386000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Construction of Road including Drainage at Barangay Sto. Rosario, City of Malolos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0615-009963",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Anakan, Gingoog City, Misamis Oriental",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 11380000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Construction of Road, Barangay Anakan, Gingoog City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0154-000849",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0120 + 517 - K0121 + 000",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 11367000,
      "lengthKm": 0.483,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23534161.49,
      "lengthMeters": 483.0,
      "allocationPerStatedMeter": 23534.16,
      "rangesMeters": [
        [
          120517.0,
          121000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0120 + 517 - K0121 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 0.99,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0155-000853",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Palo-Carigara-Ormoc Rd - K0957 + (-118) - K0957 + 000",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 11364000,
      "lengthKm": 0.118,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 96305084.75,
      "lengthMeters": 118.0,
      "allocationPerStatedMeter": 96305.08,
      "rangesMeters": [
        [
          956882.0,
          957000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "Palo-Carigara-Ormoc Rd - K0957 + (-118) - K0957 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 2.42,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0273-002950",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tambanan Br. (B00496MN) along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd)",
      "office": "Central Office",
      "amountPesos": 11300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Tambanan Br. (B00496MN) along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0284-003212",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Taguipuro Br. (B01015LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 11300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "284",
      "lengthEvidence": "Taguipuro Br. (B01015LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0184-001360",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Kiangan-Tinoc-Buguias Rd - K0354 + 740 - K0354 + 776, K0355 + 309 - K0355 + 360",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 11295000,
      "lengthKm": 0.087,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 129827586.21,
      "lengthMeters": 87.0,
      "allocationPerStatedMeter": 129827.59,
      "rangesMeters": [
        [
          354740.0,
          354776.0
        ],
        [
          355309.0,
          355360.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Kiangan-Tinoc-Buguias Rd - K0354 + 740 - K0354 + 776, K0355 + 309 - K0355 + 360",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.35,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0129-000368",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Carmen Jct - Bayambang - Manat Road, K0207+008 - K0207+612",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 11275000,
      "lengthKm": 0.604,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18667218.54,
      "lengthMeters": 604.0,
      "allocationPerStatedMeter": 18667.22,
      "rangesMeters": [
        [
          207008.0,
          207612.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Carmen Jct - Bayambang - Manat Road, K0207+008 - K0207+612",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.58,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0601-009665",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Adante – Barangay Bacuyong, Piñan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "amountPesos": 11250000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Barangay Adante – Barangay Bacuyong, Piñan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0148-000741",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0087 + 276 - K0087 + 512, K0090 + 898 - K0090 + 915, K0093 + 755 - K0093 + 761",
      "office": "Central Office",
      "amountPesos": 11224000,
      "lengthKm": 0.259,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 43335907.34,
      "lengthMeters": 259.0,
      "allocationPerStatedMeter": 43335.91,
      "rangesMeters": [
        [
          87276.0,
          87512.0
        ],
        [
          90898.0,
          90915.0
        ],
        [
          93755.0,
          93761.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "148",
      "lengthEvidence": "Maharlika Highway (LZ) - K0087 + 276 - K0087 + 512, K0090 + 898 - K0090 + 915, K0093 + 755 - K0093 + 761",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 1.51,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0178-001241",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0389 + 780 - K0389 + 810, K0398 + 620 - K0398 + 820",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 11200000,
      "lengthKm": 0.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 48695652.17,
      "lengthMeters": 230.0,
      "allocationPerStatedMeter": 48695.65,
      "rangesMeters": [
        [
          389780.0,
          389810.0
        ],
        [
          398620.0,
          398820.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0389 + 780 - K0389 + 810, K0398 + 620 - K0398 + 820",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 0.26,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0272-002941",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Lawayon Br. (B00357SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "office": "Central Office",
      "amountPesos": 11142000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Lawayon Br. (B00357SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0146-000713",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Hernan Cortes St - (S00367CB) Chainage 1602 - Chainage 2342",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 11105000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Hernan Cortes St - (S00367CB) Chainage 1602 - Chainage 2342",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0167-001068",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Pasong Tamo - K0006 + 244 - K0006 + 561",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 11100000,
      "lengthKm": 0.317,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35015772.87,
      "lengthMeters": 317.0,
      "allocationPerStatedMeter": 35015.77,
      "rangesMeters": [
        [
          6244.0,
          6561.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "Pasong Tamo - K0006 + 244 - K0006 + 561",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.1,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0154-000839",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bais-Kabankalan Rd - K0098+464 - K0098 + 805",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 11050000,
      "lengthKm": 0.341,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32404692.08,
      "lengthMeters": 341.0,
      "allocationPerStatedMeter": 32404.69,
      "rangesMeters": [
        [
          98464.0,
          98805.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "Bais-Kabankalan Rd - K0098+464 - K0098 + 805",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 1.13,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0154-000838",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bais-Kabankalan Rd - K0096 + 000 - K0096 + 350",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 11020000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31485714.29,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 31485.71,
      "rangesMeters": [
        [
          96000.0,
          96350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "Bais-Kabankalan Rd - K0096 + 000 - K0096 + 350",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 1.1,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0171-001134",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Dancalan-Candoni-Damutan Valley Rd - K0099 + (-247) - K0099 + (-190)",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": 0.057,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 192982456.14,
      "lengthMeters": 57.0,
      "allocationPerStatedMeter": 192982.46,
      "rangesMeters": [
        [
          98753.0,
          98810.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Dancalan-Candoni-Damutan Valley Rd - K0099 + (-247) - K0099 + (-190)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 3.56,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0252-002548",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Sn Juan-Sn Gabriel Rd - K0281 + 300 - K0281 + 510 (Road Safety: Roller Barrier)",
      "office": "Central Office",
      "amountPesos": 11000000,
      "lengthKm": 0.21,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52380952.38,
      "lengthMeters": 210.0,
      "allocationPerStatedMeter": 52380.95,
      "rangesMeters": [
        [
          281300.0,
          281510.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "252",
      "lengthEvidence": "Sn Juan-Sn Gabriel Rd - K0281 + 300 - K0281 + 510 (Road Safety: Roller Barrier)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 5.28,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0269-002872",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Candavoc Br. (B00014SJ) along Siquijor Circumferential Rd",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Candavoc Br. (B00014SJ) along Siquijor Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003131",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Kalagutay Br. (B01654MN) along Kapalong-Talaingod-Valencia (Bukidnon) Rd",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Kalagutay Br. (B01654MN) along Kapalong-Talaingod-Valencia (Bukidnon) Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006527",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Tindalo St. (C0+000 to C0+280) , Barangay Parada, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Tindalo St. (C0+000 to C0+280) , Barangay Parada, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006600",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road and Drainage System along Rodriguez Street, Barangay 133 Zone 13 and its vicinity, Pasay City",
      "office": "South Manila District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Road and Drainage System along Rodriguez Street, Barangay 133 Zone 13 and its vicinity, Pasay City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006985",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage Structure, Bado Dangwa Road at Cresencia Village Barangay, Baguio City (Sta. 0+000 - Sta. 0+395)",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": 0.395,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27848101.27,
      "lengthMeters": 395.0,
      "allocationPerStatedMeter": 27848.1,
      "rangesMeters": [
        [
          0.0,
          395.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Rehabilitation of Road including Drainage Structure, Bado Dangwa Road at Cresencia Village Barangay, Baguio City (Sta. 0+000 - Sta. 0+395)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.14,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0479-007044",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Anonang-Santor Access Road, Barangay Santor, Rizal, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Anonang-Santor Access Road, Barangay Santor, Rizal, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0490-007274",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge (Sta. 1+000 - Sta. 1+012) at Sitio Callueng, Barangay Barumbong, Santo Tomas, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": 0.012,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 916666666.67,
      "lengthMeters": 12.0,
      "allocationPerStatedMeter": 916666.67,
      "rangesMeters": [
        [
          1000.0,
          1012.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Construction of Bridge (Sta. 1+000 - Sta. 1+012) at Sitio Callueng, Barangay Barumbong, Santo Tomas, Isabela",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 0.65,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0501-007516",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+825, Barangay Quimalabasa Sur - Barangay San Antonio, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": 0.825,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 825.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          825.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+825, Barangay Quimalabasa Sur - Barangay San Antonio, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.69,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0502-007534",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+675 - Sta. 1+500, Barangay Papan Este, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": 0.825,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 825.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          675.0,
          1500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Sta. 0+675 - Sta. 1+500, Barangay Papan Este, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.69,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0518-007864",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sto. Tomas Feria, Quezon, Nueva Ecija, Sta. 0+000 - Sta. 0+977",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": 0.977,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11258955.99,
      "lengthMeters": 977.0,
      "allocationPerStatedMeter": 11258.96,
      "rangesMeters": [
        [
          0.0,
          977.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Road, Barangay Sto. Tomas Feria, Quezon, Nueva Ecija, Sta. 0+000 - Sta. 0+977",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0518-007865",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Lucia Young, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+977",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": 0.977,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11258955.99,
      "lengthMeters": 977.0,
      "allocationPerStatedMeter": 11258.96,
      "rangesMeters": [
        [
          0.0,
          977.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Road, Barangay Sta. Lucia Young, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+977",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0520-007912",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Carmen, Zaragoza Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Carmen, Zaragoza Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007913",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Casongsong, Guimba, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Casongsong, Guimba, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007916",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Colosboa, Cuyapo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Colosboa, Cuyapo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0528-008106",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Lined Canal along Santiago, Tolentino, Palad, Lejarde and Serrano Street, Pandaguirig, Floridablanca, Pampanga, Sta.0+000 - Sta.0+460",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": 0.46,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23913043.48,
      "lengthMeters": 460.0,
      "allocationPerStatedMeter": 23913.04,
      "rangesMeters": [
        [
          0.0,
          460.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Rehabilitation of Road with Lined Canal along Santiago, Tolentino, Palad, Lejarde and Serrano Street, Pandaguirig, Floridablanca, Pampanga, Sta.0+000 - Sta.0+460",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.98,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0530-008136",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Lined Canal at Gasak 1 and 2, Brgy. Valdez, Floridablanca, Pampanga, Sta.0+000 - Sta.1+600",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": 1.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 6875000.0,
      "lengthMeters": 1600.0,
      "allocationPerStatedMeter": 6875.0,
      "rangesMeters": [
        [
          0.0,
          1600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Road with Lined Canal at Gasak 1 and 2, Brgy. Valdez, Floridablanca, Pampanga, Sta.0+000 - Sta.1+600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.28,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0534-008213",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Barangay Service Road at Barangay Tariji, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+490.6.00",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": 0.49060000000000004,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22421524.66,
      "lengthMeters": 490.6,
      "allocationPerStatedMeter": 22421.52,
      "rangesMeters": [
        [
          0.0,
          490.6
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Rehabilitation of Barangay Service Road at Barangay Tariji, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+490.6.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.92,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0548-008534",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bulihan, San Antonio, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Barangay Bulihan, San Antonio, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0564-008878",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Box Culvert and Spillway at Barangay Talisoy, Simamla (Proper), and Calampong and Dugui Too, Virac, Catanduanes",
      "office": "Catanduanes District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Road, Box Culvert and Spillway at Barangay Talisoy, Simamla (Proper), and Calampong and Dugui Too, Virac, Catanduanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0570-009009",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Surudlan-Canhawan-Sta. Maria-Salvacion, Sta. 2 + 500 - Sta. 2 + 900, Sta. 3 + 020 - Sta. 3 + 100, Sta. 3 + 150 - Sta.3 + 200, Barangay Canhawan, Nueva Valencia, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": 0.53,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20754716.98,
      "lengthMeters": 530.0,
      "allocationPerStatedMeter": 20754.72,
      "rangesMeters": [
        [
          2500.0,
          2900.0
        ],
        [
          3020.0,
          3100.0
        ],
        [
          3150.0,
          3200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Construction of Road, Surudlan-Canhawan-Sta. Maria-Salvacion, Sta. 2 + 500 - Sta. 2 + 900, Sta. 3 + 020 - Sta. 3 + 100, Sta. 3 + 150 - Sta.3 + 200, Barangay Canhawan, Nueva Valencia, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.85,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0570-009014",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay 3 - Sitio Tagbak, Buga Bridge, Barangay 3 and Barangay Buga, Igbaras, Iloilo",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Construction of Barangay 3 - Sitio Tagbak, Buga Bridge, Barangay 3 and Barangay Buga, Igbaras, Iloilo",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009168",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sitio Mantukdo Bridge, Barangay Guiljungan, Cauayan, Negros Occidental",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Sitio Mantukdo Bridge, Barangay Guiljungan, Cauayan, Negros Occidental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009744",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Balongating - Barangay Guling, Guipos, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road, Barangay Balongating - Barangay Guling, Guipos, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0611-009890",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road Barangay Ramain, Sta. 0+000 - Sta. 0 + 500, Sultan Naga Dimaporo, Lanao del Norte",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 22000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Concrete Road Barangay Ramain, Sta. 0+000 - Sta. 0 + 500, Sultan Naga Dimaporo, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.9,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0627-010190",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sumile Zoological and Botanical Park, Barangay Sumile, Butuan City Sta. 7+611.5 - Sta. 8+022.564",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 11000000,
      "lengthKm": 0.4110640000000003,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26759823.29,
      "lengthMeters": 411.064,
      "allocationPerStatedMeter": 26759.82,
      "rangesMeters": [
        [
          7611.5,
          8022.564
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction of Road at Sumile Zoological and Botanical Park, Barangay Sumile, Butuan City Sta. 7+611.5 - Sta. 8+022.564",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.09,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0169-001091",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Alicia-San Mateo Rd - K0362 + 472 - K0363 + 211",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10999000,
      "lengthKm": 0.739,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14883626.52,
      "lengthMeters": 739.0,
      "allocationPerStatedMeter": 14883.63,
      "rangesMeters": [
        [
          362472.0,
          363211.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Alicia-San Mateo Rd - K0362 + 472 - K0363 + 211",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.47,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0524-008011",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mabuhay, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+975",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10978000,
      "lengthKm": 0.975,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11259487.18,
      "lengthMeters": 975.0,
      "allocationPerStatedMeter": 11259.49,
      "rangesMeters": [
        [
          0.0,
          975.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Mabuhay, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+975",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0131-000393",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Balayan-Balibago Rd - K0110 + 491.70 - K0111 + 000",
      "office": "Batangas 1st District Engineering Office",
      "amountPesos": 10943000,
      "lengthKm": 0.5083000000000029,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21528624.83,
      "lengthMeters": 508.3,
      "allocationPerStatedMeter": 21528.62,
      "rangesMeters": [
        [
          110491.7,
          111000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "131",
      "lengthEvidence": "Balayan-Balibago Rd - K0110 + 491.70 - K0111 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.67,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0275-003012",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tablang Br. (B00152LZ) along Nueva Ecija-Aurora Rd",
      "office": "Nueva Ecija 2nd District Engineering Office",
      "amountPesos": 10930000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Tablang Br. (B00152LZ) along Nueva Ecija-Aurora Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0130-000374",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Roman Expressway - K0103 + 095 - K0103 + 311",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 10922000,
      "lengthKm": 0.216,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50564814.81,
      "lengthMeters": 216.0,
      "allocationPerStatedMeter": 50564.81,
      "rangesMeters": [
        [
          103095.0,
          103311.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Roman Expressway - K0103 + 095 - K0103 + 311",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 1.0,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0253-002557",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Mayan-Mauyen Port Rd - K0001 + 806 - K0002 + 026 (Off-Carriageway Improvement: Paving of Shoulders)",
      "office": "Batanes District Engineering Office",
      "amountPesos": 10912000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49600000.0,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 49600.0,
      "rangesMeters": [
        [
          1806.0,
          2026.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "253",
      "lengthEvidence": "Mayan-Mauyen Port Rd - K0001 + 806 - K0002 + 026 (Off-Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 5.0,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0200-001609",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Iloilo-Capiz Rd (New Route) - K0098 + 803 - K0098 + 1004",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 10892000,
      "lengthKm": 0.201,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54189054.73,
      "lengthMeters": 201.0,
      "allocationPerStatedMeter": 54189.05,
      "rangesMeters": [
        [
          98803.0,
          99004.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Iloilo-Capiz Rd (New Route) - K0098 + 803 - K0098 + 1004",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 1.11,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0245-002448",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1430 + 433 - K1431 + 207, K1431 + 285 - K1431 + 365, K1431 + 366 - K1432 + 000 (Road Safety: Roadway Lighting)",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 10891000,
      "lengthKm": 1.488,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 7319220.43,
      "lengthMeters": 1488.0,
      "allocationPerStatedMeter": 7319.22,
      "rangesMeters": [
        [
          1430433.0,
          1431207.0
        ],
        [
          1431285.0,
          1431365.0
        ],
        [
          1431366.0,
          1432000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1430 + 433 - K1431 + 207, K1431 + 285 - K1431 + 365, K1431 + 366 - K1432 + 000 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.61,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0283-003187",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Andulan Br. (B00737LZ) along Pangasinan-Nueva Vizcaya Rd",
      "office": "Central Office",
      "amountPesos": 10890000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Andulan Br. (B00737LZ) along Pangasinan-Nueva Vizcaya Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0132-000420",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tanza-Trece Martires City-Indang Rd - K0055 + 000 - K0055 + 467",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 10842000,
      "lengthKm": 0.467,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23216274.09,
      "lengthMeters": 467.0,
      "allocationPerStatedMeter": 23216.27,
      "rangesMeters": [
        [
          55000.0,
          55467.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Tanza-Trece Martires City-Indang Rd - K0055 + 000 - K0055 + 467",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.72,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0153-000821",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0035 + (-768) - K0035 + (-617), K0035 + 687 - K0035 + 792",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 10839000,
      "lengthKm": 0.256,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 42339843.75,
      "lengthMeters": 256.0,
      "allocationPerStatedMeter": 42339.84,
      "rangesMeters": [
        [
          34232.0,
          34383.0
        ],
        [
          35687.0,
          35792.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0035 + (-768) - K0035 + (-617), K0035 + 687 - K0035 + 792",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 1.48,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0129-000362",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Camiling - Wawa - Bayambang - Malasiqui - Sta. barbara Road, K0196+000 - K0196+577",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 10800000,
      "lengthKm": 0.577,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18717504.33,
      "lengthMeters": 577.0,
      "allocationPerStatedMeter": 18717.5,
      "rangesMeters": [
        [
          196000.0,
          196577.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Camiling - Wawa - Bayambang - Malasiqui - Sta. barbara Road, K0196+000 - K0196+577",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.58,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0152-000807",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Manila North Rd - K0291+331 - K0291+631",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 10800000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36000000.0,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 36000.0,
      "rangesMeters": [
        [
          291331.0,
          291631.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Manila North Rd - K0291+331 - K0291+631",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 1.26,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0153-000828",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Iloilo-Capiz (New Route) - K0051 + 950 - K0052 + 395",
      "office": "Ilolilo 2nd District Engineering Office",
      "amountPesos": 10800000,
      "lengthKm": 0.445,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24269662.92,
      "lengthMeters": 445.0,
      "allocationPerStatedMeter": 24269.66,
      "rangesMeters": [
        [
          51950.0,
          52395.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Iloilo-Capiz (New Route) - K0051 + 950 - K0052 + 395",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 0.85,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0184-001348",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Ayaga-Sta. Marcela-Flora-Lasam Rd - K0699 + 146 - K0699 + 251",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 10800000,
      "lengthKm": 0.105,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 102857142.86,
      "lengthMeters": 105.0,
      "allocationPerStatedMeter": 102857.14,
      "rangesMeters": [
        [
          699146.0,
          699251.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Ayaga-Sta. Marcela-Flora-Lasam Rd - K0699 + 146 - K0699 + 251",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.28,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0270-002899",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Guibato Br. (B01810MN) along Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 10800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Guibato Br. (B01810MN) along Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007530",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+800, Barangay Minuri, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10800000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13500000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 13500.0,
      "rangesMeters": [
        [
          0.0,
          800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+800, Barangay Minuri, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.69,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0206-001741",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Lipa City - Alaminos Rd - K0077 + (-548) - K0077 + 000",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 10764000,
      "lengthKm": 0.548,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19642335.77,
      "lengthMeters": 548.0,
      "allocationPerStatedMeter": 19642.34,
      "rangesMeters": [
        [
          76452.0,
          77000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "206",
      "lengthEvidence": "Lipa City - Alaminos Rd - K0077 + (-548) - K0077 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 0.38,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0162-000975",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Nabua-Bato-Libon (Tandaay-Buluang, Bato) Rd - K0490 + 717 - K0491 + 239",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 10726000,
      "lengthKm": 0.522,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20547892.72,
      "lengthMeters": 522.0,
      "allocationPerStatedMeter": 20547.89,
      "rangesMeters": [
        [
          490717.0,
          491239.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Nabua-Bato-Libon (Tandaay-Buluang, Bato) Rd - K0490 + 717 - K0491 + 239",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.52,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0575-009112",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 0+000 - Sta. 0+678, Sta. 0+905 - Sta. 0+993), Sitio Tison to Sitio Buncio, Barangay XI, Victorias City, Negros Occidental (10.8160070, 123.1479170)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 10724000,
      "lengthKm": 0.766,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14000000.0,
      "lengthMeters": 766.0,
      "allocationPerStatedMeter": 14000.0,
      "rangesMeters": [
        [
          0.0,
          678.0
        ],
        [
          905.0,
          993.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road (Sta. 0+000 - Sta. 0+678, Sta. 0+905 - Sta. 0+993), Sitio Tison to Sitio Buncio, Barangay XI, Victorias City, Negros Occidental (10.8160070, 123.1479170)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.72,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0269-002868",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Mauhao Br. (B00170MR) along Mindoro Oriental/Occidental East Coastal Rd",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 10700000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Mauhao Br. (B00170MR) along Mindoro Oriental/Occidental East Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0532-008171",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage Barangay San Nicolas II, Magalang, Pampanga, Sta. 0+000 - Sta. 0+400 Sta. 0+000 - Sta. 0+294",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 10700000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 26750000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 26750.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ],
        [
          0.0,
          294.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Construction of Road and Drainage Barangay San Nicolas II, Magalang, Pampanga, Sta. 0+000 - Sta. 0+400 Sta. 0+000 - Sta. 0+294",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.09,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0197-001564",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0288 + 306 - K0288 + 803",
      "office": "Central Office",
      "amountPesos": 10691000,
      "lengthKm": 0.497,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21511066.4,
      "lengthMeters": 497.0,
      "allocationPerStatedMeter": 21511.07,
      "rangesMeters": [
        [
          288306.0,
          288803.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "197",
      "lengthEvidence": "Maharlika Highway (LZ) - K0288 + 306 - K0288 + 803",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 0.44,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0146-000712",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "AS Fortuna St - K0008 + 966 - K0009 + 419",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 10674000,
      "lengthKm": 0.453,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23562913.91,
      "lengthMeters": 453.0,
      "allocationPerStatedMeter": 23562.91,
      "rangesMeters": [
        [
          8966.0,
          9419.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "AS Fortuna St - K0008 + 966 - K0009 + 419",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 0.72,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0174-001177",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Davao-Bukidnon Rd - K1642 + 862 - K1642 + 882",
      "office": "Davao City 2nd District Engineering Office",
      "amountPesos": 10640000,
      "lengthKm": 0.02,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 532000000.0,
      "lengthMeters": 20.0,
      "allocationPerStatedMeter": 532000.0,
      "rangesMeters": [
        [
          1642862.0,
          1642882.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "174",
      "lengthEvidence": "Davao-Bukidnon Rd - K1642 + 862 - K1642 + 882",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 1.6,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0130-000381",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Nueva Ecija-Aurora Rd - K0118 + 000 - K0118 + 516",
      "office": "Nueva Ecija 2nd District Engineering Office",
      "amountPesos": 10625000,
      "lengthKm": 0.516,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20591085.27,
      "lengthMeters": 516.0,
      "allocationPerStatedMeter": 20591.09,
      "rangesMeters": [
        [
          118000.0,
          118516.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Nueva Ecija-Aurora Rd - K0118 + 000 - K0118 + 516",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.64,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0114-000064",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LT) - K0945 + 910 - K0946 + 000, K0953 + 450 - K0953 + 552",
      "office": "Central Office",
      "amountPesos": 10612000,
      "lengthKm": 0.192,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 55270833.33,
      "lengthMeters": 192.0,
      "allocationPerStatedMeter": 55270.83,
      "rangesMeters": [
        [
          945910.0,
          946000.0
        ],
        [
          953450.0,
          953552.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "114",
      "lengthEvidence": "Maharlika Highway (LT) - K0945 + 910 - K0946 + 000, K0953 + 450 - K0953 + 552",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 1.19,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0462-006664",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Saguigui Proper, Barangay Saguigui, Pagudpud, Ilocos Norte, Start 120.815537, 18.569181 End 120.815571, 18.569090",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Construction of Bridge, Saguigui Proper, Barangay Saguigui, Pagudpud, Ilocos Norte, Start 120.815537, 18.569181 End 120.815571, 18.569090",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007436",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Constructinn of Road, Barangay Quimalabasa Norte, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Constructinn of Road, Barangay Quimalabasa Norte, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0626-010185",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pangabugan to Barangay San Vicente (Sta. 0 + 000.00 - Sta. 0 + 460.00), Butuan City, Agusan del Norte",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 10580000,
      "lengthKm": 0.46,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23000000.0,
      "lengthMeters": 460.0,
      "allocationPerStatedMeter": 23000.0,
      "rangesMeters": [
        [
          0.0,
          460.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "626",
      "lengthEvidence": "Construction of Road, Barangay Pangabugan to Barangay San Vicente (Sta. 0 + 000.00 - Sta. 0 + 460.00), Butuan City, Agusan del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.94,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0158-000918",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0508 + 655 - K0508 + 760.50, K0508 + 769 - K0508 + 828, K0517 + 039 - K0517 + 092, K0517 + 577 - K0517 + 641",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 10578000,
      "lengthKm": 0.2815,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 37577264.65,
      "lengthMeters": 281.5,
      "allocationPerStatedMeter": 37577.26,
      "rangesMeters": [
        [
          508655.0,
          508760.5
        ],
        [
          508769.0,
          508828.0
        ],
        [
          517039.0,
          517092.0
        ],
        [
          517577.0,
          517641.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0508 + 655 - K0508 + 760.50, K0508 + 769 - K0508 + 828, K0517 + 039 - K0517 + 092, K0517 + 577 - K0517 + 641",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 0.69,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0121-000200",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Bacolod North Rd - K0004 + 000 - K0004 + 267",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 10573000,
      "lengthKm": 0.267,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39599250.94,
      "lengthMeters": 267.0,
      "allocationPerStatedMeter": 39599.25,
      "rangesMeters": [
        [
          4000.0,
          4267.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "Bacolod North Rd - K0004 + 000 - K0004 + 267",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 0.85,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0205-001728",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Roman Expressway - K0113 + 700 - K0114 + 048",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 10566000,
      "lengthKm": 0.348,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30362068.97,
      "lengthMeters": 348.0,
      "allocationPerStatedMeter": 30362.07,
      "rangesMeters": [
        [
          113700.0,
          114048.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "205",
      "lengthEvidence": "Roman Expressway - K0113 + 700 - K0114 + 048",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 0.61,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0198-001567",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0628 + 672 - K0629 + 163",
      "office": "Central Office",
      "amountPesos": 10563000,
      "lengthKm": 0.491,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21513238.29,
      "lengthMeters": 491.0,
      "allocationPerStatedMeter": 21513.24,
      "rangesMeters": [
        [
          628672.0,
          629163.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Maharlika Highway (LZ) - K0628 + 672 - K0629 + 163",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 0.44,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0466-006753",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cadumanian ,Rosario, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 10500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay Cadumanian ,Rosario, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0488-007232",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sta. 0+000 - Sta. 0+870) at Sitio Tubo, Barangay San Ignacio, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 10500000,
      "lengthKm": 0.87,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12068965.52,
      "lengthMeters": 870.0,
      "allocationPerStatedMeter": 12068.97,
      "rangesMeters": [
        [
          0.0,
          870.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Construction of Concrete Road (Sta. 0+000 - Sta. 0+870) at Sitio Tubo, Barangay San Ignacio, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.62,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0502-007528",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Sta. 0+000 - Sta. 0+785, Barangay Sto. Domingo, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10500000,
      "lengthKm": 0.785,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13375796.18,
      "lengthMeters": 785.0,
      "allocationPerStatedMeter": 13375.8,
      "rangesMeters": [
        [
          0.0,
          785.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road Sta. 0+000 - Sta. 0+785, Barangay Sto. Domingo, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.69,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0510-007702",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage Improvement at Gil Carlos St., San Jose, City of Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road with Drainage Improvement at Gil Carlos St., San Jose, City of Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0532-008175",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage Barangay Turu, Magalang, Pampanga, Sta. 0+000 - Sta. 0+150, Sta. 0+000 - Sta. 0+290",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 10500000,
      "lengthKm": 0.29,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 36206896.55,
      "lengthMeters": 290.0,
      "allocationPerStatedMeter": 36206.9,
      "rangesMeters": [
        [
          0.0,
          150.0
        ],
        [
          0.0,
          290.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Construction of Road and Drainage Barangay Turu, Magalang, Pampanga, Sta. 0+000 - Sta. 0+150, Sta. 0+000 - Sta. 0+290",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.27,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0622-010093",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, DSWD Regional Rehabilitation Center for Youth (RRCY) XII to National Road, Barangay Bukaypait, Tantangan, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 10500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Construction of Concrete Road, DSWD Regional Rehabilitation Center for Youth (RRCY) XII to National Road, Barangay Bukaypait, Tantangan, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0170-001109",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Bacoor-Dasmariñas National Rd - K0031 + 000 - K0031 + 125",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 10470000,
      "lengthKm": 0.125,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 83760000.0,
      "lengthMeters": 125.0,
      "allocationPerStatedMeter": 83760.0,
      "rangesMeters": [
        [
          31000.0,
          31125.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Bacoor-Dasmariñas National Rd - K0031 + 000 - K0031 + 125",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 1.55,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0135-000497",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Bacolod Circumferential Rd - K0003 + (-222) - K0004 + 046",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 10469000,
      "lengthKm": 1.268,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8256309.15,
      "lengthMeters": 1268.0,
      "allocationPerStatedMeter": 8256.31,
      "rangesMeters": [
        [
          2778.0,
          4046.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Bacolod Circumferential Rd - K0003 + (-222) - K0004 + 046",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.27,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0208-001782",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0054 + 903 - K0055 + 110",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 10450000,
      "lengthKm": 0.207,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50483091.79,
      "lengthMeters": 207.0,
      "allocationPerStatedMeter": 50483.09,
      "rangesMeters": [
        [
          54903.0,
          55110.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0054 + 903 - K0055 + 110",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 1.01,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0118-000142",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway( Digos-Makar Rd) - K1652 + 750 - K1652 + 950",
      "office": "Central Office",
      "amountPesos": 10440000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 52200000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 52200.0,
      "rangesMeters": [
        [
          1652750.0,
          1652950.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Maharlika Highway( Digos-Makar Rd) - K1652 + 750 - K1652 + 950",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 1.12,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0134-000474",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tiaong Bypass Rd - K0094 + (-320) - K0094 + (-274), K0094 + 360 - K0094 + 432, K0094 + 463 - K0094 + 484, K0094 + 821 - K0094 + 931",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 10381000,
      "lengthKm": 0.249,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 41690763.05,
      "lengthMeters": 249.0,
      "allocationPerStatedMeter": 41690.76,
      "rangesMeters": [
        [
          93680.0,
          93726.0
        ],
        [
          94360.0,
          94432.0
        ],
        [
          94463.0,
          94484.0
        ],
        [
          94821.0,
          94931.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Tiaong Bypass Rd - K0094 + (-320) - K0094 + (-274), K0094 + 360 - K0094 + 432, K0094 + 463 - K0094 + 484, K0094 + 821 - K0094 + 931",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.82,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0178-001245",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Nueva Vizcaya-Ifugao-Mt Province Rd - K0336 + 695 - K0336 + 772, K0338 + (-010) - K0338 + 045, K0340 + 1073 - K0340 + 1111",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 10373000,
      "lengthKm": 0.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 61017647.06,
      "lengthMeters": 170.0,
      "allocationPerStatedMeter": 61017.65,
      "rangesMeters": [
        [
          336695.0,
          336772.0
        ],
        [
          337990.0,
          338045.0
        ],
        [
          341073.0,
          341111.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Nueva Vizcaya-Ifugao-Mt Province Rd - K0336 + 695 - K0336 + 772, K0338 + (-010) - K0338 + 045, K0340 + 1073 - K0340 + 1111",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 0.32,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0275-002996",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Belance Br. (B04653LZ) along Jct Natl Road-Bitnong-Belance-N Vizcaya Bdry Rd",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 10368000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Belance Br. (B04653LZ) along Jct Natl Road-Bitnong-Belance-N Vizcaya Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0145-000676",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Flores St (Region 4-A) - (S06049LZ) Chainage 000 - Chainage 189",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 10350000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Flores St (Region 4-A) - (S06049LZ) Chainage 000 - Chainage 189",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0254-002583",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Luyang-Poo-Lazi Rd - K0020 + 850 - K0021 + 669 (Off-Carriageway Improvement: Paving of Shoulders)",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 10350000,
      "lengthKm": 0.819,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12637362.64,
      "lengthMeters": 819.0,
      "allocationPerStatedMeter": 12637.36,
      "rangesMeters": [
        [
          20850.0,
          21669.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "254",
      "lengthEvidence": "Luyang-Poo-Lazi Rd - K0020 + 850 - K0021 + 669 (Off-Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 1.28,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0120-000181",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Noveleta-Rosario Div Rd - K0029 + 533 - K0030 + 012, K0030 + 083 - K0030 + 491",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 10333000,
      "lengthKm": 0.887,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 11649379.93,
      "lengthMeters": 887.0,
      "allocationPerStatedMeter": 11649.38,
      "rangesMeters": [
        [
          29533.0,
          30012.0
        ],
        [
          30083.0,
          30491.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Noveleta-Rosario Div Rd - K0029 + 533 - K0030 + 012, K0030 + 083 - K0030 + 491",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 0.27,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0213-001874",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0032 + 702 - K0033 + 100",
      "office": "Surigao del Norte 1st District Engineering Office",
      "amountPesos": 10302000,
      "lengthKm": 0.398,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25884422.11,
      "lengthMeters": 398.0,
      "allocationPerStatedMeter": 25884.42,
      "rangesMeters": [
        [
          32702.0,
          33100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "213",
      "lengthEvidence": "Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0032 + 702 - K0033 + 100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.64,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0493-007342",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sadiat East, San Manuel, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 10250000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road, Barangay Sadiat East, San Manuel, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0118-000150",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Road - K0552 + 000 - K0553 + 000",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10200000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10200000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 10200.0,
      "rangesMeters": [
        [
          552000.0,
          553000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Manila North Road - K0552 + 000 - K0553 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 0.22,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0533-008196",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Camias, Magalang, Pampanga, Sta. 0+000 - Sta. 0+677 Sta. 0+000 - Sta. 0+360",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 10195000,
      "lengthKm": 0.677,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 15059084.19,
      "lengthMeters": 677.0,
      "allocationPerStatedMeter": 15059.08,
      "rangesMeters": [
        [
          0.0,
          677.0
        ],
        [
          0.0,
          360.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road Barangay Camias, Magalang, Pampanga, Sta. 0+000 - Sta. 0+677 Sta. 0+000 - Sta. 0+360",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.62,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0171-001141",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Prosperidad-Quezon-Cabaron Rd - K0078 + 224 - K0078 + 540, K0078 + 666 - K0078 + 812",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 10164000,
      "lengthKm": 0.462,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22000000.0,
      "lengthMeters": 462.0,
      "allocationPerStatedMeter": 22000.0,
      "rangesMeters": [
        [
          78224.0,
          78540.0
        ],
        [
          78666.0,
          78812.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Prosperidad-Quezon-Cabaron Rd - K0078 + 224 - K0078 + 540, K0078 + 666 - K0078 + 812",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.69,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0245-002449",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1432 + 000 - K1432 + 892, K1432 + 969.10 - K1433 + 000 (Road Safety: Roadway Lighting)",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 10160000,
      "lengthKm": 0.9228999999999069,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 11008776.68,
      "lengthMeters": 922.9,
      "allocationPerStatedMeter": 11008.78,
      "rangesMeters": [
        [
          1432000.0,
          1432892.0
        ],
        [
          1432969.1,
          1433000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1432 + 000 - K1432 + 892, K1432 + 969.10 - K1433 + 000 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.92,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0245-002444",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1425 + 000 - K1425 + 276, K1425 + 425 - K1426 + 000 (Road Safety: Roadway Lighting)",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 10159000,
      "lengthKm": 0.851,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 11937720.33,
      "lengthMeters": 851.0,
      "allocationPerStatedMeter": 11937.72,
      "rangesMeters": [
        [
          1425000.0,
          1425276.0
        ],
        [
          1425425.0,
          1426000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1425 + 000 - K1425 + 276, K1425 + 425 - K1426 + 000 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.99,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0432-006107",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction/ Rehabilitation of Road, Barangay Calasgasan, Daet, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 10089950,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "432",
      "lengthEvidence": "Reconstruction/ Rehabilitation of Road, Barangay Calasgasan, Daet, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003018",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Kabitanganan Br. (B03135LZ) along Talaba-Summit-Panaon Rd",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 10080000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Kabitanganan Br. (B03135LZ) along Talaba-Summit-Panaon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0627-010188",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Roadway lighting, Badiangon (Sta. 0+000 - Sta. 0+180), Barangay Ampayon, Butuan City",
      "office": "Butuan City District Engineering Office",
      "amountPesos": 10074000,
      "lengthKm": 0.18,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55966666.67,
      "lengthMeters": 180.0,
      "allocationPerStatedMeter": 55966.67,
      "rangesMeters": [
        [
          0.0,
          180.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction of Road with Roadway lighting, Badiangon (Sta. 0+000 - Sta. 0+180), Barangay Ampayon, Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.58,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0134-000463",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Carmona Div Rd - K0047 + (-720) - K0047 + (-628)",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 10047000,
      "lengthKm": 0.092,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 109206521.74,
      "lengthMeters": 92.0,
      "allocationPerStatedMeter": 109206.52,
      "rangesMeters": [
        [
          46280.0,
          46372.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Carmona Div Rd - K0047 + (-720) - K0047 + (-628)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 2.16,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0137-000521",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Catarman-Laoang Rd - K0782 + 946 - K0783 + 135",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 10039000,
      "lengthKm": 0.189,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53116402.12,
      "lengthMeters": 189.0,
      "allocationPerStatedMeter": 53116.4,
      "rangesMeters": [
        [
          782946.0,
          783135.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Catarman-Laoang Rd - K0782 + 946 - K0783 + 135",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 1.05,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0151-000787",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - (S01637MN) Chainage 000 - Chainage 504",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - (S01637MN) Chainage 000 - Chainage 504",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0151-000790",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1669 + 000 - K1669 + 349",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": 0.349,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28653295.13,
      "lengthMeters": 349.0,
      "allocationPerStatedMeter": 28653.3,
      "rangesMeters": [
        [
          1669000.0,
          1669349.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1669 + 000 - K1669 + 349",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 1.0,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0169-001104",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Talisay-Laurel-Agoncillo Rd - K0114 + 100 - K0114 + 168",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.068,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 147058823.53,
      "lengthMeters": 68.0,
      "allocationPerStatedMeter": 147058.82,
      "rangesMeters": [
        [
          114100.0,
          114168.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Talisay-Laurel-Agoncillo Rd - K0114 + 100 - K0114 + 168",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 2.72,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0181-001294",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Palompon-Isabel-Merida-Ormoc Rd - K1113 + 838 - K1114 + 000",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.162,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 61728395.06,
      "lengthMeters": 162.0,
      "allocationPerStatedMeter": 61728.4,
      "rangesMeters": [
        [
          1113838.0,
          1114000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Palompon-Isabel-Merida-Ormoc Rd - K1113 + 838 - K1114 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 190082.64,
      "peerRateMultiple": 0.32,
      "peerRecords": 21,
      "peerBand": "108–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 537679.27,
      "graphUpperFence": 779874.4600000001
    },
    {
      "id": "HB10858-3-0181-001305",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Asuncion-San Isidro-Laak-Veruela Rd - K1523 + 510 - K1523 + 530",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.02,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 500000000.0,
      "lengthMeters": 20.0,
      "allocationPerStatedMeter": 500000.0,
      "rangesMeters": [
        [
          1523510.0,
          1523530.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Asuncion-San Isidro-Laak-Veruela Rd - K1523 + 510 - K1523 + 530",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 2.35,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0184-001353",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Claveria-Calanasan-Kabugao Rd - K0667 + 014 - K0667 + 286",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.272,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36764705.88,
      "lengthMeters": 272.0,
      "allocationPerStatedMeter": 36764.71,
      "rangesMeters": [
        [
          667014.0,
          667286.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Claveria-Calanasan-Kabugao Rd - K0667 + 014 - K0667 + 286",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 174840.0,
      "peerRateMultiple": 0.21,
      "peerRecords": 21,
      "peerBand": "134–<302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 536372.5599999999,
      "graphUpperFence": 781078.45
    },
    {
      "id": "HB10858-3-0187-001400",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Nabunturan-Mainit Park Rd - K1440 + 800 - K1440 + 830",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 333333333.33,
      "lengthMeters": 30.0,
      "allocationPerStatedMeter": 333333.33,
      "rangesMeters": [
        [
          1440800.0,
          1440830.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "187",
      "lengthEvidence": "Nabunturan-Mainit Park Rd - K1440 + 800 - K1440 + 830",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.89,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0225-002105",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Sta. 10+216 - Sta. 10+220.67 Barangay Bagocboc, Opol, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": 0.0046700000000000725,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2141327623.13,
      "lengthMeters": 4.67,
      "allocationPerStatedMeter": 2141327.62,
      "rangesMeters": [
        [
          10216.0,
          10220.67
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "225",
      "lengthEvidence": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Sta. 10+216 - Sta. 10+220.67 Barangay Bagocboc, Opol, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": true,
      "rateReview": "Very short printed range · verify length first"
    },
    {
      "id": "HB10858-3-0227-002135",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Opol Diversion Road (Opol-Canito-an), Barangay Igpit-Barangay Taboc, Sta. 2+500 - Sta. 2+900, Opol, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          2500.0,
          2900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Opol Diversion Road (Opol-Canito-an), Barangay Igpit-Barangay Taboc, Sta. 2+500 - Sta. 2+900, Opol, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 127273.68,
      "peerRateMultiple": 0.2,
      "peerRecords": 35,
      "peerBand": "325.5–<505.98 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 546199.1375000001,
      "graphUpperFence": 813918.6200000001
    },
    {
      "id": "HB10858-3-0227-002139",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Puerto - Claveria Bypass Road,Barangay Natumolan Section, Sta. 5+400 - Sta. 5+645, Tagoloan, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": 0.245,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40816326.53,
      "lengthMeters": 245.0,
      "allocationPerStatedMeter": 40816.33,
      "rangesMeters": [
        [
          5400.0,
          5645.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "227",
      "lengthEvidence": "Puerto - Claveria Bypass Road,Barangay Natumolan Section, Sta. 5+400 - Sta. 5+645, Tagoloan, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.19,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0233-002241",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "233",
      "lengthEvidence": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0240-002372",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Minalwang Br. 3, Sta. 0+230 - Sta. 0+310, Barangay Minalwang, Claveria, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": 0.08,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 125000000.0,
      "lengthMeters": 80.0,
      "allocationPerStatedMeter": 125000.0,
      "rangesMeters": [
        [
          230.0,
          310.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Minalwang Br. 3, Sta. 0+230 - Sta. 0+310, Barangay Minalwang, Claveria, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 0.14,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0240-002379",
      "category": "Mixed roads / bridges",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Tagoloan-Misamis Oriental Bdry. Road, Sta. Ana Bridge, Barangay Sta. Ana, Sta. 4+420 - Sta. 4+428, Tagoloan, Misamis Oriental",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": 0.008,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": 8.0,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          4420.0,
          4428.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "240",
      "lengthEvidence": "Tagoloan-Misamis Oriental Bdry. Road, Sta. Ana Bridge, Barangay Sta. Ana, Sta. 4+420 - Sta. 4+428, Tagoloan, Misamis Oriental",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0245-002441",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Dumaguete South Rd - K0024 + 000 - K0024 + 700 (Road Safety: Roadway Lighting)",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14285714.29,
      "lengthMeters": 700.0,
      "allocationPerStatedMeter": 14285.71,
      "rangesMeters": [
        [
          24000.0,
          24700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Dumaguete South Rd - K0024 + 000 - K0024 + 700 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 1.19,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0246-002459",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd., K1455 + 417 - K1456 + 243 (Road Safety: Road Lighting)",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.826,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12106537.53,
      "lengthMeters": 826.0,
      "allocationPerStatedMeter": 12106.54,
      "rangesMeters": [
        [
          1455417.0,
          1456243.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd., K1455 + 417 - K1456 + 243 (Road Safety: Road Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 1.01,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0246-002461",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd., K1454+984 - K1455+386, (Road Safety: Roadway Lighting)",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.402,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24875621.89,
      "lengthMeters": 402.0,
      "allocationPerStatedMeter": 24875.62,
      "rangesMeters": [
        [
          1454984.0,
          1455386.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "246",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd., K1454+984 - K1455+386, (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 2.07,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0248-002492",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd (S01376MN) K1816 + 849 – K1817 + 280 (Road Safety: Roadway Lighting)",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": 0.431,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23201856.15,
      "lengthMeters": 431.0,
      "allocationPerStatedMeter": 23201.86,
      "rangesMeters": [
        [
          1816849.0,
          1817280.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "248",
      "lengthEvidence": "Surigao-Davao Coastal Rd (S01376MN) K1816 + 849 – K1817 + 280 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 1.84,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0248-002495",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Pangasinan-Nueva Ecija Rd - K0176 + 337 - K0179 + 785 (Installation of Solar Street Lights)",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 3.448,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2900232.02,
      "lengthMeters": 3448.0,
      "allocationPerStatedMeter": 2900.23,
      "rangesMeters": [
        [
          176337.0,
          179785.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "248",
      "lengthEvidence": "Pangasinan-Nueva Ecija Rd - K0176 + 337 - K0179 + 785 (Installation of Solar Street Lights)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.28,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0252-002545",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Surigao - Davao Coastal Rd. (S00313MN) K1298 + 396 - K1302 + 696 (Road Safety: Roadway Lighting)",
      "office": "Surigao del Sur 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 4.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2325581.4,
      "lengthMeters": 4300.0,
      "allocationPerStatedMeter": 2325.58,
      "rangesMeters": [
        [
          1298396.0,
          1302696.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "252",
      "lengthEvidence": "Surigao - Davao Coastal Rd. (S00313MN) K1298 + 396 - K1302 + 696 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 10347.83,
      "peerRateMultiple": 0.22,
      "peerRecords": 40,
      "peerBand": "≥1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 23439.745000000003,
      "graphUpperFence": 32812.6825
    },
    {
      "id": "HB10858-3-0253-002561",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Muñoz-Lupao Rd - K0162 + 833 - K0163 + 000, K0164 + 000 - K0164 + 377",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.544,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 18382352.94,
      "lengthMeters": 544.0,
      "allocationPerStatedMeter": 18382.35,
      "rangesMeters": [
        [
          162833.0,
          163000.0
        ],
        [
          164000.0,
          164377.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "253",
      "lengthEvidence": "Muñoz-Lupao Rd - K0162 + 833 - K0163 + 000, K0164 + 000 - K0164 + 377",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 1.85,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0256-002598",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Tertiary Roads",
      "projectName": "Mountain Province-Cervantes, Ilocos Sur via Dacudac-Pilipil Rd - Chainage 21539 - Chainage 21759",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "256",
      "lengthEvidence": "Mountain Province-Cervantes, Ilocos Sur via Dacudac-Pilipil Rd - Chainage 21539 - Chainage 21759",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0256-002605",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Tertiary Roads",
      "projectName": "Lanao del Norte Interior Circum. Rd (LDNICR) - K1562 + 474 - K1562 + 794",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.32,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31250000.0,
      "lengthMeters": 320.0,
      "allocationPerStatedMeter": 31250.0,
      "rangesMeters": [
        [
          1562474.0,
          1562794.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "256",
      "lengthEvidence": "Lanao del Norte Interior Circum. Rd (LDNICR) - K1562 + 474 - K1562 + 794",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 2,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0261-002716",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Singanan Br. (B00926MN) along Maharlika Highway (Agusan-Davao Sect)",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Singanan Br. (B00926MN) along Maharlika Highway (Agusan-Davao Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0262-002726",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Baguingey Br. (B01314LZ) along Baguio-Bontoc Rd",
      "office": "Benguet 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "Baguingey Br. (B01314LZ) along Baguio-Bontoc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0263-002742",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Baldong Br. (B00256LZ) along Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco- Camarines Sur Bdry Rd",
      "office": "Albay 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Baldong Br. (B00256LZ) along Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco- Camarines Sur Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0265-002793",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Rosario Br. 1 (B01238LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Rosario Br. 1 (B01238LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002800",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Bagula Br. (B00390LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Bagula Br. (B00390LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002816",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Datal Salvan Br. 2 (B02241MN) along General Santos City-T'Boli-Surallah Rd",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Datal Salvan Br. 2 (B02241MN) along General Santos City-T'Boli-Surallah Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002819",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Silway 8 (Twin Br. SB) (B01213MN) along Maharlika Highway",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Silway 8 (Twin Br. SB) (B01213MN) along Maharlika Highway",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002820",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Solibao Br. (B00899MN) along Maharlika Highway (Agusan-Davao Sect)",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Solibao Br. (B00899MN) along Maharlika Highway (Agusan-Davao Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002833",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Sabangan Br. (B01414LZ) along Claveria-Calanasan-Kabugao Rd",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Sabangan Br. (B01414LZ) along Claveria-Calanasan-Kabugao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0268-002858",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Sibaltan Br. 1 (B00344PW) along El Nido-Jct New Ibahay Rd",
      "office": "Palawan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Sibaltan Br. 1 (B00344PW) along El Nido-Jct New Ibahay Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0268-002859",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Villapaz Br. 1 (B00346PW) along El Nido-Jct New Ibahay Rd",
      "office": "Palawan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Villapaz Br. 1 (B00346PW) along El Nido-Jct New Ibahay Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0269-002877",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Pangdan Br. 1 (B00607CB) along Naga-Uling Rd",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Pangdan Br. 1 (B00607CB) along Naga-Uling Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0270-002885",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Nunucan Br. 2 (B01275MN) along Misamis Oriental-Ma Cristina Bdry Rd",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Nunucan Br. 2 (B01275MN) along Misamis Oriental-Ma Cristina Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0271-002910",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Mag-asawang Kahoy Br. (B01219LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Mag-asawang Kahoy Br. (B01219LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0272-002932",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "San Gabriel Br. (B00393LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "San Gabriel Br. (B00393LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0272-002937",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Sibalom Br. (B00317PN) along Iloilo-Antique Rd",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Sibalom Br. (B00317PN) along Iloilo-Antique Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002969",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Legarda Fly-Over (B03350LZ) along Legarda Flyover",
      "office": "North Manila District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Legarda Fly-Over (B03350LZ) along Legarda Flyover",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-003013",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Banqueruan Br. 2 (B01532LZ) along Sasmuan-Lubao Rd",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Banqueruan Br. 2 (B01532LZ) along Sasmuan-Lubao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003021",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Pinamanaan Br. (B00254MR) along Mindoro West Coastal Rd",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Pinamanaan Br. (B00254MR) along Mindoro West Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003032",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Badiangan Br. (B00250PN) along Iloilo East Coast-Capiz Rd",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Badiangan Br. (B00250PN) along Iloilo East Coast-Capiz Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0277-003045",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Inguan Br. (B00004PN) along Jct Bancal-Leon-Antique Bdry Rd",
      "office": "Iloilo 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Inguan Br. (B00004PN) along Jct Bancal-Leon-Antique Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0277-003047",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Iloilo City Flyover (B00466PN) along Iloilo City Flyover",
      "office": "Iloilo City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Iloilo City Flyover (B00466PN) along Iloilo City Flyover",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003065",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Abatan Br. (B00227BH) along The President Carlos P. Garcia Circumferential Rd",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Abatan Br. (B00227BH) along The President Carlos P. Garcia Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003068",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Banban Br. (B00545CB) along Toledo-Pinamungahan-Aloguinsan-Mantalongon Rd",
      "office": "Cebu 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Banban Br. (B00545CB) along Toledo-Pinamungahan-Aloguinsan-Mantalongon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003076",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tambongon Br. (B00018CB) along Antonio y De Pio H-way",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Tambongon Br. (B00018CB) along Antonio y De Pio H-way",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003077",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Bagatayam Br. (B00572CB) along Cebu North Hagnaya Wharf Rd",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Bagatayam Br. (B00572CB) along Cebu North Hagnaya Wharf Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003078",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tapon br. (B00648CB) along Cebu North Hagnaya Wharf Rd",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Tapon br. (B00648CB) along Cebu North Hagnaya Wharf Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003082",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Montaneza Br. (B00459CB) along Santander-Barili-Toledo Rd",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Montaneza Br. (B00459CB) along Santander-Barili-Toledo Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003085",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Colon Br. (B00304CB) along Colon St",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Colon Br. (B00304CB) along Colon St",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003086",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Kinalumsan Br. 1 (B00405CB) along N Bacalso Ave (Cebu South Rd)",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Kinalumsan Br. 1 (B00405CB) along N Bacalso Ave (Cebu South Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003091",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Lawaan Br. (B00052BR) along Biliran Circumferential Rd",
      "office": "Biliran District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Lawaan Br. (B00052BR) along Biliran Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003108",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Mondragon Br. (B00539SM) along Catarman-Laoang Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Mondragon Br. (B00539SM) along Catarman-Laoang Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003142",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Dodiongan Br. (B02194MN) along Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Dodiongan Br. (B02194MN) along Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003144",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tablon Br. (B02196MN) along Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Tablon Br. (B02196MN) along Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003146",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Digkilaan Br. (B02195MN) along Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Digkilaan Br. (B02195MN) along Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003157",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Grebona Br. (B01246MN) along Banisilan-Guiling-Alamada-Libungan Rd",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Grebona Br. (B01246MN) along Banisilan-Guiling-Alamada-Libungan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003291",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Hubang Br. (B01744MN) along Maharlika Highway (Agusan-Davao Sect)",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Hubang Br. (B01744MN) along Maharlika Highway (Agusan-Davao Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003293",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Paypay Twin Parallel Br. along Maharlika Highway (Surigao-Agusan Sect)",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Paypay Twin Parallel Br. along Maharlika Highway (Surigao-Agusan Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003297",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Callusa Br. (B00773LZ) along Laoag-Sarrat-Piddig-Solsona Rd",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Callusa Br. (B00773LZ) along Laoag-Sarrat-Piddig-Solsona Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003304",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Camanauan Br. (B02022LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Camanauan Br. (B02022LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003305",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Cullit Br. 2 (B02019LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Cullit Br. 2 (B02019LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0288-003307",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Cullit Br. 4 (B02021LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Cullit Br. 4 (B02021LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0293-003402",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "La Union Br. (B01726MN) along Pandanon-Magallanes Rd",
      "office": "Agusan del Norte District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "293",
      "lengthEvidence": "La Union Br. (B01726MN) along Pandanon-Magallanes Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005758",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Binmeckeg, Sison, Pangasinan",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Road at Barangay Binmeckeg, Sison, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005761",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Sta. Maria Norte, Binalonan, Pangasinan",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Road at Barangay Sta. Maria Norte, Binalonan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005763",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Vacante, Binalonan, Pangasinan",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Road at Barangay Vacante, Binalonan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005765",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Barangobong, Villasis, Pangasinan",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Road, Barangay Barangobong, Villasis, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005766",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Barraca, Villasis, Pangasinan",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Road, Barangay Barraca, Villasis, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005767",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion - Amagbagan, Sison, Pangasinan",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Road, Barangay Poblacion - Amagbagan, Sison, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0416-005769",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Nicolas - Tombod Irrigation Road, Barangay San Nicolas and Barangay Tombod, Villasis, Pangasinan",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "416",
      "lengthEvidence": "Construction of Road, San Nicolas - Tombod Irrigation Road, Barangay San Nicolas and Barangay Tombod, Villasis, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0438-006227",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road concreting, Barangay Banga, Marawi City, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Road concreting, Barangay Banga, Marawi City, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0439-006245",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road Barangay Basak Malutlut, Marawi City, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Construction of Barangay Road Barangay Basak Malutlut, Marawi City, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006405",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Drainage at CRM Avenue, Barangay Almanza Uno, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Construction of Road including Drainage at CRM Avenue, Barangay Almanza Uno, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006407",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage at Aria St, Barangay Talon 2, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Rehabilitation of Road and Drainage at Aria St, Barangay Talon 2, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006412",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage Villa Coastal, Barangay Daniel Fajardo, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Rehabilitation of Road and Drainage Villa Coastal, Barangay Daniel Fajardo, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006413",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage, Casimiro, Barangay Pulanglupa 1, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Rehabilitation of Road and Drainage, Casimiro, Barangay Pulanglupa 1, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006414",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage at Green Valley, Barangay Manuyo 2, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Rehabilitation of Road including Drainage at Green Valley, Barangay Manuyo 2, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006415",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage at Remarville Subd., Barangay Pamplona 2, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Rehabilitation of Road including Drainage at Remarville Subd., Barangay Pamplona 2, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0449-006425",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Barangay Concepcion Uno Road Network at Padre Burgos St. San Isidro Village 1 (Chainage 0+000 - Chainage 0+303), Padre Zamora St. San Isidro Village 1 (Chainage 0+000 - Chainage 0+130), Sampaguita St. San Isidro Village 2 (Chainage 0+000 - Chainage 0+116), Jasmin St. San Isidro Village 2 (Chainage 0+000 - Chainage 0+323) Camia St. San Isidro Village 2 (Chainage 0+000 - Chainage 0+068), Rosal St. San Isidro Village 2 (Chainage 0+000 - Chainage 0+039), Santan St. San Isidro Village 2 (Chainage 0+000 - Chainage 0+072), Barangay Concepcion Uno, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "449",
      "lengthEvidence": "Rehabilitation of Barangay Concepcion Uno Road Network at Padre Burgos St. San Isidro Village 1 (Chainage 0+000 - Chainage 0+303), Padre Zamora St. San Isidro Village 1 (Chainage 0+000 - Chainage 0+130), Sampaguita St. San Isidro Village 2 (Chainage 0+000 - Chainage 0+116), Jasmin St. San Isidro Village 2 (Chainage 0+000 - Chainage 0+323) Camia St. San Isidro Village 2 (Chainage 0+000 - Chainage 0+068), Rosal St. San Isidro Village 2 (Chainage 0+000 - Chainage 0+039), Santan St. San Isidro Village 2 (Chainage 0+000 - Chainage 0+072), Barangay Concepcion Uno, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0449-006429",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "449",
      "lengthEvidence": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0450-006440",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Network Including Laterals at La Colina, Orchids St. (Chainage 0+000 - Chainage 0+194), Dama de Noche St. (Chainage 0+000 - Chainage 0+620), Carnation St. (Chainage 0+000 - Chainage 0+570), Magnolia St. (Chainage 0+000 - Chainage 0+180), Barangay Fortune, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "450",
      "lengthEvidence": "Rehabilitation of Road Network Including Laterals at La Colina, Orchids St. (Chainage 0+000 - Chainage 0+194), Dama de Noche St. (Chainage 0+000 - Chainage 0+620), Carnation St. (Chainage 0+000 - Chainage 0+570), Magnolia St. (Chainage 0+000 - Chainage 0+180), Barangay Fortune, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0450-006441",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Network Including Laterals at St. Claire Subdivision, Barangay Concepcion Uno, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "450",
      "lengthEvidence": "Rehabilitation of Road Network Including Laterals at St. Claire Subdivision, Barangay Concepcion Uno, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0451-006452",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage (Interconnecting Alleys) along Diego Silang St. (C 0+000 - C 0+512), Barangay 178, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Construction of Road and Drainage (Interconnecting Alleys) along Diego Silang St. (C 0+000 - C 0+512), Barangay 178, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0452-006479",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage Systems along Banal and Tugatog Sts., Barangay 147, Caoocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "452",
      "lengthEvidence": "Rehabilitation of Road and Drainage Systems along Banal and Tugatog Sts., Barangay 147, Caoocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0453-006498",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road along Tanigue St. (C 0+000 - C 0+526), Barangay 14, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "453",
      "lengthEvidence": "Rehabilitation of Road along Tanigue St. (C 0+000 - C 0+526), Barangay 14, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006509",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along G. Molina St. (C0+000 to C0+160) to Out Fall (C0+000 to C0+100), Barangay Paso De Blas, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along G. Molina St. (C0+000 to C0+160) to Out Fall (C0+000 to C0+100), Barangay Paso De Blas, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006512",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Igmidio St. (C0+000 to C0+259), Barangay Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Igmidio St. (C0+000 to C0+259), Barangay Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006520",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Prodon (C0+000 to C0+320), Barangay Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Prodon (C0+000 to C0+320), Barangay Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006540",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage Systems, Lupang Pinagpala Lot 581, Barangay 171, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Road and Drainage Systems, Lupang Pinagpala Lot 581, Barangay 171, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006541",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Villa Maria, Barangay 168, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Road at Villa Maria, Barangay 168, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006544",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage (Sectional Reblocking) along C. Dior St.(C0+000 - C0+140) and Lady Passion St.(C0+000 - C0+058), Barangay 186, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Roads and Drainage (Sectional Reblocking) along C. Dior St.(C0+000 - C0+140) and Lady Passion St.(C0+000 - C0+058), Barangay 186, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006597",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road and Drainage System along Barangay 201 Zone 20 and its vicinity, Pasay City",
      "office": "South Manila District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Road and Drainage System along Barangay 201 Zone 20 and its vicinity, Pasay City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006598",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road and Drainage System along E. Rodriguez Street, Barangay 165 Zone 18 and its vicinity, Pasay City",
      "office": "South Manila District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Road and Drainage System along E. Rodriguez Street, Barangay 165 Zone 18 and its vicinity, Pasay City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006601",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road and Drainage System along Vitales Street, Barangay 164 Zone 18 and its vicinity, Pasay City",
      "office": "South Manila District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Road and Drainage System along Vitales Street, Barangay 164 Zone 18 and its vicinity, Pasay City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006602",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Roads and Drainage at Barangay 727, Malate, Manila",
      "office": "South Manila District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Roads and Drainage at Barangay 727, Malate, Manila",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006603",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Roads and Drainage at Barangay 808, Zone 88, Manila City",
      "office": "South Manila District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Roads and Drainage at Barangay 808, Zone 88, Manila City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006604",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Roads and Drainage System Ada's Park, Pandacan, Manila Sta. 0 - Sta. 373",
      "office": "South Manila District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Roads and Drainage System Ada's Park, Pandacan, Manila Sta. 0 - Sta. 373",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006612",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Cabangaran, Vintar, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Construction of Bridge, Barangay Cabangaran, Vintar, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006613",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Maruaya, Piddig, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Construction of Bridge, Barangay Maruaya, Piddig, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006630",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nagsurot, Burgos, Ilocos Norte, Start 18.505483, 120.677072 End 18.505447, 120.677129",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Construction of Road, Barangay Nagsurot, Burgos, Ilocos Norte, Start 18.505483, 120.677072 End 18.505447, 120.677129",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006631",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Nagsurot, Burgos, Ilocos Norte, Start 18.510711, 120.676454 End 18.511554, 120.678133",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Rehabilitation of Road, Barangay Nagsurot, Burgos, Ilocos Norte, Start 18.510711, 120.676454 End 18.511554, 120.678133",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006632",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Processional Road, Burgos, Ilocos Norte, Start 18.510617, 120.641706 End 18.509954, 120.642839",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Rehabilitation of Processional Road, Burgos, Ilocos Norte, Start 18.510617, 120.641706 End 18.509954, 120.642839",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006633",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Burgos, Ilocos Norte (18.510617, 120.641706 - 18.509954, 120.642839)",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Rehabilitation of Road, Burgos, Ilocos Norte (18.510617, 120.641706 - 18.509954, 120.642839)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006634",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bobon, Burgos, Ilocos Norte (18.500645, 120.586562 - 18.505260, 120.584566)",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Construction of Road, Barangay Bobon, Burgos, Ilocos Norte (18.500645, 120.586562 - 18.505260, 120.584566)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006648",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Cataban-Madiladig Road, Laoag City, Ilocos Norte, Start 18.23754, 120.56357 End 18.24382, 120.56589",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Rehabilitation of Cataban-Madiladig Road, Laoag City, Ilocos Norte, Start 18.23754, 120.56357 End 18.24382, 120.56589",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006649",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Navotas South-Navotas North Road, Laoag City, Ilocos Norte, Start 18.22574, 120.56039 End 18.22949, 120.56458",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Rehabilitation of Navotas South-Navotas North Road, Laoag City, Ilocos Norte, Start 18.22574, 120.56039 End 18.22949, 120.56458",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006665",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Cabaruan West & East, Barangay Pasaleng, Pagudpud, Ilocos Norte, Start 120.944990, 18.557141 End 120.945054, 18.557153",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Construction of Bridge, Cabaruan West & East, Barangay Pasaleng, Pagudpud, Ilocos Norte, Start 120.944990, 18.557141 End 120.945054, 18.557153",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006670",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Reinforced Concrete Deck Girder (RCDG) Bridge, Barangay 1 Poblacion, Pasuquin, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Construction of Reinforced Concrete Deck Girder (RCDG) Bridge, Barangay 1 Poblacion, Pasuquin, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006671",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sulvec Bridge, Pasuquin, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Sulvec Bridge, Pasuquin, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006680",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of San Francisco - San Andres Bridge, Barangay 4, Sarrat, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of San Francisco - San Andres Bridge, Barangay 4, Sarrat, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006684",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Santo Tomas-San Jose Road, Vintar, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Santo Tomas-San Jose Road, Vintar, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006685",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation (Completion) of Cabangaran-Isic-isic Road, Vintar, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Rehabilitation (Completion) of Cabangaran-Isic-isic Road, Vintar, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006687",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Pungto, Bacarra, IlocosNorte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Rehabilitation of Road, Barangay Pungto, Bacarra, IlocosNorte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006689",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Potero Bridge, Barangay Agaga, Burgos,Ilocos Norte, Start 18.4521853, 120.653551 End 18.4521981, 120.6535372",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Potero Bridge, Barangay Agaga, Burgos,Ilocos Norte, Start 18.4521853, 120.653551 End 18.4521981, 120.6535372",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006690",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bimmoyayong Road, Barangay Virbira, Carasi,Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Bimmoyayong Road, Barangay Virbira, Carasi,Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006691",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road along Ayayo Boulevard, Barangay SanIsidro, Dumalneg, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Road along Ayayo Boulevard, Barangay SanIsidro, Dumalneg, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006692",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay 50, Laoag City, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Road, Barangay 50, Laoag City, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006698",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sta. Maria Bridge, Barangay Sta. Maria,Piddig, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Sta. Maria Bridge, Barangay Sta. Maria,Piddig, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006699",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Arua-ay-Lagandit Bridge, Barangay Arua-ay and Barangay Lagandit, Piddig, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Arua-ay-Lagandit Bridge, Barangay Arua-ay and Barangay Lagandit, Piddig, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006700",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Bernabe, Sarrat, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Road, Barangay San Bernabe, Sarrat, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006705",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Sitio Agapang, Barangay Mabanbanag, Vintar, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Bridge, Sitio Agapang, Barangay Mabanbanag, Vintar, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006706",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Sitio Bago, Barangay Ester, Vintar, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Bridge, Sitio Bago, Barangay Ester, Vintar, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006708",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Sitio Tungel, Barangay Isic-isic, Vintar, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Bridge, Sitio Tungel, Barangay Isic-isic, Vintar, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006713",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Local Road, Barangay Liliputen, Pinili, Ilocos Norte",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Local Road, Barangay Liliputen, Pinili, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006730",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Butubut Oeste-Pao-Guinaburan Road, La Union, Start 16.799153, 120.429165 End 16.796092, 120.428280",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Improvement of Butubut Oeste-Pao-Guinaburan Road, La Union, Start 16.799153, 120.429165 End 16.796092, 120.428280",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006735",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Access Road (NLUC Administration- Library Road), Barangay Sapilang, Bacnotan, La Union",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Rehabilitation of Access Road (NLUC Administration- Library Road), Barangay Sapilang, Bacnotan, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006736",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Bato, City of San Fernando, La Union",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Rehabilitation of Road, Barangay Bato, City of San Fernando, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006737",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Dalumpinas Este, City of San Fernando, La Union",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Rehabilitation of Road, Barangay Dalumpinas Este, City of San Fernando, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006738",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Dalumpinas Oeste, City of San Fernando, La Union",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Rehabilitation of Road, Barangay Dalumpinas Oeste, City of San Fernando, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006766",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Palintucang, Bauang, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Barangay Palintucang, Bauang, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006797",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Catuday, Bolinao, Pangasinan, Start 16.283533, 119.817363 End 16.284172, 119.822086",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangay Catuday, Bolinao, Pangasinan, Start 16.283533, 119.817363 End 16.284172, 119.822086",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006798",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sapa Pequeña, Burgos, Pangasinan, Start 16.03144244, 119.83891604 End 16.03314354, 119.83525571",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangay Sapa Pequeña, Burgos, Pangasinan, Start 16.03144244, 119.83891604 End 16.03314354, 119.83525571",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006799",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabanaetan, Mabini, Pangasinan, Start 16.112849, 119.889058 End 16.110858, 119.882235",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangay Cabanaetan, Mabini, Pangasinan, Start 16.112849, 119.889058 End 16.110858, 119.882235",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006801",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Allabon, Agno, Pangasinan, Start 16.02339, 119.802072 End 16.029916, 119.801355",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangay Allabon, Agno, Pangasinan, Start 16.02339, 119.802072 End 16.029916, 119.801355",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006804",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Telbang - Victoria, Alaminos City, Pangasinan, Start 16.172383, 120.055019 End 16.174685, 120.050899",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangay Telbang - Victoria, Alaminos City, Pangasinan, Start 16.172383, 120.055019 End 16.174685, 120.050899",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006807",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tupa, Bolinao, Pangasinan, Start 16.306062, 119.859098 End 16.309458, 119.866431",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangay Tupa, Bolinao, Pangasinan, Start 16.306062, 119.859098 End 16.309458, 119.866431",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006810",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Palamis (Tococ West), Alaminos City, Pangasinan, Start 16.14144162, 119.97401668 End 16.1452171, 119.97139161",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, Barangay Palamis (Tococ West), Alaminos City, Pangasinan, Start 16.14144162, 119.97401668 End 16.1452171, 119.97139161",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006811",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion (Braganza Village), Alaminos City, Pangasinan, Start 16.163818, 119.983307 End 16.16498, 119.98217",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, Barangay Poblacion (Braganza Village), Alaminos City, Pangasinan, Start 16.163818, 119.983307 End 16.16498, 119.98217",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006812",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Lined Canal, Barangay Pogo, Alaminos City, Pangasinan, Start 16.166721, 119.95775 End 16.174266, 119.95448",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road with Lined Canal, Barangay Pogo, Alaminos City, Pangasinan, Start 16.166721, 119.95775 End 16.174266, 119.95448",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006813",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Vicente, Alaminos City, Pangasinan, Start 16.12878581, 120.0009707 End 16.12981201, 120.0053629",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, Barangay San Vicente, Alaminos City, Pangasinan, Start 16.12878581, 120.0009707 End 16.12981201, 120.0053629",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006821",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sto. Domingo, Sual, Pangasinan, Start 16.068731, 120.034381 End 16.063221, 120.035168",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, Barangay Sto. Domingo, Sual, Pangasinan, Start 16.068731, 120.034381 End 16.063221, 120.035168",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006826",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of East Humilde Road, Barangay San Roque, Alaminos City, Pangasinan, Sta 0+000 - Sta 0+600",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16666666.67,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 16666.67,
      "rangesMeters": [
        [
          0.0,
          600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of East Humilde Road, Barangay San Roque, Alaminos City, Pangasinan, Sta 0+000 - Sta 0+600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.68,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0470-006836",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Roque, Bolinao, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road, Barangay San Roque, Bolinao, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006845",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Lingayen, Pangasinan, Start 16.030286, 120.228177 End 16.030048, 120.227261",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Improvement of Road at Lingayen, Pangasinan, Start 16.030286, 120.228177 End 16.030048, 120.227261",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006847",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Olo Cacamposan - Barangay Pampano, Sta 0+000 - Sta 0+843 , Mangatarem, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.843,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11862396.2,
      "lengthMeters": 843.0,
      "allocationPerStatedMeter": 11862.4,
      "rangesMeters": [
        [
          0.0,
          843.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road, Barangay Olo Cacamposan - Barangay Pampano, Sta 0+000 - Sta 0+843 , Mangatarem, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.61,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0470-006848",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Alacan - Barangay Mabilao, Sta 0+000 - Sta 0+843 , San Fabian, Pangasinan,",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.843,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11862396.2,
      "lengthMeters": 843.0,
      "allocationPerStatedMeter": 11862.4,
      "rangesMeters": [
        [
          0.0,
          843.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road, Barangay Alacan - Barangay Mabilao, Sta 0+000 - Sta 0+843 , San Fabian, Pangasinan,",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.61,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0471-006865",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Capaoay, San Jacinto, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Capaoay, San Jacinto, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006878",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Oraan East, Manaoag, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Oraan East, Manaoag, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006904",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Rabago, Rosales, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road at Barangay Rabago, Rosales, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006905",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Crossing, Barangay Camangaan, Rosales, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Road with Drainage Crossing, Barangay Camangaan, Rosales, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006908",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Rosa, Sta. Maria, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Road, Barangay Sta. Rosa, Sta. Maria, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006924",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Maximo, Natividad, Pangasinan, 16.027233, 120.781904",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Road, Barangay San Maximo, Natividad, Pangasinan, 16.027233, 120.781904",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006925",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Acop, Rosales, Pangasinan, 15.86777778, 120.64694444",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay Acop, Rosales, Pangasinan, 15.86777778, 120.64694444",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006927",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0 + 000 - Sta. 0 + 818, Barangay Carosucan Norte, Asingan, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.818,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12224938.88,
      "lengthMeters": 818.0,
      "allocationPerStatedMeter": 12224.94,
      "rangesMeters": [
        [
          0.0,
          818.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Sta. 0 + 000 - Sta. 0 + 818, Barangay Carosucan Norte, Asingan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.63,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0474-006928",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Antonio, Rosales, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay San Antonio, Rosales, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006930",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bakit-Bakit, Rosales, Pangasinan, 15.89472222, 120.65194444 End 15.89222222, 120.6450",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay Bakit-Bakit, Rosales, Pangasinan, 15.89472222, 120.65194444 End 15.89222222, 120.6450",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006931",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Marcos - Barangay Luna, Sto. Tomas, Pangasinan, 15.867030755616724, 120.5850552207216",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay San Marcos - Barangay Luna, Sto. Tomas, Pangasinan, 15.867030755616724, 120.5850552207216",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006951",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Local Road, Barangay Bongato East, Bayambang, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Local Road, Barangay Bongato East, Bayambang, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006952",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Local Road, Barangay Taloyan, Malasiqui, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Local Road, Barangay Taloyan, Malasiqui, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006965",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mangayao, Bayambang, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Road, Barangay Mangayao, Bayambang, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0476-006967",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pugo, Bayambang, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "476",
      "lengthEvidence": "Construction of Road, Barangay Pugo, Bayambang, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007023",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Tannibung - Labannun Access Road, Pindongan, Kiangan, Ifugao",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Construction of Tannibung - Labannun Access Road, Pindongan, Kiangan, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007027",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Yuko - Duit Access Road, Baguinge, Kiangan, Ifugao",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Construction of Yuko - Duit Access Road, Baguinge, Kiangan, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007029",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Bongan to Barangay Mayoyao Proper Access Road, Barangay Mayoyao Proper, Mayoyao, Ifugao",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Barangay Bongan to Barangay Mayoyao Proper Access Road, Barangay Mayoyao Proper, Mayoyao, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007035",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bongan Access Road, Bongan, Mayoyao, Ifugao",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Bongan Access Road, Bongan, Mayoyao, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007036",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge along Alimit -Banao Road, Banao, Mayoyao, Ifugao",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Bridge along Alimit -Banao Road, Banao, Mayoyao, Ifugao",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007037",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Butayan Access Road, Chalalo, Aguinaldo, Ifugao",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Butayan Access Road, Chalalo, Aguinaldo, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007039",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Mapawoy Access Road, Mapawoy, Mayoyao, Ifugao",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Mapawoy Access Road, Mapawoy, Mayoyao, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007053",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of General Luna Access Road, Barangay Casigayan and Dilag, Tabuk, City, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of General Luna Access Road, Barangay Casigayan and Dilag, Tabuk, City, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007061",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Rizal, Isabela Nat'l Road Junct., Santor-Liwan East Access Road, Barangay Santor, Rizal, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Rizal, Isabela Nat'l Road Junct., Santor-Liwan East Access Road, Barangay Santor, Rizal, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007063",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sandara Access Road, Barangay Santor, Rizal, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Sandara Access Road, Barangay Santor, Rizal, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007107",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Mount Data Junction-Binaka-Bebe-Asbiagan, Barangay Monamon Sur, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Mount Data Junction-Binaka-Bebe-Asbiagan, Barangay Monamon Sur, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007109",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Salin-Balicanao, Barangay Sadsadan, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Salin-Balicanao, Barangay Sadsadan, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007116",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Bangad - Bulo, Barangay Buringal, Paracelis, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Bangad - Bulo, Barangay Buringal, Paracelis, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007138",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Malayo Road (Batanes State College - Agri Building) , Barangay San Antonio, Basco, Batanes",
      "office": "Batanes District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Malayo Road (Batanes State College - Agri Building) , Barangay San Antonio, Basco, Batanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007139",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Chawadi to Masupit, Barangay Kayvaluganan, Basco, Batanes",
      "office": "Batanes District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Road, Chawadi to Masupit, Barangay Kayvaluganan, Basco, Batanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007151",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Tanglagan, Gattaran, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Tanglagan, Gattaran, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007153",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road at Sitio Agnaoan, Barangay Mabuno, Gattaran, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road at Sitio Agnaoan, Barangay Mabuno, Gattaran, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007154",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road at Sitio Rissik, Barangay Mabuno, Gattaran, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road at Sitio Rissik, Barangay Mabuno, Gattaran, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007155",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road at Sitio Tanog, BarangayMabuno, Gattaran, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road at Sitio Tanog, BarangayMabuno, Gattaran, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007160",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Centro-Norte, Cabayu, Gattaran",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Centro-Norte, Cabayu, Gattaran",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007161",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Ganzano, Gattran, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Ganzano, Gattran, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007164",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Nabaccayan, Gattaran, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Nabaccayan, Gattaran, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007165",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Nassiping, Gattaran, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Nassiping, Gattaran, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007176",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road along Barangay Libertad (LDRMO), Abulug , Cagayan",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Road along Barangay Libertad (LDRMO), Abulug , Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007181",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road along Barangay Payagan West-Payagan East, Ballesteros, Cagayan",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Road along Barangay Payagan West-Payagan East, Ballesteros, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007186",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road along Purok Regta, Barangay Libertad, Abulug, Cagayan",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Road along Purok Regta, Barangay Libertad, Abulug, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007188",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Colony Road, Sta. 0+000 - Sta. 0+350, Barangay Libertad, Abulug, Cagayan",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Rehabilitation of Colony Road, Sta. 0+000 - Sta. 0+350, Barangay Libertad, Abulug, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0489-007259",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including, Barangay Osmeña, City of Ilagan, Isabela (Sta. 0+000 - Sta. 0+316)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.316,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31645569.62,
      "lengthMeters": 316.0,
      "allocationPerStatedMeter": 31645.57,
      "rangesMeters": [
        [
          0.0,
          316.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of Road including, Barangay Osmeña, City of Ilagan, Isabela (Sta. 0+000 - Sta. 0+316)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.11,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0490-007272",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "� Construction of Concrete Road (Section 1: Sta. 0+000 - Sta. 0+292, Section 2: Sta. 0+114 - Sta. 0+497, Section 3: Sta. 0+000 - Sta. 0+132) at Barangay Paliueg, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.497,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20120724.35,
      "lengthMeters": 497.0,
      "allocationPerStatedMeter": 20120.72,
      "rangesMeters": [
        [
          0.0,
          292.0
        ],
        [
          114.0,
          497.0
        ],
        [
          0.0,
          132.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "� Construction of Concrete Road (Section 1: Sta. 0+000 - Sta. 0+292, Section 2: Sta. 0+114 - Sta. 0+497, Section 3: Sta. 0+000 - Sta. 0+132) at Barangay Paliueg, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.82,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0491-007289",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Concrete Road at Barangay Magassi to Barangay Union, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Concrete Road at Barangay Magassi to Barangay Union, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007307",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Bimonton, Mallig, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay Bimonton, Mallig, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007325",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay San Jose, Quirino, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay San Jose, Quirino, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007333",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Caliguian, Burgos, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road at Barangay Caliguian, Burgos, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007335",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay San Placido, Roxas, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road at Barangay San Placido, Roxas, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007364",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road leading to Barangay Mansibang, Naguilian, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Construction of Access Road leading to Barangay Mansibang, Naguilian, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007365",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road leading to Barangay Tomines, Naguilian, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Construction of Access Road leading to Barangay Tomines, Naguilian, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007369",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Concrete Road, Barangay San Pedro, Alicia, Isabela, Start 16.833831, 121.639609 End 16.825142, 121.636914",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Rehabilitation of Concrete Road, Barangay San Pedro, Alicia, Isabela, Start 16.833831, 121.639609 End 16.825142, 121.636914",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007373",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta Maria, Alicia, Isabela, Start 16.7679, 121.689898, End 16.765862, 121.685737",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Construction of Road, Barangay Sta Maria, Alicia, Isabela, Start 16.7679, 121.689898, End 16.765862, 121.685737",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007374",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Juan - Sitio Malasin, Barangay San Juan, Alicia, Isabela, Start 16.85248, 121.687527, End 16.854487, 121.697529",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Construction of Road, Barangay San Juan - Sitio Malasin, Barangay San Juan, Alicia, Isabela, Start 16.85248, 121.687527, End 16.854487, 121.697529",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007375",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Villa Domingo-Amobocan Road, Barangay Villa Domingo, Angadanan, Isabela, Start 16.838105, 121.80247 End 16.835275, 121.797431",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Construction of Road, Barangay Villa Domingo-Amobocan Road, Barangay Villa Domingo, Angadanan, Isabela, Start 16.838105, 121.80247 End 16.835275, 121.797431",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0495-007376",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Villa Salvador Road, Barangay La Paz, Cabatuan, Isabela, Start 16.911032, 121.689651 End 16.91496, 121.690562",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Villa Salvador Road, Barangay La Paz, Cabatuan, Isabela, Start 16.911032, 121.689651 End 16.91496, 121.690562",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0495-007377",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Villa Garcia Road, Barangay La Paz, Cabatuan, Isabela, Start 16.90887, 121.664 End 16.89885, 121.660716",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Villa Garcia Road, Barangay La Paz, Cabatuan, Isabela, Start 16.90887, 121.664 End 16.89885, 121.660716",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0495-007378",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pagrang-ayan, Ramon, Isabela (Sta. 0+000 - Sta. 0+537)",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.537,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18621973.93,
      "lengthMeters": 537.0,
      "allocationPerStatedMeter": 18621.97,
      "rangesMeters": [
        [
          0.0,
          537.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Barangay Pagrang-ayan, Ramon, Isabela (Sta. 0+000 - Sta. 0+537)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.76,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0495-007380",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Miguel, Ramon, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Barangay San Miguel, Ramon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0495-007383",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Victoria, San Mateo, Isabela (Sta. 0+000 - Sta. 0+633.00)",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.633,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15797788.31,
      "lengthMeters": 633.0,
      "allocationPerStatedMeter": 15797.79,
      "rangesMeters": [
        [
          0.0,
          633.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Barangay Victoria, San Mateo, Isabela (Sta. 0+000 - Sta. 0+633.00)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.65,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0495-007384",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gaddanan - Pinoma Road, Barangay Gaddanan, San Mateo, Isabela (Sta. 0+000 - Sta. 0+564.00)",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.564,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17730496.45,
      "lengthMeters": 564.0,
      "allocationPerStatedMeter": 17730.5,
      "rangesMeters": [
        [
          0.0,
          564.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Barangay Gaddanan - Pinoma Road, Barangay Gaddanan, San Mateo, Isabela (Sta. 0+000 - Sta. 0+564.00)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.72,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0495-007385",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Paddad - Linglingay Road, Barangay Paddad, Alicia, Isabela (Sta. 0+000 - Sta. 0+736.50)",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.7365,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13577732.52,
      "lengthMeters": 736.5,
      "allocationPerStatedMeter": 13577.73,
      "rangesMeters": [
        [
          0.0,
          736.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Barangay Paddad - Linglingay Road, Barangay Paddad, Alicia, Isabela (Sta. 0+000 - Sta. 0+736.50)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.7,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0495-007390",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Planas, Ramon, Isabela (0+000.00 - 0+249.00)",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.249,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40160642.57,
      "lengthMeters": 249.0,
      "allocationPerStatedMeter": 40160.64,
      "rangesMeters": [
        [
          0.0,
          249.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Road, Barangay Planas, Ramon, Isabela (0+000.00 - 0+249.00)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.41,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0495-007391",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Concrete Road, Barangay Bella Luz, San Mateo, Isabela Sta. (0+000 - 0+325.00)",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.325,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30769230.77,
      "lengthMeters": 325.0,
      "allocationPerStatedMeter": 30769.23,
      "rangesMeters": [
        [
          0.0,
          325.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Rehabilitation of Concrete Road, Barangay Bella Luz, San Mateo, Isabela Sta. (0+000 - 0+325.00)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.08,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0495-007394",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Malasin, San Mateo, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "495",
      "lengthEvidence": "Construction of Roads, Barangay Malasin, San Mateo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007401",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Estrella, San Mateo, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Barangay Road, Barangay Estrella, San Mateo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007403",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Rang-ayan, Naguilian, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Barangay Road, Barangay Rang-ayan, Naguilian, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007404",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay San Manuel, San Mateo, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Barangay Road, Barangay San Manuel, San Mateo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007405",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay San Marcos, San Mateo, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Barangay Road, Barangay San Marcos, San Mateo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007406",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Villa Cruz, San Mateo, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Barangay Road, Barangay Villa Cruz, San Mateo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007408",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Villafuerte, San Mateo, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Barangay Road, Barangay Villafuerte, San Mateo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007413",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road of Barangay Roxas, Naguilian, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Road of Barangay Roxas, Naguilian, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007416",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure, Barangay Villa Magat, San Mateo, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Road Slope Protection Structure, Barangay Villa Magat, San Mateo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007417",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bugallon Proper to Barangay New York, Barangay Bugallon Proper, Ramon, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Road, Barangay Bugallon Proper to Barangay New York, Barangay Bugallon Proper, Ramon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007419",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Furao, Gamu, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Construction of Road, Barangay Furao, Gamu, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007425",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Santiago to Barangay Sinipit, Benito Soliven, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Construction of Road, Barangay Santiago to Barangay Sinipit, Benito Soliven, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007434",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 2 Gomez, San Isidro) Gomez, San Isidro, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Concreting of Road (Purok 2 Gomez, San Isidro) Gomez, San Isidro, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0498-007452",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - 0+750, Barangay Sinaoangan Norte, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - 0+750, Barangay Sinaoangan Norte, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.69,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0500-007492",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Arubub, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Road at Barangay Arubub, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0500-007495",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Rizal West, San Isidro, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Road at Rizal West, San Isidro, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0500-007496",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Victoria, San Isidro, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Road at Victoria, San Isidro, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007501",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Angoluan, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Barangay Angoluan, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007503",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Babaran, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Barangay Babaran, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007506",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bannawag, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Barangay Bannawag, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007507",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bantay - Barangay San Sebastian, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Barangay Bantay - Barangay San Sebastian, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007508",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Busilelao, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Barangay Busilelao, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007511",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+750, Barangay Dicamay 2, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+750, Barangay Dicamay 2, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.69,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0501-007523",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malitao, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Barangay Malitao, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007525",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mercullo, Rizaluna, Cordon, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Barangay Mercullo, Rizaluna, Cordon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007535",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Antonio Ugad, Echague Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Barangay San Antonio Ugad, Echague Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007537",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Mariano Sur, San Guillermo, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Barangay San Mariano Sur, San Guillermo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007540",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tuguegarao, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Barangay Tuguegarao, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007541",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Villamiemban - Barangay Anonang, Cordon, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Barangay Villamiemban - Barangay Anonang, Cordon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007542",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Kabanayan Road, Barangay Dallao, Cordon, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Kabanayan Road, Barangay Dallao, Cordon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007543",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Kakandungan road, Barangay Villamiemban, Cordon, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Kakandungan road, Barangay Villamiemban, Cordon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007544",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Mabbayad To Benguet, Barangay Mabbayad And Barangay Benguet, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Mabbayad To Benguet, Barangay Mabbayad And Barangay Benguet, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007545",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, P5 Surong Road, Barangay Dallao, Cordon, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, P5 Surong Road, Barangay Dallao, Cordon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007546",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Dulo, Barangay Taliktik, Cordon, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Sitio Dulo, Barangay Taliktik, Cordon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007547",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0 + 000 - Sta. 0 + 750, Barangay Sinabbaran, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.75,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 750.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Sta. 0 + 000 - Sta. 0 + 750, Barangay Sinabbaran, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.69,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0503-007548",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0 + 000 - Sta. 0 + 800, Barangay Busilelao, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12500000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 12500.0,
      "rangesMeters": [
        [
          0.0,
          800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Construction of Road, Sta. 0 + 000 - Sta. 0 + 800, Barangay Busilelao, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0503-007549",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0 + 000 - Sta. 0 + 800, Barangay Pangal Norte, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12500000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 12500.0,
      "rangesMeters": [
        [
          0.0,
          800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Construction of Road, Sta. 0 + 000 - Sta. 0 + 800, Barangay Pangal Norte, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0503-007554",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Silauan Sur, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Rehabilitation of Road, Barangay Silauan Sur, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0503-007555",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Sto. Domingo, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Rehabilitation of Road, Barangay Sto. Domingo, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007578",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay San Juan, Solano, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Bridge, Barangay San Juan, Solano, Nueva Vizcaya",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007591",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Dupax del Norte, Nueva Vizcaya",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Road in Dupax del Norte, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007593",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Andres Bonifacio, Diffun, Quirino",
      "office": "Quirino District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Road, Andres Bonifacio, Diffun, Quirino",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007594",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Aurora West, Diffun, Quirino",
      "office": "Quirino District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Road, Aurora West, Diffun, Quirino",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007598",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Disimungal, Nagtipunan, Quirino",
      "office": "Quirino District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Road, Disimungal, Nagtipunan, Quirino",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007599",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Gabriela Silang, Diffun, Quirino",
      "office": "Quirino District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Road, Gabriela Silang, Diffun, Quirino",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007600",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Guribang, Diffun, Quirino",
      "office": "Quirino District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Road, Guribang, Diffun, Quirino",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007603",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Rizal, Diffun, Quirino",
      "office": "Quirino District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Road, Rizal, Diffun, Quirino",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0508-007663",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge at Barangay San Nicolas, Hagonoy, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Construction of Bridge at Barangay San Nicolas, Hagonoy, Bulacan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0508-007669",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Sta. 0+000 - Sta. 0+216.03, Sta. 0+000 - Sta. 0+060.80, & Sta. 0+000 - Sta. 0+102.17, including Drainage Canal, Pinagkaisahan, Sta. Barbara, Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.21603,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 46289867.15,
      "lengthMeters": 216.03,
      "allocationPerStatedMeter": 46289.87,
      "rangesMeters": [
        [
          0.0,
          216.03
        ],
        [
          0.0,
          60.8
        ],
        [
          0.0,
          102.17
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Construction of Road Sta. 0+000 - Sta. 0+216.03, Sta. 0+000 - Sta. 0+060.80, & Sta. 0+000 - Sta. 0+102.17, including Drainage Canal, Pinagkaisahan, Sta. Barbara, Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.31,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0508-007670",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Sta. 0+000- Sta. 0+495, Divine Grace Village II, Pulong Gubat, Balagtas, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.495,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20202020.2,
      "lengthMeters": 495.0,
      "allocationPerStatedMeter": 20202.02,
      "rangesMeters": [
        [
          0.0,
          495.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Construction of Road with Drainage, Sta. 0+000- Sta. 0+495, Divine Grace Village II, Pulong Gubat, Balagtas, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.83,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0508-007675",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+435, Palapat, Hagonoy, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.435,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22988505.75,
      "lengthMeters": 435.0,
      "allocationPerStatedMeter": 22988.51,
      "rangesMeters": [
        [
          0.0,
          435.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+435, Palapat, Hagonoy, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.94,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0509-007677",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 1+238, Tambubong, Bocaue, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 1.238,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8077544.43,
      "lengthMeters": 1238.0,
      "allocationPerStatedMeter": 8077.54,
      "rangesMeters": [
        [
          0.0,
          1238.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 1+238, Tambubong, Bocaue, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.32,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0509-007678",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+763 - Sta. 2+013, Abulalas, Hagonoy, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 1.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8000000.0,
      "lengthMeters": 1250.0,
      "allocationPerStatedMeter": 8000.0,
      "rangesMeters": [
        [
          763.0,
          2013.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Construction of Road, Sta. 0+763 - Sta. 2+013, Abulalas, Hagonoy, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.32,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0509-007679",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 1+727 - Sta. 1+877, Iba Este, Calumpit, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 66666666.67,
      "lengthMeters": 150.0,
      "allocationPerStatedMeter": 66666.67,
      "rangesMeters": [
        [
          1727.0,
          1877.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Construction of Road, Sta. 1+727 - Sta. 1+877, Iba Este, Calumpit, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.89,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0509-007680",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 1+994 - Sta. 2+294, Balite, Calumpit, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          1994.0,
          2294.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Construction of Road, Sta. 1+994 - Sta. 2+294, Balite, Calumpit, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.17,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0510-007698",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Including Drainage Canal, Sta. 0+000 - Sta. 1+880, Bulihan, Plaridel, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 1.88,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 5319148.94,
      "lengthMeters": 1880.0,
      "allocationPerStatedMeter": 5319.15,
      "rangesMeters": [
        [
          0.0,
          1880.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road Including Drainage Canal, Sta. 0+000 - Sta. 1+880, Bulihan, Plaridel, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24139.32,
      "peerRateMultiple": 0.22,
      "peerRecords": 128,
      "peerBand": "1455–<2318 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 69052.4925,
      "graphUpperFence": 102483.98999999999
    },
    {
      "id": "HB10858-3-0510-007709",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage, Sta. 0+000 - Sta. 0+200, Ronlyn Subd., Panginay, Balagtas, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road with Drainage, Sta. 0+000 - Sta. 0+200, Ronlyn Subd., Panginay, Balagtas, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.41,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0510-007710",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sitio Paraan, Matimbo, City of Malolos, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road, Sitio Paraan, Matimbo, City of Malolos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0510-007713",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+142.60, San Vicente, Paombong, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.1426,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 70126227.21,
      "lengthMeters": 142.6,
      "allocationPerStatedMeter": 70126.23,
      "rangesMeters": [
        [
          0.0,
          142.6
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+142.60, San Vicente, Paombong, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.98,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0511-007722",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+092, Iba-Ibayo, Hagonoy, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 1.092,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9157509.16,
      "lengthMeters": 1092.0,
      "allocationPerStatedMeter": 9157.51,
      "rangesMeters": [
        [
          0.0,
          1092.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+092, Iba-Ibayo, Hagonoy, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.37,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0511-007725",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 2+627 - Sta. 2+927, Iba O' Este, Calumpit, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          2627.0,
          2927.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation of Road, Sta. 2+627 - Sta. 2+927, Iba O' Este, Calumpit, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.17,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0511-007729",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Road at Barangay Babatnin, City of Malolos, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation/Improvement of Road at Barangay Babatnin, City of Malolos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0511-007732",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Road at Barangay Bulihan, City of Malolos, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation/Improvement of Road at Barangay Bulihan, City of Malolos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0511-007733",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Road at Barangay Caingin, City of Malolos, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation/Improvement of Road at Barangay Caingin, City of Malolos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0511-007735",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Road at Barangay San Pascual, Hagonoy, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation/Improvement of Road at Barangay San Pascual, Hagonoy, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0511-007736",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Road at Barangay Sto. Niño, Calumpit, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation/Improvement of Road at Barangay Sto. Niño, Calumpit, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0511-007738",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Road at San Isidro, Hagonoy, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation/Improvement of Road at San Isidro, Hagonoy, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0512-007746",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road in Barangay Santa Cruz, Angat, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "512",
      "lengthEvidence": "Concreting of Road in Barangay Santa Cruz, Angat, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0512-007747",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road in Barangay Taboc, Angat, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "512",
      "lengthEvidence": "Concreting of Road in Barangay Taboc, Angat, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0512-007752",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Local Road in Barangay Encanto, Angat, Bulacan, Region III (Central Luzon)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "512",
      "lengthEvidence": "Construction of Concrete Local Road in Barangay Encanto, Angat, Bulacan, Region III (Central Luzon)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007761",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage Canal at Bañez St., Bayugo, Meycauayan City, Buacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road and Drainage Canal at Bañez St., Bayugo, Meycauayan City, Buacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007762",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage Canal at Main Road, Barangay Pantoc, Meycauayan City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road and Drainage Canal at Main Road, Barangay Pantoc, Meycauayan City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007763",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Bulac (Sitio Linawan), Sta. Maria, Bulacan, Sta. 00+000 - Sta. 00+400",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road at Barangay Bulac (Sitio Linawan), Sta. Maria, Bulacan, Sta. 00+000 - Sta. 00+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.02,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0514-007786",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Barangay Longos, City of Meycauayan, Sta. 00+000 - Sta. 00+240 (120.94953889, 14.73491667)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road with Drainage, Barangay Longos, City of Meycauayan, Sta. 00+000 - Sta. 00+240 (120.94953889, 14.73491667)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.46,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0514-007789",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Kingsville, Barangay Lawa, Obando, Sta. 00+000 - Sta. 00+240 (120.936036, 14.72594)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road with Drainage, Kingsville, Barangay Lawa, Obando, Sta. 00+000 - Sta. 00+240 (120.936036, 14.72594)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.46,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0514-007790",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Liliesville, Barangay Lawa, City of Meycauayan, Sta. 00+000 - Sta. 00+240 (120.97563611, 14.73606944)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road with Drainage, Liliesville, Barangay Lawa, City of Meycauayan, Sta. 00+000 - Sta. 00+240 (120.97563611, 14.73606944)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.46,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0514-007791",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Sitio Mapayapa, Barangay Sta. Cruz, Sta. Maria, Bulacan, Sta. 00+000 - Sta. 00+240",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road with Drainage, Sitio Mapayapa, Barangay Sta. Cruz, Sta. Maria, Bulacan, Sta. 00+000 - Sta. 00+240",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.46,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0515-007800",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Kingsville, Barangay Lawa, Obando, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Construction of Road, Kingsville, Barangay Lawa, Obando, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0515-007805",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Pire, Barangay Sta. Lucia, Angat, Bulacan (Sta. 00+000 - Sta. 00+205)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.205,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 48780487.8,
      "lengthMeters": 205.0,
      "allocationPerStatedMeter": 48780.49,
      "rangesMeters": [
        [
          0.0,
          205.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Improvement of Road at Pire, Barangay Sta. Lucia, Angat, Bulacan (Sta. 00+000 - Sta. 00+205)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.38,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0515-007806",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road with Drainage Canal, Barangay Banga, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.96135556, 14.72910278)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Improvement of Road with Drainage Canal, Barangay Banga, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.96135556, 14.72910278)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.46,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0515-007807",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road with Drainage Canal, Barangay Camalig, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.99552778, 14.77342222)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Improvement of Road with Drainage Canal, Barangay Camalig, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.99552778, 14.77342222)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.46,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0515-007808",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road with Drainage Canal, Barangay Poblacion, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.95767222, 14.73638889)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Improvement of Road with Drainage Canal, Barangay Poblacion, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.95767222, 14.73638889)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.46,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0515-007809",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road with Drainage Canal, Barangay Zamora, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.95456944, 14.73543889)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Improvement of Road with Drainage Canal, Barangay Zamora, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.95456944, 14.73543889)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.46,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0515-007810",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road with Drainage Canal, Mark St., Sto Nino, Barangay Perez, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.99446944, 14.76070278)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Improvement of Road with Drainage Canal, Mark St., Sto Nino, Barangay Perez, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.99446944, 14.76070278)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.46,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0515-007811",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road with Drainage Canal, San Diego St., Barangay Bancal, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.95906944, 14.72302500)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41666666.67,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 41666.67,
      "rangesMeters": [
        [
          0.0,
          240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Improvement of Road with Drainage Canal, San Diego St., Barangay Bancal, City of Meycauayan, Bulacan, Sta. 00+000 - Sta. 00+240 (120.95906944, 14.72302500)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.46,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0516-007835",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bagong Barrio, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "516",
      "lengthEvidence": "Construction of Road, Barangay Bagong Barrio, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.02,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0517-007836",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0517-007837",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bubulong Malaki, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Barangay Bubulong Malaki, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.02,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0517-007838",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bulusukan, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Barangay Bulusukan, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.02,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0517-007839",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Calawitan, San Ildefonso, Bulacan, Sta. 00+000 - 00+200",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Rehabilitation of Road, Barangay Calawitan, San Ildefonso, Bulacan, Sta. 00+000 - 00+200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.41,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0517-007840",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malipampang, San Ildefonso, Bulacan",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Barangay Malipampang, San Ildefonso, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0517-007841",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nabaong Garlang, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Barangay Nabaong Garlang, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.02,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0517-007842",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pacalag, San Miguel. Bulacan Sta. 00+000 - 00+400",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Barangay Pacalag, San Miguel. Bulacan Sta. 00+000 - 00+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.02,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0517-007843",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pinambaran, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Barangay Pinambaran, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.02,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0517-007844",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pinaod, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Barangay Pinaod, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.02,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0517-007845",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pulong Bayabas, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Barangay Pulong Bayabas, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.02,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0517-007846",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Pulong Duhat, San Miguel, Bulacan Sta. 00+000 - 00+230",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 43478260.87,
      "lengthMeters": 230.0,
      "allocationPerStatedMeter": 43478.26,
      "rangesMeters": [
        [
          0.0,
          230.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Rehabilitation of Road, Barangay Pulong Duhat, San Miguel, Bulacan Sta. 00+000 - 00+230",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.23,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0517-007847",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay San Juan, San Ildefonso, Bulacan, Sta. 00+000 - 00+300",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          0.0,
          300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Rehabilitation of Road, Barangay San Juan, San Ildefonso, Bulacan, Sta. 00+000 - 00+300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.17,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0517-007848",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sapang Dayap, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Barangay Sapang Dayap, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.02,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0517-007849",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sapang Pahalang, San Rafael, Bulacan Sta. 00+000 - 00+400",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Barangay Sapang Pahalang, San Rafael, Bulacan Sta. 00+000 - 00+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.02,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0517-007850",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sapang Putik, San Ildefonso, Bulacan, Sta. 00+000 - 00+420",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.42,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23809523.81,
      "lengthMeters": 420.0,
      "allocationPerStatedMeter": 23809.52,
      "rangesMeters": [
        [
          0.0,
          420.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Barangay Sapang Putik, San Ildefonso, Bulacan, Sta. 00+000 - 00+420",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.97,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0517-007851",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Rita Matanda, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Barangay Sta. Rita Matanda, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.02,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0517-007852",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tibagan, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Barangay Tibagan, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.02,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0517-007853",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Umpucan, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "517",
      "lengthEvidence": "Construction of Road, Barangay Umpucan, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.02,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0518-007866",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Antonio, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+798",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.798,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12531328.32,
      "lengthMeters": 798.0,
      "allocationPerStatedMeter": 12531.33,
      "rangesMeters": [
        [
          0.0,
          798.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Road, Barangay San Antonio, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+798",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0518-007867",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Curva, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+798",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.798,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12531328.32,
      "lengthMeters": 798.0,
      "allocationPerStatedMeter": 12531.33,
      "rangesMeters": [
        [
          0.0,
          798.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Road, Barangay Curva, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+798",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0518-007868",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay H. Romero, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+798",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.798,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12531328.32,
      "lengthMeters": 798.0,
      "allocationPerStatedMeter": 12531.33,
      "rangesMeters": [
        [
          0.0,
          798.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Road, Barangay H. Romero, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+798",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0518-007869",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lamorito, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+798",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.798,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12531328.32,
      "lengthMeters": 798.0,
      "allocationPerStatedMeter": 12531.33,
      "rangesMeters": [
        [
          0.0,
          798.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Road, Barangay Lamorito, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+798",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0518-007870",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tutuloy, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+798",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.798,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12531328.32,
      "lengthMeters": 798.0,
      "allocationPerStatedMeter": 12531.33,
      "rangesMeters": [
        [
          0.0,
          798.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Road, Barangay Tutuloy, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+798",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0518-007871",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Balingog East, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+798",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.798,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12531328.32,
      "lengthMeters": 798.0,
      "allocationPerStatedMeter": 12531.33,
      "rangesMeters": [
        [
          0.0,
          798.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Road, Barangay Balingog East, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+798",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0518-007872",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Doña Lucia, Quezon, Nueva Ecija, Sta. 0+000 - Sta. 0+798",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.798,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12531328.32,
      "lengthMeters": 798.0,
      "allocationPerStatedMeter": 12531.33,
      "rangesMeters": [
        [
          0.0,
          798.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Road, Barangay Doña Lucia, Quezon, Nueva Ecija, Sta. 0+000 - Sta. 0+798",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0519-007891",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Aliaga IS, Barangay Macabucod, Aliaga, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Aliaga IS, Barangay Macabucod, Aliaga, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0519-007893",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Alalay Grande, Lupao, Nueva Ecija Road A - Sta. 0+000 - Sta. 0+600, Road B Sta. 0+000 - Sta. 0+283",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          600.0
        ],
        [
          0.0,
          283.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay Alalay Grande, Lupao, Nueva Ecija Road A - Sta. 0+000 - Sta. 0+600, Road B Sta. 0+000 - Sta. 0+283",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007905",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bicos to Barangay Maligaya, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+780",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.78,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12820512.82,
      "lengthMeters": 780.0,
      "allocationPerStatedMeter": 12820.51,
      "rangesMeters": [
        [
          0.0,
          780.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Bicos to Barangay Maligaya, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+780",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.66,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0520-007914",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cavite to Barangay Sta. Ana, Guimba, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Cavite to Barangay Sta. Ana, Guimba, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007928",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gen. Luna, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+900",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.9,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11111111.11,
      "lengthMeters": 900.0,
      "allocationPerStatedMeter": 11111.11,
      "rangesMeters": [
        [
          0.0,
          900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Gen. Luna, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+900",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.57,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0521-007935",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Anak-Pawis, Sitio Cabanasan, Barangay San Roque, Lupao, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Anak-Pawis, Sitio Cabanasan, Barangay San Roque, Lupao, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007937",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bagong Flores, Lupao, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Bagong Flores, Lupao, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007938",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Buted, Talugtug, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Buted, Talugtug, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007946",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Macatcatuit, Guimba, Nueva Ecija Sta. 0+000 - Sta. 0+993",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.993,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10070493.45,
      "lengthMeters": 993.0,
      "allocationPerStatedMeter": 10070.49,
      "rangesMeters": [
        [
          0.0,
          993.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Macatcatuit, Guimba, Nueva Ecija Sta. 0+000 - Sta. 0+993",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.52,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0522-007952",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Marikit, Pantabangan, Nueva Ecija Road A - Sta. 0+000 - Sta. 0+320, Road B - Sta. 0+000 - Sta. 0+110, Road C - Sta. 0+000 - Sta. 0+060, Road D - Sta. 0+000 - Sta. 0+100, Road E - Sta. 0+000 - Sta. 0+150, Road F - Sta. 0+000 - Sta. 0+143",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          320.0
        ],
        [
          0.0,
          110.0
        ],
        [
          0.0,
          60.0
        ],
        [
          0.0,
          100.0
        ],
        [
          0.0,
          150.0
        ],
        [
          0.0,
          143.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Marikit, Pantabangan, Nueva Ecija Road A - Sta. 0+000 - Sta. 0+320, Road B - Sta. 0+000 - Sta. 0+110, Road C - Sta. 0+000 - Sta. 0+060, Road D - Sta. 0+000 - Sta. 0+100, Road E - Sta. 0+000 - Sta. 0+150, Road F - Sta. 0+000 - Sta. 0+143",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007963",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007965",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Portal, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+883",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.883,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11325028.31,
      "lengthMeters": 883.0,
      "allocationPerStatedMeter": 11325.03,
      "rangesMeters": [
        [
          0.0,
          883.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Portal, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+883",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0522-007966",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pula to Barangay Minabuyok, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Pula to Barangay Minabuyok, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007969",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sagaba to Barangay Burgos, Sto. Domingo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay Sagaba to Barangay Burgos, Sto. Domingo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007974",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Antonio Este, Lupao, Nueva Ecija Sta. 0+000 - Sta. 0+883",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.883,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11325028.31,
      "lengthMeters": 883.0,
      "allocationPerStatedMeter": 11325.03,
      "rangesMeters": [
        [
          0.0,
          883.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Antonio Este, Lupao, Nueva Ecija Sta. 0+000 - Sta. 0+883",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0523-007975",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Antonio Weste, Sitio Caraelan, Lupao, Nueva Ecija Sta. 0+000 - Sta. 0+883",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.883,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11325028.31,
      "lengthMeters": 883.0,
      "allocationPerStatedMeter": 11325.03,
      "rangesMeters": [
        [
          0.0,
          883.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Antonio Weste, Sitio Caraelan, Lupao, Nueva Ecija Sta. 0+000 - Sta. 0+883",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0523-007980",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Gregorio, Rizal, Nueva Ecija Road A - Sta. 0+000 - Sta. 0+300, Road B - Sta. 0+000 - Sta. 0+600",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          300.0
        ],
        [
          0.0,
          600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Gregorio, Rizal, Nueva Ecija Road A - Sta. 0+000 - Sta. 0+300, Road B - Sta. 0+000 - Sta. 0+600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007984",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Juan, Pantabangan, Nueva Ecija Road A - Sta. 0+000 - Sta. 0+170, Road B - Sta. 0+000 - Sta. 0+100, Road C - Sta. 0+000 - Sta. 0+100, Road D - Sta. 0+000 - Sta. 0+080, Road E - Sta. 0+000 - Sta. 0+400",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          170.0
        ],
        [
          0.0,
          100.0
        ],
        [
          0.0,
          100.0
        ],
        [
          0.0,
          80.0
        ],
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Juan, Pantabangan, Nueva Ecija Road A - Sta. 0+000 - Sta. 0+170, Road B - Sta. 0+000 - Sta. 0+100, Road C - Sta. 0+000 - Sta. 0+100, Road D - Sta. 0+000 - Sta. 0+080, Road E - Sta. 0+000 - Sta. 0+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007988",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Vicente, Llanera, Nueva Ecija Sta. 0+000 - Sta. 0+883",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.883,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11325028.31,
      "lengthMeters": 883.0,
      "allocationPerStatedMeter": 11325.03,
      "rangesMeters": [
        [
          0.0,
          883.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Vicente, Llanera, Nueva Ecija Sta. 0+000 - Sta. 0+883",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0523-007989",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sicsican, Matanda, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay Sicsican, Matanda, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0524-007993",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Monica, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+883",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.883,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11325028.31,
      "lengthMeters": 883.0,
      "allocationPerStatedMeter": 11325.03,
      "rangesMeters": [
        [
          0.0,
          883.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Sta. Monica, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+883",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0524-007996",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sto Domingo, Lupao, Nueva Ecija Sta. 0+000 - Sta. 0+883",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.883,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11325028.31,
      "lengthMeters": 883.0,
      "allocationPerStatedMeter": 11325.03,
      "rangesMeters": [
        [
          0.0,
          883.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Sto Domingo, Lupao, Nueva Ecija Sta. 0+000 - Sta. 0+883",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0524-007997",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sto. Rosario Young to Barangay Del Pilar, Zaragoza Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Sto. Rosario Young to Barangay Del Pilar, Zaragoza Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0524-008004",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Villaflores, Cuyapo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Villaflores, Cuyapo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0524-008006",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, PRIS-SDC, Barangay Tampac II & III, Guimba, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, PRIS-SDC, Barangay Tampac II & III, Guimba, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0524-008007",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, PRIS-SDC, Barangay Triala, Barangay Tampac I, Guimba, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, PRIS-SDC, Barangay Triala, Barangay Tampac I, Guimba, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0524-008008",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, PRIS-SDC-PH2, Barangay Malineng, Cuyapo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, PRIS-SDC-PH2, Barangay Malineng, Cuyapo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0525-008014",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation & Improvement of Road at San Isidro Nueva Ecija",
      "office": "Nueva Ecija 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Rehabilitation & Improvement of Road at San Isidro Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008036",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Cabetican, Bacolor, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road at Cabetican, Bacolor, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0528-008092",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation & Improvement of Road Project at Barangay San Agustin, Sta. Ana, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Rehabilitation & Improvement of Road Project at Barangay San Agustin, Sta. Ana, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0528-008099",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at San Antonio, Lubao, Pampanga",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Construction of Road at San Antonio, Lubao, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0528-008100",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitaion & Improvement of Road project in Purok 6, Barangay San Juan Nepomuceno Betis, Guagua, Pampanga",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Rehabilitaion & Improvement of Road project in Purok 6, Barangay San Juan Nepomuceno Betis, Guagua, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0529-008112",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Brgy. Natividad to Brgy. San Jose, Guagua, Pampanga, Sta.0+000 - Sta.0+900",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.9,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11111111.11,
      "lengthMeters": 900.0,
      "allocationPerStatedMeter": 11111.11,
      "rangesMeters": [
        [
          0.0,
          900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Road Brgy. Natividad to Brgy. San Jose, Guagua, Pampanga, Sta.0+000 - Sta.0+900",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.57,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0529-008116",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Sanchez St., Brgy. Valdez, Floridablanca, Pampanga, Sta.0+000 - Sta.0+550",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.55,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18181818.18,
      "lengthMeters": 550.0,
      "allocationPerStatedMeter": 18181.82,
      "rangesMeters": [
        [
          0.0,
          550.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Rehabilitation of Road at Sanchez St., Brgy. Valdez, Floridablanca, Pampanga, Sta.0+000 - Sta.0+550",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.74,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0529-008120",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Purok 1 Local Road Brgy. San Jose, Floridablanca, Pampanga, Sta.0+000 - Sta.0+245",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.245,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40816326.53,
      "lengthMeters": 245.0,
      "allocationPerStatedMeter": 40816.33,
      "rangesMeters": [
        [
          0.0,
          245.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Purok 1 Local Road Brgy. San Jose, Floridablanca, Pampanga, Sta.0+000 - Sta.0+245",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.43,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0529-008121",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Purok 8 Brgy. San Jose, Floridablanca, Pampanga, Sta.0+000 - Sta.0+620",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.62,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16129032.26,
      "lengthMeters": 620.0,
      "allocationPerStatedMeter": 16129.03,
      "rangesMeters": [
        [
          0.0,
          620.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Road at Purok 8 Brgy. San Jose, Floridablanca, Pampanga, Sta.0+000 - Sta.0+620",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.66,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0529-008125",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Purok 1 & 6 Brgy. Natividad, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+340, Sec. B: Sta.0+000 - Sta.0+200, Sec. C: Sta.0+000 - Sta.0+160, Sec. D: Sta.0+000 - Sta.0+170, Sec. E: Sta.0+000 - Sta.0+030",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.34,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 340.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          340.0
        ],
        [
          0.0,
          200.0
        ],
        [
          0.0,
          160.0
        ],
        [
          0.0,
          170.0
        ],
        [
          0.0,
          30.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Road in Purok 1 & 6 Brgy. Natividad, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+340, Sec. B: Sta.0+000 - Sta.0+200, Sec. C: Sta.0+000 - Sta.0+160, Sec. D: Sta.0+000 - Sta.0+170, Sec. E: Sta.0+000 - Sta.0+030",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.03,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0530-008128",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Drainage Canal, Brgy. San Nicolas 1st, Sasmuan, Pampanga, Sta.0+000 - Sta.0+345",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.345,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28985507.25,
      "lengthMeters": 345.0,
      "allocationPerStatedMeter": 28985.51,
      "rangesMeters": [
        [
          0.0,
          345.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Road including Drainage Canal, Brgy. San Nicolas 1st, Sasmuan, Pampanga, Sta.0+000 - Sta.0+345",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.01,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0530-008129",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Drainage Canal, Brgy. Malusac, Sasmuan, Pampanga, Sta.0+000 - Sta.0+420",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.42,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23809523.81,
      "lengthMeters": 420.0,
      "allocationPerStatedMeter": 23809.52,
      "rangesMeters": [
        [
          0.0,
          420.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Road including Drainage Canal, Brgy. Malusac, Sasmuan, Pampanga, Sta.0+000 - Sta.0+420",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.97,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0530-008130",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Lined Canal, Brgy. San Nicolas 2nd, Sasmuan, Pampanga, Sta.0+000 - Sta.0+310",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.31,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32258064.52,
      "lengthMeters": 310.0,
      "allocationPerStatedMeter": 32258.06,
      "rangesMeters": [
        [
          0.0,
          310.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Road with Lined Canal, Brgy. San Nicolas 2nd, Sasmuan, Pampanga, Sta.0+000 - Sta.0+310",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.13,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0530-008131",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Lined Canal, Brgy. San Nicolas 1st, Sasmuan, Pampanga, Sta.0+000 - Sta.0+290",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.29,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34482758.62,
      "lengthMeters": 290.0,
      "allocationPerStatedMeter": 34482.76,
      "rangesMeters": [
        [
          0.0,
          290.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Road with Lined Canal, Brgy. San Nicolas 1st, Sasmuan, Pampanga, Sta.0+000 - Sta.0+290",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.21,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0530-008132",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Lined Canal, Brgy. Sta. Lucia, Sasmuan, Pampanga, Sta.0+000 - Sta.0+200",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Road with Lined Canal, Brgy. Sta. Lucia, Sasmuan, Pampanga, Sta.0+000 - Sta.0+200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.41,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0530-008134",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal, Brgy. San Antonio, Sasmuan, Pampanga, Sta.0+000 - Sta.0+217",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.217,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46082949.31,
      "lengthMeters": 217.0,
      "allocationPerStatedMeter": 46082.95,
      "rangesMeters": [
        [
          0.0,
          217.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Road with Drainage Canal, Brgy. San Antonio, Sasmuan, Pampanga, Sta.0+000 - Sta.0+217",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.3,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0530-008135",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Line Canal in Purok 2, Brgy. Paguiruan, Floridablanca, Pampanga, Sta.0+000 - Sta.0+593",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.593,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16863406.41,
      "lengthMeters": 593.0,
      "allocationPerStatedMeter": 16863.41,
      "rangesMeters": [
        [
          0.0,
          593.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Road with Line Canal in Purok 2, Brgy. Paguiruan, Floridablanca, Pampanga, Sta.0+000 - Sta.0+593",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.69,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0530-008138",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Canal at Zone 4 to Zone 6, Brgy. San Basilio, Sta.Rita, Pampanga, Sta.0+000 - Sta.0+430",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.43,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23255813.95,
      "lengthMeters": 430.0,
      "allocationPerStatedMeter": 23255.81,
      "rangesMeters": [
        [
          0.0,
          430.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Road with Canal at Zone 4 to Zone 6, Brgy. San Basilio, Sta.Rita, Pampanga, Sta.0+000 - Sta.0+430",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.95,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0530-008144",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Canal with Cover at Zone 1 to Zone 3, Brgy. Diladila, Sta.Rita, Pampanga, Sta.0+000 - Sta.1+200",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 1.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8333333.33,
      "lengthMeters": 1200.0,
      "allocationPerStatedMeter": 8333.33,
      "rangesMeters": [
        [
          0.0,
          1200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Road with Canal with Cover at Zone 1 to Zone 3, Brgy. Diladila, Sta.Rita, Pampanga, Sta.0+000 - Sta.1+200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25000.0,
      "peerRateMultiple": 0.33,
      "peerRecords": 129,
      "peerBand": "999.5–<1455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75718.755,
      "graphUpperFence": 112005.33000000002
    },
    {
      "id": "HB10858-3-0530-008145",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road with Line Canal, Brgy. Baruya, Lubao, Pampanga, Sta.0+000 - Sta.0+220",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45454545.45,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 45454.55,
      "rangesMeters": [
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Improvement of Road with Line Canal, Brgy. Baruya, Lubao, Pampanga, Sta.0+000 - Sta.0+220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.29,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0531-008148",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Brgy. Sta. Catalina, Lubao, Pampanga, Sta.0+000 - Sta.0+409",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.409,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24449877.75,
      "lengthMeters": 409.0,
      "allocationPerStatedMeter": 24449.88,
      "rangesMeters": [
        [
          0.0,
          409.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "531",
      "lengthEvidence": "Construction of Barangay Road, Brgy. Sta. Catalina, Lubao, Pampanga, Sta.0+000 - Sta.0+409",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.0,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0531-008150",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road with Lined Canal, Brgy. Sta. Niño, Lubao, Pampanga, Sta.0+000 - Sta.0+650",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.65,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15384615.38,
      "lengthMeters": 650.0,
      "allocationPerStatedMeter": 15384.62,
      "rangesMeters": [
        [
          0.0,
          650.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "531",
      "lengthEvidence": "Construction of Barangay Road with Lined Canal, Brgy. Sta. Niño, Lubao, Pampanga, Sta.0+000 - Sta.0+650",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.63,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0531-008151",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road with Lined Canal at Zone 1, Brgy. Diladila, Sta.Rita, Pampanga, Sec A: Sta.0+000 - Sta.0+485, Sec B: Sta.0+000 - Sta.0+115",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.485,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20618556.7,
      "lengthMeters": 485.0,
      "allocationPerStatedMeter": 20618.56,
      "rangesMeters": [
        [
          0.0,
          485.0
        ],
        [
          0.0,
          115.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "531",
      "lengthEvidence": "Improvement of Road with Lined Canal at Zone 1, Brgy. Diladila, Sta.Rita, Pampanga, Sec A: Sta.0+000 - Sta.0+485, Sec B: Sta.0+000 - Sta.0+115",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.84,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0531-008152",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Brgy. Pulungmasle,Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+090, Sec. B: Sta.0+000 - Sta.0+110, Sec. C: Sta.0+000 - Sta.0+380, Sec. D: Sta.0+000 - Sta.0+270, Sec. E: Sta.0+000 - Sta.0+050",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.38,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 26315789.47,
      "lengthMeters": 380.0,
      "allocationPerStatedMeter": 26315.79,
      "rangesMeters": [
        [
          0.0,
          90.0
        ],
        [
          0.0,
          110.0
        ],
        [
          0.0,
          380.0
        ],
        [
          0.0,
          270.0
        ],
        [
          0.0,
          50.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "531",
      "lengthEvidence": "Construction of Barangay Road, Brgy. Pulungmasle,Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+090, Sec. B: Sta.0+000 - Sta.0+110, Sec. C: Sta.0+000 - Sta.0+380, Sec. D: Sta.0+000 - Sta.0+270, Sec. E: Sta.0+000 - Sta.0+050",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 1.07,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0531-008161",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation & Improvement of Road at Mangga, San Francisco, Lubao, Pampanga",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "531",
      "lengthEvidence": "Rehabilitation & Improvement of Road at Mangga, San Francisco, Lubao, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0531-008162",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation & improvement of road project in Sitio Pasville, Barangay Pulungmasle, Guagua, Pampanga",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "531",
      "lengthEvidence": "Rehabilitation & improvement of road project in Sitio Pasville, Barangay Pulungmasle, Guagua, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0531-008163",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation & Improvement of Road, Purok 7 Barangay San Jose, Floridablanca, Pampanga",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "531",
      "lengthEvidence": "Rehabilitation & Improvement of Road, Purok 7 Barangay San Jose, Floridablanca, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0531-008164",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation and Improvement of Road at Barangay Calangain, Lubao, Pampanga",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "531",
      "lengthEvidence": "Rehabilitation and Improvement of Road at Barangay Calangain, Lubao, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0532-008165",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation and Improvement of Road at Remedios, Lubao, Pampanga",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Rehabilitation and Improvement of Road at Remedios, Lubao, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0534-008207",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Service Road at Barangay Capehan, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+477.30",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.4773,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20951183.74,
      "lengthMeters": 477.3,
      "allocationPerStatedMeter": 20951.18,
      "rangesMeters": [
        [
          0.0,
          477.3
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction of Barangay Service Road at Barangay Capehan, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+477.30",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.86,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0534-008209",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Sta. Maria, Municipality of Camiling, Province of Tarlac",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction of Bridge, Barangay Sta. Maria, Municipality of Camiling, Province of Tarlac",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0534-008215",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Suizo, Tarlac City, Tarlac",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction of Road at Barangay Suizo, Tarlac City, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0534-008216",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio LA, Barangay Binauganan, Tarlac City, Tarlac",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction of Road at Sitio LA, Barangay Binauganan, Tarlac City, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0535-008219",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal at Barangay Villa Bacolor, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+500.00",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Construction of Road with Drainage Canal at Barangay Villa Bacolor, Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+500.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.82,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0535-008225",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Calabtangan, Municipality of Mayantoc, Province of Tarlac",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Rehabilitation of Road, Barangay Calabtangan, Municipality of Mayantoc, Province of Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0535-008226",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Barangay Road at Purok 7, Barangay Sta. Maria, Tarlac City, Tarlac, Sta. 0+000 - Sta. 0+700.00",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.7,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14285714.29,
      "lengthMeters": 700.0,
      "allocationPerStatedMeter": 14285.71,
      "rangesMeters": [
        [
          0.0,
          700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Rehabilitation/Improvement of Barangay Road at Purok 7, Barangay Sta. Maria, Tarlac City, Tarlac, Sta. 0+000 - Sta. 0+700.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.58,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0535-008229",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Santa Cruz - Mangatarem - Lucapon - Uacon - Binabalian, Barangay Taposo, Bridge 1, Candelaria, Zambales",
      "office": "Zambales 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Construction of Bridge, Santa Cruz - Mangatarem - Lucapon - Uacon - Binabalian, Barangay Taposo, Bridge 1, Candelaria, Zambales",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0536-008249",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road of San Francisco-Sto. Niño Section, Mabini, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Barangay Road of San Francisco-Sto. Niño Section, Mabini, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0536-008250",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road of Malimatoc I, Mabini, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Barangay Road of Malimatoc I, Mabini, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0536-008251",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Dalig, Batangas City, 13.772119, 121.096080",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Rehabilitation of Road, Barangay Dalig, Batangas City, 13.772119, 121.096080",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0536-008253",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Drainage and Slope Protection, Barangay Padre Castillo, San Pascual, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Road including Drainage and Slope Protection, Barangay Padre Castillo, San Pascual, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0536-008254",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Drainage and Slope Protection, Barangay Gelerang Kawayan, San Pascual, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Road including Drainage and Slope Protection, Barangay Gelerang Kawayan, San Pascual, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0536-008255",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure at Poblacion Evacuation Center, Barangay Poblacion, Lobo, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Road Slope Protection Structure at Poblacion Evacuation Center, Barangay Poblacion, Lobo, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008262",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay San Antonio, San Pascual, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Improvement of Road, Barangay San Antonio, San Pascual, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008263",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sto. Nino, San Pascual, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Barangay Sto. Nino, San Pascual, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008264",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Laurel, San Pascual, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Barangay Laurel, San Pascual, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008267",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Balatbat, Lobo, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Barangay Balatbat, Lobo, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008275",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Banaba Kanluran, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Barangay Banaba Kanluran, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008277",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Calumpit, Lobo, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Barangay Calumpit, Lobo, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008278",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ilihan, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Barangay Ilihan, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008281",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Malalim, Batangas City, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Construction of Bridge, Barangay Malalim, Batangas City, Batangas",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008283",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Leading to Cumba Falls, Malimatoc II to Nag-iba Section, Mabini, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Construction of Road, Leading to Cumba Falls, Malimatoc II to Nag-iba Section, Mabini, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008289",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay Alangilan, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Improvement of Road, Barangay Alangilan, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008290",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Balimbing Road, San Pascual, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Improvement of Road along Balimbing Road, San Pascual, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008292",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ilat North, San Pascual, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Construction of Road, Barangay Ilat North, San Pascual, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008293",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Mabilog na Bundok to Barangay Nagtoctoc, Lobo",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Improvement of Road along Barangay Mabilog na Bundok to Barangay Nagtoctoc, Lobo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008294",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Tayuman to Barangay Nagtaluntong, Lobo, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Improvement of Road along Barangay Tayuman to Barangay Nagtaluntong, Lobo, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008296",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay Banaba Ibaba, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Improvement of Road, Barangay Banaba Ibaba, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008297",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay Bilogo, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Improvement of Road, Barangay Bilogo, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008298",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay Dumantay, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Improvement of Road, Barangay Dumantay, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008300",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay Sorosoro Ilaya, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Improvement of Road, Barangay Sorosoro Ilaya, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008302",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay Pinamucan Silangan, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Improvement of Road, Barangay Pinamucan Silangan, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008303",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay San Miguel, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Improvement of Road, Barangay San Miguel, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008304",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay San Teodoro, Mabini, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Improvement of Road, Barangay San Teodoro, Mabini, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008305",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008332",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Barangay Upa – Bubuyan Road, Barangay Upa, Mataasnakahoy, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Improvement of Barangay Upa – Bubuyan Road, Barangay Upa, Mataasnakahoy, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008334",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along V. Templo St., Barangay II, and Barangay IV, Mataasnakahoy, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Improvement of Road along V. Templo St., Barangay II, and Barangay IV, Mataasnakahoy, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008341",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Completion of Road with Bridge, Barangay Sta. Maria, Sto. Tomas City to Poblacion 2, Tanauan City, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Completion of Road with Bridge, Barangay Sta. Maria, Sto. Tomas City to Poblacion 2, Tanauan City, Batangas",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008360",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Anilao Labac, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road at Barangay Anilao Labac, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008369",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Makweteb, Barangay Laiya Aplaya, San Juan, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road at Sitio Makweteb, Barangay Laiya Aplaya, San Juan, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008376",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay Antipolo del Sur, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Improvement of Road at Barangay Antipolo del Sur, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008380",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay Muntingpulo, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Improvement of Road at Barangay Muntingpulo, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008384",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay San Lucas, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Improvement of Road at Barangay San Lucas, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008387",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Pinagkawitan, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Construction of Road at Barangay Pinagkawitan, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008388",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay Sto. Niño, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Improvement of Road at Barangay Sto. Niño, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008390",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay San Francisco, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Construction of Road at Barangay San Francisco, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008405",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Tanauan, Tanza, Cavite, Sta. 0 + 000, Sta. 0 + 433",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Concreting of Roads at Barangay Tanauan, Tanza, Cavite, Sta. 0 + 000, Sta. 0 + 433",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008419",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Halang, Amadeo, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads at Barangay Halang, Amadeo, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008421",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Kaytambog, Indang, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads at Barangay Kaytambog, Indang, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008463",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Barangay Calubcob, Silang, Cavite",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Construction of Road with Drainage, Barangay Calubcob, Silang, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008466",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage, Barangay Pantaleon Granados, Gen. Mariano Alvarez, Cavite",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Rehabilitation of Road with Drainage, Barangay Pantaleon Granados, Gen. Mariano Alvarez, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008467",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage, Barangay Tiniente Tiago, Gen. Mariano Alvarez, Cavite",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Rehabilitation of Road with Drainage, Barangay Tiniente Tiago, Gen. Mariano Alvarez, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008468",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Barangay Yakal, Silang, Cavite",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Construction of Road with Drainage, Barangay Yakal, Silang, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008469",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Malabag, Silang, Cavite",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Rehabilitation of Road, Barangay Malabag, Silang, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008470",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Nanguma, Mabitac, Laguna",
      "office": "Laguna 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Construction of Road at Barangay Nanguma, Mabitac, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008471",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Barangay Calios, Santa Cruz, Laguna",
      "office": "Laguna 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Concreting of Road at Barangay Calios, Santa Cruz, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008478",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads and Drainage at Barangay Banlic, Calamba City, Laguna, 14.2291144, 121.14758035",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Construction of Roads and Drainage at Barangay Banlic, Calamba City, Laguna, 14.2291144, 121.14758035",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008483",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Canal, Langkiwa, Biñan",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Construction of Road with Canal, Langkiwa, Biñan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008490",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Langgam, San Pedro City, Laguna",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Rehabilitation of Road at Barangay Langgam, San Pedro City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008498",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Felomina, San Pablo City, Laguna",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Construction of Road, Barangay Sta. Felomina, San Pablo City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008500",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Kanluran, Calauan, Laguna",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Rehabilitation of Road, Barangay Kanluran, Calauan, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008516",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction/Completion of Languyin Bridge, Barangay Languyin, Polillo, Quezon",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Construction/Completion of Languyin Bridge, Barangay Languyin, Polillo, Quezon",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008520",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pahinga Sur, Candelaria, Quezon, Start 13.907777, 121.408658 End 13.905704, 121.407400",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Barangay Pahinga Sur, Candelaria, Quezon, Start 13.907777, 121.408658 End 13.905704, 121.407400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008523",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay Ibabang Dupay, Lucena City, Quezon, Start 13.947111, 121.623963 End 13.950172, 121.625411",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Improvement of Road, Barangay Ibabang Dupay, Lucena City, Quezon, Start 13.947111, 121.623963 End 13.950172, 121.625411",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008526",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bignay 2, Sariaya, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Barangay Bignay 2, Sariaya, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008527",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mamala 1, Sariaya, Quezon, Start 14.004386, 121.515778 End 14.008279, 121.515740",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Barangay Mamala 1, Sariaya, Quezon, Start 14.004386, 121.515778 End 14.008279, 121.515740",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008531",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Maulawin, Barangay Isabang, Lucena City, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Purok Maulawin, Barangay Isabang, Lucena City, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008532",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tumbaga 2, Sariaya, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Barangay Tumbaga 2, Sariaya, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008533",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Paved Road, Barangay Bula, Tiaong, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Rehabilitation of Paved Road, Barangay Bula, Tiaong, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008537",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Isabang, Lucena City, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Barangay Isabang, Lucena City, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008545",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Approach of Piris Bridge, Barangay Cadlit, Buenavista, Quezon",
      "office": "Quezon 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road with Approach of Piris Bridge, Barangay Cadlit, Buenavista, Quezon",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008549",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Soliyao, Ibaba Pitogo, Quezon",
      "office": "Quezon 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road, Barangay Soliyao, Ibaba Pitogo, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008550",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Cawayan, Barangay Camflora, San Andres, Quezon",
      "office": "Quezon 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road, Sitio Cawayan, Barangay Camflora, San Andres, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008551",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Central A, Barangay San Vicente, General Luna, Quezon",
      "office": "Quezon 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road, Sitio Central A, Barangay San Vicente, General Luna, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008554",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Pulo, Barangay Olongtao Ibaba, Macalelon, Quezon",
      "office": "Quezon 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road, Sitio Pulo, Barangay Olongtao Ibaba, Macalelon, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0550-008563",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Tunton-Maguibuay Bridge and Approaches, Sta. 0+579 - Sta. 0+649, Sta. 0+679 - Sta. 749, Tagkawayan, Quezon",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          579.0,
          649.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction (Completion) of Tunton-Maguibuay Bridge and Approaches, Sta. 0+579 - Sta. 0+649, Sta. 0+679 - Sta. 749, Tagkawayan, Quezon",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0550-008573",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Phase 2, Purok 5, Sitio Sapinit, Barangay San Juan, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction of Road at Phase 2, Purok 5, Sitio Sapinit, Barangay San Juan, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0550-008576",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage at Lourdes Subdivision, Barangay Cupang, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction of Road with Drainage at Lourdes Subdivision, Barangay Cupang, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0550-008578",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage System, Sitio Kabisig, Barangay San Jose, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "550",
      "lengthEvidence": "Construction of Road with Drainage System, Sitio Kabisig, Barangay San Jose, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0551-008587",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road and Drainage at Dimanlig st. and Sumulong st., Barangay San Roque, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Improvement of Road and Drainage at Dimanlig st. and Sumulong st., Barangay San Roque, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0551-008588",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road and Drainage at Ligtasan st. Barangay San Roque, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Improvement of Road and Drainage at Ligtasan st. Barangay San Roque, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0551-008594",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Rambutan St. Nayon Silangan, Barangay Dalig, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Rehabilitation of Road at Rambutan St. Nayon Silangan, Barangay Dalig, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0551-008595",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Sitio Payong Road, Barangay Dalig, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Rehabilitation of Road at Sitio Payong Road, Barangay Dalig, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0551-008597",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage Systems, Road 15, Barangay Bagong Nayon, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Rehabilitation of Road with Drainage Systems, Road 15, Barangay Bagong Nayon, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008612",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Guitna, Looc, Occidental Mindoro",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Road in Barangay Guitna, Looc, Occidental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008613",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ligaya, Sablayan, Occidental Mindoro",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Road, Barangay Ligaya, Sablayan, Occidental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008625",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Monteverde, Socorro, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Rehabilitation of Road at Barangay Monteverde, Socorro, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008636",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road along Barangay Bondoc, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Road along Barangay Bondoc, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008657",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Dulangan II, Baco, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Dulangan II, Baco, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008675",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Balaguen, Magsaysay, Palawan",
      "office": "Palawan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of Road, Barangay Balaguen, Magsaysay, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008678",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Minapla, Taytay, Palawan",
      "office": "Palawan 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of Road, Barangay Minapla, Taytay, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008688",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure at Barangay Santa Monica, Puerto Princesa City, Palawan",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of Road Slope Protection Structure at Barangay Santa Monica, Puerto Princesa City, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008692",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tagabinet, Puerto Princesa City, Palawan, Start 10.086780, 118.856238 End 10.085955, 118.860373",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of Road, Barangay Tagabinet, Puerto Princesa City, Palawan, Start 10.086780, 118.856238 End 10.085955, 118.860373",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008693",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bahile, Puerto Princesa City, Palawan, Start 10.00187746 End 118.78534474",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of Road, Barangay Bahile, Puerto Princesa City, Palawan, Start 10.00187746 End 118.78534474",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008694",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Ilang-Ilang to Purok Anonang Phase 2, Barangay Sicsican, Puerto Princesa City, Palawan, Start 9.812030N, 118.711440E End 9.812004N, 118.715298E",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Road, Purok Ilang-Ilang to Purok Anonang Phase 2, Barangay Sicsican, Puerto Princesa City, Palawan, Start 9.812030N, 118.711440E End 9.812004N, 118.715298E",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008700",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bacungan, Puerto Princesa City, Palawan",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Road, Barangay Bacungan, Puerto Princesa City, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008702",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Isaub, Aborlan, Palawan",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Road, Barangay Isaub, Aborlan, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008703",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Manalo, Puerto Princesa City, Palawan",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Road, Barangay Manalo, Puerto Princesa City, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008705",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Napsan, Puerto Princesa City, Palawan",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Road, Barangay Napsan, Puerto Princesa City, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008706",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Salvacion, Puerto Princesa City, Palawan",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Road, Barangay Salvacion, Puerto Princesa City, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008724",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Anilao, Bongabong, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road at Barangay Anilao, Bongabong, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008728",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Cawayan, Bongabong, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road at Barangay Cawayan, Bongabong, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008729",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Mina De Oro, Bongabong, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road at Barangay Mina De Oro, Bongabong, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008733",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Kaligtasan, Barangay Banus, Gloria, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road at Sitio Kaligtasan, Barangay Banus, Gloria, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008734",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Korampil Centro, Barangay Waygan, Mansalay Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road at Sitio Korampil Centro, Barangay Waygan, Mansalay Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008736",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Roma Sur, Barangay Roma, Mansalay Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road at Sitio Roma Sur, Barangay Roma, Mansalay Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008739",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay San Juan to Barangay Balatasan, Bulalacao, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Rehabilitation of Road at Barangay San Juan to Barangay Balatasan, Bulalacao, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008749",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay 16, Legazpi City, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay 16, Legazpi City, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008787",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Awayan, Sipocot, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Construction of Road in Awayan, Sipocot, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0560-008788",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Cabusao, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road in Cabusao, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0560-008789",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Lipilip, Sipocot, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road in Lipilip, Sipocot, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0560-008790",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Apale, Ragay, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay Apale, Ragay, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0560-008806",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Upper Omon, Ragay, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay Upper Omon, Ragay, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008812",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Belen, Calabanga, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Bridge, Barangay Belen, Calabanga, Camarines Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008814",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Zone 6, Barangay Balatas, Naga City, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Road at Zone 6, Barangay Balatas, Naga City, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008817",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Agustin, Canaman, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Road, Barangay San Agustin, Canaman, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008821",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Cabanbanan-Cagsao Road beside Tigman River, Barangay Cagsao, Calabanga, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Cabanbanan-Cagsao Road beside Tigman River, Barangay Cagsao, Calabanga, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008822",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Zone 5 to Zone 7A, Barangay Sabang, Calabanga, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Road from Zone 5 to Zone 7A, Barangay Sabang, Calabanga, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008824",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Zone 2-6 Barangay La Purisima, Pili, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Road, Zone 2-6 Barangay La Purisima, Pili, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0561-008829",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Zone 9 Barangay San Jose, Pili, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Road, Zone 9 Barangay San Jose, Pili, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0562-008835",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction/Improvement of Access Road, Naga City (Del Rosario)-Cararayan-Langon- SanIsidro-Carolina Road to Mt. Isarog Natural Park and East Highland Tourism Zone, Barangay San Isidro, Naga City, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction/Improvement of Access Road, Naga City (Del Rosario)-Cararayan-Langon- SanIsidro-Carolina Road to Mt. Isarog Natural Park and East Highland Tourism Zone, Barangay San Isidro, Naga City, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0562-008844",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Maylubas, Barangay Abucayan-San Pedro Aroro Road, Abucayan, Goa, Camarines Sur",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction of Road, Sitio Maylubas, Barangay Abucayan-San Pedro Aroro Road, Abucayan, Goa, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008859",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Zone 3 to Zone 5, Barangay Camagong, Tinambac, Camarines Sur",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Roads, Zone 3 to Zone 5, Barangay Camagong, Tinambac, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008860",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Pili-Bitaogan Road (Pili Section), Presentacion, Camarines Sur",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Road, Pili-Bitaogan Road (Pili Section), Presentacion, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008867",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge in Barangay Sagrada, Iriga, Camarines Sur",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Bridge in Barangay Sagrada, Iriga, Camarines Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0565-008891",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Jct National Road to Sitio Imbudo, Barangay Jamorawon, Milagros Masbate, Sta. 2+003 to Sta. 2+233",
      "office": "Masbate 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 43478260.87,
      "lengthMeters": 230.0,
      "allocationPerStatedMeter": 43478.26,
      "rangesMeters": [
        [
          2003.0,
          2233.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Road, Jct National Road to Sitio Imbudo, Barangay Jamorawon, Milagros Masbate, Sta. 2+003 to Sta. 2+233",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.23,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0565-008893",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion, Cataingan, Masbate",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Road, Barangay Poblacion, Cataingan, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0565-008898",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mahayag to Barangay Burabod, Placer, Masbate",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Road, Barangay Mahayag to Barangay Burabod, Placer, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0565-008903",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Junction Barangay Recodo to Sitio Bitlig, Barangay Begia, Cawayan, Masbate",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Road, Junction Barangay Recodo to Sitio Bitlig, Barangay Begia, Cawayan, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0565-008904",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road to Military (Army) Camp, Barangay Fabrica, Barcelona, Sorsogon",
      "office": "Sorsogon 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Access Road to Military (Army) Camp, Barangay Fabrica, Barcelona, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0565-008910",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction/Improvement of Access Road from Barangay Fabrica to Barangay Otavi, Bulan, Sorsogon",
      "office": "Sorsogon 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction/Improvement of Access Road from Barangay Fabrica to Barangay Otavi, Bulan, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0565-008912",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Paghaluban-Putiao-Sta.Cruz Road, Barangay Paghaluban, Putiao, and Sta. Cruz, Barcelona, Sorsogon",
      "office": "Sorsogon 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Rehabilitation/Improvement of Paghaluban-Putiao-Sta.Cruz Road, Barangay Paghaluban, Putiao, and Sta. Cruz, Barcelona, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008914",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+355, Barangay Del Rosario, Bacon District, Sorsogon City, Sorsogon",
      "office": "Sorsogon District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.355,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28169014.08,
      "lengthMeters": 355.0,
      "allocationPerStatedMeter": 28169.01,
      "rangesMeters": [
        [
          0.0,
          355.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+355, Barangay Del Rosario, Bacon District, Sorsogon City, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.99,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0566-008921",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Alibagon Bridge, Barangay Alibagon, Makato, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Alibagon Bridge, Barangay Alibagon, Makato, Aklan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008923",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge from Barangay Mamba Crossing Dumalaylay River to Sitio Tagpi, Barangay Mamba, Madalag, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Bridge from Barangay Mamba Crossing Dumalaylay River to Sitio Tagpi, Barangay Mamba, Madalag, Aklan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008927",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Barangay Matabana, Buenafortuna, Nagustan to Barangay Toledo, Nabas, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Road from Barangay Matabana, Buenafortuna, Nagustan to Barangay Toledo, Nabas, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008930",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Balete Urban Center, Barangay Aranas, Balete, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Road, Balete Urban Center, Barangay Aranas, Balete, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008937",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Liloan to Barangay San Ramon, Malinao, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Barangay Liloan to Barangay San Ramon, Malinao, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008953",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Kasawahan to Sitio Maandak, Barangay Fulgencio, Balete, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Sitio Kasawahan to Sitio Maandak, Barangay Fulgencio, Balete, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008961",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Access Bridge Road, Barangay Lanipga to Barangay Napatag, Tangalan, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Rehabilitation of Access Bridge Road, Barangay Lanipga to Barangay Napatag, Tangalan, Aklan",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008962",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Poblacion to Sitio Binaliw, Barangay Katipunan Barangay Road, Buruanga, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Rehabilitation of Road, Barangay Poblacion to Sitio Binaliw, Barangay Katipunan Barangay Road, Buruanga, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008964",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Access road, Sta. 0+680 - Sta. 1+180, in Bgy Binanoan,Barbaza Antique",
      "office": "Antique District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          680.0,
          1180.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Concreting of Access road, Sta. 0+680 - Sta. 1+180, in Bgy Binanoan,Barbaza Antique",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.82,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0568-008968",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Banica, Roxas City, Capiz",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction of Road, Barangay Banica, Roxas City, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008980",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malagab-i, Cuartero, Capiz",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction of Road, Barangay Malagab-i, Cuartero, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0569-008996",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Maabay to Dasal Road, Sta. 0 + 000 - Sta. 0 + 605, Barangay Maabay and Barangay Dasal, Sibunag, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.605,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16528925.62,
      "lengthMeters": 605.0,
      "allocationPerStatedMeter": 16528.93,
      "rangesMeters": [
        [
          0.0,
          605.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Maabay to Dasal Road, Sta. 0 + 000 - Sta. 0 + 605, Barangay Maabay and Barangay Dasal, Sibunag, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.68,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0570-009006",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Tibwason - Paho, Sta. 0 + 800 - Sta. 1 + 350, Barangay Ayangan, Sibunag, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.55,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18181818.18,
      "lengthMeters": 550.0,
      "allocationPerStatedMeter": 18181.82,
      "rangesMeters": [
        [
          800.0,
          1350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Construction of Road, Sitio Tibwason - Paho, Sta. 0 + 800 - Sta. 1 + 350, Barangay Ayangan, Sibunag, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.74,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0570-009012",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Liningwan - Dasal - Alegria Road, Barangay Maabay, Barangay Dasal, and Barangay Alegria, Sibunag, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Rehabilitation of Liningwan - Dasal - Alegria Road, Barangay Maabay, Barangay Dasal, and Barangay Alegria, Sibunag, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0571-009016",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Camangahan-Sitio Igtuba Bridge, Barangay Camangahan, Guimbal, Iloilo",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Camangahan-Sitio Igtuba Bridge, Barangay Camangahan, Guimbal, Iloilo",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0571-009027",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Nahapay-Sitio Nahapay Iki Bridge, Barangay Nahapay, Guimbal, Iloilo",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Nahapay-Sitio Nahapay Iki Bridge, Barangay Nahapay, Guimbal, Iloilo",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0571-009029",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Drainage Structure along Road, Barangay Poblacion, Anilao, Iloilo",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Drainage Structure along Road, Barangay Poblacion, Anilao, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0571-009032",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road in Barangay Sambag Culob, Anilao, Iloilo, 10.97343, 122.74262",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Concrete Road in Barangay Sambag Culob, Anilao, Iloilo, 10.97343, 122.74262",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0571-009033",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Lico-an, Barotac Nuevo, Iloilo, Start 10.9246, 122.7168 End 10.9252, 122.7144",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Bridge, Barangay Lico-an, Barotac Nuevo, Iloilo, Start 10.9246, 122.7168 End 10.9252, 122.7144",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009038",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road in Barangay Sambag Culob, Anilao, Iloilo",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Concrete Road in Barangay Sambag Culob, Anilao, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009042",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lantangan, Carles, Iloilo",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay Lantangan, Carles, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009043",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Miguel, Barotac Viejo, Iloilo",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay San Miguel, Barotac Viejo, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009047",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Roque, Estancia, Iloilo",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay San Roque, Estancia, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009048",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tacbuyan, Estancia, Iloilo",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay Tacbuyan, Estancia, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009050",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, NISU, Barangay Batad Viejo, Batad, Iloilo",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, NISU, Barangay Batad Viejo, Batad, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009051",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Posadas-Aposaga, Barangay Posadas-Barangay Aposaga, Sara, Iloilo",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Posadas-Aposaga, Barangay Posadas-Barangay Aposaga, Sara, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009053",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pajo to Barangay Tuburan, Zarraga, Iloilo",
      "office": "Iloilo 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay Pajo to Barangay Tuburan, Zarraga, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009058",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Amiroy to Barangay Badiangan, Mina, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay Amiroy to Barangay Badiangan, Mina, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009059",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Amiroy to Barangay Mina East Sitio Burot, Mina, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay Amiroy to Barangay Mina East Sitio Burot, Mina, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009063",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Guinacas, Pototan, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay Guinacas, Pototan, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009064",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Inabasan, Maasin, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay Inabasan, Maasin, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009065",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Janipa-an East, Mina, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay Janipa-an East, Mina, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009066",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Janipa-an West, Mina, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay Janipa-an West, Mina, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009068",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mina West, Mina, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay Mina West, Mina, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009069",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Naumuan, Mina, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay Naumuan, Mina, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009070",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Nicolas, Calinog, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay San Nicolas, Calinog, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009071",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Singay to Barangay Mina East, Mina, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay Singay to Barangay Mina East, Mina, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009073",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Talibong Pequeño to Barangay Capul-an, Mina, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay Talibong Pequeño to Barangay Capul-an, Mina, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009076",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay San Isidro, Jaro, Iloilo City, Iloilo",
      "office": "Iloilo City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road and Drainage, Barangay San Isidro, Jaro, Iloilo City, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009082",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Rosario Heights, Barangay Taculing, Bacolod City, 10.646327, 122.967132",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Rehabilitation of Road, Rosario Heights, Barangay Taculing, Bacolod City, 10.646327, 122.967132",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009087",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Villamonte, Bacolod City, 10.673129, 122.974715",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Construction of Road, Barangay Villamonte, Bacolod City, 10.673129, 122.974715",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009091",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Prosperville, Barangay Cabug, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Construction of Road, Purok Prosperville, Barangay Cabug, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009092",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Relota Ville, Barangay Cabug, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Construction of Road, Purok Relota Ville, Barangay Cabug, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009095",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Estefania, Bacolod, City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Construction of Roads, Barangay Estefania, Bacolod, City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009097",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Singcang-Airport, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Construction of Roads, Barangay Singcang-Airport, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009123",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Sewahon I, Sagay City to Barangay Sewahon II, Cadiz City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road Barangay Sewahon I, Sagay City to Barangay Sewahon II, Cadiz City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009140",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Hacienda Celsa to Hacienda Teresing and Hacienda Unson, Barangay Andres Bonifacio, Cadiz City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Hacienda Celsa to Hacienda Teresing and Hacienda Unson, Barangay Andres Bonifacio, Cadiz City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009152",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Access Road in Bgy Nanunga,Hinigaran, Negros Occidental, 10.25436076, 122.87237551",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Concreting of Access Road in Bgy Nanunga,Hinigaran, Negros Occidental, 10.25436076, 122.87237551",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009153",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Nato, La Castellana, Negros Occidental",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Road at Barangay Nato, La Castellana, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009154",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Haplas, Barangay Tinongan, Isabela, Negros Occidental",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Road, Sitio Haplas, Barangay Tinongan, Isabela, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009155",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Josefa, Barangay Camp Clark, Isabela, Negros Occidental",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Road, Sitio Josefa, Barangay Camp Clark, Isabela, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009156",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Aranda, Hinigaran, Negros Occidental",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Road, Barangay Aranda, Hinigaran, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009157",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Gargato, Hinigaran, Negros Occidental",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Road at Barangay Gargato, Hinigaran, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009167",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sitio BalikBalik Road, Barangay Tabu, Ilog, Negros Occidental",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Sitio BalikBalik Road, Barangay Tabu, Ilog, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009169",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Tabu Road, Barangay Tabu, Ilog, Negros Occidental",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Tabu Road, Barangay Tabu, Ilog, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009171",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction of Delicioso to Salong Road, Barangay Delicioso, Ilog, Negros Occidental",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Reconstruction of Delicioso to Salong Road, Barangay Delicioso, Ilog, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009191",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Eli, La Libertad, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Road, Barangay Eli, La Libertad, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009193",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Linao, Tayasan, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Road, Barangay Linao, Tayasan, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009211",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Balayong, Pamplona, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Balayong, Pamplona, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009212",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bio-os, Amlan, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Bio-os, Amlan, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009213",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cambaguio, Bais City, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Cambaguio, Bais City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009215",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Himocdungon, Mabinay, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Himocdungon, Mabinay, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009216",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Luyang, Mabinay, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Luyang, Mabinay, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009218",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Magsusunog, Pamplona, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Magsusunog, Pamplona, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009219",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mayaposi, Mabinay, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Mayaposi, Mabinay, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009220",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion IV, Tanjay City, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Poblacion IV, Tanjay City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009222",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sab-ahan, Bais City, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Sab-ahan, Bais City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009223",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Isidro, Pamplona, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay San Isidro, Pamplona, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009224",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Silab, Amlan, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Silab, Amlan, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009225",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Agueda, Pamplona, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Sta. Agueda, Pamplona, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009226",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tagpo, Bais City, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Tagpo, Bais City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009228",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Nalimbagan, Barangay Lumbangan, Mabinay, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Nalimbagan, Barangay Lumbangan, Mabinay, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009236",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Bahian, Barangay Dawis, Bayawan City, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Road, Sitio Bahian, Barangay Dawis, Bayawan City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009238",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Baknit, Barangay San Francisco, Santa Catalina, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Road, Sitio Baknit, Barangay San Francisco, Santa Catalina, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009239",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Hingles, Barangay San Francisco, Santa Catalina, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Road, Sitio Hingles, Barangay San Francisco, Santa Catalina, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009240",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tunga-tunga, Dauin, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Road, Barangay Tunga-tunga, Dauin, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009248",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Timbao, Bacong, Negros Oriental",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Road, Barangay Timbao, Bacong, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009277",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Badiang and Barangay Poblacion II, Sikatuna, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road at Barangay Badiang and Barangay Poblacion II, Sikatuna, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009287",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Tanday, Corella, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Construction of Road at Tanday, Corella, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009288",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Poblacion, Corella, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Construction of Road at Poblacion, Corella, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009289",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Booy, Tagbilaran City,Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Construction of Road at Barangay Booy, Tagbilaran City,Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009290",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Taloto, Tagbilaran City,Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Construction of Road at Barangay Taloto, Tagbilaran City,Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009301",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, North Poblacion, San Fernando, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Concreting of Road, North Poblacion, San Fernando, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009303",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Cutod to Sitio Danawan, Barangay Guindarohan, Minglanilla, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Concreting of Road, Sitio Cutod to Sitio Danawan, Barangay Guindarohan, Minglanilla, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009316",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Dungoan, Barangay Cawayan, Dalaguete, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Concreting of Road, Sitio Dungoan, Barangay Cawayan, Dalaguete, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009343",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Anopog to Barangay Tanibag, Pinamungajan, Cebu",
      "office": "Cebu 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Concreting of Road, Barangay Anopog to Barangay Tanibag, Pinamungajan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009346",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Capitan Claudio, Toledo City, Cebu",
      "office": "Cebu 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Concreting of Road, Barangay Capitan Claudio, Toledo City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009360",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Silvino Du Road, Barangay Bantigue, Bantayan, Cebu",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Silvino Du Road, Barangay Bantigue, Bantayan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009375",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cantukong, Carmen, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Construction of Road, Barangay Cantukong, Carmen, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009381",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lugo, Borbon, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Road, Barangay Lugo, Borbon, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009398",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage at Barangay Jagobiao, Mandaue City, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Road with Drainage at Barangay Jagobiao, Mandaue City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009434",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Mandayang to Lower Lombo, Barangay Lombo, Malabuyoc, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Construction of Road at Sitio Mandayang to Lower Lombo, Barangay Lombo, Malabuyoc, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009443",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Sitio Cambugalon, Barangay San Roque to Mangaco Road at Barangays San Roque, Kalabawan and Mangaco, Ginatilan, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Improvement of Sitio Cambugalon, Barangay San Roque to Mangaco Road at Barangays San Roque, Kalabawan and Mangaco, Ginatilan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009446",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure, Barangay Pamutan, Cebu City, Cebu",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction of Road Slope Protection Structure, Barangay Pamutan, Cebu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009448",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure, Barangay Sudlon II, Cebu City, Cebu",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction of Road Slope Protection Structure, Barangay Sudlon II, Cebu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009449",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Inayawan, Cebu City, Cebu",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction of Road, Barangay Inayawan, Cebu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009461",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Ansay, Barangay Union, Caibiran, Biliran (Sta. 2 + 142 - Sta. 2 + 492)",
      "office": "Biliran District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          2142.0,
          2492.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction of Road, Sitio Ansay, Barangay Union, Caibiran, Biliran (Sta. 2 + 142 - Sta. 2 + 492)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0591-009463",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pili, Almeria Biliran (Sta. 1 + 463 - Sta. 1 + 563, Sta. 1 + 516 - Sta. 1 + 616, Sta. 2 + 179 - Sta. 2 + 359, Sta. 2 + 235 - Sta. 2 + 315)",
      "office": "Biliran District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.333,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 30030030.03,
      "lengthMeters": 333.0,
      "allocationPerStatedMeter": 30030.03,
      "rangesMeters": [
        [
          1463.0,
          1563.0
        ],
        [
          1516.0,
          1616.0
        ],
        [
          2179.0,
          2359.0
        ],
        [
          2235.0,
          2315.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Construction of Road, Barangay Pili, Almeria Biliran (Sta. 1 + 463 - Sta. 1 + 563, Sta. 1 + 516 - Sta. 1 + 616, Sta. 2 + 179 - Sta. 2 + 359, Sta. 2 + 235 - Sta. 2 + 315)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.05,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0591-009464",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Bato to Sitio Bantilan, Biliran, Biliran (Sta. 0+000 - Sta. 0+500)",
      "office": "Biliran District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Rehabilitation of Road, Barangay Bato to Sitio Bantilan, Biliran, Biliran (Sta. 0+000 - Sta. 0+500)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.82,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0591-009466",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Haguikhikan, Naval, Biliran (Sta. 1+796 - Sta. 2+296)",
      "office": "Biliran District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          1796.0,
          2296.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Rehabilitation of Road, Barangay Haguikhikan, Naval, Biliran (Sta. 1+796 - Sta. 2+296)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.82,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0591-009467",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Kawayanon, Caibiran, Biliran (Sta. 0+198 - Sta. 0+698)",
      "office": "Biliran District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          198.0,
          698.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Rehabilitation of Road, Barangay Kawayanon, Caibiran, Biliran (Sta. 0+198 - Sta. 0+698)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.82,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0592-009494",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Retrofitting/Rehabilitation of Borongan Detour Bridge, Borongan City, Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Retrofitting/Rehabilitation of Borongan Detour Bridge, Borongan City, Eastern Samar",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0592-009497",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Banawang - Barangay Astorga, Tunga, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Construction of Road, Barangay Banawang - Barangay Astorga, Tunga, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0593-009506",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay General Luna, Macarthur, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Road, Barangay General Luna, Macarthur, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0593-009512",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ugiao - Barangay Pitogo, Jaro, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Road, Barangay Ugiao - Barangay Pitogo, Jaro, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0593-009515",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay A. Tumamak, Villaba, Leyte (11.201775, 124.430504)",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Bridge, Barangay A. Tumamak, Villaba, Leyte (11.201775, 124.430504)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0594-009532",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Buga-Buga, Villaba, Leyte 11.174963, 124.423733",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Concreting of Road, Buga-Buga, Villaba, Leyte 11.174963, 124.423733",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0594-009533",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Hinabuyan, Villaba, Leyte 11.237073, 124.406538",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Concreting of Road, Hinabuyan, Villaba, Leyte 11.237073, 124.406538",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0595-009549",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Sta. 2+500 - Sta. 3+100, Sitio Macalpe, Barangay Cangag, Isabel, Leyte",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16666666.67,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 16666.67,
      "rangesMeters": [
        [
          2500.0,
          3100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Concrete Road, Sta. 2+500 - Sta. 3+100, Sitio Macalpe, Barangay Cangag, Isabel, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.68,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0596-009573",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tabok, Sta. 0+000 - 0+765, Hindang, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.765,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13071895.42,
      "lengthMeters": 765.0,
      "allocationPerStatedMeter": 13071.9,
      "rangesMeters": [
        [
          0.0,
          765.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Road, Barangay Tabok, Sta. 0+000 - 0+765, Hindang, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.67,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0596-009581",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, University Homes, Catarman, Northern Samar",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Road, University Homes, Catarman, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0596-009582",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads - Junction Highway (Sitio Kalangkaan) - Osmeña - Sampaguita - San Jose - San Francisco Road, Sta. 002+720 - Sta. 003+000, Lope de Vega, Northern Samar",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.28,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35714285.71,
      "lengthMeters": 280.0,
      "allocationPerStatedMeter": 35714.29,
      "rangesMeters": [
        [
          2720.0,
          3000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Roads - Junction Highway (Sitio Kalangkaan) - Osmeña - Sampaguita - San Jose - San Francisco Road, Sta. 002+720 - Sta. 003+000, Lope de Vega, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.25,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0598-009607",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure, Sta. 0+000 - Sta. 0+051.73, Barangay Burabod II, Gandara, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.05173,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 193311424.71,
      "lengthMeters": 51.73,
      "allocationPerStatedMeter": 193311.42,
      "rangesMeters": [
        [
          0.0,
          51.73
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Construction of Road Slope Protection Structure, Sta. 0+000 - Sta. 0+051.73, Barangay Burabod II, Gandara, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 5.47,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0603-009716",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Barangay Inasagan - Barangay Gubaan, Aurora, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road from Barangay Inasagan - Barangay Gubaan, Aurora, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0603-009719",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Barangay Poblacion - Barangay Alegria -Barangay Libertad, Aurora, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road from Barangay Poblacion - Barangay Alegria -Barangay Libertad, Aurora, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0603-009722",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road from Barangay Upper Timoman - Barangay Manlabay, Dumingag, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Construction of Road from Barangay Upper Timoman - Barangay Manlabay, Dumingag, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009725",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Dapiwak - Barangay Sinonok, Dumingag, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road in Barangay Dapiwak - Barangay Sinonok, Dumingag, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009726",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Fabian, Tambulig, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road in Barangay Fabian, Tambulig, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009734",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Upper Pulacan, Labangan, Zamboanga del Sur",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road in Barangay Upper Pulacan, Labangan, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009736",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Libertad - Barangay Mercedes, Dimataling, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road, Barangay Libertad - Barangay Mercedes, Dimataling, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009737",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malasik, Dumalinao, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road, Barangay Malasik, Dumalinao, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009738",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Regla - Barangay Litan, Guipos, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road, Barangay Regla - Barangay Litan, Guipos, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0604-009742",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Upper Panikian - Barangay Lower Panikian, Pitogo, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "604",
      "lengthEvidence": "Construction of Road, Barangay Upper Panikian - Barangay Lower Panikian, Pitogo, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009750",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sikatuna - Balongating, Guipos, Zamboanga del Sur",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road, Barangay Sikatuna - Balongating, Guipos, Zamboanga del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009754",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sitio Bacolod to Sitio Moldok), Barangay Lapaz, Alicia, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Concrete Road (Sitio Bacolod to Sitio Moldok), Barangay Lapaz, Alicia, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009756",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road in Barangay Alegria, Alicia, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Concrete Road in Barangay Alegria, Alicia, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009757",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road in Purok Daisy Barangay Dawa-Dawa, Alicia, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Concrete Road in Purok Daisy Barangay Dawa-Dawa, Alicia, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009758",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok 5 Barangay Kahayagan, Olutanga, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Concrete Road, Purok 5 Barangay Kahayagan, Olutanga, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009759",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok Uranus Barangay Bulawan, Payao, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Concrete Road, Purok Uranus Barangay Bulawan, Payao, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009763",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Purok 1-3 Barangay San Vicente, Payao, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road in Purok 1-3 Barangay San Vicente, Payao, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009788",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Roads in Barangay Baikingon, Cagayan de Oro City, Misamis Oriental",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Construction of Access Roads in Barangay Baikingon, Cagayan de Oro City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009789",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Roads in Barangay San Simon, Cagayan de Oro City, Misamis Oriental",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Construction of Access Roads in Barangay San Simon, Cagayan de Oro City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009790",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Bulua, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Construction of Roads, Barangay Bulua, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009791",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Carmen, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Construction of Roads, Barangay Carmen, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009795",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Balulang, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Balulang, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009800",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Iponan, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Iponan, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009802",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Lumbia, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Lumbia, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009803",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Mambuaya, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Mambuaya, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009805",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Pagatpat, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Pagatpat, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009806",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Patag, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Patag, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009814",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Canitoan, Cagayan de Oro City, Misamis Oriental",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Canitoan, Cagayan de Oro City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009816",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Road with Drainage along Gaabucayan Street Agora, Barangay Lapasan, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Construction (Completion) of Road with Drainage along Gaabucayan Street Agora, Barangay Lapasan, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009820",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009821",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Drainage Structure along Indahag-Macasandig Diversion Road, Barangay Macasandig, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Construction of Drainage Structure along Indahag-Macasandig Diversion Road, Barangay Macasandig, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009824",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Local Roads at Barangay Indahag, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Construction of Local Roads at Barangay Indahag, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009826",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Lower Berjaya, Barangay Camaman-an, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Construction of Road at Lower Berjaya, Barangay Camaman-an, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009827",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Concreting at Sitio Lomboy, Barangay Indahag, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Road Concreting at Sitio Lomboy, Barangay Indahag, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009828",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Upper Puerto, Barangay Puerto, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Construction of Road at Upper Puerto, Barangay Puerto, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009857",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Taoc-toc - Talimonos - Minsua Rd, Barangay Tupsan Pequeño, Mahinog, Camigiun",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Construction of Road, Taoc-toc - Talimonos - Minsua Rd, Barangay Tupsan Pequeño, Mahinog, Camigiun",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009860",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Abbu Baylao to Binunsaran Road, Barangay Baylao, Mambajao, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Rehabilitation of Abbu Baylao to Binunsaran Road, Barangay Baylao, Mambajao, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009861",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Cabunoan-Katibawasan Road, Barangay Soro-Soro, Mambajao, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Rehabilitation of Cabunoan-Katibawasan Road, Barangay Soro-Soro, Mambajao, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009869",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Purok 5A, Barangay Tominobo Proper, Sta. 0+000 - Sta. 500, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Construction of Road at Purok 5A, Barangay Tominobo Proper, Sta. 0+000 - Sta. 500, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0611-009889",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road at Sitio Panadtaran, Barangay Gumagamot, Sta. 0+000 - Sta. 0+500, Lala, Lanao del Norte",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Concrete Road at Sitio Panadtaran, Barangay Gumagamot, Sta. 0+000 - Sta. 0+500, Lala, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.82,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0612-009898",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Leading to Purok 2 of Barangay Dapacan Bajo, Calamba, Misamis Occidental",
      "office": "Misamis Occidental 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Road Leading to Purok 2 of Barangay Dapacan Bajo, Calamba, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0613-009921",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nailon - Barangay Dela Paz, Sta. 0+000 - Sta. 0+350, Tudela, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Construction of Road, Barangay Nailon - Barangay Dela Paz, Sta. 0+000 - Sta. 0+350, Tudela, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0613-009925",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 1 to Purok 4), Barangay Bolinsong, Sta. 0+000 - Sta. 0+350, Bonifacio, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Concreting of Road (Purok 1 to Purok 4), Barangay Bolinsong, Sta. 0+000 - Sta. 0+350, Bonifacio, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0613-009928",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 3 to Purok 4), Barangay Lower Usugan, Sta. 0+000 - Sta. 0+350, Bonifacio, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Concreting of Road (Purok 3 to Purok 4), Barangay Lower Usugan, Sta. 0+000 - Sta. 0+350, Bonifacio, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0613-009929",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 7), Barangay Lower Usugan, Sta. 0+000 - Sta. 0+350, Bonifacio, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Concreting of Road (Purok 7), Barangay Lower Usugan, Sta. 0+000 - Sta. 0+350, Bonifacio, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0614-009932",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 5), Barangay Demetrio Fernan, Sta. 0+000 - Sta. 0+350, Bonifacio, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Concreting of Road (Purok 5), Barangay Demetrio Fernan, Sta. 0+000 - Sta. 0+350, Bonifacio, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0614-009935",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Purok 6 to Adorable Road), Barangay San Vicente, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Construction of Road (Purok 6 to Adorable Road), Barangay San Vicente, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0614-009936",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Purok 5 - Purok 6), Barangay Camanse, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Construction of Road (Purok 5 - Purok 6), Barangay Camanse, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0614-009937",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 3 Barangay Colupan Alto, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Construction of Road, Purok 3 Barangay Colupan Alto, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0614-009938",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 2 Casoy, Barangay Libertad Bajo, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Construction of Road, Purok 2 Casoy, Barangay Libertad Bajo, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0614-009939",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Purok 1 - Purok 7), Barangay Dinas, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Construction of Road (Purok 1 - Purok 7), Barangay Dinas, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0614-009940",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Purok Gumamela), Barangay Señor, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Construction of Road (Purok Gumamela), Barangay Señor, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0614-009941",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Purok San Jose), Barangay Poblacion, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Construction of Road (Purok San Jose), Barangay Poblacion, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0614-009942",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Purok 6 - Purok 3), Barangay Tipan, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Construction of Road (Purok 6 - Purok 3), Barangay Tipan, Sta. 0+000 - Sta. 0+350, Sinacaban, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0614-009943",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 3), Cogon, Sta. 0+000 - Sta. 0+350 Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Concreting of Road (Purok 3), Cogon, Sta. 0+000 - Sta. 0+350 Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0614-009944",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 2), Gotocan Daku, Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Concreting of Road (Purok 2), Gotocan Daku, Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0614-009947",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Purok 8), Stimson Abordo, Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Construction of Road (Purok 8), Stimson Abordo, Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0615-009949",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Capucao C - Gotocan Diot Purok 2), Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Construction of Road (Capucao C - Gotocan Diot Purok 2), Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0615-009950",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Purok 2C), Barangay Kinuman Sur, Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Construction of Road (Purok 2C), Barangay Kinuman Sur, Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0615-009954",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 2 to Purok 4), Barangay Embargo, Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 28571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Concreting of Road (Purok 2 to Purok 4), Barangay Embargo, Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.0,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0617-009995",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tagbaros, Maco, Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Road, Barangay Tagbaros, Maco, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0617-010001",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Purok 4 (Patilan), Barangay Bongbong, Pantukan, Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Concreting of Road, Purok 4 (Patilan), Barangay Bongbong, Pantukan, Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0617-010004",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Prk. 3, Barangay Teresa, Maco , Davao de Oro",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "617",
      "lengthEvidence": "Construction of Road, Prk. 3, Barangay Teresa, Maco , Davao de Oro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0618-010012",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road in Barangay Bobongon, Sto. Tomas, Davao del Norte",
      "office": "Davao del Norte 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Concreting of Road in Barangay Bobongon, Sto. Tomas, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0618-010013",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road in Barangay Kimamon, Sto. Tomas, Davao del Norte",
      "office": "Davao del Norte 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Concreting of Road in Barangay Kimamon, Sto. Tomas, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0618-010014",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road in Barangay Dalisay, Panabo, Davao del Norte",
      "office": "Davao del Norte 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Concreting of Road in Barangay Dalisay, Panabo, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0618-010015",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road in Barangay Sindaton, Panabo, Davao del Norte",
      "office": "Davao del Norte 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Concreting of Road in Barangay Sindaton, Panabo, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0618-010016",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road in Barangay Alejal to Barangay Alemag, Carmen, Davao del Norte",
      "office": "Davao del Norte 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Concreting of Road in Barangay Alejal to Barangay Alemag, Carmen, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010041",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Kimagango, Midsayap, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Concrete Road, Barangay Kimagango, Midsayap, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010042",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Concreting Barangay Lomopog, Midsayap, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Road Concreting Barangay Lomopog, Midsayap, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010043",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Concreting Barangay Upper Labas, Midsayap, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Road Concreting Barangay Upper Labas, Midsayap, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010047",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Sitio Brotherhood 2, Barangay Takepan, Pikit, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Concrete Road, Sitio Brotherhood 2, Barangay Takepan, Pikit, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010048",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Sitio Lower Mingading, Aleosan, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Concrete Road, Sitio Lower Mingading, Aleosan, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010053",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Sitio Tukas, Barangay Dalingaoen, Pikit, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Concrete Road, Sitio Tukas, Barangay Dalingaoen, Pikit, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010062",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Saguing, Makilala, North Cotabato",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Road, Barangay Saguing, Makilala, North Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010063",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Talun - Talunan - Bagong Silang Road, Makilala, North Cotabato",
      "office": "Cotabato 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Talun - Talunan - Bagong Silang Road, Makilala, North Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010064",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Box Culvert) connecting Barangay Dungos and Barangay Tambac, Tulunan, Cotabato",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Road (Box Culvert) connecting Barangay Dungos and Barangay Tambac, Tulunan, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010066",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gastav, Banisilan, Cotabato",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Road, Barangay Gastav, Banisilan, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010068",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Luz Village, M'lang, Cotabato",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Road, Barangay Luz Village, M'lang, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010070",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Salama Proper to Sitio Tuno Bridge, Barangay Salama, Banisilan, Cotabato",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Road, Salama Proper to Sitio Tuno Bridge, Barangay Salama, Banisilan, Cotabato",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010074",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Mabuhay to Sito Komapil to Kansan Road, Barangay Kapate, Kiamba, Sarangani",
      "office": "Sarangani District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Rehabilitation of Road, Mabuhay to Sito Komapil to Kansan Road, Barangay Kapate, Kiamba, Sarangani",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010079",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Jct. Albert Morrow Blvd. connecting to Marcos Avenue, Barangay Sinawal, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road, Jct. Albert Morrow Blvd. connecting to Marcos Avenue, Barangay Sinawal, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010081",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok Paradise, Barangay City Heights, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road, Purok Paradise, Barangay City Heights, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010082",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Perez Avenue, Barangay San Isidro, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road, Perez Avenue, Barangay San Isidro, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010086",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road with Drainage, Lower Lot 1 Sogod, Barangay Apopong, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road with Drainage, Lower Lot 1 Sogod, Barangay Apopong, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010088",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok 6, Lower Labay to Upper Labay, Barangay Tinagacan, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road, Purok 6, Lower Labay to Upper Labay, Barangay Tinagacan, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010089",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok 11, Barangay Katangawan, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road, Purok 11, Barangay Katangawan, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0621-010090",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok 15, Barangay Tinagacan, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "621",
      "lengthEvidence": "Construction of Concrete Road, Purok 15, Barangay Tinagacan, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0622-010091",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok 28, Barangay Mabuhay, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Construction of Concrete Road, Purok 28, Barangay Mabuhay, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0622-010092",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Aviation Road, Purok San Lorenzo, Barangay Apopong, General Santos City",
      "office": "South Cotabato 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Construction of Concrete Road, Aviation Road, Purok San Lorenzo, Barangay Apopong, General Santos City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0622-010094",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Junction highway to South Cotabato Police Provincial Office, Barangay Morales, Koronadal City, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Construction of Concrete Road, Junction highway to South Cotabato Police Provincial Office, Barangay Morales, Koronadal City, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0622-010101",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Purok Maligaya, Barangay San Isidro, Koronadal City, South Cotabato, 6.471650, 124.857238, 6.469807, 124.853456",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Concreting of Road, Purok Maligaya, Barangay San Isidro, Koronadal City, South Cotabato, 6.471650, 124.857238, 6.469807, 124.853456",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0622-010102",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road Jct. National Highway to Barangay Morales to Barangay Caloocan, Koronadal City, South Cotabato, 6.514713, 124.847752, 6.517217, 124.849887",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Concreting of Road Jct. National Highway to Barangay Morales to Barangay Caloocan, Koronadal City, South Cotabato, 6.514713, 124.847752, 6.517217, 124.849887",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010113",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Basag - Mongokayo Road, Barangay Basag, T'boli, South Cotabato, 6.143678,124.993279, 6.136267, 124.97485",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Construction of Basag - Mongokayo Road, Barangay Basag, T'boli, South Cotabato, 6.143678,124.993279, 6.136267, 124.97485",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0627-010202",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Sta. 0 + 000 - Sta. 0 + 300, Barangay Arellano, Libjo, Dinagat Islands",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33333333.33,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 33333.33,
      "rangesMeters": [
        [
          0.0,
          300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction of Road Sta. 0 + 000 - Sta. 0 + 300, Barangay Arellano, Libjo, Dinagat Islands",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.17,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0628-010207",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of NRJ Libertad-Magsaysay Road, General Luna, Surigao del Norte.",
      "office": "Surigao del Norte 1st District Engineering Office",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of NRJ Libertad-Magsaysay Road, General Luna, Surigao del Norte.",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0592-009503",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road Barangay Caltayan - Barangay Bagacay West, Chainage 1+118.34 - Chainage 1+432.00, La Paz, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 9960000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Construction of Concrete Road Barangay Caltayan - Barangay Bagacay West, Chainage 1+118.34 - Chainage 1+432.00, La Paz, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0164-001017",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Dumaguete South Rd - K0106 + 520 - K0107 + 000",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 9949000,
      "lengthKm": 0.48,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20727083.33,
      "lengthMeters": 480.0,
      "allocationPerStatedMeter": 20727.08,
      "rangesMeters": [
        [
          106520.0,
          107000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Dumaguete South Rd - K0106 + 520 - K0107 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.52,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0255-002592",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Secondary Roads",
      "projectName": "Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1718 + 549 - K1718 + 766, K1718 + 796 - K1719 + 000",
      "office": "Davao Occidental District Engineering Office",
      "amountPesos": 9918000,
      "lengthKm": 0.421,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23558194.77,
      "lengthMeters": 421.0,
      "allocationPerStatedMeter": 23558.19,
      "rangesMeters": [
        [
          1718549.0,
          1718766.0
        ],
        [
          1718796.0,
          1719000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "255",
      "lengthEvidence": "Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1718 + 549 - K1718 + 766, K1718 + 796 - K1719 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 1,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0208-001792",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0082 + 831 - K0083 + 280",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 9916000,
      "lengthKm": 0.449,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22084632.52,
      "lengthMeters": 449.0,
      "allocationPerStatedMeter": 22084.63,
      "rangesMeters": [
        [
          82831.0,
          83280.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0082 + 831 - K0083 + 280",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 0.43,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0213-001866",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Iloilo-Capiz Rd (Old Route) - K0094 + 453 - K0094 + 473, K0095 + 121 - K0095 + 145, K0095 + 171 - K0095 + 206, K0095 + 681 - K0095 + 735, K0095 + 754 - K0095 + 804",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 9916000,
      "lengthKm": 0.183,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 54185792.35,
      "lengthMeters": 183.0,
      "allocationPerStatedMeter": 54185.79,
      "rangesMeters": [
        [
          94453.0,
          94473.0
        ],
        [
          95121.0,
          95145.0
        ],
        [
          95171.0,
          95206.0
        ],
        [
          95681.0,
          95735.0
        ],
        [
          95754.0,
          95804.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "213",
      "lengthEvidence": "Iloilo-Capiz Rd (Old Route) - K0094 + 453 - K0094 + 473, K0095 + 121 - K0095 + 145, K0095 + 171 - K0095 + 206, K0095 + 681 - K0095 + 735, K0095 + 754 - K0095 + 804",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.33,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0288-003299",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Balingueo Br. (B04603LZ) along Camiling-Wawa-Bayambang-Malasiqui-Sta Barbara Rd",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 9900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "288",
      "lengthEvidence": "Balingueo Br. (B04603LZ) along Camiling-Wawa-Bayambang-Malasiqui-Sta Barbara Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007414",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road of Barangay Songsong, Gamu to Barangay Tomines, Naguilian, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 9896000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Road of Barangay Songsong, Gamu to Barangay Tomines, Naguilian, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0430-006053",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Purok 1, Barangay Alawihao, Daet, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 9850000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Concreting of Barangay Road, Purok 1, Barangay Alawihao, Daet, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0451-006448",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage System at UPS 5 (Sta. 0+000 - Sta. 0+127) and its Vicinity (Sta. 0+000 - Sta. 0+100), Area 6, Barangay San Isidro, Parañaque City",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 9800000,
      "lengthKm": 0.127,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 77165354.33,
      "lengthMeters": 127.0,
      "allocationPerStatedMeter": 77165.35,
      "rangesMeters": [
        [
          0.0,
          127.0
        ],
        [
          0.0,
          100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Rehabilitation of Road and Drainage System at UPS 5 (Sta. 0+000 - Sta. 0+127) and its Vicinity (Sta. 0+000 - Sta. 0+100), Area 6, Barangay San Isidro, Parañaque City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 2.18,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0497-007418",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Buyasan to Barangay Cadsalan, San Mariano, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 9797000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Construction of Road, Barangay Buyasan to Barangay Cadsalan, San Mariano, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007409",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Guilingan to Tappa, Barangay Guilingan, Benito Soliven, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 9795000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Barangay Road, Guilingan to Tappa, Barangay Guilingan, Benito Soliven, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0265-002792",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Nassiping Br. (B01091LZ) along Maharlika Highway ( Cagayan Valley Rd)",
      "office": "Central Office",
      "amountPesos": 9780000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Nassiping Br. (B01091LZ) along Maharlika Highway ( Cagayan Valley Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006748",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Sitio Kanubat 1 Barangay San Jose to Barangay San Fermin, Caba, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 9750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road Barangay Sitio Kanubat 1 Barangay San Jose to Barangay San Fermin, Caba, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0132-000412",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Imus-Bacoor Link Rd - (S06100LZ) Chainage 009 - Chainage 192",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 9730000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Imus-Bacoor Link Rd - (S06100LZ) Chainage 009 - Chainage 192",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0185-001363",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Banaue-Hungduan-Benguet Bdry Rd - K0350 + 282 - K0350 + 321, K0350 + 376 - K0350 + 409",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 9700000,
      "lengthKm": 0.072,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 134722222.22,
      "lengthMeters": 72.0,
      "allocationPerStatedMeter": 134722.22,
      "rangesMeters": [
        [
          350282.0,
          350321.0
        ],
        [
          350376.0,
          350409.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "185",
      "lengthEvidence": "Banaue-Hungduan-Benguet Bdry Rd - K0350 + 282 - K0350 + 321, K0350 + 376 - K0350 + 409",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.36,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0583-009295",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Concreting, Barangay Liburon to Barangay Balungag, San Fernando, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 9690000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Road Concreting, Barangay Liburon to Barangay Balungag, San Fernando, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0121-000205",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Kabankalan-Bais Rd - K0092+628 - K0093 + 041",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 9676000,
      "lengthKm": 0.413,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23428571.43,
      "lengthMeters": 413.0,
      "allocationPerStatedMeter": 23428.57,
      "rangesMeters": [
        [
          92628.0,
          93041.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "Kabankalan-Bais Rd - K0092+628 - K0093 + 041",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 0.49,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0120-000197",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Sagbat-Pililla Div Rd - K0056 + 000 - K0057 + 000, K0058 + 194 - K0058 + 407",
      "office": "Rizal 2nd District Engineering Office",
      "amountPesos": 9661000,
      "lengthKm": 1.213,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 7964550.7,
      "lengthMeters": 1213.0,
      "allocationPerStatedMeter": 7964.55,
      "rangesMeters": [
        [
          56000.0,
          57000.0
        ],
        [
          58194.0,
          58407.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Sagbat-Pililla Div Rd - K0056 + 000 - K0057 + 000, K0058 + 194 - K0058 + 407",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39246.92,
      "peerRateMultiple": 0.2,
      "peerRecords": 28,
      "peerBand": "1193–<1485.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 83687.82375000001,
      "graphUpperFence": 117166.26750000003
    },
    {
      "id": "HB10858-3-0118-000154",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0338 + 731 - K0338 + 918",
      "office": "Ilocos Sur 2nd District Engineering Office",
      "amountPesos": 9659000,
      "lengthKm": 0.187,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 51652406.42,
      "lengthMeters": 187.0,
      "allocationPerStatedMeter": 51652.41,
      "rangesMeters": [
        [
          338731.0,
          338918.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Manila North Rd - K0338 + 731 - K0338 + 918",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 1.11,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0112-000033",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0329 + 750 - K0329 + 811, K0331 + 000 - K0331 + 168",
      "office": "Central Office",
      "amountPesos": 9644000,
      "lengthKm": 0.229,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 42113537.12,
      "lengthMeters": 229.0,
      "allocationPerStatedMeter": 42113.54,
      "rangesMeters": [
        [
          329750.0,
          329811.0
        ],
        [
          331000.0,
          331168.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Maharlika Highway (LZ) - K0329 + 750 - K0329 + 811, K0331 + 000 - K0331 + 168",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 0.9,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0494-007362",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road of Barangay Guilingan to Barangay Tappa, Barangay Tappa, San Mariano, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 9603000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Concreting of Road of Barangay Guilingan to Barangay Tappa, Barangay Tappa, San Mariano, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0615-009964",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay 18-A, (Segment A: Sta. 0 + 000 - Sta. 0 + 280, Segment B: Sta. 0 + 000 - Sta. 0 + 350, Segment C: Sta. 0 + 000 - Sta. 0 + 074), Gingoog City, Misamis Oriental",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 9602000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 27434285.71,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 27434.29,
      "rangesMeters": [
        [
          0.0,
          280.0
        ],
        [
          0.0,
          350.0
        ],
        [
          0.0,
          74.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Construction of Road, Barangay 18-A, (Segment A: Sta. 0 + 000 - Sta. 0 + 280, Segment B: Sta. 0 + 000 - Sta. 0 + 350, Segment C: Sta. 0 + 000 - Sta. 0 + 074), Gingoog City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.96,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0129-000361",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Camiling-Wawa-Bayambang-Malasiqui-Sta. Barbara Rd (S05942LZ), K0175+336 - K0175+941",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 9596000,
      "lengthKm": 0.605,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15861157.02,
      "lengthMeters": 605.0,
      "allocationPerStatedMeter": 15861.16,
      "rangesMeters": [
        [
          175336.0,
          175941.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Camiling-Wawa-Bayambang-Malasiqui-Sta. Barbara Rd (S05942LZ), K0175+336 - K0175+941",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.49,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0146-000700",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Candoni-Sipalay Rd - K0159 + 150 - K0159 + 600",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 9590000,
      "lengthKm": 0.45,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21311111.11,
      "lengthMeters": 450.0,
      "allocationPerStatedMeter": 21311.11,
      "rangesMeters": [
        [
          159150.0,
          159600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Candoni-Sipalay Rd - K0159 + 150 - K0159 + 600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 0.65,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0213-001865",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Jct Natl Rd-Mi-anay-Duyoc-Calaan-Panitan Rd - K0109 + 700 - K0109 + 905",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 9541000,
      "lengthKm": 0.205,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46541463.41,
      "lengthMeters": 205.0,
      "allocationPerStatedMeter": 46541.46,
      "rangesMeters": [
        [
          109700.0,
          109905.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "213",
      "lengthEvidence": "Jct Natl Rd-Mi-anay-Duyoc-Calaan-Panitan Rd - K0109 + 700 - K0109 + 905",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 1.15,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0151-000789",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - K1656 + 000 - K1656 + 201",
      "office": "Central Office",
      "amountPesos": 9537000,
      "lengthKm": 0.201,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 47447761.19,
      "lengthMeters": 201.0,
      "allocationPerStatedMeter": 47447.76,
      "rangesMeters": [
        [
          1656000.0,
          1656201.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway ( Tucuran Jct-Karomatan Jct Rd) - K1656 + 000 - K1656 + 201",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 1.19,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0130-000380",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "San Jose City-Rizal Rd via Pinili-Porais-Villa Joson (Palarilla) Rd - K0168 + 000 - K0168 + 565",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 9524000,
      "lengthKm": 0.565,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16856637.17,
      "lengthMeters": 565.0,
      "allocationPerStatedMeter": 16856.64,
      "rangesMeters": [
        [
          168000.0,
          168565.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "San Jose City-Rizal Rd via Pinili-Porais-Villa Joson (Palarilla) Rd - K0168 + 000 - K0168 + 565",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.52,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0137-000523",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Zamboanga City-Labuan-Limpapa Rd - K1949 + 000 - K1949 + 701.10",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 9500000,
      "lengthKm": 0.7011000000000931,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13550135.5,
      "lengthMeters": 701.1,
      "allocationPerStatedMeter": 13550.14,
      "rangesMeters": [
        [
          1949000.0,
          1949701.1
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Zamboanga City-Labuan-Limpapa Rd - K1949 + 000 - K1949 + 701.10",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.42,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0480-007054",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Guilayon ES/Cabaritan/Calanan Access Road, Barangay Guilayon, Cabaritan and Calanan, Tabuk City, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 9500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Guilayon ES/Cabaritan/Calanan Access Road, Barangay Guilayon, Cabaritan and Calanan, Tabuk City, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007505",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+715, Barangay Balintocatoc, Santiago City, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 9500000,
      "lengthKm": 0.715,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13286713.29,
      "lengthMeters": 715.0,
      "allocationPerStatedMeter": 13286.71,
      "rangesMeters": [
        [
          0.0,
          715.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+715, Barangay Balintocatoc, Santiago City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.54,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0544-008430",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Dagatan, Amadeo, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 9500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road at Barangay Dagatan, Amadeo, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010114",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sitio Turukbato - Barangay Proper Road, Barangay Basag, T'boli, South Cotabato, 6.149291, 124.925800, 6.150502, 124.946604",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 9500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Construction of Sitio Turukbato - Barangay Proper Road, Barangay Basag, T'boli, South Cotabato, 6.149291, 124.925800, 6.150502, 124.946604",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010140",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Pobalcion - Desawo Road, Barangay Poblacion T'boli, South Cotabato, 6.207902,124.825915, 6.193201, 124.833861",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 9500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Construction of Pobalcion - Desawo Road, Barangay Poblacion T'boli, South Cotabato, 6.207902,124.825915, 6.193201, 124.833861",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007991",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Cruz to Barangay Pantoc to Barangay Carmen, Zaragoza, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 9437750,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay Sta. Cruz to Barangay Pantoc to Barangay Carmen, Zaragoza, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0489-007266",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sta. 0+000 - Sta.0+980), Barangay Baligatan, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 9420000,
      "lengthKm": 0.98,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9612244.9,
      "lengthMeters": 980.0,
      "allocationPerStatedMeter": 9612.24,
      "rangesMeters": [
        [
          0.0,
          980.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "489",
      "lengthEvidence": "Construction of Concrete Road (Sta. 0+000 - Sta.0+980), Barangay Baligatan, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.49,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0144-000665",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0033 + (-831) - K0033 + (-541), K0033 + (- 491) - K0033 + 000",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 9372000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          32169.0,
          32459.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0033 + (-831) - K0033 + (-541), K0033 + (- 491) - K0033 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0255-002590",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Secondary Roads",
      "projectName": "Zamboanga City Bypass Rd - (S01215MN) Chainage 4589 - Chainage 4779",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 9352000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "255",
      "lengthEvidence": "Zamboanga City Bypass Rd - (S01215MN) Chainage 4589 - Chainage 4779",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0154-000834",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0062 + 473 - K0062 + 609, K0072 + 390 - K0072+630",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 9306000,
      "lengthKm": 0.376,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 24750000.0,
      "lengthMeters": 376.0,
      "allocationPerStatedMeter": 24750.0,
      "rangesMeters": [
        [
          62473.0,
          62609.0
        ],
        [
          72390.0,
          72630.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0062 + 473 - K0062 + 609, K0072 + 390 - K0072+630",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 0.86,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0277-003042",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Sapao Br. (B00020PN) along Iloilo City-Leganes-Dumangas Coastal Rd",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 9300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Sapao Br. (B00020PN) along Iloilo City-Leganes-Dumangas Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0183-001337",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Sn Fernando-Bagulin Rd - K0275 + 259 - K0275 + 296",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 9250000,
      "lengthKm": 0.037,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 250000000.0,
      "lengthMeters": 37.0,
      "allocationPerStatedMeter": 250000.0,
      "rangesMeters": [
        [
          275259.0,
          275296.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "183",
      "lengthEvidence": "Sn Fernando-Bagulin Rd - K0275 + 259 - K0275 + 296",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.67,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0253-002559",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Roadway Lighting) along Tarlac - Guimba Road K0148±184 - K0151+650",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 9250000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "253",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Roadway Lighting) along Tarlac - Guimba Road K0148±184 - K0151+650",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0166-001044",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd - K1479 + 500 - K1479 + 604, K1479 + 639 - K1479+758",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 9189000,
      "lengthKm": 0.223,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 41206278.03,
      "lengthMeters": 223.0,
      "allocationPerStatedMeter": 41206.28,
      "rangesMeters": [
        [
          1479500.0,
          1479604.0
        ],
        [
          1479639.0,
          1479758.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "166",
      "lengthEvidence": "Surigao-Davao Coastal Rd - K1479 + 500 - K1479 + 604, K1479 + 639 - K1479+758",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 0.76,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0244-002432",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Santiago-Tuguegarao Rd - K0349 + 506 - K0350 + 000, K0361 + 506 - K0362 + 050 (Off-Carriageway Improvement: Paving of Shoulders)",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 9159000,
      "lengthKm": 1.038,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 8823699.42,
      "lengthMeters": 1038.0,
      "allocationPerStatedMeter": 8823.7,
      "rangesMeters": [
        [
          349506.0,
          350000.0
        ],
        [
          361506.0,
          362050.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "244",
      "lengthEvidence": "Santiago-Tuguegarao Rd - K0349 + 506 - K0350 + 000, K0361 + 506 - K0362 + 050 (Off-Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.73,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0161-000951",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Marinduque Circumferential Rd - K0093 + 930 - K0094 + 285",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 9152000,
      "lengthKm": 0.355,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25780281.69,
      "lengthMeters": 355.0,
      "allocationPerStatedMeter": 25780.28,
      "rangesMeters": [
        [
          93930.0,
          94285.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Marinduque Circumferential Rd - K0093 + 930 - K0094 + 285",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.65,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0208-001778",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Masbate-Cataingan-Placer Rd - K0044 + 717 - K0044 + 900",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 9150000,
      "lengthKm": 0.183,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 183.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          44717.0,
          44900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Masbate-Cataingan-Placer Rd - K0044 + 717 - K0044 + 900",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0153-000814",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Santiago - Tuguegarao Rd - K0365 + (-338) - K0365 + 000",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 9130000,
      "lengthKm": 0.338,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27011834.32,
      "lengthMeters": 338.0,
      "allocationPerStatedMeter": 27011.83,
      "rangesMeters": [
        [
          364662.0,
          365000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Santiago - Tuguegarao Rd - K0365 + (-338) - K0365 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 0.94,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0198-001566",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0310 + 950 - K0311 + 100, K0311 + 880 - K0312 + 145",
      "office": "Central Office",
      "amountPesos": 9099000,
      "lengthKm": 0.415,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21925301.2,
      "lengthMeters": 415.0,
      "allocationPerStatedMeter": 21925.3,
      "rangesMeters": [
        [
          310950.0,
          311100.0
        ],
        [
          311880.0,
          312145.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "198",
      "lengthEvidence": "Maharlika Highway (LZ) - K0310 + 950 - K0311 + 100, K0311 + 880 - K0312 + 145",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 0.45,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0153-000815",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Jose Abad Santos Ave (JASA) - K0073 + 862 - K0074 + 026.56",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 9042000,
      "lengthKm": 0.16455999999999768,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54946524.06,
      "lengthMeters": 164.56,
      "allocationPerStatedMeter": 54946.52,
      "rangesMeters": [
        [
          73862.0,
          74026.56
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Jose Abad Santos Ave (JASA) - K0073 + 862 - K0074 + 026.56",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 1.38,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0241-002398",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Sagada-Besao-Quirino (via Laylaya) Road, Sta.27+665 - Sta.27+880, Besao, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": 0.215,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41860465.12,
      "lengthMeters": 215.0,
      "allocationPerStatedMeter": 41860.47,
      "rangesMeters": [
        [
          27665.0,
          27880.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "Sagada-Besao-Quirino (via Laylaya) Road, Sta.27+665 - Sta.27+880, Besao, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 0.05,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0252-002549",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Sn Juan-Sn Gabriel Rd - K0281 + 354 - K0281 + 540 (Road Safety: Roller Barrier)",
      "office": "Central Office",
      "amountPesos": 9000000,
      "lengthKm": 0.186,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 48387096.77,
      "lengthMeters": 186.0,
      "allocationPerStatedMeter": 48387.1,
      "rangesMeters": [
        [
          281354.0,
          281540.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "252",
      "lengthEvidence": "Sn Juan-Sn Gabriel Rd - K0281 + 354 - K0281 + 540 (Road Safety: Roller Barrier)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 4.88,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0266-002807",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Bunga Br. (B00537LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Bunga Br. (B00537LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0269-002873",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Cangmangki Br. (B00004SJ) along Siquijor Circumferential Rd",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Cangmangki Br. (B00004SJ) along Siquijor Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003024",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Inabuyan Br (B00082PW) along Puerto Princesa North Rd",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Inabuyan Br (B00082PW) along Puerto Princesa North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003081",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Looc Br. 2 (B00448CB) along Santander-Barili-Toledo Rd",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Looc Br. 2 (B00448CB) along Santander-Barili-Toledo Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0415-005760",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay San Vicente, Alcala, Pangasinan",
      "office": "Central Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "415",
      "lengthEvidence": "Construction of Road at Barangay San Vicente, Alcala, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006418",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage Holy Family, Barangay Talon 1, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Rehabilitation of Road including Drainage Holy Family, Barangay Talon 1, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0449-006426",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Barangay Marikina Heights Road Network at Ladislaw Diwa St. (Chainage 0+000 - Chainage 0+276), Narra St. (Chainage 0+000 - Chainage 0+023), Barangay Marikina Heights, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "449",
      "lengthEvidence": "Rehabilitation of Barangay Marikina Heights Road Network at Ladislaw Diwa St. (Chainage 0+000 - Chainage 0+276), Narra St. (Chainage 0+000 - Chainage 0+023), Barangay Marikina Heights, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0451-006466",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainages along Deato Subd. (C0+000 to C0+143), Barangay Pasolo, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "451",
      "lengthEvidence": "Construction of Road and Drainages along Deato Subd. (C0+000 to C0+143), Barangay Pasolo, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0452-006473",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads and Drainage System along Camia St. (C0+000 to C0+282), Barangay 177, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "452",
      "lengthEvidence": "Construction of Roads and Drainage System along Camia St. (C0+000 to C0+282), Barangay 177, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0452-006477",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage Systems, Waling-Waling St., Barangay 175, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "452",
      "lengthEvidence": "Rehabilitation of Road and Drainage Systems, Waling-Waling St., Barangay 175, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006517",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Mahogany St. (C0+000 to C0+278), Barangay 167, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Mahogany St. (C0+000 to C0+278), Barangay 167, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006523",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Perez St. (C0+000 to C0+230), Barangay Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Perez St. (C0+000 to C0+230), Barangay Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006529",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Victoria St. (C0+000 to C0+215), Barangay Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Victoria St. (C0+000 to C0+215), Barangay Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006750",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Amlang, Rosario, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay Amlang, Rosario, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006784",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Kanaraan, Barangay San Cornelio, Caba, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Sitio Kanaraan, Barangay San Cornelio, Caba, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007051",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Ducalao/Sitio Butigui/Amlao Access Road, Barangay Suyang, Balawag and Amlao, Tabuk City, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Ducalao/Sitio Butigui/Amlao Access Road, Barangay Suyang, Balawag and Amlao, Tabuk City, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0488-007240",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 0+098 - Sta. 0+895), Barangay Centro-San Antonio to Barangay Cabeseria 8, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": 0.797,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11292346.3,
      "lengthMeters": 797.0,
      "allocationPerStatedMeter": 11292.35,
      "rangesMeters": [
        [
          98.0,
          895.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Rehabilitation of Road (Sta. 0+098 - Sta. 0+895), Barangay Centro-San Antonio to Barangay Cabeseria 8, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0488-007243",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sta. 0+096 - Sta. 0+276, Sta. 0+359 - Sta. 1+004) at Core Shelter, Barangay Carmencita, Delfin Albano, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": 0.825,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 10909090.91,
      "lengthMeters": 825.0,
      "allocationPerStatedMeter": 10909.09,
      "rangesMeters": [
        [
          96.0,
          276.0
        ],
        [
          359.0,
          1004.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Construction of Concrete Road (Sta. 0+096 - Sta. 0+276, Sta. 0+359 - Sta. 1+004) at Core Shelter, Barangay Carmencita, Delfin Albano, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.56,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0491-007292",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Section 1: Sta. 0+200 - Sta. 0+493, Section 2: Sta. 0+000 - Sta. 0+240) and Construction of Concrete Road (Section 3: Sta. 0+000 - Sta. 0+280), Barangay Auitan, San Pablo, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          200.0,
          493.0
        ],
        [
          0.0,
          240.0
        ],
        [
          0.0,
          280.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Road (Section 1: Sta. 0+200 - Sta. 0+493, Section 2: Sta. 0+000 - Sta. 0+240) and Construction of Concrete Road (Section 3: Sta. 0+000 - Sta. 0+280), Barangay Auitan, San Pablo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0498-007453",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+675, Barangay Sinaoangan Sur, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": 0.675,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 675.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          675.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+675, Barangay Sinaoangan Sur, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.54,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0499-007466",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+675, Barangay Papan Este, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": 0.675,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 675.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          675.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+675, Barangay Papan Este, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.54,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0518-007873",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Villarosa, Licab, Nueva Ecija, Sta. 0+000 - Sta. 695",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Road, Barangay Villarosa, Licab, Nueva Ecija, Sta. 0+000 - Sta. 695",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0524-008013",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Yuson, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+718",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": 0.718,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12534818.94,
      "lengthMeters": 718.0,
      "allocationPerStatedMeter": 12534.82,
      "rangesMeters": [
        [
          0.0,
          718.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Yuson, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+718",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.51,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0528-008107",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Palmayo-San Jose, Palmayo, Floridablanca, Pampanga, Sta.0+000 - Sta.0+810",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": 0.81,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11111111.11,
      "lengthMeters": 810.0,
      "allocationPerStatedMeter": 11111.11,
      "rangesMeters": [
        [
          0.0,
          810.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Construction of Road, Palmayo-San Jose, Palmayo, Floridablanca, Pampanga, Sta.0+000 - Sta.0+810",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.57,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0561-008823",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Zone 6, Barangay Pinit, Ocampo, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "561",
      "lengthEvidence": "Construction of Road, Zone 6, Barangay Pinit, Ocampo, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0571-009018",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Cubay Ubos to Pungtod Monteclaro Bridge Phase 2, Barangay Cubay Ubos and Barangay Puntod Monteclaro, Miagao, Iloilo, 122.218260, 10.683983",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Cubay Ubos to Pungtod Monteclaro Bridge Phase 2, Barangay Cubay Ubos and Barangay Puntod Monteclaro, Miagao, Iloilo, 122.218260, 10.683983",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0571-009019",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Maninila Bridge Phase 2, Barangay Maninila, San Joaquin, Iloilo, 10.67388, 122.07898",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Maninila Bridge Phase 2, Barangay Maninila, San Joaquin, Iloilo, 10.67388, 122.07898",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0571-009025",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Cubay Ubos to Pungtod Monteclaro Bridge, Barangay Cubay Ubos and Barangay Puntod Monteclaro, Miagao, Iloilo",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Cubay Ubos to Pungtod Monteclaro Bridge, Barangay Cubay Ubos and Barangay Puntod Monteclaro, Miagao, Iloilo",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0571-009026",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Maninila Bridge, Barangay, Maninila, San Joaquin, Iloilo",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Maninila Bridge, Barangay, Maninila, San Joaquin, Iloilo",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009408",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Malatbo-Campisong Road at Barangay Campisong, Ginatilan, Cebu, 9.602752, 123.332294",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Construction of Malatbo-Campisong Road at Barangay Campisong, Ginatilan, Cebu, 9.602752, 123.332294",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009409",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Agbalanga - Barangay Busay, Barangay Agbalanga and Busay, Moalboal, Cebu, 9.926517, 123.423267",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Construction of Road at Barangay Agbalanga - Barangay Busay, Barangay Agbalanga and Busay, Moalboal, Cebu, 9.926517, 123.423267",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009441",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Panlaan-Balaygtiki Road at Barangay Panlaan and Balaygtiki, Dumanjug, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Construction of Panlaan-Balaygtiki Road at Barangay Panlaan and Balaygtiki, Dumanjug, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010117",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Sitio Lambusong Road, Barangay Puti, Norala, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 9000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Sitio Lambusong Road, Barangay Puti, Norala, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0160-000930",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Isaac O. Tolentino Ave. - K0057 + (-762) - K0057 + (-537), K0057 + (-122) - K0057 + 385, K0057 + 1051 - K0059 + 000",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 8982000,
      "lengthKm": 1.681,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 5343248.07,
      "lengthMeters": 1681.0,
      "allocationPerStatedMeter": 5343.25,
      "rangesMeters": [
        [
          56238.0,
          56463.0
        ],
        [
          56878.0,
          57385.0
        ],
        [
          58051.0,
          59000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "160",
      "lengthEvidence": "Isaac O. Tolentino Ave. - K0057 + (-762) - K0057 + (-537), K0057 + (-122) - K0057 + 385, K0057 + 1051 - K0059 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32490.97,
      "peerRateMultiple": 0.16,
      "peerRecords": 21,
      "peerBand": "1226.5–<1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99385.905,
      "graphUpperFence": 144883.68
    },
    {
      "id": "HB10858-3-0145-000692",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Balabag-Maquina-Cayos-Patlad Rd - K0283 + (-324) - K0283 + (-281.20), K0283 + (-272.20) - K0283 + (-215.80), K0283 + (-211.30) - K0283 + (-185.00), K0283 + 023.30 - K0283 + 120, K0283 + 496.40 - K0283 + 534.20, K0286 + 263.00 - K0286 + 375.50, K0286 + 390.00 - K0286 + 521.00, K0286 + 534.50 - K0286 + 629.00, K0288 + 090.00 - K0288 + 108.00, K0288+1050 - K0288+1262.50",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 8980000,
      "lengthKm": 0.8285,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 10838865.42,
      "lengthMeters": 828.5,
      "allocationPerStatedMeter": 10838.87,
      "rangesMeters": [
        [
          282676.0,
          282718.8
        ],
        [
          282727.8,
          282784.2
        ],
        [
          282788.7,
          282815.0
        ],
        [
          283023.3,
          283120.0
        ],
        [
          283496.4,
          283534.2
        ],
        [
          286263.0,
          286375.5
        ],
        [
          286390.0,
          286521.0
        ],
        [
          286534.5,
          286629.0
        ],
        [
          288090.0,
          288108.0
        ],
        [
          289050.0,
          289262.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Balabag-Maquina-Cayos-Patlad Rd - K0283 + (-324) - K0283 + (-281.20), K0283 + (-272.20) - K0283 + (-215.80), K0283 + (-211.30) - K0283 + (-185.00), K0283 + 023.30 - K0283 + 120, K0283 + 496.40 - K0283 + 534.20, K0286 + 263.00 - K0286 + 375.50, K0286 + 390.00 - K0286 + 521.00, K0286 + 534.50 - K0286 + 629.00, K0288 + 090.00 - K0288 + 108.00, K0288+1050 - K0288+1262.50",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.45,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0187-001395",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Calbayog Diversion Rd - K0732 + (-667) - K0732 + (-570)",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 8970000,
      "lengthKm": 0.097,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 92474226.8,
      "lengthMeters": 97.0,
      "allocationPerStatedMeter": 92474.23,
      "rangesMeters": [
        [
          731333.0,
          731430.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "187",
      "lengthEvidence": "Calbayog Diversion Rd - K0732 + (-667) - K0732 + (-570)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.25,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0625-010162",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Isulan Public Cemetery, Barangay Kalawag II to Sampao Road, Barangay Sampao, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 8946000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Road, Isulan Public Cemetery, Barangay Kalawag II to Sampao Road, Barangay Sampao, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0168-001078",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0468 + 310 - K0468 + 495",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 8932000,
      "lengthKm": 0.185,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 48281081.08,
      "lengthMeters": 185.0,
      "allocationPerStatedMeter": 48281.08,
      "rangesMeters": [
        [
          468310.0,
          468495.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0468 + 310 - K0468 + 495",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 0.89,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0155-000855",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Palo-Carigara-Ormoc Rd - K0966 + 272 - K0966 + 510",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 8923000,
      "lengthKm": 0.238,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37491596.64,
      "lengthMeters": 238.0,
      "allocationPerStatedMeter": 37491.6,
      "rangesMeters": [
        [
          966272.0,
          966510.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "Palo-Carigara-Ormoc Rd - K0966 + 272 - K0966 + 510",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 0.94,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0487-007226",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Section 1: Sta. 0+410 - Sta. 0+910, Section 2: Sta. 0+100 - Sta. 0+600) at Barangay Paragu, Tumauini, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 8900000,
      "lengthKm": 0.81,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 10987654.32,
      "lengthMeters": 810.0,
      "allocationPerStatedMeter": 10987.65,
      "rangesMeters": [
        [
          410.0,
          910.0
        ],
        [
          100.0,
          600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Construction of Concrete Road (Section 1: Sta. 0+410 - Sta. 0+910, Section 2: Sta. 0+100 - Sta. 0+600) at Barangay Paragu, Tumauini, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.57,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0142-000634",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "IBP-San Mateo Rd - K0020 + 131 - K0020 + 747",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 8880000,
      "lengthKm": 0.616,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14415584.42,
      "lengthMeters": 616.0,
      "allocationPerStatedMeter": 14415.58,
      "rangesMeters": [
        [
          20131.0,
          20747.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "IBP-San Mateo Rd - K0020 + 131 - K0020 + 747",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.6,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0268-002851",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Cawit Br. (B00025MQ) along Marinduque Circumferential Rd",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 8855000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Cawit Br. (B00025MQ) along Marinduque Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0163-000992",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Buenavista-Kawayan Rd - K0050 + 190 - K0050 + 221",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 8840000,
      "lengthKm": 0.031,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 285161290.32,
      "lengthMeters": 31.0,
      "allocationPerStatedMeter": 285161.29,
      "rangesMeters": [
        [
          50190.0,
          50221.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "163",
      "lengthEvidence": "Buenavista-Kawayan Rd - K0050 + 190 - K0050 + 221",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 5.48,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0143-000635",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Bacnotan-Luna-Balaoan Rd - K0291 + 680 - K0292 + 243",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 8837000,
      "lengthKm": 0.563,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15696269.98,
      "lengthMeters": 563.0,
      "allocationPerStatedMeter": 15696.27,
      "rangesMeters": [
        [
          291680.0,
          292243.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Bacnotan-Luna-Balaoan Rd - K0291 + 680 - K0292 + 243",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.66,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0152-000805",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Manila North Rd - K0288+000 - K0288+245",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 8820000,
      "lengthKm": 0.245,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36000000.0,
      "lengthMeters": 245.0,
      "allocationPerStatedMeter": 36000.0,
      "rangesMeters": [
        [
          288000.0,
          288245.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Manila North Rd - K0288+000 - K0288+245",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 1.26,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0151-000775",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (LT) - K1004 + 109 - K1004 +330",
      "office": "Central Office",
      "amountPesos": 8778000,
      "lengthKm": 0.221,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39719457.01,
      "lengthMeters": 221.0,
      "allocationPerStatedMeter": 39719.46,
      "rangesMeters": [
        [
          1004109.0,
          1004330.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "151",
      "lengthEvidence": "Maharlika Highway (LT) - K1004 + 109 - K1004 +330",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 1.0,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0524-008002",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Umangan, Aliaga, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 8700000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Umangan, Aliaga, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0533-008186",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay San Miguel, Magalang, Pampanga, Sta. 0+000 - Sta. 0+616",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 8700000,
      "lengthKm": 0.616,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14123376.62,
      "lengthMeters": 616.0,
      "allocationPerStatedMeter": 14123.38,
      "rangesMeters": [
        [
          0.0,
          616.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road and Drainage, Barangay San Miguel, Magalang, Pampanga, Sta. 0+000 - Sta. 0+616",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.58,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0592-009495",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Macopa - Barangay Sto. Niño, Jaro, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 8700000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Construction of Concrete Road, Barangay Macopa - Barangay Sto. Niño, Jaro, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0575-009111",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 0+000 - Sta. 0+621) at Barangay XIII, Victorias City, Negros Occidental (10.9017200, 123.0562070)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 8694000,
      "lengthKm": 0.621,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14000000.0,
      "lengthMeters": 621.0,
      "allocationPerStatedMeter": 14000.0,
      "rangesMeters": [
        [
          0.0,
          621.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road (Sta. 0+000 - Sta. 0+621) at Barangay XIII, Victorias City, Negros Occidental (10.9017200, 123.0562070)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.57,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0263-002755",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Cabugao Br. (B00188LT) along Palo-Carigara-Ormoc Rd",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 8670000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Cabugao Br. (B00188LT) along Palo-Carigara-Ormoc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0136-000515",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1053 + 609 - K1055 + 400",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 8666000,
      "lengthKm": 1.791,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 4838637.63,
      "lengthMeters": 1791.0,
      "allocationPerStatedMeter": 4838.64,
      "rangesMeters": [
        [
          1053609.0,
          1055400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1053 + 609 - K1055 + 400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.16,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0276-003036",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Aglalana Br. (B00195PN) along Iloilo-Capiz (New Route)",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 8650000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Aglalana Br. (B00195PN) along Iloilo-Capiz (New Route)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0154-000844",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0065 + 567 - K0065 + 642, K0065 + 747 - K0066 + 052",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 8622000,
      "lengthKm": 0.38,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 22689473.68,
      "lengthMeters": 380.0,
      "allocationPerStatedMeter": 22689.47,
      "rangesMeters": [
        [
          65567.0,
          65642.0
        ],
        [
          65747.0,
          66052.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0065 + 567 - K0065 + 642, K0065 + 747 - K0066 + 052",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 0.79,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0241-002397",
      "category": "Roads",
      "program": "Construction of Missing Links/ New Roads",
      "projectName": "Besao-Tubo (via Tamboan) Road, Sta.11+387 - Sta.11+567, Besao, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 8600000,
      "lengthKm": 0.18,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 47777777.78,
      "lengthMeters": 180.0,
      "allocationPerStatedMeter": 47777.78,
      "rangesMeters": [
        [
          11387.0,
          11567.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "241",
      "lengthEvidence": "Besao-Tubo (via Tamboan) Road, Sta.11+387 - Sta.11+567, Besao, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 870000.0,
      "peerRateMultiple": 0.05,
      "peerRecords": 21,
      "peerBand": "0–<308 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3450447.1099999994,
      "graphUpperFence": 5302533.56
    },
    {
      "id": "HB10858-3-0453-006487",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads including Drainage along Kamagong St. (C 0+000 - C 0+171), Barangay 179, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 8600000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "453",
      "lengthEvidence": "Construction of Roads including Drainage along Kamagong St. (C 0+000 - C 0+171), Barangay 179, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0532-008180",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay Pandan, Angeles City Pampanga, Sta. 0+000 - Sta. 0+850, Sta. 0+000 - Sta. 0+071, Sta. 0+000 - Sta. 0+248",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 8580000,
      "lengthKm": 0.85,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 10094117.65,
      "lengthMeters": 850.0,
      "allocationPerStatedMeter": 10094.12,
      "rangesMeters": [
        [
          0.0,
          850.0
        ],
        [
          0.0,
          71.0
        ],
        [
          0.0,
          248.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "532",
      "lengthEvidence": "Construction of Road and Drainage, Barangay Pandan, Angeles City Pampanga, Sta. 0+000 - Sta. 0+850, Sta. 0+000 - Sta. 0+071, Sta. 0+000 - Sta. 0+248",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.52,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0278-003074",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Soso Br. (B00005CB) along Antonio y De Pio H-way",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 8528000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Soso Br. (B00005CB) along Antonio y De Pio H-way",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0164-001006",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Vito Port Rd - K0097 + 000 - K0097 + 500",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 8500000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 17000.0,
      "rangesMeters": [
        [
          97000.0,
          97500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Vito Port Rd - K0097 + 000 - K0097 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.43,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0487-007227",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Slope Protection Structure (Sta. 0+212 - Sta. 0+462) at Purok 3, Barangay Moldero, Tumauini, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 8500000,
      "lengthKm": 0.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34000000.0,
      "lengthMeters": 250.0,
      "allocationPerStatedMeter": 34000.0,
      "rangesMeters": [
        [
          212.0,
          462.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Construction of Road including Slope Protection Structure (Sta. 0+212 - Sta. 0+462) at Purok 3, Barangay Moldero, Tumauini, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.19,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0501-007520",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+635, Barangay Laoag, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 8500000,
      "lengthKm": 0.635,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13385826.77,
      "lengthMeters": 635.0,
      "allocationPerStatedMeter": 13385.83,
      "rangesMeters": [
        [
          0.0,
          635.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+635, Barangay Laoag, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.55,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0502-007529",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+635, Barangay Plaridel, Santiago City, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 8500000,
      "lengthKm": 0.635,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13385826.77,
      "lengthMeters": 635.0,
      "allocationPerStatedMeter": 13385.83,
      "rangesMeters": [
        [
          0.0,
          635.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+635, Barangay Plaridel, Santiago City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.55,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0502-007531",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+635, Barangay Namnama - Barangay Villa Bello, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 8500000,
      "lengthKm": 0.635,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13385826.77,
      "lengthMeters": 635.0,
      "allocationPerStatedMeter": 13385.83,
      "rangesMeters": [
        [
          0.0,
          635.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+635, Barangay Namnama - Barangay Villa Bello, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.55,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0519-007874",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Caballero to Barangay Triala, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+693",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 8500000,
      "lengthKm": 0.693,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12265512.27,
      "lengthMeters": 693.0,
      "allocationPerStatedMeter": 12265.51,
      "rangesMeters": [
        [
          0.0,
          693.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay Caballero to Barangay Triala, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+693",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.5,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0533-008198",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay San Agustin, Magalang, Pampanga, Sta. 0+000 - Sta. 0+130, Sta. 0+000 - Sta. 0+147, Sta. 0+000 - Sta. 0+135, Sta. 0+000 - Sta. 0+132, Sta. 0+000 - Sta. 0+150",
      "office": "Pampanga 3rd District Engineering Office",
      "amountPesos": 8500000,
      "lengthKm": 0.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 56666666.67,
      "lengthMeters": 150.0,
      "allocationPerStatedMeter": 56666.67,
      "rangesMeters": [
        [
          0.0,
          130.0
        ],
        [
          0.0,
          147.0
        ],
        [
          0.0,
          135.0
        ],
        [
          0.0,
          132.0
        ],
        [
          0.0,
          150.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "533",
      "lengthEvidence": "Construction of Road Barangay San Agustin, Magalang, Pampanga, Sta. 0+000 - Sta. 0+130, Sta. 0+000 - Sta. 0+147, Sta. 0+000 - Sta. 0+135, Sta. 0+000 - Sta. 0+132, Sta. 0+000 - Sta. 0+150",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.6,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0546-008485",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Lorenzo, San Pedro City, Laguna",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 8500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Construction of Road, Barangay San Lorenzo, San Pedro City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008746",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+130, at Peñafrancia - Kiwalo, Daraga, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 8500000,
      "lengthKm": 0.13,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 65384615.38,
      "lengthMeters": 130.0,
      "allocationPerStatedMeter": 65384.62,
      "rangesMeters": [
        [
          0.0,
          130.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+130, at Peñafrancia - Kiwalo, Daraga, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.85,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0172-001143",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Argao-Moalboal Rd - K0058 + (-399) - K0058 + (-005)",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 8497000,
      "lengthKm": 0.394,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21565989.85,
      "lengthMeters": 394.0,
      "allocationPerStatedMeter": 21565.99,
      "rangesMeters": [
        [
          57601.0,
          57995.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "172",
      "lengthEvidence": "Argao-Moalboal Rd - K0058 + (-399) - K0058 + (-005)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.68,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0132-000435",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0066 + 970 - K0068 + 000",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 8424000,
      "lengthKm": 1.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8178640.78,
      "lengthMeters": 1030.0,
      "allocationPerStatedMeter": 8178.64,
      "rangesMeters": [
        [
          66970.0,
          68000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0066 + 970 - K0068 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31091.62,
      "peerRateMultiple": 0.26,
      "peerRecords": 39,
      "peerBand": "1024–<1489 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 78504.36,
      "graphUpperFence": 114829.83
    },
    {
      "id": "HB10858-3-0144-000666",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0033 + 000 - K0033 + 728, K0034 + 588 - K0035 + 000",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 8423000,
      "lengthKm": 1.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 7388596.49,
      "lengthMeters": 1140.0,
      "allocationPerStatedMeter": 7388.6,
      "rangesMeters": [
        [
          33000.0,
          33728.0
        ],
        [
          34588.0,
          35000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0033 + 000 - K0033 + 728, K0034 + 588 - K0035 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.31,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0169-001101",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Candaba-Sn Miguel Rd - K0082 + 380 - K0082 + 614.27",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 8416000,
      "lengthKm": 0.23427000000000409,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35924360.78,
      "lengthMeters": 234.27,
      "allocationPerStatedMeter": 35924.36,
      "rangesMeters": [
        [
          82380.0,
          82614.27
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Candaba-Sn Miguel Rd - K0082 + 380 - K0082 + 614.27",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 1.13,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0186-001391",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Merida-Lundag-Puting Bato-Consolacion-Isabel Rd - K1114 + 915 - K1114 + 952.5",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 8400000,
      "lengthKm": 0.0375,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 224000000.0,
      "lengthMeters": 37.5,
      "allocationPerStatedMeter": 224000.0,
      "rangesMeters": [
        [
          1114915.0,
          1114952.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Merida-Lundag-Puting Bato-Consolacion-Isabel Rd - K1114 + 915 - K1114 + 952.5",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.6,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0143-000653",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sta Rita-Biak-na-Bato via Pulong Bayabas Rd - K0084 + 000 - K0085 + 000",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 8390000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8390000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 8390.0,
      "rangesMeters": [
        [
          84000.0,
          85000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Sta Rita-Biak-na-Bato via Pulong Bayabas Rd - K0084 + 000 - K0085 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.35,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0282-003170",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Paril Br. (B01661MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 8307000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Paril Br. (B01661MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0154-000841",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0014 + 755 - K0015 + 000",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 8300000,
      "lengthKm": 0.245,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33877551.02,
      "lengthMeters": 245.0,
      "allocationPerStatedMeter": 33877.55,
      "rangesMeters": [
        [
          14755.0,
          15000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - K0014 + 755 - K0015 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 1.18,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0491-007298",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 0+000-Sta. 0+800) at Barangay Catabayungan, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 8300000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10375000.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 10375.0,
      "rangesMeters": [
        [
          0.0,
          800.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Road (Sta. 0+000-Sta. 0+800) at Barangay Catabayungan, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.53,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0158-000912",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "South Super H-way - K0007 + 081 - K0007 + 200",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 8200000,
      "lengthKm": 0.119,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 68907563.03,
      "lengthMeters": 119.0,
      "allocationPerStatedMeter": 68907.56,
      "rangesMeters": [
        [
          7081.0,
          7200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "South Super H-way - K0007 + 081 - K0007 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 1.32,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0262-002732",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Curing Br. (B01553LZ) along Jct Layac-Balanga-Mariveles Port Rd",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 8200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "262",
      "lengthEvidence": "Curing Br. (B01553LZ) along Jct Layac-Balanga-Mariveles Port Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0118-000157",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0221 + 945 - K0222 + 000, K0227 + 480 - K0227 + 569, K0227 + 849 - K0227 + 903, K0227 + 935 - K0227 + 994, K0242 + 717 - K0243 + 061",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 8196000,
      "lengthKm": 0.601,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 13637271.21,
      "lengthMeters": 601.0,
      "allocationPerStatedMeter": 13637.27,
      "rangesMeters": [
        [
          221945.0,
          222000.0
        ],
        [
          227480.0,
          227569.0
        ],
        [
          227849.0,
          227903.0
        ],
        [
          227935.0,
          227994.0
        ],
        [
          242717.0,
          243061.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Manila North Rd - K0221 + 945 - K0222 + 000, K0227 + 480 - K0227 + 569, K0227 + 849 - K0227 + 903, K0227 + 935 - K0227 + 994, K0242 + 717 - K0243 + 061",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 0.32,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0245-002450",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1433 + 000 - K1433 + 660 (Road Safety: Roadway Lighting)",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 8193000,
      "lengthKm": 0.66,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12413636.36,
      "lengthMeters": 660.0,
      "allocationPerStatedMeter": 12413.64,
      "rangesMeters": [
        [
          1433000.0,
          1433660.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1433 + 000 - K1433 + 660 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 1.03,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0117-000132",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Marbel-Makar Rd) - K1699 + 400 - K1700 + 038",
      "office": "Central Office",
      "amountPesos": 8182000,
      "lengthKm": 0.638,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12824451.41,
      "lengthMeters": 638.0,
      "allocationPerStatedMeter": 12824.45,
      "rangesMeters": [
        [
          1699400.0,
          1700038.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "117",
      "lengthEvidence": "Maharlika Highway (Marbel-Makar Rd) - K1699 + 400 - K1700 + 038",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 0.3,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0607-009785",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Jct. (Buda-Kalagangan) Alternate Bypass Road, Sitio Pag-asa, Barangay Salawagan to Minongan Box Culvert, Quezon, Bukidnon",
      "office": "Bukidnon 2nd District Engineering Office",
      "amountPesos": 8160000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Construction of Road, Jct. (Buda-Kalagangan) Alternate Bypass Road, Sitio Pag-asa, Barangay Salawagan to Minongan Box Culvert, Quezon, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009786",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Jct. Buda to Balangay 7, Mibando Road, Poblacion, Quezon, Bukidnon",
      "office": "Bukidnon 2nd District Engineering Office",
      "amountPesos": 8160000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Construction of Road, Jct. Buda to Balangay 7, Mibando Road, Poblacion, Quezon, Bukidnon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0153-000820",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0035 + (-617) - K0035 + (-525), K0035 + (-485) - K0035 + (-397), K0036 + 615 - K0037 + 239",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 8132000,
      "lengthKm": 0.804,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 10114427.86,
      "lengthMeters": 804.0,
      "allocationPerStatedMeter": 10114.43,
      "rangesMeters": [
        [
          34383.0,
          34475.0
        ],
        [
          34515.0,
          34603.0
        ],
        [
          36615.0,
          37239.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0035 + (-617) - K0035 + (-525), K0035 + (-485) - K0035 + (-397), K0036 + 615 - K0037 + 239",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23733.16,
      "peerRateMultiple": 0.43,
      "peerRecords": 24,
      "peerBand": "455–<1425.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 47428.74,
      "graphUpperFence": 62212.215
    },
    {
      "id": "HB10858-3-0153-000812",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Manila North Rd - K0226 + 144 - K0226 + 177, K0226 + 196 - K0226 + 550",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 8127000,
      "lengthKm": 0.387,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21000000.0,
      "lengthMeters": 387.0,
      "allocationPerStatedMeter": 21000.0,
      "rangesMeters": [
        [
          226144.0,
          226177.0
        ],
        [
          226196.0,
          226550.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Manila North Rd - K0226 + 144 - K0226 + 177, K0226 + 196 - K0226 + 550",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 0.73,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0169-001106",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Julian Felipe Blvd - K0032 + (-099) - K0032 + (-008)",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 8104000,
      "lengthKm": 0.091,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 89054945.05,
      "lengthMeters": 91.0,
      "allocationPerStatedMeter": 89054.95,
      "rangesMeters": [
        [
          31901.0,
          31992.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Julian Felipe Blvd - K0032 + (-099) - K0032 + (-008)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 1.64,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0269-002882",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Taberna Br. (B00204LT) along Palompon-Isabel-Merida-Ormoc Rd",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 8053000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Taberna Br. (B00204LT) along Palompon-Isabel-Merida-Ormoc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0155-000864",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1704 + 600 - K1704 + 800, K1708 + 800 - K1709 + 000",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 8040000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20100000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 20100.0,
      "rangesMeters": [
        [
          1704600.0,
          1704800.0
        ],
        [
          1708800.0,
          1709000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1704 + 600 - K1704 + 800, K1708 + 800 - K1709 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 0.7,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0263-002757",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Juaton Br. (B00187LT) along Palo-Carigara-Ormoc Rd",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 8040000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "263",
      "lengthEvidence": "Juaton Br. (B00187LT) along Palo-Carigara-Ormoc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0152-000792",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1936 + 840 - K1936 + 947, K1938 + 000 - K1938 + 056",
      "office": "Central Office",
      "amountPesos": 8009000,
      "lengthKm": 0.163,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 49134969.33,
      "lengthMeters": 163.0,
      "allocationPerStatedMeter": 49134.97,
      "rangesMeters": [
        [
          1936840.0,
          1936947.0
        ],
        [
          1938000.0,
          1938056.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Maharlika Highway (Pagadian City-Zamboanga City Rd) - K1936 + 840 - K1936 + 947, K1938 + 000 - K1938 + 056",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 1.24,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0119-000167",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0116 + 595 - K0116 + 752",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.157,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50955414.01,
      "lengthMeters": 157.0,
      "allocationPerStatedMeter": 50955.41,
      "rangesMeters": [
        [
          116595.0,
          116752.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Manila North Rd - K0116 + 595 - K0116 + 752",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 1.09,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0130-000376",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Nueva Ecija-Pangasinan Rd - K0154 + 975 - K0155 + 265",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.29,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27586206.9,
      "lengthMeters": 290.0,
      "allocationPerStatedMeter": 27586.21,
      "rangesMeters": [
        [
          154975.0,
          155265.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Nueva Ecija-Pangasinan Rd - K0154 + 975 - K0155 + 265",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.55,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0159-000919",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Mt Prov-Cagayan via Tabuk Enrile Rd - K0394+029 - K0394+137, K0397+224 - K0397+304",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.188,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 42553191.49,
      "lengthMeters": 188.0,
      "allocationPerStatedMeter": 42553.19,
      "rangesMeters": [
        [
          394029.0,
          394137.0
        ],
        [
          397224.0,
          397304.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "159",
      "lengthEvidence": "Mt Prov-Cagayan via Tabuk Enrile Rd - K0394+029 - K0394+137, K0397+224 - K0397+304",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 0.78,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0171-001133",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Candoni-Sipalay Rd - K0144 + 165 - K0144 + 206",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.041,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 195121951.22,
      "lengthMeters": 41.0,
      "allocationPerStatedMeter": 195121.95,
      "rangesMeters": [
        [
          144165.0,
          144206.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Candoni-Sipalay Rd - K0144 + 165 - K0144 + 206",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 3.6,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0171-001137",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Dancalan-Candoni-Damutan Valley Rd - K0138 + 480 - K0138 + 525",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.045,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 177777777.78,
      "lengthMeters": 45.0,
      "allocationPerStatedMeter": 177777.78,
      "rangesMeters": [
        [
          138480.0,
          138525.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Dancalan-Candoni-Damutan Valley Rd - K0138 + 480 - K0138 + 525",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 3.28,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0177-001226",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Conner - Kabugao Rd - K0601+820 - K0601+926",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.106,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 75471698.11,
      "lengthMeters": 106.0,
      "allocationPerStatedMeter": 75471.7,
      "rangesMeters": [
        [
          601820.0,
          601926.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Conner - Kabugao Rd - K0601+820 - K0601+926",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 0.25,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0180-001274",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "PPSR Jct-Napsan-Apurawan Rd - K0051+250 - K0051+280",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 266666666.67,
      "lengthMeters": 30.0,
      "allocationPerStatedMeter": 266666.67,
      "rangesMeters": [
        [
          51250.0,
          51280.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "PPSR Jct-Napsan-Apurawan Rd - K0051+250 - K0051+280",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 1.25,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0230-002202",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Padre Burgos By-Pass Road, Chainage 1272 - Chainage 2109, Chainage 3218 - Chainage 3338, Quezon",
      "office": "Quezon 3rd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Padre Burgos By-Pass Road, Chainage 1272 - Chainage 2109, Chainage 3218 - Chainage 3338, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0267-002840",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Napo Br. (B02443LZ) along Jct Lucban-Luisiana Rd",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "267",
      "lengthEvidence": "Napo Br. (B02443LZ) along Jct Lucban-Luisiana Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002987",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Lana Br. (B00771LZ) along Laoag-Sarrat-Piddig-Solsona Rd",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Lana Br. (B00771LZ) along Laoag-Sarrat-Piddig-Solsona Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002991",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Ab-ab Br. (B00921LZ) along Mt Province-N Vizcaya Rd",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Ab-ab Br. (B00921LZ) along Mt Province-N Vizcaya Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0277-003046",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Talaugis Br. (B00475PN) along Iloilo City-Leganes-Dumangas Coastal Rd",
      "office": "Iloilo 4th District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Talaugis Br. (B00475PN) along Iloilo City-Leganes-Dumangas Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003100",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Bugko Br. (B00540SM) along Catarman-Laoang Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Bugko Br. (B00540SM) along Catarman-Laoang Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003101",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Dao Br. (B00287SM) along Allen-Catarman Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Dao Br. (B00287SM) along Allen-Catarman Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003102",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Geratag Br. 1 (B00289SM) along Allen-Catarman Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Geratag Br. 1 (B00289SM) along Allen-Catarman Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0431-006074",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Maisog Purok 1- Purok 3 San Lorenzo Ruiz, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road Barangay Maisog Purok 1- Purok 3 San Lorenzo Ruiz, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0431-006075",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Mangcayo, Vinzons, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road Barangay Mangcayo, Vinzons, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0431-006078",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Purok 2 Barangay Napilihan, Vinzons, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road Purok 2 Barangay Napilihan, Vinzons, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0431-006080",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Sitio Mangcawayan Calangcawan Sur to Sitio Mantabog, Sto. Domingo Vinzons, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road Sitio Mangcawayan Calangcawan Sur to Sitio Mantabog, Sto. Domingo Vinzons, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0431-006082",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabanbanan, San Vicente, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road, Barangay Cabanbanan, San Vicente, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0431-006088",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Kanluran, San Vicente, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road, Barangay Kanluran, San Vicente, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0431-006092",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Man-ogob, San Vicente, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road, Barangay Man-ogob, San Vicente, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006410",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage at Patola St. and Maunlad St., Barangay CAA, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Rehabilitation of Road and Drainage at Patola St. and Maunlad St., Barangay CAA, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006417",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage Diamond Street, Jade Compound, Garnet St., Barangay Talon 1, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Rehabilitation of Road including Drainage Diamond Street, Jade Compound, Garnet St., Barangay Talon 1, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0450-006439",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road Network Including Laterals at Friendly Village 1 and 2, Barangay Concepcion Uno, Marikina City",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "450",
      "lengthEvidence": "Rehabilitation of Road Network Including Laterals at Friendly Village 1 and 2, Barangay Concepcion Uno, Marikina City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0453-006489",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads including Drainage Structure connecting M.B. Asistio Street and Rose Street, (C 0+000 - C 0+268), Barangay 187, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "453",
      "lengthEvidence": "Construction of Roads including Drainage Structure connecting M.B. Asistio Street and Rose Street, (C 0+000 - C 0+268), Barangay 187, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006504",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Chico St. (C0+000 to C0+210), Barangay Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Chico St. (C0+000 to C0+210), Barangay Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006528",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Tolentino St. (C0+000 to C0+160), Barangay Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Tolentino St. (C0+000 to C0+160), Barangay Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006549",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage along Avocado Street (C 0+000 - C 0+169.50) and Alley 1 (C 0+000 - C 0+080), Barangay 178, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Roads and Drainage along Avocado Street (C 0+000 - C 0+169.50) and Alley 1 (C 0+000 - C 0+080), Barangay 178, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006611",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Abkir, Vintar, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Construction of Bridge, Barangay Abkir, Vintar, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006625",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Pulangi, Bacarra, Ilocos Norte (18.274607, 120.640192 - 18.277292, 120.642510)",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Rehabilitation of Road, Barangay Pulangi, Bacarra, Ilocos Norte (18.274607, 120.640192 - 18.277292, 120.642510)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006704",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Surong, Pasuquin, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Bridge, Barangay Surong, Pasuquin, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006899",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Labrador, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Improvement of Road at Labrador, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006955",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lasip, Malasiqui, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Road, Barangay Lasip, Malasiqui, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006956",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bacundao West, Malasiqui, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Road, Barangay Bacundao West, Malasiqui, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007137",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Balbalasang Elementary Access Road, Barangay Balbalasang, Balbalan, Kalinga",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Improvement of Balbalasang Elementary Access Road, Barangay Balbalasang, Balbalan, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007361",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Purok 6,5,4 & 3, Barangay San Rafael, Roxas, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Rehabilitation of Road, Purok 6,5,4 & 3, Barangay San Rafael, Roxas, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0498-007451",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+600, Barangay Dabubu Pequeno, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+600, Barangay Dabubu Pequeno, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.54,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0503-007556",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Reconstruction of Road and Drainage, Barangay San Fabian, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Rehabilitation/Reconstruction of Road and Drainage, Barangay San Fabian, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007597",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge of Sitio Tabiis, Anak, Nagtipuna, Quirino",
      "office": "Quirino District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Bridge of Sitio Tabiis, Anak, Nagtipuna, Quirino",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007616",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road including drainage, JP Rizal Street, Barangay Palihan, Hermosa, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Barangay Road including drainage, JP Rizal Street, Barangay Palihan, Hermosa, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007618",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Bridge, Sitio Ibayo I and II, Barangay San Juan, Samal, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Concrete Bridge, Sitio Ibayo I and II, Barangay San Juan, Samal, Bataan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0509-007693",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 0+414, Javier St. and San Diego St., Poblacion, Plaridel, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.414,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19323671.5,
      "lengthMeters": 414.0,
      "allocationPerStatedMeter": 19323.67,
      "rangesMeters": [
        [
          0.0,
          414.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 0+414, Javier St. and San Diego St., Poblacion, Plaridel, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.79,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0511-007724",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+373 - Sta. 0+954, Purok 1-4, Rueda, Plaridel, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.581,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13769363.17,
      "lengthMeters": 581.0,
      "allocationPerStatedMeter": 13769.36,
      "rangesMeters": [
        [
          373.0,
          954.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+373 - Sta. 0+954, Purok 1-4, Rueda, Plaridel, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.56,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0512-007745",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads with Drainage Canal, Dove St., Barangay Malhacan, City of Meycauayan, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "512",
      "lengthEvidence": "Construction of Roads with Drainage Canal, Dove St., Barangay Malhacan, City of Meycauayan, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0512-007749",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction and Improvement of Valenzuela-Obando Road (Obando Section - Barangay Catanghalan), Obando, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "512",
      "lengthEvidence": "Construction and Improvement of Valenzuela-Obando Road (Obando Section - Barangay Catanghalan), Obando, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007768",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal, Ana Maria, Barangay Iba, Meycauayan City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road with Drainage Canal, Ana Maria, Barangay Iba, Meycauayan City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007769",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal, Barangay Langka, Meycauayan City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road with Drainage Canal, Barangay Langka, Meycauayan City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007770",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal, Barangay Longos, Meycauayan City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road with Drainage Canal, Barangay Longos, Meycauayan City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007771",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal, Barangay Pandayan, Meycauayan, City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road with Drainage Canal, Barangay Pandayan, Meycauayan, City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007772",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal, Barangay Perez, Meycauayan City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road with Drainage Canal, Barangay Perez, Meycauayan City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007773",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal, Barangay Saluysoy, Meycauayan City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road with Drainage Canal, Barangay Saluysoy, Meycauayan City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007774",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal, Barangay Tabing-Ilog, Marilao, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road with Drainage Canal, Barangay Tabing-Ilog, Marilao, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007775",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal, Barangay Zamora, Meycauayan City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road with Drainage Canal, Barangay Zamora, Meycauayan City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007776",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal, Ciudad Grande, Barangay Lawa, Meycauayan City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road with Drainage Canal, Ciudad Grande, Barangay Lawa, Meycauayan City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007777",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal, Diez St., Barangay Malhacan, Meycauayan City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road with Drainage Canal, Diez St., Barangay Malhacan, Meycauayan City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007778",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal, F. Dazo St., Barangay Calvario, Meycauayan City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road with Drainage Canal, F. Dazo St., Barangay Calvario, Meycauayan City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0514-007779",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal, Liliesville, Barangay Lawa, Meycauayan City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road with Drainage Canal, Liliesville, Barangay Lawa, Meycauayan City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0514-007781",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Canal, San Diego St., Barangay Bancal, Meycauayan City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road with Drainage Canal, San Diego St., Barangay Bancal, Meycauayan City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0514-007792",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Banga, Meycauayan City, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road, Barangay Banga, Meycauayan City, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0514-007793",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ibayo, Marilao, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "514",
      "lengthEvidence": "Construction of Road, Barangay Ibayo, Marilao, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0515-007798",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Gavino St., Barangay Prenza I, Marilao, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Construction of Road, Gavino St., Barangay Prenza I, Marilao, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0531-008160",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation & Improvement of Road at Calibutbut, San Miguel Betis, Guagua, Pampanga",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "531",
      "lengthEvidence": "Rehabilitation & Improvement of Road at Calibutbut, San Miguel Betis, Guagua, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0534-008212",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Culipat Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+316.70",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.3167,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25260498.89,
      "lengthMeters": 316.7,
      "allocationPerStatedMeter": 25260.5,
      "rangesMeters": [
        [
          0.0,
          316.7
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction of Road at Barangay Culipat Tarlac City, Tarlac, Sta. 0+000.00 - Sta. 0+316.70",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.88,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0536-008248",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road near Iglesia ni Cristo, Sta. 0 + 000, Sta. 0+ 500, Barangay Cawag, Subic, Zambales",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Road near Iglesia ni Cristo, Sta. 0 + 000, Sta. 0+ 500, Barangay Cawag, Subic, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008256",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure, Barangay Pinamucan Silangan, Batangas City",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road Slope Protection Structure, Barangay Pinamucan Silangan, Batangas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008258",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Slope Protection Structure, Sta. 0+000 – Sta. 0+320, Barangay Olo-olo, Lobo, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.32,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 320.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          320.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road with Slope Protection Structure, Sta. 0+000 – Sta. 0+320, Barangay Olo-olo, Lobo, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.87,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0541-008364",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Pinagbayanan, Taysan, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road at Barangay Pinagbayanan, Taysan, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008459",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Koronel Jose P. Elises, Gen. Mariano Alvarez, Cavite",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Construction of Bridge, Barangay Koronel Jose P. Elises, Gen. Mariano Alvarez, Cavite",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008491",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay Laguan, Rizal, Laguna",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Construction of Road and Drainage, Barangay Laguan, Rizal, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0551-008591",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road with Drainage Systems, Purok Angela, Barangay Dela Paz, Antipolo City, Sta.(0+000 - Sta.0+220)",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36363636.36,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 36363.64,
      "rangesMeters": [
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Improvement of Road with Drainage Systems, Purok Angela, Barangay Dela Paz, Antipolo City, Sta.(0+000 - Sta.0+220)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.03,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0552-008615",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Batong Buhay, Sablayan, Occidental Mindoro",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Road, Batong Buhay, Sablayan, Occidental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008744",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road along Barangay 7, Legazpi City, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Construction of Road along Barangay 7, Legazpi City, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008745",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road along Lidong, Legazpi City, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Construction of Road along Lidong, Legazpi City, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008771",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Nag-Aso Lake Barangay Hologan, Manito, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Improvement of Road along Nag-Aso Lake Barangay Hologan, Manito, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008775",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Concreting along Barangay Villahermosa, Daraga, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Road Concreting along Barangay Villahermosa, Daraga, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0564-008875",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Panay , Sta. Ana, Alinawan, Burabod, Panganiban, Catanduanes",
      "office": "Catanduanes District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Road at Barangay Panay , Sta. Ana, Alinawan, Burabod, Panganiban, Catanduanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0569-008998",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Pin-as-Malbag-Fundacion Road, Sta. 1 + 600 - Sta. 2 + 000, Barangay Sebaste, Sibunag, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          1600.0,
          2000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Pin-as-Malbag-Fundacion Road, Sta. 1 + 600 - Sta. 2 + 000, Barangay Sebaste, Sibunag, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.82,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0570-009005",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Proper - Sitio Hacienda - Philippine Science High School, Jct. N.R. Balcon Maravilla, Sta. 1 + 355 - Sta. 1 + 790, Barangay Balcon Maravilla, Jordan, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.435,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18390804.6,
      "lengthMeters": 435.0,
      "allocationPerStatedMeter": 18390.8,
      "rangesMeters": [
        [
          1355.0,
          1790.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Construction of Road, Sitio Proper - Sitio Hacienda - Philippine Science High School, Jct. N.R. Balcon Maravilla, Sta. 1 + 355 - Sta. 1 + 790, Barangay Balcon Maravilla, Jordan, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.75,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0583-009284",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Liboran Rd, Tiptip District,Tagbilaran City, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Construction of Road at Liboran Rd, Tiptip District,Tagbilaran City, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009411",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Alawijao - Barangay Basak Road at Barangay Alawijao and Basak, Badian, Cebu, Start 9.834365, 123.40528 End 9.830901, 123.414212",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Construction of Barangay Alawijao - Barangay Basak Road at Barangay Alawijao and Basak, Badian, Cebu, Start 9.834365, 123.40528 End 9.830901, 123.414212",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009442",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Lepanto-Guadalupe Road at Barangays Lepanto and Guadalupe, Alegria, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Improvement of Road at Lepanto-Guadalupe Road at Barangays Lepanto and Guadalupe, Alegria, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0592-009500",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+891 - Sta. 1+219, Sta. 1+445 - Sta. 1+767, Barangay Burgos - Barangay Mabini, Mayorga, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.65,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 12307692.31,
      "lengthMeters": 650.0,
      "allocationPerStatedMeter": 12307.69,
      "rangesMeters": [
        [
          891.0,
          1219.0
        ],
        [
          1445.0,
          1767.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Construction of Road, Sta. 0+891 - Sta. 1+219, Sta. 1+445 - Sta. 1+767, Barangay Burgos - Barangay Mabini, Mayorga, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.5,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0592-009501",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Concrete Road (Dike Site), District 1 Poblacion - District 2 Poblacion, Jaro, Leyte, Chainage 0+000 - Chainage 0+629.40",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Rehabilitation of Concrete Road (Dike Site), District 1 Poblacion - District 2 Poblacion, Jaro, Leyte, Chainage 0+000 - Chainage 0+629.40",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0597-009597",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabarasan - Barangay Dao (Sta. 4+760 - Sta. 4+900), Gamay, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": 0.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 57142857.14,
      "lengthMeters": 140.0,
      "allocationPerStatedMeter": 57142.86,
      "rangesMeters": [
        [
          4760.0,
          4900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Road, Barangay Cabarasan - Barangay Dao (Sta. 4+760 - Sta. 4+900), Gamay, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.62,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0603-009704",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Concreting in Barangay Caracol, Salug, Zamboanga del Norte",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "603",
      "lengthEvidence": "Road Concreting in Barangay Caracol, Salug, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0611-009872",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at 31st Street, Upper Lluch Compund, Carbide Village, Barangay Tubod, Sta. 0+000 - Sta. 300, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Road at 31st Street, Upper Lluch Compund, Carbide Village, Barangay Tubod, Sta. 0+000 - Sta. 300, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0618-010011",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of NRJ Tagum-Panabo Circumferential Road To Libertad To San Miguel, Sto. Tomas, Davao del Norte",
      "office": "Davao del Norte 2nd District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Construction of NRJ Tagum-Panabo Circumferential Road To Libertad To San Miguel, Sto. Tomas, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010040",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Inug-ug to Poblacion, Pikit, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Concrete Road, Barangay Inug-ug to Poblacion, Pikit, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0146-000709",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sogod-Tabuelan Rd - K0110 + 604 - K0110 + 705.66",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 7969000,
      "lengthKm": 0.1016600000000035,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 78388746.8,
      "lengthMeters": 101.66,
      "allocationPerStatedMeter": 78388.75,
      "rangesMeters": [
        [
          110604.0,
          110705.66
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Sogod-Tabuelan Rd - K0110 + 604 - K0110 + 705.66",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 2.39,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": true,
      "graphExtreme": false,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0134-000467",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sta Cruz-Pob Rd - K0088 + 2014 - K0088 + 2380",
      "office": "Laguna 1st District Engineering Office",
      "amountPesos": 7910000,
      "lengthKm": 0.366,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21612021.86,
      "lengthMeters": 366.0,
      "allocationPerStatedMeter": 21612.02,
      "rangesMeters": [
        [
          90014.0,
          90380.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Sta Cruz-Pob Rd - K0088 + 2014 - K0088 + 2380",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.67,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0291-003350",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Caigit Br. (B00156LT) along Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 7900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "291",
      "lengthEvidence": "Caigit Br. (B00156LT) along Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0490-007285",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure (Sta. 0+514 - Sta. 0+910), Purok 1, Barangay Lanna, Tumauini, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 7900000,
      "lengthKm": 0.396,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19949494.95,
      "lengthMeters": 396.0,
      "allocationPerStatedMeter": 19949.49,
      "rangesMeters": [
        [
          514.0,
          910.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Construction of Road Slope Protection Structure (Sta. 0+514 - Sta. 0+910), Purok 1, Barangay Lanna, Tumauini, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.81,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0134-000478",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Marikina-Infanta Rd - K0041 + 501 - K0042 + 000",
      "office": "Rizal 2nd District Engineering Office",
      "amountPesos": 7896000,
      "lengthKm": 0.499,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15823647.29,
      "lengthMeters": 499.0,
      "allocationPerStatedMeter": 15823.65,
      "rangesMeters": [
        [
          41501.0,
          42000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Marikina-Infanta Rd - K0041 + 501 - K0042 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.49,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0153-000819",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Romulo H-way - K0142 + 982 - K0143 + 299",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 7873000,
      "lengthKm": 0.317,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24835962.15,
      "lengthMeters": 317.0,
      "allocationPerStatedMeter": 24835.96,
      "rangesMeters": [
        [
          142982.0,
          143299.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Romulo H-way - K0142 + 982 - K0143 + 299",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 0.87,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0266-002812",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Solokegue Br. (B00534LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 7800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Solokegue Br. (B00534LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003167",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Masurot Br. (B00623MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 7800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Masurot Br. (B00623MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003172",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tibulos Br. 1 (B00397MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 7800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Tibulos Br. 1 (B00397MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003173",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tibulos Br. 2 (B00398MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 7800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Tibulos Br. 2 (B00398MN) along Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007954",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Minabuyoc, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 7800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Minabuyoc, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0132-000419",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tanza-Trece Martires City-Indang Rd - K0054 + 678 - K0055 + 000",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 7776000,
      "lengthKm": 0.322,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24149068.32,
      "lengthMeters": 322.0,
      "allocationPerStatedMeter": 24149.07,
      "rangesMeters": [
        [
          54678.0,
          55000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Tanza-Trece Martires City-Indang Rd - K0054 + 678 - K0055 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.75,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0488-007239",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Section 1: Sta. 0+000 - Sta. 0+800, Section 2: Sta. 0+060 - Sta. 0+358), Barangay Cabeseria 8, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 7750000,
      "lengthKm": 0.8,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 9687500.0,
      "lengthMeters": 800.0,
      "allocationPerStatedMeter": 9687.5,
      "rangesMeters": [
        [
          0.0,
          800.0
        ],
        [
          60.0,
          358.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "488",
      "lengthEvidence": "Construction of Concrete Road (Section 1: Sta. 0+000 - Sta. 0+800, Section 2: Sta. 0+060 - Sta. 0+358), Barangay Cabeseria 8, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.5,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0135-000496",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Gate-Bulan Airport Rd - K0634 + 690 - K0635 + 000",
      "office": "Sorsogon 2nd District Engineering Office",
      "amountPesos": 7725000,
      "lengthKm": 0.31,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24919354.84,
      "lengthMeters": 310.0,
      "allocationPerStatedMeter": 24919.35,
      "rangesMeters": [
        [
          634690.0,
          635000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Gate-Bulan Airport Rd - K0634 + 690 - K0635 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.49,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0147-000715",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Jaro-Dagami-Burauen-Lapaz Rd - K0973 + 070 - K0973 + 360",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 7700000,
      "lengthKm": 0.29,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26551724.14,
      "lengthMeters": 290.0,
      "allocationPerStatedMeter": 26551.72,
      "rangesMeters": [
        [
          973070.0,
          973360.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Jaro-Dagami-Burauen-Lapaz Rd - K0973 + 070 - K0973 + 360",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 0.81,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0487-007230",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sta. 0+000 - Sta. 0+635) at Barangay Fuyo, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 7700000,
      "lengthKm": 0.635,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12125984.25,
      "lengthMeters": 635.0,
      "allocationPerStatedMeter": 12125.98,
      "rangesMeters": [
        [
          0.0,
          635.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Construction of Concrete Road (Sta. 0+000 - Sta. 0+635) at Barangay Fuyo, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.5,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0520-007910",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabileo, Cuyapo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 7700000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Cabileo, Cuyapo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0164-001004",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Iloilo East Coast-Capiz Rd - K0234 + 570 - K0234 + 899",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 7680000,
      "lengthKm": 0.329,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23343465.05,
      "lengthMeters": 329.0,
      "allocationPerStatedMeter": 23343.47,
      "rangesMeters": [
        [
          234570.0,
          234899.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Iloilo East Coast-Capiz Rd - K0234 + 570 - K0234 + 899",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 0.43,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0253-002558",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Sta Rita-Biak-na-Bato via Pulong Bayabas Rd - K0080 + 297 - K0081 + 215 (Off- Carriageway Improvement: Paving of Shoulders)",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 7632000,
      "lengthKm": 0.918,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8313725.49,
      "lengthMeters": 918.0,
      "allocationPerStatedMeter": 8313.73,
      "rangesMeters": [
        [
          80297.0,
          81215.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "253",
      "lengthEvidence": "Sta Rita-Biak-na-Bato via Pulong Bayabas Rd - K0080 + 297 - K0081 + 215 (Off- Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.84,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0511-007739",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Road, Lapid's Ville, Longos, City of Malolos, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 7614000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation/Improvement of Road, Lapid's Ville, Longos, City of Malolos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0186-001390",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Libungao-Matag-ob-Palompon Rd - K1009 + 473 - K1009 + 503",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 7600000,
      "lengthKm": 0.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 253333333.33,
      "lengthMeters": 30.0,
      "allocationPerStatedMeter": 253333.33,
      "rangesMeters": [
        [
          1009473.0,
          1009503.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Libungao-Matag-ob-Palompon Rd - K1009 + 473 - K1009 + 503",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.68,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0265-002786",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Gilbert Br. 1 (B00897LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 7600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Gilbert Br. 1 (B00897LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0265-002787",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Gilbert Br. 2 (B00842LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 7600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Gilbert Br. 2 (B00842LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0277-003043",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tambunac Br. (B00202PN) along Passi-San Enrique-Garrita Rd",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 7600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Tambunac Br. (B00202PN) along Passi-San Enrique-Garrita Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0134-000476",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Antipolo Circumferential Rd A - K0025 + (-142) - K0025 + 000",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 7550000,
      "lengthKm": 0.142,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 53169014.08,
      "lengthMeters": 142.0,
      "allocationPerStatedMeter": 53169.01,
      "rangesMeters": [
        [
          24858.0,
          25000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Antipolo Circumferential Rd A - K0025 + (-142) - K0025 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 1.05,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0129-000356",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Laoag-Airport Rd - K0486 + (-627) - K0486 + 060",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": 0.687,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10917030.57,
      "lengthMeters": 687.0,
      "allocationPerStatedMeter": 10917.03,
      "rangesMeters": [
        [
          485373.0,
          486060.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Laoag-Airport Rd - K0486 + (-627) - K0486 + 060",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.34,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0143-000643",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Ayaga-Sta. Marcela-Flora-Lasam Rd - K0670 + (-806) - K0670 + (-394)",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": 0.412,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18203883.5,
      "lengthMeters": 412.0,
      "allocationPerStatedMeter": 18203.88,
      "rangesMeters": [
        [
          669194.0,
          669606.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Ayaga-Sta. Marcela-Flora-Lasam Rd - K0670 + (-806) - K0670 + (-394)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 0.55,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0164-001005",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Metro Iloilo Radial Rd (R4 Bypass Rd) - K0020 + 421 - K0020 + 807",
      "office": "Iloilo 4th District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": 0.386,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19430051.81,
      "lengthMeters": 386.0,
      "allocationPerStatedMeter": 19430.05,
      "rangesMeters": [
        [
          20421.0,
          20807.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Metro Iloilo Radial Rd (R4 Bypass Rd) - K0020 + 421 - K0020 + 807",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.49,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0173-001170",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Palo-Carigara-Ormoc Rd - K0971 + 255.80 - K0971 + 290.80",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": 0.035,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 214285714.29,
      "lengthMeters": 35.0,
      "allocationPerStatedMeter": 214285.71,
      "rangesMeters": [
        [
          971255.8,
          971290.8
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Palo-Carigara-Ormoc Rd - K0971 + 255.80 - K0971 + 290.80",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 0.64,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0177-001230",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Conner-Kabugao Rd - K0584 + 530 - K0584 + 565",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": 0.035,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 214285714.29,
      "lengthMeters": 35.0,
      "allocationPerStatedMeter": 214285.71,
      "rangesMeters": [
        [
          584530.0,
          584565.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Conner-Kabugao Rd - K0584 + 530 - K0584 + 565",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 1.01,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0274-002993",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Malitep Br. (B02980LZ) along Baguio-Bontoc Rd",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Malitep Br. (B02980LZ) along Baguio-Bontoc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-003001",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Baubo Br. (B03008LZ) along A Castañeda--Ma Aurora-Sn Luis Rd",
      "office": "Aurora District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Baubo Br. (B03008LZ) along A Castañeda--Ma Aurora-Sn Luis Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-003003",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tanawan Br. (B03004LZ) along Dingalan-Gabaldon Rd",
      "office": "Aurora District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Tanawan Br. (B03004LZ) along Dingalan-Gabaldon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0429-006051",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay San Isidro, Daet, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "429",
      "lengthEvidence": "Concreting of Barangay Road, Barangay San Isidro, Daet, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0457-006566",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads along Dagupan St., (Bulacan St., to Dead End), Manila City",
      "office": "North Manila District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Rehabilitation of Roads along Dagupan St., (Bulacan St., to Dead End), Manila City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007437",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road from Bgy Diarao to Bgy San Sebastian ,Jones, Isabela (Sta. 0+000- Sta.0+560)",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": 0.56,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13392857.14,
      "lengthMeters": 560.0,
      "allocationPerStatedMeter": 13392.86,
      "rangesMeters": [
        [
          0.0,
          560.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Concreting of Road from Bgy Diarao to Bgy San Sebastian ,Jones, Isabela (Sta. 0+000- Sta.0+560)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.55,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0498-007457",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+560, Barangay Linamanan, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": 0.56,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13392857.14,
      "lengthMeters": 560.0,
      "allocationPerStatedMeter": 13392.86,
      "rangesMeters": [
        [
          0.0,
          560.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+560, Barangay Linamanan, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.55,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0499-007463",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+560, Barangay Napaliong, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": 0.56,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13392857.14,
      "lengthMeters": 560.0,
      "allocationPerStatedMeter": 13392.86,
      "rangesMeters": [
        [
          0.0,
          560.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+560, Barangay Napaliong, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.55,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0500-007487",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Purok 5, Barangay Dabubu Grande, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "500",
      "lengthEvidence": "Construction of Barangay Road, Purok 5, Barangay Dabubu Grande, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007585",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Carolotan, Barangay Carolotan, Dupax del Sur, Nueva Vizcaya",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Bridge, Barangay Carolotan, Barangay Carolotan, Dupax del Sur, Nueva Vizcaya",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007586",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Dopaj bridge, Barangay Domang, Dupax del Sur, Nueva Vizcaya",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Dopaj bridge, Barangay Domang, Dupax del Sur, Nueva Vizcaya",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007613",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Gueco, Barangay Bagong Paraiso, Orani, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Concreting of Road, Sitio Gueco, Barangay Bagong Paraiso, Orani, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007615",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting Road, Sitio Baliteng Pula, Barangay Pagasa, Orani, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Concreting Road, Sitio Baliteng Pula, Barangay Pagasa, Orani, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0524-007998",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sto. Rosario, Aliaga, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Sto. Rosario, Aliaga, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009672",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sinuyak, Katipunan, Zamboanga del Norte, Start 8.43656, 123.30653 End 8.43393, 123.30364",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Barangay Sinuyak, Katipunan, Zamboanga del Norte, Start 8.43656, 123.30653 End 8.43393, 123.30364",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0613-009926",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 6), Barangay Liloan, Sta. 0+000 to Sta. 0+250, Bonifacio, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": 0.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 250.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          0.0,
          250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Concreting of Road (Purok 6), Barangay Liloan, Sta. 0+000 to Sta. 0+250, Bonifacio, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.05,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0613-009927",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 5), Barangay Liloan, Sta. 0+000 to Sta. 0+250, Bonifacio, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": 0.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 250.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          0.0,
          250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Concreting of Road (Purok 5), Barangay Liloan, Sta. 0+000 to Sta. 0+250, Bonifacio, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 1.05,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0619-010044",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Tubon, Pigcawayan, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Concrete Road, Barangay Tubon, Pigcawayan, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010046",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Sitio Abacanhan, Barangay Cabaruyan, Libungan, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Concrete Road, Sitio Abacanhan, Barangay Cabaruyan, Libungan, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010049",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Sitio Margos, Barangay Bulucaon, Pigcawayan, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Concrete Road, Sitio Margos, Barangay Bulucaon, Pigcawayan, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010054",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Zone 6, Barangay New Panay to Barangay Molok, Pigcawayan, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Concrete Road, Zone 6, Barangay New Panay to Barangay Molok, Pigcawayan, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0129-000352",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Fairview Ave - K0024 + 385.30 - K0024 + 637.40",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 7489000,
      "lengthKm": 0.25210000000000216,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29706465.69,
      "lengthMeters": 252.1,
      "allocationPerStatedMeter": 29706.47,
      "rangesMeters": [
        [
          24385.3,
          24637.4
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Fairview Ave - K0024 + 385.30 - K0024 + 637.40",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.59,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0271-002923",
      "category": "Mixed roads / bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "PNR Overpass Bridge (B00435LZ) along Andaya Highway (Package B3-B)",
      "office": "Central Office",
      "amountPesos": 7465000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "PNR Overpass Bridge (B00435LZ) along Andaya Highway (Package B3-B)",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0174-001175",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Maharlika Highway (LT) - K1041 + 462 - K1041 + 542",
      "office": "Southern Leyte 2nd District Engineering Office",
      "amountPesos": 7440000,
      "lengthKm": 0.08,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 93000000.0,
      "lengthMeters": 80.0,
      "allocationPerStatedMeter": 93000.0,
      "rangesMeters": [
        [
          1041462.0,
          1041542.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "174",
      "lengthEvidence": "Maharlika Highway (LT) - K1041 + 462 - K1041 + 542",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 0.28,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0152-000803",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Paranaque-Sucat Rd - K0019 + 795 - K0018 + 000",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 7431000,
      "lengthKm": 1.795,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 4139832.87,
      "lengthMeters": 1795.0,
      "allocationPerStatedMeter": 4139.83,
      "rangesMeters": [
        [
          18000.0,
          19795.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Paranaque-Sucat Rd - K0019 + 795 - K0018 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 0.17,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0244-002434",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Calamba-Sta Cruz-Famy Jct Rd - K0072 + 299 - K0072 + 456, K0072 + 806 - K0072 + 1015, K0077 + 367 - K0078 + 000, K0078 + 300 - K0078 + 482 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 7403000,
      "lengthKm": 1.181,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 6268416.6,
      "lengthMeters": 1181.0,
      "allocationPerStatedMeter": 6268.42,
      "rangesMeters": [
        [
          72299.0,
          72456.0
        ],
        [
          72806.0,
          73015.0
        ],
        [
          77367.0,
          78000.0
        ],
        [
          78300.0,
          78482.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "244",
      "lengthEvidence": "Calamba-Sta Cruz-Famy Jct Rd - K0072 + 299 - K0072 + 456, K0072 + 806 - K0072 + 1015, K0077 + 367 - K0078 + 000, K0078 + 300 - K0078 + 482 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.52,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0159-000922",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Batangas-Lobo Rd - K0110+768 - K0110 + 839 (L/S), K0110 + 858 - K0110 + 944 (L/S), K0111 + 724 - K0111 + 744 (L/S), K0111 + 763 - K0111 + 771 (L/S), K0112 + 445 - K0112 + 455 (L/S), K0112 + 466 - K0112 + 473 (BL)",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 7396000,
      "lengthKm": 0.202,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 36613861.39,
      "lengthMeters": 202.0,
      "allocationPerStatedMeter": 36613.86,
      "rangesMeters": [
        [
          110768.0,
          110839.0
        ],
        [
          110858.0,
          110944.0
        ],
        [
          111724.0,
          111744.0
        ],
        [
          111763.0,
          111771.0
        ],
        [
          112445.0,
          112455.0
        ],
        [
          112466.0,
          112473.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "159",
      "lengthEvidence": "Batangas-Lobo Rd - K0110+768 - K0110 + 839 (L/S), K0110 + 858 - K0110 + 944 (L/S), K0111 + 724 - K0111 + 744 (L/S), K0111 + 763 - K0111 + 771 (L/S), K0112 + 445 - K0112 + 455 (L/S), K0112 + 466 - K0112 + 473 (BL)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 0.67,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0148-000734",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Surallah-Lake Sebu-Maitum Rd - K1752 + 231 - K1752 + 450",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 7367000,
      "lengthKm": 0.219,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33639269.41,
      "lengthMeters": 219.0,
      "allocationPerStatedMeter": 33639.27,
      "rangesMeters": [
        [
          1752231.0,
          1752450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "148",
      "lengthEvidence": "Surallah-Lake Sebu-Maitum Rd - K1752 + 231 - K1752 + 450",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 1.03,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0164-001010",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0182 + 007 - K0182+149, K0182+407 - K0182 + 614",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 7329000,
      "lengthKm": 0.349,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21000000.0,
      "lengthMeters": 349.0,
      "allocationPerStatedMeter": 21000.0,
      "rangesMeters": [
        [
          182007.0,
          182149.0
        ],
        [
          182407.0,
          182614.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Bacolod South Rd (Kabankalan-Hinobaan Section) - K0182 + 007 - K0182+149, K0182+407 - K0182 + 614",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 0.39,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0487-007225",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sta. 000 - Sta. 871) at Barangay Fermeldy to Barangay Malamag East, Tumauini, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 7300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Construction of Concrete Road (Sta. 000 - Sta. 871) at Barangay Fermeldy to Barangay Malamag East, Tumauini, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0268-002850",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Caganhao Br. (B00028MQ) along Marinduque Circumferential Rd",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 7274000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Caganhao Br. (B00028MQ) along Marinduque Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0252-002555",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Alfonso Lista - Aurora Bdry Rd - K0445 + 005 - K0445 + 082, K0445 + 082 - K0445 + 089, K0445 + 117 - K0445 + 305, K0449 + 216 - K0449 + 668",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 7223000,
      "lengthKm": 0.724,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 9976519.34,
      "lengthMeters": 724.0,
      "allocationPerStatedMeter": 9976.52,
      "rangesMeters": [
        [
          445005.0,
          445082.0
        ],
        [
          445082.0,
          445089.0
        ],
        [
          445117.0,
          445305.0
        ],
        [
          449216.0,
          449668.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "252",
      "lengthEvidence": "Alfonso Lista - Aurora Bdry Rd - K0445 + 005 - K0445 + 082, K0445 + 082 - K0445 + 089, K0445 + 117 - K0445 + 305, K0449 + 216 - K0449 + 668",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 1.01,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0265-002790",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Gattaran Br. (B01096LZ) along Maharlika Highway ( Cagayan Valley Rd)",
      "office": "Central Office",
      "amountPesos": 7200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "265",
      "lengthEvidence": "Gattaran Br. (B01096LZ) along Maharlika Highway ( Cagayan Valley Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0430-006059",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Purok 3-6 Barangay Dogongan, Daet, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 7200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Concreting of Barangay Road, Purok 3-6 Barangay Dogongan, Daet, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0161-000949",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "MSR Jct-Lopez-Buenavista Rd - K0226 + 095 - K0226 + 162, K0226 + 527 - K0226 + 576",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 7150000,
      "lengthKm": 0.116,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 61637931.03,
      "lengthMeters": 116.0,
      "allocationPerStatedMeter": 61637.93,
      "rangesMeters": [
        [
          226095.0,
          226162.0
        ],
        [
          226527.0,
          226576.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "MSR Jct-Lopez-Buenavista Rd - K0226 + 095 - K0226 + 162, K0226 + 527 - K0226 + 576",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 1.18,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0523-007987",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Rafael, Guimba, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 7130750,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Rafael, Guimba, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0431-006089",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mangcamagong - Barangay Mandazo, Basud, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 7111200,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road, Barangay Mangcamagong - Barangay Mandazo, Basud, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0251-002531",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Construction of Solar Lights along H-way Secondary Div Rd, Barangay San Roque, Chainage 0 - Chainage 1428, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 7100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "251",
      "lengthEvidence": "Construction of Solar Lights along H-way Secondary Div Rd, Barangay San Roque, Chainage 0 - Chainage 1428, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0200-001615",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Palo-Carigara-Ormoc Rd - K0975 + (-256) - K0975 + 060",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 7092000,
      "lengthKm": 0.316,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22443037.97,
      "lengthMeters": 316.0,
      "allocationPerStatedMeter": 22443.04,
      "rangesMeters": [
        [
          974744.0,
          975060.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Palo-Carigara-Ormoc Rd - K0975 + (-256) - K0975 + 060",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 0.46,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0592-009502",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Concrete Road Barangay Tinambacan, Jaro, Leyte, Chainage 2+150.00 0 Chainage 2+691.00",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 7040000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Rehabilitation of Concrete Road Barangay Tinambacan, Jaro, Leyte, Chainage 2+150.00 0 Chainage 2+691.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0209-001808",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "The President Carlos P. Garcia Circumferential Rd - K0209 + 1000 - K0209 + 1400",
      "office": "Bohol 3rd District Engineering Office",
      "amountPesos": 7011000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17527500.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 17527.5,
      "rangesMeters": [
        [
          210000.0,
          210400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "The President Carlos P. Garcia Circumferential Rd - K0209 + 1000 - K0209 + 1400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 51878.78,
      "peerRateMultiple": 0.34,
      "peerRecords": 26,
      "peerBand": "364.5–<563.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 104504.865,
      "graphUpperFence": 145273.8225
    },
    {
      "id": "HB10858-3-0129-000351",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "P Casal St - K0002 + (-087) - K0002 + 174",
      "office": "North Manila District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.261,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26819923.37,
      "lengthMeters": 261.0,
      "allocationPerStatedMeter": 26819.92,
      "rangesMeters": [
        [
          1913.0,
          2174.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "P Casal St - K0002 + (-087) - K0002 + 174",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.53,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0173-001164",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Maharlika Highway (MN) - K1438 + 900 - K1438 + 930",
      "office": "Central Office",
      "amountPesos": 7000000,
      "lengthKm": 0.03,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 233333333.33,
      "lengthMeters": 30.0,
      "allocationPerStatedMeter": 233333.33,
      "rangesMeters": [
        [
          1438900.0,
          1438930.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Maharlika Highway (MN) - K1438 + 900 - K1438 + 930",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 0.7,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0177-001231",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Conner-Kabugao Rd - K0588 + 400 - K0588 + 445",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.045,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 155555555.56,
      "lengthMeters": 45.0,
      "allocationPerStatedMeter": 155555.56,
      "rangesMeters": [
        [
          588400.0,
          588445.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Conner-Kabugao Rd - K0588 + 400 - K0588 + 445",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 0.25,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0178-001250",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Baguio-Bontoc Rd - K0348 + 000 - K0348 + 076",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.076,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 92105263.16,
      "lengthMeters": 76.0,
      "allocationPerStatedMeter": 92105.26,
      "rangesMeters": [
        [
          348000.0,
          348076.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Baguio-Bontoc Rd - K0348 + 000 - K0348 + 076",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 0.31,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0180-001273",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "PPSR Jct-Napsan-Apurawan Rd - K0037+006 -K0037+021",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.015,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 466666666.67,
      "lengthMeters": 15.0,
      "allocationPerStatedMeter": 466666.67,
      "rangesMeters": [
        [
          37006.0,
          37021.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "PPSR Jct-Napsan-Apurawan Rd - K0037+006 -K0037+021",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 2.19,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0181-001299",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1555 + 546 - K1555 + 578",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.032,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 218750000.0,
      "lengthMeters": 32.0,
      "allocationPerStatedMeter": 218750.0,
      "rangesMeters": [
        [
          1555546.0,
          1555578.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1555 + 546 - K1555 + 578",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 1.03,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0259-002673",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "San Roque Br. (B00042LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "259",
      "lengthEvidence": "San Roque Br. (B00042LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0261-002708",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Magpayang Br. 2 (B01746MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "office": "Central Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Magpayang Br. 2 (B01746MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0269-002867",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Panique Br. 2 (B00014TL) along Tablas Circumferential Rd",
      "office": "Romblon District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Panique Br. 2 (B00014TL) along Tablas Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002963",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Claro M. Recto Br. 2 (B01771LZ) along CM Recto",
      "office": "North Manila District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Claro M. Recto Br. 2 (B01771LZ) along CM Recto",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002992",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Balitian Br. (B02982LZ) along Baguio-Bontoc Rd",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Balitian Br. (B02982LZ) along Baguio-Bontoc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003017",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Balibaguhin Br. (B02434LZ) along Famy-Real-Infanta-Dinahican Port Rd",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Balibaguhin Br. (B02434LZ) along Famy-Real-Infanta-Dinahican Port Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003064",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tigbao Br. (B00418NR) along Bacolod North Rd",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Tigbao Br. (B00418NR) along Bacolod North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003132",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Camp 1 Br. (B01375MN) along Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry)",
      "office": "Bukidnon 2nd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Camp 1 Br. (B01375MN) along Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003153",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Piedad Br. (B01226MN) along Bayabas-Eden Rd",
      "office": "Davao City 2nd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Piedad Br. (B01226MN) along Bayabas-Eden Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003154",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tamugan Br. (B00215MN) along Davao-Bukidnon Rd",
      "office": "Davao City 2nd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Tamugan Br. (B00215MN) along Davao-Bukidnon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0439-006241",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Lumbaca Ingud, Sta. 0+000 - Sta. 0+280, Madamba, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 7000000,
      "lengthKm": 0.28,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 280.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          280.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "439",
      "lengthEvidence": "Concreting of Road, Barangay Lumbaca Ingud, Sta. 0+000 - Sta. 0+280, Madamba, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.87,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0448-006399",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Chesa Street Golden Acres, Barangay Talon 5, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Construction of Road and Drainage at Chesa Street Golden Acres, Barangay Talon 5, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0452-006470",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads and Drainage along Everlasting St. and Interconnecting Alleys, (C0+000 - C0+342), Barangay 178, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "452",
      "lengthEvidence": "Construction of Roads and Drainage along Everlasting St. and Interconnecting Alleys, (C0+000 - C0+342), Barangay 178, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006501",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Caimito St. (C0+000 to C0+140), Barangay Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Caimito St. (C0+000 to C0+140), Barangay Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0455-006519",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Martinez St. (C0+000 to C0+170), Barangay Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Martinez St. (C0+000 to C0+170), Barangay Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006551",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage along Busa St. (C 0+000 - C 0+201), Barangay 128, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Roads and Drainage along Busa St. (C 0+000 - C 0+201), Barangay 128, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006575",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitaiton of Road and Drainage System at Mauban Street (Chainage 0+000 - Chainage 0+78, Barangay Masambong, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Rehabilitaiton of Road and Drainage System at Mauban Street (Chainage 0+000 - Chainage 0+78, Barangay Masambong, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006593",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road and Drainage System along Alvarez Street Street, Barangay 51 Zone 8 and its vicinity, Pasay City",
      "office": "South Manila District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Road and Drainage System along Alvarez Street Street, Barangay 51 Zone 8 and its vicinity, Pasay City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006814",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Samang Norte, Bolinao, Pangasinan, Start 16.29158, 119.864873 End 16.298929, 119.859801",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, Barangay Samang Norte, Bolinao, Pangasinan, Start 16.29158, 119.864873 End 16.298929, 119.859801",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-006987",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Local Road with Slope Protection, Barangay Sto. Tomas School Area, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Rehabilitation of Local Road with Slope Protection, Barangay Sto. Tomas School Area, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-006991",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Sidewalk and Railings at Barangay Camp Henry T. Allen, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Rehabilitation of Road with Sidewalk and Railings at Barangay Camp Henry T. Allen, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007042",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Tuga-Kagatakan/Masablang Road, Barangay Tuga and Masablang, Tabuk City, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Access Road, Tuga-Kagatakan/Masablang Road, Barangay Tuga and Masablang, Tabuk City, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007052",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Eastern Badong/Kasut Access Road, Barangay Ammacian and Malagnat, Pinukpuk, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Eastern Badong/Kasut Access Road, Barangay Ammacian and Malagnat, Pinukpuk, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007113",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Tamog-o-Suyo-Pangao, Barangay Monamon Norte, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Tamog-o-Suyo-Pangao, Barangay Monamon Norte, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007515",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+375- Sta. 0+900, Barangay Papan Weste, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.525,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 525.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          375.0,
          900.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Sta. 0+375- Sta. 0+900, Barangay Papan Weste, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.54,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0506-007622",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Rosaville, Barangay Tugatog, Orani, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Road, Rosaville, Barangay Tugatog, Orani, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007629",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Upgrading of Road and Improvement of Drainage Canal, Lakandula, Barangay Mulawin, Orani, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Upgrading of Road and Improvement of Drainage Canal, Lakandula, Barangay Mulawin, Orani, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0510-007715",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+466, Sitio Pulong Bato, San Jose, Plaridel, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.466,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15021459.23,
      "lengthMeters": 466.0,
      "allocationPerStatedMeter": 15021.46,
      "rangesMeters": [
        [
          0.0,
          466.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+466, Sitio Pulong Bato, San Jose, Plaridel, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.61,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0515-007813",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road 1 and Road 3 Pajo, Meycauayan City, Bulacan, Sta. 00+000 - Sta. 00+285 (121.00260278, 14.77600000)",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.285,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24561403.51,
      "lengthMeters": 285.0,
      "allocationPerStatedMeter": 24561.4,
      "rangesMeters": [
        [
          0.0,
          285.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "515",
      "lengthEvidence": "Rehabilitation of Road 1 and Road 3 Pajo, Meycauayan City, Bulacan, Sta. 00+000 - Sta. 00+285 (121.00260278, 14.77600000)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.86,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0519-007875",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Juan, Aliaga, Nueva Ecija, Sta. 0+000 - Sta. 0+622",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.622,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11254019.29,
      "lengthMeters": 622.0,
      "allocationPerStatedMeter": 11254.02,
      "rangesMeters": [
        [
          0.0,
          622.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay San Juan, Aliaga, Nueva Ecija, Sta. 0+000 - Sta. 0+622",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.46,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0519-007876",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bakal III, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+622",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.622,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11254019.29,
      "lengthMeters": 622.0,
      "allocationPerStatedMeter": 11254.02,
      "rangesMeters": [
        [
          0.0,
          622.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay Bakal III, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+622",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.46,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0521-007929",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gen. Luna, Sto. Domingo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Gen. Luna, Sto. Domingo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007934",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay A. Bonifacio, Llanera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay A. Bonifacio, Llanera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007941",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Inanama, Llanera, Nueva Ecija Sta. 0+000 - Sta. 0+883",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.883,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 7927519.82,
      "lengthMeters": 883.0,
      "allocationPerStatedMeter": 7927.52,
      "rangesMeters": [
        [
          0.0,
          883.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Inanama, Llanera, Nueva Ecija Sta. 0+000 - Sta. 0+883",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.41,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0522-007964",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Piut, Carranglan, Nueva Ecija Sta. 0+000 - Sta. 0+620",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.62,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11290322.58,
      "lengthMeters": 620.0,
      "allocationPerStatedMeter": 11290.32,
      "rangesMeters": [
        [
          0.0,
          620.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Piut, Carranglan, Nueva Ecija Sta. 0+000 - Sta. 0+620",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.46,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0523-007983",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Juan, Aliaga, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Juan, Aliaga, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0530-008141",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Espeleta st. Zone 7, Brgy. Diladila, Sta.Rita, Pampanga, Sta.0+000 - Sta.0+220",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31818181.82,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 31818.18,
      "rangesMeters": [
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Concreting of Road at Espeleta st. Zone 7, Brgy. Diladila, Sta.Rita, Pampanga, Sta.0+000 - Sta.0+220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.9,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0530-008142",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road Lansang Cayanan at Zone 1, Brgy. Diladila, Sta.Rita, Pampanga, Sta.0+000 - Sta.0+180",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.18,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 38888888.89,
      "lengthMeters": 180.0,
      "allocationPerStatedMeter": 38888.89,
      "rangesMeters": [
        [
          0.0,
          180.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Concreting of Road Lansang Cayanan at Zone 1, Brgy. Diladila, Sta.Rita, Pampanga, Sta.0+000 - Sta.0+180",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.1,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0535-008220",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 1, 2 and 3, Barangay San Roque, Municipality of Moncada, Province of Tarlac",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Construction of Road, Purok 1, 2 and 3, Barangay San Roque, Municipality of Moncada, Province of Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0535-008221",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 7, Barangay Campo Santo 2, Municipality of Moncada, Province of Tarlac",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Construction of Road, Purok 7, Barangay Campo Santo 2, Municipality of Moncada, Province of Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0535-008222",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Namnama, Barangay Atencio, Municipality of Moncada, Province of Tarlac",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Construction of Road, Purok Namnama, Barangay Atencio, Municipality of Moncada, Province of Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0535-008223",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Tambo, Barangay Sta. Monica, Municipality of Moncada, Province of Tarlac",
      "office": "Tarlac District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "535",
      "lengthEvidence": "Construction of Road, Sitio Tambo, Barangay Sta. Monica, Municipality of Moncada, Province of Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008280",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tungal, San Luis, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Barangay Tungal, San Luis, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008331",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Slope Protection along Manggahan – Lumang Lipa Road, Mataasnakahoy, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Slope Protection along Manggahan – Lumang Lipa Road, Mataasnakahoy, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008347",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Slope Protection, Barangay Bugaan West, Laurel, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Rehabilitation of Road with Slope Protection, Barangay Bugaan West, Laurel, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008681",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Paly, Taytay, Palawan",
      "office": "Palawan 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of Road, Barangay Paly, Taytay, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008748",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay 15, Ilawod East, Legazpi City, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay 15, Ilawod East, Legazpi City, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008770",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Inang Maharang Barangay Nagotgot, Manito, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Improvement of Road along Inang Maharang Barangay Nagotgot, Manito, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008772",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Purok 1 and Purok 2 Barangay San Roque, Legazpi City, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Improvement of Road along Purok 1 and Purok 2 Barangay San Roque, Legazpi City, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008773",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Purok 4 Alternate Road, Barangay 17 Rizal Street, Ilawod, Legazpi City",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Improvement of Road along Purok 4 Alternate Road, Barangay 17 Rizal Street, Ilawod, Legazpi City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008774",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Purok 4, Barangay Peñafrancia, Daraga, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Improvement of Road along Purok 4, Barangay Peñafrancia, Daraga, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0562-008842",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge (Spillway), Barangay Mabca, Sagnay, Camarines Sur",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction of Bridge (Spillway), Barangay Mabca, Sagnay, Camarines Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0564-008879",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Road Slope Protection Structure and Box Culvert at Barangay Rizal, Salvacion, Batong Paloway, San Andres, Catanduanes",
      "office": "Catanduanes District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Road, Road Slope Protection Structure and Box Culvert at Barangay Rizal, Salvacion, Batong Paloway, San Andres, Catanduanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0571-009015",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bulad-Lubacan Bridge, Barangay Bulad and Barangay Lubacan, Guimbal, Iloilo",
      "office": "Iloilo 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Bulad-Lubacan Bridge, Barangay Bulad and Barangay Lubacan, Guimbal, Iloilo",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009174",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Nalupitan-Binubuhan Road, Barangay Ara-al, La Carlota City and Barangay Binubuhan, Bago City, Negros Occidental",
      "office": "Negros Occidental 4th District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Nalupitan-Binubuhan Road, Barangay Ara-al, La Carlota City and Barangay Binubuhan, Bago City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009420",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Sitio Middle to Sitio Ading, Palanas Road at Barangay Palanas,Ginatilan, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Concreting of Sitio Middle to Sitio Ading, Palanas Road at Barangay Palanas,Ginatilan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009421",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Sorsogon-Cerdeña Road at Barangay Sorsogon and Cerdeña, Malabuyoc, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Concreting of Sorsogon-Cerdeña Road at Barangay Sorsogon and Cerdeña, Malabuyoc, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009422",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Tolosa-Cerdeña Road at Barangay Tolosa and Cerdeña, Malabuyoc, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Concreting of Tolosa-Cerdeña Road at Barangay Tolosa and Cerdeña, Malabuyoc, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009423",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Tolosa-Lombo Road at Barangay Tolosa and Lombo, Malabuyoc, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Concreting of Tolosa-Lombo Road at Barangay Tolosa and Lombo, Malabuyoc, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009424",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Tomonoy-Agbalanga Road at Barangay Tomonoy and Agbalanga, Moalboal, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Concreting of Tomonoy-Agbalanga Road at Barangay Tomonoy and Agbalanga, Moalboal, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009432",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Elithon, Barangay Vive, Ronda, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Construction of Road at Sitio Elithon, Barangay Vive, Ronda, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009437",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Barangay Candabong Road, Barangay Candabong, Alcantara, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Improvement of Barangay Candabong Road, Barangay Candabong, Alcantara, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009438",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Barangay Lanao Road, at Barangay Lanao, Moalboal, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Improvement of Barangay Lanao Road, at Barangay Lanao, Moalboal, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009440",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Montañeza-Lombo Road at Barangays Montañeza and Lombo, Malabuyoc, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Improvement of Montañeza-Lombo Road at Barangays Montañeza and Lombo, Malabuyoc, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0593-009505",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Capilla, Pastrana, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Road, Barangay Capilla, Pastrana, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0596-009578",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Cal-igang, Catarman, Northern Samar",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Bridge, Barangay Cal-igang, Catarman, Northern Samar",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0598-009611",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cag-anibong, Sta. 0+000 - Sta. 0+350.69, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.35069,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19960649.01,
      "lengthMeters": 350.69,
      "allocationPerStatedMeter": 19960.65,
      "rangesMeters": [
        [
          0.0,
          350.69
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Construction of Road, Barangay Cag-anibong, Sta. 0+000 - Sta. 0+350.69, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.7,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0610-009868",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Hindang, Sta. 0+000 - Sta. 0+177, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.177,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39548022.6,
      "lengthMeters": 177.0,
      "allocationPerStatedMeter": 39548.02,
      "rangesMeters": [
        [
          0.0,
          177.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Construction of Road, Barangay Hindang, Sta. 0+000 - Sta. 0+177, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.12,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0618-010009",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Barangay New Visayas, Santo Tomas, Davao Del Norte",
      "office": "Davao del Norte 2nd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Concreting of Road at Barangay New Visayas, Santo Tomas, Davao Del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010116",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Purok del Pilar - Barangay Proper Road, Barangay Kibid, Norala, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Purok del Pilar - Barangay Proper Road, Barangay Kibid, Norala, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0627-010196",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Sta. 0 + 000 - Sta. 0 + 200 (Sitio Dapya to Sitio Melody), Barangay San Antonio, Libjo, Dinagat Islands",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 7000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 35000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction of Road Sta. 0 + 000 - Sta. 0 + 200 (Sitio Dapya to Sitio Melody), Barangay San Antonio, Libjo, Dinagat Islands",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.99,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0431-006090",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mangcamagong - Barangay Taba-Taba, Basud, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 6972800,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road, Barangay Mangcamagong - Barangay Taba-Taba, Basud, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0152-000808",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bauang-Baguio Rd - K0275 + 383 - K0275 + 714",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 6951000,
      "lengthKm": 0.331,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21000000.0,
      "lengthMeters": 331.0,
      "allocationPerStatedMeter": 21000.0,
      "rangesMeters": [
        [
          275383.0,
          275714.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Bauang-Baguio Rd - K0275 + 383 - K0275 + 714",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 0.73,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0120-000188",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Calamba-Sta Cruz-Famy Jct Rd - K0102 + 585 - K0102 + 910",
      "office": "Laguna 1st District Engineering Office",
      "amountPesos": 6938000,
      "lengthKm": 0.325,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21347692.31,
      "lengthMeters": 325.0,
      "allocationPerStatedMeter": 21347.69,
      "rangesMeters": [
        [
          102585.0,
          102910.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Calamba-Sta Cruz-Famy Jct Rd - K0102 + 585 - K0102 + 910",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 0.46,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0164-001015",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Jct Balintawak-Old Escalante Rd - K0101+775 - K0102 + 153",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 6913000,
      "lengthKm": 0.378,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18288359.79,
      "lengthMeters": 378.0,
      "allocationPerStatedMeter": 18288.36,
      "rangesMeters": [
        [
          101775.0,
          102153.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Jct Balintawak-Old Escalante Rd - K0101+775 - K0102 + 153",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39783.52,
      "peerRateMultiple": 0.46,
      "peerRecords": 41,
      "peerBand": "349.5–<636 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 105553.24500000001,
      "graphUpperFence": 153923.94
    },
    {
      "id": "HB10858-3-0162-000960",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Tablas Circumferential Rd - K0021 + 438 - K0021 + 576",
      "office": "Romblon District Engineering Office",
      "amountPesos": 6900000,
      "lengthKm": 0.138,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 138.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          21438.0,
          21576.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Tablas Circumferential Rd - K0021 + 438 - K0021 + 576",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 0.96,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0520-007907",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bunol, Guimba, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6875000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Bunol, Guimba, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0277-003038",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Garita Br. (B00544PN) along Passi-San Enrique-Garrita Rd",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 6800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Garita Br. (B00544PN) along Passi-San Enrique-Garrita Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003148",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Balili Parallel Br. (B01925MN) along Linamon-Zamboanga Rd",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 6800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Balili Parallel Br. (B01925MN) along Linamon-Zamboanga Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0490-007282",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road including Drainage Structure (Sta. 0+000 - Sta. 0+319), Purok 7, Barangay Lanna, Tumauini, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 6800000,
      "lengthKm": 0.319,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21316614.42,
      "lengthMeters": 319.0,
      "allocationPerStatedMeter": 21316.61,
      "rangesMeters": [
        [
          0.0,
          319.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Construction of Concrete Road including Drainage Structure (Sta. 0+000 - Sta. 0+319), Purok 7, Barangay Lanna, Tumauini, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.75,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0519-007877",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Catimon, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+554",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6800000,
      "lengthKm": 0.554,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12274368.23,
      "lengthMeters": 554.0,
      "allocationPerStatedMeter": 12274.37,
      "rangesMeters": [
        [
          0.0,
          554.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay Catimon, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+554",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.5,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0520-007911",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Caputican, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Caputican, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0169-001102",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Candaba-Sn Miguel Rd - K0084 + 355 - K0084 + 557.54",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 6787000,
      "lengthKm": 0.2025399999999936,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33509430.24,
      "lengthMeters": 202.54,
      "allocationPerStatedMeter": 33509.43,
      "rangesMeters": [
        [
          84355.0,
          84557.54
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Candaba-Sn Miguel Rd - K0084 + 355 - K0084 + 557.54",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 0.62,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0115-000092",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - (S01634MN) Chainage 000 - Chainage 116, Chainage 197 - Chainage 301",
      "office": "Central Office",
      "amountPesos": 6786000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "115",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - (S01634MN) Chainage 000 - Chainage 116, Chainage 197 - Chainage 301",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0147-000722",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Eastern Bobongan-Sominot-Midsalip-Dumingag Rd - K1691 + 384 - K1692 + 266",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 6782000,
      "lengthKm": 0.882,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 7689342.4,
      "lengthMeters": 882.0,
      "allocationPerStatedMeter": 7689.34,
      "rangesMeters": [
        [
          1691384.0,
          1692266.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Eastern Bobongan-Sominot-Midsalip-Dumingag Rd - K1691 + 384 - K1692 + 266",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.32,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0120-000195",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Marikina-Victoria Valley-Antipolo Rd - K0028 + (-155) - K0028 + 036",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 6770000,
      "lengthKm": 0.191,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35445026.18,
      "lengthMeters": 191.0,
      "allocationPerStatedMeter": 35445.03,
      "rangesMeters": [
        [
          27845.0,
          28036.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Marikina-Victoria Valley-Antipolo Rd - K0028 + (-155) - K0028 + 036",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 0.76,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0154-000833",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0046 + 577 - K0046 + 864",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 6746000,
      "lengthKm": 0.287,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23505226.48,
      "lengthMeters": 287.0,
      "allocationPerStatedMeter": 23505.23,
      "rangesMeters": [
        [
          46577.0,
          46864.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0046 + 577 - K0046 + 864",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 0.82,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0155-000856",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Dipolog-Oroquieta National Rd - K1846 + 328 - K1846 + 420",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 6729000,
      "lengthKm": 0.092,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 73141304.35,
      "lengthMeters": 92.0,
      "allocationPerStatedMeter": 73141.3,
      "rangesMeters": [
        [
          1846328.0,
          1846420.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "Dipolog-Oroquieta National Rd - K1846 + 328 - K1846 + 420",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 1.84,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0601-009664",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvemement of Provincial Road Along Mutia-Head Tipan (Diland Road Section), Municipality of Mutia, Zamboanga del Norte, 8.386535, 123.466301",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "amountPesos": 6685000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Improvemement of Provincial Road Along Mutia-Head Tipan (Diland Road Section), Municipality of Mutia, Zamboanga del Norte, 8.386535, 123.466301",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0162-000959",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Sibuyan Circumferential Rd - K0072 + 509 - K0072 + 567, K0079 + 299 - K0079 + 352",
      "office": "Romblon District Engineering Office",
      "amountPesos": 6660000,
      "lengthKm": 0.111,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 60000000.0,
      "lengthMeters": 111.0,
      "allocationPerStatedMeter": 60000.0,
      "rangesMeters": [
        [
          72509.0,
          72567.0
        ],
        [
          79299.0,
          79352.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Sibuyan Circumferential Rd - K0072 + 509 - K0072 + 567, K0079 + 299 - K0079 + 352",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 1.15,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0179-001269",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Calapan South Rd - K0052 + 601 - K0052 + 658",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 6600000,
      "lengthKm": 0.057,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 115789473.68,
      "lengthMeters": 57.0,
      "allocationPerStatedMeter": 115789.47,
      "rangesMeters": [
        [
          52601.0,
          52658.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "Calapan South Rd - K0052 + 601 - K0052 + 658",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 300943.4,
      "peerRateMultiple": 0.38,
      "peerRecords": 22,
      "peerBand": "56.5–<108 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 949675.3162499999,
      "graphUpperFence": 1410714.27
    },
    {
      "id": "HB10858-3-0266-002809",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Macaong Br. (B00539LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 6600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Macaong Br. (B00539LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002813",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Ulhay Br. (B00538LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 6600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Ulhay Br. (B00538LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006550",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage along Bernadette Street (C 0+000 - C 0+150), Barangay 60, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 6600000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Roads and Drainage along Bernadette Street (C 0+000 - C 0+150), Barangay 60, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0457-006565",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Upagrading of Road and Drainages along Deato Subd. (C0+000 to C0+140), Barangay Pasolo, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 6600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Upagrading of Road and Drainages along Deato Subd. (C0+000 to C0+140), Barangay Pasolo, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0487-007219",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 0+000 - Sta.0+600) at Barangay Magassi, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 6600000,
      "lengthKm": 0.6,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11000000.0,
      "lengthMeters": 600.0,
      "allocationPerStatedMeter": 11000.0,
      "rangesMeters": [
        [
          0.0,
          600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Rehabilitation of Road (Sta. 0+000 - Sta.0+600) at Barangay Magassi, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.45,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0208-001775",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Buenavista-Kawayan Rd - K0063 + 450 - K0064 + 065",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 6582000,
      "lengthKm": 0.615,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10702439.02,
      "lengthMeters": 615.0,
      "allocationPerStatedMeter": 10702.44,
      "rangesMeters": [
        [
          63450.0,
          64065.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "208",
      "lengthEvidence": "Buenavista-Kawayan Rd - K0063 + 450 - K0064 + 065",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 60234.85,
      "peerRateMultiple": 0.18,
      "peerRecords": 26,
      "peerBand": "563.5–<802 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 130519.6875,
      "graphUpperFence": 178831.5
    },
    {
      "id": "HB10858-3-0136-000510",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Mactan Circumferential Rd - K0031 + 787 - K0032 + 000",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 6578000,
      "lengthKm": 0.213,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30882629.11,
      "lengthMeters": 213.0,
      "allocationPerStatedMeter": 30882.63,
      "rangesMeters": [
        [
          31787.0,
          32000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Mactan Circumferential Rd - K0031 + 787 - K0032 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.61,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0519-007878",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Burnay, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+582",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6550000,
      "lengthKm": 0.582,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11254295.53,
      "lengthMeters": 582.0,
      "allocationPerStatedMeter": 11254.3,
      "rangesMeters": [
        [
          0.0,
          582.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay Burnay, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+582",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.46,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0132-000416",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Noveleta-Naic-Tagaytay Rd - K0037 + 000 - K0037 + 176, K0038 + 967 - K0039 + 184, K0041 + 000 - K0042 + 000, K0042 + 415 - K0042 + 545",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 6522000,
      "lengthKm": 1.523,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 4282337.49,
      "lengthMeters": 1523.0,
      "allocationPerStatedMeter": 4282.34,
      "rangesMeters": [
        [
          37000.0,
          37176.0
        ],
        [
          38967.0,
          39184.0
        ],
        [
          41000.0,
          42000.0
        ],
        [
          42415.0,
          42545.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Noveleta-Naic-Tagaytay Rd - K0037 + 000 - K0037 + 176, K0038 + 967 - K0039 + 184, K0041 + 000 - K0042 + 000, K0042 + 415 - K0042 + 545",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 30531.14,
      "peerRateMultiple": 0.14,
      "peerRecords": 38,
      "peerBand": "1489–<2048.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102668.95625,
      "graphUpperFence": 153473.27000000002
    },
    {
      "id": "HB10858-3-0142-000632",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "VG Cruz St. (S02472LZ) K0005 + 520 - K0005 + 662",
      "office": "North Manila District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": 0.142,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45774647.89,
      "lengthMeters": 142.0,
      "allocationPerStatedMeter": 45774.65,
      "rangesMeters": [
        [
          5520.0,
          5662.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "VG Cruz St. (S02472LZ) K0005 + 520 - K0005 + 662",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 1.4,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0146-000702",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Dumaguete Airport Rd - K0002+340 - K0002 + 590",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": 0.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26000000.0,
      "lengthMeters": 250.0,
      "allocationPerStatedMeter": 26000.0,
      "rangesMeters": [
        [
          2340.0,
          2590.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Dumaguete Airport Rd - K0002+340 - K0002 + 590",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 0.79,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0266-002810",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Manaba Br. (B00541LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Manaba Br. (B00541LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0277-003041",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Lictinon Br. (B00186PN) along Passi-Sn Rafael-Lemery-Sara Rd",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Lictinon Br. (B00186PN) along Passi-Sn Rafael-Lemery-Sara Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003120",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Magta-on Br. (B00306SM) along Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Magta-on Br. (B00306SM) along Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003122",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Mapno Br. (B00553SM) along Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Mapno Br. (B00553SM) along Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003127",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tabonon Br. (B00294SM) along Catarman-Laoang Rd",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Tabonon Br. (B00294SM) along Catarman-Laoang Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003176",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Hubo Br. (B01834MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Sur 1st District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Hubo Br. (B01834MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003180",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Pagtilaan Br. (B00779MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Pagtilaan Br. (B00779MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0430-006062",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Purok 6 Barangay Lag-On, Daet, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Concreting of Barangay Road, Purok 6 Barangay Lag-On, Daet, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006673",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Darupidip-Dadaeman Road, Pasuquin, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Rehabilitation of Darupidip-Dadaeman Road, Pasuquin, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0498-007447",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+485, Barangay Abra, Santiago City, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": 0.485,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13402061.86,
      "lengthMeters": 485.0,
      "allocationPerStatedMeter": 13402.06,
      "rangesMeters": [
        [
          0.0,
          485.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+485, Barangay Abra, Santiago City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.55,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0505-007595",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge of Barangay San Pascual, Diffun, Quirino",
      "office": "Quirino District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Bridge of Barangay San Pascual, Diffun, Quirino",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007936",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mangandingay, Muñoz, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Mangandingay, Muñoz, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0524-008000",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tagaytay, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Tagaytay, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009037",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tabucan, Barotac Nuevo, Iloilo, Start 10.9015, 122.6924 End 10.9015, 122.6924",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay Tabucan, Barotac Nuevo, Iloilo, Start 10.9015, 122.6924 End 10.9015, 122.6924",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0575-009105",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Overflow Bridge (Sta. 0+335 - Sta. 0+348) Barangay E. Lopez, Silay City, Negros Occidental (10.7935166, 123.0691141)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": 0.013,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 500000000.0,
      "lengthMeters": 13.0,
      "allocationPerStatedMeter": 500000.0,
      "rangesMeters": [
        [
          335.0,
          348.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Overflow Bridge (Sta. 0+335 - Sta. 0+348) Barangay E. Lopez, Silay City, Negros Occidental (10.7935166, 123.0691141)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 0.35,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0588-009406",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Access Road at Sitio Dyutayang Datag, Barangay Armeña, at Barangay Armeña, Malabuyoc, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Concreting of Access Road at Sitio Dyutayang Datag, Barangay Armeña, at Barangay Armeña, Malabuyoc, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009407",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Contumahay Cerdeña Road at Barangay Cerdeña, Malabuyoc, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Concreting of Contumahay Cerdeña Road at Barangay Cerdeña, Malabuyoc, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009419",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Sitio Ading, Palanas to Barangay San Roque Road at Barangays Palanas and San Roque, Ginatilan, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Concreting of Sitio Ading, Palanas to Barangay San Roque Road at Barangays Palanas and San Roque, Ginatilan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0589-009425",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Tunga-Linayugan Road at Barangay Montañeza, Malabuyoc, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "589",
      "lengthEvidence": "Concreting of Tunga-Linayugan Road at Barangay Montañeza, Malabuyoc, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0611-009873",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Purok Dalamas to Purok Olambog, Barangay Pugaan, Sta. 0+000 - Sta. 0+350, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 6500000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18571428.57,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 18571.43,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Road at Purok Dalamas to Purok Olambog, Barangay Pugaan, Sta. 0+000 - Sta. 0+350, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.65,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0207-001763",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Sn Fernando North Rd - K0021 + 114 - K0021 + 244",
      "office": "Masbate 1st District Engineering Office",
      "amountPesos": 6467000,
      "lengthKm": 0.13,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 49746153.85,
      "lengthMeters": 130.0,
      "allocationPerStatedMeter": 49746.15,
      "rangesMeters": [
        [
          21114.0,
          21244.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Sn Fernando North Rd - K0021 + 114 - K0021 + 244",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 0.99,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0207-001768",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Buenavista-Kawayan Rd - K0053 + 153 - K0053 + 282",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 6450000,
      "lengthKm": 0.129,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 129.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          53153.0,
          53282.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Buenavista-Kawayan Rd - K0053 + 153 - K0053 + 282",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 1.0,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0266-002811",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Pamunawan Br. (B00535LT) along Maharlika Highway (LT)",
      "office": "Central Office",
      "amountPesos": 6400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Pamunawan Br. (B00535LT) along Maharlika Highway (LT)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0269-002869",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Small Balite Br. (B00208MR) along Calapan South Rd",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 6400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Small Balite Br. (B00208MR) along Calapan South Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009399",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage along R. Colina Ext Street, Sitio Abbrai to Sitio Liong, Barangay Alang-Alang, Mandaue City, Cebu Sta. 0+256.00 to Sta. 0+538.00",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 6400000,
      "lengthKm": 0.282,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22695035.46,
      "lengthMeters": 282.0,
      "allocationPerStatedMeter": 22695.04,
      "rangesMeters": [
        [
          256.0,
          538.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Road with Drainage along R. Colina Ext Street, Sitio Abbrai to Sitio Liong, Barangay Alang-Alang, Mandaue City, Cebu Sta. 0+256.00 to Sta. 0+538.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.79,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0168-001073",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Apayao-Ilocos Norte Rd - K0620 + 800 - K0621 + 100",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 6398000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21326666.67,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 21326.67,
      "rangesMeters": [
        [
          620800.0,
          621100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "Apayao-Ilocos Norte Rd - K0620 + 800 - K0621 + 100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.67,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0520-007900",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Basang Hamog, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6380000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Basang Hamog, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0160-000939",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Tagaytay-Batangas via Tuy Rd - K0066 + 000 - K0067 + 000",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 6338000,
      "lengthKm": 1.0,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 6338000.0,
      "lengthMeters": 1000.0,
      "allocationPerStatedMeter": 6338.0,
      "rangesMeters": [
        [
          66000.0,
          67000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "160",
      "lengthEvidence": "Tagaytay-Batangas via Tuy Rd - K0066 + 000 - K0067 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 26411.59,
      "peerRateMultiple": 0.24,
      "peerRecords": 21,
      "peerBand": "923.5–<1226.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 102864.955,
      "graphUpperFence": 152463.58000000002
    },
    {
      "id": "HB10858-3-0184-001358",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Kiangan-Tinoc-Buguias Rd - K0324 + 646 - K0324 + 748, K0329 + 517 - K0329 + 532",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 6320000,
      "lengthKm": 0.117,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 54017094.02,
      "lengthMeters": 117.0,
      "allocationPerStatedMeter": 54017.09,
      "rangesMeters": [
        [
          324646.0,
          324748.0
        ],
        [
          329517.0,
          329532.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "184",
      "lengthEvidence": "Kiangan-Tinoc-Buguias Rd - K0324 + 646 - K0324 + 748, K0329 + 517 - K0329 + 532",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.14,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0467-006775",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sector 1 Bautista, Caba, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 6300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Barangay Sector 1 Bautista, Caba, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0491-007294",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta. 0+000 - Sta. 0+550), Barangay Garita, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 6300000,
      "lengthKm": 0.55,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11454545.45,
      "lengthMeters": 550.0,
      "allocationPerStatedMeter": 11454.55,
      "rangesMeters": [
        [
          0.0,
          550.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Road (Sta. 0+000 - Sta. 0+550), Barangay Garita, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.47,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0544-008432",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Poblacion 5, Amadeo, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 6300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road at Barangay Poblacion 5, Amadeo, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0134-000477",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Marikina-Infanta Rd - K0019 + (-072) - K0019 + 000, K0019 + 605 - K0019 + 794, K0021 + 434 - K0021 + 774, K0022 + 188 - K0023 + 109, K0024 + 000 - K0025 + 000",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 6274000,
      "lengthKm": 2.522,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 2487708.17,
      "lengthMeters": 2522.0,
      "allocationPerStatedMeter": 2487.71,
      "rangesMeters": [
        [
          18928.0,
          19000.0
        ],
        [
          19605.0,
          19794.0
        ],
        [
          21434.0,
          21774.0
        ],
        [
          22188.0,
          23109.0
        ],
        [
          24000.0,
          25000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Marikina-Infanta Rd - K0019 + (-072) - K0019 + 000, K0019 + 605 - K0019 + 794, K0021 + 434 - K0021 + 774, K0022 + 188 - K0023 + 109, K0024 + 000 - K0025 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 20093.58,
      "peerRateMultiple": 0.12,
      "peerRecords": 38,
      "peerBand": "2048.5–<3509 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 56210.784999999996,
      "graphUpperFence": 80716.89249999999
    },
    {
      "id": "HB10858-3-0134-000471",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Rizal Shrine Rd - K0052 + (-1073) - K0052 + (-595), K0052 + 000 - K0052 + 169, K0052 + 506 - K0052 + 584",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 6259000,
      "lengthKm": 0.725,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 8633103.45,
      "lengthMeters": 725.0,
      "allocationPerStatedMeter": 8633.1,
      "rangesMeters": [
        [
          50927.0,
          51405.0
        ],
        [
          52000.0,
          52169.0
        ],
        [
          52506.0,
          52584.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Rizal Shrine Rd - K0052 + (-1073) - K0052 + (-595), K0052 + 000 - K0052 + 169, K0052 + 506 - K0052 + 584",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.27,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0575-009122",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Napilas 2 (Sta. 0+000 - Sta. 0+051, Sta. 1+617 - Sta. 2+013) Barangay E. Lopez, Silay City, Negros Occidental (10.7933233, 123.0658352)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 6258000,
      "lengthKm": 0.447,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14000000.0,
      "lengthMeters": 447.0,
      "allocationPerStatedMeter": 14000.0,
      "rangesMeters": [
        [
          0.0,
          51.0
        ],
        [
          1617.0,
          2013.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road at Napilas 2 (Sta. 0+000 - Sta. 0+051, Sta. 1+617 - Sta. 2+013) Barangay E. Lopez, Silay City, Negros Occidental (10.7933233, 123.0658352)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.57,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0165-001030",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Catarman-Laoang Rd - K0771 + 080 - K0771 + 280",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 6252000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31260000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 31260.0,
      "rangesMeters": [
        [
          771080.0,
          771280.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Catarman-Laoang Rd - K0771 + 080 - K0771 + 280",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 0.58,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0282-003168",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Sta. Clara Br. (B01783MN) along SNA-Lebak-Kalamansig Rd (S00739MN)",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 6240000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Sta. Clara Br. (B01783MN) along SNA-Lebak-Kalamansig Rd (S00739MN)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003171",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Sta. Clara Br. (B01783MN) along SNA-Lebak-Kalamansig Rd",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "amountPesos": 6240000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Sta. Clara Br. (B01783MN) along SNA-Lebak-Kalamansig Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007960",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Partida II, Guimba, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6226000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Partida II, Guimba, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007953",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Matingkis, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6220500,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Matingkis, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0129-000365",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Villasis - Malasiqui - Sn Carlos Road, K0186+607 - K0186+903",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 6216000,
      "lengthKm": 0.296,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21000000.0,
      "lengthMeters": 296.0,
      "allocationPerStatedMeter": 21000.0,
      "rangesMeters": [
        [
          186607.0,
          186903.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Villasis - Malasiqui - Sn Carlos Road, K0186+607 - K0186+903",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.42,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0272-002945",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Baga Br. (B00495MN) along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd)",
      "office": "Central Office",
      "amountPesos": 6200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Baga Br. (B00495MN) along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0581-009254",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Pisong-A to Barangay Pisong-B, Maria, Siquijor, Segment 1: Sta. 1+783 - Sta. 1 + 860 - Segment 2: Sta. 2+144 - Sta. 2+265",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 6200000,
      "lengthKm": 0.198,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 31313131.31,
      "lengthMeters": 198.0,
      "allocationPerStatedMeter": 31313.13,
      "rangesMeters": [
        [
          1783.0,
          1860.0
        ],
        [
          2144.0,
          2265.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "581",
      "lengthEvidence": "Construction of Access Road, Barangay Pisong-A to Barangay Pisong-B, Maria, Siquijor, Segment 1: Sta. 1+783 - Sta. 1 + 860 - Segment 2: Sta. 2+144 - Sta. 2+265",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.89,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0152-000809",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bauang-Baguio Rd - K0278 + 760 - K0279 + 070",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 6195000,
      "lengthKm": 0.31,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19983870.97,
      "lengthMeters": 310.0,
      "allocationPerStatedMeter": 19983.87,
      "rangesMeters": [
        [
          278760.0,
          279070.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Bauang-Baguio Rd - K0278 + 760 - K0279 + 070",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 0.7,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0596-009579",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Daganas, Sta. 000+000 - Sta. 000+260, Catarman, Northern Samar",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 6168000,
      "lengthKm": 0.26,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23723076.92,
      "lengthMeters": 260.0,
      "allocationPerStatedMeter": 23723.08,
      "rangesMeters": [
        [
          0.0,
          260.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Road, Barangay Daganas, Sta. 000+000 - Sta. 000+260, Catarman, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.83,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0152-000794",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1651 + 284 - K1651 + 426, K1651 + 450 - K1651 + 566",
      "office": "Central Office",
      "amountPesos": 6121000,
      "lengthKm": 0.258,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23724806.2,
      "lengthMeters": 258.0,
      "allocationPerStatedMeter": 23724.81,
      "rangesMeters": [
        [
          1651284.0,
          1651426.0
        ],
        [
          1651450.0,
          1651566.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1651 + 284 - K1651 + 426, K1651 + 450 - K1651 + 566",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28653.3,
      "peerRateMultiple": 0.83,
      "peerRecords": 23,
      "peerBand": "241.5–<455 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 57095.744999999995,
      "graphUpperFence": 77184.18
    },
    {
      "id": "HB10858-3-0142-000625",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Muntinlupa-Railroad Station Rd - K0028 + (-018) - K0028 + 152",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 6100000,
      "lengthKm": 0.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35882352.94,
      "lengthMeters": 170.0,
      "allocationPerStatedMeter": 35882.35,
      "rangesMeters": [
        [
          27982.0,
          28152.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "Muntinlupa-Railroad Station Rd - K0028 + (-018) - K0028 + 152",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 1.09,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0455-006535",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Vinchy St. (C0+000 to C0+160), Barangay Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 6100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "455",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Vinchy St. (C0+000 to C0+160), Barangay Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007897",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bakal II, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6050000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Bakal II, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0129-000350",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Blumentritt St (LZ) - K0006 + (-1186) - K0006 + (-784)",
      "office": "North Manila District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": 0.402,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14925373.13,
      "lengthMeters": 402.0,
      "allocationPerStatedMeter": 14925.37,
      "rangesMeters": [
        [
          4814.0,
          5216.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Blumentritt St (LZ) - K0006 + (-1186) - K0006 + (-784)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.46,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0173-001163",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Maharlika Highway (MN) - K1426 + 372 - K1426 + 390",
      "office": "Central Office",
      "amountPesos": 6000000,
      "lengthKm": 0.018,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 333333333.33,
      "lengthMeters": 18.0,
      "allocationPerStatedMeter": 333333.33,
      "rangesMeters": [
        [
          1426372.0,
          1426390.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Maharlika Highway (MN) - K1426 + 372 - K1426 + 390",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 1.0,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0177-001224",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Abbut-Conner Rd - K0564 + 150 - K0564 + 200",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 120000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 120000.0,
      "rangesMeters": [
        [
          564150.0,
          564200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Abbut-Conner Rd - K0564 + 150 - K0564 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 625000.0,
      "peerRateMultiple": 0.19,
      "peerRecords": 21,
      "peerBand": "39.5–<56.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1750000.0,
      "graphUpperFence": 2500000.0
    },
    {
      "id": "HB10858-3-0210-001829",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Tagum - Panabo Circumferential Road K1480 + 729 - K1480 + 897, K1481 + 267 - K1481 + 391,",
      "office": "Davao del Norte District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": 0.292,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20547945.21,
      "lengthMeters": 292.0,
      "allocationPerStatedMeter": 20547.95,
      "rangesMeters": [
        [
          1480729.0,
          1480897.0
        ],
        [
          1481267.0,
          1481391.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "210",
      "lengthEvidence": "Tagum - Panabo Circumferential Road K1480 + 729 - K1480 + 897, K1481 + 267 - K1481 + 391,",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 0.41,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0233-002246",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Koronadal City Bypass Road, 1st Segment, Sta. 5+317, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "233",
      "lengthEvidence": "Koronadal City Bypass Road, 1st Segment, Sta. 5+317, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0250-002520",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Installation of Solar LED (Roadway Lighting) along Airport Road (S01208MN) Chainage 000 - Chainage 670",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "250",
      "lengthEvidence": "Installation of Solar LED (Roadway Lighting) along Airport Road (S01208MN) Chainage 000 - Chainage 670",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0272-002949",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Nilo Br. (B00547MN) along Maharlika Highway (Pagadian City-Zamboanga City Rd)",
      "office": "Central Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Nilo Br. (B00547MN) along Maharlika Highway (Pagadian City-Zamboanga City Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-002999",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Imugan Br. (B04441LZ) along Nueva Vizcaya-Pangasinan Rd",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Imugan Br. (B04441LZ) along Nueva Vizcaya-Pangasinan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003031",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Macabari Br. 1 (B00176LZ) along Ariman-Jct Bulusan Lake Rd",
      "office": "Sorsogon 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Macabari Br. 1 (B00176LZ) along Ariman-Jct Bulusan Lake Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0277-003040",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Dacutan Br. (B00019PN) along Iloilo City-Leganes-Dumangas Coastal Rd",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Dacutan Br. (B00019PN) along Iloilo City-Leganes-Dumangas Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003104",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Kinaguitman Br. (B00009SM) along Poblacion-Barangay Cabacungan Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Kinaguitman Br. (B00009SM) along Poblacion-Barangay Cabacungan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003106",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Looc Br. (B00008SM) along Poblacion-Barangay Cabacungan Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Looc Br. (B00008SM) along Poblacion-Barangay Cabacungan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003121",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Malarag Br. (B00297SM) along Catarman-Laoang Rd",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Malarag Br. (B00297SM) along Catarman-Laoang Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003138",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Maradugao Br. (B01445MN) along Maramag-Maradugao Rd",
      "office": "Bukidnon 4th District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Maradugao Br. (B01445MN) along Maramag-Maradugao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003177",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Bentigan Br. (B00782MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Bentigan Br. (B00782MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003178",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Cadilotan Br. (B00772MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Cadilotan Br. (B00772MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003179",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Hamindang Br. (B00773MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Hamindang Br. (B00773MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003182",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Ugpason Br. 2 (B00784MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Ugpason Br. 2 (B00784MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003184",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Union Br. 1 (B00775MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Union Br. 1 (B00775MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003185",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Union Jumbo Br. (B00777MN) along Surigao-Davao Coastal Rd",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Union Jumbo Br. (B00777MN) along Surigao-Davao Coastal Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0438-006225",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Basak Malutlut, Marawi City, Lanao del Sur",
      "office": "Central Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "438",
      "lengthEvidence": "Concreting of Road, Barangay Basak Malutlut, Marawi City, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006514",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Parola B Street (C0+000 to C0+130), Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Parola B Street (C0+000 to C0+130), Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006740",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of bridge, Barangay Gumot Nagcolaran Rosario, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of bridge, Barangay Gumot Nagcolaran Rosario, La Union",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006743",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Leones East, Tubao, La Union, Start 16.366647, 120.394362 End 16.360963, 120.397541",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Leones East, Tubao, La Union, Start 16.366647, 120.394362 End 16.360963, 120.397541",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006763",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nazareno, Agoo, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay Nazareno, Agoo, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006769",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pottot, Bauang, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Barangay Pottot, Bauang, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006774",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Vicente Sur, Agoo, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Barangay San Vicente Sur, Agoo, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006846",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Binmaley, Pangasinan, Start 16.035788, 120.276468 End 16.034888, 120.275267",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Improvement of Road at Binmaley, Pangasinan, Start 16.035788, 120.276468 End 16.034888, 120.275267",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006880",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion- Barangay Namolan, Lingayen, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Barangay Poblacion- Barangay Namolan, Lingayen, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006896",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Talogtog, Lingayen to Bañaga, Bugallon, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Talogtog, Lingayen to Bañaga, Bugallon, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006898",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Aguilar, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Improvement of Road at Aguilar, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007041",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road Lateral D-Purok 2/Compra, Barangays Agbannawag and Lacnog, Tabuk City, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Access Road Lateral D-Purok 2/Compra, Barangays Agbannawag and Lacnog, Tabuk City, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007309",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Lanting, Roxas, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay Lanting, Roxas, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007317",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Malasin, Burgos, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay Malasin, Burgos, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007320",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Minagbag, Quezon, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay Minagbag, Quezon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007327",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay San Vicente, Quirino, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay San Vicente, Quirino, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007331",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Lilagan, Barangay Cabaritan, San Manuel, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Concreting of Road, Sitio Lilagan, Barangay Cabaritan, San Manuel, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007360",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Purok 3 & 4, Barangay Rizal",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Rehabilitation of Road, Purok 3 & 4, Barangay Rizal",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0497-007429",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road of Purok 2 and Purok 3, Barangay Cutog Grande, Reina Mercedes, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "497",
      "lengthEvidence": "Rehabilitation of Road of Purok 2 and Purok 3, Barangay Cutog Grande, Reina Mercedes, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0499-007475",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+450, Barangay Villa Gonzaga - Barangay San Isidro, Santiago City, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": 0.45,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 450.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+450, Barangay Villa Gonzaga - Barangay San Isidro, Santiago City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.54,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0501-007509",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabulay, Santiago City, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Barangay Cabulay, Santiago City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0502-007527",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Patul, Santiago City, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Barangay Patul, Santiago City, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007611",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Tenement St., Iguana and Gawad Kalinga, Barangay Pantalan Luma, Orani, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Concreting of Road at Tenement St., Iguana and Gawad Kalinga, Barangay Pantalan Luma, Orani, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007626",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road Sito Lorta, Barangay Maria Fe, Orani, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Improvement of Road Sito Lorta, Barangay Maria Fe, Orani, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007628",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Slope Protection of Road along Capitangan Vicinal road",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Rehabilitation of Slope Protection of Road along Capitangan Vicinal road",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0509-007682",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Bridge, Sta. 0+193 - Sta. 0+210, Lipana St., Parulan, Plaridel, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": 0.017,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 352941176.47,
      "lengthMeters": 17.0,
      "allocationPerStatedMeter": 352941.18,
      "rangesMeters": [
        [
          193.0,
          210.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Rehabilitation of Bridge, Sta. 0+193 - Sta. 0+210, Lipana St., Parulan, Plaridel, Bulacan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": 1410000.0,
      "peerRateMultiple": 0.25,
      "peerRecords": 20,
      "peerBand": "0–<40.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3347854.1724999994,
      "graphUpperFence": 4819066.674999999
    },
    {
      "id": "HB10858-3-0519-007879",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Pascual, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+533",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": 0.533,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11257035.65,
      "lengthMeters": 533.0,
      "allocationPerStatedMeter": 11257.04,
      "rangesMeters": [
        [
          0.0,
          533.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay San Pascual, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+533",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.46,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0521-007920",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Del Pilar Zaragoza, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Del Pilar Zaragoza, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007933",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mapangpang, Lupao, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Mapangpang, Lupao, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007944",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lomboy, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Lomboy, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007968",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pulong Buli, Sto. Domingo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Pulong Buli, Sto. Domingo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007970",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sampaloc, Talugtug, Nueva Ecija Road A - Sta. 0+000 - Sta. 0+200, Road B Sta. 0+000 - Sta. 0+300",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "Multiple routes: common station reference unverified",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          0.0,
          200.0
        ],
        [
          0.0,
          300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay Sampaloc, Talugtug, Nueva Ecija Road A - Sta. 0+000 - Sta. 0+200, Road B Sta. 0+000 - Sta. 0+300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0524-008012",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Cruz Purok 1, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+500",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12000000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 12000.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Sta. Cruz Purok 1, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.49,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0526-008052",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay, San Pablo Libutad, San Simon, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road at Barangay, San Pablo Libutad, San Simon, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0536-008244",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage near Sto. Niño Chapel, Sta. 0 + 000 - Sta. 0 + 300, Barangay Matain, Subic, Zambales",
      "office": "Zambales 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          0.0,
          300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "536",
      "lengthEvidence": "Construction of Road and Drainage near Sto. Niño Chapel, Sta. 0 + 000 - Sta. 0 + 300, Barangay Matain, Subic, Zambales",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.7,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0537-008272",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure, Barangay Nag-Iba, Mabini, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road Slope Protection Structure, Barangay Nag-Iba, Mabini, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0556-008711",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road in Guimpingan, Romblon, Romblon",
      "office": "Romblon District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "556",
      "lengthEvidence": "Construction of Access Road in Guimpingan, Romblon, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008732",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay San Jose, Bongabong, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road at Barangay San Jose, Bongabong, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008747",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay 13 Ilawod West Pob. Legazpi City, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay 13 Ilawod West Pob. Legazpi City, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008750",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay 17, Legazpi City, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay 17, Legazpi City, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008751",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay 3, Legazpi City, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay 3, Legazpi City, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008752",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Alobo, Daraga, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay Alobo, Daraga, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008753",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Baligang, Camalig, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay Baligang, Camalig, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008754",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Balinad, Daraga, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay Balinad, Daraga, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008755",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Bariw, Camalig, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay Bariw, Camalig, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008756",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Binanderahan, Camalig, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay Binanderahan, Camalig, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008757",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Bitano, Legazpi City, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay Bitano, Legazpi City, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008758",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Bongabong, Camalig, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay Bongabong, Camalig, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008759",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Cabangan, Camalig, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay Cabangan, Camalig, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008760",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Dita, Legazpi City, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay Dita, Legazpi City, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008761",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Gabawan, Daraga, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay Gabawan, Daraga, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008762",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Libod, Camalig, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay Libod, Camalig, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008763",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Namantao, Daraga, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay Namantao, Daraga, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0558-008764",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Panoypoy, Camalig, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "558",
      "lengthEvidence": "Improvement of Road along Barangay Panoypoy, Camalig, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008765",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Poblacion, Camalig, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Improvement of Road along Barangay Poblacion, Camalig, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008766",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Salvacion, Daraga, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Improvement of Road along Barangay Salvacion, Daraga, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008767",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Sipi, Daraga, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Improvement of Road along Barangay Sipi, Daraga, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008768",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Talahib, Daraga, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Improvement of Road along Barangay Talahib, Daraga, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0559-008769",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road along Barangay Taysan, Legazpi City, Albay",
      "office": "Albay 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "559",
      "lengthEvidence": "Improvement of Road along Barangay Taysan, Legazpi City, Albay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008851",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Bariis to Barangay Buyo, Barangay Mananao, Tinambac, Camarines Sur",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Road, Sitio Bariis to Barangay Buyo, Barangay Mananao, Tinambac, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008871",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Slope protection Structure at Barangay Buenavista, Tucao and Icanbato, Caramoran, Catanduanes",
      "office": "Catanduanes District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Road and Slope protection Structure at Barangay Buenavista, Tucao and Icanbato, Caramoran, Catanduanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0569-008987",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Slope Protection Project along the Road Section in Purok 7, Barangay Bun-od, Cuartero, Capiz",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Slope Protection Project along the Road Section in Purok 7, Barangay Bun-od, Cuartero, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0570-009001",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barog Pensikan, Millan - Curipao, Constancia Road, Sta. 4 + 200 - Sta. 4 + 460, Barangay Millan and Barangay Constancia, Sibunag and San Lorenzo, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": 0.26,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23076923.08,
      "lengthMeters": 260.0,
      "allocationPerStatedMeter": 23076.92,
      "rangesMeters": [
        [
          4200.0,
          4460.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Construction of Road, Barog Pensikan, Millan - Curipao, Constancia Road, Sta. 4 + 200 - Sta. 4 + 460, Barangay Millan and Barangay Constancia, Sibunag and San Lorenzo, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.81,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0574-009100",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 12, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Rehabilitation of Road, Barangay 12, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009203",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Spillway Bridge and Trail, Barangay Mambulod, La Libertad, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Spillway Bridge and Trail, Barangay Mambulod, La Libertad, Negros Oriental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009204",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Spillway Bridge and Trail, Barangay Pacuan, La Libertad, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Spillway Bridge and Trail, Barangay Pacuan, La Libertad, Negros Oriental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009210",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Arebasore, Mabinay, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Road, Barangay Arebasore, Mabinay, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009846",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Camp B. Aranas Road, Baylao, Mambajao, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Camp B. Aranas Road, Baylao, Mambajao, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009847",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Catibac-Lawigan Road, Catibac, Catarman, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Catibac-Lawigan Road, Catibac, Catarman, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0611-009874",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage at 3rd - 2nd Street, Palmspring, Barangay San Miguel, Sta. 0+000 - Sta. 0+200, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 30000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Road with Drainage at 3rd - 2nd Street, Palmspring, Barangay San Miguel, Sta. 0+000 - Sta. 0+200, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.85,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0618-010010",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Drainage Structure along Road, Barangay Gredu, Panabo City, Davao del Norte",
      "office": "Davao del Norte 2nd District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "618",
      "lengthEvidence": "Construction of Drainage Structure along Road, Barangay Gredu, Panabo City, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010050",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Sitio Nueva Fuerza, Cabaruyan, Libungan, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Concrete Road, Sitio Nueva Fuerza, Cabaruyan, Libungan, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0147-000719",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Gen V Alvarez St - (S01204MN) Chainage 000 - Chainage 369",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 5958000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Gen V Alvarez St - (S01204MN) Chainage 000 - Chainage 369",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0257-002606",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Bocal Br. (B00532LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 5900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "257",
      "lengthEvidence": "Bocal Br. (B00532LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0172-001152",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Maitum-Lake Sebu Rd - K1780 + 045 - K1780 + 117, K1780 + 304 - K1780 + 341, K1780 + 685 - K1780 + 718, K1780 + 922 - K1780 + 941, K1781 + 045 - K1781 + 104, K1781 + 540 - K1781 + 604",
      "office": "Sarangani District Engineering Office",
      "amountPesos": 5878000,
      "lengthKm": 0.284,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20697183.1,
      "lengthMeters": 284.0,
      "allocationPerStatedMeter": 20697.18,
      "rangesMeters": [
        [
          1780045.0,
          1780117.0
        ],
        [
          1780304.0,
          1780341.0
        ],
        [
          1780685.0,
          1780718.0
        ],
        [
          1780922.0,
          1780941.0
        ],
        [
          1781045.0,
          1781104.0
        ],
        [
          1781540.0,
          1781604.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "172",
      "lengthEvidence": "Maitum-Lake Sebu Rd - K1780 + 045 - K1780 + 117, K1780 + 304 - K1780 + 341, K1780 + 685 - K1780 + 718, K1780 + 922 - K1780 + 941, K1781 + 045 - K1781 + 104, K1781 + 540 - K1781 + 604",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.65,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0522-007947",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malasin, Sto. Domingo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5868000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Malasin, Sto. Domingo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010142",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, from Canja Street to Manua Street, Barangay Kalawag 1, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 5860000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Construction of Road, from Canja Street to Manua Street, Barangay Kalawag 1, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0147-000720",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Rizal St - (S01202MN) Chainage 000 - Chainage 362",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 5845000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Rizal St - (S01202MN) Chainage 000 - Chainage 362",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0261-002714",
      "category": "Bridges",
      "program": "Replacement of Permanent Weak Bridges",
      "projectName": "Sayadion Br. (B00831MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "office": "Central Office",
      "amountPesos": 5827000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "261",
      "lengthEvidence": "Sayadion Br. (B00831MN) along Maharlika Highway (Surigao-Agusan Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0213-001875",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0042 + 485 - K0042 + 697",
      "office": "Surigao del Norte 1st District Engineering Office",
      "amountPesos": 5812000,
      "lengthKm": 0.212,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27415094.34,
      "lengthMeters": 212.0,
      "allocationPerStatedMeter": 27415.09,
      "rangesMeters": [
        [
          42485.0,
          42697.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "213",
      "lengthEvidence": "Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0042 + 485 - K0042 + 697",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.67,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0132-000414",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Indang-Alfonso via Luksuhin Rd - K0057 + 000 - K0057 + 157",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5805000,
      "lengthKm": 0.157,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36974522.29,
      "lengthMeters": 157.0,
      "allocationPerStatedMeter": 36974.52,
      "rangesMeters": [
        [
          57000.0,
          57157.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Indang-Alfonso via Luksuhin Rd - K0057 + 000 - K0057 + 157",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.73,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0276-003029",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Callagon Br (B00404PW) along Aramaywan-Berong-Pto Princesa Rd",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 5800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Callagon Br (B00404PW) along Aramaywan-Berong-Pto Princesa Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0456-006548",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage along A. De Leon St. (C 0+000 - C 0+152), Barangay 60, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 5800000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "456",
      "lengthEvidence": "Rehabilitation of Roads and Drainage along A. De Leon St. (C 0+000 - C 0+152), Barangay 60, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010143",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Panes-Gacayan Street, Barangay Kalawag I, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 5780000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Construction of Road, Panes-Gacayan Street, Barangay Kalawag I, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007990",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Clara, Quezon to Barangay Linao, Licab, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay Sta. Clara, Quezon to Barangay Linao, Licab, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007977",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Eustacio, Aliaga, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5730000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Eustacio, Aliaga, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0135-000492",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0487 + 000 - K0487 + 278.10",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 5702000,
      "lengthKm": 0.2780999999999767,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20503416.04,
      "lengthMeters": 278.1,
      "allocationPerStatedMeter": 20503.42,
      "rangesMeters": [
        [
          487000.0,
          487278.1
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "135",
      "lengthEvidence": "Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0487 + 000 - K0487 + 278.10",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.41,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0177-001236",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0606 + 063 - K0606 + 090",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 5700000,
      "lengthKm": 0.027,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 211111111.11,
      "lengthMeters": 27.0,
      "allocationPerStatedMeter": 211111.11,
      "rangesMeters": [
        [
          606063.0,
          606090.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0606 + 063 - K0606 + 090",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 0.99,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0143-000652",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Sta Maria-Norzagaray Rd - K0033+849 - K0033+1008, K0034+000 - K0034+130",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 5676000,
      "lengthKm": 0.281,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20199288.26,
      "lengthMeters": 281.0,
      "allocationPerStatedMeter": 20199.29,
      "rangesMeters": [
        [
          33849.0,
          34008.0
        ],
        [
          34000.0,
          34130.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "143",
      "lengthEvidence": "Sta Maria-Norzagaray Rd - K0033+849 - K0033+1008, K0034+000 - K0034+130",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 0.62,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0524-007995",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Rita, Sto. Domingo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5670000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Sta. Rita, Sto. Domingo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0120-000196",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Sumulong Highway - K0022 + 453 - K0023 + 000, K0024 + 000 - K0025 + 000",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 5663000,
      "lengthKm": 1.547,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 3660633.48,
      "lengthMeters": 1547.0,
      "allocationPerStatedMeter": 3660.63,
      "rangesMeters": [
        [
          22453.0,
          23000.0
        ],
        [
          24000.0,
          25000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Sumulong Highway - K0022 + 453 - K0023 + 000, K0024 + 000 - K0025 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 37500.0,
      "peerRateMultiple": 0.1,
      "peerRecords": 57,
      "peerBand": "1485.5–<2832.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 75629.685,
      "graphUpperFence": 102444.84
    },
    {
      "id": "HB10858-3-0490-007276",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sta. 0+000 - Sta. 0+400) at Barangay Magassi, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 5650000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14125000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 14125.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Construction of Concrete Road (Sta. 0+000 - Sta. 0+400) at Barangay Magassi, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.58,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0133-000461",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Tagaytay-Talisay Rd - K0060 + 800 - K0060 + 900, K0061 + 395 - K0061 + 608",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 5634000,
      "lengthKm": 0.313,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 18000000.0,
      "lengthMeters": 313.0,
      "allocationPerStatedMeter": 18000.0,
      "rangesMeters": [
        [
          60800.0,
          60900.0
        ],
        [
          61395.0,
          61608.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Tagaytay-Talisay Rd - K0060 + 800 - K0060 + 900, K0061 + 395 - K0061 + 608",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.36,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0587-009400",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Barangay Cabancalan, Mandaue City, Cebu - Sta. 0+000.00 - Sta. 0+450.00",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 5625000,
      "lengthKm": 0.45,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12500000.0,
      "lengthMeters": 450.0,
      "allocationPerStatedMeter": 12500.0,
      "rangesMeters": [
        [
          0.0,
          450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Road with Drainage, Barangay Cabancalan, Mandaue City, Cebu - Sta. 0+000.00 - Sta. 0+450.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.51,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0170-001117",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Bagong Silang-Capalonga Rd - K0317 + 500 - K0317 + 650",
      "office": "Camarines Norte District Engineering Office",
      "amountPesos": 5617000,
      "lengthKm": 0.15,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37446666.67,
      "lengthMeters": 150.0,
      "allocationPerStatedMeter": 37446.67,
      "rangesMeters": [
        [
          317500.0,
          317650.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Bagong Silang-Capalonga Rd - K0317 + 500 - K0317 + 650",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 0.69,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0178-001248",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0475 + 947 - K0475 + 974",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 5590000,
      "lengthKm": 0.027,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 207037037.04,
      "lengthMeters": 27.0,
      "allocationPerStatedMeter": 207037.04,
      "rangesMeters": [
        [
          475947.0,
          475974.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "178",
      "lengthEvidence": "Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0475 + 947 - K0475 + 974",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 0.97,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0120-000189",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Calamba-Sta Cruz-Famy Jct Rd - K0107 + 726 - K0107 + 906, K0108 + 500 - K0108 + 990",
      "office": "Laguna 1st District Engineering Office",
      "amountPesos": 5577000,
      "lengthKm": 0.67,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 8323880.6,
      "lengthMeters": 670.0,
      "allocationPerStatedMeter": 8323.88,
      "rangesMeters": [
        [
          107726.0,
          107906.0
        ],
        [
          108500.0,
          108990.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Calamba-Sta Cruz-Famy Jct Rd - K0107 + 726 - K0107 + 906, K0108 + 500 - K0108 + 990",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 42480.86,
      "peerRateMultiple": 0.2,
      "peerRecords": 29,
      "peerBand": "596.5–<910 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 116518.16500000001,
      "graphUpperFence": 171450.64
    },
    {
      "id": "HB10858-3-0522-007957",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay North Poblacion, Nampicuan, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5510000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay North Poblacion, Nampicuan, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0177-001232",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Conner-Kabugao Rd - K0591 + 370 - K0591 + 390",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": 0.02,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 275000000.0,
      "lengthMeters": 20.0,
      "allocationPerStatedMeter": 275000.0,
      "rangesMeters": [
        [
          591370.0,
          591390.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Conner-Kabugao Rd - K0591 + 370 - K0591 + 390",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 1.29,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0230-002192",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Allacapan Bypass Road, Sta. 0 + 220 - Sta. 0 + 300, Cagayan",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": 0.08,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 68750000.0,
      "lengthMeters": 80.0,
      "allocationPerStatedMeter": 68750.0,
      "rangesMeters": [
        [
          220.0,
          300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "230",
      "lengthEvidence": "Allacapan Bypass Road, Sta. 0 + 220 - Sta. 0 + 300, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.06,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0466-006761",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Las-ud, Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay Las-ud, Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006861",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bonuan Gueset, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Bonuan Gueset, Dagupan City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007058",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Matucnang/Mapaoay Access Road, Barangay Ipil, Tabuk City, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Matucnang/Mapaoay Access Road, Barangay Ipil, Tabuk City, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0490-007268",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road (Sta.0+0000-Sta. 0+237, Sta. 0+343 - Sta. 0+646), Barangay Alinguigan 3rd, City of Ilagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": 0.54,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 10185185.19,
      "lengthMeters": 540.0,
      "allocationPerStatedMeter": 10185.19,
      "rangesMeters": [
        [
          0.0,
          237.0
        ],
        [
          343.0,
          646.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Rehabilitation of Road (Sta.0+0000-Sta. 0+237, Sta. 0+343 - Sta. 0+646), Barangay Alinguigan 3rd, City of Ilagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.42,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0505-007596",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge of Barangay Ifugao Village, Diffun, Quirino",
      "office": "Quirino District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Construction of Bridge of Barangay Ifugao Village, Diffun, Quirino",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007926",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Galvan, Guimba, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Galvan, Guimba, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007945",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007962",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Piglisan, Cuyapo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Piglisan, Cuyapo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007982",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Jose, Licab, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Jose, Licab, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007986",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Pascual, Sto. Domingo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Pascual, Sto. Domingo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0524-007992",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Cruz, Cuyapo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Sta. Cruz, Cuyapo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008354",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Niyugan, Laurel, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Rehabilitation of Road, Barangay Niyugan, Laurel, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008522",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cotta, Lucena City, Quezon, Start 13.9258, 121.6123 End 13.9219, 121.6130",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Barangay Cotta, Lucena City, Quezon, Start 13.9258, 121.6123 End 13.9219, 121.6130",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0548-008528",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mamala 2, Sariaya, Quezon",
      "office": "Quezon 2nd District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "548",
      "lengthEvidence": "Construction of Road, Barangay Mamala 2, Sariaya, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0570-009004",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Comian - Sitio Dulit, San Roque - Sitio Cali-an - Sitio Proper - JCT. Circumferential Road, Sta. 2 + 178 - Sta. 2 + 468, Barangay San Roque and Barangay Salvacion, Nueva Valencia, Guimaras",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": 0.29,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18965517.24,
      "lengthMeters": 290.0,
      "allocationPerStatedMeter": 18965.52,
      "rangesMeters": [
        [
          2178.0,
          2468.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "570",
      "lengthEvidence": "Construction of Road, Sitio Comian - Sitio Dulit, San Roque - Sitio Cali-an - Sitio Proper - JCT. Circumferential Road, Sta. 2 + 178 - Sta. 2 + 468, Barangay San Roque and Barangay Salvacion, Nueva Valencia, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.66,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0588-009405",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road with Drainage System at Fuentes Road in Barangays Agus and Pajac, Lapu-Lapu City, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Improvement of Road with Drainage System at Fuentes Road in Barangays Agus and Pajac, Lapu-Lapu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0612-009894",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road at Barangay Pigkalawag, Sta. 0 + 000 - Sta. 0 + 250, Sultan Naga Dimaporo, Lanao del Norte",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": 0.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22000000.0,
      "lengthMeters": 250.0,
      "allocationPerStatedMeter": 22000.0,
      "rangesMeters": [
        [
          0.0,
          250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "612",
      "lengthEvidence": "Construction of Concrete Road at Barangay Pigkalawag, Sta. 0 + 000 - Sta. 0 + 250, Sultan Naga Dimaporo, Lanao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.77,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0623-010123",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Sitio Jolason Road, Barangay Lamian, Surallah, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Sitio Jolason Road, Barangay Lamian, Surallah, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010128",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Sitio Malones Road, Barangay Upper Sepaka, Surallah, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Sitio Malones Road, Barangay Upper Sepaka, Surallah, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010129",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Sitio Riverside - Sitio Lambobong Road, Barangay Tubiala, Surallah, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Sitio Riverside - Sitio Lambobong Road, Barangay Tubiala, Surallah, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0200-001608",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Iloilo-Capiz Rd (New Route) - K0068 + 621 - K0068 + 722",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 5473000,
      "lengthKm": 0.101,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 54188118.81,
      "lengthMeters": 101.0,
      "allocationPerStatedMeter": 54188.12,
      "rangesMeters": [
        [
          68621.0,
          68722.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Iloilo-Capiz Rd (New Route) - K0068 + 621 - K0068 + 722",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 1.11,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0207-001760",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0059 + (-1672) - K0059 + (-1467)",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 5463000,
      "lengthKm": 0.205,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26648780.49,
      "lengthMeters": 205.0,
      "allocationPerStatedMeter": 26648.78,
      "rangesMeters": [
        [
          57328.0,
          57533.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Puerto Princesa South Rd - K0059 + (-1672) - K0059 + (-1467)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 0.53,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0119-000161",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Santiago - Tuguegarao Rd - K0365 + (-1440) - K0365 + (-1268)",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 5457000,
      "lengthKm": 0.172,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31726744.19,
      "lengthMeters": 172.0,
      "allocationPerStatedMeter": 31726.74,
      "rangesMeters": [
        [
          363560.0,
          363732.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Santiago - Tuguegarao Rd - K0365 + (-1440) - K0365 + (-1268)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 0.68,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0520-007899",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Barangay I, Quezon, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5417500,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Barangay I, Quezon, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0256-002601",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Tertiary Roads",
      "projectName": "Zamboanga del Sur Coastal Rd - K1708 + 935 - K1709 + 040, K1711 + 120 - K1711 + 128, K1711 + 997 - K1712 + 006, K1712 + 748 - K1712 + 811, K1725 + 078 - K1725 + 083",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 5404000,
      "lengthKm": 0.19,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 28442105.26,
      "lengthMeters": 190.0,
      "allocationPerStatedMeter": 28442.11,
      "rangesMeters": [
        [
          1708935.0,
          1709040.0
        ],
        [
          1711120.0,
          1711128.0
        ],
        [
          1711997.0,
          1712006.0
        ],
        [
          1712748.0,
          1712811.0
        ],
        [
          1725078.0,
          1725083.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "256",
      "lengthEvidence": "Zamboanga del Sur Coastal Rd - K1708 + 935 - K1709 + 040, K1711 + 120 - K1711 + 128, K1711 + 997 - K1712 + 006, K1712 + 748 - K1712 + 811, K1725 + 078 - K1725 + 083",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 2,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-3-0177-001227",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0599+430 - K0599+464",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 5400000,
      "lengthKm": 0.034,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 158823529.41,
      "lengthMeters": 34.0,
      "allocationPerStatedMeter": 158823.53,
      "rangesMeters": [
        [
          599430.0,
          599464.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0599+430 - K0599+464",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 0.75,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0430-006052",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Purok 1 (Going to Camarines Norte High School) Barangay Camambugan, Daet, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 5400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Concreting of Barangay Road, Purok 1 (Going to Camarines Norte High School) Barangay Camambugan, Daet, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0519-007880",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Manggang Marikit, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+500",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5400000,
      "lengthKm": 0.5,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10800000.0,
      "lengthMeters": 500.0,
      "allocationPerStatedMeter": 10800.0,
      "rangesMeters": [
        [
          0.0,
          500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay Manggang Marikit, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.44,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0544-008431",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Poblacion 12, Amadeo, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road at Barangay Poblacion 12, Amadeo, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0197-001563",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0283 + 227 - K0283 + 266, K0284 + 359 - K0284 + 575",
      "office": "Central Office",
      "amountPesos": 5280000,
      "lengthKm": 0.255,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20705882.35,
      "lengthMeters": 255.0,
      "allocationPerStatedMeter": 20705.88,
      "rangesMeters": [
        [
          283227.0,
          283266.0
        ],
        [
          284359.0,
          284575.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "197",
      "lengthEvidence": "Maharlika Highway (LZ) - K0283 + 227 - K0283 + 266, K0284 + 359 - K0284 + 575",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 0.42,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0467-006776",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tay-ac, Rosario, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 5250000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Barangay Tay-ac, Rosario, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006780",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Camangaan, Barangay Carunoan East, Rosario, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 5250000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Sitio Camangaan, Barangay Carunoan East, Rosario, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0154-000836",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bais-Kabankalan Rd - K0060 + 145 - K0060 + 285",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 5215000,
      "lengthKm": 0.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37250000.0,
      "lengthMeters": 140.0,
      "allocationPerStatedMeter": 37250.0,
      "rangesMeters": [
        [
          60145.0,
          60285.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "Bais-Kabankalan Rd - K0060 + 145 - K0060 + 285",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 0.94,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0430-006058",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Purok 3, Barangay Cobangbang, Daet, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 5200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Concreting of Barangay Road, Purok 3, Barangay Cobangbang, Daet, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0592-009496",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Badiang - Barangay Sari-Sari, Jaro, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 5200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Construction of Road, Barangay Badiang - Barangay Sari-Sari, Jaro, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0625-010161",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, D’Lotilla-Laglagaron Street, Barangay Kalawag I, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 5200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Road, D’Lotilla-Laglagaron Street, Barangay Kalawag I, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009401",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage T. Cabahug St., Barangay Casuntingan, Mandaue City, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 5180000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Road with Drainage T. Cabahug St., Barangay Casuntingan, Mandaue City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010144",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Gabion Street, Barangay Kalawag I, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 5147000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Construction of Road, Gabion Street, Barangay Kalawag I, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0129-000366",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Villasis-Malasiqui-Sn Carlos Rd (S00026LZ), K0192+018 - K0192+283",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 5078000,
      "lengthKm": 0.265,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19162264.15,
      "lengthMeters": 265.0,
      "allocationPerStatedMeter": 19162.26,
      "rangesMeters": [
        [
          192018.0,
          192283.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Villasis-Malasiqui-Sn Carlos Rd (S00026LZ), K0192+018 - K0192+283",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.38,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0520-007909",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabaducan East, Nampicuan, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5010000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Cabaducan East, Nampicuan, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010149",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Junction National Highway-Galinato, Barangay Dansuli, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 5004000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Construction of Concrete Road, Junction National Highway-Galinato, Barangay Dansuli, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0137-000519",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sn Policarpo-Arteche-Lapinig Rd - K0853 + 900 - K0853 + 944.60",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.044599999999976714,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 112107623.32,
      "lengthMeters": 44.6,
      "allocationPerStatedMeter": 112107.62,
      "rangesMeters": [
        [
          853900.0,
          853944.6
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "137",
      "lengthEvidence": "Sn Policarpo-Arteche-Lapinig Rd - K0853 + 900 - K0853 + 944.60",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 2.22,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0145-000691",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "JNR Compayan-JNR Pantud-Fabrica Rd - Chainage 0 - Chainage 1555",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "JNR Compayan-JNR Pantud-Fabrica Rd - Chainage 0 - Chainage 1555",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0147-000714",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Mabini-Lopez Jaena St - (S00098CB) Chainage 000 - Chainage 063",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Mabini-Lopez Jaena St - (S00098CB) Chainage 000 - Chainage 063",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0152-000804",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Manila North Rd - K0283+569 - K0283+708",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.139,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35971223.02,
      "lengthMeters": 139.0,
      "allocationPerStatedMeter": 35971.22,
      "rangesMeters": [
        [
          283569.0,
          283708.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Manila North Rd - K0283+569 - K0283+708",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 0.91,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0154-000837",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bais-Kabankalan Rd - K0067 + 160 - K0067 + 277",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.117,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42735042.74,
      "lengthMeters": 117.0,
      "allocationPerStatedMeter": 42735.04,
      "rangesMeters": [
        [
          67160.0,
          67277.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "Bais-Kabankalan Rd - K0067 + 160 - K0067 + 277",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 1.08,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0169-001103",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Lemery-Taal Diversion Rd - K0128 + (-957) - K0128 + (-838.41)",
      "office": "Batangas 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.1185899999999965,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42162071.0,
      "lengthMeters": 118.59,
      "allocationPerStatedMeter": 42162.07,
      "rangesMeters": [
        [
          127043.0,
          127161.59
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Lemery-Taal Diversion Rd - K0128 + (-957) - K0128 + (-838.41)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 0.78,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0180-001278",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Tablas Circumferential Rd - K0043 + 284 - K0043 + 320",
      "office": "Romblon District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.036,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 138888888.89,
      "lengthMeters": 36.0,
      "allocationPerStatedMeter": 138888.89,
      "rangesMeters": [
        [
          43284.0,
          43320.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Tablas Circumferential Rd - K0043 + 284 - K0043 + 320",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 0.65,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0186-001392",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Merida-Lundag-Puting Bato-Consolacion-Isabel Rd - K1122 + 550 - K1122 + 572",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.022,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 227272727.27,
      "lengthMeters": 22.0,
      "allocationPerStatedMeter": 227272.73,
      "rangesMeters": [
        [
          1122550.0,
          1122572.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Merida-Lundag-Puting Bato-Consolacion-Isabel Rd - K1122 + 550 - K1122 + 572",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.61,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0197-001559",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Maharlika Highway (LZ) - K0322+179 - K0322+193",
      "office": "Central Office",
      "amountPesos": 5000000,
      "lengthKm": 0.014,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 357142857.14,
      "lengthMeters": 14.0,
      "allocationPerStatedMeter": 357142.86,
      "rangesMeters": [
        [
          322179.0,
          322193.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "197",
      "lengthEvidence": "Maharlika Highway (LZ) - K0322+179 - K0322+193",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 7.31,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0231-002216",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Sigma Bypass Road",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Sigma Bypass Road",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0232-002222",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Caiguit-Cabungaan Diversion Road, (Sta.0+423 - Sta.0+507, Sta.0+816 - Sta.0+921, Sta.1+073 - Sta.1+203), Villaba, Leyte",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.319,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 15673981.19,
      "lengthMeters": 319.0,
      "allocationPerStatedMeter": 15673.98,
      "rangesMeters": [
        [
          423.0,
          507.0
        ],
        [
          816.0,
          921.0
        ],
        [
          1073.0,
          1203.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "232",
      "lengthEvidence": "Caiguit-Cabungaan Diversion Road, (Sta.0+423 - Sta.0+507, Sta.0+816 - Sta.0+921, Sta.1+073 - Sta.1+203), Villaba, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.07,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0244-002427",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Maharlika Highway (MN) K1462 + 792 - K1462 + 880",
      "office": "Central Office",
      "amountPesos": 5000000,
      "lengthKm": 0.088,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 56818181.82,
      "lengthMeters": 88.0,
      "allocationPerStatedMeter": 56818.18,
      "rangesMeters": [
        [
          1462792.0,
          1462880.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "244",
      "lengthEvidence": "Maharlika Highway (MN) K1462 + 792 - K1462 + 880",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 4.73,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0252-002544",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Dinagat-Loreto Rd - K0082 + 500 - K0083 + 500 and Jct Mabini-Tubajon Rd K0084 + (- 280) - K0084 + 720 (Road Safety: Road Lighting)",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Partial chainage: isolated station alongside ranges",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [
        [
          82500.0,
          83500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "252",
      "lengthEvidence": "Dinagat-Loreto Rd - K0082 + 500 - K0083 + 500 and Jct Mabini-Tubajon Rd K0084 + (- 280) - K0084 + 720 (Road Safety: Road Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0254-002580",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Dancalan-Candoni-Damutan Valley Rd - K0120 + 770 - K0120 + 790 (Off-Carriageway Improvement: Paving of Shoulders)",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.02,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 250000000.0,
      "lengthMeters": 20.0,
      "allocationPerStatedMeter": 250000.0,
      "rangesMeters": [
        [
          120770.0,
          120790.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "254",
      "lengthEvidence": "Dancalan-Candoni-Damutan Valley Rd - K0120 + 770 - K0120 + 790 (Off-Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 25.22,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0255-002589",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - (S01633MN) Chainage 067 - Chainage 102, Chainage 243 - Chainage 253",
      "office": "Central Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "255",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - (S01633MN) Chainage 067 - Chainage 102, Chainage 243 - Chainage 253",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002815",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Puntod Br. (B00076MN) along Maharlika Highway (MN)",
      "office": "Central Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Puntod Br. (B00076MN) along Maharlika Highway (MN)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0269-002864",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Bariri Br. 2 (B00049TL) along Tablas Circumferential Rd",
      "office": "Romblon District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Bariri Br. 2 (B00049TL) along Tablas Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0269-002865",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Canluway Br. (B00026SY) along Sibuyan Circumferential Rd",
      "office": "Romblon District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Canluway Br. (B00026SY) along Sibuyan Circumferential Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0270-002886",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Pigcotin Br. (B02200MN) along Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Pigcotin Br. (B02200MN) along Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0270-002892",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Cabidianan Br. (B00195MN) along Nabunturan-Mainit Park Rd",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Cabidianan Br. (B00195MN) along Nabunturan-Mainit Park Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0270-002894",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Soop Br. (B01566MN) along Asuncion-San Isidro-Laak-Veruela Rd",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Soop Br. (B01566MN) along Asuncion-San Isidro-Laak-Veruela Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0272-002928",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Mocong Br. 2 (B05164LZ) along Basud-Lanot Rd",
      "office": "Central Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Mocong Br. 2 (B05164LZ) along Basud-Lanot Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0272-002929",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Nalisan Br. (B02740LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Nalisan Br. (B02740LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002953",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Pangi Br. (B01881MN) along Davao City Div Rd",
      "office": "Central Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Pangi Br. (B01881MN) along Davao City Div Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002972",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Maligaya Creek Br. (B01735LZ) along J Rizal Ave",
      "office": "North Manila District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Maligaya Creek Br. (B01735LZ) along J Rizal Ave",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002974",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Moriones Br. (B01794LZ) along Moriones",
      "office": "North Manila District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Moriones Br. (B01794LZ) along Moriones",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002978",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "P. Florentino Br. (B02266LZ) along P Florentino",
      "office": "North Manila District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "P. Florentino Br. (B02266LZ) along P Florentino",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-003000",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Inaban Br. (B01254LZ) along Aritao-Quirino Rd",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Inaban Br. (B01254LZ) along Aritao-Quirino Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-003002",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Dibitognin Br. (B02835LZ) along Baler-Cemento via Dicaloyungan",
      "office": "Aurora District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Dibitognin Br. (B02835LZ) along Baler-Cemento via Dicaloyungan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-003010",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Gen. Luna Br. (B01295LZ) along Jct Pinagpanaan-Rizal-Pantabangan Rd",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Gen. Luna Br. (B01295LZ) along Jct Pinagpanaan-Rizal-Pantabangan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-003015",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Yama Br. (B03031LZ) along Batangas-Lobo Rd",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Yama Br. (B03031LZ) along Batangas-Lobo Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0275-003016",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Subic Br. along Talisay-Laurel-Agoncillo Rd",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Subic Br. along Talisay-Laurel-Agoncillo Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0277-003039",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Construction of Sea Wall/Storm Surge Protection, Sitio Lamintao, Barangay Talisay, Barotac Nuevo, Iloilo",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Construction of Sea Wall/Storm Surge Protection, Sitio Lamintao, Barangay Talisay, Barotac Nuevo, Iloilo",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003062",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Patun-an Br. (B00519NR) along Bacolod North Rd",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Patun-an Br. (B00519NR) along Bacolod North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003066",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Langoyon Br. (B00639CB) along Cebu-Toledo Wharf Rd (Jct Naga-Uling)",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Langoyon Br. (B00639CB) along Cebu-Toledo Wharf Rd (Jct Naga-Uling)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003067",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Arpili Br. (B00540CB) along Toledo-Tabuelan-Sn Remigio Rd",
      "office": "Cebu 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Arpili Br. (B00540CB) along Toledo-Tabuelan-Sn Remigio Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003069",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Camanchilles Br. (B00548CB) along Toledo-Tabuelan-Sn Remigio Rd",
      "office": "Cebu 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Camanchilles Br. (B00548CB) along Toledo-Tabuelan-Sn Remigio Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003125",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Opong Br. 4 (B00325SM) along Rawis-Catubig Rd",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Opong Br. 4 (B00325SM) along Rawis-Catubig Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003130",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Impasug-ong Br. (B01248MN) along Jct Sayre H-way-Impasugong-Patulangan By-Pass Rd",
      "office": "Bukidnon 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Impasug-ong Br. (B01248MN) along Jct Sayre H-way-Impasugong-Patulangan By-Pass Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003134",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Rawari Br. (B01384MN) along Bukidnon-Davao City Rd",
      "office": "Bukidnon 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Rawari Br. (B01384MN) along Bukidnon-Davao City Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003158",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Katingawan Br. (B01867MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Katingawan Br. (B01867MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003159",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Panicupan Br. (B00307MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Panicupan Br. (B00307MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003160",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Upper Panicupan Br. (B00324MN) along Dualing-New Panay-Midsayap Rd",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Upper Panicupan Br. (B00324MN) along Dualing-New Panay-Midsayap Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0283-003191",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Buraan Br. (B00535LZ) along Manila North Rd",
      "office": "Central Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "283",
      "lengthEvidence": "Buraan Br. (B00535LZ) along Manila North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0285-003229",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Pinaguidanan Br. (B02744LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "285",
      "lengthEvidence": "Pinaguidanan Br. (B02744LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0289-003322",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Layunan Br. (B02846LZ) along Manila East Rd",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Layunan Br. (B02846LZ) along Manila East Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0289-003323",
      "category": "Bridges",
      "program": "Widening of Permanent Bridges",
      "projectName": "Halayhayin Br. (B02462LZ) along Manila East Rd",
      "office": "Rizal 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "289",
      "lengthEvidence": "Halayhayin Br. (B02462LZ) along Manila East Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0430-006060",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Purok 5, Barangay III, Daet, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Concreting of Barangay Road, Purok 5, Barangay III, Daet, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0430-006061",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Purok 6 Barangay II, Daet, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "430",
      "lengthEvidence": "Concreting of Barangay Road, Purok 6 Barangay II, Daet, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0431-006079",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Purok Bayabas, Barangay Gubat, Daet, Camarines Norte",
      "office": "Central Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "431",
      "lengthEvidence": "Construction of Road Purok Bayabas, Barangay Gubat, Daet, Camarines Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0448-006400",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Cleanville, Barangay Manuyo 1, Las Piñas City",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "448",
      "lengthEvidence": "Construction of Road and Drainage at Cleanville, Barangay Manuyo 1, Las Piñas City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0452-006468",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads and Drainage (Sectional Reblocking) along Dominic St. (C0+000 - C0+112), Barangay 186, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "452",
      "lengthEvidence": "Construction of Roads and Drainage (Sectional Reblocking) along Dominic St. (C0+000 - C0+112), Barangay 186, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0452-006471",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage Structure along Lingayen St. (C0+000 – C0+050), Kalinga St. (C0+000 – C0+050), Katipunan St. (C0+000 – C0+047), and Hagonoy St. (C0+000 – C0+072), Horacio Dela Costa Homes II, Barangay 179, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "452",
      "lengthEvidence": "Rehabilitation of Road including Drainage Structure along Lingayen St. (C0+000 – C0+050), Kalinga St. (C0+000 – C0+050), Katipunan St. (C0+000 – C0+047), and Hagonoy St. (C0+000 – C0+072), Horacio Dela Costa Homes II, Barangay 179, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0453-006497",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road along Sampaguita St. (C 0+000 - C 0+145) and Ilang-Ilang St. (C 0+000 - C 0+148), Barangay 97, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "453",
      "lengthEvidence": "Rehabilitation of Road along Sampaguita St. (C 0+000 - C 0+145) and Ilang-Ilang St. (C 0+000 - C 0+148), Barangay 97, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006502",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Ilang-Ilang Street (C0+000 to C0+090), Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Ilang-Ilang Street (C0+000 to C0+090), Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006503",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Camia Street (C0+000 to C080), Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Camia Street (C0+000 to C080), Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0454-006515",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road and Drainage along Rosal Street (C0+000 to C080), Gen T. De Leon, Valenzuela City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "454",
      "lengthEvidence": "Rehabilitation of Road and Drainage along Rosal Street (C0+000 to C080), Gen T. De Leon, Valenzuela City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0457-006554",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage along General Luna Street (C 0+000 - C 0+120), Barangay 13, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Rehabilitation of Roads and Drainage along General Luna Street (C 0+000 - C 0+120), Barangay 13, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0457-006555",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage along Magsaysay St. (C 0+000 - C 0+144), Barangay 123, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Rehabilitation of Roads and Drainage along Magsaysay St. (C 0+000 - C 0+144), Barangay 123, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0457-006557",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads and Drainage Purok 7, along Ubas St. (C0+000 - C0+082.40), Ascoville, Barangay 185, Caloocan City",
      "office": "Metro Manila 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Rehabilitation of Roads and Drainage Purok 7, along Ubas St. (C0+000 - C0+082.40), Ascoville, Barangay 185, Caloocan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0457-006567",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads along Yuseco St., (Yuseco Br. - PNR), Manila City",
      "office": "North Manila District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "457",
      "lengthEvidence": "Rehabilitation of Roads along Yuseco St., (Yuseco Br. - PNR), Manila City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0458-006578",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Imporvement of Road and Drainage, Chainage 000 - Chainage 050 at Bagbag Elementary School at Barangay Bagbag, Quezon City",
      "office": "Quezon City 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "458",
      "lengthEvidence": "Imporvement of Road and Drainage, Chainage 000 - Chainage 050 at Bagbag Elementary School at Barangay Bagbag, Quezon City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0459-006596",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road and Drainage System along B. Mayor Street, Barangay 177 Zone 18 and its vicinity, Pasay City",
      "office": "South Manila District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "459",
      "lengthEvidence": "Improvement of Road and Drainage System along B. Mayor Street, Barangay 177 Zone 18 and its vicinity, Pasay City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006615",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Sta. Rita, Bacarra, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Rehabilitation of Road, Barangay Sta. Rita, Bacarra, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006616",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Macupit, Bacarra, Ilocos Norte, Start 18.293231, 120.646567 End 18.292758, 120.647915",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Construction of Road, Barangay Macupit, Bacarra, Ilocos Norte, Start 18.293231, 120.646567 End 18.292758, 120.647915",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006617",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sangil, Bacarra, Ilocos Norte (18.246538, 120.595626 - 18.247022, 120.594522)",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Construction of Road, Barangay Sangil, Bacarra, Ilocos Norte (18.246538, 120.595626 - 18.247022, 120.594522)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006618",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Cabaruan, Bacarra, Ilocos Norte (18.270542, 120.582646 - 18.270601, 120.582214)",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Rehabilitation of Road, Barangay Cabaruan, Bacarra, Ilocos Norte (18.270542, 120.582646 - 18.270601, 120.582214)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006619",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Duripes, Bacarra, Ilocos Norte, Start 18.290131, 120.625013 End 18.292112, 120.623779",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Rehabilitation of Road, Barangay Duripes, Bacarra, Ilocos Norte, Start 18.290131, 120.625013 End 18.292112, 120.623779",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006620",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Tubburan, Bacarra, Ilocos Norte (18.288071, 120.632938 - 18.287430, 120.633746)",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Rehabilitation of Road, Barangay Tubburan, Bacarra, Ilocos Norte (18.288071, 120.632938 - 18.287430, 120.633746)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006621",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay 20, Bacarra, Ilocos Norte, Start 18.2729, 120.6386 End 18.2729, 120.6387",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Construction of Bridge, Barangay 20, Bacarra, Ilocos Norte, Start 18.2729, 120.6386 End 18.2729, 120.6387",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006622",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tubburan, Bacarra, Ilocos Norte (18.282523, 120.638859 - 18.280656, 120.639972)",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Construction of Road, Barangay Tubburan, Bacarra, Ilocos Norte (18.282523, 120.638859 - 18.280656, 120.639972)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006623",
      "category": "Mixed roads / bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Bridge, Barangay Nambaran, Bacarra, Ilocos Norte, Start 18.2710, 120.6542 End 18.2713, 120.6541",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Rehabilitation of Road including Bridge, Barangay Nambaran, Bacarra, Ilocos Norte, Start 18.2710, 120.6542 End 18.2713, 120.6541",
      "scopeNote": "Mixed scope: no single-work cost/m shown",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006624",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 32 Corocor, Bacarra, Ilocos Norte (18.269913, 120.596870 - 18.269993, 120.596695)",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Rehabilitation of Road, Barangay 32 Corocor, Bacarra, Ilocos Norte (18.269913, 120.596870 - 18.269993, 120.596695)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006626",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay Paninaan, Bacarra, Ilocos Norte (18.285166, 120.657731 - 18.281040, 120.661314)",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Improvement of Road, Barangay Paninaan, Bacarra, Ilocos Norte (18.285166, 120.657731 - 18.281040, 120.661314)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0460-006627",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay 21, Libtong , Bacarra, Ilocos Norte (18.267643, 120.622863 - 18.268245, 120.621003)",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "460",
      "lengthEvidence": "Construction of Road, Barangay 21, Libtong , Bacarra, Ilocos Norte (18.267643, 120.622863 - 18.268245, 120.621003)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006637",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Madungon-Bungad Road, Barangay Angset, Carasi, Ilocos Norte (18.1629, 120.7915 - 18.1638, 120.7923)",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Rehabilitation of Madungon-Bungad Road, Barangay Angset, Carasi, Ilocos Norte (18.1629, 120.7915 - 18.1638, 120.7923)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006638",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Bridge, Barangay Zamboanga, Laoag City, Ilocos Norte, Start 18.189233, 120.545766 End 18.189233, 120.545766",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Rehabilitation of Bridge, Barangay Zamboanga, Laoag City, Ilocos Norte, Start 18.189233, 120.545766 End 18.189233, 120.545766",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006639",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Balacad, Laoag City, Ilocos Norte, Start 120.541971, 18.147805 End 120.541349, 18.147403",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Construction of Road, Barangay Balacad, Laoag City, Ilocos Norte, Start 120.541971, 18.147805 End 120.541349, 18.147403",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006640",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Barbar Barangay 59-B Dibua North, Laoag City, Ilocos Norte, Start 120.58346, 18.24589 End 120.58329, 18.24845",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Construction of Road, Sitio Barbar Barangay 59-B Dibua North, Laoag City, Ilocos Norte, Start 120.58346, 18.24589 End 120.58329, 18.24845",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006641",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Maharlika - By pass Road, Barangay 1, San Lorenzo, Laoag City, Ilocos Norte, Start 18.201922, 120.580992 End 18.202645, 120.580247",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Construction of Maharlika - By pass Road, Barangay 1, San Lorenzo, Laoag City, Ilocos Norte, Start 18.201922, 120.580992 End 18.202645, 120.580247",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006642",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay 45 Tangid, Laoag City, Ilocos Norte, Start 18.1954, 120.5710 End 18.1936, 120.5716",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Construction of Road, Barangay 45 Tangid, Laoag City, Ilocos Norte, Start 18.1954, 120.5710 End 18.1936, 120.5716",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006643",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay 48-B Cabungaan South, Laoag City, Ilocos Norte, Start 120.5577, 18.1856 End 120.5562, 18.1838",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Construction of Road, Barangay 48-B Cabungaan South, Laoag City, Ilocos Norte, Start 120.5577, 18.1856 End 120.5562, 18.1838",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006644",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay 53 Rioeng, Laoag City, Ilocos Norte, Start 18.182278, 120.626262 End 18.183976, 120.626647",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Construction of Road, Barangay 53 Rioeng, Laoag City, Ilocos Norte, Start 18.182278, 120.626262 End 18.183976, 120.626647",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006645",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay 54-B Camangaan, Laoag City, Ilocos Norte, Start 18.177574, 120.614313 End 18.176209, 120.613400",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Construction of Road, Barangay 54-B Camangaan, Laoag City, Ilocos Norte, Start 18.177574, 120.614313 End 18.176209, 120.613400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006646",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay 59-A Dibua South, Laoag City, Ilocos Norte, Start 18.23684, 120.57291 End 18.23572, 120.57335",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Construction of Road, Barangay 59-A Dibua South, Laoag City, Ilocos Norte, Start 18.23684, 120.57291 End 18.23572, 120.57335",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006647",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Bacsil North Road, Laoag City, Ilocos Norte, Start 18.19694, 120.64965 End 18.19918, 120.65172",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Rehabilitation of Bacsil North Road, Laoag City, Ilocos Norte, Start 18.19694, 120.64965 End 18.19918, 120.65172",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006650",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nalbo, Laoag City, Ilocos Norte, Start 120.577, 18.1892 End 120.5782, 18.1914",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Construction of Road, Barangay Nalbo, Laoag City, Ilocos Norte, Start 120.577, 18.1892 End 120.5782, 18.1914",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0461-006651",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lagui-Sail, Laoag City, Ilocos Norte, Start 120.628370, 18.204970 End 120.626290, 18.205210",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "461",
      "lengthEvidence": "Construction of Road, Barangay Lagui-Sail, Laoag City, Ilocos Norte, Start 120.628370, 18.204970 End 120.626290, 18.205210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006652",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road along P. Gomez St., Barangay 2, Laoag City, Ilocos Norte, Start 18.20637, 120.58574 End 18.20577, 120.58703",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Rehabilitation of Road along P. Gomez St., Barangay 2, Laoag City, Ilocos Norte, Start 18.20637, 120.58574 End 18.20577, 120.58703",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006654",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 7-B Nuestra Señora del Natividad, Laoag City, Ilocos Norte, Start 18.20067, 120.59289 End 18.20105, 120.59186",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Rehabilitation of Road, Barangay 7-B Nuestra Señora del Natividad, Laoag City, Ilocos Norte, Start 18.20067, 120.59289 End 18.20105, 120.59186",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006655",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 13 Nuestra Señora de Visitacion, Laoag City, Ilocos Norte, Start 120.60389200, 18.20468900 End 120.60477500, 18.20579600",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Rehabilitation of Road, Barangay 13 Nuestra Señora de Visitacion, Laoag City, Ilocos Norte, Start 120.60389200, 18.20468900 End 120.60477500, 18.20579600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006656",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 15 San Guillermo, Laoag City, Ilocos Norte, Start 18.20245, 120.59912 End 18.20104, 120.59837",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Rehabilitation of Road, Barangay 15 San Guillermo, Laoag City, Ilocos Norte, Start 18.20245, 120.59912 End 18.20104, 120.59837",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006657",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 32-C La Paz East, Laoag City, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Rehabilitation of Road, Barangay 32-C La Paz East, Laoag City, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006658",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 33-A La Paz Proper, Laoag City, Ilocos Norte, Start 120.53658000, 18.2071100 End 120.533371000, 18.20857000",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Rehabilitation of Road, Barangay 33-A La Paz Proper, Laoag City, Ilocos Norte, Start 120.53658000, 18.2071100 End 120.533371000, 18.20857000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006659",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 33-B La Paz Proper, Laoag City, Ilocos Norte, Start 18.201016, 120.537014 End 18.201033, 120.536244",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Rehabilitation of Road, Barangay 33-B La Paz Proper, Laoag City, Ilocos Norte, Start 18.201016, 120.537014 End 18.201033, 120.536244",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006660",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 50 Buttong, Laoag City, Ilocos Norte, Start 18.176879, 120.563271 End 18.178937, 120.568545",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Rehabilitation of Road, Barangay 50 Buttong, Laoag City, Ilocos Norte, Start 18.176879, 120.563271 End 18.178937, 120.568545",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006661",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 49-B Raraburan, Laoag City, Ilocos Norte, Start 18.1815, 120.5797 End 18.18018, 120.58188",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Rehabilitation of Road, Barangay 49-B Raraburan, Laoag City, Ilocos Norte, Start 18.1815, 120.5797 End 18.18018, 120.58188",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006662",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 57 Pila, Laoag City, Ilocos Norte, Start 18.227650, 120.582500 End 18.229380, 120.583560",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Rehabilitation of Road, Barangay 57 Pila, Laoag City, Ilocos Norte, Start 18.227650, 120.582500 End 18.229380, 120.583560",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006663",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Bascil South, Laoag City, Ilocos Norte, Start 120.64907, 18.19125 End 120.64904, 18.19339",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Construction of Road Barangay Bascil South, Laoag City, Ilocos Norte, Start 120.64907, 18.19125 End 120.64904, 18.19339",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006666",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sitio Rosas-Rosal Circumferential Road, Barangay Aggasi, Pagudpud, Ilocos Norte, Start 120.810465, 18.549919 End 120.811344, 18.550159",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Construction of Sitio Rosas-Rosal Circumferential Road, Barangay Aggasi, Pagudpud, Ilocos Norte, Start 120.810465, 18.549919 End 120.811344, 18.550159",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006667",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Caparispisan, Pagudpud, Ilocos Norte, Start 120.815800, 18.628898 End 120.816143, 18.627087",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Construction of Road, Barangay Caparispisan, Pagudpud, Ilocos Norte, Start 120.815800, 18.628898 End 120.816143, 18.627087",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006668",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Caunayan, Pagudpud, Ilocos Norte, Start 120.834238, 18.604501 End 120.835626, 18.606396",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Construction of Road, Barangay Caunayan, Pagudpud, Ilocos Norte, Start 120.834238, 18.604501 End 120.835626, 18.606396",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0462-006669",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion 1, Pagudpud, Ilocos Norte, Start 120.785302, 18.559069 End 120.783964, 18.560186",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "462",
      "lengthEvidence": "Construction of Road, Barangay Poblacion 1, Pagudpud, Ilocos Norte, Start 120.785302, 18.559069 End 120.783964, 18.560186",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006672",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Caruan, Pasuquin, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Road, Barangay Caruan, Pasuquin, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006674",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Tabungao-Dilanis Road, Pasuquin, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Rehabilitation of Tabungao-Dilanis Road, Pasuquin, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006675",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Arua-ay, Piddig, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Road, Barangay Arua-ay, Piddig, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006676",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tangaoan, Piddig, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Road, Barangay Tangaoan, Piddig, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006677",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Maria, Piddig, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Road, Barangay Sta. Maria, Piddig, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006678",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sucsuquen, Piddig, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Road, Barangay Sucsuquen, Piddig, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006681",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay San Agustin, Sarrat, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Bridge, Barangay San Agustin, Sarrat, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006682",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay San Manuel, Sarrat, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Bridge, Barangay San Manuel, Sarrat, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006683",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio 7 Barangay 12 San Bernabe, Sarrat, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Construction of Road, Sitio 7 Barangay 12 San Bernabe, Sarrat, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0463-006694",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay 48-A Cabungaan North,Laoag City, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "463",
      "lengthEvidence": "Rehabilitation of Road, Barangay 48-A Cabungaan North,Laoag City, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006709",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Calambeg-Mabanbanag Bridge, Piddig, Ilocos Norte",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Calambeg-Mabanbanag Bridge, Piddig, Ilocos Norte",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0464-006714",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Local Road Connecting Siitos 1, 2 & 3 along San Agustin St. Barangay San Lorenzo, San Nicolas, Ilocos Norte",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "464",
      "lengthEvidence": "Construction of Local Road Connecting Siitos 1, 2 & 3 along San Agustin St. Barangay San Lorenzo, San Nicolas, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006722",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Tamurong, Barangay San Lorenzo, San Nicolas, Ilocos Norte",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Construction of Road, Sitio Tamurong, Barangay San Lorenzo, San Nicolas, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006731",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Pagleddegan-Pao-Guinaburan Road, Balaoan, La Union, Start 16.795214 120.429672 End 16.797036, 120.431046",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Improvement of Pagleddegan-Pao-Guinaburan Road, Balaoan, La Union, Start 16.795214 120.429672 End 16.797036, 120.431046",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0465-006732",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Construction of Barangay Road along Barangay Caculangan, San Juan, La Union, Start 16.690036, 120.354500 End 16.688793, 120.353876",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "465",
      "lengthEvidence": "Rehabilitation/Construction of Barangay Road along Barangay Caculangan, San Juan, La Union, Start 16.690036, 120.354500 End 16.688793, 120.353876",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006751",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Baay, Bagulin, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay Baay, Bagulin, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0466-006756",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Dulao, Aringay, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "466",
      "lengthEvidence": "Construction of Road, Barangay Dulao, Aringay, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006770",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Benito Norte, Aringay, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Barangay San Benito Norte, Aringay, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006777",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 3, San Benito Sur, Aringay, La Union",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Purok 3, San Benito Sur, Aringay, La Union",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006787",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Amandiego - Bisocol Road, Barangay Amandiego, Alaminos City, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Amandiego - Bisocol Road, Barangay Amandiego, Alaminos City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0467-006789",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ambabaay, Bani, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "467",
      "lengthEvidence": "Construction of Road, Barangay Ambabaay, Bani, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006790",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Boboy, Agno, Pangasinan, Start 16.140455, 119.79291 End 16.140828, 119.790377",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangay Boboy, Agno, Pangasinan, Start 16.140455, 119.79291 End 16.140828, 119.790377",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006791",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cayungnan, Agno, Pangasinan, Start 16.14050992, 119.83999407",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangay Cayungnan, Agno, Pangasinan, Start 16.14050992, 119.83999407",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006792",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Magsaysay, Agno, Pangasinan, Start 16.093059, 119.774543 End 16.092524, 119.768554",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangay Magsaysay, Agno, Pangasinan, Start 16.093059, 119.774543 End 16.092524, 119.768554",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006793",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tupa, Agno, Pangasinan, Start 16.067700, 119.769300 End 16.071468, 119.766528",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangay Tupa, Agno, Pangasinan, Start 16.067700, 119.769300 End 16.071468, 119.766528",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006794",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tawin- Tawin, Alaminos City, Pangasinan, Start 16.177793, 119.916853 End 16.176069, 119.916365",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangay Tawin- Tawin, Alaminos City, Pangasinan, Start 16.177793, 119.916853 End 16.176069, 119.916365",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006795",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Cabungan, Anda Pangasinan, Start 16.336818, 119.991946 End 16.333015, 119.990195",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Cabungan, Anda Pangasinan, Start 16.336818, 119.991946 End 16.333015, 119.990195",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006796",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Carot, Anda Pangasinan, Start 16.348138, 119.985124 End 16.347216, 119.98131",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Carot, Anda Pangasinan, Start 16.348138, 119.985124 End 16.347216, 119.98131",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006800",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tagudin, Mabini, Pangasinan, Start 16.08005506, 119.9461981 End 16.08097422, 119.94447306",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangay Tagudin, Mabini, Pangasinan, Start 16.08005506, 119.9461981 End 16.08097422, 119.94447306",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0468-006806",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Arnedo, Bolinao, Pangasinan, Start 16.3787, 119.875568 End 16.377058, 119.876689",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "468",
      "lengthEvidence": "Construction of Road, Barangay Arnedo, Bolinao, Pangasinan, Start 16.3787, 119.875568 End 16.377058, 119.876689",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006809",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cayucay, Alaminos City, Pangasinan Start 16.197134, 119.975196 End 16.204999, 119.980932",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, Barangay Cayucay, Alaminos City, Pangasinan Start 16.197134, 119.975196 End 16.204999, 119.980932",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006815",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Macabit, Bani, Pangasinan, Start 16.256453, 119.827945 End 16.260271, 119.828842",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, Macabit, Bani, Pangasinan, Start 16.256453, 119.827945 End 16.260271, 119.828842",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006816",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Miguel, Bani, Pangasinan, 16.203393, 119.919783",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, San Miguel, Bani, Pangasinan, 16.203393, 119.919783",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006818",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nibaliw, Mabini, Pangasinan, Start 16.066874, 119.937478 End 16.062741, 119.939157",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, Barangay Nibaliw, Mabini, Pangasinan, Start 16.066874, 119.937478 End 16.062741, 119.939157",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006819",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Villacorta, Mabini, Pangasinan, Start 16.004476, 120.056329 End 16.001800, 120.053654",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, Barangay Villacorta, Mabini, Pangasinan, Start 16.004476, 120.056329 End 16.001800, 120.053654",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006822",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Local Bridge at Barangay Balangobong, Alaminos, Pangasinan, 16.113503, 119.9946",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Local Bridge at Barangay Balangobong, Alaminos, Pangasinan, 16.113503, 119.9946",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006824",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bolaney, Alaminos City, Pangasinan, Start 16.11555, 119.956217 End 16.117098, 119.957541",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, Barangay Bolaney, Alaminos City, Pangasinan, Start 16.11555, 119.956217 End 16.117098, 119.957541",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006825",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tangcarang, Alaminos City, Pangasinan, Start 16.104423, 119.97158 End 16.105323, 119.971519",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, Barangay Tangcarang, Alaminos City, Pangasinan, Start 16.104423, 119.97158 End 16.105323, 119.971519",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006827",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Banog Norte, Bani, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, Barangay Banog Norte, Bani, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0469-006828",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Baruan, Agno, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "469",
      "lengthEvidence": "Construction of Road, Barangay Baruan, Agno, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006829",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Calabeng, Bani, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road, Barangay Calabeng, Bani, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006830",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Pandayan Road, Barangay Poblacion, Alaminos City, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Rehabilitation of Pandayan Road, Barangay Poblacion, Alaminos City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006831",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gais-Guipe, Dasol, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road, Barangay Gais-Guipe, Dasol, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006832",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Luna, Mabini, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road, Barangay Luna, Mabini, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006833",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Palamis, Alaminos City, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road, Barangay Palamis, Alaminos City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006834",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pogoruac, Burgos, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road, Barangay Pogoruac, Burgos, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006835",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sablig, Anda, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road, Barangay Sablig, Anda, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006837",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Vicente, Burgos, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road, Barangay San Vicente, Burgos, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006838",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tipor, Bani, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road, Barangay Tipor, Bani, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006839",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Viga, Agno, Pangasinan",
      "office": "Pangasinan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road, Barangay Viga, Agno, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006841",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road & Drainage, Barangay Casibong, San Jacinto, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road & Drainage, Barangay Casibong, San Jacinto, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006842",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road & Drainage, Barangay Mayombo, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road & Drainage, Barangay Mayombo, Dagupan City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006843",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road & Drainage, Barangay Pantal, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road & Drainage, Barangay Pantal, Dagupan City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006852",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road & Drainage, Barangay Pogo Chico, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road & Drainage, Barangay Pogo Chico, Dagupan City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0470-006853",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road & Drainage, Barangay Salisay, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "470",
      "lengthEvidence": "Construction of Road & Drainage, Barangay Salisay, Dagupan City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006854",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Anolid, Mangaldan, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Anolid, Mangaldan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006855",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Awai, San Jacinto, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Awai, San Jacinto, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006856",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bacayao Sur, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Bacayao Sur, Dagupan City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006857",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Baguinay, Manaoag, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Baguinay, Manaoag, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006858",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bantayan, Mangaldan, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Bantayan, Mangaldan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006859",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bonuan Binloc, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Bonuan Binloc, Dagupan City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006860",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bonuan Boquig, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Bonuan Boquig, Dagupan City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006862",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Buenlag, Mangaldan, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Buenlag, Mangaldan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006863",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabanbanan, Manaoag, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Cabanbanan, Manaoag, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006864",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabaruan, San Fabian, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Cabaruan, San Fabian, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006868",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Caranglaan, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Caranglaan, Dagupan City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006869",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cayanga, San Fabian, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Cayanga, San Fabian, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006870",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Labney to Bolo, San Jacinto, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Labney to Bolo, San Jacinto, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006871",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Landas, Mangaldan, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Landas, Mangaldan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006872",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lobong, San Jacinto, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Lobong, San Jacinto, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006873",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006874",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Maasin, Mangaldan, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Maasin, Mangaldan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006875",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mangin, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Mangin, Dagupan City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006876",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mermer, Manaoag, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Mermer, Manaoag, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006877",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nalsian, Manaoag, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Nalsian, Manaoag, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0471-006879",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Palua, Mangaldan, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "471",
      "lengthEvidence": "Construction of Road, Barangay Palua, Mangaldan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006881",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pugaro, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Barangay Pugaro, Dagupan City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006882",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Salaan, Mangaldan, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Barangay Salaan, Mangaldan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006883",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Salay, Mangaldan, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Barangay Salay, Mangaldan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006884",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Guillermo to San Vicente, San Jacinto, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Barangay San Guillermo to San Vicente, San Jacinto, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006885",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Ramon, Manaoag, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Barangay San Ramon, Manaoag, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006886",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sapang, Manaoag, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Barangay Sapang, Manaoag, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006887",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sitio Dalumat to Sto Tomas, San Jacinto, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Barangay Sitio Dalumat to Sto Tomas, San Jacinto, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006888",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tambac, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Barangay Tambac, Dagupan City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006889",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006890",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tiblong, San Fabian, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Barangay Tiblong, San Fabian, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006891",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tobuan, Labrador, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Barangay Tobuan, Labrador, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006892",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tocok, San Fabian, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Barangay Tocok, San Fabian, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006893",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Torre 2nd, Mangatarem, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Barangay Torre 2nd, Mangatarem, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006894",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Guilig, Mangaldan, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Guilig, Mangaldan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006895",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Mabilao, San Fabian, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Mabilao, San Fabian, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006897",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Tebag, Mangaldan, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Construction of Road, Tebag, Mangaldan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0472-006902",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Mamalingling Bridge, Barangay Mamalingling, Dagupan City, Pangasinan",
      "office": "Pangasinan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "472",
      "lengthEvidence": "Rehabilitation of Mamalingling Bridge, Barangay Mamalingling, Dagupan City, Pangasinan",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006907",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Legaspi, Tayug, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Road, Barangay Legaspi, Tayug, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006910",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Ariston East, Asingan, Pangasinan, 16.015915 , 120.699832",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Roads, Barangay Ariston East, Asingan, Pangasinan, 16.015915 , 120.699832",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006911",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Cabalitian, Asingan, Pangasinan, 15.973944 , 120.659232",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Roads, Barangay Cabalitian, Asingan, Pangasinan, 15.973944 , 120.659232",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006912",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Zone 4, Rosales, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Roads, Barangay Zone 4, Rosales, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006913",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Toboy, Asingan, Pangasinan, 16.025912, 120.635338",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Roads, Barangay Toboy, Asingan, Pangasinan, 16.025912, 120.635338",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006914",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Poblacion West, Asingan, Pangasinan, 15.999743, 120.666379",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Roads, Barangay Poblacion West, Asingan, Pangasinan, 15.999743, 120.666379",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006915",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Mabini, Balungao, Pangasinan, Start 15.85538, 120.702049 End 15.855147, 120.697481",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Roads, Barangay Mabini, Balungao, Pangasinan, Start 15.85538, 120.702049 End 15.855147, 120.697481",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006916",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Arzadon, San Manuel, Pangasinan, Start 16.044557, 120.691257 End 16.046704, 120.697079",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Roads, Barangay Arzadon, San Manuel, Pangasinan, Start 16.044557, 120.691257 End 16.046704, 120.697079",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006917",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Guzon, Tayug, Pangasinan, 16.045361, 120.714421",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Roads, Barangay Guzon, Tayug, Pangasinan, 16.045361, 120.714421",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006918",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Buenavista, Umingan, Pangasinan, Start 15.944723, 120.787532 End 15.947875, 120.791864",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Roads, Barangay Buenavista, Umingan, Pangasinan, Start 15.944723, 120.787532 End 15.947875, 120.791864",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006919",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Carayungan Sur, Umingan, Pangasinan, Start 15.882528, 120.856611 End 15.882701, 120.862044",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Roads, Barangay Carayungan Sur, Umingan, Pangasinan, Start 15.882528, 120.856611 End 15.882701, 120.862044",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006920",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Luna Este, Umingan, Pangasinan, Start 15.870866, 120.802566 End 15.863701, 120.801963",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Roads, Barangay Luna Este, Umingan, Pangasinan, Start 15.870866, 120.802566 End 15.863701, 120.801963",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006921",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Ricos, Umingan, Pangasinan, Start 15.866327, 120.839446 End 15.863416, 120.835129",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Roads, Barangay Ricos, Umingan, Pangasinan, Start 15.866327, 120.839446 End 15.863416, 120.835129",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006922",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Poblacion West, Umingan, Pangasinan, 15.932014, 120.833371",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Roads, Barangay Poblacion West, Umingan, Pangasinan, 15.932014, 120.833371",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0473-006923",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay San Vicente, Umingan, Pangasinan, Start 15.877534, 120.751497 End 15.875385, 120.751674",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "473",
      "lengthEvidence": "Construction of Roads, Barangay San Vicente, Umingan, Pangasinan, Start 15.877534, 120.751497 End 15.875385, 120.751674",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006932",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Domanpot, Asingan, Pangasinan, Start 15.92158085 End 120.67457788",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay Domanpot, Asingan, Pangasinan, Start 15.92158085 End 120.67457788",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006933",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Capulaan, Balungao, Pangasinan, 15.92157034N 120.67452143E",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay Capulaan, Balungao, Pangasinan, 15.92157034N 120.67452143E",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006934",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Pedro East, Rosales, Pangasinan, Start 15.89458649N End 120.64957909E",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay San Pedro East, Rosales, Pangasinan, Start 15.89458649N End 120.64957909E",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006935",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Juan, San Manuel, Pangasinan, Start 16.04120224N End 120.66324251E",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay San Juan, San Manuel, Pangasinan, Start 16.04120224N End 120.66324251E",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006936",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Rafael East, San Nicolas, Pangasinan, Start 16.06788228N End 120.74726384E",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay San Rafael East, San Nicolas, Pangasinan, Start 16.06788228N End 120.74726384E",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006937",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Rafael West, San Nicolas, Pangasinan, Start 16.06087735N End 120.73380717E",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay San Rafael West, San Nicolas, Pangasinan, Start 16.06087735N End 120.73380717E",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006938",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sobol, San Nicolas, Pangasinan, Start 16.05749376N End 120.74587741E",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay Sobol, San Nicolas, Pangasinan, Start 16.05749376N End 120.74587741E",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006939",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay C.Lichauco, Tayug, Pangasinan, Start 15.97163689N End 120.75551481E",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay C.Lichauco, Tayug, Pangasinan, Start 15.97163689N End 120.75551481E",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006940",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Barat, Umingan, Pangasinan, Start 15.94677826N End 120.80829908E",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay Barat, Umingan, Pangasinan, Start 15.94677826N End 120.80829908E",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006941",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Rosa, Umingan, Pangasinan",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay Sta. Rosa, Umingan, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006942",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Annam, Umingan, Pangasinan, Start 15.95076868N End 120.85454349E",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay Annam, Umingan, Pangasinan, Start 15.95076868N End 120.85454349E",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006943",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Calitlitan, Umingan, Pangasinan, Start 15.95754286N End 120.8445965E",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay Calitlitan, Umingan, Pangasinan, Start 15.95754286N End 120.8445965E",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0474-006944",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Caurdanetaan, Umingan, Pangasinan, Start 15.93061587N End 120.85971496E",
      "office": "Pangasinan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "474",
      "lengthEvidence": "Construction of Road, Barangay Caurdanetaan, Umingan, Pangasinan, Start 15.93061587N End 120.85971496E",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006950",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Local Road, Barangay Abonagan, Malasiqui, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Local Road, Barangay Abonagan, Malasiqui, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006953",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Local Road, Barangay Telbang, Bayambang, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Local Road, Barangay Telbang, Bayambang, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006954",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Apaya, Malasiqui, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Road, Barangay Apaya, Malasiqui, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006957",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Warey, Bayambang, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Road, Barangay Warey, Bayambang, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006958",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Contruction of Local Road, Barangay Telbang, Bayambang, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Contruction of Local Road, Barangay Telbang, Bayambang, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006959",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nalsian, Calasiao, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Road, Barangay Nalsian, Calasiao, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006960",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabueldatan, Malasiqui, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Road, Barangay Cabueldatan, Malasiqui, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006961",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bobon, Malasiqui, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Road, Barangay Bobon, Malasiqui, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006963",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gabon, Calasiao, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Road, Barangay Gabon, Calasiao, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006964",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Iton, Bayambang, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Road, Barangay Iton, Bayambang, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0475-006966",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mestizo Norte, San Carlos City, Pangasinan",
      "office": "Pangasinan 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "475",
      "lengthEvidence": "Construction of Road, Barangay Mestizo Norte, San Carlos City, Pangasinan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0477-006992",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Imelda Village, Baguio City",
      "office": "Baguio City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "477",
      "lengthEvidence": "Rehabilitation of Road, Barangay Imelda Village, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007014",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Ambuwaya - to Ba-e Access Road, Barangay Ambabag, Kiangan, Ifugao",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Construction of Ambuwaya - to Ba-e Access Road, Barangay Ambabag, Kiangan, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007016",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Poblacion West (Lamut) Access Road, Barangay Poblacion West, Lamut, Ifugao",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Concreting of Barangay Poblacion West (Lamut) Access Road, Barangay Poblacion West, Lamut, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007020",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bolog to Pugo Access Road, Barangay Bolog, Kiangan, Ifugao",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Construction of Bolog to Pugo Access Road, Barangay Bolog, Kiangan, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0478-007022",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sitio Humalophop, Mompolia,Hingyon, Ifugao to Barangay Montabiong, Lagawe, Ifugao Access Road, Mompolia, Hingyon, Ifugao",
      "office": "Ifugao 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "478",
      "lengthEvidence": "Construction of Sitio Humalophop, Mompolia,Hingyon, Ifugao to Barangay Montabiong, Lagawe, Ifugao Access Road, Mompolia, Hingyon, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007032",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Montabiong - Barangay Banao - Barangay Anaba Access Road, Banao, Banaue, Ifugao",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Barangay Montabiong - Barangay Banao - Barangay Anaba Access Road, Banao, Banaue, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007033",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Nalbu Access Road, Nalbu, Mayoyao, Ifugao",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Barangay Nalbu Access Road, Nalbu, Mayoyao, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007034",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Palaad - Barangay Ayangan Access Road, Ayangan, Mayoyao, Ifugao",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Barangay Palaad - Barangay Ayangan Access Road, Ayangan, Mayoyao, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007040",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sitio Caravania Access Road, Sta. Maria, Alfonso Lista, Ifugao",
      "office": "Ifugao 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Sitio Caravania Access Road, Sta. Maria, Alfonso Lista, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007043",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Allaguia Access Road, Barangay Allaguia, Pinukpuk, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Allaguia Access Road, Barangay Allaguia, Pinukpuk, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0479-007048",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bulagot, Gobgob Access Road, Barangay Gobgob, Tabuk City, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "479",
      "lengthEvidence": "Construction of Bulagot, Gobgob Access Road, Barangay Gobgob, Tabuk City, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007050",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Catabbogan-Daga Access Road, Barangay Catabbogan, Pinukpuk, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Catabbogan-Daga Access Road, Barangay Catabbogan, Pinukpuk, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007055",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Makilo-Aselap Road, Barangay Calaccad, Tabuk City, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Makilo-Aselap Road, Barangay Calaccad, Tabuk City, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007059",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Patol-Bakir Access Road, Barangay Calaocan, Rizal, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Patol-Bakir Access Road, Barangay Calaocan, Rizal, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007062",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Romualdez Access Road, Barangay Romualdez, Rizal, Kalinga",
      "office": "Lower Kalinga District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Romualdez Access Road, Barangay Romualdez, Rizal, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007067",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Balili-Alab, Bontoc, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Road, Balili-Alab, Bontoc, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007068",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Abatan, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Road, Barangay Abatan, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0480-007069",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ambasing, Sagada, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "480",
      "lengthEvidence": "Construction of Road, Barangay Ambasing, Sagada, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007070",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ankileng, Sagada, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Ankileng, Sagada, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007071",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bagnen Proper, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Bagnen Proper, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007072",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Balintaugan, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Balintaugan, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007073",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bana-ao, Tadian, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Bana-ao, Tadian, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007074",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Banao, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Banao, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007075",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Besao East, Besao, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Besao East, Besao, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007076",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Betwagan, Sadanga, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Betwagan, Sadanga, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007077",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bun-ayan, Sabangan, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Bun-ayan, Sabangan, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007078",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Can-eo, Bontoc, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Can-eo, Bontoc, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007079",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Dacudac, Tadian, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Dacudac, Tadian, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007080",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Fidelisan, Sagada, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Fidelisan, Sagada, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007081",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gayang, Sabangan, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Gayang, Sabangan, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007082",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gueday, Besao, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Gueday, Besao, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007083",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Guinzadan Central, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Guinzadan Central, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007084",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Kayan West, Tadian, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Kayan West, Tadian, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007085",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lagawa-Coputan, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Lagawa-Coputan, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007086",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lenga, Tadian, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Lenga, Tadian, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007087",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Leseb, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Leseb, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007088",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mainit, Bontoc, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Mainit, Bontoc, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007089",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Maligcong, Bontoc, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Maligcong, Bontoc, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007090",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Masla, Tadian, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Masla, Tadian, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007091",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mayag, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Mayag, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007092",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Napua, Sabangan, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Napua, Sabangan, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007093",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Otucan Sur, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Otucan Sur, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007094",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Patay, Sagada, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Patay, Sagada, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007095",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Saclit, Sadanga, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Saclit, Sadanga, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0481-007096",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sinto, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "481",
      "lengthEvidence": "Construction of Road, Barangay Sinto, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007097",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sumadel, Tadian, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Barangay Sumadel, Tadian, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007098",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Supang, Sabangan, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Barangay Supang, Sabangan, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007099",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Talubin, Bontoc, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Barangay Talubin, Bontoc, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007100",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tambingan, Sabangan, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Barangay Tambingan, Sabangan, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007101",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tanulong, Sagada, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Barangay Tanulong, Sagada, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007102",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tapapan, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Barangay Tapapan, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007103",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tocucan, Bontoc, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Barangay Tocucan, Bontoc, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007104",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Bila-Otucan Norte, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Bila-Otucan Norte, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007105",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Bontoc-Dalican, Bontoc, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Bontoc-Dalican, Bontoc, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007106",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Lengao-Guidao-Kayan, Barangay Poblacion, Tadian, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Lengao-Guidao-Kayan, Barangay Poblacion, Tadian, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007108",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Poblacion-Belwang, Sadanga, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Poblacion-Belwang, Sadanga, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007110",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sinto-Asbiagan-Bebe, Barangay Monamon Sur, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Sinto-Asbiagan-Bebe, Barangay Monamon Sur, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007111",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Karatula, Sadsadan-Sitio Bansa, Monamon Norte, Bauko, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Sitio Karatula, Sadsadan-Sitio Bansa, Monamon Norte, Bauko, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007112",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Legleg, Barangay Camatagan, Sabangan, Mountain Province",
      "office": "Mountain Province 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Sitio Legleg, Barangay Camatagan, Sabangan, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007117",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Alunogan, Natonin, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Barangay Alunogan, Natonin, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007118",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Anonat, Paracelis, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Barangay Anonat, Paracelis, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0482-007119",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bacarri, Paracelis, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "482",
      "lengthEvidence": "Construction of Road, Barangay Bacarri, Paracelis, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007120",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Buringal, Paracelis, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Road, Barangay Buringal, Paracelis, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007121",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Butigue, Paracelis, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Road, Barangay Butigue, Paracelis, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007122",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Kaleo, Barlig, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Road, Barangay Kaleo, Barlig, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007123",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lingoy, Barlig, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Road, Barangay Lingoy, Barlig, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007124",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Palitod, Paracelis, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Road, Barangay Palitod, Paracelis, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007125",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tonglayan, Natonin, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Road, Barangay Tonglayan, Natonin, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007126",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Gayang-Alino-Arapang-Dalanao, Barangay Bantay, Paracelis, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Road, Gayang-Alino-Arapang-Dalanao, Barangay Bantay, Paracelis, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007127",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Poblacion - Sitio Batnong, Barangay Banawel, Natonin, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Road, Poblacion - Sitio Batnong, Barangay Banawel, Natonin, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007128",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Ambatotong-Addang, Barangay Bunot, Paracelis, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Road, Sitio Ambatotong-Addang, Barangay Bunot, Paracelis, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007129",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Asilap, Barangay Bantay, Paracelis, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Road, Sitio Asilap, Barangay Bantay, Paracelis, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007130",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Licoy, Barangay Poblacion, Paracelis, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Road, Sitio Licoy, Barangay Poblacion, Paracelis, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007131",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Mulliang to Sitio Anonat Proper, Barangay Anonat, Paracelis, Mountain Province",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Road, Sitio Mulliang to Sitio Anonat Proper, Barangay Anonat, Paracelis, Mountain Province",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007135",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Batongbuhay National Road Junction, Puapo-Dangtalan-Amdalao Road, Barangays Puapo, Dangtalan, Pasil, Kalinga",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Batongbuhay National Road Junction, Puapo-Dangtalan-Amdalao Road, Barangays Puapo, Dangtalan, Pasil, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0483-007136",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Char-ig Arong Access Road, Barangay Mallango, Tinglayan, Kalinga",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "483",
      "lengthEvidence": "Construction of Char-ig Arong Access Road, Barangay Mallango, Tinglayan, Kalinga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007141",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road at Barangay Agaman Norte, Baggao, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road at Barangay Agaman Norte, Baggao, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007142",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road at Barangay Imurung-San Miguel, Baggao, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road at Barangay Imurung-San Miguel, Baggao, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007143",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Bisagu, Aparri, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Bisagu, Aparri, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007144",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Paruddun Norte, Aparri, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Paruddun Norte, Aparri, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007145",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Toran, Aparri, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Toran, Aparri, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007146",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Villa Leonora, Buguey, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Villa Leonora, Buguey, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007147",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Cullit, Gattaran, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Cullit, Gattaran, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007148",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road at Barangay Maura, Aparri, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road at Barangay Maura, Aparri, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007149",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Dalla, Baggao, Cagayan (17.95038889, 121.88372222 - 17.95058333, 121.88372222)",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Dalla, Baggao, Cagayan (17.95038889, 121.88372222 - 17.95058333, 121.88372222)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007150",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Asassi, Baggao, Cagayan (17.90041667, 121.76811111- 17.90033333, 121.76808333)",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Asassi, Baggao, Cagayan (17.90041667, 121.76811111- 17.90033333, 121.76808333)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007156",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Afunan Cabayu, Camalaniugan, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Afunan Cabayu, Camalaniugan, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007157",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Agaman Sur, Baggao, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Agaman Sur, Baggao, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007158",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Bagunot, Baggao, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Bagunot, Baggao, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007159",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Ballang, Buguey, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Ballang, Buguey, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007162",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Linao, Aparri, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Linao, Aparri, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0484-007163",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Masical, Baggao, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "484",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Masical, Baggao, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007166",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay San Antonio, Baggao, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Barangay Road, Barangay San Antonio, Baggao, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007167",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay San Esteban, Alcala, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Barangay Road, Barangay San Esteban, Alcala, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007168",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay San Vicente, Buguey, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Barangay Road, Barangay San Vicente, Buguey, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007169",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Simbaluca, Sta. Teresita, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Simbaluca, Sta. Teresita, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007170",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Sta. Isabel, Buguey, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Sta. Isabel, Buguey, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007171",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Tallang, Baggao, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Tallang, Baggao, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007172",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Road, Barangay Tamban, Alcala, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Barangay Road, Barangay Tamban, Alcala, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007173",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Afusing Bato, Alcala, Cagayan",
      "office": "Cagayan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Construction of Barangay Road, Barangay Afusing Bato, Alcala, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007180",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road along Barangay Mabitnong, Santo Nino, Cagayan",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Road along Barangay Mabitnong, Santo Nino, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007183",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Barangay Baung, Piat, Cagayan",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Concreting of Road at Barangay Baung, Piat, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0485-007184",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Box Culvert along Dibay-Dilam Road, Barangay Dibay, Calayan, Cagayan",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "485",
      "lengthEvidence": "Construction of Box Culvert along Dibay-Dilam Road, Barangay Dibay, Calayan, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007191",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bical, Peñablanca, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Bical, Peñablanca, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007193",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Calintaan, Amulung, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Calintaan, Amulung, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007196",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Pacac Grande, Amulung, Cagayan (Sta. 0+000 - Sta. 0+365)",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.365,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13698630.14,
      "lengthMeters": 365.0,
      "allocationPerStatedMeter": 13698.63,
      "rangesMeters": [
        [
          0.0,
          365.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Roads, Barangay Pacac Grande, Amulung, Cagayan (Sta. 0+000 - Sta. 0+365)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.48,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0486-007200",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Carig Sur, Tuguegarao City, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Carig Sur, Tuguegarao City, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007201",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gosi, Tuguegarao City, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Gosi, Tuguegarao City, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007202",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Iraga, Solana, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Iraga, Solana, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007205",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Liwan Norte, Enrile, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Liwan Norte, Enrile, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007206",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Padul, Solana, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Padul, Solana, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007207",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Roma Norte, Enrile, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Roma Norte, Enrile, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007208",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Roma Sur, Enrile, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Roma Sur, Enrile, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0486-007214",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lannig, Solana, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "486",
      "lengthEvidence": "Construction of Road, Barangay Lannig, Solana, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0487-007217",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Callao to Cabbo Road, Peñablanca, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Rehabilitation of Road, Callao to Cabbo Road, Peñablanca, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0487-007218",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sisim to Manga Road, Peñablanca, Cagayan",
      "office": "Cagayan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "487",
      "lengthEvidence": "Rehabilitation of Road, Sisim to Manga Road, Peñablanca, Cagayan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0490-007273",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road with RCBC at Dacque to Sitio Annaronan, Barangay San Antonio, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Concreting of Road with RCBC at Dacque to Sitio Annaronan, Barangay San Antonio, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0490-007278",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road (Sta. 1+250 - Sta. 1+673) at Sitio Alibagu, Barangay Tallag, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.423,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11820330.97,
      "lengthMeters": 423.0,
      "allocationPerStatedMeter": 11820.33,
      "rangesMeters": [
        [
          1250.0,
          1673.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Construction of Concrete Road (Sta. 1+250 - Sta. 1+673) at Sitio Alibagu, Barangay Tallag, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.48,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0490-007283",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Balasig, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Construction of Road at Barangay Balasig, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0490-007284",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Union, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "490",
      "lengthEvidence": "Construction of Road at Barangay Union, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0491-007287",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Concrete Road at Barangay Angancasilian, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Concrete Road at Barangay Angancasilian, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0491-007288",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Concrete Road at Barangay Catabayungan, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Concrete Road at Barangay Catabayungan, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0491-007290",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Concrete Road at Barangay San Antonio, Cabagan, Isabela",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "491",
      "lengthEvidence": "Rehabilitation of Concrete Road at Barangay San Antonio, Cabagan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007305",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Aurora, Quezon, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay Aurora, Quezon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007308",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Camaal, Quirino, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay Camaal, Quirino, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007319",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Masigun, Burgos, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay Masigun, Burgos, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0492-007326",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay San Jose, Roxas, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "492",
      "lengthEvidence": "Concreting of Road, Barangay San Jose, Roxas, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007330",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Purok Pag-asa 1, Barangay Matusalem, Roxas, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Concreting of Road, Purok Pag-asa 1, Barangay Matusalem, Roxas, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0493-007345",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Catalina, Quirino, Isabela",
      "office": "Isabela 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "493",
      "lengthEvidence": "Construction of Road, Barangay Sta. Catalina, Quirino, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0494-007367",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road of Barangay La Salette to Barangay District 1, Benito Soliven, Isabela, Start 16.95173, 121.92771 End 16.951406, 121.933393",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "494",
      "lengthEvidence": "Construction of Access Road of Barangay La Salette to Barangay District 1, Benito Soliven, Isabela, Start 16.95173, 121.92771 End 16.951406, 121.933393",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007396",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road of Barangay La Salette to Barangay District 1, Benito Soliven, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Access Road of Barangay La Salette to Barangay District 1, Benito Soliven, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0496-007415",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure, Barangay Malasin, San Mateo, Isabela",
      "office": "Isabela 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "496",
      "lengthEvidence": "Construction of Road Slope Protection Structure, Barangay Malasin, San Mateo, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0498-007443",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+375, Barangay Aguinaldo, Cordon, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.375,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 375.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          375.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "498",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+375, Barangay Aguinaldo, Cordon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.54,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0501-007504",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bacradal, Echague, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Barangay Bacradal, Echague, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007510",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Dabubu Grande, San Agustin, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Barangay Dabubu Grande, San Agustin, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0501-007517",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+375, Barangay San Antonio, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.375,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 375.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          375.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "501",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+375, Barangay San Antonio, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.54,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0502-007532",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Sta. 0+000 - Sta. 0+345, Barangay Dallao - Barangay Taliktik, Cordon, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.345,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14492753.62,
      "lengthMeters": 345.0,
      "allocationPerStatedMeter": 14492.75,
      "rangesMeters": [
        [
          0.0,
          345.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road Sta. 0+000 - Sta. 0+345, Barangay Dallao - Barangay Taliktik, Cordon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.51,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0502-007539",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+375, Barangay Sta. Isabel, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.375,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 375.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          375.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "502",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+375, Barangay Sta. Isabel, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.54,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0503-007557",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Purok 5 Barangay Sta. Cruz, Bagabag, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Construction of Access Road, Purok 5 Barangay Sta. Cruz, Bagabag, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0503-007558",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Villa Coloma, Bagabag, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Construction of Access Road, Barangay Villa Coloma, Bagabag, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0503-007559",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Villaros, Bagabag, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Construction of Access Road, Barangay Villaros, Bagabag, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0503-007560",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Ammoweg-Tened Road, Barangay Ammoweg, Ambaguio, Nueva Vizcaya, 16.55877, 121.02483",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Construction of Access Road, Ammoweg-Tened Road, Barangay Ammoweg, Ambaguio, Nueva Vizcaya, 16.55877, 121.02483",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0503-007561",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Dulli, Ambaguio, Nueva Vizcaya, Start 16.55738, 121.07002 End 16.57764, 121.07127",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Construction of Access Road, Barangay Dulli, Ambaguio, Nueva Vizcaya, Start 16.55738, 121.07002 End 16.57764, 121.07127",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0503-007562",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Labang Road, Barangay Labang, Ambaguio, Nueva Vizcaya, Start 16.49820, 121.0113 End 16.49865, 121.00969",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Construction of Access Road, Labang Road, Barangay Labang, Ambaguio, Nueva Vizcaya, Start 16.49820, 121.0113 End 16.49865, 121.00969",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0503-007563",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Salinsingan Road, Barangay Salingsingan, Ambaguio, Nueva Vizcaya, Start 16.53190, 121.02284 End 16.53244, 121.02202",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Construction of Access Road, Salinsingan Road, Barangay Salingsingan, Ambaguio, Nueva Vizcaya, Start 16.53190, 121.02284 End 16.53244, 121.02202",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0503-007564",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Butao, Diadi, Nueva Vizcaya, Start 16.75216, 121.35807 End 16.75407, 121.35864",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Construction of Access Road, Barangay Butao, Diadi, Nueva Vizcaya, Start 16.75216, 121.35807 End 16.75407, 121.35864",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0503-007565",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Villa Aurora, Diadi, Nueva Vizcaya, Start 16.628662, 121.396784 End 16.626726, 121.395098",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Construction of Access Road, Barangay Villa Aurora, Diadi, Nueva Vizcaya, Start 16.628662, 121.396784 End 16.626726, 121.395098",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0503-007566",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Villa Florentino, Diadi, Nueva Vizcaya, Start 16.630884, 121.426970 End 16.633140, 121.427263",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Construction of Access Road, Barangay Villa Florentino, Diadi, Nueva Vizcaya, Start 16.630884, 121.426970 End 16.633140, 121.427263",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0503-007567",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Ramirez Street, Barangay Bonfal West, Bayombong, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "503",
      "lengthEvidence": "Construction of Access Road, Ramirez Street, Barangay Bonfal West, Bayombong, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007568",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Almaguer North, Bambang, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Access Road, Barangay Almaguer North, Bambang, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007569",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Buag, Bambang, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Access Road, Barangay Buag, Bambang, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007570",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Calaocan, Bambang, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Access Road, Barangay Calaocan, Bambang, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007571",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Dullao, Bambang, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Access Road, Barangay Dullao, Bambang, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007572",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Indiana, Bambang, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Access Road, Barangay Indiana, Bambang, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007573",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay San Antonio South, Bambang, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Access Road, Barangay San Antonio South, Bambang, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007574",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay San Antonio North, Bambang, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Access Road, Barangay San Antonio North, Bambang, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007575",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, San Fernando, Bambang, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Access Road, San Fernando, Bambang, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007576",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay San Leonardo, Bambang, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Access Road, Barangay San Leonardo, Bambang, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007577",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Sitio Canaan, Purok 6B, Barangay Sto. Domingo Proper, Bambang, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Access Road, Sitio Canaan, Purok 6B, Barangay Sto. Domingo Proper, Bambang, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007579",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Bintawan Norte, Villaverde, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Access Road, Barangay Bintawan Norte, Villaverde, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007580",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Banggot, Bambang, Nueva Vizcaya",
      "office": "Nueva Vizcaya District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Access Road, Barangay Banggot, Bambang, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007582",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Baan-San Fabian Road, Kayapa, Nueva Vizcaya",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Baan-San Fabian Road, Kayapa, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007583",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Keon Road, Bitnong, Dupax Del Norte, Nueva Vizcaya",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Keon Road, Bitnong, Dupax Del Norte, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007584",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Old Ressetlement Road, Baan, Kayapa, Nueva Vizcaya",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Old Ressetlement Road, Baan, Kayapa, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007587",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Macatbeng Bridge, Barangay Kimbutan, Dupax del Sur, Nueva Vizcaya",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Macatbeng Bridge, Barangay Kimbutan, Dupax del Sur, Nueva Vizcaya",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007588",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Access Road, Barangay Sanguit, Dupax del Sur, Nueva Vizcaya",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Concreting of Access Road, Barangay Sanguit, Dupax del Sur, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007589",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Talbek, Dupax del Sur, Nueva Vizcaya",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Access Road, Barangay Talbek, Dupax del Sur, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0504-007590",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Bone- Ocao- Capiniaan Road, Aritao, Nueva Vizcaya",
      "office": "Nueva Vizcaya 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "504",
      "lengthEvidence": "Construction of Road Bone- Ocao- Capiniaan Road, Aritao, Nueva Vizcaya",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007608",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Purok 05 Barangay Cataning, Hermosa, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Concreting of Road at Purok 05 Barangay Cataning, Hermosa, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007609",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Sitio Apalang, Barangay Apalang, Barangay Maite, Hermosa, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Concreting of Road at Sitio Apalang, Barangay Apalang, Barangay Maite, Hermosa, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007612",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road Barangay A. Rivera, Hermosa, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Concreting of Road Barangay A. Rivera, Hermosa, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0505-007614",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Upland, Purok 2 and Providence Estate, Barangay JRC Mandama, Hermosa, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "505",
      "lengthEvidence": "Concreting of Road, Sitio Upland, Purok 2 and Providence Estate, Barangay JRC Mandama, Hermosa, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007619",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Cataning-Pulo, Barangay Pulo, Hermosa, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Road Cataning-Pulo, Barangay Pulo, Hermosa, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007620",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road including Box Culvert, Purok 1, Barangay Tipo, Hermosa, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Road including Box Culvert, Purok 1, Barangay Tipo, Hermosa, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007621",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Labina Street, Barangay Talimundoc, Orani, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Road, Labina Street, Barangay Talimundoc, Orani, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007623",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Albon Purok II, Barangay Palili, Samal, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Road, Sitio Albon Purok II, Barangay Palili, Samal, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007624",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Bulog, Butcheki at Buor-Abo, Barangay Bangkal, Abucay, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Road, Sitio Bulog, Butcheki at Buor-Abo, Barangay Bangkal, Abucay, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007625",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Lati, Barangay Kaparangan, Orani, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Road, Sitio Lati, Barangay Kaparangan, Orani, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007627",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay Tagumapay, Orani, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Improvement of Road, Barangay Tagumapay, Orani, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007630",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Upgrading of Road Barangay Tenejero, Orani, Bataan",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Upgrading of Road Barangay Tenejero, Orani, Bataan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0506-007633",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Kitang I, Limay, Bataan (0+00-0+170)",
      "office": "Bataan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 170.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Road, Barangay Kitang I, Limay, Bataan (0+00-0+170)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.83,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0506-007634",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Sisiman, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 005",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.005,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1000000000.0,
      "lengthMeters": 5.0,
      "allocationPerStatedMeter": 1000000.0,
      "rangesMeters": [
        [
          0.0,
          5.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Bridge, Barangay Sisiman, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 005",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": true,
      "rateReview": "Very short printed range · verify length first"
    },
    {
      "id": "HB10858-3-0506-007635",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bangal, Dinalupihan, Bataan, Sta. 0+ 000 - Sta. 0 + 200",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "506",
      "lengthEvidence": "Construction of Road, Barangay Bangal, Dinalupihan, Bataan, Sta. 0+ 000 - Sta. 0 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.71,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007639",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bayan-Bayanan, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 210",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.21,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23809523.81,
      "lengthMeters": 210.0,
      "allocationPerStatedMeter": 23809.52,
      "rangesMeters": [
        [
          0.0,
          210.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay Bayan-Bayanan, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.67,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007640",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Binaritan, Morong, Bataan, Sta. 0 + 000 - Sta. 0 + 200",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay Binaritan, Morong, Bataan, Sta. 0 + 000 - Sta. 0 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.71,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007641",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabcaben, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay Cabcaben, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007642",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Colo, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay Colo, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007643",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Happy Valley, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay Happy Valley, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007644",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay JC Payumo, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay JC Payumo, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007645",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Kataasan, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 230",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21739130.43,
      "lengthMeters": 230.0,
      "allocationPerStatedMeter": 21739.13,
      "rangesMeters": [
        [
          0.0,
          230.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay Kataasan, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 230",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.61,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007646",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Maligaya, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay Maligaya, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007647",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mt. View, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay Mt. View, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007648",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay New San Jose, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 230",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21739130.43,
      "lengthMeters": 230.0,
      "allocationPerStatedMeter": 21739.13,
      "rangesMeters": [
        [
          0.0,
          230.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay New San Jose, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 230",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.61,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007649",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Old San Jose, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 240",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20833333.33,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 20833.33,
      "rangesMeters": [
        [
          0.0,
          240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay Old San Jose, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 240",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.73,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0507-007650",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Payangan, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 210",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.21,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23809523.81,
      "lengthMeters": 210.0,
      "allocationPerStatedMeter": 23809.52,
      "rangesMeters": [
        [
          0.0,
          210.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay Payangan, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.67,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007651",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pentor, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay Pentor, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007652",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pinulot, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay Pinulot, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007653",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 100",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 100.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          0.0,
          100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay Poblacion, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.41,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007654",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Roosevelt, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay Roosevelt, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007655",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Antonio, Bagac, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay San Antonio, Bagac, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0507-007656",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Isidro, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "507",
      "lengthEvidence": "Construction of Road, Barangay San Isidro, Mariveles, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0508-007657",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Ramon, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 230",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21739130.43,
      "lengthMeters": 230.0,
      "allocationPerStatedMeter": 21739.13,
      "rangesMeters": [
        [
          0.0,
          230.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Construction of Road, Barangay San Ramon, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 230",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.61,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0508-007658",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Bagumbayan, Bagac, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.22,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22727272.73,
      "lengthMeters": 220.0,
      "allocationPerStatedMeter": 22727.27,
      "rangesMeters": [
        [
          0.0,
          220.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Rehabilitation of Road, Barangay Bagumbayan, Bagac, Bataan, Sta. 0 + 000 - Sta. 0 + 220",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0508-007659",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Daang Bago, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 210",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.21,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23809523.81,
      "lengthMeters": 210.0,
      "allocationPerStatedMeter": 23809.52,
      "rangesMeters": [
        [
          0.0,
          210.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Rehabilitation of Road, Barangay Daang Bago, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.67,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0508-007660",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay San Pablo, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 200",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Rehabilitation of Road, Barangay San Pablo, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.71,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0508-007661",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Sto. Niño, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 230",
      "office": "Bataan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21739130.43,
      "lengthMeters": 230.0,
      "allocationPerStatedMeter": 21739.13,
      "rangesMeters": [
        [
          0.0,
          230.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Rehabilitation of Road, Barangay Sto. Niño, Dinalupihan, Bataan, Sta. 0 + 000 - Sta. 0 + 230",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.61,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0508-007672",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+239, Igulot, Bocaue, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.239,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20920502.09,
      "lengthMeters": 239.0,
      "allocationPerStatedMeter": 20920.5,
      "rangesMeters": [
        [
          0.0,
          239.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+239, Igulot, Bocaue, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.73,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0508-007673",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+302.82, Sta. 0+000 - Sta. 0+196.69, & Sta. 0+000 - Sta. 0+089.29, Catulinan, Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.30282,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 16511458.95,
      "lengthMeters": 302.82,
      "allocationPerStatedMeter": 16511.46,
      "rangesMeters": [
        [
          0.0,
          302.82
        ],
        [
          0.0,
          196.69
        ],
        [
          0.0,
          89.29
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+302.82, Sta. 0+000 - Sta. 0+196.69, & Sta. 0+000 - Sta. 0+089.29, Catulinan, Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0508-007676",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+688, Lalangan, Plaridel, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.688,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 7267441.86,
      "lengthMeters": 688.0,
      "allocationPerStatedMeter": 7267.44,
      "rangesMeters": [
        [
          0.0,
          688.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "508",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+688, Lalangan, Plaridel, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.3,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0509-007692",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 0+405.25, T. Bugallion St., Subic, Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.40525,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12338062.92,
      "lengthMeters": 405.25,
      "allocationPerStatedMeter": 12338.06,
      "rangesMeters": [
        [
          0.0,
          405.25
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 0+405.25, T. Bugallion St., Subic, Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.5,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0509-007694",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 0+420, M. Ponce St., Poblacion, Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.42,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11904761.9,
      "lengthMeters": 420.0,
      "allocationPerStatedMeter": 11904.76,
      "rangesMeters": [
        [
          0.0,
          420.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 0+420, M. Ponce St., Poblacion, Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.49,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0509-007695",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 0+466.22, Aldama St., Virgen Delas Flores, Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.46622,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10724550.64,
      "lengthMeters": 466.22,
      "allocationPerStatedMeter": 10724.55,
      "rangesMeters": [
        [
          0.0,
          466.22
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "509",
      "lengthEvidence": "Rehabilitation of Road including Drainage Canal, Sta. 0+000 - Sta. 0+466.22, Aldama St., Virgen Delas Flores, Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.44,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0510-007699",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road including Drainage System, Sta. 0+000 - Sta. 0+125, Gregorio del Pilar St., Poblacion, Calumpit, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.125,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 125.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          0.0,
          125.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road including Drainage System, Sta. 0+000 - Sta. 0+125, Gregorio del Pilar St., Poblacion, Calumpit, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.13,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0510-007711",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+110, E. Bautista St., Dampol, Plaridel, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.11,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 45454545.45,
      "lengthMeters": 110.0,
      "allocationPerStatedMeter": 45454.55,
      "rangesMeters": [
        [
          0.0,
          110.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+110, E. Bautista St., Dampol, Plaridel, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.29,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0510-007717",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+640.53, Sulivan, Baliuag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.6405299999999999,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 7806035.63,
      "lengthMeters": 640.53,
      "allocationPerStatedMeter": 7806.04,
      "rangesMeters": [
        [
          0.0,
          640.53
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "510",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+640.53, Sulivan, Baliuag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.32,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0511-007718",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+779.14, P. Angeles St., Sto. Cristo, Baliwag, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.7791399999999999,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 6417331.93,
      "lengthMeters": 779.14,
      "allocationPerStatedMeter": 6417.33,
      "rangesMeters": [
        [
          0.0,
          779.14
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+779.14, P. Angeles St., Sto. Cristo, Baliwag, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 19436.24,
      "peerRateMultiple": 0.33,
      "peerRecords": 128,
      "peerBand": "735.75–<999.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 70621.27375,
      "graphUpperFence": 105475.23999999999
    },
    {
      "id": "HB10858-3-0511-007728",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation/Improvement of Road and Drainage System at Lugam, City of Malolos, Bulacan",
      "office": "Bulacan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "511",
      "lengthEvidence": "Rehabilitation/Improvement of Road and Drainage System at Lugam, City of Malolos, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0512-007740",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Malaysia Street, Sitio Catmon, Barangay Binagbag, Angat, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "512",
      "lengthEvidence": "Concreting of Road at Malaysia Street, Sitio Catmon, Barangay Binagbag, Angat, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0512-007741",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Purok Ibabaw and Sitio Bakawan, Barangay Camangyanan, Santa Maria, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "512",
      "lengthEvidence": "Concreting of Road at Purok Ibabaw and Sitio Bakawan, Barangay Camangyanan, Santa Maria, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0512-007742",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Sitio Centro, Barangay Caysio, Santa Maria, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "512",
      "lengthEvidence": "Concreting of Road at Sitio Centro, Barangay Caysio, Santa Maria, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0512-007756",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Drainage Canal at Macaiban-By Pass Road, Barangay San Jose Patag, Santa Maria, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "512",
      "lengthEvidence": "Construction of Drainage Canal at Macaiban-By Pass Road, Barangay San Jose Patag, Santa Maria, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0513-007766",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Concreting at Sitio Lingunan, Barangay Partida, Norzagaray, Bulacan",
      "office": "Bulacan 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "513",
      "lengthEvidence": "Construction of Road Concreting at Sitio Lingunan, Barangay Partida, Norzagaray, Bulacan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0518-007855",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Poblacion, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "office": "Bulacan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12500000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 12500.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Rehabilitation of Road, Barangay Poblacion, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.51,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0518-007859",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Balbalino, Guimba, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "518",
      "lengthEvidence": "Construction of Road Barangay Balbalino, Guimba, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0519-007882",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Valle, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.444,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11261261.26,
      "lengthMeters": 444.0,
      "allocationPerStatedMeter": 11261.26,
      "rangesMeters": [
        [
          0.0,
          444.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay Valle, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.46,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0519-007883",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Guiset, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.444,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11261261.26,
      "lengthMeters": 444.0,
      "allocationPerStatedMeter": 11261.26,
      "rangesMeters": [
        [
          0.0,
          444.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay Guiset, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.46,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0519-007884",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bulakid, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.444,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11261261.26,
      "lengthMeters": 444.0,
      "allocationPerStatedMeter": 11261.26,
      "rangesMeters": [
        [
          0.0,
          444.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay Bulakid, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.46,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0519-007885",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Alemania, Nampicuan, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.444,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11261261.26,
      "lengthMeters": 444.0,
      "allocationPerStatedMeter": 11261.26,
      "rangesMeters": [
        [
          0.0,
          444.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay Alemania, Nampicuan, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.46,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0519-007886",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Escaño, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.444,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11261261.26,
      "lengthMeters": 444.0,
      "allocationPerStatedMeter": 11261.26,
      "rangesMeters": [
        [
          0.0,
          444.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay Escaño, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.46,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0519-007887",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabawangan, Nampicuan, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.444,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11261261.26,
      "lengthMeters": 444.0,
      "allocationPerStatedMeter": 11261.26,
      "rangesMeters": [
        [
          0.0,
          444.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay Cabawangan, Nampicuan, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.46,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0519-007888",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sabit, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.444,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11261261.26,
      "lengthMeters": 444.0,
      "allocationPerStatedMeter": 11261.26,
      "rangesMeters": [
        [
          0.0,
          444.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay Sabit, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.46,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0519-007889",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Paitan Sur, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.444,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11261261.26,
      "lengthMeters": 444.0,
      "allocationPerStatedMeter": 11261.26,
      "rangesMeters": [
        [
          0.0,
          444.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road, Barangay Paitan Sur, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+444",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.46,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0519-007890",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Batitang, Zaragoza, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "519",
      "lengthEvidence": "Construction of Road Barangay Batitang, Zaragoza, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007894",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ambassador Alzate Village, Nampicuan, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Ambassador Alzate Village, Nampicuan, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007895",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bagong Sikat, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Bagong Sikat, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007896",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bagong Silang, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Bagong Silang, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007898",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007902",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bertese, Quezon, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Bertese, Quezon, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007903",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bibiclat, Aliaga, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Bibiclat, Aliaga, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007904",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bibiclat, Cuyapo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Bibiclat, Cuyapo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007906",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bugtong na Buli, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Bugtong na Buli, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007908",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Caaninaplahan, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Caaninaplahan, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007915",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Collado, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Collado, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007917",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Comitang, Sto. Domingo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Comitang, Sto. Domingo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007918",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Concepcion, Zaragoza, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Concepcion, Zaragoza, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0520-007919",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Culong, Guimba, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "520",
      "lengthEvidence": "Construction of Road, Barangay Culong, Guimba, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007921",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Dimasalang Sur, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Dimasalang Sur, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007922",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay District V, Cuyapo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay District V, Cuyapo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007923",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Dulong Bayan, Quezon, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Dulong Bayan, Quezon, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007924",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Esguerra, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Esguerra, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007925",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Estacion, Nampicuan, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Estacion, Nampicuan, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007939",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Hulo, Sto. Domingo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Hulo, Sto. Domingo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007940",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ilog Baliwag, Quezon, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Ilog Baliwag, Quezon, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007942",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Kinalanguyan, Talavera, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Kinalanguyan, Talavera, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0521-007943",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "521",
      "lengthEvidence": "Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007948",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malaya, Sto. Domingo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Malaya, Sto. Domingo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007949",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malayantoc, Sto. Domingo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Malayantoc, Sto. Domingo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007951",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mambarao, Sto. Domingo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Mambarao, Sto. Domingo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007955",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Monic, Nampicuan, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Monic, Nampicuan, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007956",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Narvacan II, Guimba, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Narvacan II, Guimba, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007958",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Northwest Poblacion, Nampicuan, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Northwest Poblacion, Nampicuan, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007959",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pag-asa, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+416",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.416,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12019230.77,
      "lengthMeters": 416.0,
      "allocationPerStatedMeter": 12019.23,
      "rangesMeters": [
        [
          0.0,
          416.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Pag-asa, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+416",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.49,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0522-007961",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pasong Inchic, Guimba, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Pasong Inchic, Guimba, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0522-007967",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pulong Bahay, Quezon, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "522",
      "lengthEvidence": "Construction of Road, Barangay Pulong Bahay, Quezon, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007971",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Agustin, Sto. Domingo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Agustin, Sto. Domingo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007972",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Andres, Guimba, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Andres, Guimba, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007976",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Cristobal, Licab, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Cristobal, Licab, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007978",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Fabian, Sto. Domingo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Fabian, Sto. Domingo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007979",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Francisco, Sto. Domingo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Francisco, Sto. Domingo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007981",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Jose, Cuyapo, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Jose, Cuyapo, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0523-007985",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Manuel, Quezon, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "523",
      "lengthEvidence": "Construction of Road, Barangay San Manuel, Quezon, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0524-007994",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Rita, Quezon, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Sta. Rita, Quezon, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0524-008001",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tony, Nampicuan, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay Tony, Nampicuan, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0524-008005",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay West Central Poblacion, Nampicuan, Nueva Ecija",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "524",
      "lengthEvidence": "Construction of Road, Barangay West Central Poblacion, Nampicuan, Nueva Ecija",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0525-008021",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, San Isidro, San Luis, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Rehabilitation of Road, San Isidro, San Luis, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0525-008022",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sta. Rita, San Luis, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Rehabilitation of Road, Sta. Rita, San Luis, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0525-008023",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Saplad David, Macabebe, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Rehabilitation of Road, Saplad David, Macabebe, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0525-008024",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Caduang Tete, Macabebe, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Rehabilitation of Road, Caduang Tete, Macabebe, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0525-008032",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Sto. Niño Sapa, Sto. Tomas, Pampanga, Start 15.004207, 120.704321 End 15.006656, 120.703890",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "525",
      "lengthEvidence": "Rehabilitation of Road, Sto. Niño Sapa, Sto. Tomas, Pampanga, Start 15.004207, 120.704321 End 15.006656, 120.703890",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008037",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Bahay Pare, Candaba, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road, Bahay Pare, Candaba, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008038",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Bambang, Candaba, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road, Bambang, Candaba, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008039",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Bebe Matua, Masantol, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road, Bebe Matua, Masantol, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008040",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Bulacus, Masantol, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road, Bulacus, Masantol, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008041",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008042",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Calantipe, Apalit, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road, Calantipe, Apalit, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008043",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Candelaria, Macabebe, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road, Candelaria, Macabebe, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008044",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Cuayang Bugtong, Candaba, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road, Cuayang Bugtong, Candaba, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008051",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay San Francisco 2, Minalin, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road at Barangay San Francisco 2, Minalin, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008053",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Dalayap, Candaba, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road, Dalayap, Candaba, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008054",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Dulong Ilog, Candaba, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road, Dulong Ilog, Candaba, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008055",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Lourdes, Minalin, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road, Lourdes, Minalin, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008056",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Mandasig, Candaba, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road, Mandasig, Candaba, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008057",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Mataguiti, Macabebe, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road, Mataguiti, Macabebe, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008058",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Moras Dela Paz, Sto. Tomas, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road, Moras Dela Paz, Sto. Tomas, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0526-008059",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Paguiaba, Masantol, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "526",
      "lengthEvidence": "Construction of Road, Paguiaba, Masantol, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008060",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Paligui, Apalit, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, Paligui, Apalit, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008061",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Palimpe, Masantol, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, Palimpe, Masantol, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008062",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Pangclara, Candaba, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, Pangclara, Candaba, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008063",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Poblacion, Sto. Tomas, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, Poblacion, Sto. Tomas, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008064",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sagrada, Masantol, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, Sagrada, Masantol, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008065",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Francisco, Macabebe, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, San Francisco, Macabebe, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008066",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Isidro Anac, Masantol, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, San Isidro Anac, Masantol, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008067",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Isidro, Minalin, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, San Isidro, Minalin, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008068",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Jose, San Luis, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, San Jose, San Luis, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008069",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Juan, Macabebe, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, San Juan, Macabebe, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008070",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Juan, San Luis, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, San Juan, San Luis, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008071",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Matias, Sto. Tomas, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, San Matias, Sto. Tomas, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008072",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Miguel, San Simon, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, San Miguel, San Simon, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008073",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Nicolas, Minalin, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, San Nicolas, Minalin, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008074",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Nicolas, San Luis, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, San Nicolas, San Luis, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008075",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Pablo Libutad, San Simon, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, San Pablo Libutad, San Simon, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008076",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Roque, Macabebe, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, San Roque, Macabebe, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008077",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Vicente, Apalit, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, San Vicente, Apalit, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008078",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, San Vicente, Sto. Tomas, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, San Vicente, Sto. Tomas, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008079",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. Lucia Matua, Masantol, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, Sta. Lucia Matua, Masantol, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008080",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. Maria, Macabebe, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, Sta. Maria, Macabebe, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008081",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. Rita, Macabebe, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, Sta. Rita, Macabebe, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008082",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. Rita, Minalin, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, Sta. Rita, Minalin, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008083",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. Rita, San Luis, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, Sta. Rita, San Luis, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008084",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta.Cruz, San Simon, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, Sta.Cruz, San Simon, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008085",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta.Monica, San Simon, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, Sta.Monica, San Simon, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008086",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sto. Rosario, Minalin, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, Sto. Rosario, Minalin, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0527-008087",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sucad, Apalit, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "527",
      "lengthEvidence": "Construction of Road, Sucad, Apalit, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0528-008088",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Tacasan, Macabebe, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Construction of Road, Tacasan, Macabebe, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0528-008089",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Tagulod, Candaba, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Construction of Road, Tagulod, Candaba, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0528-008090",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Talang, Candaba, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Construction of Road, Talang, Candaba, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0528-008091",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Telacsa, Macabebe, Pampanga",
      "office": "Pampanga 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Construction of Road, Telacsa, Macabebe, Pampanga",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0528-008103",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with lined canal, Brgy. Maquiapo, Guagua, Pampanga, Sec. A: Sta.0+350 - Sta.0+482, Sec. B: Sta.0+000 - Sta.0+078, Sec. C: Sta.0+000 - Sta.0+145",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.277,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 18050541.52,
      "lengthMeters": 277.0,
      "allocationPerStatedMeter": 18050.54,
      "rangesMeters": [
        [
          350.0,
          482.0
        ],
        [
          0.0,
          78.0
        ],
        [
          0.0,
          145.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Construction of Road with lined canal, Brgy. Maquiapo, Guagua, Pampanga, Sec. A: Sta.0+350 - Sta.0+482, Sec. B: Sta.0+000 - Sta.0+078, Sec. C: Sta.0+000 - Sta.0+145",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.63,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0528-008108",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at San Jose, Riles Fortuna side road from Purok2 to Purok6, San Jose, Floridablanca, Pampanga, Sta.0+000 - Sta.0+580",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.58,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8620689.66,
      "lengthMeters": 580.0,
      "allocationPerStatedMeter": 8620.69,
      "rangesMeters": [
        [
          0.0,
          580.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Construction of Road at San Jose, Riles Fortuna side road from Purok2 to Purok6, San Jose, Floridablanca, Pampanga, Sta.0+000 - Sta.0+580",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.35,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0528-008109",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement and Rehabilitation of Barangay Road at Sta. Maria St., Poblacion, Floridablanca, Pampanga, Sta.0+000 - Sta.0+350",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14285714.29,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 14285.71,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "528",
      "lengthEvidence": "Improvement and Rehabilitation of Barangay Road at Sta. Maria St., Poblacion, Floridablanca, Pampanga, Sta.0+000 - Sta.0+350",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.5,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0529-008110",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Purok 5, Brgy. San Roque, Floridablanca, Pampanga, Sta.0+000 - Sta.0+540",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.54,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9259259.26,
      "lengthMeters": 540.0,
      "allocationPerStatedMeter": 9259.26,
      "rangesMeters": [
        [
          0.0,
          540.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Road in Purok 5, Brgy. San Roque, Floridablanca, Pampanga, Sta.0+000 - Sta.0+540",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.38,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0529-008111",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Purok 8, Biglang Sibul, Brgy. Bodega, Floridablanca, Pampanga, Sta.0+000 - Sta.0+540",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.54,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9259259.26,
      "lengthMeters": 540.0,
      "allocationPerStatedMeter": 9259.26,
      "rangesMeters": [
        [
          0.0,
          540.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Road at Purok 8, Biglang Sibul, Brgy. Bodega, Floridablanca, Pampanga, Sta.0+000 - Sta.0+540",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.38,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0529-008113",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Brgy. Siran, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+150, Sec. B: Sta.0+000 - Sta.0+050, Sec. C: Sta.0+000 - Sta.0+165",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.165,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 30303030.3,
      "lengthMeters": 165.0,
      "allocationPerStatedMeter": 30303.03,
      "rangesMeters": [
        [
          0.0,
          150.0
        ],
        [
          0.0,
          50.0
        ],
        [
          0.0,
          165.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Road Brgy. Siran, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+150, Sec. B: Sta.0+000 - Sta.0+050, Sec. C: Sta.0+000 - Sta.0+165",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.86,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0529-008114",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Brgy. Ligaya, Pulungmasle, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+240, Sec. B: Sta.0+000 - Sta.0+100, Sec. C: Sta.0+000 - Sta.0+140, Sec. D: Sta.0+000 - Sta.0+175",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 20833333.33,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 20833.33,
      "rangesMeters": [
        [
          0.0,
          240.0
        ],
        [
          0.0,
          100.0
        ],
        [
          0.0,
          140.0
        ],
        [
          0.0,
          175.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Road Brgy. Ligaya, Pulungmasle, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+240, Sec. B: Sta.0+000 - Sta.0+100, Sec. C: Sta.0+000 - Sta.0+140, Sec. D: Sta.0+000 - Sta.0+175",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.73,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0529-008118",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Project at Purok 6 Rosal St., San Nicolas, Floridablanca, Pampanga, Sta. 0+000 - Sta. 0+270",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.27,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18518518.52,
      "lengthMeters": 270.0,
      "allocationPerStatedMeter": 18518.52,
      "rangesMeters": [
        [
          0.0,
          270.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Road Project at Purok 6 Rosal St., San Nicolas, Floridablanca, Pampanga, Sta. 0+000 - Sta. 0+270",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.65,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0529-008119",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Lined Canal, Purok 5, Sto. Rosario, Floridablanca, Pampanga, Sta. 0+000 - Sta. 0+180",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.18,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27777777.78,
      "lengthMeters": 180.0,
      "allocationPerStatedMeter": 27777.78,
      "rangesMeters": [
        [
          0.0,
          180.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Road with Lined Canal, Purok 5, Sto. Rosario, Floridablanca, Pampanga, Sta. 0+000 - Sta. 0+180",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.79,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0529-008122",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road in Purok 5 Brgy. Anon, Floridablanca, Pampanga, Sta. 0+000 - Sta. 0+350",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14285714.29,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 14285.71,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Barangay Road in Purok 5 Brgy. Anon, Floridablanca, Pampanga, Sta. 0+000 - Sta. 0+350",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.5,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0529-008123",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Located at Purok 4 Brgy. San Pablo, Guagua, Pampanga, Sta.0+000 - Sta.0+290",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.29,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17241379.31,
      "lengthMeters": 290.0,
      "allocationPerStatedMeter": 17241.38,
      "rangesMeters": [
        [
          0.0,
          290.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Road Located at Purok 4 Brgy. San Pablo, Guagua, Pampanga, Sta.0+000 - Sta.0+290",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.6,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0529-008124",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Purok 3 Brgy. Natividad, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+150, Sec. B: Sta.0+000 - Sta.0+200, Sec. C: Sta.0+000 - Sta.0+190",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          150.0
        ],
        [
          0.0,
          200.0
        ],
        [
          0.0,
          190.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Road in Purok 3 Brgy. Natividad, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+150, Sec. B: Sta.0+000 - Sta.0+200, Sec. C: Sta.0+000 - Sta.0+190",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.71,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0529-008126",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Brgy. Magsaysay, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+340, Sec. B: Sta.0+000 - Sta.0+200",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.34,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 14705882.35,
      "lengthMeters": 340.0,
      "allocationPerStatedMeter": 14705.88,
      "rangesMeters": [
        [
          0.0,
          340.0
        ],
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Road, Brgy. Magsaysay, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+340, Sec. B: Sta.0+000 - Sta.0+200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.51,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0529-008127",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Langka St., Brgy. Calantas, Floridablanca, Pampanga, Sta.0+000 - Sta.0+337",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.337,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14836795.25,
      "lengthMeters": 337.0,
      "allocationPerStatedMeter": 14836.8,
      "rangesMeters": [
        [
          0.0,
          337.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "529",
      "lengthEvidence": "Construction of Road at Langka St., Brgy. Calantas, Floridablanca, Pampanga, Sta.0+000 - Sta.0+337",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.52,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0530-008133",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Brgy. Batang 2nd, Sasmuan, Pampanga, Sta.0+000 - Sta.0+195",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.195,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25641025.64,
      "lengthMeters": 195.0,
      "allocationPerStatedMeter": 25641.03,
      "rangesMeters": [
        [
          0.0,
          195.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Road, Brgy. Batang 2nd, Sasmuan, Pampanga, Sta.0+000 - Sta.0+195",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.73,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0530-008137",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Lined Canal at Telagunting St., Brgy. Valdez, Floridablanca, Pampanga, Sta.0+000 - Sta.0+350",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.35,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14285714.29,
      "lengthMeters": 350.0,
      "allocationPerStatedMeter": 14285.71,
      "rangesMeters": [
        [
          0.0,
          350.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Road with Lined Canal at Telagunting St., Brgy. Valdez, Floridablanca, Pampanga, Sta.0+000 - Sta.0+350",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.5,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0530-008139",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Canal at Zone 1, Brgy. Becuran, Sta.Rita, Pampanga, Sta.0+000 - Sta.0+200",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Road with Canal at Zone 1, Brgy. Becuran, Sta.Rita, Pampanga, Sta.0+000 - Sta.0+200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.71,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0530-008143",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Manuali, Brgy. San Basilio, Sta.Rita, Pampanga, Sta.0+000 - Sta.0+450",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.45,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11111111.11,
      "lengthMeters": 450.0,
      "allocationPerStatedMeter": 11111.11,
      "rangesMeters": [
        [
          0.0,
          450.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "530",
      "lengthEvidence": "Construction of Road at Manuali, Brgy. San Basilio, Sta.Rita, Pampanga, Sta.0+000 - Sta.0+450",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.45,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0531-008153",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Babo Sacan, Porac, Pampanga, Section A: Sta. 0+000 - Sta. 0+070, Section B: Sta. 0+000 - Sta. 0+130, Section C: Sta. 0+000 - Sta. 0+100",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.13,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 38461538.46,
      "lengthMeters": 130.0,
      "allocationPerStatedMeter": 38461.54,
      "rangesMeters": [
        [
          0.0,
          70.0
        ],
        [
          0.0,
          130.0
        ],
        [
          0.0,
          100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "531",
      "lengthEvidence": "Construction of Road Barangay Babo Sacan, Porac, Pampanga, Section A: Sta. 0+000 - Sta. 0+070, Section B: Sta. 0+000 - Sta. 0+130, Section C: Sta. 0+000 - Sta. 0+100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.09,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0531-008156",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Villa Carmela Purok 2 Barangay San Agustin, Betis, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+290, Sec. B: Sta.0+000 - Sta.0+110, Sec. C: Sta.0+000 - Sta.0+050",
      "office": "Pampanga 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.29,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 17241379.31,
      "lengthMeters": 290.0,
      "allocationPerStatedMeter": 17241.38,
      "rangesMeters": [
        [
          0.0,
          290.0
        ],
        [
          0.0,
          110.0
        ],
        [
          0.0,
          50.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "531",
      "lengthEvidence": "Construction of Road Villa Carmela Purok 2 Barangay San Agustin, Betis, Guagua, Pampanga, Sec. A: Sta.0+000 - Sta.0+290, Sec. B: Sta.0+000 - Sta.0+110, Sec. C: Sta.0+000 - Sta.0+050",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.6,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0534-008202",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Balanoy, La Paz, Tarlac",
      "office": "Tarlac 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction of Road, Barangay Balanoy, La Paz, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0534-008203",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Roque, La Paz, Tarlac.",
      "office": "Tarlac 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction of Road, Barangay San Roque, La Paz, Tarlac.",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0534-008204",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction/Concreting of Road From Tumbaga Creek to Barangay Paludpud, La Paz, Tarlac",
      "office": "Tarlac 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction/Concreting of Road From Tumbaga Creek to Barangay Paludpud, La Paz, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0534-008205",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction/Concreting of Road, Barangay Mayang, La Paz, Tarlac",
      "office": "Tarlac 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "534",
      "lengthEvidence": "Construction/Concreting of Road, Barangay Mayang, La Paz, Tarlac",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008257",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Sitio Hagonoy, Barangay Poblacion, San Pascual, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road with Drainage, Sitio Hagonoy, Barangay Poblacion, San Pascual, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008261",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure along Batangas - Lobo Road (Lobo Section) K0128+(-270) - K0128+(-350)",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.08,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 62500000.0,
      "lengthMeters": 80.0,
      "allocationPerStatedMeter": 62500.0,
      "rangesMeters": [
        [
          127650.0,
          127730.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road Slope Protection Structure along Batangas - Lobo Road (Lobo Section) K0128+(-270) - K0128+(-350)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.77,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0537-008265",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Mateo, San Pascual, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Barangay San Mateo, San Pascual, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008268",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Natunuan South, San Pascual, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Barangay Natunuan South, San Pascual, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008270",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure, Barangay Estrella, Mabini, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road Slope Protection Structure, Barangay Estrella, Mabini, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008271",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Slope Protection Structure, Barangay Majuben, Mabini, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road Slope Protection Structure, Barangay Majuben, Mabini, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0537-008273",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Abiacao, San Luis, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "537",
      "lengthEvidence": "Construction of Road, Barangay Abiacao, San Luis, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008285",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Ayala, Barangay Poblacion, San Pascual, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Construction of Road, Sitio Ayala, Barangay Poblacion, San Pascual, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0538-008287",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Punto Baba, Barangay Bagalangit, Mabini, Batangas",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "538",
      "lengthEvidence": "Construction of Road, Sitio Punto Baba, Barangay Bagalangit, Mabini, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008307",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road - Barangay Pagaspas, Tanauan City, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road - Barangay Pagaspas, Tanauan City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008310",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Salvador Agito. Alitagtag, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road at Barangay Salvador Agito. Alitagtag, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008311",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Gonzales, Tanauan City, Batangas (14.074548, 121.079273 - 14.072510, 121.078373)",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Rehabilitation of Road at Barangay Gonzales, Tanauan City, Batangas (14.074548, 121.079273 - 14.072510, 121.078373)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008313",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay San Sebastian, Mataasnakahoy, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road at Barangay San Sebastian, Mataasnakahoy, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008314",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Sampalocan, Barangay Malabanan, Balete, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road at Sitio Sampalocan, Barangay Malabanan, Balete, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008315",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Ping-As, Alitagtag, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road in Barangay Ping-As, Alitagtag, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008316",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Purok 1 to Purok 5, Barangay Bugaan East, Laurel, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road in Purok 1 to Purok 5, Barangay Bugaan East, Laurel, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008317",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Purok 1, Barangay Santa Elena, Sto. Tomas City, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road in Purok 1, Barangay Santa Elena, Sto. Tomas City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008318",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Sito Manggahan to Sitio Pulong Parang, Barangay Montana, Tanauan City & Barangay Tranca, Talisay, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road Sito Manggahan to Sitio Pulong Parang, Barangay Montana, Tanauan City & Barangay Tranca, Talisay, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008319",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage at Barangay Loob, Mataasnakahoy, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road with Drainage at Barangay Loob, Mataasnakahoy, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008320",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Slope Protection, Poblacion 2, Laurel, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road with Slope Protection, Poblacion 2, Laurel, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008321",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Bagumbayan, Tanauan City, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road, Bagumbayan, Tanauan City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008322",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bancoro, San Nicolas, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road, Barangay Bancoro, San Nicolas, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008323",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bangin, San Nicolas, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road, Barangay Bangin, San Nicolas, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008324",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Banyaga, Agoncillo, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road, Barangay Banyaga, Agoncillo, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008325",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Calangay, San Nicolas, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road, Barangay Calangay, San Nicolas, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008326",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Maabud North, San Nicolas, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road, Barangay Maabud North, San Nicolas, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008327",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pansipit, San Nicolas, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road, Barangay Pansipit, San Nicolas, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008328",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sinturisan, San Nicolas, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road, Barangay Sinturisan, San Nicolas, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008329",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Maria, Sto. Tomas City, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road, Barangay Sta. Maria, Sto. Tomas City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0539-008330",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Trapiche, Tanauan City, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "539",
      "lengthEvidence": "Construction of Road, Barangay Trapiche, Tanauan City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008335",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay Bayorbor, Mataasnakahoy, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Improvement of Road at Barangay Bayorbor, Mataasnakahoy, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008336",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay I, Mataasnakahoy, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Improvement of Road at Barangay I, Mataasnakahoy, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008337",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay II, Mataasnakahoy, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Improvement of Road at Barangay II, Mataasnakahoy, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008338",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay II-A, Mataasnakahoy, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Improvement of Road at Barangay II-A, Mataasnakahoy, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008339",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay III, Mataasnakahoy, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Improvement of Road at Barangay III, Mataasnakahoy, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008340",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay IV, Mataasnakahoy, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Improvement of Road at Barangay IV, Mataasnakahoy, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008344",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Completion of Road, Barangay Tumaway, Talisay, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Completion of Road, Barangay Tumaway, Talisay, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008345",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Pook, Agoncillo, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Rehabilitation of Road, Barangay Pook, Agoncillo, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008348",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Slope Protection, Barangay Molinete, Laurel, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Rehabilitation of Road with Slope Protection, Barangay Molinete, Laurel, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008349",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Abelo, San Nicolas, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Rehabilitation of Road, Barangay Abelo, San Nicolas, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008350",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Aya, Talisay, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Rehabilitation of Road, Barangay Aya, Talisay, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008351",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Bangin, Agoncillo, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Rehabilitation of Road, Barangay Bangin, Agoncillo, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008352",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Hipit, San Nicolas, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Rehabilitation of Road, Barangay Hipit, San Nicolas, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008353",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Maabud South, San Nicolas, Batangas",
      "office": "Batangas 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Rehabilitation of Road, Barangay Maabud South, San Nicolas, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0540-008355",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road at Barangay Marawoy, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "540",
      "lengthEvidence": "Construction of Barangay Road at Barangay Marawoy, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008361",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Bataan, San Juan, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road at Barangay Bataan, San Juan, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008362",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Buhaynasapa, San Juan, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road at Barangay Buhaynasapa, San Juan, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008363",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Calubcub 1, San Juan, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road at Barangay Calubcub 1, San Juan, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008365",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Putingbuhangin, San Juan, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road at Barangay Putingbuhangin, San Juan, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008367",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Ticalan, San Juan, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road at Barangay Ticalan, San Juan, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008368",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Lasuerte, Barangay Putingkahoy, Rosario, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road at Sitio Lasuerte, Barangay Putingkahoy, Rosario, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008371",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malaya, Rosario, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road, Barangay Malaya, Rosario, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008372",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Marilag, Rosario, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road, Barangay Marilag, Rosario, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008373",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Quipot, San Juan, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road, Barangay Quipot, San Juan, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008374",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta Cruz, Rosario, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road, Barangay Sta Cruz, Rosario, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008375",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Bayante, BarangayPinagtung-ulan, San Jose, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Construction of Road, Sitio Bayante, BarangayPinagtung-ulan, San Jose, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008377",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay Balagbag, San Juan, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Improvement of Road at Barangay Balagbag, San Juan, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0541-008378",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road At Barangay Bulacnin, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "541",
      "lengthEvidence": "Improvement of Road At Barangay Bulacnin, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008385",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road, Barangay Cahigam, Rosario, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Improvement of Road, Barangay Cahigam, Rosario, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008391",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay San Benito, Lipa City, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Rehabilitation of Road at Barangay San Benito, Lipa City, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008393",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Maalas-as - Bulihan Road (Maalas-as Section), Rosario, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Rehabilitation of Maalas-as - Bulihan Road (Maalas-as Section), Rosario, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008395",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Escribano, San Juan, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Rehabilitation of Road at Barangay Escribano, San Juan, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008396",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Macalamcam B, Rosario, Batangas",
      "office": "Batangas 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Rehabilitation of Road at Barangay Macalamcam B, Rosario, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008400",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of RCDG Bridge Phase II, Barangay Poblacion #1, Amadeo to Balagbag, Indang, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Construction of RCDG Bridge Phase II, Barangay Poblacion #1, Amadeo to Balagbag, Indang, Cavite",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008401",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Poblacion #5 to Pinaglintikan Road, Barangay Poblacion #5, Amadeo, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Concreting of Roads at Barangay Poblacion #5 to Pinaglintikan Road, Barangay Poblacion #5, Amadeo, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008402",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Dagatan to Minantok West, Barangay Dagatan, Amadeo, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Concreting of Roads at Dagatan to Minantok West, Barangay Dagatan, Amadeo, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0542-008403",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Santol, Tanza, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "542",
      "lengthEvidence": "Concreting of Roads at Barangay Santol, Tanza, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008406",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Julugan III, Tanza, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads at Barangay Julugan III, Tanza, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008407",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Aguado, Trece Martires City, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads at Barangay Aguado, Trece Martires City, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008409",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Sahud Ulan, Tanza, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads at Barangay Sahud Ulan, Tanza, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008410",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Halayhay, Tanza, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads at Barangay Halayhay, Tanza, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008411",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Calibuyo, Tanza, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads at Barangay Calibuyo, Tanza, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008412",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Sanja Mayor, Tanza, Cavite, 14.404396, 120.843614",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads at Barangay Sanja Mayor, Tanza, Cavite, 14.404396, 120.843614",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008413",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Calumpang Cerca, Indang, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads at Barangay Calumpang Cerca, Indang, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008414",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads at Calumpang Lejos, Indang, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Construction of Roads at Calumpang Lejos, Indang, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008415",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Banaba Lejos, Indang, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads at Barangay Banaba Lejos, Indang, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008416",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Mahabang Kahoy Lejos, Indang, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads at Barangay Mahabang Kahoy Lejos, Indang, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008417",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Tambo Kulit, Indang, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads at Barangay Tambo Kulit, Indang, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0543-008418",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Roads at Barangay Amaya 1, Tanza, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "Station points only: no connected range",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "543",
      "lengthEvidence": "Concreting of Roads at Barangay Amaya 1, Tanza, Cavite, Sta. 0 + 000, Sta. 0 + 210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0544-008437",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road connecting Barangay Banaba Cerca to Barangay Banaba Lejos, Indang, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road connecting Barangay Banaba Cerca to Barangay Banaba Lejos, Indang, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0544-008438",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road connecting Barangay Gregorio to Barangay De Ocampo, Trece Martires City, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road connecting Barangay Gregorio to Barangay De Ocampo, Trece Martires City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0544-008440",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Canal Lining at Barangay Poblacion 4, Indang, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road with Canal Lining at Barangay Poblacion 4, Indang, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0544-008443",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Panungyanan, General Trias City, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "544",
      "lengthEvidence": "Construction of Road, Barangay Panungyanan, General Trias City, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008454",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road at Barangay Calumpang Cerca, Indang, Cavite",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Rehabilitation of Road at Barangay Calumpang Cerca, Indang, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008460",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Barangay Adlas, Silang, Cavite",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Construction of Road with Drainage, Barangay Adlas, Silang, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0545-008461",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Pooc - Malaking Tatiao, Silang, Cavite, (Sta. 0 + 000 - Sta. 0 + 325)",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.325,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15384615.38,
      "lengthMeters": 325.0,
      "allocationPerStatedMeter": 15384.62,
      "rangesMeters": [
        [
          0.0,
          325.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Concreting of Road, Barangay Pooc - Malaking Tatiao, Silang, Cavite, (Sta. 0 + 000 - Sta. 0 + 325)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.54,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0545-008462",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Barangay Bernardo Pulido, Gen. Mariano Alvarez, Cavite",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "545",
      "lengthEvidence": "Construction of Road with Drainage, Barangay Bernardo Pulido, Gen. Mariano Alvarez, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0546-008480",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage at Barangay Milagrosa, Calamba City, Laguna",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "546",
      "lengthEvidence": "Construction of Road and Drainage at Barangay Milagrosa, Calamba City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008497",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Jose, San Pablo City, Laguna",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Construction of Road, Barangay San Jose, San Pablo City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008504",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Slope Protection along Road in Purok 2 and Purok 6, Barangay San Benito, Victoria, Laguna",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Rehabilitation of Slope Protection along Road in Purok 2 and Purok 6, Barangay San Benito, Victoria, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008505",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge at Barangay Alupay, Tayabas, Quezon",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Construction of Bridge at Barangay Alupay, Tayabas, Quezon",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008508",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Lual Poblacion, Mauban Quezon",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Construction of Road at Barangay Lual Poblacion, Mauban Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008511",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction/Completion of Pinaglubayan-Pilion Bridge, Barangay Pinaglubayan, Polillo, Quezon",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Construction/Completion of Pinaglubayan-Pilion Bridge, Barangay Pinaglubayan, Polillo, Quezon",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008512",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Poblacion, Polillo, Quezon",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Construction of Road at Barangay Poblacion, Polillo, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0547-008515",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at San Roque Zone 1, Tayabas City, Quezon",
      "office": "Quezon 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "547",
      "lengthEvidence": "Construction of Road at San Roque Zone 1, Tayabas City, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0549-008553",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Polytechnic University of the Philippines-Mulanay, Barangay Sta. Rosa, Municipality of Mulanay, Quezon",
      "office": "Quezon 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "549",
      "lengthEvidence": "Construction of Road, Polytechnic University of the Philippines-Mulanay, Barangay Sta. Rosa, Municipality of Mulanay, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0551-008581",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage Systems, Ruhat V, Barangay Mambugan, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Construction of Road with Drainage Systems, Ruhat V, Barangay Mambugan, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0551-008590",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road With Drainage Systems Narcissus St. Antipolo Valley, Barangay Mambugan, Antipolo City (Sta.0+000-Sta.0+140)",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35714285.71,
      "lengthMeters": 140.0,
      "allocationPerStatedMeter": 35714.29,
      "rangesMeters": [
        [
          0.0,
          140.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Improvement of Road With Drainage Systems Narcissus St. Antipolo Valley, Barangay Mambugan, Antipolo City (Sta.0+000-Sta.0+140)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.01,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0551-008598",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage Systems, Sunflower and Cattleya, Barangay Mayamot, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Rehabilitation of Road with Drainage Systems, Sunflower and Cattleya, Barangay Mayamot, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0551-008599",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Slope Protection at Sitio Corina, Barangay Bagong Nayon, Antipolo City",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "551",
      "lengthEvidence": "Rehabilitation of Road with Slope Protection at Sitio Corina, Barangay Bagong Nayon, Antipolo City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008604",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Matahimik, Barangay Tungib, Buenavista, Marinduque",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Road, Sitio Matahimik, Barangay Tungib, Buenavista, Marinduque",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008608",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Timbo, Buenavista, Marinduque",
      "office": "Marinduque District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Rehabilitation of Road, Barangay Timbo, Buenavista, Marinduque",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008610",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Lagnas, Barangay Naibuan, San Jose, Occidental Mindoro",
      "office": "Mindoro Occidental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Construction of Road at Sitio Lagnas, Barangay Naibuan, San Jose, Occidental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0552-008620",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sta. 0+000 - Sta. 0+505, at Barangay Katwiran I, Baco, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.505,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9900990.1,
      "lengthMeters": 505.0,
      "allocationPerStatedMeter": 9900.99,
      "rangesMeters": [
        [
          0.0,
          505.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Concreting of Road, Sta. 0+000 - Sta. 0+505, at Barangay Katwiran I, Baco, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.4,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0552-008621",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sta. 0+000 - Sta. 0+490, at Barangay Mangangan I, Baco, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.49,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10204081.63,
      "lengthMeters": 490.0,
      "allocationPerStatedMeter": 10204.08,
      "rangesMeters": [
        [
          0.0,
          490.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "552",
      "lengthEvidence": "Concreting of Road, Sta. 0+000 - Sta. 0+490, at Barangay Mangangan I, Baco, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.42,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0553-008622",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Barangay Metolza, Naujan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Concreting of Road at Barangay Metolza, Naujan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008623",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Barangay Mahabang Parang, Naujan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Concreting of Road at Barangay Mahabang Parang, Naujan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008624",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Barangay Antipolo, Naujan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Concreting of Road at Barangay Antipolo, Naujan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008626",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Barangay San Andres to Barangay Inarawan, Naujan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Concreting of Road at Barangay San Andres to Barangay Inarawan, Naujan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008627",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Barangay Batino, Calapan City , Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Concreting of Road at Barangay Batino, Calapan City , Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008628",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Barangay Subaan ,Socorro, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Concreting of Road at Barangay Subaan ,Socorro, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008629",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Barangay Camilmil, Calapan City, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Concreting of Road at Barangay Camilmil, Calapan City, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008630",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road at Barangay Villareal, Socorro, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Concreting of Road at Barangay Villareal, Socorro, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008634",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Along Barangay Balingayan, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Road Along Barangay Balingayan, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008635",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Along Barangay Balite, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Road Along Barangay Balite, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008637",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Along Barangay Caagutayan, San Teodoro, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Road Along Barangay Caagutayan, San Teodoro, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008638",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Along Barangay Canubing 2, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Road Along Barangay Canubing 2, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008639",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Along Barangay Malad, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Road Along Barangay Malad, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008640",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Along Barangay Managpi, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Road Along Barangay Managpi, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008641",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Along Barangay Nag-Iba 1, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Road Along Barangay Nag-Iba 1, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008642",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Along Barangay Pachoca, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Road Along Barangay Pachoca, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008643",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Along Barangay Parang, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Road Along Barangay Parang, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008644",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Along Barangay Sta. Cruz, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Road Along Barangay Sta. Cruz, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008645",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Along Barangay Sta. Rita, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Road Along Barangay Sta. Rita, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008646",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Agsambalilo - Pagturian, Barangay Ilag,San Teodoro, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Road, Agsambalilo - Pagturian, Barangay Ilag,San Teodoro, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0553-008647",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Baclayan, Puerto Galera, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "553",
      "lengthEvidence": "Construction of Road, Barangay Baclayan, Puerto Galera, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008648",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bagong Silang, Victoria, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Bagong Silang, Victoria, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008649",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Balatero, Puerto Galera, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Balatero, Puerto Galera, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008650",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Calubasanhon - Barangay Matulatula, Pola, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Rehabilitation of Road, Barangay Calubasanhon - Barangay Matulatula, Pola, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008651",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Baras, Baco, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Baras, Baco, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008652",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gulod, Calapan City, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Gulod, Calapan City, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008653",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Calubayan, Socorro, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Calubayan, Socorro, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008654",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Camansihan , City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Camansihan , City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008656",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Comunal , City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Comunal , City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008658",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Kalinisan, Naujan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Rehabilitation of Road, Barangay Kalinisan, Naujan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008659",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Malamig, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Rehabilitation of Road, Barangay Malamig, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008661",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Managpi, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Rehabilitation of Road, Barangay Managpi, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008662",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mangangan II, Baco, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Mangangan II, Baco, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008664",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mayabig , Baco, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Mayabig , Baco, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008665",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nag-Iba II, City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Nag-Iba II, City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008668",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Putican Cabulo, Baco, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Putican Cabulo, Baco, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008669",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Rosa I, Baco, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, Barangay Sta. Rosa I, Baco, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0554-008670",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, BarangayGuinobatan , City of Calapan, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "554",
      "lengthEvidence": "Construction of Road, BarangayGuinobatan , City of Calapan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008674",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Calucmoy - Barangay Bayuin, Socorro, Oriental Mindoro",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Rehabilitation of Road, Barangay Calucmoy - Barangay Bayuin, Socorro, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008679",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay New Cuyo, Roxas, Palawan",
      "office": "Palawan 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of Road, Barangay New Cuyo, Roxas, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0555-008691",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok New Princesa, Road 1, Barangay Tiniguiban, Puerto Princesa City, Palawan, Start 9.782035N, 118.728304E End 9.782911N, 118.727872E",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "555",
      "lengthEvidence": "Construction of Road, Purok New Princesa, Road 1, Barangay Tiniguiban, Puerto Princesa City, Palawan, Start 9.782035N, 118.728304E End 9.782911N, 118.727872E",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008725",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Bagong Bayan II, Bongabong, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road at Barangay Bagong Bayan II, Bongabong, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008730",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Pagalagala, Pinamalayan, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road at Barangay Pagalagala, Pinamalayan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008731",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Sagana, Bongabong, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road at Barangay Sagana, Bongabong, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008735",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Proper, Barangay San Isidro, Bulalacao,Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road at Sitio Proper, Barangay San Isidro, Bulalacao,Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0557-008738",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta 0 + 000- Sta 0 + 250, Sitio Amihan, Barangay San Aquilino, Roxas, Oriental Mindoro",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 250.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          0.0,
          250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "557",
      "lengthEvidence": "Construction of Road, Sta 0 + 000- Sta 0 + 250, Sitio Amihan, Barangay San Aquilino, Roxas, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.7,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0560-008801",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Pablo, Sta. 8 + 925.00 to Sta. 9 + 015.00, Del Gallego, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.09,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55555555.56,
      "lengthMeters": 90.0,
      "allocationPerStatedMeter": 55555.56,
      "rangesMeters": [
        [
          8925.0,
          9015.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay San Pablo, Sta. 8 + 925.00 to Sta. 9 + 015.00, Del Gallego, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.57,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0560-008802",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Pablo, Sta. 9 + 015.00 to Sta. 9 + 105.00, Del Gallego, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.09,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55555555.56,
      "lengthMeters": 90.0,
      "allocationPerStatedMeter": 55555.56,
      "rangesMeters": [
        [
          9015.0,
          9105.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay San Pablo, Sta. 9 + 015.00 to Sta. 9 + 105.00, Del Gallego, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.57,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0560-008804",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tabion, Sta. 6 + 800.00 to Sta. 6 + 890.00, Del Gallego, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.09,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55555555.56,
      "lengthMeters": 90.0,
      "allocationPerStatedMeter": 55555.56,
      "rangesMeters": [
        [
          6800.0,
          6890.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay Tabion, Sta. 6 + 800.00 to Sta. 6 + 890.00, Del Gallego, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.57,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0560-008805",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tabion, Sta. 6 + 890.00 to Sta. 6 + 980.00, Del Gallego, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.09,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 55555555.56,
      "lengthMeters": 90.0,
      "allocationPerStatedMeter": 55555.56,
      "rangesMeters": [
        [
          6890.0,
          6980.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Barangay Tabion, Sta. 6 + 890.00 to Sta. 6 + 980.00, Del Gallego, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.57,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0560-008807",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Zone 5, Barangay Poblacion, Sta. 0 + 888.00 to Sta. 1 + 088.00, Lupi, Camarines Sur",
      "office": "Camarines Sur 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          888.0,
          1088.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "560",
      "lengthEvidence": "Construction of Road, Zone 5, Barangay Poblacion, Sta. 0 + 888.00 to Sta. 1 + 088.00, Lupi, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.71,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0562-008838",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Zone 1, Barangay San Jose West, Canaman, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction of Road, Zone 1, Barangay San Jose West, Canaman, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0562-008839",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Zone 3, Barangay San Jose East, Canaman, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction of Road, Zone 3, Barangay San Jose East, Canaman, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0562-008840",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Zone 7, Barangay Sibao, Calabanga, Camarines Sur",
      "office": "Camarines Sur 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction of Road in Zone 7, Barangay Sibao, Calabanga, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0562-008841",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge (Box Culvert), Barangay Patitinan, Sagñay, Camarines Sur",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction of Bridge (Box Culvert), Barangay Patitinan, Sagñay, Camarines Sur",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0562-008845",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tambangan to Barangay Manzana, San Jose-Partido, Camarines Sur Section 1: Sta. 1+400 - Sta. 1+540 Section 2 : Sta. 0+000 - Sta. 0+024, Section 3: Sta. 0+000 - Sta. 0+028, Section 4: Sta. 0+000 - Sta. 0+050",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.19,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 26315789.47,
      "lengthMeters": 190.0,
      "allocationPerStatedMeter": 26315.79,
      "rangesMeters": [
        [
          1400.0,
          1540.0
        ],
        [
          0.0,
          24.0
        ],
        [
          0.0,
          28.0
        ],
        [
          0.0,
          50.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction of Road, Barangay Tambangan to Barangay Manzana, San Jose-Partido, Camarines Sur Section 1: Sta. 1+400 - Sta. 1+540 Section 2 : Sta. 0+000 - Sta. 0+024, Section 3: Sta. 0+000 - Sta. 0+028, Section 4: Sta. 0+000 - Sta. 0+050",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.74,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0562-008846",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage, Barangay Salogon, San Jose, Camarines Sur Sta. 0+000 - Sta. 0+400",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12500000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 12500.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Rehabilitation of Road with Drainage, Barangay Salogon, San Jose, Camarines Sur Sta. 0+000 - Sta. 0+400",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.51,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0562-008847",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Salogon - Barangay Ponglon, San Jose, Camarines Sur Sta. 0+000 - Sta. 0+730",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.73,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 6849315.07,
      "lengthMeters": 730.0,
      "allocationPerStatedMeter": 6849.32,
      "rangesMeters": [
        [
          0.0,
          730.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Rehabilitation of Road, Barangay Salogon - Barangay Ponglon, San Jose, Camarines Sur Sta. 0+000 - Sta. 0+730",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.28,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0562-008848",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Danlog, San Jose-Partido, Camarines Sur Sta. 0+350 - Sta. 0+765",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.415,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12048192.77,
      "lengthMeters": 415.0,
      "allocationPerStatedMeter": 12048.19,
      "rangesMeters": [
        [
          350.0,
          765.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Rehabilitation of Road, Barangay Danlog, San Jose-Partido, Camarines Sur Sta. 0+350 - Sta. 0+765",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.49,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0562-008849",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bagacay, San Jose-Partido, Camarines Sur Sta. 0+706 - Sta. 1+256",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.55,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9090909.09,
      "lengthMeters": 550.0,
      "allocationPerStatedMeter": 9090.91,
      "rangesMeters": [
        [
          706.0,
          1256.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "562",
      "lengthEvidence": "Construction of Road, Barangay Bagacay, San Jose-Partido, Camarines Sur Sta. 0+706 - Sta. 1+256",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.37,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0563-008852",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Carantas Barangay Buyo, Goa, Camarines Sur",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Road, Sitio Carantas Barangay Buyo, Goa, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008858",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Sitio Kiloon Barangay Boboan, Siruma, Camarines Sur",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Roads, Sitio Kiloon Barangay Boboan, Siruma, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008861",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road with Drainage Canal, Barangay Gingaroy, Tigaon, Camarines Sur",
      "office": "Camarines Sur 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Rehabilitation of Road with Drainage Canal, Barangay Gingaroy, Tigaon, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0563-008868",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Rafael, Iriga, Camarines Sur",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "563",
      "lengthEvidence": "Construction of Road, Barangay San Rafael, Iriga, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0564-008872",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Bridge at Barangay JMA (Tucao), San Miguel, Catanduanes, 13.74124, 124.24218",
      "office": "Catanduanes District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction (Completion) of Bridge at Barangay JMA (Tucao), San Miguel, Catanduanes, 13.74124, 124.24218",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0564-008873",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Slope protection Structure at Barangay Lumabao and Balangonan, Pandan, Catanduanes",
      "office": "Catanduanes District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Road and Slope protection Structure at Barangay Lumabao and Balangonan, Pandan, Catanduanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0564-008874",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay District II and Dororian, Gigmoto, Catanduanes",
      "office": "Catanduanes District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Road at Barangay District II and Dororian, Gigmoto, Catanduanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0564-008876",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Salvacion and Cahan , Bagamanoc,Catanduanes",
      "office": "Catanduanes District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Road at Barangay Salvacion and Cahan , Bagamanoc,Catanduanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0564-008877",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay San Miguel and Abihao, Baras, Catanduanes",
      "office": "Catanduanes District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "564",
      "lengthEvidence": "Construction of Road at Barangay San Miguel and Abihao, Baras, Catanduanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0565-008900",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Panisijan, Uson, Masbate",
      "office": "Masbate 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "565",
      "lengthEvidence": "Construction of Road, Barangay Panisijan, Uson, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008913",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Ramon, Barcelona, Sorsogon",
      "office": "Sorsogon 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Road, Barangay San Ramon, Barcelona, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008922",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Sitio Eahog to Sitio Cabilan, Barangay Catmon, Altavas, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Barangay Road, Sitio Eahog to Sitio Cabilan, Barangay Catmon, Altavas, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008924",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Isberto Road, Barangay Tigayon, Kalibo, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Road at Isberto Road, Barangay Tigayon, Kalibo, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008925",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction/Rehabilitation of Barangay Road, Barangay Baybay, Tangalan, Aklan, 11.77138333333, 122.27058333333",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction/Rehabilitation of Barangay Road, Barangay Baybay, Tangalan, Aklan, 11.77138333333, 122.27058333333",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008926",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Sitio Hinonok, Barangay Pagsanghan, Banga, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Road at Sitio Hinonok, Barangay Pagsanghan, Banga, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008928",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, along Right Side of Creek from Barangay Venturanza to Barangay Agbanawan, Banga, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Road, along Right Side of Creek from Barangay Venturanza to Barangay Agbanawan, Banga, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008929",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Along Quimpo-Quimpo Street, Barangay Andagaw to Sitio Kawatihan, Barangay Pook, Kalibo, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Road, Along Quimpo-Quimpo Street, Barangay Andagaw to Sitio Kawatihan, Barangay Pook, Kalibo, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008931",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Ambolong, Batan, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Road, Barangay Ambolong, Batan, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0566-008932",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bulwang, Numancia, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "566",
      "lengthEvidence": "Construction of Road, Barangay Bulwang, Numancia, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008933",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabugao, Batan, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Barangay Cabugao, Batan, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008934",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Camaligan, Batan, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Barangay Camaligan, Batan, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008935",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Laguinbanwa East, Numancia, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Barangay Laguinbanwa East, Numancia, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008936",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Libas, Banga, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Barangay Libas, Banga, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008939",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Matabana, Nabas, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Barangay Matabana, Nabas, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008940",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Navitas, Malinao, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Barangay Navitas, Malinao, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008941",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Palale, Banga, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Barangay Palale, Banga, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008942",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Polocate, Banga, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Barangay Polocate, Banga, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008943",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Rosario, Malinao, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Barangay Rosario, Malinao, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008944",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tayhawan to Barangay Agcawilan, Lezo, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Barangay Tayhawan to Barangay Agcawilan, Lezo, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008945",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Venturanza, Banga, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Barangay Venturanza, Banga, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008947",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 3A, Barangay Tinigao, Kalibo, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Purok 3A, Barangay Tinigao, Kalibo, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008948",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Aglunay, Barangay Talon, Altavas, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Sitio Aglunay, Barangay Talon, Altavas, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008949",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Bukid, Barangay Tinapuay, Banga, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Sitio Bukid, Barangay Tinapuay, Banga, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008950",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Bungad 2 to Sitio Bungad 1, Barangay Linayasan, Altavas, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Sitio Bungad 2 to Sitio Bungad 1, Barangay Linayasan, Altavas, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008951",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Dusog, Barangay Calimbajan, Makato, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Sitio Dusog, Barangay Calimbajan, Makato, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008952",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Karumahan, Barangay Bakhaw Norte Kalibo, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Sitio Karumahan, Barangay Bakhaw Norte Kalibo, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008954",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Laguyod to Sitio Balotbot, Barangay Ogsip, Libacao, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Sitio Laguyod to Sitio Balotbot, Barangay Ogsip, Libacao, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008955",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Pandan, Barangay Bay-ang, Batan, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Sitio Pandan, Barangay Bay-ang, Batan, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008956",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Pulahan, Barangay Arcangel, Balete, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Sitio Pulahan, Barangay Arcangel, Balete, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008957",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Sangaeay, Barangay Lumaynay, Altavas, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Sitio Sangaeay, Barangay Lumaynay, Altavas, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0567-008958",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Tacubi, Barangay Castillo, Makato, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "567",
      "lengthEvidence": "Construction of Road, Sitio Tacubi, Barangay Castillo, Makato, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008959",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Tino-ungan, Barangay Rizal to Barangay Naligusan, Ibajay, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction of Road, Sitio Tino-ungan, Barangay Rizal to Barangay Naligusan, Ibajay, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008960",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Ilaya, Barangay Candelaria, New Washington, Aklan",
      "office": "Aklan District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction of Road, Sitio Ilaya, Barangay Candelaria, New Washington, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008970",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bato, Panay, Capiz",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction of Road, Barangay Bato, Panay, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008971",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Casanayan, Pilar, Capiz",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction of Road, Barangay Casanayan, Pilar, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008974",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Ilaya, Barangay Cabugao, Roxas City, Capiz",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction of Road, Sitio Ilaya, Barangay Cabugao, Roxas City, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008977",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Acuña, Tapaz, Capiz",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction of Road, Barangay Acuña, Tapaz, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008978",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Aglinab, Tapaz, Capiz",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction of Road, Barangay Aglinab, Tapaz, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0568-008979",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Daan Sur, Tapaz, Capiz",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "568",
      "lengthEvidence": "Construction of Road, Barangay Daan Sur, Tapaz, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0569-008981",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nayawan, Tapaz, Capiz",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Road, Barangay Nayawan, Tapaz, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0569-008983",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Taslan, Tapaz, Capiz",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Road, Barangay Taslan, Tapaz, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0569-008985",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Agkawayan Road, Barangay Burias, Mambusao, Capiz",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Road, Sitio Agkawayan Road, Barangay Burias, Mambusao, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0569-008986",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Dam Road, Barangay Tumalalud, Mambusao, Capiz",
      "office": "Capiz 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Road, Sitio Dam Road, Barangay Tumalalud, Mambusao, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0569-008994",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Bitbit -Santa Teresa Road, BarangaySanta Teresa, Jordan, Guimaras,Sta. 0 + 930 - Sta. 1 + 088",
      "office": "Guimaras District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.158,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31645569.62,
      "lengthMeters": 158.0,
      "allocationPerStatedMeter": 31645.57,
      "rangesMeters": [
        [
          930.0,
          1088.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "569",
      "lengthEvidence": "Construction of Road, Sitio Bitbit -Santa Teresa Road, BarangaySanta Teresa, Jordan, Guimaras,Sta. 0 + 930 - Sta. 1 + 088",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.9,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0571-009035",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tiwi, Barotac Nuevo, Iloilo, 10.9320, 122.7303",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "571",
      "lengthEvidence": "Construction of Road, Barangay Tiwi, Barotac Nuevo, Iloilo, 10.9320, 122.7303",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009036",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Monpon, Barotac Nuevo, Iloilo, Start 10.8910, 122.6694 End 10.8876, 122.6718",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay Monpon, Barotac Nuevo, Iloilo, Start 10.8910, 122.6694 End 10.8876, 122.6718",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009039",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cag-an, Anilao, Iloilo",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay Cag-an, Anilao, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009040",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Luag, Dueñas, Iloilo",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay Luag, Dueñas, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009041",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Manganese, Anilao, Iloilo",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay Manganese, Anilao, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009046",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabilao Pequeño - Barangay Cabilao Grande - Barangay Poblacion, Carles, Iloilo",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Barangay Cabilao Pequeño - Barangay Cabilao Grande - Barangay Poblacion, Carles, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0572-009052",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Naburot, Barangay Buenavista, Carles, Iloilo",
      "office": "Iloilo 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "572",
      "lengthEvidence": "Construction of Road, Sitio Naburot, Barangay Buenavista, Carles, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009062",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Guibuangan to Barangay Talibong Pequeño, Mina, Iloilo",
      "office": "Iloilo 6th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay Guibuangan to Barangay Talibong Pequeño, Mina, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009074",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage within Arevalo District, Arevalo, Iloilo City, Iloilo",
      "office": "Iloilo City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road and Drainage within Arevalo District, Arevalo, Iloilo City, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009075",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road and Drainage, Barangay Javellana, Jaro, Iloilo City, Iloilo",
      "office": "Iloilo City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road and Drainage, Barangay Javellana, Jaro, Iloilo City, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009077",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Daguitan, Banga, Aklan",
      "office": "Iloilo City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay Daguitan, Banga, Aklan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009079",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay 8, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay 8, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0573-009080",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mandalagan, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "573",
      "lengthEvidence": "Construction of Road, Barangay Mandalagan, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009088",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road along La Salle Ave, Barangay Mandalagan, Bacolod City, Negros Occidental, 10.684364, 122.967794",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Rehabilitation of Road along La Salle Ave, Barangay Mandalagan, Bacolod City, Negros Occidental, 10.684364, 122.967794",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0574-009090",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Reconstruction of Roads, Dona Juliana Drive-Sharina Heights, Barangay Taculing, Bacolod City",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "574",
      "lengthEvidence": "Reconstruction of Roads, Dona Juliana Drive-Sharina Heights, Barangay Taculing, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0575-009106",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Sta. 0+706 - Sta. 1+033) Barangay Alegria, Murcia, Negros Occidental (10.6380030, 123.0632850)",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.327,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15290519.88,
      "lengthMeters": 327.0,
      "allocationPerStatedMeter": 15290.52,
      "rangesMeters": [
        [
          706.0,
          1033.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road (Sta. 0+706 - Sta. 1+033) Barangay Alegria, Murcia, Negros Occidental (10.6380030, 123.0632850)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.54,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0575-009107",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+170, at Purok Sta. Maria, Barangay Himoga- an Baybay, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 170.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+170, at Purok Sta. Maria, Barangay Himoga- an Baybay, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.83,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0575-009108",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+170, at Purok Tisa Barangay Bulanon, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 170.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "575",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+170, at Purok Tisa Barangay Bulanon, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.83,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0576-009126",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Baviera, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Barangay Baviera, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009127",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Campo Himoga-an, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Barangay Campo Himoga-an, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009128",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Daga, Cadiz City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Barangay Daga, Cadiz City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009129",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009130",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Luna, Cadiz City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Barangay Luna, Cadiz City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009131",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Magsaysay, Cadiz City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Barangay Magsaysay, Cadiz City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009132",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Old Sagay, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Barangay Old Sagay, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009133",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Paraiso, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Barangay Paraiso, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009134",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Plaridel, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Barangay Plaridel, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009135",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion I, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Barangay Poblacion I, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009136",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tiglawigan, Cadiz City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Barangay Tiglawigan, Cadiz City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009137",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tinampa-an, Cadiz City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Barangay Tinampa-an, Cadiz City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009138",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Zone 2, Cadiz City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Barangay Zone 2, Cadiz City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009139",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Hacienda Barbara to Hacienda Dau, Barangay Burgos, Cadiz City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Hacienda Barbara to Hacienda Dau, Barangay Burgos, Cadiz City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009141",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Gemilina, Barangay Vito, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Purok Gemilina, Barangay Vito, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009142",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Kabungahan, Barangay Puey, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Purok Kabungahan, Barangay Puey, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009143",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Rizal, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Barangay Rizal, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009144",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Maalwan to Purok Liwayway, Barangay Sewahon I, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Purok Maalwan to Purok Liwayway, Barangay Sewahon I, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0576-009145",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Magay, Barangay Molocaboc, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "576",
      "lengthEvidence": "Construction of Road, Purok Magay, Barangay Molocaboc, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009146",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Pinetree, Barangay Malubon, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Road, Purok Pinetree, Barangay Malubon, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009147",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Proper B, Barangay Rafaela Barrera, Sagay City, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Road, Purok Proper B, Barangay Rafaela Barrera, Sagay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009148",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Patyo, Barangay I, Municipality of Manapla, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Road, Sitio Patyo, Barangay I, Municipality of Manapla, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009149",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay 9, Isabela, Negros Occidental",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Road, Barangay 9, Isabela, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0577-009150",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Tiguisan, Barangay Montilla, Moises Padilla, Negros Occidental",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "577",
      "lengthEvidence": "Construction of Road, Sitio Tiguisan, Barangay Montilla, Moises Padilla, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009172",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Site Road, Barangay General Malvar, Municipality of Pontevedra, Negros Occidental",
      "office": "Negros Occidental 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Barangay Site Road, Barangay General Malvar, Municipality of Pontevedra, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009173",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Najalin Relocation Site Road, Barangay Nagasi, La Carlota City, Negros Occidental",
      "office": "Negros Occidental 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Najalin Relocation Site Road, Barangay Nagasi, La Carlota City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009175",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Nanas-Batuan Road, Barangay Bagonawa and Barangay Batuan, Municipality of San Enrique, Negros Occidental",
      "office": "Negros Occidental 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Nanas-Batuan Road, Barangay Bagonawa and Barangay Batuan, Municipality of San Enrique, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009176",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Papaya 2 Road, Barangay Tabao-Rizal, Municipality of San Enrique, Negros Occidental",
      "office": "Negros Occidental 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Papaya 2 Road, Barangay Tabao-Rizal, Municipality of San Enrique, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009180",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Sampaguita Barangay Antipolo Road, Barangay Antipolo, Municipality of Pontevedra, Negros Occidental",
      "office": "Negros Occidental 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Sampaguita Barangay Antipolo Road, Barangay Antipolo, Municipality of Pontevedra, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009184",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Alibabay, Barangay Panubigan, Canlaon City, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Road, Alibabay, Barangay Panubigan, Canlaon City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009185",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Bangkal, Barangay Libjo, Manjuyod, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Road, Bangkal, Barangay Libjo, Manjuyod, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009186",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Awa-an, Ayungon, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Road, Barangay Awa-an, Ayungon, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0578-009187",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bakid, Guihulngan City, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "578",
      "lengthEvidence": "Construction of Road, Barangay Bakid, Guihulngan City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009188",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Pasto-Canoque, Barangay Binalbagan, Canlaon City, Negros Oriental, 10.399757, 123.251441",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Bridge, Pasto-Canoque, Barangay Binalbagan, Canlaon City, Negros Oriental, 10.399757, 123.251441",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009189",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Carmen-Natae Barangay Budlasan, Canlaon City, Negros Oriental, 10.355444, 123.238584",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Bridge, Carmen-Natae Barangay Budlasan, Canlaon City, Negros Oriental, 10.355444, 123.238584",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009190",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Canluto, Bindoy, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Road, Barangay Canluto, Bindoy, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009192",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Hibaiyo, Guihulngan City, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Road, Barangay Hibaiyo, Guihulngan City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009194",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Panubigan, Canlaon City, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Road, Barangay Panubigan, Canlaon City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009195",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pindahan, Tayasan, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Road, Barangay Pindahan, Tayasan, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009197",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Isidro, Manjuyod, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Road, Barangay San Isidro, Manjuyod, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009198",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Saying, Tayasan, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Road, Barangay Saying, Tayasan, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009199",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay South Poblacion, La Libertad, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Road, Barangay South Poblacion, La Libertad, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009200",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tanlad, Tayasan, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Road, Barangay Tanlad, Tayasan, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009202",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Lupac, Barangay San Jose, Manjuyod, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Road, Lupac, Barangay San Jose, Manjuyod, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009205",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Spillway Bridge and Trail, Orchid-Daffodil, Barangay Tinaogan, Bindoy, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Spillway Bridge and Trail, Orchid-Daffodil, Barangay Tinaogan, Bindoy, Negros Oriental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009206",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Spillway Bridge, Barangays Linao-Pinocawan, Tayasan, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Spillway Bridge, Barangays Linao-Pinocawan, Tayasan, Negros Oriental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009207",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Spillway Bridge and Trail, Barangay Solonggon, La Libertad, Negros Oriental",
      "office": "Negros Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Rehabilitation of Spillway Bridge and Trail, Barangay Solonggon, La Libertad, Negros Oriental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0579-009209",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Box Culvert Bridge, Barangay Canggohob, Mabinay, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "579",
      "lengthEvidence": "Construction of Box Culvert Bridge, Barangay Canggohob, Mabinay, Negros Oriental",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009214",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cambanjao, Bais City, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Cambanjao, Bais City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009217",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mag-abo, Amlan, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Mag-abo, Amlan, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009221",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Polo, Tanjay City, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Polo, Tanjay City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0580-009227",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tugas, Tanjay City, Negros Oriental",
      "office": "Negros Oriental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "580",
      "lengthEvidence": "Construction of Road, Barangay Tugas, Tanjay City, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009275",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, F. Toledo Street, Dao District, Tagbilaran City, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road, F. Toledo Street, Dao District, Tagbilaran City, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0582-009276",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Lincod, Maribojoc, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "582",
      "lengthEvidence": "Construction of Road at Barangay Lincod, Maribojoc, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009278",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Libjo, Sikatuna leading to Barangay Dangay, Alburquerque, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Construction of Road at Barangay Libjo, Sikatuna leading to Barangay Dangay, Alburquerque, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009282",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Buhion Road, Cabawan, Tagbilaran City, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Construction of Road at Buhion Road, Cabawan, Tagbilaran City, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009285",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Habitat Bool District, TagbilaranCity, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Construction of Road at Habitat Bool District, TagbilaranCity, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009291",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion (Gil Arbilo St.),Panglao, Bohol",
      "office": "Bohol 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Construction of Road, Barangay Poblacion (Gil Arbilo St.),Panglao, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009292",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Cagay, Sibonga, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Concreting of Road, Barangay Cagay, Sibonga, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009293",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Cantaoan, Naga City, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Concreting of Road, Barangay Cantaoan, Naga City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009294",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Lutac, City of Naga, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Construction of Bridge, Lutac, City of Naga, Cebu",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009296",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Jaguimit, Naga City, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Concreting of Road, Barangay Jaguimit, Naga City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009297",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Lantawan, San Fernando, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Concreting of Road, Barangay Lantawan, San Fernando, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009298",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Libo, Sibonga, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Concreting of Road, Barangay Libo, Sibonga, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009299",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Liburon, San Fernando, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Concreting of Road, Barangay Liburon, San Fernando, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009300",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Kayam Road, Napo, Carcar City, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Concreting of Road, Kayam Road, Napo, Carcar City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0583-009302",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Pobreng Pungtod, Can-asujan, Carcar City, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "583",
      "lengthEvidence": "Concreting of Road, Pobreng Pungtod, Can-asujan, Carcar City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009304",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Lomboy to Sitio Magsipit, Barangay Liburon, Carcar City, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Concreting of Road, Sitio Lomboy to Sitio Magsipit, Barangay Liburon, Carcar City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009305",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Magsipit, Can-asujan, Carcar City, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Concreting of Road, Sitio Magsipit, Can-asujan, Carcar City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009306",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Tumpag, Guadalupe, Carcar City, Cebu",
      "office": "Cebu 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Concreting of Road, Sitio Tumpag, Guadalupe, Carcar City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009310",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Canukban, Oslob, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Concreting of Road, Barangay Canukban, Oslob, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009311",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Liloan to Barangay Bunlan, Santander, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Concreting of Road, Barangay Liloan to Barangay Bunlan, Santander, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009312",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Monteverde, Samboan, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Concreting of Road, Barangay Monteverde, Samboan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009313",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay South Granada, Boljoon, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Concreting of Road, Barangay South Granada, Boljoon, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009314",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Balaas, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Construction of Road, Barangay Balaas, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009315",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Tulang, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Concreting of Road, Barangay Tulang, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009317",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Upper Bulalacao to Research Center, Barangay Nug-as, Alcoy, Cebu.",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Concreting of Road, Sitio Upper Bulalacao to Research Center, Barangay Nug-as, Alcoy, Cebu.",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009318",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Road leading to Tabayag Elementary School, Barangay Tabayag, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Construction of Road, Barangay Road leading to Tabayag Elementary School, Barangay Tabayag, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009319",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Road, Barangay Caleriohan, Dalaguete, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Construction of Road, Barangay Road, Barangay Caleriohan, Dalaguete, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009320",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Road, Barangay Dugyan, Dalaguete, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Construction of Road, Barangay Road, Barangay Dugyan, Dalaguete, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009321",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Road, Barangay Mompeller, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Construction of Road, Barangay Road, Barangay Mompeller, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009322",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Mantalongon Barangay Road, Barangay Mantalongon, Dalaguete, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Construction of Road, Mantalongon Barangay Road, Barangay Mantalongon, Dalaguete, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009323",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Road, Barangay Colawin, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Construction of Road, Barangay Road, Barangay Colawin, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009324",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Road, Barangay Jomgao, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Construction of Road, Barangay Road, Barangay Jomgao, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009325",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Road, Barangay Lunop, Boljoon, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Construction of Road, Barangay Road, Barangay Lunop, Boljoon, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0584-009326",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Road, Barangay Panadtaran, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "584",
      "lengthEvidence": "Construction of Road, Barangay Road, Barangay Panadtaran, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009327",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Road, Barangay Poblacion, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Construction of Road, Barangay Road, Barangay Poblacion, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009328",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Road, Barangay Sumaguan, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Construction of Road, Barangay Road, Barangay Sumaguan, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009329",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Road, Barangay Usmad, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Construction of Road, Barangay Road, Barangay Usmad, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009330",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Road, Sitio Candulunon, Barangay Balisong, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Construction of Road, Barangay Road, Sitio Candulunon, Barangay Balisong, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009331",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Bulak Barangay Road, Barangay Bulak, Dalaguete, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Construction of Road, Bulak Barangay Road, Barangay Bulak, Dalaguete, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009332",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Canbanua Barangay Road, Barangay Canbanua, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Construction of Road, Canbanua Barangay Road, Barangay Canbanua, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009333",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Conalum Barangay Road, Barangay Conalum, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Construction of Road, Conalum Barangay Road, Barangay Conalum, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009334",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Daanglungsod Barangay Road, Sitio Nonok, Barangay Daanglungsod, Alcoy, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Construction of Road, Daanglungsod Barangay Road, Sitio Nonok, Barangay Daanglungsod, Alcoy, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009335",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Gutlang Barangay Road, Barangay Gutlang, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Construction of Road, Gutlang Barangay Road, Barangay Gutlang, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009336",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Langub Barangay Road, Barangay Langub, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Construction of Road, Langub Barangay Road, Barangay Langub, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009337",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Lengigon Barangay Road, Barangay Lengigon, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Construction of Road, Lengigon Barangay Road, Barangay Lengigon, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009338",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Mabasa Barangay Road, Sitio Baclao, Barangay Mabasa, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Construction of Road, Mabasa Barangay Road, Sitio Baclao, Barangay Mabasa, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009339",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Mandilikit Barangay Road, Barangay Mandilikit, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Construction of Road, Mandilikit Barangay Road, Barangay Mandilikit, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009340",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sua Barangay Road, Sitio Proper, Barangay Sua, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Construction of Road, Sua Barangay Road, Sitio Proper, Barangay Sua, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009341",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction/Rehabilitation of Road, Barangay Road, Barangay Binlod, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Construction/Rehabilitation of Road, Barangay Road, Barangay Binlod, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009342",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Constructionof Road, Barangay Road, Barangay Capio-an, Argao, Cebu",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Constructionof Road, Barangay Road, Barangay Capio-an, Argao, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009344",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
      "office": "Cebu 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009345",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Cabcaban, Barili, Cebu",
      "office": "Cebu 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Concreting of Road, Barangay Cabcaban, Barili, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009347",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Kaluangan, Asturias, Cebu",
      "office": "Cebu 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Concreting of Road, Barangay Kaluangan, Asturias, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009348",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
      "office": "Cebu 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009349",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Marmol, Tuburan, Cebu",
      "office": "Cebu 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Concreting of Road, Barangay Marmol, Tuburan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009350",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Ibo, Barangay Pondol, Balamban, Cebu",
      "office": "Cebu 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Concreting of Road, Sitio Ibo, Barangay Pondol, Balamban, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0585-009351",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Caputatan, Medellin, Cebu",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "585",
      "lengthEvidence": "Concreting of Road, Barangay Caputatan, Medellin, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009352",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Curva, Medellin, Cebu",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Barangay Curva, Medellin, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009353",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Malingin, Daanbantayan, Cebu",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Barangay Malingin, Daanbantayan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009354",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Maricaban, Santa Fe, Cebu",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Barangay Maricaban, Santa Fe, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009355",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Maya, Daanbantayan, Cebu",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Barangay Maya, Daanbantayan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009356",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Okoy, Santa Fe, Cebu",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Barangay Okoy, Santa Fe, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009357",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Poblacion, Tabuelan, Cebu",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Barangay Poblacion, Tabuelan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009358",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Kayam-Dapdap-Toong, Barangay Kayam, San Remigio, Cebu",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Kayam-Dapdap-Toong, Barangay Kayam, San Remigio, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009359",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Roa St. Extension, Barangay Poblacion, Madridejos, Cebu",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Roa St. Extension, Barangay Poblacion, Madridejos, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009361",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Guzo, Barangay Taba-ao , Tabogon, Cebu",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Sitio Guzo, Barangay Taba-ao , Tabogon, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009363",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road with Drainage System, Barangay Poblacion, Sogod, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road with Drainage System, Barangay Poblacion, Sogod, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009364",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Ipil, Carmen, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Barangay Ipil, Carmen, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009365",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Lupa, Compostela, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Barangay Lupa, Compostela, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009366",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Moabog, Pilar, Camotes, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Barangay Moabog, Pilar, Camotes, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009367",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Puertobello, Tudela, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Barangay Puertobello, Tudela, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009368",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Awihaw, Barangay San Isidro, San Francisco, Camotes, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Sitio Awihaw, Barangay San Isidro, San Francisco, Camotes, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009369",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Bagacay, Barangay Santa Rita, Poro, Camotes, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Sitio Bagacay, Barangay Santa Rita, Poro, Camotes, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009370",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Corazon, Barangay Poblacion, Catmon, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Sitio Corazon, Barangay Poblacion, Catmon, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009371",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Flores, Barangay Poblacion, Catmon, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Sitio Flores, Barangay Poblacion, Catmon, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009372",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Kinamagan, Barangay Poblacion, Borbon Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Sitio Kinamagan, Barangay Poblacion, Borbon Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009373",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Luayan, Barangay Tabunan, Borbon, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Concreting of Road, Sitio Luayan, Barangay Tabunan, Borbon, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009374",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabangahan, Sogod, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Construction of Road, Barangay Cabangahan, Sogod, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009376",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Catarman, Liloan, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Construction of Road, Barangay Catarman, Liloan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0586-009377",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Esperanza, San Francisco, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "586",
      "lengthEvidence": "Construction of Road, Barangay Esperanza, San Francisco, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009378",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Flores (Poblacion), Catmon, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Road, Barangay Flores (Poblacion), Catmon, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009379",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay General, Tudela, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Road, Barangay General, Tudela, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009380",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lower Poblacion, Pilar, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Road, Barangay Lower Poblacion, Pilar, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009382",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Montserrat - Barangay Biasong, Pilar, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Road, Barangay Montserrat - Barangay Biasong, Pilar, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009383",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mulao-Barangay Dapdap, Compostela, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Road, Barangay Mulao-Barangay Dapdap, Compostela, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009384",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pagsa - Barangay Altavista, Poro, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Road, Barangay Pagsa - Barangay Altavista, Poro, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009385",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Roque, Liloan, Cebu",
      "office": "Cebu 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Road, Barangay San Roque, Liloan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009387",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Roadside, Barangay Looc, Mandaue City, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Concreting of Road, Sitio Roadside, Barangay Looc, Mandaue City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009388",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road of Sitio Lomboy, Day-as, Cordova , Cebu, 10.25459261, 123.93997786",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Concreting of Road of Sitio Lomboy, Day-as, Cordova , Cebu, 10.25459261, 123.93997786",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009389",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Tikyan, Barangay Banilad, Mandaue City, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Concreting of Road, Sitio Tikyan, Barangay Banilad, Mandaue City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009390",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Zone 6, Don Sergio Suico St., Barangay Canduman, Mandaue City, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Concreting of Road, Zone 6, Don Sergio Suico St., Barangay Canduman, Mandaue City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0587-009397",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage along A.G. Cabahug, Sitio Centro, Barangay Looc, Mandaue City, Cebu. Sta. 0+000.00 to Sta. 0+122.00",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.122,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40983606.56,
      "lengthMeters": 122.0,
      "allocationPerStatedMeter": 40983.61,
      "rangesMeters": [
        [
          0.0,
          122.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "587",
      "lengthEvidence": "Construction of Road with Drainage along A.G. Cabahug, Sitio Centro, Barangay Looc, Mandaue City, Cebu. Sta. 0+000.00 to Sta. 0+122.00",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.16,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0588-009403",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage at M. Ceniza St., Mandaue City, Cebu",
      "office": "Cebu 6th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Construction of Road with Drainage at M. Ceniza St., Mandaue City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009412",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Batadbatad, Moalboal, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Concreting of Road, Barangay Batadbatad, Moalboal, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009413",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Cabadiangan, Alcantara, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Concreting of Road, Barangay Cabadiangan, Alcantara, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009414",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Cansalonoy, Ronda, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Concreting of Road, Barangay Cansalonoy, Ronda, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009415",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Manga, Alcantara, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Concreting of Road, Barangay Manga, Alcantara, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009416",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay San Roque to Barangay Poblacion, Ginatilan, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Concreting of Road, Barangay San Roque to Barangay Poblacion, Ginatilan, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009417",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Bitoon to Sitio Kanghumaod, Barangay Tubod, Dumanjug, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Concreting of Road, Sitio Bitoon to Sitio Kanghumaod, Barangay Tubod, Dumanjug, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0588-009418",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sitio Laguna, Barangay Tolosa, Malabuyoc, Cebu",
      "office": "Cebu 7th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "588",
      "lengthEvidence": "Concreting of Road, Sitio Laguna, Barangay Tolosa, Malabuyoc, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009447",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Basak Pardo, Cebu City, Cebu",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction of Road, Barangay Basak Pardo, Cebu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009451",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Quiot, Cebu City, Cebu",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction of Road, Barangay Quiot, Cebu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009452",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Punta Princesa, Cebu City, Cebu",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction of Road, Barangay Punta Princesa, Cebu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009453",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Poblacion Pardo, Cebu City, Cebu",
      "office": "Cebu City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Construction of Road, Barangay Poblacion Pardo, Cebu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0590-009462",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Calumpang, Naval, Biliran (Sta. 0 + 000 - Sta. 0 + 115, Sta. 0 + 060 - Sta. 0 + 142, Sta. 0 + 146 - Sta. 0 + 196)",
      "office": "Biliran District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.192,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 26041666.67,
      "lengthMeters": 192.0,
      "allocationPerStatedMeter": 26041.67,
      "rangesMeters": [
        [
          0.0,
          115.0
        ],
        [
          60.0,
          142.0
        ],
        [
          146.0,
          196.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "590",
      "lengthEvidence": "Rehabilitation of Road, Barangay Calumpang, Naval, Biliran (Sta. 0 + 000 - Sta. 0 + 115, Sta. 0 + 060 - Sta. 0 + 142, Sta. 0 + 146 - Sta. 0 + 196)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.74,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0591-009468",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Manlabang, Caibiran, Biliran (Sta. 0+000 - Sta. 0+177)",
      "office": "Biliran District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.177,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 28248587.57,
      "lengthMeters": 177.0,
      "allocationPerStatedMeter": 28248.59,
      "rangesMeters": [
        [
          0.0,
          177.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Rehabilitation of Road, Barangay Manlabang, Caibiran, Biliran (Sta. 0+000 - Sta. 0+177)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.8,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0591-009469",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Ungale, Kawayan, Biliran (Sta. 1+030 - Sta. 1+280)",
      "office": "Biliran District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.25,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20000000.0,
      "lengthMeters": 250.0,
      "allocationPerStatedMeter": 20000.0,
      "rangesMeters": [
        [
          1030.0,
          1280.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Rehabilitation of Road, Barangay Ungale, Kawayan, Biliran (Sta. 1+030 - Sta. 1+280)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.7,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0591-009475",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+200, Barangay Cansumangkay, Balangiga Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+200, Barangay Cansumangkay, Balangiga Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.71,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0591-009476",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+185, Barangay Bagua, Guiuan Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.185,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27027027.03,
      "lengthMeters": 185.0,
      "allocationPerStatedMeter": 27027.03,
      "rangesMeters": [
        [
          0.0,
          185.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+185, Barangay Bagua, Guiuan Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.76,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0591-009478",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sulangan, Guiuan, Eastern Samar, 125.822713, 10.945901",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Construction of Road, Barangay Sulangan, Guiuan, Eastern Samar, 125.822713, 10.945901",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0591-009479",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Timala, Guiuan, Eastern Samar, Start 11.069093, 125.725785",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Construction of Road, Barangay Timala, Guiuan, Eastern Samar, Start 11.069093, 125.725785",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0591-009480",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. Rosa, Balangiga, Eastern Samar",
      "office": "Eastern Samar District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "591",
      "lengthEvidence": "Construction of Road, Sta. Rosa, Balangiga, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0592-009499",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+205 - Sta. 0+590, Barangay Aringit, Pastrana, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.385,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12987012.99,
      "lengthMeters": 385.0,
      "allocationPerStatedMeter": 12987.01,
      "rangesMeters": [
        [
          205.0,
          590.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "592",
      "lengthEvidence": "Construction of Road, Sta. 0+205 - Sta. 0+590, Barangay Aringit, Pastrana, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.53,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0593-009511",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Joaquin, Capoocan, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Road, Barangay San Joaquin, Capoocan, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0593-009513",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Visares - Barangay Balugo, Capoocan, Leyte",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Road, Barangay Visares - Barangay Balugo, Capoocan, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0593-009516",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge, Barangay Parasan, Leyte, Leyte (11.387463, 124.429612)",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Bridge, Barangay Parasan, Leyte, Leyte (11.387463, 124.429612)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0593-009517",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Baco, Leyte Leyte (Station 0+000 - 0+200)",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Road, Barangay Baco, Leyte Leyte (Station 0+000 - 0+200)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.71,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0593-009518",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Rimas, Bartangay Palarao, Leyte, Leyte",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "593",
      "lengthEvidence": "Construction of Road, Sitio Rimas, Bartangay Palarao, Leyte, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0594-009539",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio San Vicente, Barangay Daja Daku, San Isidro, Leyte (Station 0+000 - 0+200)",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "594",
      "lengthEvidence": "Construction of Road, Sitio San Vicente, Barangay Daja Daku, San Isidro, Leyte (Station 0+000 - 0+200)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.71,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0595-009551",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Abuyogay, Sta. 0+000 - 0+355, Javier, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.355,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14084507.04,
      "lengthMeters": 355.0,
      "allocationPerStatedMeter": 14084.51,
      "rangesMeters": [
        [
          0.0,
          355.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Abuyogay, Sta. 0+000 - 0+355, Javier, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.49,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0595-009552",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Alangilan, Sta. 0+000 - 0+375, Abuyog, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.375,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 375.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          0.0,
          375.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Alangilan, Sta. 0+000 - 0+375, Abuyog, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.54,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0595-009553",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cagbolo, Abuyog, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Cagbolo, Abuyog, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0595-009554",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Alegria, Sta. 0+000 - 0+374, Bato, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.374,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13368983.96,
      "lengthMeters": 374.0,
      "allocationPerStatedMeter": 13368.98,
      "rangesMeters": [
        [
          0.0,
          374.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Alegria, Sta. 0+000 - 0+374, Bato, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.55,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0595-009555",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Amagos, Sta. 0+000 - 0+376, Bato, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.376,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13297872.34,
      "lengthMeters": 376.0,
      "allocationPerStatedMeter": 13297.87,
      "rangesMeters": [
        [
          0.0,
          376.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Amagos, Sta. 0+000 - 0+376, Bato, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.54,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0595-009556",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Atabay, Sta. 0+000 - 0+371, Hilongos, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.371,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13477088.95,
      "lengthMeters": 371.0,
      "allocationPerStatedMeter": 13477.09,
      "rangesMeters": [
        [
          0.0,
          371.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Atabay, Sta. 0+000 - 0+371, Hilongos, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.55,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0595-009557",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cancayang, Sta. 0+000 - 0+357, Javier, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.357,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14005602.24,
      "lengthMeters": 357.0,
      "allocationPerStatedMeter": 14005.6,
      "rangesMeters": [
        [
          0.0,
          357.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Cancayang, Sta. 0+000 - 0+357, Javier, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.49,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0595-009558",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Himamara, Mahaplag, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Himamara, Mahaplag, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0595-009559",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Hitoog, Matalom, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Hitoog, Matalom, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0595-009560",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Gacat, Sta. 0+000 - 0+380, Baybay City, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.38,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13157894.74,
      "lengthMeters": 380.0,
      "allocationPerStatedMeter": 13157.89,
      "rangesMeters": [
        [
          0.0,
          380.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Gacat, Sta. 0+000 - 0+380, Baybay City, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.54,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0595-009561",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Hitoog, Sta. 0+000 - 0+342, Matalom, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.342,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14619883.04,
      "lengthMeters": 342.0,
      "allocationPerStatedMeter": 14619.88,
      "rangesMeters": [
        [
          0.0,
          342.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Hitoog, Sta. 0+000 - 0+342, Matalom, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.51,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0595-009562",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Itum, Sta. 0+450 - 0+821, Matalom, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.371,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13477088.95,
      "lengthMeters": 371.0,
      "allocationPerStatedMeter": 13477.09,
      "rangesMeters": [
        [
          450.0,
          821.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Itum, Sta. 0+450 - 0+821, Matalom, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.55,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0595-009563",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mabunga, Sta. 0+000 - 0+355, Mahaplag, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.355,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14084507.04,
      "lengthMeters": 355.0,
      "allocationPerStatedMeter": 14084.51,
      "rangesMeters": [
        [
          0.0,
          355.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Mabunga, Sta. 0+000 - 0+355, Mahaplag, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.49,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0595-009564",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Malitbogay, Sta. 0+000 - 0+365, Javier, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.365,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13698630.14,
      "lengthMeters": 365.0,
      "allocationPerStatedMeter": 13698.63,
      "rangesMeters": [
        [
          0.0,
          365.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Malitbogay, Sta. 0+000 - 0+365, Javier, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.48,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0595-009565",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Old Taligue, Sta. 0+500 - 0+875, Abuyog, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.375,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13333333.33,
      "lengthMeters": 375.0,
      "allocationPerStatedMeter": 13333.33,
      "rangesMeters": [
        [
          500.0,
          875.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Old Taligue, Sta. 0+500 - 0+875, Abuyog, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.54,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0595-009566",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.36,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13888888.89,
      "lengthMeters": 360.0,
      "allocationPerStatedMeter": 13888.89,
      "rangesMeters": [
        [
          1390.0,
          1750.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.49,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0595-009567",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Pomponan, Sta. 0+000 - 0+372, Baybay City, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.372,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13440860.22,
      "lengthMeters": 372.0,
      "allocationPerStatedMeter": 13440.86,
      "rangesMeters": [
        [
          0.0,
          372.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "595",
      "lengthEvidence": "Construction of Road, Barangay Pomponan, Sta. 0+000 - 0+372, Baybay City, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.55,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0596-009568",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Punta, Sta. 0+000 - 0+374, Baybay City, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.374,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13368983.96,
      "lengthMeters": 374.0,
      "allocationPerStatedMeter": 13368.98,
      "rangesMeters": [
        [
          0.0,
          374.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Road, Barangay Punta, Sta. 0+000 - 0+374, Baybay City, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.55,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0596-009569",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Rivilla, Sta. 0+800 - 1+156, Bato, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.356,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14044943.82,
      "lengthMeters": 356.0,
      "allocationPerStatedMeter": 14044.94,
      "rangesMeters": [
        [
          800.0,
          1156.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Road, Barangay Rivilla, Sta. 0+800 - 1+156, Bato, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.49,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0596-009570",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Francisco, Sta. 0+000 - 0+300, Abuyog, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16666666.67,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 16666.67,
      "rangesMeters": [
        [
          0.0,
          300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Road, Barangay San Francisco, Sta. 0+000 - 0+300, Abuyog, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0596-009571",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Isidro, Sta. 0+000 - 0+367, Mahaplag, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.367,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13623978.2,
      "lengthMeters": 367.0,
      "allocationPerStatedMeter": 13623.98,
      "rangesMeters": [
        [
          0.0,
          367.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Road, Barangay San Isidro, Sta. 0+000 - 0+367, Mahaplag, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.56,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0596-009572",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Santo Rosario, Sta. 0+000 - 0+362, Baybay City, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.362,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13812154.7,
      "lengthMeters": 362.0,
      "allocationPerStatedMeter": 13812.15,
      "rangesMeters": [
        [
          0.0,
          362.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Road, Barangay Santo Rosario, Sta. 0+000 - 0+362, Baybay City, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.48,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0596-009574",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tagaytay, Sta. 0+000 - 0+365, Mahaplag, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.365,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13698630.14,
      "lengthMeters": 365.0,
      "allocationPerStatedMeter": 13698.63,
      "rangesMeters": [
        [
          0.0,
          365.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Road, Barangay Tagaytay, Sta. 0+000 - 0+365, Mahaplag, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.48,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0596-009575",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tuy-a, Sta. 0+600 - 0+968, Abuyog, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.368,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13586956.52,
      "lengthMeters": 368.0,
      "allocationPerStatedMeter": 13586.96,
      "rangesMeters": [
        [
          600.0,
          968.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Road, Barangay Tuy-a, Sta. 0+600 - 0+968, Abuyog, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.55,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0596-009576",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Villa Mag-aso, Sta. 0+000 - 0+370, Baybay City, Leyte",
      "office": "Leyte 5th District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.37,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 13513513.51,
      "lengthMeters": 370.0,
      "allocationPerStatedMeter": 13513.51,
      "rangesMeters": [
        [
          0.0,
          370.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "596",
      "lengthEvidence": "Construction of Road, Barangay Villa Mag-aso, Sta. 0+000 - 0+370, Baybay City, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.55,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0597-009596",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cababto-an (Sta. 0+214.50 - Sta. 0+274.50), Pambujan, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.06,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 83333333.33,
      "lengthMeters": 60.0,
      "allocationPerStatedMeter": 83333.33,
      "rangesMeters": [
        [
          214.5,
          274.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Road, Barangay Cababto-an (Sta. 0+214.50 - Sta. 0+274.50), Pambujan, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 2.36,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0597-009598",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cabulaloan (Sta. 0+000 - Sta. 0+125), Laoang, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.125,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 125.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          0.0,
          125.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Road, Barangay Cabulaloan (Sta. 0+000 - Sta. 0+125), Laoang, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.13,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0597-009600",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lawaan (Sta. 0+000 - Sta. 0+125), Laoang, Northern Samar",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.125,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 40000000.0,
      "lengthMeters": 125.0,
      "allocationPerStatedMeter": 40000.0,
      "rangesMeters": [
        [
          0.0,
          125.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Construction of Road, Barangay Lawaan (Sta. 0+000 - Sta. 0+125), Laoang, Northern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.13,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0597-009606",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Bridge leading to Pinusilan Blue Lagoon, Barangay Magtaon, Mapanas, Northern Samar (12.506514, 125.248756)",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "597",
      "lengthEvidence": "Rehabilitation of Bridge leading to Pinusilan Blue Lagoon, Barangay Magtaon, Mapanas, Northern Samar (12.506514, 125.248756)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0598-009608",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Cagmanipis Norte, Sta. 0+000 - Sta. 0+225, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.225,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22222222.22,
      "lengthMeters": 225.0,
      "allocationPerStatedMeter": 22222.22,
      "rangesMeters": [
        [
          0.0,
          225.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Construction of Road, Barangay Cagmanipis Norte, Sta. 0+000 - Sta. 0+225, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.63,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0598-009609",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Carayman, Sta. 0+000 - Sta. 0+172, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.172,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29069767.44,
      "lengthMeters": 172.0,
      "allocationPerStatedMeter": 29069.77,
      "rangesMeters": [
        [
          0.0,
          172.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Construction of Road, Barangay Carayman, Sta. 0+000 - Sta. 0+172, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.82,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0598-009612",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lonoy, Sta. 0+000 - Sta. 0+220.69, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.22069,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22656214.6,
      "lengthMeters": 220.69,
      "allocationPerStatedMeter": 22656.21,
      "rangesMeters": [
        [
          0.0,
          220.69
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Construction of Road, Barangay Lonoy, Sta. 0+000 - Sta. 0+220.69, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0598-009613",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Guin-on, Sta. 0+000 - Sta. 0+504, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.504,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 9920634.92,
      "lengthMeters": 504.0,
      "allocationPerStatedMeter": 9920.63,
      "rangesMeters": [
        [
          0.0,
          504.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Construction of Road, Barangay Guin-on, Sta. 0+000 - Sta. 0+504, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.41,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0598-009614",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Nijaga, Sta. 0+000 - Sta. 0+300, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16666666.67,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 16666.67,
      "rangesMeters": [
        [
          0.0,
          300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Construction of Road, Barangay Nijaga, Sta. 0+000 - Sta. 0+300, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0598-009615",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Payahan, Sta. 0+000 - Sta. 0+247, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.247,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20242914.98,
      "lengthMeters": 247.0,
      "allocationPerStatedMeter": 20242.91,
      "rangesMeters": [
        [
          0.0,
          247.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Construction of Road, Barangay Payahan, Sta. 0+000 - Sta. 0+247, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.71,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0598-009618",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Begaho, Sta. 0+000 - Sta. 0+227.96, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.22796,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21933672.57,
      "lengthMeters": 227.96,
      "allocationPerStatedMeter": 21933.67,
      "rangesMeters": [
        [
          0.0,
          227.96
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Rehabilitation of Road, Barangay Begaho, Sta. 0+000 - Sta. 0+227.96, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.62,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0598-009619",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Cabacungan, Sta. 0+000 - Sta. 0+400, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.4,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12500000.0,
      "lengthMeters": 400.0,
      "allocationPerStatedMeter": 12500.0,
      "rangesMeters": [
        [
          0.0,
          400.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Rehabilitation of Road, Barangay Cabacungan, Sta. 0+000 - Sta. 0+400, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.51,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0598-009620",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Cagbilwang, Sta. 0+000 - Sta. 0+140, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35714285.71,
      "lengthMeters": 140.0,
      "allocationPerStatedMeter": 35714.29,
      "rangesMeters": [
        [
          0.0,
          140.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Rehabilitation of Road, Barangay Cagbilwang, Sta. 0+000 - Sta. 0+140, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.01,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0598-009621",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Cagnipa, Sta. 0+000 - Sta. 0+472, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.472,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10593220.34,
      "lengthMeters": 472.0,
      "allocationPerStatedMeter": 10593.22,
      "rangesMeters": [
        [
          0.0,
          472.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Rehabilitation of Road, Barangay Cagnipa, Sta. 0+000 - Sta. 0+472, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.43,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0598-009622",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Cag-olango, Sta. 0+000 - Sta. 0+458, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.458,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10917030.57,
      "lengthMeters": 458.0,
      "allocationPerStatedMeter": 10917.03,
      "rangesMeters": [
        [
          0.0,
          458.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Rehabilitation of Road, Barangay Cag-olango, Sta. 0+000 - Sta. 0+458, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.45,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0598-009623",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Carmen, Sta. 0+000 - Sta. 0+235, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.235,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21276595.74,
      "lengthMeters": 235.0,
      "allocationPerStatedMeter": 21276.6,
      "rangesMeters": [
        [
          0.0,
          235.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Rehabilitation of Road, Barangay Carmen, Sta. 0+000 - Sta. 0+235, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.6,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0598-009624",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Danao I, Sta. 0+000 - Sta. 0+200, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "598",
      "lengthEvidence": "Rehabilitation of Road, Barangay Danao I, Sta. 0+000 - Sta. 0+200, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.71,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0599-009625",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Dinagan, Sta. 0+000 - Sta. 0+210, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.21,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23809523.81,
      "lengthMeters": 210.0,
      "allocationPerStatedMeter": 23809.52,
      "rangesMeters": [
        [
          0.0,
          210.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Rehabilitation of Road, Barangay Dinagan, Sta. 0+000 - Sta. 0+210, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.67,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0599-009626",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Jimautan, Sta. 0+000 - Sta. 0+225, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.225,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 22222222.22,
      "lengthMeters": 225.0,
      "allocationPerStatedMeter": 22222.22,
      "rangesMeters": [
        [
          0.0,
          225.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Rehabilitation of Road, Barangay Jimautan, Sta. 0+000 - Sta. 0+225, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.63,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0599-009627",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay La Paz, Sta. 0+000 - Sta. 0+227.41, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.22741,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21986720.02,
      "lengthMeters": 227.41,
      "allocationPerStatedMeter": 21986.72,
      "rangesMeters": [
        [
          0.0,
          227.41
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Rehabilitation of Road, Barangay La Paz, Sta. 0+000 - Sta. 0+227.41, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.62,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0599-009628",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Malayog, Sta. 0+000 - Sta. 0+460, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.46,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10869565.22,
      "lengthMeters": 460.0,
      "allocationPerStatedMeter": 10869.57,
      "rangesMeters": [
        [
          0.0,
          460.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Rehabilitation of Road, Barangay Malayog, Sta. 0+000 - Sta. 0+460, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 24481.33,
      "peerRateMultiple": 0.44,
      "peerRecords": 257,
      "peerBand": "366–<735.75 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77960.48000000001,
      "graphUpperFence": 116705.27
    },
    {
      "id": "HB10858-3-0599-009629",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Migara, Sta. 0+000 - Sta. 0+200, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25000000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 25000.0,
      "rangesMeters": [
        [
          0.0,
          200.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Rehabilitation of Road, Barangay Migara, Sta. 0+000 - Sta. 0+200, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.71,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0599-009630",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Palanas Cara, Sta. 0+000 - Sta. 0+231.10, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.2311,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21635655.56,
      "lengthMeters": 231.1,
      "allocationPerStatedMeter": 21635.66,
      "rangesMeters": [
        [
          0.0,
          231.1
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Rehabilitation of Road, Barangay Palanas Cara, Sta. 0+000 - Sta. 0+231.10, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.61,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0599-009631",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Patong, Sta. 0+000 - Sta. 0+272, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.272,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18382352.94,
      "lengthMeters": 272.0,
      "allocationPerStatedMeter": 18382.35,
      "rangesMeters": [
        [
          0.0,
          272.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Rehabilitation of Road, Barangay Patong, Sta. 0+000 - Sta. 0+272, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.64,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0599-009632",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Sinidman Occidental, Sta. 0+000 - Sta. 0+352, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.352,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14204545.45,
      "lengthMeters": 352.0,
      "allocationPerStatedMeter": 14204.55,
      "rangesMeters": [
        [
          0.0,
          352.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Rehabilitation of Road, Barangay Sinidman Occidental, Sta. 0+000 - Sta. 0+352, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.5,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0599-009633",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Sinidman Oriental, Sta. 0+000 - Sta. 0+348, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.348,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14367816.09,
      "lengthMeters": 348.0,
      "allocationPerStatedMeter": 14367.82,
      "rangesMeters": [
        [
          0.0,
          348.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Rehabilitation of Road, Barangay Sinidman Oriental, Sta. 0+000 - Sta. 0+348, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.5,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0599-009634",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Tomaligues, Sta. 0+000 - Sta. 0+347, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.347,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14409221.9,
      "lengthMeters": 347.0,
      "allocationPerStatedMeter": 14409.22,
      "rangesMeters": [
        [
          0.0,
          347.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Rehabilitation of Road, Barangay Tomaligues, Sta. 0+000 - Sta. 0+347, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.5,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0599-009635",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Victory, Sta. 0+000 - Sta. 0+236, Calbayog City, Samar",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.236,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21186440.68,
      "lengthMeters": 236.0,
      "allocationPerStatedMeter": 21186.44,
      "rangesMeters": [
        [
          0.0,
          236.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Rehabilitation of Road, Barangay Victory, Sta. 0+000 - Sta. 0+236, Calbayog City, Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.74,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0599-009637",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Catabunan, Calbayog City",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Construction of Road in Barangay Catabunan, Calbayog City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0599-009638",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Mabini 2, Calbayog City",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Construction of Road in Barangay Mabini 2, Calbayog City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0599-009639",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Rizal 2, Calbayog City",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Construction of Road in Barangay Rizal 2, Calbayog City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0599-009640",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Cangomaod, Calbayog City",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Construction of Road in Barangay Cangomaod, Calbayog City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0599-009642",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay San Rufino, Calbayog City",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "599",
      "lengthEvidence": "Construction of Road in Barangay San Rufino, Calbayog City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0600-009660",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road Barangay Talon Talon, Zamboanga City",
      "office": "Zamboanga City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Construction of Road Barangay Talon Talon, Zamboanga City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0600-009661",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Barangay Talon-Talon Main Rd, Torres Drive, and Logoy Grande, Zamboanga City",
      "office": "Zamboanga City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "600",
      "lengthEvidence": "Construction of Road at Barangay Talon-Talon Main Rd, Torres Drive, and Logoy Grande, Zamboanga City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009668",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bato, Sindangan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Barangay Bato, Sindangan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009669",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bitoon, Jose Dalman, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Barangay Bitoon, Jose Dalman, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009670",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Bucana, Sindangan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Barangay Bucana, Sindangan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009671",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Sta. 0+000 - Sta. 0+240, from Jct. National Highway Leading to Disud Barangay Hall, Disud, Sindangan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.24,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20833333.33,
      "lengthMeters": 240.0,
      "allocationPerStatedMeter": 20833.33,
      "rangesMeters": [
        [
          0.0,
          240.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Concreting of Road, Sta. 0+000 - Sta. 0+240, from Jct. National Highway Leading to Disud Barangay Hall, Disud, Sindangan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.73,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0601-009674",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Labakid, Sindangan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Barangay Labakid, Sindangan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009675",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lagag, Sindangan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Barangay Lagag, Sindangan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009676",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sanao, Katipunan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Barangay Sanao, Katipunan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009677",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Centro, Barangay Mate, Manukan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Centro, Barangay Mate, Manukan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009678",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Centro, Barangay Nato, Sindangan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Centro, Barangay Nato, Sindangan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009679",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, from Centro to Sitio Guevarra Hill, Barangay Dumalogdog, Sindangan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, from Centro to Sitio Guevarra Hill, Barangay Dumalogdog, Sindangan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009680",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Highway to Sitio Labaluran, Barangay Nipaan, Sindangan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Highway to Sitio Labaluran, Barangay Nipaan, Sindangan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009681",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Lower Dequis, Barangay Poblacion, Manukan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Lower Dequis, Barangay Poblacion, Manukan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009682",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 1, Barangay Tamarok, Jose Dalman, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Purok 1, Barangay Tamarok, Jose Dalman, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0601-009683",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 4, Barangay Lower Inuman, Sindangan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "601",
      "lengthEvidence": "Construction of Road, Purok 4, Barangay Lower Inuman, Sindangan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009684",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 5, Barangay Uno, Katipunan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Construction of Road, Purok 5, Barangay Uno, Katipunan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009685",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Lomboy to Boundary Tanayan Section, Barangay Lower Irasan, Pres. Manuel Roxas, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Construction of Road, Purok Lomboy to Boundary Tanayan Section, Barangay Lower Irasan, Pres. Manuel Roxas, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009686",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Lovebird, Barangay Sigamok, Jose Dalman, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Construction of Road, Purok Lovebird, Barangay Sigamok, Jose Dalman, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009688",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sector 1 & 7, Barangay Datu Tangkilan, Sindangan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Construction of Road, Sector 1 & 7, Barangay Datu Tangkilan, Sindangan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009689",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sector 5, Barangay Benigno Aquino, Sindangan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Construction of Road, Sector 5, Barangay Benigno Aquino, Sindangan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009690",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Bayol, Barangay San Antonio, Manukan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Construction of Road, Sitio Bayol, Barangay San Antonio, Manukan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009691",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Cacawan, Barangay Bago, Sindangan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Construction of Road, Sitio Cacawan, Barangay Bago, Sindangan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009692",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Dequis, Barangay Palaranan, Manukan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Construction of Road, Sitio Dequis, Barangay Palaranan, Manukan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009693",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Dinuman, Barangay Marupay, Jose Dalman, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Construction of Road, Sitio Dinuman, Barangay Marupay, Jose Dalman, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009694",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Purok Bato, Barangay Punta Blanca, Manukan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Construction of Road, Sitio Purok Bato, Barangay Punta Blanca, Manukan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009695",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Tambad to Matam, Barangay Upper Disakan, Manukan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Construction of Road, Sitio Tambad to Matam, Barangay Upper Disakan, Manukan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009696",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Tingga, Barangay Meses, Manukan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Construction of Road, Sitio Tingga, Barangay Meses, Manukan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009697",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, South Baybay Mauswagon, Barangay Galas, Dipolog City, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Construction of Road, South Baybay Mauswagon, Barangay Galas, Dipolog City, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0602-009698",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Road, Barangay Mandih, Sindangan, Zamboanga del Norte",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "602",
      "lengthEvidence": "Rehabilitation of Road, Barangay Mandih, Sindangan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009760",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay San Isidro, Payao, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road in Barangay San Isidro, Payao, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009761",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Barangay Villagonzalo, Olutanga, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road in Barangay Villagonzalo, Olutanga, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009762",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Purok 1-2 Barangay Guitom, Buug, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road in Purok 1-2 Barangay Guitom, Buug, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009764",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Purok 1-4 Barangay Basak-Bawang, Malangas, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road in Purok 1-4 Barangay Basak-Bawang, Malangas, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009765",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Purok 3 Barangay Guintoloan, Buug, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road in Purok 3 Barangay Guintoloan, Buug, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0605-009766",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Purok 5, Barangay Basalem, Buug, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "605",
      "lengthEvidence": "Construction of Road in Purok 5, Barangay Basalem, Buug, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009767",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Purok 7 Barangay Gandiangan, Imelda, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of Road in Purok 7 Barangay Gandiangan, Imelda, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009768",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Purok District 1 Barangay Punawan, Mabuhay, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of Road in Purok District 1 Barangay Punawan, Mabuhay, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009769",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Purok Kalubian Barangay Talaptap, Alicia, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of Road in Purok Kalubian Barangay Talaptap, Alicia, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009770",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Purok Lerio, Barangay Poblacion, Alicia, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of Road in Purok Lerio, Barangay Poblacion, Alicia, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009771",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road in Purok Santing Barangay Tandiong Muslim, Alicia, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of Road in Purok Santing Barangay Tandiong Muslim, Alicia, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0606-009774",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Access Road, Barangay Gubawang, Naga, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "606",
      "lengthEvidence": "Construction of Access Road, Barangay Gubawang, Naga, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009792",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Kauswagan, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Construction of Roads, Barangay Kauswagan, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009793",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads, Barangay Lumbia, Cagayan de Oro City, 8.401534, 124.588101",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Construction of Roads, Barangay Lumbia, Cagayan de Oro City, 8.401534, 124.588101",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009794",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Bayanga, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Bayanga, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009796",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Bayabas, Cagayan de Oro City, 8.511354, 124.627584",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Bayabas, Cagayan de Oro City, 8.511354, 124.627584",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009797",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Besigan, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Besigan, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009798",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Bonbon, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Bonbon, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009799",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Dansolihon, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Dansolihon, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009801",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Kauswagan, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Kauswagan, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009804",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Pagalungan, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Pagalungan, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009807",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Pigsag-an, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Pigsag-an, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0607-009808",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay San Simon, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "607",
      "lengthEvidence": "Rehabilitation of Roads in Barangay San Simon, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009809",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Tignapoloan, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Tignapoloan, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009810",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Tuburan, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Tuburan, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009811",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Rehabilitation of Roads in Barangay Tumpagon, Cagayan de Oro City",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Rehabilitation of Roads in Barangay Tumpagon, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009815",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Completion) of Bridge along Malasag River, Barangay Cugman, Cagayan de Oro City, Misamis Oriental, 8.452176°, 124.689299°",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Construction (Completion) of Bridge along Malasag River, Barangay Cugman, Cagayan de Oro City, Misamis Oriental, 8.452176°, 124.689299°",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009818",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Road Concreting with Drainage Lower Puerto, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Road Concreting with Drainage Lower Puerto, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009819",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Upper Puerto-Purok 7, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Concreting of Road, Upper Puerto-Purok 7, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009823",
      "category": "Bridges",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Bridge (Bagumbilid Area), Barangay Balubal, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Construction of Bridge (Bagumbilid Area), Barangay Balubal, Cagayan de Oro City",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009825",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay 9, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Improvement of Road at Barangay 9, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009829",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Kamakawan, Barangay Gusa, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Construction of Road at Kamakawan, Barangay Gusa, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009830",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads at Barangay Camaman-an, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Construction of Roads at Barangay Camaman-an, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0608-009831",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay 29, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "608",
      "lengthEvidence": "Improvement of Road at Barangay 29, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009832",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at VTS Phase 3B, Barangay Bugo, Cagayan de Oro City, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Road at VTS Phase 3B, Barangay Bugo, Cagayan de Oro City, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009833",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road at Barangay 6, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Improvement of Road at Barangay 6, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009834",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road at Upper Agusan, Barangay Agusan, Cagayan de Oro City, Misamis Oriental",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Road at Upper Agusan, Barangay Agusan, Cagayan de Oro City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009835",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Taguanao, Barangay Indahag, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Road with Drainage, Taguanao, Barangay Indahag, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009836",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road near Mother Theresa Foundation, Barangay Puerto, Cagayan de Oro City, Misamis Oriental",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Road near Mother Theresa Foundation, Barangay Puerto, Cagayan de Oro City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009837",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road leading to Apo Malaki Integrated School, Barangay FS Catanico, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Road leading to Apo Malaki Integrated School, Barangay FS Catanico, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009838",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage at Barangay Puntod, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Road with Drainage at Barangay Puntod, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009839",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage at Barangay Tablon, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Road with Drainage at Barangay Tablon, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009840",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage at Villaflora, Barangay Cugman, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Road with Drainage at Villaflora, Barangay Cugman, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009841",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Roads (Pathway) along Barangay Balubal, Cagayan de Oro City",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Construction of Roads (Pathway) along Barangay Balubal, Cagayan de Oro City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0609-009842",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay San Roque, Municipality of Mahinog, Province of Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "609",
      "lengthEvidence": "Concreting of Road, Barangay San Roque, Municipality of Mahinog, Province of Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009853",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Lisbong to Barangay Cabu-an, Guinsiliban, Camigiun",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Construction of Road, Sitio Lisbong to Barangay Cabu-an, Guinsiliban, Camigiun",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009854",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sitio Luangan, Barangay Anito, Mambajao, Camiguin",
      "office": "Camiguin District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Construction of Road, Sitio Luangan, Barangay Anito, Mambajao, Camiguin",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0610-009867",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Road with Drainage, Purok Abigail, Barangay Del Carmen, Sta. 0+000 - Sta. 0+140, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.14,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35714285.71,
      "lengthMeters": 140.0,
      "allocationPerStatedMeter": 35714.29,
      "rangesMeters": [
        [
          0.0,
          140.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "610",
      "lengthEvidence": "Improvement of Road with Drainage, Purok Abigail, Barangay Del Carmen, Sta. 0+000 - Sta. 0+140, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.01,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0611-009875",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Drainage, Barangay Acmac, Sta. 0+000 -Sta. 0+133, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.133,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37593984.96,
      "lengthMeters": 133.0,
      "allocationPerStatedMeter": 37593.98,
      "rangesMeters": [
        [
          0.0,
          133.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Road with Drainage, Barangay Acmac, Sta. 0+000 -Sta. 0+133, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.06,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0611-009876",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok Makugihon and Purok Masidlakon, Barangay Sta. Felomina, Section A: Sta. 0+000 - Sta. 0+080, Section B: Sta. 0+000 - Sta. 0+230, Iligan City",
      "office": "Iligan City District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.23,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 21739130.43,
      "lengthMeters": 230.0,
      "allocationPerStatedMeter": 21739.13,
      "rangesMeters": [
        [
          0.0,
          80.0
        ],
        [
          0.0,
          230.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "611",
      "lengthEvidence": "Construction of Road, Purok Makugihon and Purok Masidlakon, Barangay Sta. Felomina, Section A: Sta. 0+000 - Sta. 0+080, Section B: Sta. 0+000 - Sta. 0+230, Iligan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.61,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0613-009917",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 4), Barangay Poblacion, Sta. 0+000 - Sta. 0+170, Bonifacio, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 170.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Concreting of Road (Purok 4), Barangay Poblacion, Sta. 0+000 - Sta. 0+170, Bonifacio, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.83,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0613-009920",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Barangay Road, Barangay Pangabuan, Sta. 0+000 - Sta. 0+170, Tangub City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 170.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "613",
      "lengthEvidence": "Construction of Barangay Road, Barangay Pangabuan, Sta. 0+000 - Sta. 0+170, Tangub City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.83,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0614-009930",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 7), Barangay Linconan, Sta. 0+000 - Sta. 0+170, Bonifacio, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 170.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Concreting of Road (Purok 7), Barangay Linconan, Sta. 0+000 - Sta. 0+170, Bonifacio, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.83,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0614-009931",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 2), Barangay Demetrio Fernan, Sta. 0+000 - Sta. 0+170, Bonifacio, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 170.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Concreting of Road (Purok 2), Barangay Demetrio Fernan, Sta. 0+000 - Sta. 0+170, Bonifacio, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.83,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0614-009945",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 3), Doña Consuelo, Sta. 0+000 - Sta. 0+170, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 170.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Concreting of Road (Purok 3), Doña Consuelo, Sta. 0+000 - Sta. 0+170, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.83,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0614-009948",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Purok 4 - Paustino Decena Integrated School), Barangay Carangan, Sta. 0+000 - Sta. 0+170, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 170.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "614",
      "lengthEvidence": "Concreting of Road (Purok 4 - Paustino Decena Integrated School), Barangay Carangan, Sta. 0+000 - Sta. 0+170, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.83,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0615-009952",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road (Segment D Purok 7), Barangay Bagakay, Sta. 0+000 - Sta. 0+170, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29411764.71,
      "lengthMeters": 170.0,
      "allocationPerStatedMeter": 29411.76,
      "rangesMeters": [
        [
          0.0,
          170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Concreting of Road (Segment D Purok 7), Barangay Bagakay, Sta. 0+000 - Sta. 0+170, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.83,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0615-009958",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Improvement of Roads including Facilities along Purok Rizal to Purok Bonifacio, Barangay Bacolod, Sta. 0+000 - Sta. 0+100, Ozamiz City, Misamis Occidental",
      "office": "Misamis Occidenatal 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 100.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          0.0,
          100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Improvement of Roads including Facilities along Purok Rizal to Purok Bonifacio, Barangay Bacolod, Sta. 0+000 - Sta. 0+100, Ozamiz City, Misamis Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.41,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0615-009965",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok - 3, Barangay 25, Gingoog City, Misamis Oriental",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "615",
      "lengthEvidence": "Construction of Road, Purok - 3, Barangay 25, Gingoog City, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009970",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay San Pedro, Initao, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road, Barangay San Pedro, Initao, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009971",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road/Circumferential Road at Initao Bus Terminal",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Concreting of Road/Circumferential Road at Initao Bus Terminal",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009974",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road with Canal, Barangay Linangkayan, Naawan, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road with Canal, Barangay Linangkayan, Naawan, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009975",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Digkilaan, Manticao, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road, Barangay Digkilaan, Manticao, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009977",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Lanise, Claveria, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road, Barangay Lanise, Claveria, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009979",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Mapulog, Naawan, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road, Barangay Mapulog, Naawan, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009980",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Retablo, Libertad, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road, Barangay Retablo, Libertad, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009981",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sambulawan, Laguindingan, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road, Barangay Sambulawan, Laguindingan, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0616-009983",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Tubigan, Initao, Misamis Oriental",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "616",
      "lengthEvidence": "Construction of Road, Barangay Tubigan, Initao, Misamis Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010039",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Barangay Balatican, Pikit, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Concrete Road, Barangay Balatican, Pikit, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0619-010045",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Purok Orchids to Purok Two Lovers, Barangay Sadaan, Midsayap, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "619",
      "lengthEvidence": "Construction of Concrete Road, Purok Orchids to Purok Two Lovers, Barangay Sadaan, Midsayap, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010052",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Sitio Riverside to Sitio Antara, Nicaan, Barangay Libungan, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Concrete Road, Sitio Riverside to Sitio Antara, Nicaan, Barangay Libungan, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010057",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Sta. Cruz, Aleosan, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Road, Barangay Sta. Cruz, Aleosan, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010058",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Purok 2 to Purok Tres Rosas, Barangay Anonang, Midsayap, Cotabato",
      "office": "Cotabato 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Road, Purok 2 to Purok Tres Rosas, Barangay Anonang, Midsayap, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0620-010065",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road (Box Culvert), Barangay Lika, M'lang, Cotabato",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "620",
      "lengthEvidence": "Construction of Road (Box Culvert), Barangay Lika, M'lang, Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0622-010100",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Concrete Road, Chinatown, Barangay GPS, Koronadal City, South Cotabato, 6.502359, 124.853021",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "622",
      "lengthEvidence": "Construction of Concrete Road, Chinatown, Barangay GPS, Koronadal City, South Cotabato, 6.502359, 124.853021",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010115",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Purok Sampaguita - Sitio Tunga Road, Barangay Poblacion, Sto. Nino, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Purok Sampaguita - Sitio Tunga Road, Barangay Poblacion, Sto. Nino, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010118",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Dumaguil - Tinago Road, Barangay Tinago, Norala, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Dumaguil - Tinago Road, Barangay Tinago, Norala, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010119",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Barangay Proper - Lamlaho B Road, Barangay Buenavista, Surallah, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Barangay Proper - Lamlaho B Road, Barangay Buenavista, Surallah, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010120",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Lamlaho B - Lamlaho C Road, Barangay Canahay, Surallah, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Lamlaho B - Lamlaho C Road, Barangay Canahay, Surallah, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010121",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Purok 5 - Sitio Damasco Road, Barangay Centrala, Surallah, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Purok 5 - Sitio Damasco Road, Barangay Centrala, Surallah, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010122",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Lambusong - Mahi Road, Barangay Colongulo, Surallah, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Lambusong - Mahi Road, Barangay Colongulo, Surallah, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010124",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Sitio Lamluma Road, Barangay Little Baguio, Surallah, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Sitio Lamluma Road, Barangay Little Baguio, Surallah, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010125",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Sitio Tapok Road, Barangay Moloy, Surallah, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Sitio Tapok Road, Barangay Moloy, Surallah, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010126",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Sitio Sawmill Road, Barangay Naci, Surallah, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Sitio Sawmill Road, Barangay Naci, Surallah, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0623-010127",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Sitio Lamaha Road, Barangay Talahik, Surallah, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "623",
      "lengthEvidence": "Concreting of Sitio Lamaha Road, Barangay Talahik, Surallah, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010130",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Purok T'Boli Road, Barangay Lake Lahit, Lake Sebu, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Concreting of Purok T'Boli Road, Barangay Lake Lahit, Lake Sebu, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010131",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Road, Barangay Tasiman, Lake Sebu, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Concreting of Road, Barangay Tasiman, Lake Sebu, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010132",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Sitio Proper - Sitio Lem Afus Road, Barangay Upper Maculan, Lake Sebu, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Concreting of Sitio Proper - Sitio Lem Afus Road, Barangay Upper Maculan, Lake Sebu, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010133",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Sitio 3 Fingers - Sitio Culohulo Road, Barangay Bacdulong, Lake Sebu, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Concreting of Sitio 3 Fingers - Sitio Culohulo Road, Barangay Bacdulong, Lake Sebu, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010134",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Junction HW - Lemsnolon Road, Barangay Edwards, T'Boli, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Concreting of Junction HW - Lemsnolon Road, Barangay Edwards, T'Boli, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010135",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Concreting of Mabuhay - Silang Road, Barangay Dumaguil, Norala, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Concreting of Mabuhay - Silang Road, Barangay Dumaguil, Norala, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010136",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Purok 1 Road, Barangay Talisay, Lake Sebu, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Construction of Purok 1 Road, Barangay Talisay, Lake Sebu, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0624-010138",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Datal Bob Road, Barangay Datal Bob, T'Boli, South Cotabato",
      "office": "South Cotabato 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "624",
      "lengthEvidence": "Construction of Datal Bob Road, Barangay Datal Bob, T'Boli, South Cotabato",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0625-010164",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Lasedeco Road, Barangay Kalawag I, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Road, Lasedeco Road, Barangay Kalawag I, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0625-010169",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, from Leonora to Isulan National High School Road, Barangay Kalawag II, Isulan, Sultan Kudarat",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "625",
      "lengthEvidence": "Construction of Road, from Leonora to Isulan National High School Road, Barangay Kalawag II, Isulan, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0627-010204",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction (Improvement) Sta. 0 + 000 - Sta. 0 + 100 of Road, Barangay Carmen, Loreto, Dinagat Islands",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.1,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50000000.0,
      "lengthMeters": 100.0,
      "allocationPerStatedMeter": 50000.0,
      "rangesMeters": [
        [
          0.0,
          100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "627",
      "lengthEvidence": "Construction (Improvement) Sta. 0 + 000 - Sta. 0 + 100 of Road, Barangay Carmen, Loreto, Dinagat Islands",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 1.41,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0628-010209",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Barangay Jubang, Dapa Siargao Island, Surigao del Norte",
      "office": "Surigao del Norte 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of Road, Barangay Jubang, Dapa Siargao Island, Surigao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0628-010215",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, (0+000 - 0+300), Purok 5, Barangay Togbongon, Surigao City, Surigao del Norte",
      "office": "Surigao del Norte 2nd District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": 0.3,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16666666.67,
      "lengthMeters": 300.0,
      "allocationPerStatedMeter": 16666.67,
      "rangesMeters": [
        [
          0.0,
          300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "628",
      "lengthEvidence": "Construction of Road, (0+000 - 0+300), Purok 5, Barangay Togbongon, Surigao City, Surigao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 28571.43,
      "peerRateMultiple": 0.58,
      "peerRecords": 128,
      "peerBand": "235.5–<366 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74105.44875000001,
      "graphUpperFence": 106741.5975
    },
    {
      "id": "HB10858-3-0629-010237",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Causeway for Environmental Protection, Barangay Chambery, Municipality of Manapla, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "629",
      "lengthEvidence": "Construction of Causeway for Environmental Protection, Barangay Chambery, Municipality of Manapla, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0629-010238",
      "category": "Roads",
      "program": "BIP - Coastal Roads to augment Resiliency of Coastal Communities",
      "projectName": "Construction of Causeway for Environmental Protection, Barangay Punta Salong, Municipality of Manapla, Negros Occidental",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "629",
      "lengthEvidence": "Construction of Causeway for Environmental Protection, Barangay Punta Salong, Municipality of Manapla, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002799",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Abuyog Br. (B04695LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 4900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Abuyog Br. (B04695LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0215-001903",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Alicia - Angadanan - San Guillermo - Cauayan City - Naguilian Alternate Route (Sta. 4+224 - Sta. 4+423), Isabela",
      "office": "Central Office",
      "amountPesos": 4865000,
      "lengthKm": 0.199,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24447236.18,
      "lengthMeters": 199.0,
      "allocationPerStatedMeter": 24447.24,
      "rangesMeters": [
        [
          4224.0,
          4423.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "215",
      "lengthEvidence": "Alicia - Angadanan - San Guillermo - Cauayan City - Naguilian Alternate Route (Sta. 4+224 - Sta. 4+423), Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 209790.21,
      "peerRateMultiple": 0.12,
      "peerRecords": 35,
      "peerBand": "137.8–<325.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1043149.6425,
      "graphUpperFence": 1612047.66
    },
    {
      "id": "HB10858-3-0233-002240",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "NRJ Barangay Balugo to Barangay San Jose, Imelda, Zamboanga Sibugay",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "amountPesos": 4800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "233",
      "lengthEvidence": "NRJ Barangay Balugo to Barangay San Jose, Imelda, Zamboanga Sibugay",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0253-002568",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Sn Pablo-Rizal-Nagcarlan-Liliw Rd - K0086 + 290 - K0086 + 303, K0087 + 382 - K0087 + 491, K0087 + 518 - K0088 + 163, K0088 + 500 - K0088 + 527, K0088 + 568 - K0088 + 585, K0091 + 000 - K0091 + 045, K0098 + 221 - K0098 + 296, K0098 + 527 - K0098 + 534, K0100 + 513 - K0100 + 572, K0102 + 189 - K0102 + 330 (Off- Carriageway Improvement: Construction of Sidewalk)",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 4781000,
      "lengthKm": 1.138,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 4201230.23,
      "lengthMeters": 1138.0,
      "allocationPerStatedMeter": 4201.23,
      "rangesMeters": [
        [
          86290.0,
          86303.0
        ],
        [
          87382.0,
          87491.0
        ],
        [
          87518.0,
          88163.0
        ],
        [
          88500.0,
          88527.0
        ],
        [
          88568.0,
          88585.0
        ],
        [
          91000.0,
          91045.0
        ],
        [
          98221.0,
          98296.0
        ],
        [
          98527.0,
          98534.0
        ],
        [
          100513.0,
          100572.0
        ],
        [
          102189.0,
          102330.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "253",
      "lengthEvidence": "Sn Pablo-Rizal-Nagcarlan-Liliw Rd - K0086 + 290 - K0086 + 303, K0087 + 382 - K0087 + 491, K0087 + 518 - K0088 + 163, K0088 + 500 - K0088 + 527, K0088 + 568 - K0088 + 585, K0091 + 000 - K0091 + 045, K0098 + 221 - K0098 + 296, K0098 + 527 - K0098 + 534, K0100 + 513 - K0100 + 572, K0102 + 189 - K0102 + 330 (Off- Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.42,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0212-001850",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Tungusong-Tubig Indangan Rd - Chainage 9616 - Chainage 10000",
      "office": "Central Office",
      "amountPesos": 4772000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "212",
      "lengthEvidence": "Tungusong-Tubig Indangan Rd - Chainage 9616 - Chainage 10000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0160-000929",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Indang-Alfonso via Luksuhin Rd - K0068 + 529 - K0068 + 664",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 4731000,
      "lengthKm": 0.135,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35044444.44,
      "lengthMeters": 135.0,
      "allocationPerStatedMeter": 35044.44,
      "rangesMeters": [
        [
          68529.0,
          68664.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "160",
      "lengthEvidence": "Indang-Alfonso via Luksuhin Rd - K0068 + 529 - K0068 + 664",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 0.67,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0168-001085",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Balbalan-Pinukpuk Rd - K0480 + 155 - K0480 + 260, K0488 + 947 - K0489 + 000",
      "office": "Upper Kalinga District Engineering Office",
      "amountPesos": 4650000,
      "lengthKm": 0.158,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 29430379.75,
      "lengthMeters": 158.0,
      "allocationPerStatedMeter": 29430.38,
      "rangesMeters": [
        [
          480155.0,
          480260.0
        ],
        [
          488947.0,
          489000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "Balbalan-Pinukpuk Rd - K0480 + 155 - K0480 + 260, K0488 + 947 - K0489 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 0.54,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0256-002600",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Tertiary Roads",
      "projectName": "Zamboanga del Sur Coastal Rd - (S01511MN) Chainage 2376 - Chainage 2466",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "amountPesos": 4648000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "256",
      "lengthEvidence": "Zamboanga del Sur Coastal Rd - (S01511MN) Chainage 2376 - Chainage 2466",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0187-001394",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Mondragon-Bantayan Old Rd - K0758 + 960 - K0759 + 000",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 4590000,
      "lengthKm": 0.04,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 114750000.0,
      "lengthMeters": 40.0,
      "allocationPerStatedMeter": 114750.0,
      "rangesMeters": [
        [
          758960.0,
          759000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "187",
      "lengthEvidence": "Mondragon-Bantayan Old Rd - K0758 + 960 - K0759 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 373527.02,
      "peerRateMultiple": 0.31,
      "peerRecords": 40,
      "peerBand": "0–<134 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 1008819.7649999999,
      "graphUpperFence": 1477985.6849999998
    },
    {
      "id": "HB10858-3-0142-000628",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Zapote-Alabang Rd - (S03496LZ) Chainage 000 - Chainage 134",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 4570000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "Zapote-Alabang Rd - (S03496LZ) Chainage 000 - Chainage 134",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0167-001069",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "South Super H-way East Service Rd - K0018 + 759 - K0019 + 057",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 4561000,
      "lengthKm": 0.298,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 15305369.13,
      "lengthMeters": 298.0,
      "allocationPerStatedMeter": 15305.37,
      "rangesMeters": [
        [
          18759.0,
          19057.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "167",
      "lengthEvidence": "South Super H-way East Service Rd - K0018 + 759 - K0019 + 057",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.48,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0177-001234",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0592 + 060 - K0592 + 087",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 4500000,
      "lengthKm": 0.027,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 166666666.67,
      "lengthMeters": 27.0,
      "allocationPerStatedMeter": 166666.67,
      "rangesMeters": [
        [
          592060.0,
          592087.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0592 + 060 - K0592 + 087",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 0.78,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0248-002496",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Jct. Ayaga (Abulug)-Ballesteros-Aparri Rd - K0680 + 280 - K0680 + 700 (Off- Carriageway Improvement: Paving of Shoulders)",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 4500000,
      "lengthKm": 0.42,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10714285.71,
      "lengthMeters": 420.0,
      "allocationPerStatedMeter": 10714.29,
      "rangesMeters": [
        [
          680280.0,
          680700.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "248",
      "lengthEvidence": "Jct. Ayaga (Abulug)-Ballesteros-Aparri Rd - K0680 + 280 - K0680 + 700 (Off- Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 0.85,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0255-002585",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Installation of Solar LED (Roadway Lighting) along Mayor CA Fernandez (S01496MN) Rd Chainage 000 - Chainage 500",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 4500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "255",
      "lengthEvidence": "Installation of Solar LED (Roadway Lighting) along Mayor CA Fernandez (S01496MN) Rd Chainage 000 - Chainage 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0209-001796",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Aklan East Rd - K0296 + 1017 - K0296 + 1019, K0302 + 476 - K0302 + 528, K0302 + 557 - K0302 + 631, K0311 + 969 - K0311 + 984, K0312 + 692 - K0312 + 712, K0313 + 406 - K0313 + 427",
      "office": "Aklan District Engineering Office",
      "amountPesos": 4499000,
      "lengthKm": 0.184,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 24451086.96,
      "lengthMeters": 184.0,
      "allocationPerStatedMeter": 24451.09,
      "rangesMeters": [
        [
          297017.0,
          297019.0
        ],
        [
          302476.0,
          302528.0
        ],
        [
          302557.0,
          302631.0
        ],
        [
          311969.0,
          311984.0
        ],
        [
          312692.0,
          312712.0
        ],
        [
          313406.0,
          313427.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "209",
      "lengthEvidence": "Aklan East Rd - K0296 + 1017 - K0296 + 1019, K0302 + 476 - K0302 + 528, K0302 + 557 - K0302 + 631, K0311 + 969 - K0311 + 984, K0312 + 692 - K0312 + 712, K0313 + 406 - K0313 + 427",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 0.49,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0120-000179",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0043 + 537 - K0043 + 615",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 4488000,
      "lengthKm": 0.078,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 57538461.54,
      "lengthMeters": 78.0,
      "allocationPerStatedMeter": 57538.46,
      "rangesMeters": [
        [
          43537.0,
          43615.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0043 + 537 - K0043 + 615",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 1.24,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0153-000811",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Manila North Rd - K0213 + 809 - K0214 + 017",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 4473000,
      "lengthKm": 0.208,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21504807.69,
      "lengthMeters": 208.0,
      "allocationPerStatedMeter": 21504.81,
      "rangesMeters": [
        [
          213809.0,
          214017.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Manila North Rd - K0213 + 809 - K0214 + 017",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 0.54,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0155-000862",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1392 + 725 - K1392 + 792.50, K1395 + 471 - K1395 + 497, K1399 + 310 - K1399 + 378",
      "office": "Misamis Oriental 1st District Engineering Office",
      "amountPesos": 4471000,
      "lengthKm": 0.1615,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 27684210.53,
      "lengthMeters": 161.5,
      "allocationPerStatedMeter": 27684.21,
      "rangesMeters": [
        [
          1392725.0,
          1392792.5
        ],
        [
          1395471.0,
          1395497.0
        ],
        [
          1399310.0,
          1399378.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1392 + 725 - K1392 + 792.50, K1395 + 471 - K1395 + 497, K1399 + 310 - K1399 + 378",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 0.7,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0169-001094",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Jct Ipil-Quirino Bdry Rd - K0338 + 018 - K0339 + 000",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 4410000,
      "lengthKm": 0.982,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 4490835.03,
      "lengthMeters": 982.0,
      "allocationPerStatedMeter": 4490.84,
      "rangesMeters": [
        [
          338018.0,
          339000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Jct Ipil-Quirino Bdry Rd - K0338 + 018 - K0339 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.14,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0170-001116",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Jct Guinhayaan-Malbog Port Rd - K0100 + 725 - K0100 + 798",
      "office": "Romblon District Engineering Office",
      "amountPesos": 4380000,
      "lengthKm": 0.073,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 60000000.0,
      "lengthMeters": 73.0,
      "allocationPerStatedMeter": 60000.0,
      "rangesMeters": [
        [
          100725.0,
          100798.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Jct Guinhayaan-Malbog Port Rd - K0100 + 725 - K0100 + 798",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 1.11,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0146-000699",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Candoni-Sipalay Rd - K0149 + 400 - K0149 + 600",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 4262000,
      "lengthKm": 0.2,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21310000.0,
      "lengthMeters": 200.0,
      "allocationPerStatedMeter": 21310.0,
      "rangesMeters": [
        [
          149400.0,
          149600.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Candoni-Sipalay Rd - K0149 + 400 - K0149 + 600",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 0.65,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0154-000832",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bacolod North Rd - K0119 + 718 - K0119+823, K0120+132 - K0120+210",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 4209000,
      "lengthKm": 0.183,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 23000000.0,
      "lengthMeters": 183.0,
      "allocationPerStatedMeter": 23000.0,
      "rangesMeters": [
        [
          119718.0,
          119823.0
        ],
        [
          120132.0,
          120210.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "Bacolod North Rd - K0119 + 718 - K0119+823, K0120+132 - K0120+210",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 0.58,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0247-002469",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Mindanao Ave - K0019 + (-893) - K0019 + 217 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Central Office",
      "amountPesos": 4039000,
      "lengthKm": 1.11,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 3638738.74,
      "lengthMeters": 1110.0,
      "allocationPerStatedMeter": 3638.74,
      "rangesMeters": [
        [
          18107.0,
          19217.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "Mindanao Ave - K0019 + (-893) - K0019 + 217 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 0.29,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0170-001112",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Mabini St - (S05825LZ) Chainage 000 - Chainage 238",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 4034000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Mabini St - (S05825LZ) Chainage 000 - Chainage 238",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0186-001389",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Cabunga-an-Tabunok-Consuegra Rd - K1024 + 000 - K1024 + 460",
      "office": "Leyte 3rd District Engineering Office",
      "amountPesos": 4016000,
      "lengthKm": 0.46,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8730434.78,
      "lengthMeters": 460.0,
      "allocationPerStatedMeter": 8730.43,
      "rangesMeters": [
        [
          1024000.0,
          1024460.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Cabunga-an-Tabunok-Consuegra Rd - K1024 + 000 - K1024 + 460",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 92679.17,
      "peerRateMultiple": 0.09,
      "peerRecords": 20,
      "peerBand": "≥302.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 195329.03375,
      "graphUpperFence": 271659.845
    },
    {
      "id": "HB10858-3-0142-000627",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Zapote-Alabang Rd - (S03274LZ) Chainage 260 - Chainage 383",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 4006000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "Zapote-Alabang Rd - (S03274LZ) Chainage 260 - Chainage 383",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0177-001235",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0593 + 450 - K0593 + 475",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 4000000,
      "lengthKm": 0.025,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 160000000.0,
      "lengthMeters": 25.0,
      "allocationPerStatedMeter": 160000.0,
      "rangesMeters": [
        [
          593450.0,
          593475.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0593 + 450 - K0593 + 475",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 0.75,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0255-002586",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Installation of Solar LED (Roadway Lighting) along Veterans Ave (S01207MN) Chainage 000 - Chainage 456",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 4000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "255",
      "lengthEvidence": "Installation of Solar LED (Roadway Lighting) along Veterans Ave (S01207MN) Chainage 000 - Chainage 456",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0271-002915",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Alinao Br. (B02720LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 4000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Alinao Br. (B02720LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0271-002916",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Langga Br. (B02730LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 4000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Langga Br. (B02730LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0272-002927",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Mandazo Br. (B05166LZ) along Basud-Lanot Rd",
      "office": "Central Office",
      "amountPesos": 4000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Mandazo Br. (B05166LZ) along Basud-Lanot Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0272-002930",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Parapatuangan Br. (B02735LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 4000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Parapatuangan Br. (B02735LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0272-002935",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tuaca Br. (B02737LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 4000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Tuaca Br. (B02737LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0272-002936",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tulay na Bato Br. (B02727LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 4000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Tulay na Bato Br. (B02727LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002957",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Magalibobo Br. (B00929MN) along Maharlika Highway (Agusan-Davao Sect)",
      "office": "Central Office",
      "amountPesos": 4000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Magalibobo Br. (B00929MN) along Maharlika Highway (Agusan-Davao Sect)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003111",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Nahibang Br. (B00644SM) along Allen-Catarman Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 4000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Nahibang Br. (B00644SM) along Allen-Catarman Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003114",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Rosario Br. 5 (B00282SM) along Allen-Catarman Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 4000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Rosario Br. 5 (B00282SM) along Allen-Catarman Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003126",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Simora Br. (B00318SM) along Rawis-Catubig Rd",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 4000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Simora Br. (B00318SM) along Rawis-Catubig Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003149",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Bansarvil Br. (B00975MN) along Dobleston-Butadon Rd",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 4000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Bansarvil Br. (B00975MN) along Dobleston-Butadon Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0120-000192",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Antipolo Div Rd 2 - K0024 + (-093) - K0024 + 250",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 3969000,
      "lengthKm": 0.343,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11571428.57,
      "lengthMeters": 343.0,
      "allocationPerStatedMeter": 11571.43,
      "rangesMeters": [
        [
          23907.0,
          24250.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Antipolo Div Rd 2 - K0024 + (-093) - K0024 + 250",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 47913.23,
      "peerRateMultiple": 0.24,
      "peerRecords": 28,
      "peerBand": "332.5–<596.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 112925.95250000001,
      "graphUpperFence": 161141.99750000003
    },
    {
      "id": "HB10858-3-0277-003049",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Alimango Br. 2 (B00483NR) along Bacolod South Rd",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 3890000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Alimango Br. 2 (B00483NR) along Bacolod South Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0146-000703",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Larena-Basac-Maria Rd - (S00005SJ) Chainage 10488 - Chainage 10687",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 3870000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Larena-Basac-Maria Rd - (S00005SJ) Chainage 10488 - Chainage 10687",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0152-000810",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bauang-Baguio Rd - K0280 + 170 - K0280 + 354",
      "office": "La Union 2nd District Engineering Office",
      "amountPesos": 3864000,
      "lengthKm": 0.184,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21000000.0,
      "lengthMeters": 184.0,
      "allocationPerStatedMeter": 21000.0,
      "rangesMeters": [
        [
          280170.0,
          280354.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Bauang-Baguio Rd - K0280 + 170 - K0280 + 354",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 0.53,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0166-001042",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd - K1417 + 637 - K1417 + 795",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 3842000,
      "lengthKm": 0.158,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24316455.7,
      "lengthMeters": 158.0,
      "allocationPerStatedMeter": 24316.46,
      "rangesMeters": [
        [
          1417637.0,
          1417795.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "166",
      "lengthEvidence": "Surigao-Davao Coastal Rd - K1417 + 637 - K1417 + 795",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 0.47,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0281-003150",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Calingawan Br. (B02381MN) along Lanao del Norte Interior Circum. Rd (LDNICR)",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 3842000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Calingawan Br. (B02381MN) along Lanao del Norte Interior Circum. Rd (LDNICR)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003151",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Ningal Br. (B02383MN) along Lanao del Norte Interior Circum. Rd (LDNICR)",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "amountPesos": 3842000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Ningal Br. (B02383MN) along Lanao del Norte Interior Circum. Rd (LDNICR)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0146-000701",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Candoni-Sipalay Rd - K0162 + 120 - K0163 + 300",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 3836000,
      "lengthKm": 1.18,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 3250847.46,
      "lengthMeters": 1180.0,
      "allocationPerStatedMeter": 3250.85,
      "rangesMeters": [
        [
          162120.0,
          163300.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Candoni-Sipalay Rd - K0162 + 120 - K0163 + 300",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 23923.44,
      "peerRateMultiple": 0.14,
      "peerRecords": 45,
      "peerBand": "508–<1287.28 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 63381.065,
      "graphUpperFence": 91276.76000000001
    },
    {
      "id": "HB10858-3-0144-000668",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0042 + 328 - K0042 + 512, K0043 + 579 - K0043 + 725",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 3818000,
      "lengthKm": 0.33,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 11569696.97,
      "lengthMeters": 330.0,
      "allocationPerStatedMeter": 11569.7,
      "rangesMeters": [
        [
          42328.0,
          42512.0
        ],
        [
          43579.0,
          43725.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Tejero-Gen Trias-Amadeo-Tagaytay Rd - K0042 + 328 - K0042 + 512, K0043 + 579 - K0043 + 725",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 0.35,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0132-000427",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Isaac O. Tolentino Ave. - K0059 + 377 - K0059 + 589",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 3816000,
      "lengthKm": 0.212,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18000000.0,
      "lengthMeters": 212.0,
      "allocationPerStatedMeter": 18000.0,
      "rangesMeters": [
        [
          59377.0,
          59589.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "132",
      "lengthEvidence": "Isaac O. Tolentino Ave. - K0059 + 377 - K0059 + 589",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.36,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0177-001233",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Conner-Kabugao Rd - K0598 + 015 - K0598 + 038",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 3800000,
      "lengthKm": 0.023,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 165217391.3,
      "lengthMeters": 23.0,
      "allocationPerStatedMeter": 165217.39,
      "rangesMeters": [
        [
          598015.0,
          598038.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Conner-Kabugao Rd - K0598 + 015 - K0598 + 038",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 0.78,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0149-000748",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway ( Manila South Road) - K0031 + (-780) - K0031 + (-684)",
      "office": "Central Office",
      "amountPesos": 3771000,
      "lengthKm": 0.096,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 39281250.0,
      "lengthMeters": 96.0,
      "allocationPerStatedMeter": 39281.25,
      "rangesMeters": [
        [
          30220.0,
          30316.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "149",
      "lengthEvidence": "Maharlika Highway ( Manila South Road) - K0031 + (-780) - K0031 + (-684)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 0.99,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0186-001377",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads",
      "projectName": "Paracelis-Mallig-Roxas Rd - (S04031LZ) Chainage 4282 - Chainage 4318",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 3686000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "186",
      "lengthEvidence": "Paracelis-Mallig-Roxas Rd - (S04031LZ) Chainage 4282 - Chainage 4318",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0247-002468",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Mindanao Ave - K0019 + (-309) - K0019 + 684 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Central Office",
      "amountPesos": 3636000,
      "lengthKm": 0.993,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 3661631.42,
      "lengthMeters": 993.0,
      "allocationPerStatedMeter": 3661.63,
      "rangesMeters": [
        [
          18691.0,
          19684.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "Mindanao Ave - K0019 + (-309) - K0019 + 684 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 0.29,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0277-003048",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Guicay Bridge - B00161NR along Bacolod North Rd",
      "office": "Negros Occidental 1st District Engineering Office",
      "amountPesos": 3600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Guicay Bridge - B00161NR along Bacolod North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0133-000442",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Maragondon-Magallanes-Amuyong Rd - K0058 + 834 - K0058 + 932",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 3588000,
      "lengthKm": 0.098,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 36612244.9,
      "lengthMeters": 98.0,
      "allocationPerStatedMeter": 36612.24,
      "rangesMeters": [
        [
          58834.0,
          58932.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "133",
      "lengthEvidence": "Maragondon-Magallanes-Amuyong Rd - K0058 + 834 - K0058 + 932",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.72,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0170-001108",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Tagaytay-Taal Lake Rd - K0057 + (-191) - K0057 + 000",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 3584000,
      "lengthKm": 0.191,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18764397.91,
      "lengthMeters": 191.0,
      "allocationPerStatedMeter": 18764.4,
      "rangesMeters": [
        [
          56809.0,
          57000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Tagaytay-Taal Lake Rd - K0057 + (-191) - K0057 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 0.35,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0142-000629",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "San Juan-Santolan Rd - K0009 + (-182) - K0010 + 403",
      "office": "Metro Manila 1st District Engineering Office",
      "amountPesos": 3562000,
      "lengthKm": 1.585,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2247318.61,
      "lengthMeters": 1585.0,
      "allocationPerStatedMeter": 2247.32,
      "rangesMeters": [
        [
          8818.0,
          10403.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "San Juan-Santolan Rd - K0009 + (-182) - K0010 + 403",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 21572.63,
      "peerRateMultiple": 0.1,
      "peerRecords": 22,
      "peerBand": "1287.28–<1787 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 71586.32750000001,
      "graphUpperFence": 103641.40250000001
    },
    {
      "id": "HB10858-3-0272-002946",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Calapan Br. (B00489MN) along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd)",
      "office": "Central Office",
      "amountPesos": 3550000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Calapan Br. (B00489MN) along Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0138-000544",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Sindangan-Siayan-Dumingag-Mahayag Rd (Mahayag-Dumingag Sect) - K1671 + 992 - K1672 + 000",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "amountPesos": 3520000,
      "lengthKm": 0.008,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 440000000.0,
      "lengthMeters": 8.0,
      "allocationPerStatedMeter": 440000.0,
      "rangesMeters": [
        [
          1671992.0,
          1672000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "138",
      "lengthEvidence": "Sindangan-Siayan-Dumingag-Mahayag Rd (Mahayag-Dumingag Sect) - K1671 + 992 - K1672 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": true,
      "rateReview": "Very short printed range · verify length first"
    },
    {
      "id": "HB10858-3-0168-001082",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Paracelis-Mallig-Roxas Rd - Chainage 1890 - Chainage 2010",
      "office": "Mountain Province 2nd District Engineering Office",
      "amountPesos": 3500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "Paracelis-Mallig-Roxas Rd - Chainage 1890 - Chainage 2010",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0171-001136",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Dancalan-Candoni-Damutan Valley Rd - K0138 + 050 - K0138 + 100",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 3500000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 70000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 70000.0,
      "rangesMeters": [
        [
          138050.0,
          138100.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Dancalan-Candoni-Damutan Valley Rd - K0138 + 050 - K0138 + 100",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 1.29,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0180-001281",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Iloilo East Coast-Capiz Rd - K0263 + 110 - K0263 + 130, K0263 + 609 - K0263 + 623",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 3500000,
      "lengthKm": 0.034,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 102941176.47,
      "lengthMeters": 34.0,
      "allocationPerStatedMeter": 102941.18,
      "rangesMeters": [
        [
          263110.0,
          263130.0
        ],
        [
          263609.0,
          263623.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "180",
      "lengthEvidence": "Iloilo East Coast-Capiz Rd - K0263 + 110 - K0263 + 130, K0263 + 609 - K0263 + 623",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 0.48,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0280-003105",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Lamod Br. (B00286SM) along Allen-Catarman Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 3500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Lamod Br. (B00286SM) along Allen-Catarman Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0145-000677",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Mabini St - (S06052LZ) Chainage 000 - Chainage 200",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 3494000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Mabini St - (S06052LZ) Chainage 000 - Chainage 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0155-000859",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Dipolog-Sindangan-Liloy Rd - K1869 + 000 - K1869 + 139",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 3455000,
      "lengthKm": 0.139,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 24856115.11,
      "lengthMeters": 139.0,
      "allocationPerStatedMeter": 24856.12,
      "rangesMeters": [
        [
          1869000.0,
          1869139.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "Dipolog-Sindangan-Liloy Rd - K1869 + 000 - K1869 + 139",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 0.63,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0279-003099",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Bobon Br. (B00293SM) along Bobon Old Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 3400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Bobon Br. (B00293SM) along Bobon Old Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0165-001033",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Zamboanga City-Labuan-Limpapa Rd - K1947 + 326 - K1947 + 340, K1947 + 562 - K1947 + 571.40, K1954 + 915 - K1954 + 929, K1960 + 374.20 - K1960 + 413.30",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 3397000,
      "lengthKm": 0.0765,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 44405228.76,
      "lengthMeters": 76.5,
      "allocationPerStatedMeter": 44405.23,
      "rangesMeters": [
        [
          1947326.0,
          1947340.0
        ],
        [
          1947562.0,
          1947571.4
        ],
        [
          1954915.0,
          1954929.0
        ],
        [
          1960374.2,
          1960413.3
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Zamboanga City-Labuan-Limpapa Rd - K1947 + 326 - K1947 + 340, K1947 + 562 - K1947 + 571.40, K1954 + 915 - K1954 + 929, K1960 + 374.20 - K1960 + 413.30",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 0.85,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0119-000177",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0038 + 315 - K0038 + 604",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 3344000,
      "lengthKm": 0.289,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11570934.26,
      "lengthMeters": 289.0,
      "allocationPerStatedMeter": 11570.93,
      "rangesMeters": [
        [
          38315.0,
          38604.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "119",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0038 + 315 - K0038 + 604",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 0.25,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0121-000215",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "N Bacalso Ave (Cebu South Rd) - K0065 + 438 - K0065 + 567",
      "office": "Cebu 2nd District Engineering Office",
      "amountPesos": 3308000,
      "lengthKm": 0.129,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25643410.85,
      "lengthMeters": 129.0,
      "allocationPerStatedMeter": 25643.41,
      "rangesMeters": [
        [
          65438.0,
          65567.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "121",
      "lengthEvidence": "N Bacalso Ave (Cebu South Rd) - K0065 + 438 - K0065 + 567",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 0.55,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0147-000731",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Matalam-Mlang-Bagontapay Jct Rd - K1653 + 779 - K1653 + 877",
      "office": "Cotabato 3rd District Engineering Office",
      "amountPesos": 3297000,
      "lengthKm": 0.098,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33642857.14,
      "lengthMeters": 98.0,
      "allocationPerStatedMeter": 33642.86,
      "rangesMeters": [
        [
          1653779.0,
          1653877.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "147",
      "lengthEvidence": "Matalam-Mlang-Bagontapay Jct Rd - K1653 + 779 - K1653 + 877",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 1.03,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0170-001122",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Baras-Gigmoto-Viga Rd - K0031 + 821 - K0032 + 261, K0032 + 914 - K0033 + 000, K0050 + 860 - K0051 + 000, K0083 + 000 - K0084 + 000, K0088 + 577 - K0088 + 906",
      "office": "Catanduanes District Engineering Office",
      "amountPesos": 3280000,
      "lengthKm": 1.995,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 1644110.28,
      "lengthMeters": 1995.0,
      "allocationPerStatedMeter": 1644.11,
      "rangesMeters": [
        [
          31821.0,
          32261.0
        ],
        [
          32914.0,
          33000.0
        ],
        [
          50860.0,
          51000.0
        ],
        [
          83000.0,
          84000.0
        ],
        [
          88577.0,
          88906.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Baras-Gigmoto-Viga Rd - K0031 + 821 - K0032 + 261, K0032 + 914 - K0033 + 000, K0050 + 860 - K0051 + 000, K0083 + 000 - K0084 + 000, K0088 + 577 - K0088 + 906",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22654.56,
      "peerRateMultiple": 0.07,
      "peerRecords": 22,
      "peerBand": "≥1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 43782.54750000001,
      "graphUpperFence": 58323.11250000001
    },
    {
      "id": "HB10858-3-0160-000935",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Maragondon-Magallanes-Amuyong Rd - K0085 + 949 - K0086 + 120",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 3249000,
      "lengthKm": 0.171,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 19000000.0,
      "lengthMeters": 171.0,
      "allocationPerStatedMeter": 19000.0,
      "rangesMeters": [
        [
          85949.0,
          86120.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "160",
      "lengthEvidence": "Maragondon-Magallanes-Amuyong Rd - K0085 + 949 - K0086 + 120",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54342.11,
      "peerRateMultiple": 0.35,
      "peerRecords": 21,
      "peerBand": "164.5–<349.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 132134.11,
      "graphUpperFence": 188868.22
    },
    {
      "id": "HB10858-3-0269-002880",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Jugaban Br. (B00532LT) along Palo-Carigara-Ormoc Rd",
      "office": "Leyte 2nd District Engineering Office",
      "amountPesos": 3240000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Jugaban Br. (B00532LT) along Palo-Carigara-Ormoc Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002801",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Camalig Br. (B05223LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 3206000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Camalig Br. (B05223LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0112-000024",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway ( Manila South Road) - K0042 + 336 - K0042 + 410",
      "office": "Central Office",
      "amountPesos": 3199000,
      "lengthKm": 0.074,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 43229729.73,
      "lengthMeters": 74.0,
      "allocationPerStatedMeter": 43229.73,
      "rangesMeters": [
        [
          42336.0,
          42410.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "112",
      "lengthEvidence": "Maharlika Highway ( Manila South Road) - K0042 + 336 - K0042 + 410",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 0.93,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0155-000860",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Sindangan-Liloy Rd - K1941 + 923 - K1942 + 000",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "amountPesos": 3178000,
      "lengthKm": 0.077,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 41272727.27,
      "lengthMeters": 77.0,
      "allocationPerStatedMeter": 41272.73,
      "rangesMeters": [
        [
          1941923.0,
          1942000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "155",
      "lengthEvidence": "Sindangan-Liloy Rd - K1941 + 923 - K1942 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 1.04,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0207-001753",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa North Rd - K0169 + 573 - K0169 + 595.50, K0169 + 758.20 - K0169 + 804",
      "office": "Palawan 1st District Engineering Office",
      "amountPesos": 3142000,
      "lengthKm": 0.06829999999998836,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 46002928.26,
      "lengthMeters": 68.3,
      "allocationPerStatedMeter": 46002.93,
      "rangesMeters": [
        [
          169573.0,
          169595.5
        ],
        [
          169758.2,
          169804.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Puerto Princesa North Rd - K0169 + 573 - K0169 + 595.50, K0169 + 758.20 - K0169 + 804",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 0.92,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0272-002948",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Gusawan Br. (Cantilever) (B00487MN) along Maharlika Highway( Lanao-Pagadian- Zamboanga City Rd)",
      "office": "Central Office",
      "amountPesos": 3100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "Gusawan Br. (Cantilever) (B00487MN) along Maharlika Highway( Lanao-Pagadian- Zamboanga City Rd)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003128",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Marsolo Br. (B01553MN) along Crossing Sta. Clara-Sandayong Rd",
      "office": "Zamboanga Sibugay 2nd District Engineering Office",
      "amountPesos": 3100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Marsolo Br. (B01553MN) along Crossing Sta. Clara-Sandayong Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003129",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Sta. Clara Br. (B01552MN) along Crossing Sta. Clara-Sandayong Rd",
      "office": "Zamboanga Sibugay 2nd District Engineering Office",
      "amountPesos": 3100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Sta. Clara Br. (B01552MN) along Crossing Sta. Clara-Sandayong Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0118-000147",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Maharlika Highway (Surigao-Agusan Sect) - K1229 + 680 - K1229 + 773",
      "office": "Central Office",
      "amountPesos": 3087000,
      "lengthKm": 0.093,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 33193548.39,
      "lengthMeters": 93.0,
      "allocationPerStatedMeter": 33193.55,
      "rangesMeters": [
        [
          1229680.0,
          1229773.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Maharlika Highway (Surigao-Agusan Sect) - K1229 + 680 - K1229 + 773",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 0.71,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0161-000941",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Mayapa-Canlubang Cadre Rd - K0050 + 855 - K0051 + 000",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 3084000,
      "lengthKm": 0.145,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21268965.52,
      "lengthMeters": 145.0,
      "allocationPerStatedMeter": 21268.97,
      "rangesMeters": [
        [
          50855.0,
          51000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "Mayapa-Canlubang Cadre Rd - K0050 + 855 - K0051 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 0.41,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0165-001036",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Zamboanga City-Labuan-Limpapa Rd - K1969 + 054 - K1969 + 099.10, K1969 + 182.50 - K1969 + 213.10",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 3081000,
      "lengthKm": 0.07570000000018627,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 40700132.1,
      "lengthMeters": 75.7,
      "allocationPerStatedMeter": 40700.13,
      "rangesMeters": [
        [
          1969054.0,
          1969099.1
        ],
        [
          1969182.5,
          1969213.1
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Zamboanga City-Labuan-Limpapa Rd - K1969 + 054 - K1969 + 099.10, K1969 + 182.50 - K1969 + 213.10",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 0.78,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0200-001616",
      "category": "Roads",
      "program": "Road Widening - Primary Roads",
      "projectName": "Ormoc-Baybay-Southern Leyte Bdry Rd - K1014 + 000 - K1014 + 175",
      "office": "Leyte 4th District Engineering Office",
      "amountPesos": 3005000,
      "lengthKm": 0.175,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17171428.57,
      "lengthMeters": 175.0,
      "allocationPerStatedMeter": 17171.43,
      "rangesMeters": [
        [
          1014000.0,
          1014175.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "200",
      "lengthEvidence": "Ormoc-Baybay-Southern Leyte Bdry Rd - K1014 + 000 - K1014 + 175",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 48836.33,
      "peerRateMultiple": 0.35,
      "peerRecords": 24,
      "peerBand": "0–<1011.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 101282.95374999999,
      "graphUpperFence": 146484.06999999998
    },
    {
      "id": "HB10858-3-0152-000793",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - (S01633MN) Chainage 130 - Chainage 243",
      "office": "Central Office",
      "amountPesos": 3000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - (S01633MN) Chainage 130 - Chainage 243",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0154-000843",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Dumaguete South Rd - K0052 + 539 - K0052 + 619",
      "office": "Negros Oriental 3rd District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": 0.08,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 37500000.0,
      "lengthMeters": 80.0,
      "allocationPerStatedMeter": 37500.0,
      "rangesMeters": [
        [
          52539.0,
          52619.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "Dumaguete South Rd - K0052 + 539 - K0052 + 619",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 0.94,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0171-001135",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Dancalan-Candoni-Damutan Valley Rd - K0134 + 115 - K0134 + 165",
      "office": "Negros Occidental 3rd District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 60000000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 60000.0,
      "rangesMeters": [
        [
          134115.0,
          134165.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "171",
      "lengthEvidence": "Dancalan-Candoni-Damutan Valley Rd - K0134 + 115 - K0134 + 165",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 1.11,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0179-001268",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Calapan South Rd - K0052 + 175 - K0052 + 207",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": 0.032,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 93750000.0,
      "lengthMeters": 32.0,
      "allocationPerStatedMeter": 93750.0,
      "rangesMeters": [
        [
          52175.0,
          52207.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "179",
      "lengthEvidence": "Calapan South Rd - K0052 + 175 - K0052 + 207",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 0.44,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0207-001761",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Calapan South Rd - K0069 + 303 - K0069 + 406",
      "office": "Southern Mindoro District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": 0.103,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29126213.59,
      "lengthMeters": 103.0,
      "allocationPerStatedMeter": 29126.21,
      "rangesMeters": [
        [
          69303.0,
          69406.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Calapan South Rd - K0069 + 303 - K0069 + 406",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 0.58,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0249-002501",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Puerto Princesa South Rd K0000+000 - K0001+402 (Pavement Marking)",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": 1.402,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2139800.29,
      "lengthMeters": 1402.0,
      "allocationPerStatedMeter": 2139.8,
      "rangesMeters": [
        [
          0.0,
          1402.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "249",
      "lengthEvidence": "Puerto Princesa South Rd K0000+000 - K0001+402 (Pavement Marking)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 0.17,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0249-002504",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Wharf Rd - K0001+(-1075) - K0001+647 (Pavement Marking)",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": 1.722,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 1742160.28,
      "lengthMeters": 1722.0,
      "allocationPerStatedMeter": 1742.16,
      "rangesMeters": [
        [
          -75.0,
          1647.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "249",
      "lengthEvidence": "Wharf Rd - K0001+(-1075) - K0001+647 (Pavement Marking)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 0.14,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0253-002567",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Installation/Application of Road Safety Facilities (Roadway Lighting) along Nueva Ecija - Pangasinan Road (Y Road) Chainage 0 - Chainage 127",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "253",
      "lengthEvidence": "Installation/Application of Road Safety Facilities (Roadway Lighting) along Nueva Ecija - Pangasinan Road (Y Road) Chainage 0 - Chainage 127",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0266-002814",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Casangay Br. (B01947MN) along Maharlika Highway (MN)",
      "office": "Central Office",
      "amountPesos": 3000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "266",
      "lengthEvidence": "Casangay Br. (B01947MN) along Maharlika Highway (MN)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0269-002871",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Canubgan Br. 1 (B00518NR) along Stop Aguinaldo-Bug-ang Rd",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Canubgan Br. 1 (B00518NR) along Stop Aguinaldo-Bug-ang Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0269-002884",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Ayala Br. (B01159MN) along Zamboanga City-Labuan-Limpapa Rd",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "269",
      "lengthEvidence": "Ayala Br. (B01159MN) along Zamboanga City-Labuan-Limpapa Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0270-002893",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Langoyon Br. (B01685MN) along Asuncion-San Isidro-Laak-Veruela Rd",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Langoyon Br. (B01685MN) along Asuncion-San Isidro-Laak-Veruela Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002984",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tayuman Br. (B05077LZ) along Tayuman St.",
      "office": "North Manila District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Tayuman Br. (B05077LZ) along Tayuman St.",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003037",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Maquina Br. (B00021PN) along Balabag-Maquina-Cayos -Patlad Rd",
      "office": "Iloilo 2nd District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Maquina Br. (B00021PN) along Balabag-Maquina-Cayos -Patlad Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003063",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Talave Parallel Br. (B00560NR) along Bacolod North Rd",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Talave Parallel Br. (B00560NR) along Bacolod North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003119",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Cadat-olan Br. (B00301SM) along Catarman-Laoang Rd",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Cadat-olan Br. (B00301SM) along Catarman-Laoang Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003123",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Naliwatan Br. (B00307SM) along Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Naliwatan Br. (B00307SM) along Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003124",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Opong Br. 3 (B00324SM) along Rawis-Catubig Rd",
      "office": "Northern Samar 2nd District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Opong Br. 3 (B00324SM) along Rawis-Catubig Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0281-003147",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Titunod Br. 1 (B00955MN) along Linamon-Zamboanga Rd",
      "office": "Lanao del Norte 1st District Engineering Office",
      "amountPesos": 3000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "281",
      "lengthEvidence": "Titunod Br. 1 (B00955MN) along Linamon-Zamboanga Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0146-000704",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Luyang-Poo-Lazi Rd - K0025 + 942 - K0026 + 035",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 2973000,
      "lengthKm": 0.093,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 31967741.94,
      "lengthMeters": 93.0,
      "allocationPerStatedMeter": 31967.74,
      "rangesMeters": [
        [
          25942.0,
          26035.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "146",
      "lengthEvidence": "Luyang-Poo-Lazi Rd - K0025 + 942 - K0026 + 035",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 0.97,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0247-002478",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Harrison Rd No 2 - (S00453LZ) Chainage 0 – Chainage 235 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Central Office",
      "amountPesos": 2970000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "247",
      "lengthEvidence": "Harrison Rd No 2 - (S00453LZ) Chainage 0 – Chainage 235 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0124-000268",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Marikina-Infanta Rd - K0075 + 366 - K0075 + 620",
      "office": "Central Office",
      "amountPesos": 2939000,
      "lengthKm": 0.254,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11570866.14,
      "lengthMeters": 254.0,
      "allocationPerStatedMeter": 11570.87,
      "rangesMeters": [
        [
          75366.0,
          75620.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "124",
      "lengthEvidence": "Marikina-Infanta Rd - K0075 + 366 - K0075 + 620",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.23,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0165-001032",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Wharf Rd - (S01206MN) Chainage 004 - Chainage 135",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 2907000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "165",
      "lengthEvidence": "Wharf Rd - (S01206MN) Chainage 004 - Chainage 135",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0169-001095",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Calaguiman Vicinal Rd - K0118 + 745 - K0118 + 921",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 2854000,
      "lengthKm": 0.176,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 16215909.09,
      "lengthMeters": 176.0,
      "allocationPerStatedMeter": 16215.91,
      "rangesMeters": [
        [
          118745.0,
          118921.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Calaguiman Vicinal Rd - K0118 + 745 - K0118 + 921",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 0.3,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0173-001173",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0720 + (-575) - K0720 + (-533)",
      "office": "Samar 1st District Engineering Office",
      "amountPesos": 2840000,
      "lengthKm": 0.042,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 67619047.62,
      "lengthMeters": 42.0,
      "allocationPerStatedMeter": 67619.05,
      "rangesMeters": [
        [
          719425.0,
          719467.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "173",
      "lengthEvidence": "Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0720 + (-575) - K0720 + (-533)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 0.2,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0255-002591",
      "category": "Roads",
      "program": "Paving of Unpaved Roads - Secondary Roads",
      "projectName": "Zamboanga City-Labuan-Limpapa Rd - (S01521MN) Chainage 000 - Chainage 069, Chainage 090 - Chainage 118",
      "office": "Zamboanga City 1st District Engineering Office",
      "amountPesos": 2722000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "255",
      "lengthEvidence": "Zamboanga City-Labuan-Limpapa Rd - (S01521MN) Chainage 000 - Chainage 069, Chainage 090 - Chainage 118",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0152-000797",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1801 + 037 - K1801 + 072, K1801 + 136 - K1801 + 163",
      "office": "Central Office",
      "amountPesos": 2700000,
      "lengthKm": 0.062,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 43548387.1,
      "lengthMeters": 62.0,
      "allocationPerStatedMeter": 43548.39,
      "rangesMeters": [
        [
          1801037.0,
          1801072.0
        ],
        [
          1801136.0,
          1801163.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "152",
      "lengthEvidence": "Maharlika Highway( Lanao-Pagadian-Zamboanga City Rd) - K1801 + 037 - K1801 + 072, K1801 + 136 - K1801 + 163",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 1.1,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0142-000624",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Muntinlupa-Insular Prison Rd - K0029 + 408 - K0029 + 465",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 2634000,
      "lengthKm": 0.057,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 46210526.32,
      "lengthMeters": 57.0,
      "allocationPerStatedMeter": 46210.53,
      "rangesMeters": [
        [
          29408.0,
          29465.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "Muntinlupa-Insular Prison Rd - K0029 + 408 - K0029 + 465",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 1.41,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0139-000556",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Surigao-Davao Coastal Rd - K1464 + 832 - K1465 + 147",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "amountPesos": 2614000,
      "lengthKm": 0.315,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8298412.7,
      "lengthMeters": 315.0,
      "allocationPerStatedMeter": 8298.41,
      "rangesMeters": [
        [
          1464832.0,
          1465147.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "139",
      "lengthEvidence": "Surigao-Davao Coastal Rd - K1464 + 832 - K1465 + 147",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.26,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0271-002914",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Agdangan Br. (B00452LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 2610000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "271",
      "lengthEvidence": "Agdangan Br. (B00452LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003109",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Mondragon Br. 1 (B00643SM) along Mondragon-Bantayan Old Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 2600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Mondragon Br. 1 (B00643SM) along Mondragon-Bantayan Old Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0245-002447",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1428 + 000 - K1428 + 217 (Road Safety: Roadway Lighting)",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "amountPesos": 2574000,
      "lengthKm": 0.217,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11861751.15,
      "lengthMeters": 217.0,
      "allocationPerStatedMeter": 11861.75,
      "rangesMeters": [
        [
          1428000.0,
          1428217.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Butuan City-Cagayan de Oro City-Iligan City Rd - K1428 + 000 - K1428 + 217 (Road Safety: Roadway Lighting)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.99,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0169-001090",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0022 + 139 - K0022 + 424",
      "office": "Batanes District Engineering Office",
      "amountPesos": 2542000,
      "lengthKm": 0.285,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8919298.25,
      "lengthMeters": 285.0,
      "allocationPerStatedMeter": 8919.3,
      "rangesMeters": [
        [
          22139.0,
          22424.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0022 + 139 - K0022 + 424",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.28,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0136-000502",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Siquijor Circumferential Rd - K0004 + 909 - K0005 + 000",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 2534000,
      "lengthKm": 0.091,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 27846153.85,
      "lengthMeters": 91.0,
      "allocationPerStatedMeter": 27846.15,
      "rangesMeters": [
        [
          4909.0,
          5000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "136",
      "lengthEvidence": "Siquijor Circumferential Rd - K0004 + 909 - K0005 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.55,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0243-002417",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Gov Pack Rd - (S00409LZ) Chainage 000 - Chainage 200 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Central Office",
      "amountPesos": 2528000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "243",
      "lengthEvidence": "Gov Pack Rd - (S00409LZ) Chainage 000 - Chainage 200 (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0130-000372",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Jct. Ayaga (Abulug)-Ballesteros-Aparri Rd - K0671 + 300 - K0672 + 020",
      "office": "Cagayan 2nd District Engineering Office",
      "amountPesos": 2500000,
      "lengthKm": 0.72,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 3472222.22,
      "lengthMeters": 720.0,
      "allocationPerStatedMeter": 3472.22,
      "rangesMeters": [
        [
          671300.0,
          672020.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Jct. Ayaga (Abulug)-Ballesteros-Aparri Rd - K0671 + 300 - K0672 + 020",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.11,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0253-002569",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Tertiary Roads",
      "projectName": "Malvar Rd - K0002+(-656) - K0002+(-175), K0002+955 - K0003+778",
      "office": "Palawan 3rd District Engineering Office",
      "amountPesos": 2500000,
      "lengthKm": 1.304,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 1917177.91,
      "lengthMeters": 1304.0,
      "allocationPerStatedMeter": 1917.18,
      "rangesMeters": [
        [
          1344.0,
          1825.0
        ],
        [
          2955.0,
          3778.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "253",
      "lengthEvidence": "Malvar Rd - K0002+(-656) - K0002+(-175), K0002+955 - K0003+778",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 9911.46,
      "peerRateMultiple": 0.19,
      "peerRecords": 34,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 100273.4,
      "graphUpperFence": 155912.01499999998
    },
    {
      "id": "HB10858-3-0274-002990",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Moatong Br. (B02660LZ) along Cong. Andres Acop Cosalan Rd",
      "office": "Benguet 1st District Engineering Office",
      "amountPesos": 2500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Moatong Br. (B02660LZ) along Cong. Andres Acop Cosalan Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0279-003103",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Hibabaogan Br. (B00252SM) along Catarman-Calbayog Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 2500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "279",
      "lengthEvidence": "Hibabaogan Br. (B00252SM) along Catarman-Calbayog Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003116",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Salhag Br. (B00285SM) along Allen-Catarman Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 2500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Salhag Br. (B00285SM) along Allen-Catarman Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0499-007462",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+170, Barangay Usol - Barangay Namnama, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 2500000,
      "lengthKm": 0.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14705882.35,
      "lengthMeters": 170.0,
      "allocationPerStatedMeter": 14705.88,
      "rangesMeters": [
        [
          0.0,
          170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+170, Barangay Usol - Barangay Namnama, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.42,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0499-007465",
      "category": "Roads",
      "program": "BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities",
      "projectName": "Construction of Road, Sta. 0+000 - Sta. 0+170, Barangay Papan Weste, Jones, Isabela",
      "office": "Isabela 4th District Engineering Office",
      "amountPesos": 2500000,
      "lengthKm": 0.17,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 14705882.35,
      "lengthMeters": 170.0,
      "allocationPerStatedMeter": 14705.88,
      "rangesMeters": [
        [
          0.0,
          170.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "499",
      "lengthEvidence": "Construction of Road, Sta. 0+000 - Sta. 0+170, Barangay Papan Weste, Jones, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 35357.15,
      "peerRateMultiple": 0.42,
      "peerRecords": 128,
      "peerBand": "0–<235.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 108705.36250000002,
      "graphUpperFence": 158928.58000000002
    },
    {
      "id": "HB10858-3-0134-000466",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Pagsanjan-Lucban Rd - K0094 + 990 - K0095 + 400, K0095 + 911 - K0096 + 230",
      "office": "Laguna 1st District Engineering Office",
      "amountPesos": 2477000,
      "lengthKm": 0.729,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 3397805.21,
      "lengthMeters": 729.0,
      "allocationPerStatedMeter": 3397.81,
      "rangesMeters": [
        [
          94990.0,
          95400.0
        ],
        [
          95911.0,
          96230.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "134",
      "lengthEvidence": "Pagsanjan-Lucban Rd - K0094 + 990 - K0095 + 400, K0095 + 911 - K0096 + 230",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32266.44,
      "peerRateMultiple": 0.11,
      "peerRecords": 76,
      "peerBand": "314.5–<775 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 74840.41875,
      "graphUpperFence": 106634.94
    },
    {
      "id": "HB10858-3-0145-000680",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Marikina-Victoria Valley-Antipolo Rd - K0026 + (-209) - K0026 + 000",
      "office": "Rizal 1st District Engineering Office",
      "amountPesos": 2418000,
      "lengthKm": 0.209,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 11569377.99,
      "lengthMeters": 209.0,
      "allocationPerStatedMeter": 11569.38,
      "rangesMeters": [
        [
          25791.0,
          26000.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "145",
      "lengthEvidence": "Marikina-Victoria Valley-Antipolo Rd - K0026 + (-209) - K0026 + 000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 0.35,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0170-001110",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Gen Evangelista Rd - (S01836LZ) Chainage 000 - Chainage 061",
      "office": "Cavite 3rd District Engineering Office",
      "amountPesos": 2400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "170",
      "lengthEvidence": "Gen Evangelista Rd - (S01836LZ) Chainage 000 - Chainage 061",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0120-000178",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Juanito R. Remulla, Sr. Rd - K0040 + 916 - K0041 + 232, K0042 + 000 - K0042 + 118, K0042 + 388 - K0042 + 778, K0043 + 059 - K0043 + 146",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 2205000,
      "lengthKm": 0.911,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 2420417.12,
      "lengthMeters": 911.0,
      "allocationPerStatedMeter": 2420.42,
      "rangesMeters": [
        [
          40916.0,
          41232.0
        ],
        [
          42000.0,
          42118.0
        ],
        [
          42388.0,
          42778.0
        ],
        [
          43059.0,
          43146.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Juanito R. Remulla, Sr. Rd - K0040 + 916 - K0041 + 232, K0042 + 000 - K0042 + 118, K0042 + 388 - K0042 + 778, K0043 + 059 - K0043 + 146",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46158.63,
      "peerRateMultiple": 0.05,
      "peerRecords": 28,
      "peerBand": "910–<1193 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 99021.6675,
      "graphUpperFence": 140308.32
    },
    {
      "id": "HB10858-3-0169-001097",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Nueva Ecija - Pangasinan Rd Chainage 8 - Chainage 104",
      "office": "Nueva Ecija 1st District Engineering Office",
      "amountPesos": 2200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Nueva Ecija - Pangasinan Rd Chainage 8 - Chainage 104",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0245-002436",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Bacolod South Rd - K0005 + (-915) - K0005 + (-470) (Off-Carriageway Improvement: Construction of Sidewalk)",
      "office": "Bacolod City District Engineering Office",
      "amountPesos": 2200000,
      "lengthKm": 0.445,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 4943820.22,
      "lengthMeters": 445.0,
      "allocationPerStatedMeter": 4943.82,
      "rangesMeters": [
        [
          4085.0,
          4530.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "245",
      "lengthEvidence": "Bacolod South Rd - K0005 + (-915) - K0005 + (-470) (Off-Carriageway Improvement: Construction of Sidewalk)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.41,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0268-002857",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Pantay Br. (B00229MR) along CSR Jct-Pola Rd",
      "office": "Mindoro Oriental District Engineering Office",
      "amountPesos": 2200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "268",
      "lengthEvidence": "Pantay Br. (B00229MR) along CSR Jct-Pola Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0128-000346",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Paranaque-Sucat Rd - K0020 + 233 - K0020 + 271",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 2183000,
      "lengthKm": 0.038,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 57447368.42,
      "lengthMeters": 38.0,
      "allocationPerStatedMeter": 57447.37,
      "rangesMeters": [
        [
          20233.0,
          20271.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "128",
      "lengthEvidence": "Paranaque-Sucat Rd - K0020 + 233 - K0020 + 271",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 1.14,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0162-000973",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Nabua-Balatan Rd - K0490 + 900 - K0490 + 970",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 2157000,
      "lengthKm": 0.07,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 30814285.71,
      "lengthMeters": 70.0,
      "allocationPerStatedMeter": 30814.29,
      "rangesMeters": [
        [
          490900.0,
          490970.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Nabua-Balatan Rd - K0490 + 900 - K0490 + 970",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 0.59,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0274-002988",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Pudtol Br. (B02260LZ) along Kabugao-Pudtol-Luna-Cagayan Bdry Rd",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 2100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Pudtol Br. (B02260LZ) along Kabugao-Pudtol-Luna-Cagayan Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0142-000623",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Muntinlupa-Insular Prison Rd - (S03292LZ) Chainage 090 - Chainage 146",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 2057000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "Muntinlupa-Insular Prison Rd - (S03292LZ) Chainage 090 - Chainage 146",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0250-002519",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Secondary Roads",
      "projectName": "Antonio y De Pio H-way - K0124 + 940 - K0125 + 002 (Off-Carriageway Improvement: Paving of Shoulders)",
      "office": "Cebu 4th District Engineering Office",
      "amountPesos": 2040000,
      "lengthKm": 0.062,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 32903225.81,
      "lengthMeters": 62.0,
      "allocationPerStatedMeter": 32903.23,
      "rangesMeters": [
        [
          124940.0,
          125002.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "250",
      "lengthEvidence": "Antonio y De Pio H-way - K0124 + 940 - K0125 + 002 (Off-Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12639.36,
      "peerRateMultiple": 2.6,
      "peerRecords": 20,
      "peerBand": "0–<1886.5 m",
      "highRateCandidate": true,
      "graphExtreme": true,
      "rateReview": "High relative rate · scope review needed",
      "peerUpperFence": 24103.67,
      "graphUpperFence": 32138.9375
    },
    {
      "id": "HB10858-3-0118-000155",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0302 + 950 - K0303 + 042.5",
      "office": "La Union 1st District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": 0.0925,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21621621.62,
      "lengthMeters": 92.5,
      "allocationPerStatedMeter": 21621.62,
      "rangesMeters": [
        [
          302950.0,
          303042.5
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Manila North Rd - K0302 + 950 - K0303 + 042.5",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 0.46,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0177-001225",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Conner-Kabugao Rd - K0602 + 248 - K0602 + 260",
      "office": "Apayao 1st District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": 0.012,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 166666666.67,
      "lengthMeters": 12.0,
      "allocationPerStatedMeter": 166666.67,
      "rangesMeters": [
        [
          602248.0,
          602260.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "177",
      "lengthEvidence": "Conner-Kabugao Rd - K0602 + 248 - K0602 + 260",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 212698.41,
      "peerRateMultiple": 0.78,
      "peerRecords": 20,
      "peerBand": "0–<39.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 670797.0987499999,
      "graphUpperFence": 974927.5325
    },
    {
      "id": "HB10858-3-0270-002891",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Araibo Br. (B01430MN) along Montevista-Compostela-Mati Bdry Rd",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Araibo Br. (B01430MN) along Montevista-Compostela-Mati Bdry Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0270-002895",
      "category": "Bridges",
      "program": "Retrofitting/ Strengthening of Permanent Bridges",
      "projectName": "Tuk-an Br. (B01684MN) along Asuncion-San Isidro-Laak-Veruela Rd",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "270",
      "lengthEvidence": "Tuk-an Br. (B01684MN) along Asuncion-San Isidro-Laak-Veruela Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002967",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Juan Luna Br. 1 (B01789LZ) along Juan Luna St",
      "office": "North Manila District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Juan Luna Br. 1 (B01789LZ) along Juan Luna St",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002968",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Juan Luna Br. 3 (B01741LZ) along Juan Luna St",
      "office": "North Manila District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Juan Luna Br. 3 (B01741LZ) along Juan Luna St",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002973",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Mendiola Br. (B01772LZ) along Mendiola St",
      "office": "North Manila District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Mendiola Br. (B01772LZ) along Mendiola St",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002980",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "R-10 Br. 2 (B01745LZ) along R-10",
      "office": "North Manila District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "R-10 Br. 2 (B01745LZ) along R-10",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002981",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "R-10 Br. 2 Parallel Br. 1 (B05045LZ) along R-10",
      "office": "North Manila District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "R-10 Br. 2 Parallel Br. 1 (B05045LZ) along R-10",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002985",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Vitas Br. (B01791LZ) along R-10",
      "office": "North Manila District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Vitas Br. (B01791LZ) along R-10",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002989",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Sugoc Br. (B04217LZ) along Claveria-Calanasan-Kabugao Rd",
      "office": "Apayao 2nd District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Sugoc Br. (B04217LZ) along Claveria-Calanasan-Kabugao Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0276-003030",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Bito Br. (B00008TC) along Sn Fernando North Rd",
      "office": "Masbate 1st District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "276",
      "lengthEvidence": "Bito Br. (B00008TC) along Sn Fernando North Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003061",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Maaswa Br. 2 (B00310NR) along Jct Curva Hagnaya-Poblacion-Maaswa Rd",
      "office": "Negros Occidental 5th District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Maaswa Br. 2 (B00310NR) along Jct Curva Hagnaya-Poblacion-Maaswa Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003110",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Muyaw Br. (B00541SM) along Catarman-Laoang Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Muyaw Br. (B00541SM) along Catarman-Laoang Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003118",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tubigdanao Br. 1 (B00015SM) along Pob-Gengarog-Tubigdanao-Sn Lorenzo-Bonglas- Mandugang Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Tubigdanao Br. 1 (B00015SM) along Pob-Gengarog-Tubigdanao-Sn Lorenzo-Bonglas- Mandugang Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003152",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Solana By Pass Br. (B00636MN) along Kimaya-Solana By-Pass Rd",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "amountPesos": 2000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Solana By Pass Br. (B00636MN) along Kimaya-Solana By-Pass Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0161-000950",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "MSR Jct-Lopez-Catanauan Rd - K0226 + 425 - K0226 + 444",
      "office": "Quezon 4th District Engineering Office",
      "amountPesos": 1964000,
      "lengthKm": 0.019,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 103368421.05,
      "lengthMeters": 19.0,
      "allocationPerStatedMeter": 103368.42,
      "rangesMeters": [
        [
          226425.0,
          226444.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "161",
      "lengthEvidence": "MSR Jct-Lopez-Catanauan Rd - K0226 + 425 - K0226 + 444",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 1.99,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0169-001088",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0017 + 044 - K0017 + 149",
      "office": "Batanes District Engineering Office",
      "amountPesos": 1946000,
      "lengthKm": 0.105,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18533333.33,
      "lengthMeters": 105.0,
      "allocationPerStatedMeter": 18533.33,
      "rangesMeters": [
        [
          17044.0,
          17149.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0017 + 044 - K0017 + 149",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 0.34,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0207-001754",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Puerto Princesa South Rd - K0101 + 715 - K0101 + 788",
      "office": "Palawan 2nd District Engineering Office",
      "amountPesos": 1946000,
      "lengthKm": 0.073,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 26657534.25,
      "lengthMeters": 73.0,
      "allocationPerStatedMeter": 26657.53,
      "rangesMeters": [
        [
          101715.0,
          101788.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "207",
      "lengthEvidence": "Puerto Princesa South Rd - K0101 + 715 - K0101 + 788",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 0.53,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0168-001086",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Mayan-Mauyen Port Rd - K0008 + 485 - K0008 + 593",
      "office": "Batanes District Engineering Office",
      "amountPesos": 1927000,
      "lengthKm": 0.108,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 17842592.59,
      "lengthMeters": 108.0,
      "allocationPerStatedMeter": 17842.59,
      "rangesMeters": [
        [
          8485.0,
          8593.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "Mayan-Mauyen Port Rd - K0008 + 485 - K0008 + 593",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 0.33,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0277-003050",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Hinigaran Br. (B00351NR) along Bacolod South Rd",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 1900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Hinigaran Br. (B00351NR) along Bacolod South Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0213-001873",
      "category": "Roads",
      "program": "Road Widening - Tertiary Roads",
      "projectName": "Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0032 + 346 - K0032 + 418",
      "office": "Surigao del Norte 1st District Engineering Office",
      "amountPesos": 1836000,
      "lengthKm": 0.072,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 25500000.0,
      "lengthMeters": 72.0,
      "allocationPerStatedMeter": 25500.0,
      "rangesMeters": [
        [
          32346.0,
          32418.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "213",
      "lengthEvidence": "Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0032 + 346 - K0032 + 418",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 40627.0,
      "peerRateMultiple": 0.63,
      "peerRecords": 35,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 87373.26500000001,
      "graphUpperFence": 120932.55500000002
    },
    {
      "id": "HB10858-3-0277-003053",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tanolo Parallel Br. 1 (B00558NR) along Bacolod South Rd",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 1820000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Tanolo Parallel Br. 1 (B00558NR) along Bacolod South Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0129-000354",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Bonifacio Drive - K0001 + 589 - K0001 + 650",
      "office": "South Manila District Engineering Office",
      "amountPesos": 1812000,
      "lengthKm": 0.061,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29704918.03,
      "lengthMeters": 61.0,
      "allocationPerStatedMeter": 29704.92,
      "rangesMeters": [
        [
          1589.0,
          1650.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "129",
      "lengthEvidence": "Bonifacio Drive - K0001 + 589 - K0001 + 650",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 0.59,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0244-002431",
      "category": "Roads",
      "program": "Off-Carriageway Improvement - Primary Roads",
      "projectName": "Santiago-Tuguegarao Rd - K0429 + 000 - K0429 + 068, K0429 + 117 - K0429 + 349, K0429 + 397 - K0429 + 541 (Off-Carriageway Improvement: Paving of Shoulders)",
      "office": "Isabela 1st District Engineering Office",
      "amountPesos": 1711000,
      "lengthKm": 0.444,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 3853603.6,
      "lengthMeters": 444.0,
      "allocationPerStatedMeter": 3853.6,
      "rangesMeters": [
        [
          429000.0,
          429068.0
        ],
        [
          429117.0,
          429349.0
        ],
        [
          429397.0,
          429541.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "244",
      "lengthEvidence": "Santiago-Tuguegarao Rd - K0429 + 000 - K0429 + 068, K0429 + 117 - K0429 + 349, K0429 + 397 - K0429 + 541 (Off-Carriageway Improvement: Paving of Shoulders)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 12022.13,
      "peerRateMultiple": 0.32,
      "peerRecords": 36,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 25296.331249999996,
      "graphUpperFence": 35974.13
    },
    {
      "id": "HB10858-3-0272-002931",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "San Francisco Br. (B00453LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 1700000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "San Francisco Br. (B00453LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0153-000822",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Calamba-Sta Cruz-Famy Jct Rd - K0051 + 000 - K0052 + 000, K0057 + 187 - K0057 + 413, K0057 + 494 - K0057 + 707",
      "office": "Laguna 2nd District Engineering Office",
      "amountPesos": 1687000,
      "lengthKm": 1.439,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 1172341.9,
      "lengthMeters": 1439.0,
      "allocationPerStatedMeter": 1172.34,
      "rangesMeters": [
        [
          51000.0,
          52000.0
        ],
        [
          57187.0,
          57413.0
        ],
        [
          57494.0,
          57707.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "153",
      "lengthEvidence": "Calamba-Sta Cruz-Famy Jct Rd - K0051 + 000 - K0052 + 000, K0057 + 187 - K0057 + 413, K0057 + 494 - K0057 + 707",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 25020.49,
      "peerRateMultiple": 0.05,
      "peerRecords": 23,
      "peerBand": "1425.5–<2297 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 77427.17749999999,
      "graphUpperFence": 112180.21999999997
    },
    {
      "id": "HB10858-3-0142-000626",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "South Super H-way East Service Rd - K0022 + 212 - K0022 + 252",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "amountPesos": 1680000,
      "lengthKm": 0.04,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 42000000.0,
      "lengthMeters": 40.0,
      "allocationPerStatedMeter": 42000.0,
      "rangesMeters": [
        [
          22212.0,
          22252.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "142",
      "lengthEvidence": "South Super H-way East Service Rd - K0022 + 212 - K0022 + 252",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 1.28,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0277-003051",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tanolo Br. 1 (B00352NR) along Bacolod South Rd",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 1670000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Tanolo Br. 1 (B00352NR) along Bacolod South Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0154-000830",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads",
      "projectName": "Bacolod South Rd - K0080+788 - K0080 + 858",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 1645000,
      "lengthKm": 0.07,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 23500000.0,
      "lengthMeters": 70.0,
      "allocationPerStatedMeter": 23500.0,
      "rangesMeters": [
        [
          80788.0,
          80858.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "154",
      "lengthEvidence": "Bacolod South Rd - K0080+788 - K0080 + 858",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 39719.46,
      "peerRateMultiple": 0.59,
      "peerRecords": 23,
      "peerBand": "0–<241.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 82360.28999999998,
      "graphUpperFence": 112679.83499999998
    },
    {
      "id": "HB10858-3-0160-000933",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Maragondon-Magallanes-Amuyong Rd - K0067 + 710 - K0069 + 000, K0069 + 597 - K0069 + 661, K0071 + 810 - K0072 + 548, K0072 + 559 - K0073 + 200, K0075 + 000 - K0075 + 299, K0085 + 100 - K0085 + 949",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 1627000,
      "lengthKm": 3.881,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 419221.85,
      "lengthMeters": 3881.0,
      "allocationPerStatedMeter": 419.22,
      "rangesMeters": [
        [
          67710.0,
          69000.0
        ],
        [
          69597.0,
          69661.0
        ],
        [
          71810.0,
          72548.0
        ],
        [
          72559.0,
          73200.0
        ],
        [
          75000.0,
          75299.0
        ],
        [
          85100.0,
          85949.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "160",
      "lengthEvidence": "Maragondon-Magallanes-Amuyong Rd - K0067 + 710 - K0069 + 000, K0069 + 597 - K0069 + 661, K0071 + 810 - K0072 + 548, K0072 + 559 - K0073 + 200, K0075 + 000 - K0075 + 299, K0085 + 100 - K0085 + 949",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 22467.82,
      "peerRateMultiple": 0.02,
      "peerRecords": 20,
      "peerBand": "≥1764 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 67468.19625,
      "graphUpperFence": 95172.42749999999
    },
    {
      "id": "HB10858-3-0148-000737",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Dinagat-Loreto Rd - K0005 + 400 - K0005 + 480",
      "office": "Dinagat Islands District Engineering Office",
      "amountPesos": 1618000,
      "lengthKm": 0.08,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 20225000.0,
      "lengthMeters": 80.0,
      "allocationPerStatedMeter": 20225.0,
      "rangesMeters": [
        [
          5400.0,
          5480.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "148",
      "lengthEvidence": "Dinagat-Loreto Rd - K0005 + 400 - K0005 + 480",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 32803.5,
      "peerRateMultiple": 0.62,
      "peerRecords": 22,
      "peerBand": "0–<508 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 59058.62125000001,
      "graphUpperFence": 81707.62750000002
    },
    {
      "id": "HB10858-3-0272-002933",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "San Miguel Br. (B04903LZ) along Maharlika Highway (LZ)",
      "office": "Central Office",
      "amountPesos": 1616000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "272",
      "lengthEvidence": "San Miguel Br. (B04903LZ) along Maharlika Highway (LZ)",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0122-000222",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Dipolog-Sindangan-Liloy Rd - K1888 + 948 - K1888 + 1002",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "amountPesos": 1600000,
      "lengthKm": 0.054,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 29629629.63,
      "lengthMeters": 54.0,
      "allocationPerStatedMeter": 29629.63,
      "rangesMeters": [
        [
          1888948.0,
          1889002.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "122",
      "lengthEvidence": "Dipolog-Sindangan-Liloy Rd - K1888 + 948 - K1888 + 1002",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 0.64,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0162-000972",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Nabua-Balatan Rd - K0490 + 400 - K0490 + 445",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 1587000,
      "lengthKm": 0.045,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 35266666.67,
      "lengthMeters": 45.0,
      "allocationPerStatedMeter": 35266.67,
      "rangesMeters": [
        [
          490400.0,
          490445.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Nabua-Balatan Rd - K0490 + 400 - K0490 + 445",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 0.68,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0277-003052",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Tanolo Br. 2 (B00353NR) along Bacolod South Rd",
      "office": "Negros Occidental 2nd District Engineering Office",
      "amountPesos": 1520000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "277",
      "lengthEvidence": "Tanolo Br. 2 (B00353NR) along Bacolod South Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0204-001697",
      "category": "Roads",
      "program": "Road Widening - Secondary Roads",
      "projectName": "Basilan Circumferential Rd (Isabela-Lamitan Rd) - K0012 + (-2453) - K0012 + (-2331)",
      "office": "Central Office",
      "amountPesos": 1516000,
      "lengthKm": 0.122,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 12426229.51,
      "lengthMeters": 122.0,
      "allocationPerStatedMeter": 12426.23,
      "rangesMeters": [
        [
          9547.0,
          9669.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "204",
      "lengthEvidence": "Basilan Circumferential Rd (Isabela-Lamitan Rd) - K0012 + (-2453) - K0012 + (-2331)",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50000.0,
      "peerRateMultiple": 0.25,
      "peerRecords": 26,
      "peerBand": "0–<364.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 86748.8425,
      "graphUpperFence": 119474.36499999999
    },
    {
      "id": "HB10858-3-0233-002244",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Banga-Tupi-Malungon Road (Malungon-Tupi Section), Sta. 77+170 - Sta. 77+183 , Sarangani",
      "office": "Sarangani District Engineering Office",
      "amountPesos": 1500000,
      "lengthKm": 0.013,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 115384615.38,
      "lengthMeters": 13.0,
      "allocationPerStatedMeter": 115384.62,
      "rangesMeters": [
        [
          77170.0,
          77183.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "233",
      "lengthEvidence": "Banga-Tupi-Malungon Road (Malungon-Tupi Section), Sta. 77+170 - Sta. 77+183 , Sarangani",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.1,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0231-002213",
      "category": "Roads",
      "program": "Construction of By-Pass and Diversion Roads",
      "projectName": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
      "office": "Capiz 1st District Engineering Office",
      "amountPesos": 1420000,
      "lengthKm": 0.135,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 10518518.52,
      "lengthMeters": 135.0,
      "allocationPerStatedMeter": 10518.52,
      "rangesMeters": [
        [
          230.0,
          365.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "231",
      "lengthEvidence": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 1197799.05,
      "peerRateMultiple": 0.01,
      "peerRecords": 32,
      "peerBand": "0–<137.8 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 3518920.0512499996,
      "graphUpperFence": 5402453.899999999
    },
    {
      "id": "HB10858-3-0158-000911",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Paranaque-Sucat Rd - (S03450LZ) Chainage 004 - Chainage 200",
      "office": "Metro Manila 2nd District Engineering Office",
      "amountPesos": 1400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "158",
      "lengthEvidence": "Paranaque-Sucat Rd - (S03450LZ) Chainage 004 - Chainage 200",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0169-001089",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0020 + 346 - K0020 + 500",
      "office": "Batanes District Engineering Office",
      "amountPesos": 1374000,
      "lengthKm": 0.154,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8922077.92,
      "lengthMeters": 154.0,
      "allocationPerStatedMeter": 8922.08,
      "rangesMeters": [
        [
          20346.0,
          20500.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0020 + 346 - K0020 + 500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 0.16,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0168-001087",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0006 + 441 - K0006 + 592",
      "office": "Batanes District Engineering Office",
      "amountPesos": 1347000,
      "lengthKm": 0.151,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 8920529.8,
      "lengthMeters": 151.0,
      "allocationPerStatedMeter": 8920.53,
      "rangesMeters": [
        [
          6441.0,
          6592.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "168",
      "lengthEvidence": "Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0006 + 441 - K0006 + 592",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 54140.54,
      "peerRateMultiple": 0.16,
      "peerRecords": 22,
      "peerBand": "0–<218.405 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 299248.28875,
      "graphUpperFence": 465938.725
    },
    {
      "id": "HB10858-3-0164-001019",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Siquijor Circumferential Rd - K0018 + 891 - K0018 + 930",
      "office": "Siquijor District Engineering Office",
      "amountPesos": 1328000,
      "lengthKm": 0.039,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 34051282.05,
      "lengthMeters": 39.0,
      "allocationPerStatedMeter": 34051.28,
      "rangesMeters": [
        [
          18891.0,
          18930.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "164",
      "lengthEvidence": "Siquijor Circumferential Rd - K0018 + 891 - K0018 + 930",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 0.65,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0280-003117",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Taguibian Br. (B00536SM) along Catarman-Laoang Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 1300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Taguibian Br. (B00536SM) along Catarman-Laoang Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0144-000674",
      "category": "Roads",
      "program": "Preventive Maintenance - Tertiary Roads",
      "projectName": "Barleta St - (S05818LZ) Chainage 005 - Chainage 060",
      "office": "Laguna 3rd District Engineering Office",
      "amountPesos": 1273000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "144",
      "lengthEvidence": "Barleta St - (S05818LZ) Chainage 005 - Chainage 060",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0162-000971",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Nabua-Balatan Rd - K0489 + 430 - K0489 + 443, K0489 + 525 - K0489 + 535",
      "office": "Camarines Sur 5th District Engineering Office",
      "amountPesos": 1243000,
      "lengthKm": 0.023,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title · overlapping intervals merged",
      "allocationPerStatedKm": 54043478.26,
      "lengthMeters": 23.0,
      "allocationPerStatedMeter": 54043.48,
      "rangesMeters": [
        [
          489430.0,
          489443.0
        ],
        [
          489525.0,
          489535.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "162",
      "lengthEvidence": "Nabua-Balatan Rd - K0489 + 430 - K0489 + 443, K0489 + 525 - K0489 + 535",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 1.04,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0130-000375",
      "category": "Roads",
      "program": "Preventive Maintenance - Secondary Roads",
      "projectName": "Roman Expressway - K0107 + 000 - K0107 + 024.21",
      "office": "Bataan 1st District Engineering Office",
      "amountPesos": 1224000,
      "lengthKm": 0.024210000000006403,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 50557620.82,
      "lengthMeters": 24.21,
      "allocationPerStatedMeter": 50557.62,
      "rangesMeters": [
        [
          107000.0,
          107024.21
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "130",
      "lengthEvidence": "Roman Expressway - K0107 + 000 - K0107 + 024.21",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 50564.81,
      "peerRateMultiple": 1.0,
      "peerRecords": 37,
      "peerBand": "0–<314.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 118647.45,
      "graphUpperFence": 173128.22999999998
    },
    {
      "id": "HB10858-3-0169-001107",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads",
      "projectName": "Isaac O. Tolentino Ave. - K0061 + 727 - K0062 + 146",
      "office": "Cavite 2nd District Engineering Office",
      "amountPesos": 1203000,
      "lengthKm": 0.419,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 2871121.72,
      "lengthMeters": 419.0,
      "allocationPerStatedMeter": 2871.12,
      "rangesMeters": [
        [
          61727.0,
          62146.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "169",
      "lengthEvidence": "Isaac O. Tolentino Ave. - K0061 + 727 - K0062 + 146",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 31807.69,
      "peerRateMultiple": 0.09,
      "peerRecords": 43,
      "peerBand": "218.405–<1000.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 64387.350000000006,
      "graphUpperFence": 90412.60500000001
    },
    {
      "id": "HB10858-3-0275-003014",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Solo Br. (B02929LZ) along Bauan-Mabini Rd",
      "office": "Batangas 2nd District Engineering Office",
      "amountPesos": 1100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "275",
      "lengthEvidence": "Solo Br. (B02929LZ) along Bauan-Mabini Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0118-000149",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Manila North Rd - K0487 + 032 - K0487 + 084",
      "office": "Ilocos Norte 1st District Engineering Office",
      "amountPesos": 1094000,
      "lengthKm": 0.052,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21038461.54,
      "lengthMeters": 52.0,
      "allocationPerStatedMeter": 21038.46,
      "rangesMeters": [
        [
          487032.0,
          487084.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "118",
      "lengthEvidence": "Manila North Rd - K0487 + 032 - K0487 + 084",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 46550.72,
      "peerRateMultiple": 0.45,
      "peerRecords": 28,
      "peerBand": "0–<332.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 134745.51,
      "graphUpperFence": 195896.7075
    },
    {
      "id": "HB10858-3-0120-000180",
      "category": "Roads",
      "program": "Preventive Maintenance - Primary Roads",
      "projectName": "Noveleta-Naic-Tagaytay Rd - (S06092LZ) Chainage 188 - Chainage 212",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 1088000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "120",
      "lengthEvidence": "Noveleta-Naic-Tagaytay Rd - (S06092LZ) Chainage 188 - Chainage 212",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0174-001174",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads",
      "projectName": "Maharlika Highway (LT) - K1019 + 325 - K1019 + 375",
      "office": "Southern Leyte 2nd District Engineering Office",
      "amountPesos": 1068000,
      "lengthKm": 0.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 21360000.0,
      "lengthMeters": 50.0,
      "allocationPerStatedMeter": 21360.0,
      "rangesMeters": [
        [
          1019325.0,
          1019375.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "174",
      "lengthEvidence": "Maharlika Highway (LT) - K1019 + 325 - K1019 + 375",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 333333.33,
      "peerRateMultiple": 0.06,
      "peerRecords": 27,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 2017862.0475,
      "graphUpperFence": 3126192.18
    },
    {
      "id": "HB10858-3-0160-000926",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads",
      "projectName": "Dra Salamanca Rd - K0034 + 886 - K0034 + 941",
      "office": "Cavite 1st District Engineering Office",
      "amountPesos": 1032000,
      "lengthKm": 0.055,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 18763636.36,
      "lengthMeters": 55.0,
      "allocationPerStatedMeter": 18763.64,
      "rangesMeters": [
        [
          34886.0,
          34941.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "160",
      "lengthEvidence": "Dra Salamanca Rd - K0034 + 886 - K0034 + 941",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": 52021.74,
      "peerRateMultiple": 0.36,
      "peerRecords": 20,
      "peerBand": "0–<164.5 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Within descriptive peer screen",
      "peerUpperFence": 213186.45,
      "graphUpperFence": 320220.63
    },
    {
      "id": "HB10858-3-0181-001306",
      "category": "Roads",
      "program": "Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads",
      "projectName": "Nabunturan-Mainit Park Rd - K1432 + 050 - K1432 + 055",
      "office": "Davao de Oro 1st District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": 0.005,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Complete chainage range in title",
      "allocationPerStatedKm": 200000000.0,
      "lengthMeters": 5.0,
      "allocationPerStatedMeter": 200000.0,
      "rangesMeters": [
        [
          1432050.0,
          1432055.0
        ]
      ],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "181",
      "lengthEvidence": "Nabunturan-Mainit Park Rd - K1432 + 050 - K1432 + 055",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": true,
      "rateReview": "Very short printed range · verify length first"
    },
    {
      "id": "HB10858-3-0273-002961",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Capulong Br. (B01790LZ) along C-2 Road",
      "office": "North Manila District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Capulong Br. (B01790LZ) along C-2 Road",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002962",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Claro M. Recto Br. 1 (B01770LZ) along CM Recto",
      "office": "North Manila District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Claro M. Recto Br. 1 (B01770LZ) along CM Recto",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002964",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Dasmariñas Br. (B02624LZ) along Dasmarinas St",
      "office": "North Manila District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Dasmariñas Br. (B02624LZ) along Dasmarinas St",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0273-002966",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Domingo Santiago Br. (B05074LZ) along Domingo Santiago St.",
      "office": "North Manila District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "273",
      "lengthEvidence": "Domingo Santiago Br. (B05074LZ) along Domingo Santiago St.",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002975",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Muelle del Banco Nacional Br. (B02791LZ) along Mulle del Banco National",
      "office": "North Manila District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Muelle del Banco Nacional Br. (B02791LZ) along Mulle del Banco National",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002976",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Muelle dela Industria Br. (B02625LZ) along Mulle dela Industria",
      "office": "North Manila District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Muelle dela Industria Br. (B02625LZ) along Mulle dela Industria",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002979",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Quiricada Br. (B05076LZ) along Quiricada St",
      "office": "North Manila District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Quiricada Br. (B05076LZ) along Quiricada St",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002982",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Reina Regente Br. (B01788LZ) along Reina Regente",
      "office": "North Manila District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Reina Regente Br. (B01788LZ) along Reina Regente",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002983",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "San Fernando Br. (B01795LZ) along Sn Fernando",
      "office": "North Manila District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "San Fernando Br. (B01795LZ) along Sn Fernando",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002994",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Disked Br. (B00008BN) along Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd",
      "office": "Batanes District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Disked Br. (B00008BN) along Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0274-002995",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Gelet Br. (B00002IY) along Airport-Mauyen Port Rd",
      "office": "Batanes District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "274",
      "lengthEvidence": "Gelet Br. (B00002IY) along Airport-Mauyen Port Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003059",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Antipolo Br. (B00197NR) along Jct Pontevedra-La Castellana Rd",
      "office": "Negros Occidental 4th District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Antipolo Br. (B00197NR) along Jct Pontevedra-La Castellana Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0278-003060",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Candaguit Br. (B00349NR) along Jct Sn Enrique-Pontevedra By-Pass Rd",
      "office": "Negros Occidental 4th District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "278",
      "lengthEvidence": "Candaguit Br. (B00349NR) along Jct Sn Enrique-Pontevedra By-Pass Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003107",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Makiwalo Br. (B00537SM) along Catarman-Laoang Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Makiwalo Br. (B00537SM) along Catarman-Laoang Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003113",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Rosario Br. (B00316SM) along Rosario Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Rosario Br. (B00316SM) along Rosario Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0280-003115",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Sabang Br. 2 (B00250SM) along Allen Old Rd",
      "office": "Northern Samar 1st District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "280",
      "lengthEvidence": "Sabang Br. 2 (B00250SM) along Allen Old Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-3-0282-003155",
      "category": "Bridges",
      "program": "Rehabilitation/ Major Repair of Permanent Bridges",
      "projectName": "Libby Br. (B01975MN) along Davao-Cotabato Old Rd",
      "office": "Davao City District Engineering Office",
      "amountPesos": 1000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "3- HB 10858 FOR 3RD READING VOL I-C .pdf",
      "sourcePage": "282",
      "lengthEvidence": "Libby Br. (B01975MN) along Davao-Cotabato Old Rd",
      "scopeNote": "Bridge chainage can include approaches; not verified span length",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0666-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Rango, Brgy. Tubburan FMR, Brgy. Tubburan, Bacarra, Ilocos Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 666,
      "lengthEvidence": "REGION I - ILOCOS | 1,590,000,000 | Construction of Sitio Rango, Brgy. Tubburan FMR, Brgy. Tubburan, Bacarra, Ilocos Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0666-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of San Lorenzo FMR, Brgy. San Lorenzo, Bangui, Ilocos Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 666,
      "lengthEvidence": "Construction of San Lorenzo FMR, Brgy. San Lorenzo, Bangui, Ilocos Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0666-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Escoda - Brgy. Elizabeth FMR, Brgy. Escoda and Brgy. Elizabeth, Marcos, Ilocos Norte",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 666,
      "lengthEvidence": "Construction of Brgy. Escoda - Brgy. Elizabeth FMR, Brgy. Escoda and Brgy. Elizabeth, | Marcos, Ilocos Norte | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0666-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Sao, Brgy. Daking FMR, Brgy. Daking, San Gabriel, La Union",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 666,
      "lengthEvidence": "Construction of Sitio Sao, Brgy. Daking FMR, Brgy. Daking, San Gabriel, La Union | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0666-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Dayegdeg, Brgy. Lon-oy FMR, Brgy. Lon-oy, San Gabriel, La Union",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 666,
      "lengthEvidence": "Construction of Sitio Dayegdeg, Brgy. Lon-oy FMR, Brgy. Lon-oy, San Gabriel, La Union | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0666-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Sinabugan to Sitio Centro, Brgy. Tio-angan FMR, Brgy. Tio-angan, Bagulin, La Union",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 666,
      "lengthEvidence": "Construction of Sitio Sinabugan to Sitio Centro, Brgy. Tio-angan FMR, Brgy. Tio-angan, | Bagulin, La Union | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0666-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Alibangsay FMR, Brgy. Alibangsay, Bagulin, La Union",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 666,
      "lengthEvidence": "Construction of Brgy. Alibangsay FMR, Brgy. Alibangsay, Bagulin, La Union | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0666-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Banog Norte FMR, Brgy. Banog Norte, Bani, Pangasinan",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 666,
      "lengthEvidence": "Construction of Brgy. Banog Norte FMR, Brgy. Banog Norte, Bani, Pangasinan | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0666-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Gueteb FMR, Brgy. Gueteb, Urbiztondo, Pangasinan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 666,
      "lengthEvidence": "Construction of Brgy. Gueteb FMR, Brgy. Gueteb, Urbiztondo, Pangasinan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0666-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Buenlag FMR, Brgy. Buenlag, Mangatarem, Pangasinan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 666,
      "lengthEvidence": "Construction of Brgy. Buenlag FMR, Brgy. Buenlag, Mangatarem, Pangasinan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0666-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tobor FMR, Brgy. Tobor, Malasiqui, Pangasinan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 666,
      "lengthEvidence": "Construction of Brgy. Tobor FMR, Brgy. Tobor, Malasiqui, Pangasinan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0666-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Mancup - Brgy. Talibaew FMR, Brgy. Mancup and Brgy. Talibaew, Calasiao, Pangasinan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 666,
      "lengthEvidence": "Construction of Brgy. Mancup - Brgy. Talibaew FMR, Brgy. Mancup and Brgy. Talibaew, | Calasiao, Pangasinan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0666-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Alacan to Brgy. Mabilao FMR, Brgy. Alacan and Brgy. Mabilao, San Fabian, Pangasinan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 666,
      "lengthEvidence": "Construction of Brgy. Alacan to Brgy. Mabilao FMR, Brgy. Alacan and Brgy. Mabilao, | San Fabian, Pangasinan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0666-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Gumot to Brgy. Bigbiga FMR, Brgy. Gumot and Brgy. Bigbiga, San Fabian, Pangasinan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 666,
      "lengthEvidence": "Construction of Brgy. Gumot to Brgy. Bigbiga FMR, Brgy. Gumot and Brgy. Bigbiga, | San Fabian, Pangasinan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bobonan - Brgy. Nama - Brgy. Palacpalac FMR, Brgy. Bobonan,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. Bobonan - Brgy. Nama - Brgy. Palacpalac FMR, Brgy. Bobonan, | Brgy. Nama and Brgy. Palacpalac, Villasis, Pangasinan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Estanza FMR Phase III, Brgy. Estanza, Lingayen, Pangasinan",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Brgy. Estanza FMR Phase III, Brgy. Estanza, Lingayen, Pangasinan | 15,000,000 | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Parian to Brgy. Pagudpud to Brgy. San Vicente FMR, Brgy. Parian,",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Parian to Brgy. Pagudpud to Brgy. San Vicente FMR, Brgy. Parian, | San Fernando City, La Union | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Vicente FMR, Brgy. San Vicente, Alcala, Pangasinan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. San Vicente FMR, Brgy. San Vicente, Alcala, Pangasinan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Luna Weste - Brgy. Concepcion FMR, Brgy. Luna Weste and",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. Luna Weste - Brgy. Concepcion FMR, Brgy. Luna Weste and | Brgy. Concepcion, Umingan, Pangasinan | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Anduyan FMR, Brgy. Anduyan, Tubao, La Union",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. Anduyan FMR, Brgy. Anduyan, Tubao, La Union | 10,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Carad, Brgy. Tubburan FMR, Brgy. Tubburan, Bacarra, Ilocos Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "10,000,000 | Construction of Sitio Carad, Brgy. Tubburan FMR, Brgy. Tubburan, Bacarra, Ilocos Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Macalong FMR, Brgy. Macalong, Asingan, Pangasinan",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. Macalong FMR, Brgy. Macalong, Asingan, Pangasinan | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bani FMR, Brgy. Bani, Bacarra, Ilocos Norte",
      "office": "",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "10,000,000 | Construction of Brgy. Bani FMR, Brgy. Bani, Bacarra, Ilocos Norte | 12,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Flores-Brgy. Esperanza FMR, Brgy. Flores and Brgy. Esperanza, Umingan, Pangasinan",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. Flores-Brgy. Esperanza FMR, Brgy. Flores and Brgy. Esperanza, | Umingan, Pangasinan | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Lorenzo-Nagbalagan-Malasin-Lanao FMR, Bangui, Ilocos Norte",
      "office": "",
      "amountPesos": 13500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "10,000,000 | Construction of Brgy. San Lorenzo-Nagbalagan-Malasin-Lanao FMR, Bangui, Ilocos Norte | 13,500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Utoy, Estancia FMR, Piddig, Ilocos Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Sitio Utoy, Estancia FMR, Piddig, Ilocos Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Guiringan FMR, Sta. Maria, Piddig, Ilocos Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Sitio Guiringan FMR, Sta. Maria, Piddig, Ilocos Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tanap-Brgy. Nagsurot FMR, Burgos, Ilocos Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "20,000,000 | Construction of Brgy. Tanap-Brgy. Nagsurot FMR, Burgos, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Buenlag FMR, Calasiao, Pangasinan",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. Buenlag FMR, Calasiao, Pangasinan | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cabungaan A FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "20,000,000 | Construction of Brgy. Cabungaan A FMR, Laoag City, Ilocos Norte | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Gueteb to Brgy. Balangay FMR, Brgy. Gueteb, Urbiztondo, Pangasinan",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. Gueteb to Brgy. Balangay FMR, Brgy. Gueteb, Urbiztondo, Pangasinan | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cabungaan B FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "5,000,000 | Construction of Brgy. Cabungaan B FMR, Laoag City, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Dorongan Linmasangan FMR, Brgy. Dorongan Linmasangan,",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. Dorongan Linmasangan FMR, Brgy. Dorongan Linmasangan, | Mangatarem, Pangasinan | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Buttong FMR, Brgy. Buttong, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 8500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "5,000,000 | Construction of Brgy. Buttong FMR, Brgy. Buttong, Laoag City, Ilocos Norte | 8,500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Malabobo FMR, Brgy. Malabobo, Mangatarem, Pangasinan",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. Malabobo FMR, Brgy. Malabobo, Mangatarem, Pangasinan | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Camangaan - Brgy. 29 FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 11000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Camangaan - Brgy. 29 FMR, Laoag City, Ilocos Norte | 5,000,000 | 11,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Nagpalanga FMR, Brgy. Nagpalanga, Binmaley, Pangasinan",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. Nagpalanga FMR, Brgy. Nagpalanga, Binmaley, Pangasinan | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Camangaan - Rioeng FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Camangaan - Rioeng FMR, Laoag City, Ilocos Norte | 5,000,000 | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Macarang FMR, Brgy. Macarang, Mangatarem, Pangasinan",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. Macarang FMR, Brgy. Macarang, Mangatarem, Pangasinan | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. 29 FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. 29 FMR, Laoag City, Ilocos Norte | 5,000,000 | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Baug FMR, Brgy. Baug, Urbiztondo, Pangasinan",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. Baug FMR, Brgy. Baug, Urbiztondo, Pangasinan | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Pamalian FMR, Brgy. Pila, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Pamalian FMR, Brgy. Pila, Laoag City, Ilocos Norte | 5,000,000 | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Osmeña FMR, Brgy. Osmeña, Basista, Pangasinan",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. Osmeña FMR, Brgy. Osmeña, Basista, Pangasinan | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. 1 San Lorenzo FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. 1 San Lorenzo FMR, Laoag City, Ilocos Norte | 5,000,000 | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-032",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tampac FMR, Brgy. Tampac, Aguilar, Pangasinan",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. Tampac FMR, Brgy. Tampac, Aguilar, Pangasinan | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-033",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. 25 Santa Cayetana FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. 25 Santa Cayetana FMR, Laoag City, Ilocos Norte | 5,000,000 | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0668-034",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bocacliw FMR, Brgy. Bocacliw, Aguilar, Pangasinan",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 668,
      "lengthEvidence": "Construction of Brgy. Bocacliw FMR, Brgy. Bocacliw, Aguilar, Pangasinan | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. 27 FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. 27 FMR, Laoag City, Ilocos Norte | Section 2: 120.607603, 18.195734 | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tarrag Hardin FMR, Brgy. Tarrag, Pagudpud, Ilocos Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Brgy. Tarrag Hardin FMR, Brgy. Tarrag, Pagudpud, Ilocos Norte | 20,000,000 | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tarrag San Miguel FMR, Brgy. Tarrag, Pagudpud, Ilocos Norte",
      "office": "",
      "amountPesos": 16000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "10,000,000 | Construction of Brgy. Tarrag San Miguel FMR, Brgy. Tarrag, Pagudpud, Ilocos Norte | 16,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. 40 Balatong FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Section 2: 120.609355, 18.194385 | Construction of Brgy. 40 Balatong FMR, Laoag City, Ilocos Norte | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Cadaanan West FMR, Brgy. Pancian, Pagudpud, Ilocos Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "10,000,000 | Construction of Cadaanan West FMR, Brgy. Pancian, Pagudpud, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. 41 Balacad FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Brgy. 41 Balacad FMR, Laoag City, Ilocos Norte | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Caparispisan FMR, Brgy. Caparispisan, Pagudpud, Ilocos Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "10,000,000 | Construction of Caparispisan FMR, Brgy. Caparispisan, Pagudpud, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Zamboanga - Cavit FMR, Brgy. Zamboanga and Brgy. Cavit, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Zamboanga - Cavit FMR, Brgy. Zamboanga and Brgy. Cavit, | Laoag City, Ilocos Norte | 7,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. 30-B Santa Maria FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Brgy. 30-B Santa Maria FMR, Laoag City, Ilocos Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Juan FMR (Eda and Mauemel Section), San Juan,",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "20,000,000 | Construction of Brgy. San Juan FMR (Eda and Mauemel Section), San Juan, | Pasuquin, Ilocos Norte | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. 36 Araniw FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Brgy. 36 Araniw FMR, Laoag City, Ilocos Norte | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. 51-A Nangalisan East FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Brgy. 51-A Nangalisan East FMR, Laoag City, Ilocos Norte | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sta. Matilde FMR (Bareng, Yanos, Agagamang Section), Brgy. Sta. Matilde, Pasuquin, Ilocos Norte",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Brgy. Sta. Matilde FMR (Bareng, Yanos, Agagamang Section), | 5,000,000 | Brgy. Sta. Matilde, Pasuquin, Ilocos Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. 54-A Lagui-Sail FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Brgy. 54-A Lagui-Sail FMR, Laoag City, Ilocos Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Cabaruan Road FMR, Nagsanga, Pasuquin, Ilocos Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "20,000,000 | Construction of Sitio Cabaruan Road FMR, Nagsanga, Pasuquin, Ilocos Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. 55-B Salet-Bulangon FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Brgy. 55-B Salet-Bulangon FMR, Laoag City, Ilocos Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 3, Brgy. Pangil FMR, Brgy. Pangil, Pasuquin, Ilocos Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "20,000,000 | Construction of Purok 3, Brgy. Pangil FMR, Brgy. Pangil, Pasuquin, Ilocos Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. 56-A Bacsil North FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Brgy. 56-A Bacsil North FMR, Laoag City, Ilocos Norte | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Caruan FMR, Brgy. Caruan, Pasuquin, Ilocos Norte",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "5,000,000 | Construction of Brgy. Caruan FMR, Brgy. Caruan, Pasuquin, Ilocos Norte | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. 60-A Caaoacan FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Brgy. 60-A Caaoacan FMR, Laoag City, Ilocos Norte | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. 62-B Navotas South FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Brgy. 62-B Navotas South FMR, Laoag City, Ilocos Norte | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Cagat to Sitio Turod, Brgy. Tangaoan FMR, Brgy. Tangaoan, Piddig, Ilocos Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "5,000,000 | Construction of Sitio Cagat to Sitio Turod, Brgy. Tangaoan FMR, Brgy. Tangaoan, | Piddig, Ilocos Norte | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. 49-B Raraburan FMR, Laoag City, Ilocos Norte",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Brgy. 49-B Raraburan FMR, Laoag City, Ilocos Norte | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Libnaoan-Brgy. Lagandit FMR, Brgy. Libnaoan and Brgy. Lagandit,",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "5,000,000 | Construction of Brgy. Libnaoan-Brgy. Lagandit FMR, Brgy. Libnaoan and Brgy. Lagandit, | Piddig, Ilocos Norte | 30,000,000 | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Tamuad Brgy. Dampig FMR, Brgy. Dampig, Pagudpud, Ilocos Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Sitio Tamuad Brgy. Dampig FMR, Brgy. Dampig, Pagudpud, Ilocos Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Baduang FMR, Brgy. Baduang, Pagudpud, Ilocos Norte",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Brgy. Baduang FMR, Brgy. Baduang, Pagudpud, Ilocos Norte | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Abkir FMR, Brgy. Abkir, Vintar, Ilocos Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Brgy. Abkir FMR, Brgy. Abkir, Vintar, Ilocos Norte | 5,000,000 | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tarrag FMR, Brgy. Tarrag, Pagudpud, Ilocos Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Brgy. Tarrag FMR, Brgy. Tarrag, Pagudpud, Ilocos Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Dipilat FMR, Brgy. Dipilat, Vintar, Ilocos Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Brgy. Dipilat FMR, Brgy. Dipilat, Vintar, Ilocos Norte | 20,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0670-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Dasar FMR, Brgy. Isic-isic, Vintar, Ilocos Norte",
      "office": "",
      "amountPesos": 34000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 670,
      "lengthEvidence": "Construction of Sitio Dasar FMR, Brgy. Isic-isic, Vintar, Ilocos Norte | 27,000,000 | 34,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bago FMR, Brgy. Bago, Vintar, Ilocos Norte",
      "office": "",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. Bago FMR, Brgy. Bago, Vintar, Ilocos Norte | 18,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Bokig to Beckes, Brgy. Paoay FMR, Brgy. Paoay, Atok, Benguet",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Bokig to Beckes, Brgy. Paoay FMR, Brgy. Paoay, Atok, Benguet | 18,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Margaay FMR, Brgy. Margaay, Vintar, Ilocos Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Construction of Brgy. Margaay FMR, Brgy. Margaay, Vintar, Ilocos Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Alimang, Brgy. Poblacion FMR, Brgy. Poblacion, Sablan, Benguet",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Construction of Alimang, Brgy. Poblacion FMR, Brgy. Poblacion, Sablan, Benguet | 20,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Namoroc FMR, Brgy. Namoroc, Vintar, Ilocos Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Construction of Brgy. Namoroc FMR, Brgy. Namoroc, Vintar, Ilocos Norte | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Baguio Animal Breeding Research Center (BABRC), Brgy. Dontogan FMR Phase II, Brgy. Dontogan, Baguio City",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Construction of Baguio Animal Breeding Research Center (BABRC), Brgy. Dontogan FMR | 10,000,000 | Phase II, Brgy. Dontogan, Baguio City | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Nancalabasaan - Brgy. Don Montano FMR, Brgy. Nancalabasaan and",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Construction of Brgy. Nancalabasaan - Brgy. Don Montano FMR, Brgy. Nancalabasaan and | Brgy. Don Montano, Umingan, Pangasinan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Lower Balacbac, Brgy. Sto. Tomas Proper FMR Phase I, Brgy. Sto. Tomas Proper, Baguio City",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "15,000,000 | Construction of Lower Balacbac, Brgy. Sto. Tomas Proper FMR Phase I, | Brgy. Sto. Tomas Proper, Baguio City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Daray-Asen Sapang, Brgy. San Vicente FMR, Brgy. San Vicente,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Concreting of Daray-Asen Sapang, Brgy. San Vicente FMR, Brgy. San Vicente, | Alaminos City, Pangasinan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Busilac-Laya FMR, Brgy. Busilac, Alfonso Lista, Ifugao",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "15,000,000 | Construction of Busilac-Laya FMR, Brgy. Busilac, Alfonso Lista, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Bigat Road, Brgy. Awile FMR, Brgy. Awile, Anda, Pangasinan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Concreting of Sitio Bigat Road, Brgy. Awile FMR, Brgy. Awile, Anda, Pangasinan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 2 to Purok 1, Sitio Pugo, Brgy. San Juan FMR, Brgy. San Juan, Alfonso Lista, Ifugao",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Construction of Purok 2 to Purok 1, Sitio Pugo, Brgy. San Juan FMR, Brgy. San Juan, | 15,000,000 | Alfonso Lista, Ifugao",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Lon-oy - Brgy. Bayabas FMR, San Gabriel, La Union",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Concreting of Brgy. Lon-oy - Brgy. Bayabas FMR, San Gabriel, La Union | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Alangyan, Brgy. Kinama FMR, Brgy. Kinama, Rizal, Kalinga",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "25,000,000 | Construction of Sitio Alangyan, Brgy. Kinama FMR, Brgy. Kinama, Rizal, Kalinga | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Amontoc FMR (Palpalidan Section), Brgy. Amontoc, San Gabriel, La Union",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Concreting of Amontoc FMR (Palpalidan Section), Brgy. Amontoc, San Gabriel, La Union | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Cata'lappan-Sinamar, Brgy. Anonat FMR, Paracelis, Mountain Province",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "5,000,000 | Construction of Cata'lappan-Sinamar, Brgy. Anonat FMR, Paracelis, Mountain Province | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Balaybuaya FMR, Brgy. Balaybuaya, Bayambang, Pangasinan",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Construction of Brgy. Balaybuaya FMR, Brgy. Balaybuaya, Bayambang, Pangasinan | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Lower Balacbac, Brgy. Sto. Tomas Proper FMR Phase II, Brgy. Sto. Tomas Proper, Baguio City",
      "office": "",
      "amountPesos": 7000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "5,000,000 | Construction of Lower Balacbac, Brgy. Sto. Tomas Proper FMR Phase II, | Brgy. Sto. Tomas Proper, Baguio City | 7,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tampog FMR, Brgy. Tampog, Bayambang, Pangasinan",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Construction of Brgy. Tampog FMR, Brgy. Tampog, Bayambang, Pangasinan | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 6 to Aurelio Street, Brgy. Dontogan FMR, Brgy. Dontogan, Baguio City",
      "office": "",
      "amountPesos": 12000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "10,000,000 | Construction of Purok 6 to Aurelio Street, Brgy. Dontogan FMR, Brgy. Dontogan, Baguio City | 12,000,000 | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tambac FMR, Brgy. Tambac, Bayambang, Pangasinan",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Construction of Brgy. Tambac FMR, Brgy. Tambac, Bayambang, Pangasinan | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Gabol Road 1, Purok 9-A, Brgy. Irisan FMR, Brgy. Irisan, Baguio City",
      "office": "",
      "amountPesos": 11000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "5,000,000 | Construction of Gabol Road 1, Purok 9-A, Brgy. Irisan FMR, Brgy. Irisan, Baguio City | 11,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bacnono FMR, Brgy. Bacnono, Bayambang, Pangasinan",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Construction of Brgy. Bacnono FMR, Brgy. Bacnono, Bayambang, Pangasinan | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Mayag FMR, Brgy. Mayag, Bauco, Mountain Province",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "5,000,000 | Construction of Brgy. Mayag FMR, Brgy. Mayag, Bauco, Mountain Province | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Manambong Sur FMR, Brgy. Manambong Sur, Bayambang, Pangasinan",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Construction of Brgy. Manambong Sur FMR, Brgy. Manambong Sur, Bayambang, Pangasinan | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Lower Englandad-Tagongtongao- Boneng FMR, Brgy. Paoay, Atok, Benguet",
      "office": "",
      "amountPesos": 67000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "5,000,000 | Construction of Lower Englandad-Tagongtongao- Boneng FMR, Brgy. Paoay, Atok, Benguet | 67,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Poblacion West - Brgy. Concepcion FMR, Rosario, La Union",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Concreting of Brgy. Poblacion West - Brgy. Concepcion FMR, Rosario, La Union | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sowe-Cabayo-Keninchingan FMR, Brgy. Poblacion, Atok, Benguet",
      "office": "",
      "amountPesos": 77000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "15,000,000 | Construction of Sowe-Cabayo-Keninchingan FMR, Brgy. Poblacion, Atok, Benguet | 77,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Cadumanian FMR, Brgy. Cadumanian, Rosario, La Union",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Concreting of Brgy. Cadumanian FMR, Brgy. Cadumanian, Rosario, La Union | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0672-033",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Dinacpan, Brgy. Karikitan to Sitio Tagtagat, Brgy. Calafug FMR,",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 672,
      "lengthEvidence": "Construction of Sitio Dinacpan, Brgy. Karikitan to Sitio Tagtagat, Brgy. Calafug FMR, | Conner, Apayao | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Americana-San Francisco Norte FMR, San Guillermo, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Sitio Americana-San Francisco Norte FMR, San Guillermo, Isabela | 500, | 000,000 | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Macalong (Cell Site) FMR, Brgy. Macalong, Kasibu, Nueva Vizcaya",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Brgy. Macalong (Cell Site) FMR, Brgy. Macalong, Kasibu, Nueva Vizcaya | 250, | 000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Improvement of Sagpat-God-ang-Manawal FMR, Brgy. Sagpat to Brgy. Lubo, Kibungan, Benguet",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Improvement of Sagpat-God-ang-Manawal FMR, Brgy. Sagpat to Brgy. Lubo, | Kibungan, Benguet | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Diawe, Brgy. Sta. Victoria to Sitio San Juan, Brgy. Diodol FMR, Brgy. Sta. Victoria and Brgy. Diodol, Aglipay, Quirino",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "25,000,000 | Construction of Sitio Diawe, Brgy. Sta. Victoria to Sitio San Juan, Brgy. Diodol FMR, | Brgy. Sta. Victoria and Brgy. Diodol, Aglipay, Quirino | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Balukingking, Brgy. Magsaysay FMR, Brgy. Magsaysay, Naguilian, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "2,133,200,000 | Construction of Sitio Balukingking, Brgy. Magsaysay FMR, Brgy. Magsaysay, Naguilian, Isabela | 7,500,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Dalayap to Sitio Ibujan, Brgy. Disulap FMR, Brgy. Disulap, San Mariano, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Sitio Dalayap to Sitio Ibujan, Brgy. Disulap FMR, Brgy. Disulap, | 22,500,000 | San Mariano, Isabela | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Dicadyuan to Brgy. Didaddungan FMR, Brgy. Dicadyuan, Palanan, Isabela and Brgy. Diddadungan, Palanan, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "30,000,000 | Construction of Dicadyuan to Brgy. Didaddungan FMR, Brgy. Dicadyuan, Palanan, Isabela and | Brgy. Diddadungan, Palanan, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Balagubag, Brgy. Magsidel FMR, Brgy. Magsidel, Calayan, Cagayan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Balagubag, Brgy. Magsidel FMR, Brgy. Magsidel, Calayan, Cagayan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Calog Norte FMR, Brgy. Calog Norte, Abulug, Cagayan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Calog Norte FMR, Brgy. Calog Norte, Abulug, Cagayan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cabasan FMR, Brgy. Cabasan, Peñablanca, Cagayan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Brgy. Cabasan FMR, Brgy. Cabasan, Peñablanca, Cagayan | 30,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cumabao to Brgy. San Vicente FMR, Brgy. Cumabao, Tumauini, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Brgy. Cumabao to Brgy. San Vicente FMR, Brgy. Cumabao, Tumauini, Isabela | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. La Suerte FMR, Brgy. La Suerte, Amulung, Cagayan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Brgy. La Suerte FMR, Brgy. La Suerte, Amulung, Cagayan | 30,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Barcolan to Brgy. Mabini FMR, Gamu, Isabela",
      "office": "",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Brgy. Barcolan to Brgy. Mabini FMR, Gamu, Isabela | 55,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Gaddanan - Brgy. Mataas na Kahoy - Brgy. Nagrumbuan FMR,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Brgy. Gaddanan - Brgy. Mataas na Kahoy - Brgy. Nagrumbuan FMR, | Brgy. Gaddanan, Brgy. Mataas na Kahoy and Brgy. Nagrumbuan, San Mateo, Isabela | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Antagan to Brgy. Poblacion FMR, Brgy. Antagan, San Pablo, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Brgy. Antagan to Brgy. Poblacion FMR, Brgy. Antagan, San Pablo, Isabela | 15,000,000 | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cabisera 17-21 to Brgy. Sindon Maride FMR, Brgy. Cabisera 17-21,",
      "office": "",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Cabisera 17-21 to Brgy. Sindon Maride FMR, Brgy. Cabisera 17-21, | Ilagan City, Isabela | 45,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Spanish Road Brgy. Linglingay FMR, Alicia, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Spanish Road Brgy. Linglingay FMR, Alicia, Isabela | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Gayong FMR, Cordon, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Brgy. Gayong FMR, Cordon, Isabela | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Lingaling FMR, Brgy. Lingaling, Santa Maria, Isabela",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Brgy. Lingaling FMR, Brgy. Lingaling, Santa Maria, Isabela | 15,000,000 | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Quirat Road-Lachica Street, Rizal FMR, Santiago City, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Quirat Road-Lachica Street, Rizal FMR, Santiago City, Isabela | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Vicente-Brgy. Limbauan FMR, Brgy. San Vicente and Brgy. Limbauan, San Pablo, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Brgy. San Vicente-Brgy. Limbauan FMR, Brgy. San Vicente and | 15,000,000 | Brgy. Limbauan, San Pablo, Isabela | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Baccay-Sitio Umayam, Brgy. San Antonio FMR, Brgy. San Antonio, Cabagan, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "15,000,000 | Construction of Sitio Baccay-Sitio Umayam, Brgy. San Antonio FMR, Brgy. San Antonio, | Cabagan, Isabela | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0674-032",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Macañao to Brgy. Luyao FMR Phase II, Luna, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 674,
      "lengthEvidence": "Construction of Brgy. Macañao to Brgy. Luyao FMR Phase II, Luna, Isabela | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Simanu Norte FMR, Brgy. Simanu Norte, San Pablo, Isabela",
      "office": "",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. Simanu Norte FMR, Brgy. Simanu Norte, San Pablo, Isabela | 40,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Ramos West FMR, San Isidro, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Brgy. Ramos West FMR, San Isidro, Isabela | 40,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Beti to Brgy. Yaway FMR, Brgy. Beti and Brgy. Yaway, Aritao,",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Brgy. Beti to Brgy. Yaway FMR, Brgy. Beti and Brgy. Yaway, Aritao, | Nueva Vizcaya | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Rizal - Villa Marcos to Salvador-Divisoria FMR, Brgy. Rizal-Villa Marcos to Brgy. Salvador-Divisoria, Santiago City, Isabela",
      "office": "",
      "amountPesos": 32550000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Rizal - Villa Marcos to Salvador-Divisoria FMR, Brgy. Rizal-Villa Marcos to | 20,000,000 | Brgy. Salvador-Divisoria, Santiago City, Isabela | 32,550,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Canabay - Brgy. Carolotan FMR, Brgy. Canabay and Brgy. Carolotan,",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Brgy. Canabay - Brgy. Carolotan FMR, Brgy. Canabay and Brgy. Carolotan, | Dupax Del Sur, Nueva Vizcaya | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Dianao FMR, Brgy. Dianao, Cauayan City, Isabela",
      "office": "",
      "amountPesos": 22500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Brgy. Dianao FMR, Brgy. Dianao, Cauayan City, Isabela | 30,000,000 | 22,500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Buyon FMR, Brgy. Buyon, Cauayan City, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "30,000,000 | Construction of Brgy. Buyon FMR, Brgy. Buyon, Cauayan City, Isabela | 15,000,000 | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of P7 Brgy. Balligui FMR, Brgy. Balligui, Madella, Quirino",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of P7 Brgy. Balligui FMR, Brgy. Balligui, Madella, Quirino | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Antonio FMR, Brgy. San Antonio, Cauayan City, Isabela",
      "office": "",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "25,000,000 | Construction of Brgy. San Antonio FMR, Brgy. San Antonio, Cauayan City, Isabela | 18,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cabaruan FMR, Brgy. Cabaruan, Madella, Quirino",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Brgy. Cabaruan FMR, Brgy. Cabaruan, Madella, Quirino | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Nungnungan II to Brgy. Nungnungan I FMR, Brgy. Nungnungan II to",
      "office": "",
      "amountPesos": 27000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "25,000,000 | Construction of Brgy. Nungnungan II to Brgy. Nungnungan I FMR, Brgy. Nungnungan II to | Brgy. Nungnungan I, Cauayan City, Isabela | 27,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Magacan to Brgy. Callungan FMR, Brgy. Magacan and Brgy. Callungan, Sanchez Mira, Cagayan",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Brgy. Magacan to Brgy. Callungan FMR, Brgy. Magacan and Brgy. Callungan, | Sanchez Mira, Cagayan | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Francisco to Dabburab FMR, Brgy. San Francisco - Brgy. Dabburab,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "20,000,000 | Construction of Brgy. San Francisco to Dabburab FMR, Brgy. San Francisco - Brgy. Dabburab, | Cauayan City, Isabela | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Siguiran FMR, Brgy. Siguiran, Abulug, Cagayan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Siguiran FMR, Brgy. Siguiran, Abulug, Cagayan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Gandia, Alinunu FMR, Brgy. Alinunu, Abulug, Cagayan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Sitio Gandia, Alinunu FMR, Brgy. Alinunu, Abulug, Cagayan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Mariano Sur - Sinalugan FMR, Brgy. San Mariano Sur, San Guillermo, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Brgy. San Mariano Sur - Sinalugan FMR, Brgy. San Mariano Sur, San Guillermo, | 15,000,000 | Isabela | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Nantawakan FMR, Brgy. Nantawakan, Kasibu, Nueva Vizcaya",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Brgy. Nantawakan FMR, Brgy. Nantawakan, Kasibu, Nueva Vizcaya | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Villa Teresita FMR, Brgy. Villa Teresita, San Guillermo, Isabela (2) 16.7548787, 121.8595580",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Villa Teresita FMR, Brgy. Villa Teresita, San Guillermo, Isabela | (2) 16.7548787, 121.8595580 | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of FMR connecting Brgy. Dibuluan to Brgy. Namnama, Jones, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of FMR connecting Brgy. Dibuluan to Brgy. Namnama, Jones, Isabela | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Burgos - Sitio Vietnam FMR, Brgy. Burgos, San Guillermo, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "(2) 16.7509336, 121.8661148 | Construction of Brgy. Burgos - Sitio Vietnam FMR, Brgy. Burgos, San Guillermo, Isabela | 70,000,000 | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of South Low Nia-Boundary, Villa Gonzaga FMR, Brgy. Villa Gonzaga,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of South Low Nia-Boundary, Villa Gonzaga FMR, Brgy. Villa Gonzaga, | Santiago City, Isabela | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Aringay FMR, Brgy. Aringay, San Guillermo, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Brgy. Aringay FMR, Brgy. Aringay, San Guillermo, Isabela | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Disimuray to Casalatan FMR, Brgy. Disimuray, Cauayan City, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Disimuray to Casalatan FMR, Brgy. Disimuray, Cauayan City, Isabela | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Provincial Road Rizal-Basilio St., San Andres FMR, Brgy. San Andres, Santiago City, Isabela",
      "office": "",
      "amountPesos": 17550000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Provincial Road Rizal-Basilio St., San Andres FMR, Brgy. San Andres, | Santiago City, Isabela | 17,550,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Gappal FMR 3, Brgy. Gappal, Cauayan City, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "17,550,000 | Construction of Brgy. Gappal FMR 3, Brgy. Gappal, Cauayan City, Isabela | (2) 16.839367, 121.818317 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Quezon FMR, San Isidro, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Brgy. Quezon FMR, San Isidro, Isabela | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Salvador-Divisoria FMR, Brgy. Salvador-Divisoria, Santiago City, Isabela",
      "office": "",
      "amountPesos": 50400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Salvador-Divisoria FMR, Brgy. Salvador-Divisoria, Santiago City, Isabela | 50,400,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Maligaya to Baculod FMR, Brgy. Maligaya, Cauayan City, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "(2) 16.844298, 121.818599 | Construction of Brgy. Maligaya to Baculod FMR, Brgy. Maligaya, Cauayan City, Isabela | 50,400,000 | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Ramos East FMR, San Isidro, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Brgy. Ramos East FMR, San Isidro, Isabela | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Manaoag FMR 1, Brgy. Manaoag, Cauayan City, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Brgy. Manaoag FMR 1, Brgy. Manaoag, Cauayan City, Isabela | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0676-032",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Ramos West-Ramos East FMR, San Isidro, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 676,
      "lengthEvidence": "Construction of Brgy. Ramos West-Ramos East FMR, San Isidro, Isabela | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Manaoag FMR 2, Brgy. Manaoag, Cauayan City, Isabela",
      "office": "",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. Manaoag FMR 2, Brgy. Manaoag, Cauayan City, Isabela | (2) 16.819428, 121.839956 | 18,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Buneg to Brgy. Fugu FMR, Brgy. Buneg and Brgy. Fugu, Echague, Isabela",
      "office": "",
      "amountPesos": 25200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Brgy. Buneg to Brgy. Fugu FMR, Brgy. Buneg and Brgy. Fugu, | Echague, Isabela | 25,200,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 7, Brgy. Nueva Era FMR, San Manuel, Isabela",
      "office": "",
      "amountPesos": 10900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "18,000,000 | Construction of Purok 7, Brgy. Nueva Era FMR, San Manuel, Isabela | 10,900,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Nagrumbuan FMR 1, Brgy. Nagrumbuan, Cauayan City, Isabela",
      "office": "",
      "amountPesos": 27000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "(2) 16.819006, 121.842496 | Construction of Brgy. Nagrumbuan FMR 1, Brgy. Nagrumbuan, Cauayan City, Isabela | (2) 16.898692, 121.703649 | 27,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Cagurungan, Brgy. Eden FMR, Brgy. Eden, San Manuel, Isabela",
      "office": "",
      "amountPesos": 25200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "27,000,000 | Construction of Sitio Cagurungan, Brgy. Eden FMR, Brgy. Eden, San Manuel, Isabela | 25,200,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Sto. Domingo - Brgy. Salvacion FMR, Alicia, Isabela",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "Concreting of Brgy. Sto. Domingo - Brgy. Salvacion FMR, Alicia, Isabela | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Purok Ubbog, Brgy. Paraiso - Purok 2, Brgy. Magdalena FMR, Cabatuan, Isabela",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "22,500,000 | Concreting of Purok Ubbog, Brgy. Paraiso - Purok 2, Brgy. Magdalena FMR, | Cabatuan, Isabela | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of FMR at Sitio Dicabugue, Brgy. Dicamay 1, Jones, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "(2) 16.842231, 121.930214 | Construction of FMR at Sitio Dicabugue, Brgy. Dicamay 1, Jones, Isabela | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. San Antonio FMR, Brgy. San Antonio, Ramon, Isabela",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "30,000,000 | Concreting of Brgy. San Antonio FMR, Brgy. San Antonio, Ramon, Isabela | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Cusapit, Brgy. Dicamay 1 FMR, Brgy. Dicamay 1, Jones, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "Construction of Sitio Cusapit, Brgy. Dicamay 1 FMR, Brgy. Dicamay 1, Jones, Isabela | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Turod Sur FMR, Brgy. Turod Sur, Cordon, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "15,000,000 | Concreting of Brgy. Turod Sur FMR, Brgy. Turod Sur, Cordon, Isabela",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Dimas, Brgy. Minuri FMR, Brgy. Minuri, Jones, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "Construction of Sitio Dimas, Brgy. Minuri FMR, Brgy. Minuri, Jones, Isabela | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Patul- Brgy. Villa Gonzaga FMR Phase II, Brgy. Patul and Brgy. Villa Gonzaga, Santiago City, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "30,000,000 | Concreting of Brgy. Patul- Brgy. Villa Gonzaga FMR Phase II, Brgy. Patul and | Brgy. Villa Gonzaga, Santiago City, Isabela | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Diarao Baba, Brgy. Dicamay 2 FMR, Brgy. Dicamay 2, Jones, Isabela",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "Construction of Sitio Diarao Baba, Brgy. Dicamay 2 FMR, Brgy. Dicamay 2, Jones, Isabela | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Villaflores - Tactac FMR, Brgy.Villaflores, Sta. Fe, Nueva Vizcaya",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "20,000,000 | Concreting of Villaflores - Tactac FMR, Brgy.Villaflores, Sta. Fe, Nueva Vizcaya | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Antonio FMR, Brgy. San Antonio, Jones, Isabela",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "Construction of Brgy. San Antonio FMR, Brgy. San Antonio, Jones, Isabela | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Barindadu, Purok 5, Brgy. Dabubu Grande FMR, Brgy. Dabubu Grande, San Agustin, Isabela",
      "office": "",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "20,000,000 | Construction of Barindadu, Purok 5, Brgy. Dabubu Grande FMR, Brgy. Dabubu Grande, | San Agustin, Isabela | 45,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Nursery, P7, Brgy. Sto. Niño FMR, Brgy. Sto. Niño, San Agustin, Isabela START (SEC 1): 16.464822, 121.783702 START (SEC 2): 16.467103, 121.809653",
      "office": "",
      "amountPesos": 39000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "Construction of Nursery, P7, Brgy. Sto. Niño FMR, Brgy. Sto. Niño, San Agustin, Isabela | START (SEC 1): 16.464822, 121.783702 | START (SEC 2): 16.467103, 121.809653 | 39,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Dapiz, Kasaksian, Brgy. Mapalad FMR, Brgy. Mapalad, San Agustin, Isabela",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "39,000,000 | Concreting of Dapiz, Kasaksian, Brgy. Mapalad FMR, Brgy. Mapalad, San Agustin, Isabela | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sto. Niño FMR, Brgy. Sto. Niño, San Agustin, Isabela",
      "office": "",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "END (SEC 2): 16.468489, 121.810549 | Construction of Brgy. Sto. Niño FMR, Brgy. Sto. Niño, San Agustin, Isabela | 45,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting/Rehabilitation of Brgy. Napaliong FMR, Brgy. Napaliong, Jones, Isabela",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "45,000,000 | Concreting/Rehabilitation of Brgy. Napaliong FMR, Brgy. Napaliong, Jones, Isabela | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 7, Brgy. Mapalad FMR, San Agustin, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "Construction of Purok 7, Brgy. Mapalad FMR, San Agustin, Isabela | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Bacsay, Mapulalupa FMR, Brgy. Mapulalupa, Claveria, Cagayan",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "15,000,000 | Construction of Bacsay, Mapulalupa FMR, Brgy. Mapulalupa, Claveria, Cagayan | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Kimmulluong FMR, Brgy. Sinaoangan Sur, San Agustin, Isabela",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "Construction of Kimmulluong FMR, Brgy. Sinaoangan Sur, San Agustin, Isabela | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Culduroy, Brgy. Dibuluan FMR with Slope Protection, Brgy. Dibuluan, San Mariano, Isabela",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "15,000,000 | Concreting of Sitio Culduroy, Brgy. Dibuluan FMR with Slope Protection, Brgy. Dibuluan, | San Mariano, Isabela | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Bulawan, Brgy. Buyusan FMR, Brgy. Buyusan, San Mariano, Isabela",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "Concreting of Sitio Bulawan, Brgy. Buyusan FMR, Brgy. Buyusan, San Mariano, Isabela | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Masaya Norte FMR, Brgy. Masaya Norte, San Agustin, Isabela",
      "office": "",
      "amountPesos": 13200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "29,200,000 | Concreting of Brgy. Masaya Norte FMR, Brgy. Masaya Norte, San Agustin, Isabela | 13,200,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0678-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bannawag (Sito Dulay) FMR, Brgy. Bannawag, Diffun, Quirino",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 678,
      "lengthEvidence": "Construction of Brgy. Bannawag (Sito Dulay) FMR, Brgy. Bannawag, Diffun, Quirino | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0680-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Liwayway FMR, Brgy. Liwayway, Diffun, Quirino",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 680,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. Liwayway FMR, Brgy. Liwayway, Diffun, Quirino | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0680-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Villamore FMR, Brgy. Villamore, Cabarroguis, Quirino",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 680,
      "lengthEvidence": "Construction of Brgy. Villamore FMR, Brgy. Villamore, Cabarroguis, Quirino | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0680-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Banuar FMR, Brgy. Banuar, Cabarroguis, Quirino",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 680,
      "lengthEvidence": "Construction of Brgy. Banuar FMR, Brgy. Banuar, Cabarroguis, Quirino | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0680-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Villa Cardenas - Brgy. Balagbag FMR, Saguday & Diffun FMR, Quirino",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 680,
      "lengthEvidence": "Construction of Brgy. Villa Cardenas - Brgy. Balagbag FMR, Saguday & Diffun FMR, Quirino | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0680-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Dagupan FMR, Brgy. Dagupan, Aglipay, Quirino",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 680,
      "lengthEvidence": "Construction of Brgy. Dagupan FMR, Brgy. Dagupan, Aglipay, Quirino | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0680-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Rang-Ay FMR, Brgy. Rang-Ay, San Agustin, Isabela",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 680,
      "lengthEvidence": "Construction of Brgy. Rang-Ay FMR, Brgy. Rang-Ay, San Agustin, Isabela | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0680-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Nemmatan FMR, Brgy. Nemmatan, San Agustin, Isabela",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 680,
      "lengthEvidence": "Construction of Brgy. Nemmatan FMR, Brgy. Nemmatan, San Agustin, Isabela | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0682-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of J Gonzales-Bangan Bubon Chocolate Brgy. Amungan FMR,",
      "office": "",
      "amountPesos": 500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 682,
      "lengthEvidence": "15, | 000,000 | Construction of J Gonzales-Bangan Bubon Chocolate Brgy. Amungan FMR, | Brgy. Amungan, Iba, Zambales | 22, | 500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0682-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Maymayan Buri, Brgy. Inhobol FMR, Brgy. Inhobol, Masinloc, Zambales",
      "office": "",
      "amountPesos": 500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 682,
      "lengthEvidence": "Construction of Maymayan Buri, Brgy. Inhobol FMR, Brgy. Inhobol, Masinloc, Zambales | 15, | 000,000 | 32, | 500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0684-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sto. Rosario Young FMR, Brgy. Sto. Rosario Young, Zaragoza, Nueva Ecija",
      "office": "",
      "amountPesos": 750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 684,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Brgy. Sto. Rosario Young FMR, Brgy. Sto. Rosario Young, | 35, | 000,000 | Zaragoza, Nueva Ecija | 13, | 750,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0684-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. General Luna FMR, Brgy. General Luna, Sto. Domingo, Nueva Ecija",
      "office": "",
      "amountPesos": 500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 684,
      "lengthEvidence": "25, | 000,000 | Construction of Brgy. General Luna FMR, Brgy. General Luna, Sto. Domingo, Nueva Ecija | 27, | 500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0684-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Agustin FMR, Brgy. San Agustin, Sto. Domingo, Nueva Ecija",
      "office": "",
      "amountPesos": 287500,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 684,
      "lengthEvidence": "25, | 000,000 | Construction of Brgy. San Agustin FMR, Brgy. San Agustin, Sto. Domingo, Nueva Ecija | 18, | 287,500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0684-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tampac I FMR, Brgy. Tampac I, Guimba, Nueva Ecija",
      "office": "",
      "amountPesos": 375000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 684,
      "lengthEvidence": "Construction of Brgy. Tampac I FMR, Brgy. Tampac I, Guimba, Nueva Ecija | 25, | 000,000 | 23, | 375,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0684-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Burgos FMR, Brgy. Burgos, Cuyapo, Nueva Ecija",
      "office": "",
      "amountPesos": 125000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 684,
      "lengthEvidence": "45, | 000,000 | Construction of Brgy. Burgos FMR, Brgy. Burgos, Cuyapo, Nueva Ecija | 15, | 125,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0684-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sta. Cruz FMR, Brgy. Sta. Cruz, Guimba, Nueva Ecija",
      "office": "",
      "amountPesos": 750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 684,
      "lengthEvidence": "30, | 000,000 | Construction of Brgy. Sta. Cruz FMR, Brgy. Sta. Cruz, Guimba, Nueva Ecija | 24, | 750,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0684-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Gulod FMR, Brgy. Gulod, Talavera, Nueva Ecija",
      "office": "",
      "amountPesos": 250000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 684,
      "lengthEvidence": "Construction of Brgy. Gulod FMR, Brgy. Gulod, Talavera, Nueva Ecija | 30, | 250,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0684-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Narvacan I FMR, Brgy. Narvacan I, Guimba, Nueva Ecija",
      "office": "",
      "amountPesos": 757500,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 684,
      "lengthEvidence": "Construction of Brgy. Narvacan I FMR, Brgy. Narvacan I, Guimba, Nueva Ecija | 15, | 757,500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0684-032",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Edy FMR, Brgy. Edy, Nampicuan, Nueva Ecija",
      "office": "",
      "amountPesos": 500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 684,
      "lengthEvidence": "Construction of Brgy. Edy FMR, Brgy. Edy, Nampicuan, Nueva Ecija | 16, | 500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0684-033",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bunol FMR, Brgy. Bunol, Guimba, Nueva Ecija",
      "office": "",
      "amountPesos": 400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 684,
      "lengthEvidence": "Construction of Brgy. Bunol FMR, Brgy. Bunol, Guimba, Nueva Ecija | 16, | 500,000 | 10, | 400,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Caballero FMR, Brgy. Caballero , Guimba, Nueva Ecija",
      "office": "",
      "amountPesos": 500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. Caballero FMR, Brgy. Caballero , Guimba, Nueva Ecija | 18, | 500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Casongsong FMR, Brgy. Casongsong, Guimba, Nueva Ecija",
      "office": "",
      "amountPesos": 300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "Construction of Brgy. Casongsong FMR, Brgy. Casongsong, Guimba, Nueva Ecija | 17, | 300,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sto. Rosario FMR, Brgy. Sto. Rosario, Aliaga, Nueva Ecija",
      "office": "",
      "amountPesos": 900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "Construction of Sto. Rosario FMR, Brgy. Sto. Rosario, Aliaga, Nueva Ecija | 15, | 000,000 | 18, | 900,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Catimon FMR, Brgy. Catimon, Guimba, Nueva Ecija",
      "office": "",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "Construction of Brgy. Catimon FMR, Brgy. Catimon, Guimba, Nueva Ecija | 7, 500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Magsaysay FMR, Brgy. Magsaysay, Aliaga, Nueva Ecija",
      "office": "",
      "amountPesos": 800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "Construction of Brgy. Magsaysay FMR, Brgy. Magsaysay, Aliaga, Nueva Ecija | 7, 500,000 | 13, | 800,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Manacsac FMR, Brgy. Manacsac, Guimba, Nueva Ecija",
      "office": "",
      "amountPesos": 900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "Construction of Brgy. Manacsac FMR, Brgy. Manacsac, Guimba, Nueva Ecija | 28, | 900,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Naglabrahan FMR, Brgy. Naglabrahan, Guimba, Nueva Ecija",
      "office": "",
      "amountPesos": 900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "Construction of Brgy. Naglabrahan FMR, Brgy. Naglabrahan, Guimba, Nueva Ecija | 13, | 900,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Hacienda, Brgy. Pandacaqui FMR, Brgy. Pandacaqui, Mexico, Pampanga",
      "office": "",
      "amountPesos": 900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "Concreting of Hacienda, Brgy. Pandacaqui FMR, Brgy. Pandacaqui, Mexico, Pampanga | 65, | 000,000 | 24, | 900,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Parian FMR, Brgy. Parian, Mexico, Pampanga",
      "office": "",
      "amountPesos": 50000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "Concreting of Brgy. Parian FMR, Brgy. Parian, Mexico, Pampanga | 25, | 000,000 | 10, | 050,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Purok 1 Brgy. Buenavista FMR, Brgy. Buenavista, Mexico, Pampanga",
      "office": "",
      "amountPesos": 9450000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "Concreting of Purok 1 Brgy. Buenavista FMR, Brgy. Buenavista, Mexico, Pampanga | 70, | 000,000 | 9, 450,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Purok 1 Delta Brgy. Mangga Cacutud FMR, Brgy. Mangga Cacutud,",
      "office": "",
      "amountPesos": 150000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "70, | 000,000 | Concreting of Purok 1 Delta Brgy. Mangga Cacutud FMR, Brgy. Mangga Cacutud, | Arayat, Pampanga | 15, | 150,000 | 21, | 300,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Rafael FMR, Brgy. San Rafael, Guimba, Nueva Ecija",
      "office": "",
      "amountPesos": 300000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "Construction of Brgy. San Rafael FMR, Brgy. San Rafael, Guimba, Nueva Ecija | 21, | 300,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Triala FMR, Brgy. Triala, Guimba, Nueva Ecija",
      "office": "",
      "amountPesos": 8700000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "Construction of Brgy. Triala FMR, Brgy. Triala, Guimba, Nueva Ecija | 8, 700,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Purok 5 - Purok 2, Brgy. Tangle FMR, Brgy. Tangle, Mexico, Pampanga",
      "office": "",
      "amountPesos": 900000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "Concreting of Purok 5 - Purok 2, Brgy. Tangle FMR, Brgy. Tangle, Mexico, Pampanga | 8, 700,000 | 24, | 900,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Camino Dos, Brgy. Sto. Rosario FMR, Brgy. Sto. Rosario, Mexico, Pampanga",
      "office": "",
      "amountPesos": 550000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "Concreting of Camino Dos, Brgy. Sto. Rosario FMR, Brgy. Sto. Rosario, Mexico, Pampanga | 30, | 000,000 | 10, | 550,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Paludpod FMR, Brgy. Paludpod, Talavera, Nueva Ecija",
      "office": "",
      "amountPesos": 6600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "30, | 000,000 | Construction of Brgy. Paludpod FMR, Brgy. Paludpod, Talavera, Nueva Ecija | 6, 600,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-033",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Pacac FMR, Brgy. Pacac, Guimba, Nueva Ecija",
      "office": "",
      "amountPesos": 600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "15, | 000,000 | Concreting of Brgy. Pacac FMR, Brgy. Pacac, Guimba, Nueva Ecija | 19, | 600,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0686-035",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction og Salagusog FMR, Brgy. Salagusog, Cuyapo, Nueva Ecija",
      "office": "",
      "amountPesos": 6092500,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 686,
      "lengthEvidence": "15, | 000,000 | Construction og Salagusog FMR, Brgy. Salagusog, Cuyapo, Nueva Ecija | 6, 092,500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Ogpoy - Sitio Ariada, Brgy. Alangan FMR, Brgy. Alangan, Limay, Bataan",
      "office": "",
      "amountPesos": 500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Sitio Ogpoy - Sitio Ariada, Brgy. Alangan FMR, Brgy. Alangan, Limay, Bataan | 25, | 000,000 | 22, | 500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sta. Clara FMR, Brgy. Sta. Clara, Cuyapo, Nueva Ecija",
      "office": "",
      "amountPesos": 600000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "Construction of Brgy. Sta. Clara FMR, Brgy. Sta. Clara, Cuyapo, Nueva Ecija | 15, | 000,000 | 32, | 600,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Antonio FMR, Brgy. San Antonio, Cuyapo, Nueva Ecija",
      "office": "",
      "amountPesos": 100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "15, | 000,000 | Construction of Brgy. San Antonio FMR, Brgy. San Antonio, Cuyapo, Nueva Ecija | 23, | 100,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Bacayao to Cavite FMR, Brgy. Bacayao to Brgy. Cavite, Guimba, Nueva Ecija",
      "office": "",
      "amountPesos": 550000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "Construction of Bacayao to Cavite FMR, Brgy. Bacayao to Brgy. Cavite, | Guimba, Nueva Ecija | 35, | 550,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Tabing Ilog FMR, Brgy. Tabing Ilog, Licab, Nueva Ecija",
      "office": "",
      "amountPesos": 800000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "35, | 550,000 | Construction of Tabing Ilog FMR, Brgy. Tabing Ilog, Licab, Nueva Ecija | 16, | 800,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Bantug to Macatcatuit FMR, Brgy. Bantug to Brgy. Macatcatuit,",
      "office": "",
      "amountPesos": 500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "Construction of Bantug to Macatcatuit FMR, Brgy. Bantug to Brgy. Macatcatuit, | Guimba, Nueva Ecija | 22, | 500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of San Miguel to Sta. Rita FMR, Brgy. San Miguel to Brgy. Sta. Rita,",
      "office": "",
      "amountPesos": 8250000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "Construction of San Miguel to Sta. Rita FMR, Brgy. San Miguel to Brgy. Sta. Rita, | Quezon, Nueva Ecija | 8, 250,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Nagbaya FMR, Brgy. Nagbaya, Castillejos, Zambales",
      "office": "",
      "amountPesos": 6000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "15, | 000,000 | Construction of Brgy. Nagbaya FMR, Brgy. Nagbaya, Castillejos, Zambales | 6, 000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Bambanaba FMR, Brgy. Bambanaba, Cuyapo, Nueva Ecija",
      "office": "",
      "amountPesos": 8100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "Concreting of Brgy. Bambanaba FMR, Brgy. Bambanaba, Cuyapo, Nueva Ecija | 18, | 000,000 | 8, 100,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. La Torre FMR, Brgy. La Torre, Talavera, Nueva Ecija",
      "office": "",
      "amountPesos": 500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "18, | 000,000 | Concreting of Brgy. La Torre FMR, Brgy. La Torre, Talavera, Nueva Ecija | 13, | 500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Rizal FMR, Brgy. Rizal, Pilar, Bataan",
      "office": "",
      "amountPesos": 8500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "Construction of Brgy. Rizal FMR, Brgy. Rizal, Pilar, Bataan | 8,500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Sta. Ana FMR. Brgy. Sta. Ana, Guimba, Nueva Ecija",
      "office": "",
      "amountPesos": 7500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "8,500,000 | Concreting of Brgy. Sta. Ana FMR. Brgy. Sta. Ana, Guimba, Nueva Ecija | 7, 500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Concepcion to Pantoc FMR, Brgy. Concepcion to Brgy. Pantoc, Zaragoza, Nueva Ecija",
      "office": "",
      "amountPesos": 100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "Construction of Concepcion to Pantoc FMR, Brgy. Concepcion to Brgy. Pantoc, | Zaragoza, Nueva Ecija | 26, | 100,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Gen. Luna to Carmen FMR, Brgy. Gen. Luna to Brgy. Carmen,",
      "office": "",
      "amountPesos": 400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "Construction of Gen. Luna to Carmen FMR, Brgy. Gen. Luna to Brgy. Carmen, | Zaragoza, Nueva Ecija | 11, | 400,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Purok 5, Brgy. Dangcol FMR, Brgy. Dangcol, Balanga City, Bataan",
      "office": "",
      "amountPesos": 200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "11, | 400,000 | Concreting of Purok 5, Brgy. Dangcol FMR, Brgy. Dangcol, Balanga City, Bataan | 13, | 200,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0688-032",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Sta. Cruz FMR, Brgy. Sta. Cruz, Cuyapo, Nueva Ecija",
      "office": "",
      "amountPesos": 100000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 688,
      "lengthEvidence": "15, | 000,000 | LAT: 15.713972`N LONG: 120.396365`E | Concreting of Brgy. Sta. Cruz FMR, Brgy. Sta. Cruz, Cuyapo, Nueva Ecija | 10, | 100,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tabango Dao FMR, Brgy. Tabango Dao, Batangas City",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Brgy. Tabango Dao FMR, Brgy. Tabango Dao, Batangas City | 15, | 000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Malasin FMR, Brgy. Malasin, Santo Domingo, Nueva Ecija",
      "office": "",
      "amountPesos": 712500,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Concreting of Brgy. Malasin FMR, Brgy. Malasin, Santo Domingo, Nueva Ecija | 17, | 712,500",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Iba FMR, Brgy. Iba, Silang, Cavite",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Concreting of Brgy. Iba FMR, Brgy. Iba, Silang, Cavite | 17, | 712,500 | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Dapdap FMR, Brgy. Dapdap, Tayabas City, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "15, | 000,000 | Construction of Brgy. Dapdap FMR, Brgy. Dapdap, Tayabas City, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Ilayang Ilasan FMR, Brgy. Ilayang Ilasan, Tayabas City, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Construction of Brgy. Ilayang Ilasan FMR, Brgy. Ilayang Ilasan, Tayabas City, Quezon | 30, | 000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Paitan Sur FMR, Brgy. Paitan Sur, Cuyapo, Nueva Ecija",
      "office": "",
      "amountPesos": 500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Construction of Paitan Sur FMR, Brgy. Paitan Sur, Cuyapo, Nueva Ecija | 12, | 500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Masin FMR, Brgy. Masin, Tayabas City, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Construction of Brgy. Masin FMR, Brgy. Masin, Tayabas City, Quezon | 12, | 500,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Alemania to Brgy. Mayantoc FMR, Brgy. Alemania and Brgy. Mayantoc,",
      "office": "",
      "amountPesos": 500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Concreting of Brgy. Alemania to Brgy. Mayantoc FMR, Brgy. Alemania and Brgy. Mayantoc, | Nampicuan, Nueva Ecija | 12, | 500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Silangan Katigan FMR, Brgy. Silangan Katigan, Tayabas City, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Construction of Brgy. Silangan Katigan FMR, Brgy. Silangan Katigan, | 12, | 500,000 | Tayabas City, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok Agojo, Brgy. Buenlag FMR, Brgy. Buenlag, Gerona, Tarlac",
      "office": "",
      "amountPesos": 200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Construction of Purok Agojo, Brgy. Buenlag FMR, Brgy. Buenlag, Gerona, Tarlac | 13, | 200,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Kanlurang Katigan FMR, Brgy. Kanlurang Katigan, Tayabas City, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Construction of Brgy. Kanlurang Katigan FMR, Brgy. Kanlurang Katigan, | 13, | 200,000 | Tayabas City, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Labiano St., Brgy. Bagumbayan FMR, Brgy. Bagumbayan, Llanera, Nueva Ecija",
      "office": "",
      "amountPesos": 8400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Construction of Labiano St., Brgy. Bagumbayan FMR, Brgy. Bagumbayan, | Llanera, Nueva Ecija | 8, 400,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Ilayang Bukal FMR, Brgy. Ilayang Bukal, Tayabas City, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "8, 400,000 | Construction of Ilayang Bukal FMR, Brgy. Ilayang Bukal, Tayabas City, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Ilayang Palale FMR, Brgy. Ilayang Palale, Tayabas City, Quezon",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Construction of Brgy. Ilayang Palale FMR, Brgy. Ilayang Palale, Tayabas City, Quezon | 2,403,400,000 | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Banilad FMR, Banilad, Majayjay, Laguna",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "REGION IVA - CALABARZON | 2,403,400,000 | Construction of Brgy. Banilad FMR, Banilad, Majayjay, Laguna | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Banaba Cerca - Brgy. Banaba Lejos FMR, Brgy. Banaba Cerca to Brgy. Banaba Lejos, Indang, Cavite",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Banaba Cerca - Brgy. Banaba Lejos FMR, Brgy. Banaba Cerca | to Brgy. Banaba Lejos, Indang, Cavite | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Malabnig, Brgy. Balatbat FMR, Brgy. Balatbat, Lobo, Batangas",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Construction of Sitio Malabnig, Brgy. Balatbat FMR, Brgy. Balatbat, Lobo, Batangas | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Narvaez FMR, Brgy. Narvaez, General Emilio Aguinaldo, Cavite",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "30,000,000 | Construction of Brgy. Narvaez FMR, Brgy. Narvaez, General Emilio Aguinaldo, Cavite | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Santa Maria FMR, Brgy. Santa Maria, Laurel, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Construction of Brgy. Santa Maria FMR, Brgy. Santa Maria, Laurel, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Tikwi, Brgy. San Agustin FMR (Phase II), Brgy. San Agustin, Magallanes, Cavite",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "15,000,000 | Construction of Sitio Tikwi, Brgy. San Agustin FMR (Phase II), Brgy. San Agustin, | Magallanes, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Irukan to Brgy. Calayaan to Brgy. Poblacion III FMR, Brgy. Irukan to Brgy. Calayaan to Brgy. Poblacion III, Sta. Teresita, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Construction of Brgy. Irukan to Brgy. Calayaan to Brgy. Poblacion III FMR, | Brgy. Irukan to Brgy. Calayaan to Brgy. Poblacion III, Sta. Teresita, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cabuyew FMR, Brgy. Cabuyew, Liliw, Laguna",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Cabuyew FMR, Brgy. Cabuyew, Liliw, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bacao FMR, Brgy. Bacao, Taysan, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Construction of Brgy. Bacao FMR, Brgy. Bacao, Taysan, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Hanggan FMR, Brgy. Hanggan, Calauan, Laguna",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Hanggan FMR, Brgy. Hanggan, Calauan, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Libato FMR, Brgy. Libato, San Juan, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Construction of Brgy. Libato FMR, Brgy. Libato, San Juan, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cansuso FMR, Brgy. Cansuso, Cavinti, Laguna",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Cansuso FMR, Brgy. Cansuso, Cavinti, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0690-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Gugo, Brgy. San Jose Sico FMR, Brgy. San Jose Sico, Batangas City, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 690,
      "lengthEvidence": "Construction of Sitio Gugo, Brgy. San Jose Sico FMR, Brgy. San Jose Sico, | Batangas City, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cambuja to Brgy. Bubucal FMR, Brgy. Cambuja, Brgy. Bubucal,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. Cambuja to Brgy. Bubucal FMR, Brgy. Cambuja, Brgy. Bubucal, | Santa Maria, Laguna | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Cagga, Brgy. Tagumpay FMR, Brgy. Tagumpay, Real, Quezon",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Sitio Cagga, Brgy. Tagumpay FMR, Brgy. Tagumpay, Real, Quezon | 15,000,000 | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Maasin to Brgy. Valencia FMR, Brgy. Maasin and Brgy. Valencia,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Maasin to Brgy. Valencia FMR, Brgy. Maasin and Brgy. Valencia, | Tayabas City, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Kulapi FMR, Brgy. Kulapi, Lucban, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Brgy. Kulapi FMR, Brgy. Kulapi, Lucban, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Ilog to Brgy. Pilaway to Brgy. Agos-Agos FMR, Brgy. Ilog to",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Brgy. Ilog to Brgy. Pilaway to Brgy. Agos-Agos FMR, Brgy. Ilog to | Brgy. Pilaway to Brgy. Agos-Agos, Infanta, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Alitap FMR, Brgy. Alitap, Mauban, Quezon",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Brgy. Alitap FMR, Brgy. Alitap, Mauban, Quezon | 15,000,000 | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Pila FMR, Brgy. Pila, San Pascual, Batangas",
      "office": "",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Pila FMR, Brgy. Pila, San Pascual, Batangas | 35,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Pinagdanlayan to Brgy. Manggahan FMR, Brgy. Pinagdanlayan to Brgy. Manggahan, Dolores, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Brgy. Pinagdanlayan to Brgy. Manggahan FMR, Brgy. Pinagdanlayan to | Brgy. Manggahan, Dolores, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Ilat North FMR, San Pascual, Batangas",
      "office": "",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Ilat North FMR, San Pascual, Batangas | 35,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Bustamante, Brgy. Tagbakin FMR, Brgy. Tagbakin, Tiaong, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Sitio Bustamante, Brgy. Tagbakin FMR, Brgy. Tagbakin, Tiaong, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Malabrigo FMR, Brgy. Malabrigo, Lobo, Batangas",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Malabrigo FMR, Brgy. Malabrigo, Lobo, Batangas | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Rizal FMR, Brgy. Rizal, San Narciso, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Brgy. Rizal FMR, Brgy. Rizal, San Narciso, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Trapiche FMR, Tanauan, Batangas",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Trapiche FMR, Tanauan, Batangas | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Crossing to Sitio Sabang, Brgy. Hagonghong FMR, Brgy. Hagonghong,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Sitio Crossing to Sitio Sabang, Brgy. Hagonghong FMR, Brgy. Hagonghong, | Buenavista, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Malapia, Brgy. Samil FMR, Lucban, Quezon",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "15,000,000 | Construction of Sitio Malapia, Brgy. Samil FMR, Lucban, Quezon | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Pinagtubigan Weste to Brgy. Pambuhan FMR,",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Brgy. Pinagtubigan Weste to Brgy. Pambuhan FMR, | Brgy. Pinagtubigan Weste to Brgy. Pambuhan, Perez, Quezon | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Canculajao FMR, Brgy. Canculajao, Catanauan, Quezon",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Brgy. Canculajao FMR, Brgy. Canculajao, Catanauan, Quezon | 30,000,000 | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bendita 2 - Bulbok FMR, Magallanes, Cavite",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "30,000,000 | Construction of Brgy. Bendita 2 - Bulbok FMR, Magallanes, Cavite | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Bilwang, Brgy. Quipot FMR, Brgy. Quipot, San Juan, Batangas",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Sitio Bilwang, Brgy. Quipot FMR, Brgy. Quipot, San Juan, Batangas | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Anilao to Brgy. Dambo FMR, Brgy. Dambo, Pangil, Laguna",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "30,000,000 | Construction of Sitio Anilao to Brgy. Dambo FMR, Brgy. Dambo, Pangil, Laguna | 20,000,000 | 35,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Calubcub II FMR, Brgy. Calubcub II, San Juan, Batangas",
      "office": "",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Brgy. Calubcub II FMR, Brgy. Calubcub II, San Juan, Batangas | 35,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Anibong FMR, Brgy. Anibong, Pagsanjan, Laguna",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "35,000,000 | Construction of Brgy. Anibong FMR, Brgy. Anibong, Pagsanjan, Laguna | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sapangan FMR, Brgy. Sapangan, San Juan, Batangas",
      "office": "",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Brgy. Sapangan FMR, Brgy. Sapangan, San Juan, Batangas | S2-13.7059722, 121.3570456 | 35,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Banilad FMR, Brgy. Banilad, Magdalena, Laguna",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "35,000,000 | Construction of Brgy. Banilad FMR, Brgy. Banilad, Magdalena, Laguna | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Anibawan FMR, Brgy. Anibawan, Burdeos, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "S2-13.7868393, 121.3552979 | Construction of Brgy. Anibawan FMR, Brgy. Anibawan, Burdeos, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bangco FMR, Brgy. Bangco, Cavinti, Laguna",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Brgy. Bangco FMR, Brgy. Bangco, Cavinti, Laguna | 15,000,000 | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Miswa FMR, Brgy. Miswa, Infanta, Quezon",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Brgy. Miswa FMR, Brgy. Miswa, Infanta, Quezon | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Diego, Luisiana to Brgy. Banti FMR, Majayjay, Laguna",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Brgy. San Diego, Luisiana to Brgy. Banti FMR, Majayjay, Laguna | 20,000,000 | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Pandak, Brgy. Kalyaat FMR, Brgy. Kalyaat, Lucban, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Sitio Pandak, Brgy. Kalyaat FMR, Brgy. Kalyaat, Lucban, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tagumpay FMR, Brgy. Tagumpay, Real, Quezon",
      "office": "",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Brgy. Tagumpay FMR, Brgy. Tagumpay, Real, Quezon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0692-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Silangan Calutan FMR, Agdangan, Quezon S2- 13 51'16.99\", 121 54'33.51\"",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 692,
      "lengthEvidence": "Construction of Brgy. Silangan Calutan FMR, Agdangan, Quezon | 55,000,000 | S2- 13 51'16.99\", 121 54'33.51\" | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Kanlurang Calutan FMR, Agdangan, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. Kanlurang Calutan FMR, Agdangan, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Villa Tañada FMR, Brgy. Villa Tañada, Gumaca, Quezon",
      "office": "",
      "amountPesos": 5500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Brgy. Villa Tañada FMR, Brgy. Villa Tañada, Gumaca, Quezon | 15,000,000 | 5,500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tabangao Ambulong FMR, Brgy. Tabangao Ambulong, Batangas City",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "Construction of Brgy. Tabangao Ambulong FMR, Brgy. Tabangao Ambulong, Batangas City | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Nalunao FMR, Brgy. Nalunao, Lucban, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "Construction of Brgy. Nalunao FMR, Brgy. Nalunao, Lucban, Quezon | 20,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Matamis FMR, Brgy. Matamis, Rosario, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "Construction of Brgy. Matamis FMR, Brgy. Matamis, Rosario, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Water Lily, Brgy. Maraykit FMR, Brgy. Maraykit, San Juan, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "Construction of Sitio Water Lily, Brgy. Maraykit FMR, Brgy. Maraykit, San Juan, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Don Luis to Brgy. Salaban FMR, Brgy. Don Luis, San Jose, Batangas",
      "office": "",
      "amountPesos": 17000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "Construction of Brgy. Don Luis to Brgy. Salaban FMR, Brgy. Don Luis, San Jose, Batangas | 17,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Concepcion to Brgy. Balagbag FMR, Brgy. Concepcion,",
      "office": "",
      "amountPesos": 95000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "Construction of Brgy. Concepcion to Brgy. Balagbag FMR, Brgy. Concepcion, | Alitagtag, Batangas | 95,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Maglipad FMR, Brgy. Maglipad, Calauag, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "Construction of Brgy. Maglipad FMR, Brgy. Maglipad, Calauag, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Isidro FMR, Brgy. San Isidro, Tagkawayan, Quezon",
      "office": "",
      "amountPesos": 16875000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "13.970456, 122.379945 | Construction of Brgy. San Isidro FMR, Brgy. San Isidro, Tagkawayan, Quezon | 16,875,000 | 19,500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Talaibon FMR, Brgy. Talaibon, Ibaan, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "S4- 13°54'9.72\", 121°56'14.76\" | Concreting of Brgy. Talaibon FMR, Brgy. Talaibon, Ibaan, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Alatalatin 2 Brgy. San Francisco B FMR, Brgy. San Francisco B, Lopez, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "(3) 13.921606, 122.362273 | Construction of Sitio Alatalatin 2 Brgy. San Francisco B FMR, Brgy. San Francisco B, | Lopez, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Talahiban 1 FMR, Brgy. Talahiban 1, San Juan, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Talahiban 1 FMR, Brgy. Talahiban 1, San Juan, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Miguel FMR, Brgy. San Miguel, Lopez, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "Construction of Brgy. San Miguel FMR, Brgy. San Miguel, Lopez, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cumba FMR, Brgy. Cumba, Batangas City, Batangas",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "Construction of Brgy. Cumba FMR, Brgy. Cumba, Batangas City, Batangas | 15,000,000 | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sto Niño Ilaya FMR, Brgy. Sto Niño Ilaya, Lopez, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "Construction of Brgy. Sto Niño Ilaya FMR, Brgy. Sto Niño Ilaya, Lopez, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Sulsugin FMR, Brgy. Sulsugin, Nagcarlan, Laguna",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "Concreting of Brgy. Sulsugin FMR, Brgy. Sulsugin, Nagcarlan, Laguna | 15,000,000 | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Veronica FMR, Brgy. Veronica, Lopez, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "Construction of Brgy. Veronica FMR, Brgy. Veronica, Lopez, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction/Improvement of Brgy. Tulay FMR, Brgy. Tulay, Ibaan, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "Construction/Improvement of Brgy. Tulay FMR, Brgy. Tulay, Ibaan, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0694-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Banyaga FMR, Brgy. Banyaga, Agoncillo, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 694,
      "lengthEvidence": "Construction of Brgy. Banyaga FMR, Brgy. Banyaga, Agoncillo, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bilibinwang FMR, Brgy. Bilibinwang, Agoncillo, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. Bilibinwang FMR, Brgy. Bilibinwang, Agoncillo, Batangas | STARTt: 13.987007°, 120.943149° | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Calumpit FMR, Brgy. Calumpit, Lobo, Batangas",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Concreting of Brgy. Calumpit FMR, Brgy. Calumpit, Lobo, Batangas | 15,000,000 | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction/Improvement of Brgy. Bago FMR, Brgy. Bago, Ibaan, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Construction/Improvement of Brgy. Bago FMR, Brgy. Bago, Ibaan, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Ilat North FMR, Brgy. Ilat North, San Pascual, Batangas",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Concreting of Brgy. Ilat North FMR, Brgy. Ilat North, San Pascual, Batangas | 15,000,000 | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction/Improvement of Brgy. Mabalor FMR, Brgy. Mabalor, Ibaan, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Construction/Improvement of Brgy. Mabalor FMR, Brgy. Mabalor, Ibaan, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction/Improvement of Brgy. Bungahan FMR, Brgy. Bungahan, Ibaan, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Construction/Improvement of Brgy. Bungahan FMR, Brgy. Bungahan, Ibaan, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Banyaga FMR, Brgy. Banyaga, Agoncillo, Batangas",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Construction of Brgy. Banyaga FMR, Brgy. Banyaga, Agoncillo, Batangas | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Opening and Concreting of Sitio Saimsim, Brgy. Soloc FMR, Brgy. Soloc, Lobo, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "S2-13.665410, 121.217218 | Opening and Concreting of Sitio Saimsim, Brgy. Soloc FMR, Brgy. Soloc, Lobo, Batangas | 30,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Diego Bukid FMR, Brgy. San Diego Bukid, Gumaca, Quezon",
      "office": "",
      "amountPesos": 8400000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Construction of Brgy. San Diego Bukid FMR, Brgy. San Diego Bukid, Gumaca, Quezon | 8,400,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Opening and Concreting of Sitio Balugbog, Brgy. Soloc FMR, Brgy. Soloc, Lobo, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Opening and Concreting of Sitio Balugbog, Brgy. Soloc FMR, Brgy. Soloc, Lobo, Batangas | 8,400,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Itlugan FMR, Brgy. Itlugan, Rosario, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Construction of Brgy. Itlugan FMR, Brgy. Itlugan, Rosario, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Opening and Concreting of Brgy. San Miguel - Brgy. Tayuman FMR, Brgy. San Miguel and Brgy. Tayuman, Lobo, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Opening and Concreting of Brgy. San Miguel - Brgy. Tayuman FMR, Brgy. San Miguel | 15,000,000 | and Brgy. Tayuman, Lobo, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 6, Brgy. San Isidro FMR, Brgy. San Isidro, Rosario, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Construction of Purok 6, Brgy. San Isidro FMR, Brgy. San Isidro, Rosario, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Opening and Concreting of Sitio Mariwasa, Brgy. Biga FMR, Brgy. Biga Lobo, Batangas",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "15,000,000 | Opening and Concreting of Sitio Mariwasa, Brgy. Biga FMR, Brgy. Biga Lobo, Batangas",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Masalukot 2 FMR, Brgy. Masalukot 2, Candelaria, Quezon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Construction of Brgy. Masalukot 2 FMR, Brgy. Masalukot 2, Candelaria, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Bignay 1 to Montecillo FMR, Brgy. Bignay 1 to Montecillo,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Concreting of Brgy. Bignay 1 to Montecillo FMR, Brgy. Bignay 1 to Montecillo, | Sariaya, Quezon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Opening and Concreting of Sitio Hambulong Aso, Brgy. Nagtaluntong FMR Phase 2, Brgy. Nagtaluntong, Lobo, Batangas",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "13.646824, 121.318147 | Opening and Concreting of Sitio Hambulong Aso, Brgy. Nagtaluntong FMR Phase 2, | 15,000,000 | Brgy. Nagtaluntong, Lobo, Batangas | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Naambon, Brgy. Nag-iba FMR, Brgy. Nag-iba, Mabini, Batangas",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Concreting of Sitio Naambon, Brgy. Nag-iba FMR, Brgy. Nag-iba, Mabini, Batangas | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Opening and Concreting of Sitio Malabnig, Brgy. Balatbat FMR, Brgy. Balatbat, Lobo, Batangas",
      "office": "",
      "amountPesos": 70000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Opening and Concreting of Sitio Malabnig, Brgy. Balatbat FMR, Brgy. Balatbat, | 5,000,000 | Lobo, Batangas | 70,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Opening and Concreting of Brgy. Nagtaluntong FMR at Sitio Hambuhang Aso, Brgy. Nagtaluntong, Lobo, Batangas",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Opening and Concreting of Brgy. Nagtaluntong FMR at Sitio Hambuhang Aso, | Brgy. Nagtaluntong, Lobo, Batangas | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Pook ni Banal FMR, Brgy. Pook ni Banal, San Pascual, Batangas",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Concreting of Brgy. Pook ni Banal FMR, Brgy. Pook ni Banal, San Pascual, Batangas | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. San Pablo FMR, Brgy. San Pablo, Bauan, Batangas",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Concreting of Brgy. San Pablo FMR, Brgy. San Pablo, Bauan, Batangas | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Bulacan FMR, Brgy. Bulacan, Mabini Batangas",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Concreting of Brgy. Bulacan FMR, Brgy. Bulacan, Mabini Batangas | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. San Martin FMR, Brgy. San Martin, San Luis, Batangas",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "5,000,000 | Concreting of Brgy. San Martin FMR, Brgy. San Martin, San Luis, Batangas | 10,000,000 | S2-13.843125, 120.950735",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Balagtasin FMR, Brgy. Balagtasin, San Luis, Batangas",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Concreting of Brgy. Balagtasin FMR, Brgy. Balagtasin, San Luis, Batangas | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Sta Ana FMR, Brgy. Sta Ana, Mabini, Batangas",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Concreting of Brgy. Sta Ana FMR, Brgy. Sta Ana, Mabini, Batangas | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Boboy FMR, Brgy. Boboy, San Luis, Batangas",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "S2-13.843681, 120.950128 | 5,000,000 | Concreting of Brgy. Boboy FMR, Brgy. Boboy, San Luis, Batangas | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0696-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio 7, Brgy. Balite FMR, Sitio 7, Brgy. Balite, San Luis, Batangas",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 696,
      "lengthEvidence": "Concreting of Sitio 7, Brgy. Balite FMR, Sitio 7, Brgy. Balite, San Luis, Batangas | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Malitlit, Brgy. Jaybanga FMR, Brgy. Jaybanga, Lobo, Batangas",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Concreting of Sitio Malitlit, Brgy. Jaybanga FMR, Brgy. Jaybanga, Lobo, Batangas | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Panumban, Brgy. Kaypaaba FMR, Brgy. Kaypaaba, General Emilio Aguinaldo, Cavite",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Concreting of Sitio Panumban, Brgy. Kaypaaba FMR, Brgy. Kaypaaba, | 5,000,000 | General Emilio Aguinaldo, Cavite | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Sawang FMR, Brgy. Sawang, Lobo, Batangas",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Concreting of Brgy. Sawang FMR, Brgy. Sawang, Lobo, Batangas | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Takutan, Brgy. Dalusag FMR, Brgy. Dalusag, General Emilio Aguinaldo, Cavite",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "10,000,000 | Concreting of Sitio Takutan, Brgy. Dalusag FMR, Brgy. Dalusag, | General Emilio Aguinaldo, Cavite",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Tayuman - Brgy. San Miguel FMR, Brgy. Tayuman and Brgy. San Miguel, Lobo, Batangas",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Concreting of Brgy. Tayuman - Brgy. San Miguel FMR, Brgy. Tayuman and | Brgy. San Miguel, Lobo, Batangas | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Sambong FMR, Brgy, Sambong, Tagaytay City, Cavite",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "25,000,000 | Concreting of Brgy. Sambong FMR, Brgy, Sambong, Tagaytay City, Cavite | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Bonliw FMR, Brgy. Bonliw, San Luis, Batangas",
      "office": "",
      "amountPesos": 8000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Concreting of Brgy. Bonliw FMR, Brgy. Bonliw, San Luis, Batangas | 8,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Opening and Concreting of Brgy. Santa Veronica FMR, Brgy. Santa Veronica, San Pablo City, Laguna",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "8,000,000 | Opening and Concreting of Brgy. Santa Veronica FMR, Brgy. Santa Veronica, | San Pablo City, Laguna | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Balibago FMR, Brgy. Balibago, Lobo, Batangas",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Concreting of Brgy. Balibago FMR, Brgy. Balibago, Lobo, Batangas | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Opening and Concreting of Brgy. Dolores FMR, Brgy. Dolores, San Pablo City, Laguna",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "15,000,000 | Opening and Concreting of Brgy. Dolores FMR, Brgy. Dolores, San Pablo City, Laguna",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Papaya FMR, Brgy. Papaya, Tingloy, Batangas Section 1: START: 13.637293, 120.885406",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Concreting of Brgy. Papaya FMR, Brgy. Papaya, Tingloy, Batangas | Section 1: START: 13.637293, 120.885406 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Santol FMR, Brgy. Santol, Mauban, Quezon",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Santol FMR, Brgy. Santol, Mauban, Quezon | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. San Nicolas FMR, Brgy. San Nicolas, Lobo, Batangas",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Concreting of Brgy. San Nicolas FMR, Brgy. San Nicolas, Lobo, Batangas | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Agot FMR, Boac, Marinduque",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "10,000,000 | REGION IVB - MIMAROPA | 1,005,350,000 | Construction of Brgy. Agot FMR, Boac, Marinduque | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Soloc FMR, Brgy. Soloc, Lobo, Batangas",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Concreting of Brgy. Soloc FMR, Brgy. Soloc, Lobo, Batangas | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Morales FMR, Brgy. Morales, Santa Cruz, Marinduque",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "15,000,000 | 10,000,000 | Construction of Brgy. Morales FMR, Brgy. Morales, Santa Cruz, Marinduque",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Balibago FMR, Brgy. Balibago, Lobo, Batangas",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Concreting of Brgy. Balibago FMR, Brgy. Balibago, Lobo, Batangas | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Balansay FMR, Brgy. Balansay, Mamburao, Occidental Mindoro",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "5,000,000 | Construction of Brgy. Balansay FMR, Brgy. Balansay, Mamburao, Occidental Mindoro | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Olo-olo FMR, Brgy. Olo-olo, Lobo, Batangas",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Concreting of Brgy. Olo-olo FMR, Brgy. Olo-olo, Lobo, Batangas | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Gapasan FMR, Brgy. Gapasan, Magsaysay, Occidental Mindoro",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "5,000,000 | Construction of Brgy. Gapasan FMR, Brgy. Gapasan, Magsaysay, Occidental Mindoro | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Tayuman FMR, Brgy. Tayuman, Lobo, Batangas Section 1: START: 13.661663, 121.217115",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Concreting of Brgy. Tayuman FMR, Brgy. Tayuman, Lobo, Batangas | Section 1: START: 13.661663, 121.217115 | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Catwiran I FMR, Brgy. Catwiran I, Baco, Oriental Mindoro",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "5,000,000 | Construction of Brgy. Catwiran I FMR, Brgy. Catwiran I, Baco, Oriental Mindoro | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Tumbaga 2 - Brgy. Canda FMR, Brgy. Tumbaga 2 and Brgy. Canda,",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Concreting of Brgy. Tumbaga 2 - Brgy. Canda FMR, Brgy. Tumbaga 2 and Brgy. Canda, | Sariaya, Quezon | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Mahabang Parang FMR, Brgy. Mahabang Parang, Naujan, Oriental Mindoro",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Construction of Brgy. Mahabang Parang FMR, Brgy. Mahabang Parang, | 10,000,000 | Naujan, Oriental Mindoro | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Guis-Guis Talon FMR, Brgy. Guis-Guis Talon, Sariaya, Quezon",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Concreting of Brgy. Guis-Guis Talon FMR, Brgy. Guis-Guis Talon, Sariaya, Quezon | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Odiong FMR, Brgy. Odiong, Roxas, Oriental Mindoro",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Construction of Brgy. Odiong FMR, Brgy. Odiong, Roxas, Oriental Mindoro | 10,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. San Jose FMR, Brgy. San Jose, Tiaong, Quezon",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Concreting of Brgy. San Jose FMR, Brgy. San Jose, Tiaong, Quezon | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Dalandan II, Brgy. A. Bonifacio FMR, Brgy. A. Bonifacio, Gloria, Oriental Mindoro",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Construction of Sitio Dalandan II, Brgy. A. Bonifacio FMR, Brgy. A. Bonifacio, | 10,000,000 | Gloria, Oriental Mindoro | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Kulipay, Brgy. Kaymisas FMR, Brgy. Kaymisas,",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Concreting of Sitio Kulipay, Brgy. Kaymisas FMR, Brgy. Kaymisas, | General Emilio Aguinaldo, Cavite | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok Norte to Purok Ipil, Brgy. Bato FMR, Brgy. Bato, Taytay, Palawan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "10,000,000 | Construction of Purok Norte to Purok Ipil, Brgy. Bato FMR, Brgy. Bato, Taytay, Palawan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Bitin, Brgy. Kaypaaba FMR, Brgy. Kaypaaba,",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Concreting of Sitio Bitin, Brgy. Kaypaaba FMR, Brgy. Kaypaaba, | General Emilio Aguinaldo, Cavite | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0698-032",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Old Pancol, Brgy. Pancol FMR, Brgy. Pancol, Taytay, Palawan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 698,
      "lengthEvidence": "Construction of Sitio Old Pancol, Brgy. Pancol FMR, Brgy. Pancol, Taytay, Palawan | 5,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Iraray FMR, Brgy. Iraray, Sofronio Española, Palawan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. Iraray FMR, Brgy. Iraray, Sofronio Española, Palawan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Centro to Sitio Balite, Brgy. Camantigue FMR, Brgy. Camantigue, Bongabong, Oriental Mindoro",
      "office": "",
      "amountPesos": 34500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Sitio Centro to Sitio Balite, Brgy. Camantigue FMR, Brgy. Camantigue, | 15,000,000 | Bongabong, Oriental Mindoro | 34,500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Manalo FMR, Brgy. Manalo, Puerto Princesa City, Palawan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Brgy. Manalo FMR, Brgy. Manalo, Puerto Princesa City, Palawan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction Sitio Cuta to Sitio Lucbanan, Brgy. Anilao FMR, Brgy. Anilao, Bongabong, Oriental Mindoro",
      "office": "",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "15,000,000 | Construction Sitio Cuta to Sitio Lucbanan, Brgy. Anilao FMR, Brgy. Anilao, | Bongabong, Oriental Mindoro | 45,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Plaridel FMR, Brgy. Plaridel, Aborlan, Palawan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Brgy. Plaridel FMR, Brgy. Plaridel, Aborlan, Palawan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Ibon, Brgy. Carmundo FMR to Sitio Centro Brgy. Tawas,",
      "office": "",
      "amountPesos": 34500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "15,000,000 | Construction of Sitio Ibon, Brgy. Carmundo FMR to Sitio Centro Brgy. Tawas, | Bongabong, Oriental Mindoro | 34,500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Taclobo to Brgy. Pili FMR, Brgy. Taclobo, San Fernando, Romblon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Brgy. Taclobo to Brgy. Pili FMR, Brgy. Taclobo, San Fernando, Romblon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Tagaytay, Brgy. Tulay FMR, Brgy. Tulay, Odiongan, Romblon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Sitio Tagaytay, Brgy. Tulay FMR, Brgy. Tulay, Odiongan, Romblon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Riverside to Sitio Bungahan, Brgy. Libertad FMR, Bongabong, Oriental Mindoro",
      "office": "",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Sitio Riverside to Sitio Bungahan, Brgy. Libertad FMR, | 15,000,000 | Bongabong, Oriental Mindoro | 45,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Conrazon FMR, Brgy. Conrazon, Bansud, Oriental Mindoro",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Brgy. Conrazon FMR, Brgy. Conrazon, Bansud, Oriental Mindoro | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Mungos to Sitio Lalid, Brgy. Hagan FMR, Bongabong, Oriental Mindoro",
      "office": "",
      "amountPesos": 41000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "30,000,000 | Construction of Sitio Mungos to Sitio Lalid, Brgy. Hagan FMR, | Bongabong, Oriental Mindoro | 41,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Little Baguio to Avocado, Brgy. Conrazon FMR, Brgy. Conrazon, Bansud, Oriental Mindoro",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Sitio Little Baguio to Avocado, Brgy. Conrazon FMR, Brgy. Conrazon, | Bansud, Oriental Mindoro | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Pangulo to Brgy. Linao FMR, Brgy. Pangulo, Calatrava, Romblon",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "30,000,000 | Construction of Brgy. Pangulo to Brgy. Linao FMR, Brgy. Pangulo, Calatrava, Romblon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cawayan FMR, Brgy. Cawayan, Bongabon, Oriental Mindoro",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Brgy. Cawayan FMR, Brgy. Cawayan, Bongabon, Oriental Mindoro | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Isaub FMR, Brgy. Isaub, Aborlan, Palawan",
      "office": "",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "30,000,000 | 15,000,000 | Concreting of Brgy. Isaub FMR, Brgy. Isaub, Aborlan, Palawan | 45,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Libertad FMR, Brgy. Libertad, Bongabong, Oriental Mindoro",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Brgy. Libertad FMR, Brgy. Libertad, Bongabong, Oriental Mindoro | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Malutok, Brgy. Ransang FMR, Brgy. Ransang, Rizal, Palawan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "45,000,000 | 15,000,000 | Construction of Sitio Malutok, Brgy. Ransang FMR, Brgy. Ransang, Rizal, Palawan",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Pawikan - Sitio Upper Yunot, Brgy. Nasukob FMR, Bulalacao,",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Sitio Pawikan - Sitio Upper Yunot, Brgy. Nasukob FMR, Bulalacao, | Oriental Mindoro | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Isidro FMR, Brgy. San Isidro, Talakag, Palawan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "20,000,000 | Construction of Brgy. San Isidro FMR, Brgy. San Isidro, Talakag, Palawan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Gatol - Sitio Agong, Brgy. San Roque FMR, Bulalacao, Oriental Mindoro",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Sitio Gatol - Sitio Agong, Brgy. San Roque FMR, Bulalacao, Oriental Mindoro | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Kamuning FMR, Brgy. Kamuning, Puerto Princesa, Palawan",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Brgy. Kamuning FMR, Brgy. Kamuning, Puerto Princesa, Palawan | 25,000,000 | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Papandungin to Brgy. Malayong FMR, Gloria, Oriental Mindoro",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Brgy. Papandungin to Brgy. Malayong FMR, Gloria, Oriental Mindoro | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok Bucana, Brgy. Manalo FMR, Brgy. Manalo FMR, Puerto Princesa, Palawan",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Purok Bucana, Brgy. Manalo FMR, Brgy. Manalo FMR, | 15,000,000 | Puerto Princesa, Palawan | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Alcadesma to Brgy. Rosacara FMR, Brgy. Alcadesma, Bansud, Oriental Mindoro",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Brgy. Alcadesma to Brgy. Rosacara FMR, Brgy. Alcadesma, | Bansud, Oriental Mindoro | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Mabuhay I - Brgy. Happy Valley FMR, Socorro, Oriental Mindoro",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "50,000,000 | Concreting of Brgy. Mabuhay I - Brgy. Happy Valley FMR, Socorro, Oriental Mindoro | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Local Access road Rizal St., Brgy. Tenga-Tenga to Brgy. Suba FMR,",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Local Access road Rizal St., Brgy. Tenga-Tenga to Brgy. Suba FMR, | Brgy. Tenga-Tenga to Brgy. Suba, Cuyo, Palawan | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Bugkong, Brgy. Bugtong na Tuog FMR, Brgy. Bugtong na Tuog, Socorro, Oriental Mindoro",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Concreting of Sitio Bugkong, Brgy. Bugtong na Tuog FMR, Brgy. Bugtong na Tuog, | 50,000,000 | Socorro, Oriental Mindoro | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Arado, Brgy. Poblacion FMR, Taytay, Palawan",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Sitio Arado, Brgy. Poblacion FMR, Taytay, Palawan | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Water FMR, Brgy. Water, Baco, Oriental Mindoro",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Concreting of Brgy. Water FMR, Brgy. Water, Baco, Oriental Mindoro | 30,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Nalbot, Brgy. Poblacion FMR, Taytay, Palawan",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Sitio Nalbot, Brgy. Poblacion FMR, Taytay, Palawan | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Kanluran, Brgy. Malamig - Sitio Bagong Silang, Brgy. Canubing I FMR, Calapan City, Oriental Mindoro",
      "office": "",
      "amountPesos": 25350000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Concreting of Sitio Kanluran, Brgy. Malamig - Sitio Bagong Silang, Brgy. Canubing I FMR, | 30,000,000 | Calapan City, Oriental Mindoro | 25,350,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-032",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Salvacion FMR, Brgy. Salvacion, Busuanga, Palawan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "Construction of Brgy. Salvacion FMR, Brgy. Salvacion, Busuanga, Palawan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0700-033",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Arangin FMR, Brgy. Arangin, Naujan, Oriental Mindoro",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 700,
      "lengthEvidence": "15,000,000 | Concreting of Brgy. Arangin FMR, Brgy. Arangin, Naujan, Oriental Mindoro",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Mampaitan FMR, Brgy. Mampaitan, Mogpog, Marinduque",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Concreting of Brgy. Mampaitan FMR, Brgy. Mampaitan, Mogpog, Marinduque | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Zone 1 Hanawan FMR, Brgy. Hanawan, Ocampo, Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Zone 1 Hanawan FMR, Brgy. Hanawan, Ocampo, Camarines Sur | 20,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Tinangis FMR, Brgy. Tinangis, Pili, Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Tinangis FMR, Brgy. Tinangis, Pili, Camarines Sur | 1,391,200,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cabasan to Brgy. Pongco FMR, Brgy. Cabasan and Brgy. Pongco,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "REGION V - BICOL | 1,391,200,000 | Construction of Brgy. Cabasan to Brgy. Pongco FMR, Brgy. Cabasan and Brgy. Pongco, | Bacacay, Albay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Agpo to Brgy. Camagong FMR, Brgy. Agpo, Lagonoy and Brgy. Camagong, San Jose, Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Agpo to Brgy. Camagong FMR, Brgy. Agpo, Lagonoy and | Brgy. Camagong, San Jose, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Antonio Santicon FMR, Brgy. San Antonio Santicon,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Brgy. San Antonio Santicon FMR, Brgy. San Antonio Santicon, | Malilipot, Albay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Hanopol FMR, Brgy. Hanopol, Caramoan, Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Hanopol FMR, Brgy. Hanopol, Caramoan, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Catalotoan FMR Phase II, Brgy. Catalotoan, Sagnay, Camarines Sur",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Catalotoan FMR Phase II, Brgy. Catalotoan, Sagnay, Camarines Sur | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sagrada FMR, Baao, Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Brgy. Sagrada FMR, Baao, Camarines Sur | 30,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Canaway FMR (Phase 2), Brgy. Canaway, Malilipot, Albay",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Brgy. Canaway FMR (Phase 2), Brgy. Canaway, Malilipot, Albay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Namurabod to Labawon FMR, Brgy. Namurabod, Buhi, Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Brgy. Namurabod to Labawon FMR, Brgy. Namurabod, | 15,000,000 | Buhi, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Suchan to Brgy. Quigaray FMR, Brgy. Suchan and Brgy. Quigaray, Bagamanoc, Catanduanes",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "15,000,000 | Concreting of Brgy. Suchan to Brgy. Quigaray FMR, Brgy. Suchan and Brgy. Quigaray, Bagamanoc, | Catanduanes",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Gutob, Brgy. Lidong to Brgy. Amoguis FMR, Brgy. Lidong and Brgy. Amoguis, Polangui, Albay",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Sitio Gutob, Brgy. Lidong to Brgy. Amoguis FMR, Brgy. Lidong and | Brgy. Amoguis, Polangui, Albay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Tobrehon to Brgy. JMA FMR, San Miguel, Catanduanes Start : 13.729991°, 124.253440°",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "15,000,000 | Concreting of Brgy. Tobrehon to Brgy. JMA FMR, San Miguel, Catanduanes | Start : 13.729991°, 124.253440° | End : 13.729214°, 124.247219°",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Tugas, Brgy. Agpay FMR, Brgy. Agpay, Guinobatan, Albay",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Sitio Tugas, Brgy. Agpay FMR, Brgy. Agpay, Guinobatan, Albay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Sto. Niño, Poblacion 2 to Sitio Balete, Brgy. Imelda, Claveria FMR, Poblacion 2, Claveria, Masbate",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "End : 13.729214°, 124.247219° | 15,000,000 | Construction of Sitio Sto. Niño, Poblacion 2 to Sitio Balete, Brgy. Imelda, Claveria FMR, | Poblacion 2, Claveria, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tamisan FMR, Brgy. Tamisan, Jose Panganiban, Camarines Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Brgy. Tamisan FMR, Brgy. Tamisan, Jose Panganiban, Camarines Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Luna to Brgy. San Isidro FMR, San Jacinto, Masbate",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Luna to Brgy. San Isidro FMR, San Jacinto, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Pag-asa FMR, Brgy. Pag-asa, Labo, Camarines Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Brgy. Pag-asa FMR, Brgy. Pag-asa, Labo, Camarines Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Don Pablo Dela Rosa FMR, Brgy. Don Pablo Dela Rosa,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Don Pablo Dela Rosa FMR, Brgy. Don Pablo Dela Rosa, | Aroroy, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Isidro FMR, Brgy. San Isidro, San Lorenzo Ruiz, Camarines Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Brgy. San Isidro FMR, Brgy. San Isidro, San Lorenzo Ruiz, Camarines Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Langa FMR Phase 2, Brgy. Langa, Basud, Camarines Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Brgy. Langa FMR Phase 2, Brgy. Langa, Basud, Camarines Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Salvacion FMR, Brgy. Salvacion, Balud, Masbate",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Brgy. Salvacion FMR, Brgy. Salvacion, Balud, Masbate | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sinuknipan II to Sinagawsawan (Peñafrancia) FMR, Brgy. Sinuknipan II",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Sinuknipan II to Sinagawsawan (Peñafrancia) FMR, Brgy. Sinuknipan II | and Brgy. Sinagawsawan (Peñafrancia), Del Gallego, Camarines Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Junction Road to Brgy. Pananawan FMR, Brgy. Pananawan, Cawayan, Masbate",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Junction Road to Brgy. Pananawan FMR, Brgy. Pananawan, Cawayan, Masbate | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Gaid to Brgy. Divisoria FMR, Brgy. Gaid to Brgy. Divisoria,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Gaid to Brgy. Divisoria FMR, Brgy. Gaid to Brgy. Divisoria, | Dimasalang, Masbate",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Lohong FMR, Brgy. Lohong, Ragay, Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Brgy. Lohong FMR, Brgy. Lohong, Ragay, Camarines Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Pag Oring Nuevo FMR, Brgy. Pag Oring Nuevo, Libmanan, Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Pag Oring Nuevo FMR, Brgy. Pag Oring Nuevo, Libmanan, Camarines Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Sto. Niño, Brgy. Macalaya FMR, Brgy. Macalaya, Castilla, Sorsogon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Sitio Sto. Niño, Brgy. Macalaya FMR, Brgy. Macalaya, Castilla, Sorsogon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Alianza to San Joaquin FMR, Brgy. Alianza, San Fernando, Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Alianza to San Joaquin FMR, Brgy. Alianza, San Fernando, Camarines Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0702-032",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bayawas FMR, Brgy. Bayawas, Pilar, Sorsogon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 702,
      "lengthEvidence": "Construction of Brgy. Bayawas FMR, Brgy. Bayawas, Pilar, Sorsogon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cocok-Cabitan to Recto FMR, Bulan, Sorsogon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. Cocok-Cabitan to Recto FMR, Bulan, Sorsogon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Calaguimit FMR, Brgy. Calaguimit, Oas, Albay",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Brgy. Calaguimit FMR, Brgy. Calaguimit, Oas, Albay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Pangdan to Sitio Malidlid FMR, Brgy. Bulacao, Gubat, Sorsogon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Sitio Pangdan to Sitio Malidlid FMR, Brgy. Bulacao, Gubat, Sorsogon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bacolod FMR, Brgy. Bacolod, Libon, Albay",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Brgy. Bacolod FMR, Brgy. Bacolod, Libon, Albay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Taloto- Brgy. Panoypoy FMR, Brgy. Taloto & Brgy. Panoypoy,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Brgy. Taloto- Brgy. Panoypoy FMR, Brgy. Taloto & Brgy. Panoypoy, | Camalig, Albay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Maycuaway, Maysalay to Sitio Hipnagi, Scout Fuentebella FMR, Brgy. Scount Fuentebella, Goa, Camarines Sur END 13.813465, 123.402274",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Concreting of Sitio Maycuaway, Maysalay to Sitio Hipnagi, Scout Fuentebella FMR, | 15,000,000 | Brgy. Scount Fuentebella, Goa, Camarines Sur | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Zone 6, Brgy. Panicuason FMR, Brgy. Panicuason, Naga City, Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "END 13.813465, 123.402274 | Construction of Zone 6, Brgy. Panicuason FMR, Brgy. Panicuason, Naga City, Camarines Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Baligang to Brgy. Bongabong FMR, Brgy. Baligang and",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Brgy. Baligang to Brgy. Bongabong FMR, Brgy. Baligang and | Brgy. Bongabong, Camalig, Albay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Calanawan - Sitio Maybunga, Brgy. Hiwacloy FMR, Brgy. Hiwacloy, Goa, Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Concreting of Sitio Calanawan - Sitio Maybunga, Brgy. Hiwacloy FMR, Brgy. Hiwacloy, | 15,000,000 | Goa, Camarines Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bigao FMR, Brgy. Bigao, Daraga, Albay",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Brgy. Bigao FMR, Brgy. Bigao, Daraga, Albay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Bulao, Brgy. Digdigon - Brgy. Cagaycay FMR, Goa, Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Concreting of Sitio Bulao, Brgy. Digdigon - Brgy. Cagaycay FMR, Goa, Camarines Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bigaa FMR, Legazpi City, Albay",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Brgy. Bigaa FMR, Legazpi City, Albay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Telegrafo FMR, Brgy. Telegrafo, San Jose, Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Concreting of Brgy. Telegrafo FMR, Brgy. Telegrafo, San Jose, Camarines Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 2 to Purok 6 and 7 FMR, Brgy. Malipo, Camalig, Albay",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Purok 2 to Purok 6 and 7 FMR, Brgy. Malipo, Camalig, Albay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Calangatnan, Brgy. Digdigon FMR, Brgy. Digdigon, Goa, Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Concreting of Sitio Calangatnan, Brgy. Digdigon FMR, Brgy. Digdigon, Goa, Camarines Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Lacag FMR, Brgy. Lacag, Daraga, Albay",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Brgy. Lacag FMR, Brgy. Lacag, Daraga, Albay | STAR:13.160074, 123.674393 | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Bantugan - Brgy. Lidong, Brgy. Bantugan FMR, Presentacion, Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Concreting of Brgy. Bantugan - Brgy. Lidong, Brgy. Bantugan FMR, | 10,000,000 | Presentacion, Camarines Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Amoguis to Dahat FMR, Brgy. Amoguis-Dahat, Lagonoy, Camarines Sur",
      "office": "",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Brgy. Amoguis to Dahat FMR, Brgy. Amoguis-Dahat, | Lagonoy, Camarines Sur | 40,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of San Jose Oras-Villaflorida FMR, Brgy. San Jose Oras, Ocampo, Camarines Sur",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "40,000,000 | Construction of San Jose Oras-Villaflorida FMR, Brgy. San Jose Oras, | Ocampo, Camarines Sur | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Ragpas to Purok 3, Brgy. San Jose FMR, Brgy. San Jose,",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Sitio Ragpas to Purok 3, Brgy. San Jose FMR, Brgy. San Jose, | Basud, Camarines Norte | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Orange - Brgy. Old Maguisa FMR, Brgy. San Ramon and Brgy. San Isidro, Donsol, Sorsogon",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "50,000,000 | Concreting of Brgy. Orange - Brgy. Old Maguisa FMR, Brgy. San Ramon and | Brgy. San Isidro, Donsol, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Genitligan FMR, Brgy. Genitligan, Baras, Catanduanes",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Brgy. Genitligan FMR, Brgy. Genitligan, Baras, Catanduanes | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Saclayan FMR, Brgy. Saclayan, Castilla, Sorsogon",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "25,000,000 | Concreting of Brgy. Saclayan FMR, Brgy. Saclayan, Castilla, Sorsogon",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Warang to Cagurusong, Brgy. San Miguel FMR, San Miguel,",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Sitio Warang to Cagurusong, Brgy. San Miguel FMR, San Miguel, | Baras, Catanduanes | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Mayon FMR, Brgy. Mayon, Castilla, Sorsogon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "25,000,000 | Concreting of Brgy. Mayon FMR, Brgy. Mayon, Castilla, Sorsogon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sta. Maria to Baringkog Falls FMR, Sta. Maria, Baras, Catanduanes",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Brgy. Sta. Maria to Baringkog Falls FMR, Sta. Maria, Baras, Catanduanes | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Cogon FMR, Brgy. Cogon, Castilla, Sorsogon",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Concreting of Brgy. Cogon FMR, Brgy. Cogon, Castilla, Sorsogon | 50,000,000 | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Agos to Brgy. Cotnogan FMR, Brgy. Agos, Polangui, Albay",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Brgy. Agos to Brgy. Cotnogan FMR, Brgy. Agos, Polangui, Albay | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Inang FMR, Brgy. Inang, Pilar, Sorsogon",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Concreting of Brgy. Inang FMR, Brgy. Inang, Pilar, Sorsogon | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Palapas- Brgy. Tibabo FMR, Pio Duran, Albay",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Brgy. Palapas- Brgy. Tibabo FMR, Pio Duran, Albay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-032",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Lungib FMR, Brgy. Lungib, Pilar",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Concreting of Lungib FMR, Brgy. Lungib, Pilar | 15,000,000 | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0704-033",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cuyaoyao to Brgy. Flores FMR, Pio Duran, Albay",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 704,
      "lengthEvidence": "Construction of Brgy. Cuyaoyao to Brgy. Flores FMR, Pio Duran, Albay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. San Isidro - Brgy. Salvacion FMR, Brgy. Salvacion,",
      "office": "",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Concreting of Brgy. San Isidro - Brgy. Salvacion FMR, Brgy. Salvacion, | Sta. Magdalena, Sorsogon | 18,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Capagao FMR, Brgy. Capagao, Panitan, Capiz",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Brgy. Capagao FMR, Brgy. Capagao, Panitan, Capiz | 18,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bago Chiquito to Brgy. Candual FMR, Brgy. Bago Chiquito and",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "18,000,000 | Construction of Brgy. Bago Chiquito to Brgy. Candual FMR, Brgy. Bago Chiquito and | Brgy. Candual, Panay, Capiz | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Maragaas, Brgy. Olandia - Brgy. Fabrica FMR, Brgy. Olandia and Brgy. Fabrica, Barcelona, Sorsogon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "Concreting of Sitio Maragaas, Brgy. Olandia - Brgy. Fabrica FMR, Brgy. Olandia and | Brgy. Fabrica, Barcelona, Sorsogon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Crossing to Sitio Proper, Brgy. Agdahon FMR, Brgy. Agdahon,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "15,000,000 | Construction of Sitio Crossing to Sitio Proper, Brgy. Agdahon FMR, Brgy. Agdahon, | Cuartero, Capiz",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Purok 3 - Purok 5, Brgy. Casili FMR, Brgy. Casili, Gubat, Sorsogon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "Concreting of Purok 3 - Purok 5, Brgy. Casili FMR, Brgy. Casili, Gubat, Sorsogon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Parad, Brgy. Fabrica - Brgy. San Ramon FMR (Phase 2),",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "Concreting of Sitio Parad, Brgy. Fabrica - Brgy. San Ramon FMR (Phase 2), | Brgy. Fabrica & Brgy. San Ramon , Barcelona, Sorsogon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Maindang FMR, Brgy. Maindang, Cuartero, Capiz",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "Construction of Brgy. Maindang FMR, Brgy. Maindang, Cuartero, Capiz | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Bungol, Brgy. Tacay FMR, Brgy. Tacay, Buenavista, Guimaras",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "15,000,000 | Concreting of Sitio Bungol, Brgy. Tacay FMR, Brgy. Tacay, Buenavista, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Purok 1 - Purok 3, Brgy. Manapao - Purok 1-b, Brgy. Casili FMR, Brgy. Manapao and Brgy. Casili, Gubat, Sorsogon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "Concreting of Purok 1 - Purok 3, Brgy. Manapao - Purok 1-b, Brgy. Casili FMR, | Brgy. Manapao and Brgy. Casili, Gubat, Sorsogon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Salvacion FMR, Brgy. Salvacion, Nueva Valencia, Guimaras",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Salvacion FMR, Brgy. Salvacion, Nueva Valencia, Guimaras",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. San Rafael - Brgy. Salvacion FMR, Sta. Magdalena, Sorsogon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "Concreting of Brgy. San Rafael - Brgy. Salvacion FMR, Sta. Magdalena, Sorsogon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cansilayan FMR, Brgy. Cansilayan, Tigbauan, Iloilo",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Cansilayan FMR, Brgy. Cansilayan, Tigbauan, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Ogob - Brgy. Diaro FMR, Brgy. Ogob and Brgy. Diaro, Malinao, Albay",
      "office": "",
      "amountPesos": 13200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "Construction of Brgy. Ogob - Brgy. Diaro FMR, Brgy. Ogob and Brgy. Diaro, Malinao, Albay | 13,200,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sambaludan to Brgy. Botong FMR, Brgy. Sambaludan and Brgy. Botong, Oton, Iloilo",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "13,200,000 | Construction of Brgy. Sambaludan to Brgy. Botong FMR, Brgy. Sambaludan and | Brgy. Botong, Oton, Iloilo | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Sampaloc - Brgy. Loob FMR, Gainza Camarines Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "Concreting of Brgy. Sampaloc - Brgy. Loob FMR, Gainza Camarines Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Buga FMR, Brgy. Buga, Leon, lloilo",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Buga FMR, Brgy. Buga, Leon, lloilo | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Balud Lilo-an FMR, Brgy. Balud Lilo-an, Zarraga, Iloilo",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "30,000,000 | Construction of Brgy. Balud Lilo-an FMR, Brgy. Balud Lilo-an, Zarraga, Iloilo | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 6, Brgy. San Antonio FMR, Labo, Brgy. San Antonio, Camarines Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "Construction of Purok 6, Brgy. San Antonio FMR, Labo, Brgy. San Antonio, Camarines Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Palanguia FMR, Brgy. Palanguia, Pototan, Iloilo",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Palanguia FMR, Brgy. Palanguia, Pototan, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Labnig FMR, Brgy. Labnig, Paracale, Camarines Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "Construction of Brgy. Labnig FMR, Brgy. Labnig, Paracale, Camarines Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Linayuan to Brgy. Sinuagan FMR, Brgy. Linayuan and",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Linayuan to Brgy. Sinuagan FMR, Brgy. Linayuan and | Brgy. Sinuagan, Badiangan, Iloilo | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Puniton - Brgy. Sto. Domingo FMR, Virac, Catanduanes",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "Concreting of Brgy. Puniton - Brgy. Sto. Domingo FMR, Virac, Catanduanes | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Andres - Brgy. Sulpa FMR, Siruma, Camarines Sur",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "Construction of Brgy. San Andres - Brgy. Sulpa FMR, Siruma, Camarines Sur | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Abaca to Brgy. Braulan FMR, Brgy. Abaca and Brgy. Braulan, San Enrique, Iloilo",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "Construction of Brgy. Abaca to Brgy. Braulan FMR, Brgy. Abaca and Brgy. Braulan, | 20,000,000 | San Enrique, Iloilo | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Poblacion FMR, Brgy. Poblacion, Anilao, Iloilo",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "1,042,750,000 | Construction of Brgy. Poblacion FMR, Brgy. Poblacion, Anilao, Iloilo | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cabangila FMR, Brgy. Cabangila, Altavas, Aklan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "REGION VI - WESTERN VISAYAS | 1,042,750,000 | Construction of Brgy. Cabangila FMR, Brgy. Cabangila, Altavas, Aklan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Anabo FMR, Brgy. Anabo, Lemery, Iloilo",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Anabo FMR, Brgy. Anabo, Lemery, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Kinabkaban, Brgy. Lumaynay FMR, Brgy. Lumaynay, Altavas, Aklan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "Construction of Sitio Kinabkaban, Brgy. Lumaynay FMR, Brgy. Lumaynay, Altavas, Aklan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Adcadarao FMR, Brgy. Adcadarao, Ajuy, Iloilo",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Adcadarao FMR, Brgy. Adcadarao, Ajuy, Iloilo",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cabatanga to Agbalogo FMR, Brgy. Cabatanga and Brgy. Agbalogo, Makato, Aklan",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "Construction of Brgy. Cabatanga to Agbalogo FMR, Brgy. Cabatanga and Brgy. Agbalogo, | Makato, Aklan | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0706-032",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Capasigan, Brgy. Alimono FMR, Brgy. Alimono, Passi City, Iloilo",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 706,
      "lengthEvidence": "30,000,000 | Construction of Sitio Capasigan, Brgy. Alimono FMR, Brgy. Alimono, Passi City, Iloilo | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Agcararao, Brgy. Jaguimitan FMR, Brgy. Jaguimitan,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Sitio Agcararao, Brgy. Jaguimitan FMR, Brgy. Jaguimitan, | Passi City, Iloilo | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Alimodias FMR, Brgy. Alimodias, Miag-ao, Iloilo",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Concreting of Brgy. Alimodias FMR, Brgy. Alimodias, Miag-ao, Iloilo | 15,000,000 | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Bacong - Brgy. Bongol San Miguel FMR, Brgy. Bacong and",
      "office": "",
      "amountPesos": 21000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "15,000,000 | Concreting of Brgy. Bacong - Brgy. Bongol San Miguel FMR, Brgy. Bacong and | Brgy. San Miguel, Guimbal, Iloilo | 21,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Proper, Brgy. Agtabo to Sitio Salngan Sur, Brgy. Salngan FMR, Brgy. Agtabo, Passi City, Iloilo",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Construction of Sitio Proper, Brgy. Agtabo to Sitio Salngan Sur, Brgy. Salngan FMR, | Brgy. Agtabo, Passi City, Iloilo | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Tigmarabo FMR, Brgy. Tigmarabo, Miagao, Iloilo",
      "office": "",
      "amountPesos": 42000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "20,000,000 | Concreting of Brgy. Tigmarabo FMR, Brgy. Tigmarabo, Miagao, Iloilo | 42,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Gegacjac FMR, Brgy. Gegacjac, Passi City, Iloilo",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Construction of Brgy. Gegacjac FMR, Brgy. Gegacjac, Passi City, Iloilo | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Olango - Brgy. Pudpud FMR, Brgy. Olango and Brgy. Pudpud,",
      "office": "",
      "amountPesos": 30750000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "20,000,000 | Concreting of Brgy. Olango - Brgy. Pudpud FMR, Brgy. Olango and Brgy. Pudpud, | Miagao, Iloilo | 30,750,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Ocad, Brgy. Salngan FMR, Brgy. Salngan, Passi City, Iloilo",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Construction of Sitio Ocad, Brgy. Salngan FMR, Brgy. Salngan, Passi City, Iloilo | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Talongonan FMR, Passi City, Iloilo",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Construction of Brgy. Talongonan FMR, Passi City, Iloilo | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Pañatan - Brgy. Dacdacanan FMR, Brgy. Pañatan and Brgy. Dacdacanan, San Joaquin, Iloilo",
      "office": "",
      "amountPesos": 16500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Concreting of Brgy. Pañatan - Brgy. Dacdacanan FMR, Brgy. Pañatan and | 20,000,000 | Brgy. Dacdacanan, San Joaquin, Iloilo | 16,500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Dawog FMR, Brgy. Dawog, Miagao, Iloilo",
      "office": "",
      "amountPesos": 60000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Construction of Brgy. Dawog FMR, Brgy. Dawog, Miagao, Iloilo | 60,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Caragmayan - Sitio Baje, Brgy. Buga FMR, Brgy. Buga, Igbaras, Iloilo",
      "office": "",
      "amountPesos": 24000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "60,000,000 | Concreting of Sitio Caragmayan - Sitio Baje, Brgy. Buga FMR, Brgy. Buga, Igbaras, Iloilo | 24,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Camia FMR, Brgy. Camia, San Joaquin, Iloilo",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Concreting of Brgy. Camia FMR, Brgy. Camia, San Joaquin, Iloilo | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Pasong, Brgy. Jovellar - Sitio Capayan, Brgy. Calampitao FMR, Brgy. Jovellar and Brgy. Calampitao, Igbaras, Iloilo",
      "office": "",
      "amountPesos": 25500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "15,000,000 | Concreting of Sitio Pasong, Brgy. Jovellar - Sitio Capayan, Brgy. Calampitao FMR, | Brgy. Jovellar and Brgy. Calampitao, Igbaras, Iloilo | 25,500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Bayuco, Brgy. Taytay - Sitio Langhad, Brgy. Alameda FMR, Brgy. Taytay and Brgy. Alameda, Igbaras, Iloilo",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Concreting of Sitio Bayuco, Brgy. Taytay - Sitio Langhad, Brgy. Alameda FMR, | Brgy. Taytay and Brgy. Alameda, Igbaras, Iloilo | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Carina, Brgy. Sta.Monica FMR, Brgy. Sta. Monica, Oton, Iloilo",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "15,000,000 | Concreting of Sitio Carina, Brgy. Sta.Monica FMR, Brgy. Sta. Monica, Oton, Iloilo | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Curipao - Sitio Napuong, Brgy. Constancia FMR, Brgy. Constancia,",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Concreting of Sitio Curipao - Sitio Napuong, Brgy. Constancia FMR, Brgy. Constancia, | San Lorenzo, Guimaras | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Canabuan - Brgy. Barusong FMR, Brgy. Canabuan and Brgy. Barosong, Tigbauan, Iloilo",
      "office": "",
      "amountPesos": 16500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "30,000,000 | Concreting of Canabuan - Brgy. Barusong FMR, Brgy. Canabuan and Brgy. Barosong, | Tigbauan, Iloilo | 16,500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Pajo - Brgy. Igang FMR, Pototan, Iloilo",
      "office": "",
      "amountPesos": 35000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Concreting of Brgy. Pajo - Brgy. Igang FMR, Pototan, Iloilo | 35,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Alupidian - Brgy. Jamog FMR, Brgy. Alupidian and Brgy. Jamog, Tigbauan, Iloilo",
      "office": "",
      "amountPesos": 18000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "35,000,000 | Concreting of Brgy. Alupidian - Brgy. Jamog FMR, Brgy. Alupidian and Brgy. Jamog, | Tigbauan, Iloilo | 18,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. New Guia FMR, Brgy. New Guia, Maayon, Capiz",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Concreting of Brgy. New Guia FMR, Brgy. New Guia, Maayon, Capiz | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. San Fernando - Brgy. Buenavista Norte FMR, Brgy. San Fernando",
      "office": "",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "15,000,000 | Concreting of Brgy. San Fernando - Brgy. Buenavista Norte FMR, Brgy. San Fernando | and Brgy. Buenavista Norte, Miagao, Iloilo, | 40,000,000 | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Umarca, Brgy. Rizal FMR, Brgy. Rizal, Pontevedra, Capiz",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Concreting of Sitio Umarca, Brgy. Rizal FMR, Brgy. Rizal, Pontevedra, Capiz | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Pagdugue - Brgy. Cansilayan FMR, Dumangas, Iloilo",
      "office": "",
      "amountPesos": 16500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Construction of Brgy. Pagdugue - Brgy. Cansilayan FMR, Dumangas, Iloilo | 16,500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Ilog-Ilog - Brgy. Narorogan FMR, Brgy. Ilog-Ilog and Brgy. Narrorogan, Miagao, Iloilo",
      "office": "",
      "amountPesos": 27500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Concreting of Brgy. Ilog-Ilog - Brgy. Narorogan FMR, Brgy. Ilog-Ilog and Brgy. Narrorogan, | 16,500,000 | Miagao, Iloilo | 27,500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Talusan FMR, Brgy. Talusan, Dumangas, Iloilo",
      "office": "",
      "amountPesos": 3500000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Construction of Brgy. Talusan FMR, Brgy. Talusan, Dumangas, Iloilo | 3,500,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Kirayan Tacas - Brgy. Pungtod Naulid FMR, Brgy. Kirayan Tacas and Brgy. Pungtod, Naulid, Miagao, Iloilo",
      "office": "",
      "amountPesos": 52000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "3,500,000 | Concreting of Brgy. Kirayan Tacas - Brgy. Pungtod Naulid FMR, Brgy. Kirayan Tacas and | Brgy. Pungtod, Naulid, Miagao, Iloilo | 52,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Isauan - Brgy. Ingay FMR, Brgy. Isauan and Brgy. Ingay, Tubungan, Iloilo",
      "office": "",
      "amountPesos": 24000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Concreting of Brgy. Isauan - Brgy. Ingay FMR, Brgy. Isauan and Brgy. Ingay, | Tubungan, Iloilo | 24,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Granada FMR, Brgy. Granada, Bacolod City, Negros Occidental",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "NEGROS ISLAND REGION (NIR) | 665,000,000 | 24,000,000 | Construction of Brgy. Granada FMR, Brgy. Granada, Bacolod City, Negros Occidental | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Abang, Brgy. Buga FMR, Brgy. Buga, Igbaras, Iloilo",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Concreting of Sitio Abang, Brgy. Buga FMR, Brgy. Buga, Igbaras, Iloilo | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0708-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bug-ang FMR, Brgy. Bug-ang, Toboso, Negros Occidental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 708,
      "lengthEvidence": "Construction of Brgy. Bug-ang FMR, Brgy. Bug-ang, Toboso, Negros Occidental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Codcod FMR, Brgy. Codcod, San Carlos City, Negros Occidental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. Codcod FMR, Brgy. Codcod, San Carlos City, Negros Occidental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Maray-as, Brgy. Bonawon FMR, Brgy. Bonawon, Siaton, Negros Oriental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Sitio Maray-as, Brgy. Bonawon FMR, Brgy. Bonawon, | 15,000,000 | Siaton, Negros Oriental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bato FMR, Brgy. Bato, Mabinay, Negros Oriental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Brgy. Bato FMR, Brgy. Bato, Mabinay, Negros Oriental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Caipilan FMR, Brgy. Caipilan, Siquijor, Siquijor",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Caipilan FMR, Brgy. Caipilan, Siquijor, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Purisima FMR, Brgy. Purisima, Manapla, Negros Occidental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Brgy. Purisima FMR, Brgy. Purisima, Manapla, Negros Occidental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Logucan FMR, Brgy. Logucan, Maria, Siquijor",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Logucan FMR, Brgy. Logucan, Maria, Siquijor",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sta. Rosa FMR, Brgy. Sta. Rosa, Murcia, Negros Occidental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Brgy. Sta. Rosa FMR, Brgy. Sta. Rosa, Murcia, Negros Occidental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Sewahon 3, Brgy. VF Gustilo FMR, Brgy. VF Gustilo, Cadiz City, Negros Occidental",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "15,000,000 | Construction of Sitio Sewahon 3, Brgy. VF Gustilo FMR, Brgy. VF Gustilo, | Cadiz City, Negros Occidental | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Canlandog FMR, Brgy. Canlandog, Murcia, Negros Occidental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Brgy. Canlandog FMR, Brgy. Canlandog, Murcia, Negros Occidental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok Fermina, Brgy. Ma-ao FMR, Brgy. Ma-ao,",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "15,000,000 | Construction of Purok Fermina, Brgy. Ma-ao FMR, Brgy. Ma-ao, | Bago City, Negros Occidental | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok Paghidaet, Brgy. Sagasa FMR, Brgy. Sagasa, Bago City, Negros Occidental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Purok Paghidaet, Brgy. Sagasa FMR, Brgy. Sagasa, | Bago City, Negros Occidental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok Bulad, Brgy. Mabini to Purok Irigasyon, Brgy. Pacol FMR,",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "15,000,000 | Construction of Purok Bulad, Brgy. Mabini to Purok Irigasyon, Brgy. Pacol FMR, | Brgy. Mabini and Brgy. Pacol, Valladolid, Negros Occidental | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Miguel FMR, Brgy. San Miguel, La Carlota City, Negros Occidental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Brgy. San Miguel FMR, Brgy. San Miguel, La Carlota City, Negros Occidental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Kalubihan, Brgy. Talaptap FMR, Brgy. Talaptap, La Castellana,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Sitio Kalubihan, Brgy. Talaptap FMR, Brgy. Talaptap, La Castellana, | Negros Occidental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Hacienda Amanda, Brgy. VIII FMR, Brgy. VIII, Victorias City, Negros Occidental",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Concreting of Hacienda Amanda, Brgy. VIII FMR, Brgy. VIII, | 15,000,000 | Victorias City, Negros Occidental | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Pidpid to Sitio Kaburihan, Brgy. San Agustin FMR, Brgy. San Agustin,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Sitio Pidpid to Sitio Kaburihan, Brgy. San Agustin FMR, Brgy. San Agustin, | Negros Occidental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Manlingay - Brgy. Bugnay - Brgy. Napasu-An - Brgy. Tadlong FMR, Mabinay, Negros Oriental",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Brgy. Manlingay - Brgy. Bugnay - Brgy. Napasu-An - Brgy. Tadlong FMR, Mabinay, | 15,000,000 | Negros Oriental | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bulata FMR, Brgy. Bulata, Cauayan, Negros Occidental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Brgy. Bulata FMR, Brgy. Bulata, Cauayan, Negros Occidental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Manlucahoc FMR, Brgy. Manlucahoc, Sipalay City, Negros Occidental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Brgy. Manlucahoc FMR, Brgy. Manlucahoc, Sipalay City, Negros Occidental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Asia FMR, Brgy. Asia, Hinoba-an, Negros Occidental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Brgy. Asia FMR, Brgy. Asia, Hinoba-an, Negros Occidental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Baslay, Brgy. Talacdan FMR, Brgy. Talacdan, Cauayan, Negros Occidental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Sitio Baslay, Brgy. Talacdan FMR, Brgy. Talacdan, Cauayan, | 15,000,000 | Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Panubigan FMR, Brgy. Panubigan, Canlaon City, Negros Oriental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Brgy. Panubigan FMR, Brgy. Panubigan, Canlaon City, Negros Oriental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Nabulao FMR, Brgy. Nabulao, Sipalay City, Negros Occidental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Nabulao FMR, Brgy. Nabulao, Sipalay City, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Talaon to Brgy. Pitogo FMR, Brgy. Talaon and Brgy. Pitogo,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Brgy. Talaon to Brgy. Pitogo FMR, Brgy. Talaon and Brgy. Pitogo, | La Libertad, Negros Oriental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Camalandaan FMR, Brgy. Camalandaan, Cauayan, Negros Occidental",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Camalandaan FMR, Brgy. Camalandaan, Cauayan, Negros Occidental | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Azagra to Brgy. San Miguel FMR, Brgy. Azagra and Brgy. San Miguel,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Brgy. Azagra to Brgy. San Miguel FMR, Brgy. Azagra and Brgy. San Miguel, | Tanjay City, Negros Oriental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tabugon FMR, Brgy. Tabugon, Kabankalan City, Negros Occidental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Brgy. Tabugon FMR, Brgy. Tabugon, Kabankalan City, Negros Occidental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Camangcamang FMR, Brgy. Camangcamang, Isabela, Negros Occidental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "15,000,000 | Concreting of Brgy. Camangcamang FMR, Brgy. Camangcamang, Isabela, Negros Occidental",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Jantianon FMR Phase II, Brgy. Jantianon, Amlan, Negros Oriental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Brgy. Jantianon FMR Phase II, Brgy. Jantianon, Amlan, Negros Oriental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Ata-ata, Brgy. San Antonio - Brgy. Calabnugan FMR,",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "15,000,000 | Concreting of Sitio Ata-ata, Brgy. San Antonio - Brgy. Calabnugan FMR, | Brgy. San Antonio and Brgy. Calabnugan, Sibulan, Negros Oriental | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Kabiyabsan, Brgy. Mayabon FMR, Brgy. Mayabon, Zamboanguita, Negros Oriental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "Construction of Sitio Kabiyabsan, Brgy. Mayabon FMR, Brgy. Mayabon, | Zamboanguita, Negros Oriental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0710-032",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Alangilan FMR, Brgy. Alangilan, Bacolod City",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 710,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Alangilan FMR, Brgy. Alangilan, Bacolod City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Batadbatad - Brgy. Buguil FMR, Moalboal, Cebu Section 1 START: 9.94391, 123.441809 Section 2 START: 9.941201, 123.445775",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Concreting of Brgy. Batadbatad - Brgy. Buguil FMR, Moalboal, Cebu | 15,000,000 | Section 1 START: 9.94391, 123.441809 | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Mantacida FMR, Brgy. Mantacida, Catigbian, Bohol",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "REGION VII - CENTRAL VISAYAS | 315,000,000 | Construction of Brgy. Mantacida FMR, Brgy. Mantacida, Catigbian, Bohol | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Basiao - Brgy. Candiis FMR, Badian, Cebu Section 1 START: 9.812059, 123. 405993 Section 2 START: 9.8052549, 123.406771",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "315,000,000 | Concreting of Brgy. Basiao - Brgy. Candiis FMR, Badian, Cebu | 15,000,000 | Section 1 START: 9.812059, 123. 405993 | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bahaybahay to Brgy. Poblacion II FMR, Brgy. Bahaybahay and Brgy. Poblacion II, Sikatuna, Bohol",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Construction of Brgy. Bahaybahay to Brgy. Poblacion II FMR, Brgy. Bahaybahay and | Brgy. Poblacion II, Sikatuna, Bohol | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Libaong - Brgy. Lourdes FMR, Panglao, Bohol",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "15,000,000 | Concreting of Brgy. Libaong - Brgy. Lourdes FMR, Panglao, Bohol",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Buenavista to Sitio Kalubihan FMR, Brgy. Buenavista, Carcar City, Cebu",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Construction of Buenavista to Sitio Kalubihan FMR, Brgy. Buenavista, Carcar City, Cebu | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sudlon I FMR, Brgy. Sudlon I, Cebu City, Cebu",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Sudlon I FMR, Brgy. Sudlon I, Cebu City, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tubod to Brgy. Magsico FMR, Brgy. Tubod and Brgy. Magsico, San Fernando, Cebu",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Construction of Brgy. Tubod to Brgy. Magsico FMR, Brgy. Tubod and Brgy. Magsico, | San Fernando, Cebu | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Nagaasan to Sitio Camaoy FMR, Brgy. Nagaasan, Babatngon, Leyte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "15,000,000 | REGION VIII - EASTERN VISAYAS | 996,800,000 | Construction of Brgy. Nagaasan to Sitio Camaoy FMR, Brgy. Nagaasan, Babatngon, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Mompeller to Brgy. Apo FMR, Brgy. Mompeller and Brgy. Apo, Argao, Cebu",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Construction of Brgy. Mompeller to Brgy. Apo FMR, Brgy. Mompeller and Brgy. Apo, | Argao, Cebu | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Taguite FMR, Brgy. Taguite, Babatngon, Leyte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Taguite FMR, Brgy. Taguite, Babatngon, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Mantalongon FMR, Brgy. Mantalongon, Dalaguete, Cebu",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Construction of Brgy. Mantalongon FMR, Brgy. Mantalongon, Dalaguete, Cebu | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tutug-an to Sitio Nasunogan, Brgy. Tutug-an FMR, Brgy. Tutug-an, Barugo, Leyte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Tutug-an to Sitio Nasunogan, Brgy. Tutug-an FMR, Brgy. Tutug-an, | Barugo, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Union FMR, Brgy. Union, San Francisco, Cebu",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Union FMR, Brgy. Union, San Francisco, Cebu",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Ibag to Brgy. Sta. Rosa FMR, Brgy. Ibag and Brgy. Sta. Rosa,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Ibag to Brgy. Sta. Rosa FMR, Brgy. Ibag and Brgy. Sta. Rosa, | Barugo, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Liboron to Boundary Lanipga FMR, Brgy. Liboron, Carmen, Cebu",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Construction of Brgy. Liboron to Boundary Lanipga FMR, Brgy. Liboron, Carmen, Cebu | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tilha-ong FMR, Brgy. Tilha-ong, Consolacion, Cebu",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Construction of Brgy. Tilha-ong FMR, Brgy. Tilha-ong, Consolacion, Cebu | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Busay, Brgy. Apale FMR, Brgy. Apale, Isabel, Leyte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Construction of Sitio Busay, Brgy. Apale FMR, Brgy. Apale, Isabel, Leyte | 30,000,000 | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Manga to Brgy. Bayabas FMR, Brgy. Manga and Brgy. Bayabas,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Construction of Brgy. Manga to Brgy. Bayabas FMR, Brgy. Manga and Brgy. Bayabas, | Alcantara, Cebu | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Kabaringan, Brgy. Apale FMR, Brgy. Apale, Isabel, Leyte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Construction of Sitio Kabaringan, Brgy. Apale FMR, Brgy. Apale, Isabel, Leyte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Capilian to Brgy. Burubud-an FMR, Brgy. Capilian and",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Capilian to Brgy. Burubud-an FMR, Brgy. Capilian and | Brgy. Burubud-an, Abuyog, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Samborio, Brgy. Buot FMR, Brgy. Buot, Cebu City, Cebu",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Construction of Sitio Samborio, Brgy. Buot FMR, Brgy. Buot, Cebu City, Cebu | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Upper to Sitio Tay-ong, Brgy. Buot FMR, Brgy. Buot, Cebu City, Cebu",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Construction of Sitio Upper to Sitio Tay-ong, Brgy. Buot FMR, Brgy. Buot, Cebu City, Cebu | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Kage, Brgy. Agbanga to Sitio San Antonio, Brgy. Itum FMR, Brgy. Agbanga and Brgy. Itum, Matalom, Leyte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Construction of Sitio Kage, Brgy. Agbanga to Sitio San Antonio, Brgy. Itum FMR, | 15,000,000 | Brgy. Agbanga and Brgy. Itum, Matalom, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tagjaguimit FMR, Brgy. Tagjaguimit, Naga City, Cebu",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Construction of Brgy. Tagjaguimit FMR, Brgy. Tagjaguimit, Naga City, Cebu | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Imelda to Brgy. Lico FMR, Brgy. Imelda and Brgy. Lico, Naval, Biliran",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "10,000,000 | Construction of Brgy. Imelda to Brgy. Lico FMR, Brgy. Imelda and Brgy. Lico, Naval, Biliran | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Balud FMR, Brgy. Balud, San Fernando, Cebu",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Construction of Brgy. Balud FMR, Brgy. Balud, San Fernando, Cebu | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Habuhab FMR, Brgy. Habuhab, Culaba, Biliran",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "10,000,000 | Construction of Brgy. Habuhab FMR, Brgy. Habuhab, Culaba, Biliran | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Bactas-Tinabyonan-Guinabucan -Agsuwao FMR, Catmon, Cebu",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "Concreting of Brgy. Bactas-Tinabyonan-Guinabucan -Agsuwao FMR, Catmon, Cebu | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0712-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Paya FMR, Brgy. Paya, Giporlos, Eastern Samar",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 712,
      "lengthEvidence": "30,000,000 | Construction of Brgy. Paya FMR, Brgy. Paya, Giporlos, Eastern Samar",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Talolora to Sitio Canamucan FMR, Brgy. Talolora, Mondragon,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. Talolora to Sitio Canamucan FMR, Brgy. Talolora, Mondragon, | Northern Samar | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. E. J. Dulay, Laoang - Brgy. Nagbobtac, Palapag FMR, (Phase II), Laoang and Palapag, Northern Samar",
      "office": "",
      "amountPesos": 24000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Concreting of Brgy. E. J. Dulay, Laoang - Brgy. Nagbobtac, Palapag FMR, (Phase II), | 15,000,000 | Laoang and Palapag, Northern Samar | 24,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Santa Catalina to Brgy. La Trinidad FMR, Brgy. Santa Catalina and",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Construction of Brgy. Santa Catalina to Brgy. La Trinidad FMR, Brgy. Santa Catalina and | Brgy. La Trinidad, Mondragon, Northern Samar | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Bagacay FMR Phase II, Brgy. Bagacay, Lapinig, Northern Samar",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Concreting of Brgy. Bagacay FMR Phase II, Brgy. Bagacay, Lapinig, Northern Samar | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Tuyo - Brgy. Wilson - Brgy. Ormocay FMR, Brgy. Tuyo, MacArthur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "15,000,000 | Concreting of Brgy. Tuyo - Brgy. Wilson - Brgy. Ormocay FMR, Brgy. Tuyo, MacArthur | and Brgy. Wilson and Brgy. Ormocay, Mayorga, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Cabaywa-Cabuntoran-Malaguinara FMR, Brgy. Zone 3, San Roque, Northern Samar",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Construction of Cabaywa-Cabuntoran-Malaguinara FMR, Brgy. Zone 3, | San Roque, Northern Samar | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Pongon - Brgy. Villa Imelda FMR, Brgy. Pongon and Brgy. Villa Imelda,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "15,000,000 | Concreting of Brgy. Pongon - Brgy. Villa Imelda FMR, Brgy. Pongon and Brgy. Villa Imelda, | Mac Arthur, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Bagsang-Cabaywa-Parigoan Galutan FMR, Brgy. Balud and Brgy. Zone 3, San Roque, Northern Samar",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Construction of Bagsang-Cabaywa-Parigoan Galutan FMR, Brgy. Balud and Brgy. Zone 3, | San Roque, Northern Samar | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Alangilan - Brgy. Tuy-a FMR, Brgy. Alangilan and Brgy. Tuy-a,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Alangilan - Brgy. Tuy-a FMR, Brgy. Alangilan and Brgy. Tuy-a, | Abuyog, Leyte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Canhumadac to Brgy. Helino FMR, Brgy. Canhumadac and Brgy. Helino, Calbayog City, Samar",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Concreting of Brgy. Canhumadac to Brgy. Helino FMR, Brgy. Canhumadac and | Brgy. Helino, Calbayog City, Samar | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bayabas - Sitio Kabotosan FMR, Brgy. Bayabas, Abuyog, Leyte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "30,000,000 | Construction of Brgy. Bayabas - Sitio Kabotosan FMR, Brgy. Bayabas, Abuyog, Leyte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Roque FMR, Brgy. San Roque, Marabut, Samar",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Construction of Brgy. San Roque FMR, Brgy. San Roque, Marabut, Samar | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Burabod FMR, Brgy. Burabod, Biliran, Biliran",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "15,000,000 | Concreting of Brgy. Burabod FMR, Brgy. Burabod, Biliran, Biliran",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Obayan to Brgy. Loctob FMR, Brgy. Obayan and Brgy. Loctob, Pinabacdao, Samar",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Construction of Brgy. Obayan to Brgy. Loctob FMR, Brgy. Obayan and Brgy. Loctob, | Pinabacdao, Samar | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Bool-West FMR (Phase II), Brgy. Bool-West, Culaba, Biliran",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "15,000,000 | Concreting of Brgy. Bool-West FMR (Phase II), Brgy. Bool-West, Culaba, Biliran",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Silijagon-Sitio Pangudtan FMR, Brgy. Silijagon, Mapanas, Northern Samar",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Construction of Brgy. Silijagon-Sitio Pangudtan FMR, Brgy. Silijagon, | Mapanas, Northern Samar | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Andres FMR, Brgy. San Andres, Catbalogan, Samar",
      "office": "",
      "amountPesos": 53200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "50,000,000 | Construction of Brgy. San Andres FMR, Brgy. San Andres, Catbalogan, Samar | 53,200,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cambaro FMR, Brgy. Cambaro, Macrohon, Southern Leyte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Construction of Brgy. Cambaro FMR, Brgy. Cambaro, Macrohon, Southern Leyte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Bugtong - Brgy. Bayo FMR, Brgy. Bugtong and Brgy. Bayo, Calbayog City, Samar",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Concreting of Brgy. Bugtong - Brgy. Bayo FMR, Brgy. Bugtong and Brgy. Bayo, | 15,000,000 | Calbayog City, Samar | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Mojon, Brgy. Libas to Brgy. Ocad FMR, Brgy. Libas, Lavezares, Northern Samar",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Construction of Sitio Mojon, Brgy. Libas to Brgy. Ocad FMR, Brgy. Libas, | Lavezares, Northern Samar | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Miguel - Brgy. Maca-anga FMR, Llorente, Eastern Samar",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "15,000,000 | Construction of Brgy. San Miguel - Brgy. Maca-anga FMR, Llorente, Eastern Samar | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Isidro to Brgy. San Juan FMR, Brgy. San Isidro,",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Construction of Brgy. San Isidro to Brgy. San Juan FMR, Brgy. San Isidro, | Lavezares, Northern Samar | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Luna - Brgy. Nipa FMR, Brgy. Luna and Brgy. Nipa, Tagapul-an, Samar",
      "office": "",
      "amountPesos": 13200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Concreting of Brgy. Luna - Brgy. Nipa FMR, Brgy. Luna and Brgy. Nipa, Tagapul-an, Samar | 30,000,000 | 13,200,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Libertad - Brgy. Roxas FMR, Brgy. Libertad and Brgy. Roxas 1,",
      "office": "",
      "amountPesos": 13200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "30,000,000 | Concreting of Brgy. Libertad - Brgy. Roxas FMR, Brgy. Libertad and Brgy. Roxas 1, | Calbayog City, Samar | 15,000,000 | 13,200,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Osmeña FMR, Brgy. Osmeña, Lope de Vega, Northern Samar",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Construction of Brgy. Osmeña FMR, Brgy. Osmeña, Lope de Vega, Northern Samar | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tarabucan to Brgy. Jacinto FMR, Brgy. Tarabucan and",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Construction of Brgy. Tarabucan to Brgy. Jacinto FMR, Brgy. Tarabucan and | Brgy. Jacinto, Calbayog City, Samar | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Malobago to Sitio Caodocan, Brgy. Tagharigue FMR, Brgy. Malobago and Brgy. Tagharigue, Calubian, Leyte",
      "office": "",
      "amountPesos": 36000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Concreting of Brgy. Malobago to Sitio Caodocan, Brgy. Tagharigue FMR, Brgy. Malobago | 50,000,000 | and Brgy. Tagharigue, Calubian, Leyte | 36,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Villahermosa to Brgy. Garrido to Brgy. K. Bugtong FMR,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Construction of Brgy. Villahermosa to Brgy. Garrido to Brgy. K. Bugtong FMR, | Brgy. Villahermosa & Brgy. Garrido & Brgy. K. Bugtong, Calubian, Leyte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Anislagan to Brgy. Agas FMR, Brgy. Anislagan and Brgy. Agas, Calubian, Leyte",
      "office": "",
      "amountPesos": 14000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Concreting of Brgy. Anislagan to Brgy. Agas FMR, Brgy. Anislagan and Brgy. Agas, | 15,000,000 | Calubian, Leyte | 14,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0714-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sulpa to Sitio Agob-ob FMR, Brgy. Sulpa, Villaba, Leyte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 714,
      "lengthEvidence": "Construction of Brgy. Sulpa to Sitio Agob-ob FMR, Brgy. Sulpa, Villaba, Leyte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0716-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Majacob - Brgy. Bonga FMR, Brgy. Majacob and Brgy. Bonga, Tarangnan, Samar",
      "office": "",
      "amountPesos": 13200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 716,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS | NUMBER “1”  | PESOS | Concreting of Brgy. Majacob - Brgy. Bonga FMR, Brgy. Majacob and Brgy. Bonga, | Tarangnan, Samar | 13,200,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0716-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Lagundi - Brgy. San Andres Sitio Peña FMR, Brgy. Lagundi and Brgy. San Andres, Catbalogan City, Samar",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 716,
      "lengthEvidence": "Construction of Brgy. Lagundi - Brgy. San Andres Sitio Peña FMR, Brgy. Lagundi and | Brgy. San Andres, Catbalogan City, Samar | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0716-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Tapae - Brgy. Alibaba FMR, Brgy. Tapae and Brgy. Alibaba, Calbayog City, Samar",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 716,
      "lengthEvidence": "Concreting of Brgy. Tapae - Brgy. Alibaba FMR, Brgy. Tapae and Brgy. Alibaba, | Calbayog City, Samar | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0716-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Baruk - Brgy. Caghalong - Brgy. Can-ilay FMR, Can-avid, Eastern Samar",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 716,
      "lengthEvidence": "Construction of Brgy. Baruk - Brgy. Caghalong - Brgy. Can-ilay FMR, | Can-avid, Eastern Samar | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0716-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Aet FMR, Brgy. Aet, Sulat, Eastern Samar",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 716,
      "lengthEvidence": "Construction of Brgy. Aet FMR, Brgy. Aet, Sulat, Eastern Samar | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0716-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Magsaysay - Brgy. Malvar FMR, Balangkayan, Eastern Samar",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 716,
      "lengthEvidence": "Construction of Brgy. Magsaysay - Brgy. Malvar FMR, Balangkayan, Eastern Samar | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0716-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Rawis to Brgy. Cantaguic FMR, Brgy. Rawis and Brgy. Cantaguic, San Jorge, Samar",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 716,
      "lengthEvidence": "Concreting of Brgy. Rawis to Brgy. Cantaguic FMR, Brgy. Rawis and Brgy. Cantaguic, | San Jorge, Samar | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0716-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Pangabutan FMR, Brgy. Pangabutan, Taft, Eastern Samar",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 716,
      "lengthEvidence": "Construction of Brgy. Pangabutan FMR, Brgy. Pangabutan, Taft, Eastern Samar | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0716-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Malidong - Brgy. Luneta - Brgy. Henogawe FMR, Gamay, Northern Samar",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 716,
      "lengthEvidence": "Concreting of Brgy. Malidong - Brgy. Luneta - Brgy. Henogawe FMR, | Gamay, Northern Samar | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0716-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Osmeña - Brgy. Bangon FMR, Palapag, Northern Samar",
      "office": "",
      "amountPesos": 5000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 716,
      "lengthEvidence": "Concreting of Brgy. Osmeña - Brgy. Bangon FMR, Palapag, Northern Samar | 5,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0716-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Nangka Plain, Brgy. La Paz FMR, Brgy. La Paz, Zamboanga City",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 716,
      "lengthEvidence": "REGION IX - ZAMBOANGA PENINSULA | 580,000,000 | Construction of Sitio Nangka Plain, Brgy. La Paz FMR, Brgy. La Paz, Zamboanga City | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0716-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Miguel FMR, Brgy. San Miguel, Mutia, Zamboanga del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 716,
      "lengthEvidence": "15,000,000 | Construction of Brgy. San Miguel FMR, Brgy. San Miguel, Mutia, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0716-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Calican FMR, Brgy. Calican, Pinan, Zamboanga del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 716,
      "lengthEvidence": "Construction of Brgy. Calican FMR, Brgy. Calican, Pinan, Zamboanga del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0716-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Soguilon FMR, Siayan, Zamboanga del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 716,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Soguilon FMR, Siayan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0716-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Joaquin Macias FMR, Sindangan, Zamboanga del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 716,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Joaquin Macias FMR, Sindangan, Zamboanga del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Kipit FMR Phase II, Brgy. Kipit, Labason, Zamboanga del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS | NAME OF PROJECTS | PESOS | Construction of Brgy. Kipit FMR Phase II, Brgy. Kipit, Labason, Zamboanga del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Balagunan FMR, Siocon, Zamboanga del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Construction of Brgy. Balagunan FMR, Siocon, Zamboanga del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Malating FMR, Ramon Magsaysay, Zamboanga del Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Construction of Brgy. Malating FMR, Ramon Magsaysay, Zamboanga del Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cebuneg FMR, Brgy. Cebuneg, Aurora, Zamboanga del Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Construction of Brgy. Cebuneg FMR, Brgy. Cebuneg, Aurora, Zamboanga del Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Liangan, Brgy. Kabatan to Lunib FMR, Brgy. Kabatan, Vincenzo Sagun, Zamboanga del Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Concreting of Sitio Liangan, Brgy. Kabatan to Lunib FMR, Brgy. Kabatan, Vincenzo Sagun, Zamboanga | del Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Lunib FMR, Vincenzo A. Sagun, Zamboanga del Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Construction of Brgy. Lunib FMR, Vincenzo A. Sagun, Zamboanga del Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Road 10, Brgy. Paradise - Brgy. Sampoli B FMR, Diplahan, Zamboanga Sibugay",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Construction of Road 10, Brgy. Paradise - Brgy. Sampoli B FMR, Diplahan, Zamboanga Sibugay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Isidro - Lafurtuna FMR, Brgy. San Isidro to Brgy. Lafurtuna, Payao, Zamboanga Sibugay",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Construction of Brgy. San Isidro - Lafurtuna FMR, Brgy. San Isidro to Brgy. Lafurtuna, | Payao, Zamboanga Sibugay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Timalang FMR, Brgy. Timalang, Ipil, Zamboanga Sibugay",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Construction of Brgy. Timalang FMR, Brgy. Timalang, Ipil, Zamboanga Sibugay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Pisaan, Brgy. Marsolo FMR, Brgy. Marsolo, Naga, Zamboanga Sibugay",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Construction of Sitio Pisaan, Brgy. Marsolo FMR, Brgy. Marsolo, Naga, Zamboanga Sibugay | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tandu Patong FMR, Brgy. Tandu Patong, Maimbung, Sulu",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Construction of Brgy. Tandu Patong FMR, Brgy. Tandu Patong, Maimbung, Sulu | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Pantao FMR, Brgy. Pantao, Talipao, Sulu",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Construction of Brgy. Pantao FMR, Brgy. Pantao, Talipao, Sulu | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Lukbu Brgy. Saimbangon FMR, Brgy. Saimbangon, Pata, Sulu",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Construction of Sitio Lukbu Brgy. Saimbangon FMR, Brgy. Saimbangon, Pata, Sulu | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Jinggan FMR, Brgy. Jinggan, Panglima Estino, Sulu",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Construction of Brgy. Jinggan FMR, Brgy. Jinggan, Panglima Estino, Sulu | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok-2 to Purok-3, Brgy. Sipaon FMR, Brgy. Sipaon, Zamboanga del Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Construction of Purok-2 to Purok-3, Brgy. Sipaon FMR, Brgy. Sipaon, Zamboanga del Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Mahayahay FMR, Brgy. Mahayahay, Kumalarang, Zamboanga del Sur",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Construction of Brgy. Mahayahay FMR, Brgy. Mahayahay, Kumalarang, Zamboanga del Sur | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 3, Brgy. Calican FMR, Brgy. Calican, Piñan, Zamboanga del Norte",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Construction of Purok 3, Brgy. Calican FMR, Brgy. Calican, Piñan, Zamboanga del Norte | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0717-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Cuatro-Cuatro FMR, Dumalinao, Zamboanga del Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 717,
      "lengthEvidence": "Concreting of Brgy. Cuatro-Cuatro FMR, Dumalinao, Zamboanga del Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Diongan FMR, Siayan, Zamboanga del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. Diongan FMR, Siayan, Zamboanga del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Dansalan FMR, Brgy. Dansalan, Sapad, Lanao del Norte",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Brgy. Dansalan FMR, Brgy. Dansalan, Sapad, Lanao del Norte | 15,000,000 | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sayaw FMR, Siayan, Zamboanga del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Construction of Brgy. Sayaw FMR, Siayan, Zamboanga del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sibula to Brgy. Dampalan FMR, Brgy. Sibula, Lopez Jaena, Misamis Occidental",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Construction of Brgy. Sibula to Brgy. Dampalan FMR, Brgy. Sibula, Lopez Jaena, | 15,000,000 | Misamis Occidental | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Lumbang - Brgy. Makiri FMR Phse III, Brgy. Lumbang, Isabela City, Basilan",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Concreting of Brgy. Lumbang - Brgy. Makiri FMR Phse III, Brgy. Lumbang, Isabela City, Basilan | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Maramara to Purok 3, Brgy. Maramara FMR, Brgy. Maramara, Don Victoriano, Misamis Occidental",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Maramara to Purok 3, Brgy. Maramara FMR, Brgy. Maramara, | Don Victoriano, Misamis Occidental | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Pole Dyutay, Brgy. La Paz FMR, Brgy. La Paz, Zamboanga City",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Concreting of Sitio Pole Dyutay, Brgy. La Paz FMR, Brgy. La Paz, Zamboanga City | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bongabong FMR, Brgy. Bongabong, Tangub City, Misamis Occidental",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "10,000,000 | Construction of Brgy. Bongabong FMR, Brgy. Bongabong, Tangub City, Misamis Occidental | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Pantay-Kawasan FMR, Brgy. Kawasan, Panamao, Sulu Sta: 0+00 Lat: 5.989279, Long: 121.240667",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": 0.65,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Two printed STA endpoints in same-row FMR project context",
      "allocationPerStatedKm": 15384615.38,
      "lengthMeters": 650.0,
      "allocationPerStatedMeter": 15384.62,
      "rangesMeters": [
        [
          0.0,
          650.0
        ]
      ],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Construction of Sitio Pantay-Kawasan FMR, Brgy. Kawasan, Panamao, Sulu | Sta: 0+00 Lat: 5.989279, Long: 121.240667 | 10,000,000 | Sta. 0+650 Lat: 5.986219, Long: 121.245419",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 2,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-FMR-0718-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Huwit-Huwit - Lianutan FMR Phase II, Brgy. Huwit-Huwit, Omar, Sulu STA. 0+00 Lat: 5.948460, Long: 121.353418",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": 1.05,
      "lengthStatus": "Usable stated segment length",
      "lengthMethod": "Two printed STA endpoints in same-row FMR project context",
      "allocationPerStatedKm": 14285714.29,
      "lengthMeters": 1050.0,
      "allocationPerStatedMeter": 14285.71,
      "rangesMeters": [
        [
          0.0,
          1050.0
        ]
      ],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Sta. 0+650 Lat: 5.986219, Long: 121.245419 | Construction of Huwit-Huwit - Lianutan FMR Phase II, Brgy. Huwit-Huwit, Omar, Sulu | STA. 0+00 Lat: 5.948460, Long: 121.353418 | 15,000,000 | STA. 0+1050 Lat: 5.948704, Long: 121.344079",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 2,
      "peerBand": "≥0 m",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "Insufficient peers · no high-rate conclusion"
    },
    {
      "id": "HB10858-FMR-0718-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Tagpaco to Sitio Mahayag FMR, Brgy. Sinalac, Initao, Misamis Oriental",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "15,000,000 | Construction of Sitio Tagpaco to Sitio Mahayag FMR, Brgy. Sinalac, Initao, Misamis Oriental | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tablon (Sitio Manila) FMR, Cagayan de Oro City",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "30,000,000 | Construction of Brgy. Tablon (Sitio Manila) FMR, Cagayan de Oro City | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bacuyong, Piñan – Brgy. Lingasad FMR, Polanco, Zamboanga del Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Construction of Brgy. Bacuyong, Piñan – Brgy. Lingasad FMR, Polanco, Zamboanga del Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 5, Brgy. Balubal FMR, Cagayan de Oro City",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "20,000,000 | Construction of Purok 5, Brgy. Balubal FMR, Cagayan de Oro City | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Magangon, Polanco - Brgy. Del Pilar, Piñan FMR, Zamboanga del Norte",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Construction of Brgy. Magangon, Polanco - Brgy. Del Pilar, Piñan FMR, Zamboanga del Norte | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Zone 1, Brgy. Balubal FMR, Cagayan de Oro City",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "50,000,000 | Construction of Zone 1, Brgy. Balubal FMR, Cagayan de Oro City | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Besigan FMR, Brgy. Besigan, Cagayan de Oro City",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "683,400,000 | Construction of Brgy. Besigan FMR, Brgy. Besigan, Cagayan de Oro City | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sayawan to Brgy. Dumalaguing to Brgy. Guiheean FMR, Impasugong, Bukidnon",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "REGION X - NORTHERN MINDANAO | 683,400,000 | Construction of Brgy. Sayawan to Brgy. Dumalaguing to Brgy. Guiheean FMR, | Impasugong, Bukidnon | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Delabayan West FMR, Brgy. Delabayan West, Bacolod, Lanao del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "30,000,000 | Construction of Brgy. Delabayan West FMR, Brgy. Delabayan West, Bacolod, Lanao del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 3 to Purok 7, Brgy. Minongan FMR, Brgy. Minongan, Quezon, Bukidnon",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Construction of Purok 3 to Purok 7, Brgy. Minongan FMR, Brgy. Minongan, Quezon, Bukidnon | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 1, Brgy. Purakan FMR, Brgy. Purakan, Linamon, Lanao del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "30,000,000 | Construction of Purok 1, Brgy. Purakan FMR, Brgy. Purakan, Linamon, Lanao del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tignapoloan FMR Phase II, Brgy. Tignapoloan, Cagayan de Oro City",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Construction of Brgy. Tignapoloan FMR Phase II, Brgy. Tignapoloan, Cagayan de Oro City | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Palao Ranaranao FMR, Brgy. Palao Ranaranao, Marantao, Lanao del Sur",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "30,000,000 | Construction of Brgy. Palao Ranaranao FMR, Brgy. Palao Ranaranao, Marantao, Lanao del Sur",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Gusa FMR, Brgy. Gusa, Cagayan de Oro City",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Construction of Brgy. Gusa FMR, Brgy. Gusa, Cagayan de Oro City | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Paradise FMR, Brgy. Paradise, Cabanglasan, Bukidnon",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "30,000,000 | Concreting of Brgy. Paradise FMR, Brgy. Paradise, Cabanglasan, Bukidnon | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. South Poblacion to Brgy. Liong FMR, Brgy. South Poblacion,",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Construction of Brgy. South Poblacion to Brgy. Liong FMR, Brgy. South Poblacion, | Guinsiliban, Camiguin | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Unidos - Brgy. Agunod to Brgy. Quirino FMR, Plaridel, Misamis Occidental",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "20,000,000 | Concreting of Brgy. Unidos - Brgy. Agunod to Brgy. Quirino FMR, Plaridel, Misamis Occidental | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Mainit FMR, Brgy. Mainit, Iligan City, Lanao del Norte",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Construction of Brgy. Mainit FMR, Brgy. Mainit, Iligan City, Lanao del Norte | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Tablon FMR, Brgy. Tablon, Cagaya de Oro City",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Construction of Brgy. Tablon FMR, Brgy. Tablon, Cagaya de Oro City | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sta. Cruz FMR, Brgy. Sta. Cruz, Maigo, Lanao del Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Construction of Brgy. Sta. Cruz FMR, Brgy. Sta. Cruz, Maigo, Lanao del Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-032",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Zone 5 - Immaculate Conception Shrine, Brgy. Sambulawan FMR, Brgy. Sambulawan, Laguindingan, Misamis Oriental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Concreting of Zone 5 - Immaculate Conception Shrine, Brgy. Sambulawan FMR, Brgy. Sambulawan, | 20,000,000 | Laguindingan, Misamis Oriental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0718-033",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Maliwanag FMR, Baroy, Lanao del Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 718,
      "lengthEvidence": "Construction of Brgy. Maliwanag FMR, Baroy, Lanao del Norte | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Siare, Brgy. Baybay FMR, Brgy. Baybay, Alubijid, Misamis Oriental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Concreting of Sitio Siare, Brgy. Baybay FMR, Brgy. Baybay, Alubijid, Misamis Oriental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Coastal Road to Bacuring to Tugun to Nabintad to Gapas, Brgy. Madaum FMR, Brgy. Madaum, Tagum City, Davao del Norte",
      "office": "",
      "amountPesos": 55000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Coastal Road to Bacuring to Tugun to Nabintad to Gapas, Brgy. Madaum FMR, | 15,000,000 | Brgy. Madaum, Tagum City, Davao del Norte | 55,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Lourdes, Brgy. Tignapoloan FMR, Brgy. Tignapoloan, Cagayan de Oro City",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Concreting of Sitio Lourdes, Brgy. Tignapoloan FMR, Brgy. Tignapoloan, Cagayan de Oro City | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Buan FMR, Brgy. Buan, Asuncion, Davao del Norte",
      "office": "",
      "amountPesos": 45000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "25,000,000 | Construction of Brgy. Buan FMR, Brgy. Buan, Asuncion, Davao del Norte | 45,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Narra - Purok Marangig, Brgy. New Albay FMR, Brgy. New Albay, Maragusan, Davao de Oro",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Concreting of Sitio Narra - Purok Marangig, Brgy. New Albay FMR, Brgy. New Albay, | 8,400,000 | Maragusan, Davao de Oro | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 1 - 6, Brgy. Balnate FMR, Brgy. Balnate, Magsaysay, Davao del Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Construction of Purok 1 - 6, Brgy. Balnate FMR, Brgy. Balnate, Magsaysay, Davao del Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Cabasaran to Brgy. Bacayawan FMR going to Munai Road, Brgy. Cabasaran, Madalum, Lanao del Sur",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "124.9084762, 7.8781199 | Concreting of Brgy. Cabasaran to Brgy. Bacayawan FMR going to Munai Road, | Brgy. Cabasaran, Madalum, Lanao del Sur | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Kibao FMR, Brgy. Kibao, Matanao, Davao del Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "30,000,000 | Construction of Brgy. Kibao FMR, Brgy. Kibao, Matanao, Davao del Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Purok 5, Labinay FMR, Brgy. Labinay, Ozamiz City, Misamis Occidental",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Concreting of Purok 5, Labinay FMR, Brgy. Labinay, Ozamiz City, Misamis Occidental | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Bobongon FMR, Brgy. Bobongon, Santo Tomas, Davao del Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "30,000,000 | Concreting of Brgy. Bobongon FMR, Brgy. Bobongon, Santo Tomas, Davao del Norte | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Napurog FMR, Brgy. Napurog, Tudela, Misamis Occidental",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Concreting of Brgy. Napurog FMR, Brgy. Napurog, Tudela, Misamis Occidental | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Dalisay FMR, Brgy. Dalisay, Panabo City, Davao del Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "15,000,000 | Concreting of Brgy. Dalisay FMR, Brgy. Dalisay, Panabo City, Davao del Norte | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Sebasi to Brgy. Bernad Old Road FMR, Clarin, Misamis Occidental",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Concreting of Brgy. Sebasi to Brgy. Bernad Old Road FMR, Clarin, Misamis Occidental | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Kimamon FMR, Brgy. Kimamon, Santo Tomas, Davao del Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "10,000,000 | Concreting of Brgy. Kimamon FMR, Brgy. Kimamon, Santo Tomas, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Sitio Malambago, Brgy. Maluko FMR, Brgy. Maluko, Manolo Fortich, Bukidnon",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Concreting of Sitio Malambago, Brgy. Maluko FMR, Brgy. Maluko, Manolo Fortich, Bukidnon | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Sindaton FMR, Brgy. Sindaton, Panabo City, Davao del Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "10,000,000 | Concreting of Brgy. Sindaton FMR, Brgy. Sindaton, Panabo City, Davao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Salvacion FMR, Brgy. Salvacion, Monkayo, Davao de Oro",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "REGION XI - DAVAO | 475,000,000 | Construction of Brgy. Salvacion FMR, Brgy. Salvacion, Monkayo, Davao de Oro | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Naga FMR, Brgy. Naga, Laak, Davao de Oro",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Construction of Brgy. Naga FMR, Brgy. Naga, Laak, Davao de Oro | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Kapoc to Tabunan, Brgy. Cadunan FMR, Mabini, Davao de Oro",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Construction of Sitio Kapoc to Tabunan, Brgy. Cadunan FMR, Mabini, Davao de Oro | 30,000,000 | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Buclad FMR, Brgy. Buclad, Asuncion, Davao del Norte",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Construction of Brgy. Buclad FMR, Brgy. Buclad, Asuncion, Davao del Norte | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cabayangan FMR, Brgy. Cabayangan, Braulio E. Dujali, Davao del Norte",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Construction of Brgy. Cabayangan FMR, Brgy. Cabayangan, Braulio E. Dujali, Davao del Norte | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Guia, Brgy. Polayagan to Sitio Sambacan, Brgy. Barangiran FMR Phase I,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "30,000,000 | REGION XII - SOCCSKSARGEN | 425,000,000 | Construction of Sitio Guia, Brgy. Polayagan to Sitio Sambacan, Brgy. Barangiran FMR Phase I, | Brgy. Polayagan and Brgy. Baranginan, Alamada, Cotabato | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Acasia-Asinan, Brgy. San Isidro FMR, Brgy. San Isidro, Magsaysay, Davao del Sur",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Construction of Acasia-Asinan, Brgy. San Isidro FMR, Brgy. San Isidro, | Magsaysay, Davao del Sur | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bitoka to Brgy. Milaya FMR, Brgy. Bitoka and Brgy. Milaya,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "30,000,000 | Construction of Brgy. Bitoka to Brgy. Milaya FMR, Brgy. Bitoka and Brgy. Milaya, | Midsayap, Cotabato | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 9-B, Brgy. Alejal FMR, Brgy. Alejal, Carmen, Davao del Norte",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Construction of Purok 9-B, Brgy. Alejal FMR, Brgy. Alejal, Carmen, Davao del Norte | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 9-D, Brgy. Alejal FMR, Brgy. Alejal, Carmen, Davao del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Construction of Purok 9-D, Brgy. Alejal FMR, Brgy. Alejal, Carmen, Davao del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Avas, Brgy. Sarayan FMR Phase I, Brgy. Sarayan, President Roxas, Cotabato",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Construction of Avas, Brgy. Sarayan FMR Phase I, Brgy. Sarayan, President Roxas, Cotabato | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-030",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Miguel to Brgy. Caliclic FMR, Brgy. San Miguel,",
      "office": "",
      "amountPesos": 50000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Construction of Brgy. San Miguel to Brgy. Caliclic FMR, Brgy. San Miguel, | IGACOS, Davao del Norte | 50,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0720-031",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Sanlab, Napalico to Centro Kulaman Valley to Centro Sumalili FMR Phase I, Brgy. Napalico, Brgy. Kulaman Valley, and Brgy. Sumalili, Arakan, Cotabato",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 720,
      "lengthEvidence": "Construction of Sitio Sanlab, Napalico to Centro Kulaman Valley to Centro Sumalili FMR | 50,000,000 | Phase I, Brgy. Napalico, Brgy. Kulaman Valley, and Brgy. Sumalili, Arakan, Cotabato | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Minapan to Kanibong FMR Phase I, Brgy. Minapan and Brgy. Kanibong,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Minapan to Kanibong FMR Phase I, Brgy. Minapan and Brgy. Kanibong, | Tulunan, Cotabato | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 3/Purok 5 Boundary Road, Brgy. Dalipe FMR, Brgy. Dalipe, M'lang, Cotabato",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Purok 3/Purok 5 Boundary Road, Brgy. Dalipe FMR, Brgy. Dalipe, | 15,000,000 | M'lang, Cotabato | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 2 - Purok 3 - Purok 4, Brgy. New Consolacion FMR Phase I,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Construction of Purok 2 - Purok 3 - Purok 4, Brgy. New Consolacion FMR Phase I, | Brgy. New Consolacion, M'lang, Cotabato | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok Modelo - Purok Malipayon, Brgy. Bangbang FMR, Brgy. Bangbang, Matalam, Cotabato",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Construction of Purok Modelo - Purok Malipayon, Brgy. Bangbang FMR, Brgy. Bangbang, | 15,000,000 | Matalam, Cotabato | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Purok Makiangayon, Brgy. Esperanza to Purok Sampaguita, Brgy. New Pangasinan FMR",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Concreting of Purok Makiangayon, Brgy. Esperanza to Purok Sampaguita, Brgy. New Pangasinan FMR | Phase II, Brgy. New Pangasinan, Koronadal City, South Cotabato | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Kilada - Brgy. Lower Malamote FMR, Brgy. Kilada, Matalam, Cotabato",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Construction of Brgy. Kilada - Brgy. Lower Malamote FMR, Brgy. Kilada, Matalam, Cotabato | 15,000,000 | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok Maabi-abihon - Purok Mabinuligon Brgy. Bagontapay FMR, Brgy. Bagontapay,",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "15,000,000 | Construction of Purok Maabi-abihon - Purok Mabinuligon Brgy. Bagontapay FMR, Brgy. Bagontapay, | M'lang, Cotabato | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Purok Namnama, Brgy. Poblacion FMR Phase II, Brgy. Poblacion, Tantangan, South Cotabato",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Concreting of Purok Namnama, Brgy. Poblacion FMR Phase II, Brgy. Poblacion, | Tantangan, South Cotabato | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Minapan - Brgy. Maybula FMR, Brgy. Minapan, Tulunan, Cotabato",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Minapan - Brgy. Maybula FMR, Brgy. Minapan, Tulunan, Cotabato | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Montapet, Brgy. Ambalgan FMR, Brgy. Ambalgan, Sto. Niño, South Cotabato",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Construction of Montapet, Brgy. Ambalgan FMR, Brgy. Ambalgan, Sto. Niño, South Cotabato | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Talitay FMR, Brgy. Talitay, Buluan, Maguindanao del Sur",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Talitay FMR, Brgy. Talitay, Buluan, Maguindanao del Sur | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Lamfugon to Sitio Tabayung FMR Phase II, Brgy. Lamfugon, Lake Sebu, South Cotabato",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Construction of Brgy. Lamfugon to Sitio Tabayung FMR Phase II, Brgy. Lamfugon, | Lake Sebu, South Cotabato | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok Luyan, Brgy. Kalanawe 2 to Purok 2, Brgy. Tinaungan FMR, Brgy. Kalanawe 2 and Brgy. Tinaungan, Pres. Quirino, Sultan Kudarat",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Construction of Purok Luyan, Brgy. Kalanawe 2 to Purok 2, Brgy. Tinaungan FMR, | Brgy. Kalanawe 2 and Brgy. Tinaungan, Pres. Quirino, Sultan Kudarat | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of JNH Bantogon (Santa Clara) Nursery - Nalugdas FMR Phase I, Brgy. Bantogon, Kalamansig, Sultan Kudarat",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "15,000,000 | Concreting of JNH Bantogon (Santa Clara) Nursery - Nalugdas FMR Phase I, Brgy. Bantogon, | Kalamansig, Sultan Kudarat",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok Angeles to Purok Mainuswagon, Brgy. Bambad FMR, Brgy. Bambad, Isulan, Sultan Kudarat",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Construction of Purok Angeles to Purok Mainuswagon, Brgy. Bambad FMR, Brgy. Bambad, | Isulan, Sultan Kudarat | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Mamali - Brgy. Pidtiguian FMR, Lambayong, Sultan Kudarat",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "15,000,000 | Concreting of Brgy. Mamali - Brgy. Pidtiguian FMR, Lambayong, Sultan Kudarat | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Malingawon, Brgy. Biwang FMR, Brgy. Biwang, Bagumbayan, Sultan Kudarat",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Construction of Malingawon, Brgy. Biwang FMR, Brgy. Biwang, Bagumbayan, Sultan Kudarat | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Kilbog Proper, Brgy. Baluan FMR Phase I, Brgy. Baluan,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Construction of Sitio Kilbog Proper, Brgy. Baluan FMR Phase I, Brgy. Baluan, | Palimbang, Sultan Kudarat | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Amamaylan to Purok 1 Obod-obod, Brgy. Baan Km. 3 FMR, Butuan City",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "REGION XIII - CARAGA | 938,200,000 | Construction of Sitio Amamaylan to Purok 1 Obod-obod, Brgy. Baan Km. 3 FMR, Butuan City | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok-4, Santa Cruz to Purok-3, Brgy. Proper FMR, Butuan City",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "15,000,000 | Construction of Purok-4, Santa Cruz to Purok-3, Brgy. Proper FMR, Butuan City",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Purok Mabinuligon - Purok Kabugwason - Sitio Mani, Brgy. Topland FMR, Koronadal City, South Cotabato",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Concreting of Purok Mabinuligon - Purok Kabugwason - Sitio Mani, Brgy. Topland FMR, | Koronadal City, South Cotabato | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Mabini to Pelaez FMR, Brgy. Mabini, Sta. Monica, Surigao del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "30,000,000 | Construction of Brgy. Mabini to Pelaez FMR, Brgy. Mabini, Sta. Monica, Surigao del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Aroman FMR, Brgy. Aroman, Carmen, Cotabato",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Construction of Brgy. Aroman FMR, Brgy. Aroman, Carmen, Cotabato | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Taguranao FMR, Brgy. Taguranao, Matalam, Cotabato",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Construction of Brgy. Taguranao FMR, Brgy. Taguranao, Matalam, Cotabato | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Nabago FMR Phase 2, Brgy. Nabago, Surigao City, Surigao del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "10,000,000 | Construction of Brgy. Nabago FMR Phase 2, Brgy. Nabago, Surigao City, Surigao del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Manupal FMR, Brgy. Manupal, Matalam, Cotabato",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Construction of Brgy. Manupal FMR, Brgy. Manupal, Matalam, Cotabato | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Timamana FMR, Brgy. Timamana, Tubod, Surigao del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "10,000,000 | Construction of Brgy. Timamana FMR, Brgy. Timamana, Tubod, Surigao del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Pulang-lupa FMR, Brgy. Pulang-lupa, M'lang, Cotabato",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "Construction of Brgy. Pulang-lupa FMR, Brgy. Pulang-lupa, M'lang, Cotabato | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0722-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cabangahan FMR, Brgy. Cabangahan, Cantilan, Surigao del Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 722,
      "lengthEvidence": "10,000,000 | Construction of Brgy. Cabangahan FMR, Brgy. Cabangahan, Cantilan, Surigao del Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bayogo Proper to Kamonohan FMR, Brgy. Bayogo,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | NUMBER “1”  | PESOS | Construction of Brgy. Bayogo Proper to Kamonohan FMR, Brgy. Bayogo, | Madrid, Surigao del Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Silop FMR, Brgy. Silop, Mainit, Surigao del Norte",
      "office": "",
      "amountPesos": 10000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS PESOS | PESOS | Construction of Brgy. Silop FMR, Brgy. Silop, Mainit, Surigao del Norte | 15,000,000 | 10,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Isidro to Brgy. Binga FMR, Brgy. San Isidro,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "15,000,000 | Construction of Brgy. San Isidro to Brgy. Binga FMR, Brgy. San Isidro, | Mainit, Surigao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of PRJ Sitio Luagon to Proper Brgy. Gamut FMR, Gamut, Barobo, Surigao del Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of PRJ Sitio Luagon to Proper Brgy. Gamut FMR, Gamut, | Barobo, Surigao del Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Siana to Brgy. Dayano FMR, Brgy. Siana, Mainit, Surigao del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Siana to Brgy. Dayano FMR, Brgy. Siana, Mainit, Surigao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Bigaan FMR, Brgy. Bigaan, Hinatuan, Surigao del Sur",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Brgy. Bigaan FMR, Brgy. Bigaan, Hinatuan, Surigao del Sur | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok Magtatanim Brgy. Matin-ao FMR, Brgy. Matin-ao, Mainit, Surigao del Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "15,000,000 | Construction of Purok Magtatanim Brgy. Matin-ao FMR, Brgy. Matin-ao, | Mainit, Surigao del Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Kalingohan to Purok-3 Sitio Cambinliw Brgy. Santiago FMR Phase II, Brgy. Santiago, Loreto, Dinagat Islands",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Kalingohan to Purok-3 Sitio Cambinliw Brgy. Santiago FMR Phase II, | Brgy. Santiago, Loreto, Dinagat Islands | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of P-6 Brgy. San Francisco FMR, Brgy. San Francisco, Mainit, Surigao del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "15,000,000 | Construction of P-6 Brgy. San Francisco FMR, Brgy. San Francisco, Mainit, Surigao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of P3 Luna to Sitio Bunga, Brgy. Luna FMR Phase 2, Brgy. San Jose, Dinagat Islands",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of P3 Luna to Sitio Bunga, Brgy. Luna FMR Phase 2, | Brgy. San Jose, Dinagat Islands | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Binga to Sitio Maniuyom FMR, Brgy. Binga, Mainit, Surigao del Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "15,000,000 | Construction of Brgy. Binga to Sitio Maniuyom FMR, Brgy. Binga, Mainit, Surigao del Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Pedro to Fish Landing FMR, Brgy. San Pedro,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Brgy. San Pedro to Fish Landing FMR, Brgy. San Pedro, | Alegria, Surigao del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-013",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. San Isidro going to Sanitary Landfill FMR, Brgy. San Isidro, Mainit, Surigao del Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "15,000,000 | Construction of Brgy. San Isidro going to Sanitary Landfill FMR, Brgy. San Isidro, | Mainit, Surigao del Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-014",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Pongtud to Fish and Boat Landing FMR, Brgy. Pongtud,",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Brgy. Pongtud to Fish and Boat Landing FMR, Brgy. Pongtud, | Alegria, Surigao del Norte | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-015",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Arayat Brgy. Matin-ao, Mainit FMR, Brgy. Matin-ao, Mainit, Surigao del Norte",
      "office": "",
      "amountPesos": 40000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "25,000,000 | Construction of Sitio Arayat Brgy. Matin-ao, Mainit FMR, Brgy. Matin-ao, | Mainit, Surigao del Norte | 40,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-016",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 1 Brgy. San Pedro FMR, Brgy. San Pedro, Alegria, Surigao del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Purok 1 Brgy. San Pedro FMR, Brgy. San Pedro, Alegria, Surigao del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-017",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sitio Cabonga-an Brgy. Himama-ug FMR, Brgy. Himama-ug, Taganaan, Surigao del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "15,000,000 | Construction of Sitio Cabonga-an Brgy. Himama-ug FMR, Brgy. Himama-ug, | Taganaan, Surigao del Norte",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-018",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 2 Brgy. San Pedro FMR, Brgy. San Pedro, Alegria, Surigao del Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Purok 2 Brgy. San Pedro FMR, Brgy. San Pedro, Alegria, Surigao del Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-019",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Togbongan-Pajag Phase II FMR, Brgy. Himama-ug,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "20,000,000 | Construction of Togbongan-Pajag Phase II FMR, Brgy. Himama-ug, | Taganaan, Surigao del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-020",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 5 Brgy. Panatao FMR, Brgy. Panatao, Claver, Surigao del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Purok 5 Brgy. Panatao FMR, Brgy. Panatao, Claver, Surigao del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-021",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Sapa FMR, Brgy. Sapa, Claver, Surigao del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Brgy. Sapa FMR, Brgy. Sapa, Claver, Surigao del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-022",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Sungkoy-Sumanga FMR, Brgy. Himama-ug, Taganaan, Surigao del Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Sungkoy-Sumanga FMR, Brgy. Himama-ug, Taganaan, Surigao del Norte | 15,000,000 | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-023",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 5 to Purok 6 Brgy. Wangke FMR, Brgy. Wangke, Claver, Surigao del Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Purok 5 to Purok 6 Brgy. Wangke FMR, Brgy. Wangke, | Claver, Surigao del Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-024",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 4 Brgy. Cabugo to Togonon FMR, Brgy. Cabugo,",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Purok 4 Brgy. Cabugo to Togonon FMR, Brgy. Cabugo, | Claver, Surigao del Norte | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-025",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Siwata - Hinatigan to Eco Park, Brgy. Poblacion FMR, Brgy. Poblacion, Bacuag, Surigao del Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Siwata - Hinatigan to Eco Park, Brgy. Poblacion FMR, Brgy. Poblacion, | 25,000,000 | Bacuag, Surigao del Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-026",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Motorpool, Tubod to Brgy. Sto. Rosario, Bacuag FMR,",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Brgy. Motorpool, Tubod to Brgy. Sto. Rosario, Bacuag FMR, | Brgy. Motorpool, Tubod, Surigao del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-027",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 6 to Purok 4 Brgy. Pautao FMR, Brgy. Pautao, Bacuag, Surigao del Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Purok 6 to Purok 4 Brgy. Pautao FMR, Brgy. Pautao, | 15,000,000 | Bacuag, Surigao del Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-028",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Capayahan-Marga-San Pablo Road FMR, Brgy. Capayahan,",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Capayahan-Marga-San Pablo Road FMR, Brgy. Capayahan, | Tubod, Surigao del Norte | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0724-029",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 3 to Purok 2 Brgy. Pungtod FMR, Brgy. Pungtod, Bacuag, Surigao del Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 724,
      "lengthEvidence": "Construction of Purok 3 to Purok 2 Brgy. Pungtod FMR, Brgy. Pungtod, | 25,000,000 | Bacuag, Surigao del Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0726-001",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Doro FMR, Brgy. Doro, Malimono, Surigao del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 726,
      "lengthEvidence": "NAME OR PROJECTS | NAME OF PROJECTSPESOS | NUMBER “1”  | PESOS | Construction of Brgy. Doro FMR, Brgy. Doro, Malimono, Surigao del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0726-002",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 2 Brgy. Cayawan FMR Phase II, Brgy. Cayawan, Malimono, Surigao del Norte",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 726,
      "lengthEvidence": "Construction of Purok 2 Brgy. Cayawan FMR Phase II, Brgy. Cayawan, | Malimono, Surigao del Norte | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0726-003",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Caglayag, Carrascal to Brgy. Consuelo, Cantilan FMR, Carrascal, Surigao del Sur",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 726,
      "lengthEvidence": "Construction of Brgy. Caglayag, Carrascal to Brgy. Consuelo, Cantilan FMR, | Carrascal, Surigao del Sur | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0726-004",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Cagtinae FMR Phase II, Brgy. Cagtinae, Malimono, Surigao del Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 726,
      "lengthEvidence": "Construction of Brgy. Cagtinae FMR Phase II, Brgy. Cagtinae, Malimono, Surigao del Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0726-005",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Purok 3 Brgy. Camboayon FMR, Brgy. Camboayon, Gigaquit, Surigao del Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 726,
      "lengthEvidence": "Construction of Purok 3 Brgy. Camboayon FMR, Brgy. Camboayon, | Gigaquit, Surigao del Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0726-006",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of Brgy. Lahi FMR, Brgy. Lahi, Gigaquit, Surigao del Norte",
      "office": "",
      "amountPesos": 20000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 726,
      "lengthEvidence": "Construction of Brgy. Lahi FMR, Brgy. Lahi, Gigaquit, Surigao del Norte | 20,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0726-007",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of NRJ Purok Sun Flower, Brgy. Gamut FMR Phase II, Brgy. Gamut, Tago, Surigao del Sur",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 726,
      "lengthEvidence": "Construction of NRJ Purok Sun Flower, Brgy. Gamut FMR Phase II, | Brgy. Gamut, Tago, Surigao del Sur | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0726-008",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Purok 6- Purok 7 FMR, Brgy. Bonbon, Butuan City",
      "office": "",
      "amountPesos": 15000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 726,
      "lengthEvidence": "Concreting of Purok 6- Purok 7 FMR, Brgy. Bonbon, Butuan City | 15,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0726-009",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of NRJ Purok 4, Brgy. De Oro - Bugsukan FMR, Butuan City",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 726,
      "lengthEvidence": "Concreting of NRJ Purok 4, Brgy. De Oro - Bugsukan FMR, Butuan City | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0726-010",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Brgy. Montag Phase II FMR, Brgy. Montag, Basilisa, Dinagat Islands",
      "office": "",
      "amountPesos": 13200000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 726,
      "lengthEvidence": "Concreting of Brgy. Montag Phase II FMR, Brgy. Montag, Basilisa, Dinagat Islands | 13,200,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0726-011",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Concreting of Bag-ao Village to Brgy. Santiago FMR, Brgy. Santiago, Loreto, Dinagat Islands",
      "office": "",
      "amountPesos": 25000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 726,
      "lengthEvidence": "Concreting of Bag-ao Village to Brgy. Santiago FMR, Brgy. Santiago, | Loreto, Dinagat Islands | 25,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    },
    {
      "id": "HB10858-FMR-0726-012",
      "category": "FMR",
      "program": "FMR",
      "projectName": "Construction of P-3 Brgy. Mabini to Sitio Tagbasinga, Brgy. Mat-I FMR, Surigao City, Surigao del Norte",
      "office": "",
      "amountPesos": 30000000,
      "lengthKm": null,
      "lengthStatus": "No usable stated length found",
      "lengthMethod": "No derivable length",
      "allocationPerStatedKm": null,
      "lengthMeters": null,
      "allocationPerStatedMeter": null,
      "rangesMeters": [],
      "sourceVolume": "2- HB 10858 FOR 3RD READING VOL I-B.pdf",
      "sourcePage": 726,
      "lengthEvidence": "Construction of P-3 Brgy. Mabini to Sitio Tagbasinga, Brgy. Mat-I FMR, | Surigao City, Surigao del Norte | 30,000,000",
      "scopeNote": "Whole line-item allocation divided by stated segment; work quantities, width and funded extent unverified",
      "typicalPeerRate": null,
      "peerRateMultiple": null,
      "peerRecords": 0,
      "peerBand": "",
      "highRateCandidate": false,
      "graphExtreme": false,
      "rateReview": "No usable single-category rate"
    }
  ],
  "policy": "Allocation per stated segment meter is a screening proxy, not construction unit cost. No missing length is estimated from budget, coordinates or another stage.",
  "displayUnits": {
    "length": "meters",
    "rate": "pesos per stated meter"
  },
  "sources": [
    {
      "file": "hb_nep_comparison_3rd.csv",
      "sha256": "6358f901c9416f7c6cde9328e5a65ac05f6d8962f0bdf6bab3c5f0ef124d36c9"
    },
    {
      "file": "hgab_3rd_editions.json",
      "sha256": "d6c6bef6ad8267974d7bb3ab78a6d925169d430d6dc0e697e324e08ec147b9b2"
    }
  ],
  "scope": "Domestic DPWH road/bridge selected title/PAP records and 795 Department of Agriculture FMR records. Mixed work separated; flood/MPB/water titles and FAP excluded. Counts are extracted allocation occurrences.",
  "highRateScreen": {
    "candidates": 199,
    "graphExtremeRecords": 109,
    "method": "Peers share category, official PAP and a data-derived length band; at least 20 peers with stated length ≥10m. Candidate rate exceeds both 2× peer median and Q3+1.5×IQR. Chart extremes exceed max(2×median,Q3+3×IQR); sub-10m printed ranges also stay off rate charts.",
    "limits": "Exploratory relative-rate screen, not proof of overpricing. Width, terrain, structures, engineering quantities and funded extent remain unverified. Missing or insufficient peers produce no high-rate conclusion."
  }
}
